Mechanical Systems Thesis Proposal: Calvert Memorial Hospital Prince Frederick, MD Holly Mawritz

Size: px
Start display at page:

Download "Mechanical Systems Thesis Proposal: Calvert Memorial Hospital Prince Frederick, MD Holly Mawritz"

Transcription

1 : Holly Mawritz Senior Thesis Project Proposal Penn State University Department of Architectural Engineering Mechanical Emphasis Faculty Consultant: Dr. Jim Freihaut

2 Table of Contents: Executive Summary 2 Background: Existing Mechanical Systems 3 Air Systems 3 AHU-3 3 AHU-4 3,4 Water Systems 4 Heat Pumps 4 Heat Pump Cooling Tower 4 Chilled Water Plant 5 Boiler Plant 5 Areas of Focus for Better Design Solutions 6,7 Proposed Design Solutions 8 Removal of Patient Room Heat Pumps 8 The Desiccant Wheel 9,10 Ultraviolet Germicidal Irradiation 10,11 Design Solution Methods 12 Removal of Patient Room Heat Pumps 12 The Desiccant Wheel 12,13 Ultraviolet Germicidal Irradiation 13 Breadth Ideas 14 Project Methods 15 Preliminary Research Resources 16 Calendar Schedule of Tasks

3 Executive Summary: This report is based on the collaboration of previously written research papers in preparation for the redesign of the mechanical systems of in Prince Frederick, Maryland. This proposal will assimilate an analysis of the hospital s mechanical, electrical, and structural systems. This project will be finished and presented in the Penn State University Architectural Engineering Senior Thesis Presentations at the end of the spring 2005 semester. The existing mechanical system is explained in basic detail to represent the current operation of the equipment. The objectives to the mechanical design rely heavily on indoor air quality and infection control. These issues will increase the building s first costs, but eventually the benefits of the proposed systems in this report will eventually overshadow the first cost expenses. The use of UVGI (Ultraviolet Germicidal Irradiation) systems for infection control in critical spaces and exhaust ducts will decrease insurance costs over time. The addition of desiccant wheels to the system cooling configuration will result in a reduction of some of the mechanical equipment sizes, which will also lower mechanical equipment costs. Smaller mechanical equipment creates a reduction in energy used. All of these topics will be discussed in further detain in this proposal. The scope of this proposal is to fully explain the mechanical redesign and include areas of breadth topics such as the electrical and structural systems. The impact of these proposed ideas will be evaluated in this thesis study. Lastly, there will be an estimated schedule that gives an outline of the research processes for this proposal. This timeline will begin in December 2004 with the initial thesis proposal and end in April 2005 when the Architectural Engineering Senior Thesis Presentations will begin. 2

4 Background: Existing Mechanical Systems: contains a plethora of different mechanical systems. Due to the complexity and size of the hospital, the areas of focus will include the 2 nd 5 th floor patient towers. Below is a summary of the mechanical systems serving these areas of the hospital. Many of these systems will be replaced or renovated in the proposal section of this report. Air Systems: AHU-3 AHU-3 is a commercial grade, constant volume air handling unit which was originally installed in The air handling unit resides in the second floor mechanical penthouse. The areas served by this unit are the Intensive Care areas and Isolation rooms on the second and third floors. The unit utilizes a percentage of outside air and has a rating of 4000 cfm at 3.0 inches of static pressure. The unit is in poor condition and lacks final filters. Due to these unsatisfactory conditions, the hospital has begun planning for expansion of the areas served by this air handling unit. The new air handler, AHU-PT-1 will replace the original AHU-3 and will remain in the second floor mechanical room and serve the same areas including the expanded areas. The planned capacity for the new air handler will be approximately 50,000 cfm. AHU-4 AHU-4 is a commercial grade, constant volume air handling unit which was also installed in This unit is located in the second floor mechanical penthouse and currently serves the first, second, and third floor corridors. This unit utilizes a percent of outside air and is rated for 11,000 cfm at 3.5 inches of static pressure. This unit is also in poor condition, and is also lacking the appropriate final filters. The hospital renovation plans are to remove the existing AHU-4 and using the new AHU-PT-1 as the unit to serve the new second floor patient expansion and 3

5 existing second and third floor patient towers. In addition, AHU-PT-1 will serve the Post-Partum on the first floor that is currently supplied by heat pumps. Water Systems: Heat Pumps Water source heat pumps are used to serve numerous portions of the hospital but serve a majority of the rooms involved in the hospital patient tower (floors two through five). The patient tower s heat pump systems serve the second and third floor patient rooms and the entire fourth and fifth floors of the hospital. The heat pumps can either cool the air by rejecting heat or heat the air by collecting heat from the central condenser water loop. The heat pumps are of varying ages and capacities. Removing the heat pumps and replacing them with an all-air system configuration has been discussed, but currently no new designs have been developed. Heat Pump Cooling Tower Approximately one-third of is served by water source heat pumps. These heat pumps reject to two cooling towers: Cooling Tower No.1 and Cooling Tower No.4. Cooling Tower No.1 is a 378 ton forced-draft cooling tower was installed in Cooling Tower No.4 is an induced-draft cooling tower of unknown capacity. Cooling Tower No. 1 serves the basement, first, second, and third floor heat pumps while Cooling Tower No.4 serves the fourth and fifth floor heat pumps. Both of the cooling towers are in poor condition. For winter operation, Cooling Tower No. 4 utilizes an electric boiler and a plate and frame heat exchanger for adding required heat to the loop. Also, the louvers required for optimal winter operation of Cooling Tower No. 1 are missing. The hospital already has plans of removing these heat pumps, but not for another years. 4

6 Chilled Water Plant The existing chilled water plant consists of three electric centrifugal chillers. These chillers are located in the basement mechanical room. Chiller No. 1 has a rated capacity of 110 tons and was installed in Chiller No. 2 and Chiller No. 3 each have a rated capacity of 260 tons and were both installed in The chiller plant s total capacity is 630 tons. Chiller No.1 uses R-22 refrigerant while Chiller No. 2 and Chiller No. 3 use R-134A refrigerant. The chillers operate with an entering chilled water temperature of 55 o F and a leaving chilled water temperature of 45 o F. All of the chillers are in good condition. Boiler Plant The main boiler plant is located in the basement of the hospital. The plant contains two hot water boilers, each having a rated capacity of 5021 MBH. They are both forced-draft, gas-fired, fire tube type and are each equipped with a Cyclonetic burner. They were installed in 1996 are in excellent condition. 5

7 Areas of Focus for Better Design Solutions: The main emphasis of the mechanical redesign of is to achieve a more desirable performance of the mechanical systems based on the assignment requirements. The topics proposed in this redesign report in no way imply that the current mechanical, electrical, or structural systems of are dangerous or in error. One of the primary focuses of health care facilities are indoor air quality, and infection and disaster control. Through time, these issues have become more critically studied. Hospitals must follow important design parameters to ensure that the occupants are not exposed to any harmful contaminants in the air. A new air distribution system must be designed for the patient tower of Calvert Memorial Hospital in order to maintain a healthier living environment for the hospital occupants. The patient tower consists of the second, third, fourth, and fifth floors. The majority of the spaces on each floor consist of patient rooms that are all conditioned by water-source heat pumps. The heat pumps contain condensate drip pans that collect moisture condensing on the evaporator coil in the air conditioning system. These drip pans allow molds and other particles to grow, eventually exposing bacteria and mold spores to the breathable air. It is proposed that all of the hospital s heat pumps located in patient rooms be removed and replaced with all overhead air systems. The existing cooling towers serving the heat pumps are presently in poor shape. A new single cooling tower is suggested to replace the other cooling tower configuration. The cooling tower capacity will be further calculated once the heat pumps are removed and the new room loads are calculated. The Chilled Water and Boiler Plants, will most likely need replacements and modification due to the new system configurations. In continuing the quest for a healthier indoor air environment, humidity control must also be taken into consideration. Humid air creates the possibility for molds and bacteria to 6

8 grow, allowing infections to possibly spread from person to person. A drier air environment is needed; therefore a Desiccant Wheel will be implemented to air system. Along with the desiccant wheel configuration, UVGI (Ultraviolet Germicidal Irradiation) systems will be installed in the critical spaces and exhaust ducts. 7

9 Proposed Design Solutions: The following section describes a summary of the different design solutions to the mechanical systems being evaluated. In the solution for administering the proper indoor air quality and infection control of the hospital, the following ideas will be implemented to the building design: Removal of all patient room heat pumps, use of desiccant wheels in the building cooling system, and the installation of Ultraviolet Germicidal Irradiation in the critical care areas and exhaust ducts. Removal of Patient Room Heat Pumps The heat pumps serving the patient tower patient rooms contain bacteria and molds in the condensate drip pans. A drip pan is shaped to collect moisture condensing on an evaporator coil in an air conditioning of refrigeration system. Inadequate drainage of ductwork in terminal humidifiers can lead to potential downstream condensation, which may cause microbial growth in air distribution systems. These contaminants are emitted into the breathable air space, creating unsatisfactory breathable air quantities. To eliminate this problem, the heat pumps will all be removed and replaced with all overhead air systems. By removing the heat pumps the amount of equipment that needs to be maintained will be minimized and the system will become more versatile for future modifications. The overhead air system replacing the heat pumps will be a variable-air-volume configuration. There will be two air handling units provided to serve these spaces. The first of the two units, AHU-PT-1 (old AHU-3) is currently serving areas of the second and third floor spaces. The second and third floor patient rooms that were originally conditioned by the heat pumps will be added to the existing air handling unit, AHU-PT-1. As described in the Existing Mechanical Systems portion on the proposal, the AHU-PT-1 is located in the second floor mechanical room. The entire fourth and fifth floors will be served by a new air handling unit that will be located on fifth floor patient tower roof. 8

10 The Desiccant Wheel In the cooling system of the building, it is proposed that desiccant wheels are installed to help control the hospital s humidity levels. Dehumidification is the main focus of the desiccant cooling system. It reduces the building s latent load by removing excess moisture from the air. Moisture reduction stops or slows bacteria from growing or traveling through the air. The reduction of the latent load also decreases the size of the chiller. The air temperature of the sensible load will be dry but very hot, so sensible coolers such as rotary heat exchangers, evaporative coolers or coiling coils will be installed and sized accordingly. The desiccant used can either be solid or liquid. In this analysis a liquid lithium bromide spray solution will be used. The liquid desiccants work based-on the principle of chemical absorption of water vapor from the air to be conditioned. The humid air will pass through the lithium bromide solution spray becoming dehumidified. This occurs because the desiccant solution has a lower water vapor pressure than the air passing through it. Over time, the desiccant solution will become diluted due to the water extracted from the air, so it must be fed to a regenerator. The regenerator will then heat the lithium bromide, causing moisture to transfer to the desiccant. The heated desiccant is then sprayed into the air stream of the outdoor air and the moisture is released and exhausted to the outside. The regenerated desiccant is then cooled and reused. The benefits of using the lithium bromide solutions vary.. The performance of the solution depends on the air temperature. Lower temperature are desired, therefore it is best to run the solution through a chiller. Also, the lithium bromide kills bacteria on contact so the liquid desiccant has the ability to deliver biologically uncontaminated air to the surroundings. There are also no wet surfaces to promote bacterial growth, so this system is more beneficial than using cooling coils. If there were any doubts or worries about the spread of the lithium bromide solution to the surrounding breathable air, the UVGI (Ultraviolet Germicidal 9

11 Irradiation) in the exhaust ducts would kill off any of the proposed particles. These UVGI systems will be further discussed in the following section of this proposal. Ultraviolet Germicidal Irradiation One of the major aspects of contamination control is ventilation. In Calvert Memorial Hospital an alternative measure will be taken through the use of UVGI (Ultraviolet Germicidal Irradiation). Two kinds UVGI will be used to control contamination; one alternative will be Ultraviolet placed in the exhaust air stream and the other will be Ultraviolet lamp fixtures placed in the critical space areas. By adding these two UVGI systems, there will be a significant initial expense to the hospital. But the systems will create a savings on the hospital s insurance issues due to the enhanced infection control configurations. The system will reduce energy costs due to the decreased outdoor air intake. Determining the amount of equivalent air flow received after installation of the UV systems and the kill rate of UVGI to that which is realized by adding ventilation for proper contamination control must be evaluated. The added ventilation dilutes the contamination as if the bacteria have been killed. The equivalent air flow for the addition of UV is found by comparing the added ventilation to the actual kill rate from UV. Duct irradiation will be used in the exhaust air stream. The duct irradiation sterilizes the air which flows through a portion of the exhaust air stream. In order to maintain efficient kill results, duct sizes will need to be sized as large as possible without being too much of a burden on cost. The reason for the larger ducts is to slow down the velocity of the air moving through the UV killing zone. The longer the contaminant particles remain in the UV killing zone, the more particles will be killed. By slowing down the air velocity of the duct, more harmful particles will be killed. 10

12 Upper room irradiation will be implemented in the critical areas of the hospital such as the patient rooms, intensive care units, and operating rooms. The Upper Room Irradiation involves UVGI lamp fixtures that will be suspended or mounted on the room s ceiling or walls. The bottom portion of the light will be shielded to direct all radiation upward and prevent the lamps from coming in contact with the direct sight of the occupants. In analyzing the upper room irradiation procedure, the following factors will be considered: distance from the source, humidity levels, dust in the air, height of the ceiling, and the mixing factors occurring in the rooms. These different factors will determine the effectiveness of the upper room radiation. 11

13 Design Solution Methods: The following section describes a brief explanation of the different methods that will be used to redesign the mechanical systems being evaluated. The design solution methods will decipher the proper indoor air quality and infection control of the hospital. ASHRAE Standard 62 will be used in evaluating the clean air procedures. The following methods will be explained: Removal of all patient room heat pumps, the use of desiccant wheels in the building cooling system, and the installation of Ultraviolet Germicidal Irradiation in the critical care areas and exhaust ducts. Removal of Patient Room Heat Pumps The heat pumps will all be removed and replaced with overhead air systems. Loads will be calculated for the second, third, fourth, and fifth floor patient tower rooms by the HAP (Hourly Analysis Program) to determine the appropriate air distribution to each space. Once these airflows are determined, the air handling units can be chosen. The existing unit located in the second floor mechanical room (first floor roof) should be able to handle the additional load requirements for the second and third floor patient rooms. An appropriate air handling unit will then be selected for the fourth and fifth floors as well. The first and fifth floor roof structural systems will be evaluated to determine if the structures will withstand the weight of the new equipment. The Desiccant Wheel Dehumidification is the main focus of the desiccant cooling system. An analysis of the reduction of the latent load will be administered, thus changing the capacities of some of the mechanical equipment. Examples of the changed equipment are: heat exchangers, evaporative coolers, cooling coils, and the chiller. The loads determined from the HAP analysis will assist in determining a total loads for rooms in question. 12

14 The liquid lithium bromide spray that will be desiccant material of the cooling system will then be evaluated in terms of effectiveness, cost and other benefits of the spray solution. A detailed analysis explaining the desiccant wheel cooling system configuration will also be implemented into the report. From the HAP loads as well as the desired operating temperature of the desiccant fluid, a new chiller will be chosen. Ultraviolet Germicidal Irradiation By running a new load analysis on the hospital patient rooms, a new ventilation requirement will be established. Since contamination control is heavily related to ventilation in buildings, this will decipher the usages of UVI (Ultraviolet Germicidal Irradiation) that will be employed in the hospital. The two kinds UVGI will be used to control contamination; one alternative will be Ultraviolet placed in the exhaust air stream the other will be Ultraviolet fixtures placed in the critical space areas. The system ductwork, both supply and exhaust, will be sized from the load. The equivalent air flow for the addition of UV will be evaluated by comparing the added ventilation to the actual kill rate from UV and then setting up the proper equations. This will also affect the sizes of the ducts for the duct irradiation procedure because the larger the duct size, the slower the air flow. The slower the air flow is, the more time the lithium bromide spray has to collect harmful particles to be killed. Upper room irradiation will be implemented in the critical areas of the hospital such as the patient rooms, intensive care units, and operating rooms. Due to the UVGI lamps being wall or ceiling mounted in the rooms, there will be an intense analysis of distances from the lamp source to the room occupant. It is important that the radiation emitted from the UVGI lamps does not come in direct site with the occupants. Humidity levels, dust in the air, height of the ceiling, and the mixing factors occurring in the rooms will also be evaluated. 13

15 Breadth Ideas: The mechanical redesign of will impact the other building systems in the construction and operational aspects. The breadth areas under analysis for this proposal are: electrical and structural. The complicated mechanical redesign requires there to be advanced electrical changes to the hospital s electrical systems. New UVGI (Ultraviolet Germicidal Irradiation) lamps, also known as upper room radiation, will be installed in the existing patient rooms and critical areas to help increase the building indoor air quality. New electrical loads will be evaluated for each space thus changing the system feeders, panel boards, and over current protection devices. The structural system of the hospital will be evaluated at the first floor roof and at the fifth floor roof. The existing air handling unit located in the second floor mechanical room (on the first floor roof) is designated as AHU-PT-1. This portion of the first floor roof will be analyzed to determine if the new AHU-PT-1 load will affect the existing structural members. The second and new air handling unit being evaluated will be placed on the roof of the fifth floor of the building. Here, the framing member sizes will be analyzed and compared to the existing structure to determine if there is a necessary increase in load. 14

16 Project Methods: The research and modeling of the previously proposed design schemes will be accomplished by using various design tools. The redesign of will begin with the mechanical systems and continue on with the breadth topics; the electrical and structural systems. The first area of analysis will be the new hospital loads. By researching the patient room and intensive care treatment areas, important data will be accumulated for the load calculation process. Information on the types of equipment, square footages, and occupants will be acquired by contacting. Information may also be attained from Leach Wallace Associates, who have already done previous work on the hospital. Carrier s Hourly Analysis Program will them be used to model the proposed new ventilation and air systems. With these calculations, research from the UVGI duct systems and desiccant cooling configurations will be evaluated. After the mechanical depth has been established, the breadth work on the electrical system will begin. The electrical system will change due to the installation of UVGI lamps located in the critical patient areas. A lighting compliance will be administered using the ASHRAE Standard to ensure that the proper lighting is being delivered to each of the spaces. The 2002 National Electric Code will be utilized to make alterations to the electrical designs. The addition of air handling units and energy recovery equipment will prompt the structural analysis. The STAAD program will be used to determine if the loads of the new equipment meet the structure requirement. These results will be compared to the existing conditions and will be altered if needed. 15

17 Preliminary Research Resources: Bahnfleth, W. P., PhD, PE, W. J. Kowalkski,. PhD, PE. Airborne-Microbe Filtration in Indoor Environments. HPAC Engineering. Jan. 2002: pp Finkelstein, Hal. Contamination Control, Ventilation: A Guide to Engineering, Design, & Operations. Washington, D.C.: The National Resource Center, Hansen, Wayne, PE, REA, CEM. A Guide to Managing Indoor Air Quality in Health Care Organizations. Oakbrook Terrace: Joint Commissions on Accreditation of Healthcare Organizations, Memarzadeh, Farhad. Handbook on Assessing the Efficacy of Ultraviolet Germicidal Irradiation and Ventilation in Removing Mycobacterium Tuberculosis. Bethesda: National Institutes of Health, Natural Gas Desiccant Systems. Uniongas: A Duke Energy Company. Union Gas Limited Dec < Streifel, Andrew J., MPH, REHS. Health-Care IAQ: Guidance for Infection Control. HPAC Heating/Piping/Air-Conditioning Engineering. Oct. 2000: pp

18 Calendar Schedule of Tasks: 17

19 18

20 19

21 20

ASHRAE Standard 62 Ventilation Report Technical Assignment #1. Calvert Memorial Hospital Prince Frederick, MD

ASHRAE Standard 62 Ventilation Report Technical Assignment #1. Calvert Memorial Hospital Prince Frederick, MD ASHRAE Standard 62 Ventilation Report Technical Assignment #1 Prepared By: Holly Mawritz October 6, 2004 Table Of Contents: Executive Summary 2 Assumptions 3 Procedure 4 Sample Calculations 5 System and

More information

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1 Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9

More information

National Institutes of Health Building 37 Modernization Bethesda, Maryland MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM

National Institutes of Health Building 37 Modernization Bethesda, Maryland MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM The need to maintain occupancy during the renovation and the strict NIH Design Guidelines were the main driving forces behind the design. The mechanical engineering

More information

Architectural Engineering Senior Thesis Mechanical System Redesign

Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Architectural Engineering Senior Thesis Mechanical System Redesign Chris Nicolais Building Description Existing Mechanical System Proposed Redesign Alternative Option Emergency

More information

Heat pump and energy recovery systems

Heat pump and energy recovery systems SBS5311 HVACR II http://ibse.hk/sbs5311/ Heat pump and energy recovery systems Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2017 Contents Basic concepts Air-to-air

More information

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

EADQUARTERS. Technical Report One. Stephanie Kunkel   Mechanical Option EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

F.W. Olin Physical Science Laboratory

F.W. Olin Physical Science Laboratory Mechanical Systems Existing Conditions Evaluation Presented on Page 1 of 16 Table of Contents Executive Summary Depth p.3 Executive Summary Breadth p.4 Introduction & Background p.5 Alternatives p.7 Breadth

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

Liquid Desiccant Technology Delivers Energy Cost Reductions and Indoor Air Quality Improvements. White Paper

Liquid Desiccant Technology Delivers Energy Cost Reductions and Indoor Air Quality Improvements. White Paper Liquid Desiccant Technology Delivers Energy Cost Reductions and Indoor Air Quality Improvements White Paper Abstract Cooling represents the third leading use of energy and source of carbon emissions in

More information

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces

More information

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed

More information

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department

More information

7. MECHANICAL SYSTEM DESIGN

7. MECHANICAL SYSTEM DESIGN 7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved

More information

HVAC Efficiency In Healthcare. Presenter Mr. Nate Lincoln

HVAC Efficiency In Healthcare. Presenter Mr. Nate Lincoln HVAC Efficiency In Healthcare Presenter Mr. Nate Lincoln nlincoln@greenairenv.com 1.800.789.3734 Learning Objectives Control Systems Annuals; Chillers, Cooling Towers, Air Handler Units Infection Control

More information

Comfort and health-indoor air quality

Comfort and health-indoor air quality Comfort and health-indoor air quality 1 The human body has a complicated regulating system to maintain the human body temperature constant most of the time, which is 98.6 F (36.9 C) regardless of the environmental

More information

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013 Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...

More information

The Role of Air Handling Units in Combating the Spread of Infectious Disease

The Role of Air Handling Units in Combating the Spread of Infectious Disease The Role of Air Handling Units in Combating the Spread of Infectious Disease Goal To identify those areas within an air handler which poses risk to the healthcare industry and recommended four solutions

More information

DEHUMIDIFICATION: Ice Arena Application & Product Guide. Design, construct and operate to control indoor humidity in ice rinks

DEHUMIDIFICATION: Ice Arena Application & Product Guide. Design, construct and operate to control indoor humidity in ice rinks DEHUMIDIFICATION: Ice Arena Application & Product Guide Design, construct and operate to control indoor humidity in ice rinks Munters is the world leader in dehumidification Munters is the largest manufacturer

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

UVC GERMICIDAL TECHNOLOGY APPLICATIONS IN HOSPITALS

UVC GERMICIDAL TECHNOLOGY APPLICATIONS IN HOSPITALS Germicidal UV Technology to Inhibit Microbial Growth and Limit Transfer of Infections in Hospitals UVC can be utilized to inhibit microbial growth and transfer in hospitals through installation in HVAC

More information

Healthy Climate Indoor Air Quality Solutions. Solutions that fit your unique needs

Healthy Climate Indoor Air Quality Solutions. Solutions that fit your unique needs i n d o o r a i r q u a l i t y s o l u t i o n s Healthy Climate Indoor Air Quality s s that fit your unique needs Healthy Climate Indoor Air Quality s Custom, whole-home product solutions that reduce

More information

Healthy Climate Indoor Air Quality Solutions. Solutions that fit your unique needs

Healthy Climate Indoor Air Quality Solutions. Solutions that fit your unique needs i n d o o r a i r q u a l i t y s o l u t i o n s Healthy Climate Indoor Air Quality Solutions Solutions that fit your unique needs Healthy Climate Indoor Air Quality Solutions Custom, whole-home product

More information

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001 This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning Air Handling Distribution PART 1 - GENERAL 1.01 OVERVIEW A. This section describes criteria for design of facility air handling distribution systems, including air handlers, ductwork, ductwork accessories,

More information

Existing Mechanical System Operation

Existing Mechanical System Operation majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable

More information

Dehumidification: Energy Efficiency Comparisons

Dehumidification: Energy Efficiency Comparisons Fourth Annual Energy Management Workshop Cocoa, Florida February 10-11, 2003 Dehumidification: Energy Efficiency Comparisons Michael K. West, Ph.D., P.E. Building Systems Scientist Advantek Consulting,

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

Technical Assignment 3

Technical Assignment 3 0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative

More information

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection. Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

RoofPak Applied Rooftop Systems

RoofPak Applied Rooftop Systems RoofPak Applied Rooftop Systems RoofPak Applied Rooftop Systems Design flexibility, energy efficiency, system performance and reliability make Daikin RoofPak applied rooftop systems the ideal solution

More information

SIMULATION ANALYSIS OF BUILDING HUMIDITY CONTROL AND ENERGY CONSUMPTION FOR DIFFERENT SYSTEM CONFIGURATIONS USA

SIMULATION ANALYSIS OF BUILDING HUMIDITY CONTROL AND ENERGY CONSUMPTION FOR DIFFERENT SYSTEM CONFIGURATIONS USA Ninth International IBPSA Conference Montréal, Canada August 15-18, 25 SIMULATION ANALYSIS OF BUILDING HUMIDITY CONTROL AND ENERGY CONSUMPTION FOR DIFFERENT SYSTEM CONFIGURATIONS Chaoqin Zhai 1, Xiaohong

More information

Technical Report Three

Technical Report Three Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3

More information

DADANCO Technical Paper

DADANCO Technical Paper DADANCO Technical Paper 260 North Elm Street Westfield, MA 01085 Phone: (413) 564-5657 Fax: (413) 568-2969 March 2013 CLASSROOM SOLUTION USING ACTIVE CHILLED BEAMS (Note: This technical paper assumes the

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS CARROLL COUNTY PUBLIC SCHOOLS LIFE CYCLE COST ANALYSIS SUMMARY DGS PROCEDURES FOR THE IMPLEMENTATION OF LIFE CYCLE COST ANALYSIS AND ENERGY CONSERVATION OCTOBER, 2010 G.A.I.#09090 GIPE ASSOCIATES, INC.

More information

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Continuous Commissioning: A Valuable Partner to Retrofit Projects Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles

More information

4.0 Mechanical Redesign

4.0 Mechanical Redesign 4.0 Mechanical Redesign As my depth area of research, I have performed a detailed analysis of the existing air handling units and the existing conditions of the FIT Science Lab. After one semester of breaking

More information

UVC in the Operating Room.

UVC in the Operating Room. UVC in the Operating Room. Ultraviolet germicidal packages from American Ultraviolet reduce the threat of contamination of the operative wound, and post-operative deep wound infections, that can occur

More information

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY 2018 57 MECHANICAL ASSESSMENT MECHANICAL ASSESSMENT This report section includes an overview of the existing

More information

Description of All Alternatives Considered-

Description of All Alternatives Considered- Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142

More information

SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS

SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS Original Design: Traditional Central Heating and Cooling Heating and Cooling System Schematic Original Design Ventilation Schematic: Existing system summary:

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

or

or 800-800-9729 or 615-327-2644 www.disinfectaire.com HEALTHCARE & COMMERCIAL HVAC EXPERT ENGINEERING - UNSURPASSED QUALITY Every DisinfectAire system is engineered to meet or exceed 2008 ASHRAE guidelines

More information

Pharmaceutical Facility Design

Pharmaceutical Facility Design PhEn-602 Pharmaceutical Facility Design J. Manfredi Notes 9A PhEn-602 J. Manfredi 1 Primary & Secondary HVAC units Primary Primary air handling unit arrangement: One unit is responsible for all of the

More information

Table of Contents. List of Figures and Tables. Executive Summary: 3 ASHRAE Standard 62.1 Section 6 Analysis 7

Table of Contents. List of Figures and Tables. Executive Summary: 3 ASHRAE Standard 62.1 Section 6 Analysis 7 Army Reserve Center Newport, Rhode Island Technical Report One: ASHRAE Standard 62.1 Ventilat tion and Standard 90.1 Energy Design Evaluations October 4, 2010 2 Table of Contents Executive Summary: 3 ASHRAE

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

Cleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY

Cleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY PART I - GENERAL 1.1 SUMMARY A. This section addresses the general requirements for air handling distribution systems, including air handlers, ductwork, ductwork accessories, terminal units, air devices,

More information

SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS UNIT OBJECTIVES UNIT OBJECTIVES 3/22/2012

SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS UNIT OBJECTIVES UNIT OBJECTIVES 3/22/2012 SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS UNIT OBJECTIVES After studying this unit, the reader should be able to explain the purpose of the condenser in a refrigeration system. describe differences

More information

CONDENSATION/HUMIDITY PROBLEMS IN BREWERIES

CONDENSATION/HUMIDITY PROBLEMS IN BREWERIES CONDENSATION/HUMIDITY PROBLEMS IN BREWERIES Imtech DryGenic systems are specially designed to use low levels of energy and to minimize total energy consumption. No deep cooling and after heating such as

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

Trane Performance Climate Changer Air Handlers. An air handler for every need.

Trane Performance Climate Changer Air Handlers. An air handler for every need. Trane Performance Climate Changer Air Handlers An air handler for every need. Trane Performance Climate Changer air handlers: designed to optimize your HVAC system. Trane Performance Climate Changer air

More information

IAQ Building Education and Assessment Model (I-BEAM)

IAQ Building Education and Assessment Model (I-BEAM) Heating, Ventilation, and Airconditioning (HVAC) Text Modules IBEAM IAQ in L... http://www.epa.gov/iaq/largebldgs/ibeam/text/hvac.html Page 1 of 6 10/21/08 IAQ in Large Buildings http://www.epa.gov/iaq/largebldgs/ibeam/text/hvac.html

More information

Technical Report 1. ASHRAE Standards 62.1, 170, and 90.1 Evaluation. Morton Hospital Expansion

Technical Report 1. ASHRAE Standards 62.1, 170, and 90.1 Evaluation. Morton Hospital Expansion Technical Report 1 ASHRAE Standards 62.1, 170, and 90.1 Evaluation Morton Hospital Expansion Taunton, MA Courtney Millett Mechanical Option Advisor: Dr. Bahnfleth September 17, 2014 Millett Technical Report

More information

Reducing energy use, airstream heat gain, and condensate production

Reducing energy use, airstream heat gain, and condensate production Steam humidification: Reducing energy use, airstream heat gain, and condensate production Updated! Includes analysis of stainlesssteel-shielded dispersion tubes. by Lynne Wasner and Jim Lundgreen, Senior

More information

WORKSHOP VENTILATION- PSYCHROMETRICS-AHU

WORKSHOP VENTILATION- PSYCHROMETRICS-AHU Alkis Triantafyllopoulos Mechanical Engineer Member TEE, MASHRAE a.trianta@gmail.com WORKSHOP VENTILATION- PSYCHROMETRICS-AHU Based on ASHRAE 62 Purpose Set minimum Outdoor Air ventilation Rates Air Quality

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information

AHRI Guideline W (I-P) 2014 Guideline for Selecting, Sizing, & Specifying Packaged Air-to-Air Energy Recovery Ventilation Equipment

AHRI Guideline W (I-P) 2014 Guideline for Selecting, Sizing, & Specifying Packaged Air-to-Air Energy Recovery Ventilation Equipment AHRI Guideline W (I-P) 2014 Guideline for Selecting, Sizing, & Specifying Packaged Air-to-Air Energy Recovery Ventilation Equipment IMPORTANT SAFETY DISCLAIMER AHRI does not set safety standards and does

More information

DESIGN OF AIR-CONDITIONING SYSTEM FOR SARS WARDS. By Yuguo Li and SARS Busters * Background

DESIGN OF AIR-CONDITIONING SYSTEM FOR SARS WARDS. By Yuguo Li and SARS Busters * Background DESIGN OF AIR-CONDITIONING SYSTEM FOR SARS WARDS By Yuguo Li and SARS Busters * Background The hospital care workers (HCWs) have been the most severely affected professions during the SARS epidemics in

More information

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,

More information

Standards and Guidelines. Presented by: Aric Murray December 12, 2014

Standards and Guidelines. Presented by: Aric Murray December 12, 2014 TDSHS Ventilation Standards and Guidelines Presented by: Aric Murray December 12, 2014 Agenda 1. What are the TDSHS ventilation 1. What are the TDSHS ventilation requirements? 2. Pressure relationships.

More information

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Urbana Free Library HVAC Analysis Prepared for the Urbana Free Library Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Report Dated August 8, 2016 1. Introduction The Urbana Free Library is

More information

LECTURE-18 Vapour Absorption Refrigeration System

LECTURE-18 Vapour Absorption Refrigeration System Lecturer: -Dr. Esam Mejbil Abid Subject: Air Conditioning and Refrigeration Year: Fourth B.Sc. Babylon University College of Engineering Department of Mechanical Engineering LECTURE-18 Vapour Absorption

More information

UVGI in Ventilation Ducts & Re-circulating Room Air Disinfection Units

UVGI in Ventilation Ducts & Re-circulating Room Air Disinfection Units UVGI in Ventilation Ducts & Re-circulating Room Air Disinfection Units Part 3: Recirculation UVGI Systems, Zonal Protection Factor, In-place testing Protocols Dr. Wladyslaw Jan Kowalski, PE, Immune Building

More information

The School District of Philadelphia Administration Headquarters

The School District of Philadelphia Administration Headquarters Jayme Antolik Architectural Engineering Mechanical Option Senior Thesis 2006 Presentation Outline Reason for Renovations School District Administration Relocation Previous to move Originally in 4 offices

More information

COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units

COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection

More information

Trane CDQ Desiccant Dehumidification

Trane CDQ Desiccant Dehumidification Engineering Bulletin Trane CDQ Desiccant Dehumidification September 2004 CLCH-PRB020-EN Preface This engineering bulletin presents the Trane CDQ desiccant dehumidification system. It explains the features

More information

Section 4 of 6 DOAS Core Technologies

Section 4 of 6 DOAS Core Technologies Section 4 of 6 DOAS Core Technologies Desiccant dehumidification Air-to-air energy recovery Evaporative cooling 1 Desiccant dehumidification Industrial Desiccant Dehumidifier Hybrid DX + Desiccant Dehumidifier

More information

Chilled Water system

Chilled Water system Chilled Water system Introduction For large installations the Condenser, Evaporator, Compressor and Expansion device can be purchased as a package unit, known as a Chiller. The usual package consists of

More information

By MIKE WEST, PHD, PE Advantek Consulting Inc. Melbourne, Fla.

By MIKE WEST, PHD, PE Advantek Consulting Inc. Melbourne, Fla. Specifying S P E C I F I C A T I O N G U I D E 2 0 0 4 Dehumidifiers By MIKE WEST, PHD, PE Advantek Consulting Inc. Melbourne, Fla. Desiccant Desiccant dehumidifiers are used for lower-dew-point (below

More information

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance Table of Contents 3 Executive Summary 4 Building Overview 5 Mechanical Systems Overview 6 ASHRAE Standard 62.1 2013 Evaluation 6 Section 5: Systems and Equipment 6 5.1: Ventilation Air Distribution 6 5.2:

More information

Theatre Classification and Air Particle Count Is that Surveillance?

Theatre Classification and Air Particle Count Is that Surveillance? Theatre Classification and Air Particle Count Is that Surveillance? Codes and Specifications for Theatre Installations The South African National Standards Wiring Code - SANS 10142-1:2006. Occupational

More information

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN Introduction to HVAC Agenda Psychrometrics Human Comfort Heat Transfer Refrigeration Cycle HVAC Terminology HVAC Systems Introduction to HVAC Psychrometrics 2000 TRG-TRC002-EN Properties of Air Dry-bulb

More information

INSTITUTE FOR ENVIRONMENTAL RESEARCH & SUSTAINABLE DEVELOPMENT NATIONAL OBSERVATORY OF ATHENS (NOA)

INSTITUTE FOR ENVIRONMENTAL RESEARCH & SUSTAINABLE DEVELOPMENT NATIONAL OBSERVATORY OF ATHENS (NOA) 1 SOLAR COOLING An Overview of European Applications & Design Guidelines Costas Balaras, Ph.D. Member ASHRAE, Mechanical Engineer, Research Director GRoup Energy Conservation (GR.E.C.) INSTITUTE FOR ENVIRONMENTAL

More information

DISTRIBUTION SYSTEMS. Water Piping and Pumps

DISTRIBUTION SYSTEMS. Water Piping and Pumps DISTRIBUTION SYSTEMS Water Piping and Pumps Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They are targeted

More information

Summary Comparison of Simulation Program Features

Summary Comparison of Simulation Program Features Summary Comparison of Simulation Program Features FEATURE DOE2.2 equest TRACE 700 HAP Public/Proprietary Public Domain Proprietary Proprietary Proprietary Simulation Method 8760 hours 8760 hours 8760 hours

More information

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE ACHP 244 AIR CONDITIONING II Prepared By: CHARLES STEAD Updated By: Michael J. Newtown, P.E. CANINO SCHOOL OF ENGINEERING

More information

LATENT COOLING LEAD. Kecha Thirakomen EEC Engineering Network

LATENT COOLING LEAD. Kecha Thirakomen EEC Engineering Network Kecha Thirakomen EEC Engineering Network INTRODUCTION Air-conditioning has been advanced from comfort cooling to çquality air-conditioningé, targeting Indoor Air Quality-IAQ. Equipment will not be selected

More information

Energy Recovery Ventilation

Energy Recovery Ventilation Published on Business Energy Advisor (https://oncor.bizenergyadvisor.com) Home > Energy Recovery Ventilation Energy Recovery Ventilation Proper ventilation is essential for maintaining good indoor-air

More information

Challenges and Methods of Estimating a Conceptual HVAC Design

Challenges and Methods of Estimating a Conceptual HVAC Design Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.

More information

HVAC 101. H V A C S y s t e m s

HVAC 101. H V A C S y s t e m s H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost

More information

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop Energy-Savings Strategies for Rooftop VAV Systems Occupied set-point temperature Unoccupied set-point temperature Rooftop variable-air-volume (VAV) s are used to provide comfort in a wide range of building

More information

healthy comfort Indoor Air Quality Solutions

healthy comfort Indoor Air Quality Solutions healthy comfort Indoor Air Quality Solutions Healthy Climate Indoor Air Quality Solutions The choice for a healthier, more comfortable home Having a comfortable home goes way beyond temperature settings.

More information

Do All DOAS Configurations Provide the Same Benefits?

Do All DOAS Configurations Provide the Same Benefits? TECHNIL FTURE This article was published in ASHE Journal, July 2014. Copyright 2014 ASHE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without

More information

Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. Contextual Reminder

Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. Contextual Reminder HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 2) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 Contextual Reminder All-air systems Single zone Terminal reheat Multi-zone Dual-duct VAV Combinations

More information

Chilled beams. TRACE 700 incorporates two chilled beam strategies: passive and active.

Chilled beams. TRACE 700 incorporates two chilled beam strategies: passive and active. TRACE 700 incorporates two chilled beam strategies: passive and active. Passive chilled beams consist of a fin-and-tube cooling coil, contained in a housing (or casing), suspended from the ceiling. Chilled

More information

REMOVAL OF AIR BORN MICRO-ORGANISM

REMOVAL OF AIR BORN MICRO-ORGANISM REMOVAL OF AIR BORN MICRO-ORGANISM Imtech DryGenic helps industries to produce better quality products in a bacteria-free, clean and controlled temperature/humidity environment while minimising utility

More information

Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN

Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN Residence Inn by Marriott, Stamford CT BREADTH STUDY: MECHANICAL REDESIGN BREADTH STUDY - MECHANICAL REDESIGN Design Goals As previously mentioned, the construction of the Residence Inn was delayed by

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

b.) Technical Information:

b.) Technical Information: Section VI- Strategies a.) Summary: It is important for new construction designers to consider the heating, ventilation, and air conditioning needs within a building. There are many different systems,

More information

MECHANICAL VENTILATION

MECHANICAL VENTILATION MECHANICAL VENTILATION Natural and Mechanical Systems Four (4) possible combinations of natural and mechanical ventilations tions are as follows; Natural inlet and outlet; utilizing open able windows,

More information

Trane Performance Climate Changer Air Handlers. An air handler for every need.

Trane Performance Climate Changer Air Handlers. An air handler for every need. Trane Performance Climate Changer Air Handlers An air handler for every need. Trane Performance Climate Changer air handlers: The most comprehensive air-handler portfolio in the industry. The portfolio

More information

Appendix A. Glossary of Common Terms

Appendix A. Glossary of Common Terms Glossary of Common Terms Glossary of Common Terms Absorption chiller A refrigeration machine using heat as the power input to generate chilled water. Adjustable speed drive A means of changing the speed

More information

High Efficiency Dehumidification System (HEDS)

High Efficiency Dehumidification System (HEDS) Advanced HVAC Technologies High Efficiency Dehumidification System (HEDS) Scot Duncan, P.E., Jim Meacham, P.E. Conservant Systems, Inc. August 16, 2017 Tampa Convention Center Tampa, Florida Why Was HEDS

More information

Reducing energy use, airstream heat gain, and condensate production

Reducing energy use, airstream heat gain, and condensate production Steam humidification: Reducing energy use, airstream heat gain, and condensate production Updated! Includes analysis of stainlesssteel-shielded dispersion tubes. by Lynne Wasner and Jim Lundgreen, Senior

More information

NON-REVERSING, 100% OUTSIDE AIR HEAT PUMP FOR HEATING AND COOLING

NON-REVERSING, 100% OUTSIDE AIR HEAT PUMP FOR HEATING AND COOLING NON-REVERSING, 100% OUTSIDE AIR HEAT PUMP FOR HEATING AND COOLING Danny Hall, National Sales Manager, Desert Aire Corp., Milwaukee, WI USA Traditionally, a heat pump has relied on a reversing valve system

More information

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.

More information

2. CURRICULUM. Sl. No.

2. CURRICULUM. Sl. No. . CURRICULUM Sl. No. Code Title No. of Lecture Hours 1 RAC 001 Fundamentals of Refrigeration and Air 60 conditioning RAC 00 Psychrometry, Heat load Estimation for 70 Air conditioning and Refrigeration

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information