1 Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9 Integration and Coordination 9 Proposed Solution Method Difficulties and Limitations 11 Research and References 12 Appendix A Heating and Cooling Loads 13 Appendix B Electric Utility Rates 13 12/05/02 1
2 THESIS PROPOSAL Executive Summary Centre Community Hospital East Wing Addition is a 3 story 50,000 square foot addition to the existing Centre Community Hospital that will house 12 Intensive Care Units, Same Day Surgery Units, administrative offices, an auditorium, and a cardiovascular rehabilitation room. The existing mechanical systems consist of nine direct expansion air handling units accompanied by air cooled condensers. Two boilers provide hot water for preheating coils in the air handlers and for the heating in the terminal hot water duct heaters. The focus of this proposal will be the mechanical systems in the Intensive Care Units and Same Day Surgery Units located on the 15,000 square foot first floor. Radiant heating and cooling from suspended ceiling panels will be utilized in parallel with 100% outdoor air units for fresh air requirements. This design will require the addition of two chillers and two air handling units equipped with glycol runaround heat recovery loops. The goal of this thesis will be to improve the indoor air quality of these spaces and to show a savings in energy by the implementation of this type of system. Space savings and a reduction of congestion in the plenums will also be analyzed. Electrical systems will be affected by this radiant heating and cooling system, and it will be redesigned accordingly. Circuit breakers, circuits, panel boards, and overall power usage will be calculated and analyzed as a part of this thesis. The placement of mechanical equipment on the roof will affect the size of the structural members supporting these pieces of equipment. A structural analysis and redesign will be incorporated if the size and weights of the new units deem necessary. The entire process of this thesis has been broken down into eight major categories. A workable timetable of thirteen weeks has been developed to complete this thesis on time. Research of topics that pertain to all aspects of this thesis has been conducted and will continue to be as this process goes on. 12/05/02 2
3 Project Background Centre Community Hospital (CCH) East Wing Addition is a three story, 50,000 square foot building that performs many functions for CCH s overall hospital operations. The basement floor contains medical records, a cardiovascular rehabilitation room, mechanical spaces, and electrical spaces. The ground floor contains administrative offices, an executive board room, and an auditorium. Occupying the first floor addition are 12 Intensive Care Units (including two pressure isolation rooms) and Same Day Surgery Units. All spaces in this addition are conditioned by nine constant volume, direct expansion air handlers. AHU 69 and 70 are 100% outdoor air units that serve the patient areas with a glycol runaround loop for heat recovery. Heat for the vapor compression process is rejected through the use of air cooled condensers located in close proximity to the air handler that it is associated with. (See Appendix A for building heating and cooling loads). Heating for the spaces is accomplished by using hot water preheat coils in the air handlers accompanied with terminal hot water duct heaters. Hot water needed for this process is provided by two 225 horsepower boilers located in the existing boiler house. The boilers provide 60 psi steam which is run through a heat exchanger to provide 180 degree water. All major mechanical equipment is located in three areas, on the roof, in the ground floor mechanical space, and in the basement mechanical room. Two vertical shafts, one in the southeast corner and another in the eastern part of the addition, allow for the run of ducts, pipes, and risers for the entire East Wing. The electrical systems in the East Wing Addition are more complicated than they would be in a typical building. Six major branches of power are provided including a normal branch, a life safety branch, a critical branch, an emergency only branch, an emergency equipment branch, and an uninterrupted power supply (UPS) branch. The life safety, critical, and UPS branches are fed from the existing electrical systems in the hospital. The new 480 V, 2500 A service provides power for the normal, emergency only, and emergency equipment branches. This service is backed up by a 500 KW diesel generator located in the basement of the East Wing. (See Appendix B for CCH s Utilities Rates) 12/05/02 3
4 Proposed Depth Alternatives Proposal Alternative #1 Under Floor Air Distribution Problem Statement: The 4136 square foot, 200 person capacity auditorium located on the ground floor is supplied with air by linear ceiling diffusers. There are also hard wired computer and electrical circuits that must be supplied to each seat. Problem Solution: Use an under floor air distribution system to provide airflow underneath the seats and to make installation and relocation of computer and electrical circuit easier. The under floor air distribution will improve the comfort level in the space, and it will also raise the supply air temperature, thus saving energy. Proposal Alternative # 2 Chilled Water Problem Statement: All nine air handlers are direct expansion (DX) with air cooled condensers. This is an energy intensive way to condition a building. Problem Solution: Use a chiller to provide cooling for each air handler, and use cooling towers for heat rejection. This system will save energy compared to the DX system and also could provide first cost savings. Proposal Alternative # 3 Radiant Heating and Cooling in Parallel with 100% Outdoor Air AHU s Problem Statement: All nine air handlers are direct expansion with air cooled condensers. This is an energy intensive way to condition a building. Problem Solution: Use a radiant heating and cooling panel system in all spaces except for the auditorium. This will require the addition of chillers and cooling towers. This system will improve the indoor air quality of the building and reduce the energy consumption of the mechanical systems. Proposal Alternative # 4 Radiant Heating and Cooling in Parallel with 100% Outdoor Air AHU s Problem Statement: All nine air handlers are direct expansion with air cooled condensers. This is an energy intensive way to condition a building. Problem Solution: Same as Alternative # 3 except the radiant heating and cooling will be used only on the first floor, where all of the patient areas are located. 12/05/02 4
5 Proposed Depth Redesign The proposed redesign will be the utilization of radiant heating and cooling panels in parallel with 100% outdoor air AHU s in all spaces on the first floor of the 15,000 square foot East Wing Expansion. The first floor is where all the patient areas, therefore critical mechanical spaces, are located. 12/05/02 5
6 The radiant heating and cooling suspended panels (Figure 2) will be a four pipe system (Figure 1) allowing for heating or cooling of any space, at any given time. The 100% outdoor air units will supply only the amount of outdoor air required for acceptable indoor air quality to the spaces. A conventional HVAC system would supply the amount of outdoor air needed along with conditioned return air to meet the space loads. In this system the majority of the space load will be met with the radiant heating and cooling panels, with the conditioned outdoor air taking care of the rest of the load that is remaining. Figure 1 4 Pipe Arrangement ASHRAE HVAC Systems and Equipment Figure 2 Suspended Radiant Panel ASHRAE HVAC Systems and Equipment This system will replace three direct expansion, constant volume air handlers along with their air cooled condensers. The two existing 225 horsepower boilers will remain, although the hot water produced will be used in radiant ceiling panels instead of the existing terminal hot water duct heaters. A new chiller will be required to produce the chilled water needed for the radiant cooling panels. The Intensive Care Units and the Same Day Surgery Units require N + 1 redundancy therefore a second chiller, the same capacity as the first, will also be required. These chillers will be placed in the mechanical room located in the basement. Two new 100% outdoor air handlers will be required for this redesign. The first floor requires N + 1 redundancy, therefore two air handlers will be used for this floor. These air handlers will be equipped with an ethylene glycol runaround loop (Figure 3) for heat recover from the exhaust air ducts, located in the southeast corner of the building. Figure 3 Glycol Runaround Loop Due to the reduction of air supplied to each space the supply and return ductwork will be resized, and the layout will be changed. The existing supply air diffusers will have to be replaced with high aspiration diffusers to distribute the fresh air properly. A ceiling plan of the redesign will be provided to show the savings of space and congestion. 12/05/02 6
7 Each room will be controlled by a space thermostat located on a wall that is not adjacent to the outdoors. The thermostat will regulate a three way valve (Figure 1, V-1) located before the panels that will provided heating or cooling, whichever is called for. A first cost mechanical comparison will be calculated for the proposed design. Equipment cost will be straight forward, but labor and installation cost will have to be estimated. Installation costs of radiant panels may be difficult to find, but an educated estimate can be determined. The cost of placing less equipment on the roof will also be taken into consideration, along with the cost savings of relocating the equipment for the building s future expansion. Energy savings and operational cost will be covered in the breath analysis. Example of 100% OA air handlers to be used Example of cooling towers to be used Example of water cooled chillers to be used Courtesy of Trane Courtesy of Marley Cooling Towers Courtesy of the Carrier Corporation 12/05/02 7
8 Justification of Proposed Depth Redesign This proposed radiant heating and cooling system has been used effectively in many applications, including health care facilities, in Europe over the past years. It provides numerous beneficial factors to a building s overall operation. The most beneficial effect it will have on this building is the comfort level and indoor air quality that it will provide. The area in which this system will be installed is the Intensive Care Units and Same Day Surgery Units. The patients in these areas are very sensitive to temperature variations and airflow, and this system will greatly enhance their comfort level. A conventional HVAC system would satisfy all heating and cooling loads using air supplied to the space. This system will produce drafts and air movements that may be very unpleasant to patients. Since there will be very little air movement compared to a conventional HVAC system, the proposed solution will greatly reduce airborne contaminants. This is a very critical issue in the patient care areas. This system will reduce the chances the other patients and medical staff from receiving airborne diseases from others. Another beneficial factor is that this system will reduce the mechanical operational cost. Less air will have to be conditioned due to the fact the ceiling panels are removing most of the load, which will save energy. Since less air is being supplied to the space and the ductwork layout is simplified, energy use of the fans will be reduced. When using radiant panels the perceived room temperature is lower than the air temperature, which allows for higher temperature then normal air to be supplied, hence saving energy. Ductwork will be able to be downsized considerably due to less airflow being supplied. Not only will this save money for materials and labor, but it will make the plenum area less congested. The terminal hot water duct heaters and the piping serving them will be able to be removed, freeing up even more space in the plenum. A major beneficial factor that may not be that noticeable is that three air cooled condensers and one air handler will be removed from the roof. The equipment on the roof would not be a problem in a typical building, but this building has been designed for two more stories to be added above the first floor. The structure, electrical systems, and mechanical risers are all designed for this soon to be addition. It will be very beneficial to keep as much equipment off the roof as possible to prevent it from being moved in the future. My proposed design would only consist of two air handlers being placed on the roof. The chillers will be located in the basement mechanical room and the cooling towers will be placed in the ground floor stilt space. This proposed solution will also have educational value. Even though this system would never be approved by the building engineer, this gained knowledge of radiant systems will be beneficial in the future. Although many engineers and owners would frown at the ideas of using radiant heating and cooling, I believe that once this systems begins to be implemented it will cause a snowball effect in the HVAC industry. 12/05/02 8
9 Proposed Breath Redesign Electrical The proposed mechanical system will have a drastic change in the power consumption of the building. New power requirements will come from the chillers, cooling towers, air handlers, pumps, and fans. All of these new feeds will be sized for their power consumptions and rerouted into different panels. The new wire sizes, circuit breakers sizes, and currents will be calculated for each new piece of mechanical equipment. Power consumption of the new equipment will be less then the consumption of the existing equipment for the first floor. The proposed consumption will be calculated and compared to the existing conditions. Kilowatt and kilowatt-hour usage will be calculated, thus an overall cost savings will be able to be shown. It will be determined if any of the existing panels boards or services will be able to be downsized due to the reduced load. Structural Two new air handlers will need to be placed on the roof. The proposed location is where AHU 69 and 70 are currently located. It has yet to be determined if these units are heavier then AHU 69 and 70. If the new units are heavier, which would be a good assumption, then the structural support of the roof will have to be analyzed. If the structural support is not sufficient for these units, the associated structural members will have to be resized. Integration and Coordination This proposed solution will be easily integrated and coordinated into the existing architectural design. One possible problem may be the placement of the chillers. The proposed location in the basement mechanical space is not very congested, therefore rearranging of existing equipment should allow room for the chillers. Clearance requirements for all equipment in this room will have to be verified. The cooling towers will be able to be placed in the area on the ground floor behind existing air cooled condensers 63, 64, and 65. The two new air handlers will be able to be placed on the roof where AHU 69 and 70 currently exist, although structural support for these units will need to be verified. Integration and coordination of the plenum space becomes simplified due to this system. Ductwork will become smaller and less of it will be required. Hot water supply and return piping for the hot water duct heaters will be removed, along with the duct heaters themselves. Space in the plenum will no longer be an issue. It is estimated that up to 12 of plenum space can be saved. This type of systems makes it extremely easy for medical gas piping, sprinkler piping, and light fixtures to be laid out and installed. 12/05/02 9
10 Proposed Solution Method A. Panel Cooling Weeks 1 and 2 1. Establish design indoor design conditions. 2. Calculate sensible and latent cooling loads and heating loads for spaces. Carrier s Hourly Analysis Program 4.1 will be used to determine these loads. 3. Select mean water temperature 4. Determine the amount of outdoor air required in all spaces for the third floor. Table 7.2 from AIA Guidelines for Design and Construction of Hospital and Health Care Facilities, 2001 Edition will be used. Spaces not in this table will be designed in accordance with ASHRAE Standard 62, Ventilation for Acceptable Indoor Air Quality, 2001 Edition. 5. Calculate latent cooling available from outdoor air 6. Calculate sensible cooling from outdoor air 7. Select a panel and determine its cooling load 8. Determine the panel area necessary from the reaming cooling 9. Design the panel layout B. Panel Heating Weeks 3 and 4 1. Establish design indoor design conditions. 2. Calculate room heat loss 3. Select mean water temperature for the water 4. Determine surface temperatures of unheated surfaces t u = t a U/h * (t a t o ) 5. Determine AUST of surfaces in room 6. Determine surface temperature of heated radiant surface Refer to figure 9 and 10 of ASHRAE Systems and Equipment chapter 6 7. Determine the panel area necessary for heating Refer to figure 9 and 10 of ASHRAE Systems and Equipment chapter 6 8. Design the panel layout C. Ductwork and Diffuser Layout Week 5 1. Determine the number of diffusers per space 2. Layout and size supply and return ductwork Use ductulator to size 3. Put ductwork layout into CAD to show the space savings in the plenum D. Equipment Selection Weeks 6 and 7 1. Select and size chillers, air handlers, cooling towers, glycol runaround loops, pumps, and fans E. Structural Analysis Week 8 1. Resizing of structural support for new air handlers if necessary 12/05/02 10
11 F. Electrical Week 9 1. Size circuits and circuit breakers for all mechanical equipment 2. Place the equipment on panel boards G. Cost Analysis Weeks 10 and Determine the mechanical first cost savings 2. Determine the installation and future relocation of equipment costs. 3. Determine and calculate the KH and KWH usage 4. Determine the operational cost on a KWH basis 5. Compare the savings of using radiant heating and cooling vs. the existing system H. Prepare Thesis Presentation Weeks 12 and 13 Difficulties and Limitations A proposal for radiant heating and cooling for the entire building would have been more realistic, but due to time restraints only the first floor will be redesigned. The overall cost savings will be deflated due to the fact that this systems is being implemented in such a small area of the building and due to the fact that N + 1 redundancy is required for the entire first floor. Difficulties in this design will be to keep the space conditions at a point where condensation will not occur during cooling operations. This problem can be solved using various sensors and careful design. This design should be somewhat straight forward and any difficulties or limitations will be proper handled if they occur. Enough examples of this type of system in medical facilities exists, therefore any problems or issues can be referenced to these examples. 12/05/02 11
12 Research and References AIA Guidelines for Design and Construction of Hospital and Health Care Facilities and 7.32 Mechanical and Electrical Standards for a General Hospital. American Society for Hospital Engineering of the American Hospital Association. Mechanical Systems, Volume 8. ASHRAE Handbook. HVAC Systems and Equipment Chapter 6, Panel Heating and Cooling. ASHRAE Handbook. HVAC Applications Chapter 7, Health Care Facilities. ASHRAE Standard 62. Ventilation for Acceptable Indoor Air Quality Designing Dedicated Outdoor Air Treatment and Ventilation Systems. Mumma, Stanley. Ceiling Radiant Cooling Panels As A Viable Distributed Parallel Sensible Cooling Technology Integrated With Dedicated Outdoor-Air Systems. ASHRAE Transactions, May Mumma, Stanley. Overview Of Integrating Dedicated Outdoor Air Systems With Parallel Terminal Systems. ASHRAE Transactions, May 2001 Mumma, Stanley. Safety and Comfort Using Using DOAS Radiant Cooling Panel Systems. ASHRAE IAQ Applications Newsletter, Mumma, Stanley. Ceiling Panel Cooling Systems. ASHRAE Journal, November Solray - Radiant Heating Panels. Zent-Frenger Building Service Consultancy. Chilled Ceilings Operation and Function. * More references will be used as thesis process evolves 12/05/02 12
13 Appendix A Appendix B 12/05/02 13
Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria
Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed
More informationTopic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline
ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces
More informationMechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013
Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...
More informationENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory
Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,
More informationMechanical Systems Thesis Proposal: Calvert Memorial Hospital Prince Frederick, MD Holly Mawritz
: Holly Mawritz Senior Thesis Project Proposal Penn State University Department of Architectural Engineering Mechanical Emphasis Faculty Consultant: Dr. Jim Freihaut 12-10-04 Table of Contents: Executive
More informationMechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation
Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department
More information7. MECHANICAL SYSTEM DESIGN
7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationASHRAE Standard 62 Ventilation Report Technical Assignment #1. Calvert Memorial Hospital Prince Frederick, MD
ASHRAE Standard 62 Ventilation Report Technical Assignment #1 Prepared By: Holly Mawritz October 6, 2004 Table Of Contents: Executive Summary 2 Assumptions 3 Procedure 4 Sample Calculations 5 System and
More informationChallenges and Methods of Estimating a Conceptual HVAC Design
Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.
More informationNOVEMBER 2012 THE EUROPEAN EXPERIENCE
Radiant-cooling systems have progressed in the last few decades, garnering attention as a comfortable and energy- and material-efficient option. 1 Compared with air radiant-cooling hydronic systems use
More informationFAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney
FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1
More informationState of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney
Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled
More informationAIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University
AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort
More informationTechnical Assignment 3
0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and
More informationAppendix 13. Categories of Cooling and Heating systems
EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01
More informationArchitectural Engineering Senior Thesis Mechanical System Redesign
Saint Joseph Medical Center Architectural Engineering Senior Thesis Mechanical System Redesign Chris Nicolais Building Description Existing Mechanical System Proposed Redesign Alternative Option Emergency
More informationUnderfloor Air Distribution:
Underfloor Air Distribution: An underfloor air distribution system utilizes a plenum space between the structural slab and the underside of a raised floor to distribute the conditioned air to the room.
More informationExisting Mechanical System Operation
majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable
More informationDADANCO Technical Paper
DADANCO Technical Paper 260 North Elm Street Westfield, MA 01085 Phone: (413) 564-5657 Fax: (413) 568-2969 March 2013 CLASSROOM SOLUTION USING ACTIVE CHILLED BEAMS (Note: This technical paper assumes the
More informationEADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option
EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option
More informationNational Institutes of Health Building 37 Modernization Bethesda, Maryland MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM
MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM The need to maintain occupancy during the renovation and the strict NIH Design Guidelines were the main driving forces behind the design. The mechanical engineering
More informationHVAC 101. H V A C S y s t e m s
H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost
More informationDehumidifying with Dedicated Outdoor Air
Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,
More informationUFAD and Displacement Ventilation. Dan Int-Hout, FASHRAE Chief Engineer Krueger Richardson, Texas
UFAD and Displacement Ventilation Dan Int-Hout, FASHRAE Chief Engineer Krueger Richardson, Texas UFAD and DV Systems, Objectives: Understand Differences between: Well Mixed, Partially Stratified and Fully
More informationHONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING
ASHRAE s BEST This article was published in ASHRAE Journal, November 2010. Copyright 2010 American Society of Heating, Refrigerating and -Conditioning Engineers, Inc. Reprinted here by permission from
More informationDISTRIBUTION SYSTEMS. Water Piping and Pumps
DISTRIBUTION SYSTEMS Water Piping and Pumps Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They are targeted
More informationHVAC DISTRIBUTION and DELIVERY SYSTEMS
HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 1) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 REMINDER HVAC = Heating, Ventilating, Air-Conditioning The AC part of HVAC implies a system that
More information2 Existing Mechanical System
2 Existing Mechanical System 2.1 Design Objectives and Requirements The Gossett Field House project consists of a 25,000 sqft addition and a 40,000 sqft renovation of the existing facility for the University
More informationTechnical Report Three
Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3
More information4. OVERVIEW OF MECHANICAL SYSTEM
4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in
More informationCHAPTER 4. HVAC DELIVERY SYSTEMS
CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer
More informationTechnical Report #3 Mechanical Systems Existing Conditions Evaluation
Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents
More informationASHRAE Illinois Chapter 2015 Excellence in Engineering Awards
ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating
More informationRedesign of Bennett Hall HVAC System
MEE 488 April 18, 2006 Redesign of Bennett Hall HVAC System Greg Andreasen Michael Chicoine Florent Hohxa Jason Jacobe Mechanical Engineering, University of Maine, Orono ME 04473, USA ABSTRACT Our task
More informationterminal units only provide sensible cooling, a separate dehumidification system is usually needed.
providing insights for today s hvac system designer Engineers Newsletter volume 44 3 Dual-Temperature Chiller Plants This Engineers Newsletter describes several dual-temperature configurations that can
More informationDescription of All Alternatives Considered-
Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142
More informationChilled Beams. Getting a Warmer Reception
Chilled Beams Getting a Warmer Reception Gain an understanding of how chilled-beam technology works, the difference between active/passive chilled beams and potential applications for its use. B y G r
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.
More informationElement Z General Design Requirements Existing Facilities Information
PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical
More informationChilled Beams in Labs Eliminating Reheat & Saving Energy on a Budget
VanceFox.com 2006, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Journal Vol. 49, Jan. 2006. For personal use only. Additional reproduction,
More informationRaised Access Floor - (AE Breadth Area)
Raised Access Floor - (AE Breadth Area) Currently, the Plaza has a raised access flooring system on both the 7 th and 8 th floors. The 8 th floor is designed with an independent HVAC system utilizing an
More informationIDL20e (2 way discharge) IDS60e (4 way discharge) Inffusers. UDI (vertical discharge) Frequently Asked Questions
IDL20e (2 way discharge) IDS60e ( way discharge) Frequently Asked Questions UDI (vertical discharge) Inffusers INFFUSER FREQUENTLY ASKED QUESTIONS The following are frequently asked questions (FAQ s) on
More informationAdding More Fan Power Can Be a Good Thing
This article was published in ASHE Journal, May 14. Copyright 14 ASHE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission of
More informationCOMMERCIAL HVAC PACKAGED EQUIPMENT. Split Systems
COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They are
More informationDo All DOAS Configurations Provide the Same Benefits?
TECHNIL FTURE This article was published in ASHE Journal, July 2014. Copyright 2014 ASHE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without
More informationTechnical Assignment 3 11/15/04. Executive Summary
Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria
More informationContinuous Commissioning: A Valuable Partner to Retrofit Projects
Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles
More informationCARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems
Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.
More informationTechnical Report 1. ASHRAE Standards 62.1, 170, and 90.1 Evaluation. Morton Hospital Expansion
Technical Report 1 ASHRAE Standards 62.1, 170, and 90.1 Evaluation Morton Hospital Expansion Taunton, MA Courtney Millett Mechanical Option Advisor: Dr. Bahnfleth September 17, 2014 Millett Technical Report
More informationTechnical Investigation, Part Three Elizabeth C. Krauss Mechanical Option September 18, 2013
Technical Investigation, Part Three Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Technical Investigation, Part Three... 0 Executive
More informationINTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012
HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.
More informationSECTION AIR COILS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:
More informationElement Z General Design Requirements Existing Facilities Information
Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and
More informationBOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:
4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This
More informationNET ENERGY WATER LOOPS A clear path to net zero energy buildings
Presents NET ENERGY WATER LOOPS A clear path to net zero energy buildings Alan Niles WaterFurnace International This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer
More informationENERGY EFFICIENCY IN HOSPITALS- A CASE STUDY
ENERGY EFFICIENCY IN HOSPITALS- A CASE STUDY B V Suresh Babu Sr. Consultant, Certified Energy Auditor 23-02-2010 Thiruvananthapuram Introduction This case study is from a Hospital located in Kerala. This
More informationELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.
B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.
More informationMECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY
MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY 2018 57 MECHANICAL ASSESSMENT MECHANICAL ASSESSMENT This report section includes an overview of the existing
More informationBall State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. Contextual Reminder
HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 2) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 Contextual Reminder All-air systems Single zone Terminal reheat Multi-zone Dual-duct VAV Combinations
More informationDesign Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE
ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For more information about ASHRAE,
More informationAPPLICATION GUIDE BEAMS
BEAMS There is an increasing need for energy efficient air conditioning systems as energy codes become more stringent. Chilled beam systems are one such alternate to traditional all air conditioning systems.
More informationSubmitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University
More informationBOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:
4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This
More informationASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering
ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery Steven T. Taylor, PE Principal Taylor Engineering This program is registered with the AIA/CES for continuing professional education.
More informationCOMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems
COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection
More informationEarthWise System Seminar
EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States
More informationImproved Chilled Water Piping Distribution Methodology for Data Centers
Improved Chilled Water Piping Distribution Methodology for Data Centers By Isabel Rochow White Paper #131 Executive Summary Chilled water remains a popular cooling medium; however leaks in the piping systems
More informationMechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation
Mechanical Technical Report 3 Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department of Architectural Engineering Pennsylvania
More informationThe Ed Roberts Campus
The Ed Roberts Campus Technical Report 3 Anderson Clemenceau Mechanical Option Advisor: Donghyun Rim November 11, 2014 2 Contents Technical Report 3... 1 Executive Summary... 3 Building Overview... 4 Design
More informationCONTENTS. B. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More informationTechnical Assignment 1
0 Technical Assignment 1 ASHRAE Standard 62.1 Ventilation and Standard 90.1 Energy Design Evaluations Compliance Analysis David H. Koch Institute for Integrative Cancer Research Massachusetts Institute
More informationSelect DOAS, Ceiling Radiant Cooling Panel- Chilled Beam Projects. Updated 9/23/2008
1 Select DOAS, Ceiling Radiant Cooling Panel- Chilled Beam Projects. Updated 9/23/2008 Classroom Building-1, PA Classroom Building-2, PA Classroom Building-2, PA DOAS-Chilled Ceiling Classroom Building-3,
More informationIntroduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN
Introduction to HVAC Agenda Psychrometrics Human Comfort Heat Transfer Refrigeration Cycle HVAC Terminology HVAC Systems Introduction to HVAC Psychrometrics 2000 TRG-TRC002-EN Properties of Air Dry-bulb
More informationJim Aswegan Chief Engineer
Displacement Ventilation Jim Aswegan Chief Engineer Displacement Ventilation Systems Comfort & Contaminate Control DV Concepts & System Benefits Outlet Types and Air Patterns Example l Space Layouts Displacement
More informationASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes
ASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes In Humid Climates BY DAVID A. JOHN, P.E., MEMBER ASHRAE; DREW ELSBERRY, MEMBER ASHRAE Designing g a building s HVAC system requires designers
More informationASHRAE JOURNAL ON REHEAT
Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide
More informationENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY
SUPERIOR IAQ LOW FIRST COST BEST ROI ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY Pinnacle manages 100% of a building s ventilation and indoor humidity load in a single package. Chilled beams have
More informationSingle Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return
Single Zone System One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return Multi Zone System Used in small to medium sized buildings
More informationTrane Engineers Newsletter Live
Trane Engineers Newsletter Live Presenters: John Murphy, Dustin Meredith and Jeanne Harshaw (host) Trane program number: APP-CMC059-EN Agenda Trane Engineers Newsletter Live Series Abstract The Air Movement
More informationTechnical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,
Purpose 355 West Queens Road Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: 604-990-2480, building@dnv.org The purpose of this document is to provide
More informationDESCRIPTION OF TECHNOLOGY
March 2009 Underfloor Air Distribution INTRODUCTION Copyright 2009 Glumac. All rights reserved. While this Green Paper discusses primarily the use of raised access floors for air distribution, HVAC integration
More informationCONTROLLED CHILLED BEAM PUMP MODULE
FIRST COST SAVINGS PROACTIVE CONTROL CONTROLLED CHILLED BEAM PUMP MODULE Active condensation control system effectively eliminates chilled beam condensation High efficiency, variable speed pump uses a
More information21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device
DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity
More informationPDH & Professional Training
510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 PDH & Professional Training PDH Storm, by Engineers Edge, LLC An Introduction to HVAC Systems for Medical Facilities J. Paul
More informationThe School District of Philadelphia Administration Headquarters
Jayme Antolik Architectural Engineering Mechanical Option Senior Thesis 2006 Presentation Outline Reason for Renovations School District Administration Relocation Previous to move Originally in 4 offices
More informationTHERMAL ICE STORAGE: Application & Design Guide
THERMAL ICE STORAGE: Application & Design Guide Table of Contents: 1. Introduction A. History of Thermal Energy Storage B. Operating and Cost Benefits 2. Applications A Fundamental System B. HVAC Cooling
More informationMID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN
MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,
More informationDisplacement Ventilation
Displacement Ventilation Displacement Ventilation Displacement Ventilation vs. Dilution Ventilation Characteristics Design Considerations Layout and Selection Product Overview Casino Case Study Dilution
More informationCOMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units
COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection
More informationAHU Air Handling Unit Fundamentals. j.ilangumaran
AHU Air Handling Unit Fundamentals j.ilangumaran Objectives Review primary components of an AHU Understand the basic progression and advantages of advanced AHU control Understand the basic control sequences
More informationChilled Water system
Chilled Water system Introduction For large installations the Condenser, Evaporator, Compressor and Expansion device can be purchased as a package unit, known as a Chiller. The usual package consists of
More informationSECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...
SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...
More informationENGINEERING. Edition No. 13 October 2002
Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more
More informationDIVISION 23 - HVAC HVAC
DIVISION 23-23 00 00 PART 1 - GENERAL 1.01 GENERAL CRITERIA A. The heating system typical set point shall be 70 F inside. 1. The winter outdoor design temperature for most systems shall be -6 F. 2. The
More informationB. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
More informationDaikin Blueprint: Delivering Hot Water with a Chiller
Daikin Blueprint: Delivering Hot Water with a Chiller Analyzing the design of heat recovery on air-cooled chillers and the effect it has on building energy consumption By Paul Crisman Daikin Chiller Applications
More informationAHRI 920 Performance Rating and Comparisons of DX-DOAS Unit Efficiency
Application Note 24 AHRI 920 Performance Rating and Comparisons I NTRODUCTION In 2015, the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) introduced a performance rating for dedicated outside
More informationThe School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA
2.0 Depth Work - Alternative Mechanical Designs 2.1 Objectives The goal of designing alternative systems is to compare energy usage, system costs, emissions, lost rentable space, and constructability.