Meter* (Existing or New) Comments 13,800 volt at plant or piggy back All Campus Utility Service Val Imm Electric Generator Building Existing
|
|
- Melvyn Malone
- 6 years ago
- Views:
Transcription
1 Attachment 1 - Projected metering points The following tables are the good faith attempt to indentify all metering points for base bid. However, due to the complexity of the project and anticipation of unforeseen circumstances MSU expects to be able to work cooperatively with the vendor to either add or delete metering points during the system design process at an approximately equal cost per point as represented by the base bid. Evaluation of cost with be based on the total of all zones and will be awarded as a single contract however we are asking for the cost for each zone provided separately due to funding divisions. Academic Building Zone Building Whole or Sub-meter Metered Utility Location 13,800 volt at plant or piggy back All Campus Utility Service Val Imm Electric Generator Building Existing All Campus Utility Service Warren Street Electric Generator Building Existing reading from standby generator gear Alt 2 13,800 volt at plant or piggy back reading from standby generator gear Alt 2 All Campus sub meter Gen 1 Electric Generator Building Existing From standby system Alt 2 All Campus sub meter Gen 2 Electric Generator Building Existing From standby system Alt 2 All Campus sub meter Gen 3 Electric Generator Building Existing From standby system Alt 2 Alumni Foundation Bldg whole building Electric Mech room 112 New Meter Armstrong Hall whole building 480V Electrical Mech room M1 Existing Nelson Addition is fed from Armstrong Hall and would have to be subtracted from the AH reading Armstrong Hall whole building 208V Electrical Mech room M1 Existing Armstrong Hall whole building Steam condensate Mech room M1 Existing Armstrong Hall whole building Domestic water 14B Existing Blakeslee Stadium whole facility Electric Elect room 111 Existing Ford Hall whole building Electric?? New meter New building - requires new meter Ford Hall whole building Steam condensate?? New meter New building - requires new meter Generator Building whole building Electric New meter New building - requires new meter Highland Center whole building 480V Electrical Electrical room 1034 Existing Highland Center whole building Steam condensate Mechanical B0104 Existing Highland Center whole building Domestic Water Mechanical B0104 Existing from the city's water meters Alt1 or
2 Highland North whole building 480V Electrical Elect room B05 Existing Pennington fed from HN and need to be metered and subtracted from Highland meter or Highland North whole building Steam condensate Mech room B06 Existing Highland North whole building Domestic water Mech room B06 Existing Memorial Library whole building 277/480 Electrical Elect room 0099 Existing whole building electric including chillers Memorial Library sub meter Chiller Electric Mech room 0074 Existing ML Chiller 1 electric Memorial Library sub meter Chiller Electric Mech room 0074 Existing ML Chiller 2 electric Memorial Library sub meter Chiller BTU Mech room 0074 New BTU meter Total chilled water production (GPM & delta temp) Memorial Library whole building Cooling Tower fill Mech room 0070 Existing Memorial Library whole building Steam condensate Mech room 0075 Existing Memorial Library whole building Domestic water Mech room 0070 Existing Morris Addition whole building 480V Electrical Electrical room B02 Existing Morris Addition whole building Steam condensate Mechanical B02 Existing Morris Hall whole building 208V Electrical Electrical room B07 Existing Morris Hall whole building Steam condensate Mechanical B07 Existing Morris Hall whole building Domestic Water Mechanical B07 Existing Myers Field House whole building 480V Electrical Elect room 114B Existing Off link to Taylor Center Myers Field House whole building Steam condensate Mech room 114A Existing Myers Field House whole building Domestic Water Mech room 114A Existing Nelson Hall whole building Electric Mech room 07 Existing Nelson Hall whole building Steam condensate Mech room 07 Existing Nelson Hall whole building Domestic Water Mech room 07 Existing Nelson Hall Addition whole building Electric AH Mech room M1 Existing Nelson Addition electric is fed from Armstrong Hall
3 or Nelson Hall Addition whole building Steam condensate Mech room 155 Existing Paint Shop whole building Electric New meter Fed from Utility Plant - Requires new meter Pennington partial building heating Highland C. Mech 104 New meter Unsure if both steam and hot water or just hot water. Would be a sub-meter of Highland Center Pennington partial building Electric Highland N. Mech 224 New meter Unsure if currently being metered. This would be a sub meter of the Highland North building service, (excludes racquetball courts) Performing Arts whole building 208V Electrical Elect room 174 Existing Performing Arts whole building 480V Electrical Elect room 174A Existing Performing Arts whole building Steam condensate Mech room 174 Existing Performing Arts whole building Domestic Water Mech room 174 Existing Taylor Center whole building 480V Electrical Elect room 071 Existing Taylor Center whole building Steam condensate Mech room 039 Existing Taylor Center whole building Domestic Water Mech room 039 Existing Trafton East whole building Electric Mech room TE 003 Existing Trafton East whole building Steam condensate Mech room TE 004 Existing Trafton East whole building Domestic Water Mech room TE 004 Existing Trafton Science Center north sub meter Steam condensate Mech room TR C003 Existing Building total equals total of north and south meters Trafton Science Center south sub meter Steam condensate Mech room TR C003 Existing Building total equals total of north and south meters Trafton Science Center whole building 480V Electrical Mech room TR C004 Existing Trafton Science Center whole building 208V Electrical Mech room TR C004 Existing Trafton Science Center whole building Domestic Water Mech room TR C003 Existing Utility Plant Campus Steam condensate Boiler room Existing Utility Plant Boiler #1 Fuel oil meter Boiler room Existing
4 or Utility Plant Boiler #2 Fuel oil meter Boiler room Existing Utility Plant Boiler #3 Fuel oil meter Boiler room Existing Utility Plant Boiler #4 Fuel oil meter Boiler room Existing Utility Plant MCC-1 feed Electric Chiller Plant Existing Select chiller equipment Utility Plant MCC-2 feed Electric Chiller Plant Existing Select chiller equipment Measures GPM and delta T to calculate Utility Plant Campus Chilled Water Chiller Plant New BTU meter Total BTU Utility Plant Boiler plant Electric Electrical L4 Existing Utility Plant Boiler plant Cooling Tower fill Boiler room Existing Utility Plant Boiler plant Domestic Water Boiler room Existing Wiecking Center sub meter 208V Electrical Mech room B001 Existing East wing loads Wiecking Center sub meter 208V Electrical Mech room B002 Existing Serves west wing and shop building Wiecking Center whole building Steam condensate Mech room B004 Existing Wiecking Center whole building Domestic water Room 228 Existing Wigley Admin whole building Electric Mech room B01 Existing Wigley Admin whole building Steam condensate Mech room B02 Existing Wigley Admin whole building Domestic water CSU mech room Existing Wissink Hall whole building 480V Electrical Elect room B0001 Existing Near tunnel entrance Wissink Hall whole building Steam condensate Elect room B0001 Existing Near tunnel entrance Wissink Hall whole building Domestic water Room 113 Existing
5 Residential Life Zone Building Whole or Sub-meter Metered Utility Location or Carkoski Commons whole building 208V Electrical Elect room 77 Existing Carkoski Commons whole building Steam condensate Mech room 75 Existing Carkoski Commons whole building Chilled Water Mech room 75 Existing Carkoski Commons Kitchen Sub-meter Water Mech room 75 New meter This is a new location and new meter Carkoski Commons Kitchen Sub-meter Steam condensate Mech room 75 New meter This is a new location and new meter Carkoski Commons Kitchen Sub-meter Electric Mech room 81 Existing Crawford Complex Sub meter A,B,C 208V Electrical Elect room 100A Existing Crawford Complex Sub meter A only 208V Electrical TBD New meter Crawford Complex Sub meter B only 208V Electrical TBD New meter Crawford Complex Sub meter C only 208V Electrical TBD New meter Electric meter installed but not connected to existing metering system Note Add alt 1 - split each hall A, B, and C to meter separately deletes the requirement for the A, B, C deletes the requirement for the A, B, C deletes the requirement for the A, B, C Crawford Complex Sub meter D 208V Electrical Elect room D3 Existing Crawford Complex Sub meter D AC Units 208V Electrical New meter Meter a separate electrical distribution panel that feeds all the window AC units. Crawford Complex Sub meter D Steam condensate Mech room D4 Existing Gage whole building Steam condensate A-Tower mech 13 Existing Gage B-Tower 208V Electrical Electrical room 24 Existing Gage A-Tower 208V Electrical Electrical room 31 Existing Gage Commons 208V Electrical Electrical room 54 Existing Gage whole building Domestic water A-Tower mech 13 Existing RL2 McElroy Complex Sub meter E,F,G 208V Electrical Elect room 100B Existing Add Alt to meter each wing separately
6 McElroy Complex Sub meter E only 208V Electrical TBD New meter McElroy Complex Sub meter F only 208V Electrical TBD New meter McElroy Complex Sub meter G only 208V Electrical TBD New meter deletes the requirement for the E, F, G deletes the requirement for the E, F, G deletes the requirement for the E, F, G McElroy Complex Sub meter E,F,G Steam condensate Mech room G-2 Existing McElroy Complex Sub meter H,I 208V Electrical Elect room T0005 Existing McElroy Complex Sub meter H only 208V Electrical Elect room T0005 New meter deletes the requirement for the H, I McElroy Complex Sub meter I only 208V Electrical Elect room T0005 New meter deletes the requirement for the H, I McElroy Complex Sub meter H,I Steam condensate Mech room H-4 Add Alt to meter each wing separately Sears Hall whole building Electric Mech Room Basement New meter New Building Sears Hall whole building Steam condensate Mech Room Basement New meter New Building Sears Hall whole building Chilled Water Mech Room Basement New BTU meter New Building - Meter GPM, delta T, BTU consumption Sears Hall whole building Domestic water Mech Room Basement New Meter Add Alt to collect data from city's water meter or
7 Centennial Student Union Zone Building Whole or Sub-meter Metered Utility Location or Student Union whole building Electric Elect room 35 Existing Student Union east sub meter Steam condensate Mech room B19 Existing Student Union west sub meter Steam condensate Mech room B37 Existing Student Union whole building Chilled Water Mech room B37 New BTU meter Student Union whole building Domestic Water Mech room B37 Existing Add alt S1 to collect data from city's water meter S1 Student Union Kitchen Sub-meter Steam condensate TBD New meter Add alt to meter Kitchen steam use S1 Student Union Kitchen Sub-meter Electric TBD New meter Add alt to meter Kitchen electric use S1 *Meter Note: For reference "new meter" or "new BTU meter" indicates responsibility by the vendor for each meter type: Electric Meter includes the meter and PT's or CT's and all wiring devices to make it operational Steam Condensate meters will be provided and installed by MSU in consultation with the successful vendor Chilled water BTU meter includes all devices and equipment to measure flows and temperatures for calculation of BTU Attachment 1 - Page of 7
Parking: Yes! Add parking capacity, at Gage site or at parking deck/ramp opposite CSU
Memorandum To: File From: Kathy Wallace Project: MSU Mankato Master Plan Project Number: 12-0433 Subject: Options Open Houses Input from Students Date: February 20, 2013 Copy To: File Darryl Pratte and
More informationRequest for Proposal #
Request for Proposal # 187090 Fire Alarm Testing Department of Facilities Management Planning and Construction 1 Minnesota State University, Mankato Facilities Purchasing Office Request for Proposal Fire
More informationTo: Steve Ardolf, MSU Mankato From: Chris Plum, CEE. CC: Tim Ellingson, CEE. Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014.
To: Steve Ardolf, MSU Mankato From: Chris Plum, CEE CC: Tim Ellingson, CEE Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014 Re: MSU Mankato Verification State PBEEEP Executive Summary
More informationEnd-Use Data Collection Requirements Data Trend Type
End-Use Data Collection Requirements Data Trend Type Building Electrical: building electrical (main bldg. feed) HVAC Cooling: Total building electrical consumption data shall be submetered through the
More informationFLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK
FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated
More informationExisting Fire Protection Systems Description
21 0510 Existing Fire Protection Systems Description The existing system descriptions below are based on the best information available as of September 30, 2016. The designer shall verify on site all existing
More informationSubmitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas
More informationContact Information. Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone
Contact Information Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone 509 335 9300 steve_potratz@wsu.edu WSU Utilities WSU primary systems are all based on district type
More informationDIVISION 15 MECHANICAL
DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with
More informationCONTENTS. B. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More informationCENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment
CENTRAL GEORGIA TECHNICAL COLLEGE Maintenance, Custodial & Operation Plan Facilities & Equipment Central Georgia Technical College Maintenance, Custodial and Operation Plan In order that Central Georgia
More informationExisting Mechanical System Operation
majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable
More information5 Year Capital Improvement Plan Update
5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John
More informationSubmitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University
More informationASHRAE Illinois Chapter 2015 Excellence in Engineering Awards
ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating
More informationNovember 11, City of Sparks 215 S. 21 st St. Sparks, NV
November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of
More information21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device
DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity
More informationRFP P College-wide HVAC Service and Maintenance
RFP 632-14P College-wide HVAC Service and Maintenance Addendum 001 Issued January 14, 2015 Below are the questions we have received from various parties with respect to this Request for Proposal, along
More informationSequence of Operations (excerpt)
Sequence of Operations (excerpt) Chilled Water System Consists of one (1) 600 cooling ton Trane CVHE 3 stage centrifugal chiller, with associated chilled water pumps, condenser water pumps and one (1)
More informationTracking spatiotemporal patterns of building vulnerabilities and evacuations during flood hazards
Tracking spatiotemporal patterns of building vulnerabilities and evacuations during flood hazards Shane Hubbard Junchuan Fan Kathleen Stewart Emily White The University of Wisconsin Madison, SSEC/CIMSS
More informationSubmitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner
ESL-TR-99/12-09 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Commerce (TAMU-Commerce) Commerce, Texas Submitted to Texas
More informationBelknap Campus Master Plan Update
Belknap Campus Master Plan Update Campus Visit 3 January 10-20, 2008 The Campus Studio Rowland Design JRA Architects Staggs & Fisher Gordon Garner Visit 3 1. A process of developing, sharing and refining
More informationManufacturers Representatives Since Industrial Systems, Inc. Computer Support, Inc
Manufacturers Representatives Since 1974 Industrial Systems, Inc. Computer Support, Inc. www.industrialsystems.org 1-800-460-0469 210-493-4200 ENGINEERED PRODUCTS FOR THE ENGINEERED ENVIRONMENT Sewage
More informationMatt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.
M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. Overview Measurement & Verification (M&V) Plan for New
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationElectrical Inspection Service & Distribution
0911 Distribution Panels & Switchgear Equipment, conduit, feeders, and grounding 480 Volt Switchboard: This switchboard contains the utility meter and two main, service, circuit breakers. One circuit breaker
More informationMECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE
MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE 18422 Bear Valley Road Victorville, CA 92395 Date 25 September 2012 dha Job No. 12155 TABLE OF CONTENTS I. Purpose.... Page 1 II. Existing
More informationAPPA Institute for Facilities Management. Energy & Utilities Cooling Production (316) Purpose of Today s Presentation. Agenda
APPA Institute for Facilities Management Energy & Utilities Cooling Production (316) Mark St. Onge, EFP 1 Purpose of Today s Presentation To provide a broad understanding of central cooling production
More informationMH Non-Residential Permit Fees All Commercial Permit fees require a 3% BBS State Tax and are subject to a plan review and base fee.
BUILDING New Building $.45 per sq ft $3,500 Min $.40 per sq ft $1,000 Min $.20 per sq ft $250 Min Demolition $.10 per sq ft $150 Min Accessory Structure (over 200 sq ft) $.40 per sq ft $750 Min Retaining
More informationNEW CHILLER SCHEDULE
TITLE: REPLACE CHILLER MACC MAXIMO # 4542690 PROJECT # 14M108CN MACC # 14-0459 ATTACHMENTS: 1. MAXIMO Equipment update form SCOPE OF WORK: The contractor shall provide all material, labor, equipment, and
More informationENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY
SUPERIOR IAQ LOW FIRST COST BEST ROI ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY Pinnacle manages 100% of a building s ventilation and indoor humidity load in a single package. Chilled beams have
More informationState College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT
State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the
More informationCAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY
NEW MEXICO HIGHLANDS UNIVERSITY CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY 27 2010 MASTER PLANNING GOALS TO BALANCE THE STRATEGIC GOALS OF THE UNIVERSITY WITH THE PHYSICAL CAMPUS through the assessment
More informationThis is to inform you the Equipment List has been added to this Invitation for Bid and the BID OPENING date has been postponed
June 2, 2014 MEMORANDUM TO WHOM IT MAY CONCERN FROM: Janell Kim Financial Services Director SUBJECT: ADDENDUM NO. 2 INVITATION FOR BID NO. J15013 TO PROVIDE MAINTENANCE SERVICE, AND CHEMICAL WATER TREATMENT
More informationRuishton C of E Primary School
Ruishton C of E Primary School Fire Safety Policy (inc Induction Training) & Emergency Plan Date: April 2018 To be Reviewed: April 2020 Fire Safety Duties The following persons have fire safety responsibility
More information2014 Bond District-wide Facility Repairs
Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls
More informationMASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW
DISTRICT CAMPUS OVERVIEW Classrooms, CR Special Education Computer Lab INTERSTATE 5 FW - Faculty Work, FL - Faculty Physical Education / Athletics Support Spaces S - Storage, T - Toilets, U - Utility,
More informationWelcome to the 2019 season!
Welcome to the 2019 season! Thank you for your interest in supporting Towne s Harvest Garden! THG is MSU s 3-acre, certified organic campus farm. 2019 will mark our 13 th growing season, and we are looking
More informationUNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I
UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES for Williams Fieldhouse - Phase I 2007-2009 August 2007 DSF # 07E2H TABLE OF CONTENTS Scope of
More informationASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED MARCH 22, 2018
ASSEMBLY, No. 0 STATE OF NEW JERSEY th LEGISLATURE INTRODUCED MARCH, 0 Sponsored by: Assemblyman WAYNE P. DEANGELO District (Mercer and Middlesex) Assemblyman PARKER SPACE District (Morris, Sussex and
More informationSECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN
Brown University Department of Facilities Management Design & Construction Standards 26 09 01 Campus Central Metering System Design SECTION 26 09 01: CAMPUS CENTRAL METERING SYSTEM DESIGN 1. GENERAL A.
More informationBinghamton University Construction SUMMER 2012 HIGHLIGHTS
Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction Summer 2012 Large and small construction projects were completed during the summer 2012 construction season.
More informationEnergy at Tufts Betsy Isenstein Director, Facilities Technical Services
Energy at Tufts Betsy Isenstein Director, Facilities Technical Services Energy Used at Tufts Electricity #6 Oil #2 Oil Natural Gas Propane Purchased Steam Medford Heating Systems Energy Systems Medford/Somerville
More information4.8 LAND USE AND PLANNING
4.8 LAND USE AND PLANNING 4.8.1 INTRODUCTION This section describes existing and planned land uses at the Hayward campus and analyzes the impact of implementation of the proposed Master Plan on land uses
More informationCARNEGIE-STOUT PUBLIC LIBRARY REQUEST FOR PROPOSALS FOR HVAC MAINTENANCE
Carnegie-Stout Public Library 360 West 11th Street Dubuque, Iowa 52001-4697 (563) 589-4225 office (563) 589-4217 www.dubuque.lib.ia.us CARNEGIE-STOUT PUBLIC LIBRARY REQUEST FOR PROPOSALS FOR HVAC MAINTENANCE
More informationCherry Hill Public Schools BUILDING A SOLID FUTURE
Cherry Hill Public Schools BUILDING A SOLID FUTURE Who We Are The Cherry Hill School District is the 12 th largest in the state, serving 11,500 students 19 Locations 2 High Schools, 3 Middle Schools, 12
More informationSIGNAGE MANUAL. Skyhawk Printing and Mail Services Physical Plant Operations Office of University Relations
SIGNAGE MANUAL Skyhawk Printing and Mail Services Physical Plant Operations Office of University Relations Table of Contents Stage One: Logos, Fonts, & Color Standards 3 UT Martin Color Scheme 4 UT Martin
More informationArchitectural Engineering Senior Thesis Mechanical System Redesign
Saint Joseph Medical Center Architectural Engineering Senior Thesis Mechanical System Redesign Chris Nicolais Building Description Existing Mechanical System Proposed Redesign Alternative Option Emergency
More informationBoise State University October 8 - Workshop # 2. MASTER PLAN UPDATE Executive Committee Ayers Saint Gross
Boise State University October 8 - Workshop # 2 MASTER PLAN UPDATE Executive Committee Ayers Saint Gross WORKSHOP AGENDA 01 WORK SESSION SUMMARY Program clarifications res life, trans, STEM Concept Plan
More informationTAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE
TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE The University of Arizona has implemented a Keyless Access and Security System program to provide a cost effective, efficient, and maintainable means
More informationMEP CONDITION ASSESSMENT
MAINE EAST MEP CONDITION ASSESSMENT MAINE EAST HIGH SCHOOL This report section includes an overview of the existing mechanical cooling and heating systems serving Maine East High School. The sections will
More informationNew PHE applications in construction & HVAC.
New PHE applications in construction & HVAC Static head isolation Static Head isolation A temperature gradient present in different levels Different sizing of AHU / FCU required Reduces pressure head in
More informationPre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m.
Attendees: Pre-Bid Meeting Minutes 2018 A & E RFP February 6, 2019 10:00 a.m. Anthony Shomin Sue Martin Architectural & Engineer Professionals KCKHA Modernization Coordinator KCKHA Modernization Admin.
More informationLINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016
LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL
More information4. OVERVIEW OF MECHANICAL SYSTEM
4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in
More informationProposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT
DESIGN ASSOCIATES INC MECH/ELEC DESIGN & CONSULTING 422 Highland Ave, Cheshire, CT. 06410 (203) 271-3787, fax (203) 271-2886 Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE
More informationStaff Planner Jimmy McNamara. Location 2641 Princess Anne Road GPIN Site Size 10.8 acres AICUZ Less than 65 db DNL
Applicant & Property Owner Public Hearing July 13, 2016 City Council Election District Princess Anne Agenda Item 4 Request Modification of Conditions (Conditional Use Permit approved by City Council on
More informationMECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY
MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY 2018 57 MECHANICAL ASSESSMENT MECHANICAL ASSESSMENT This report section includes an overview of the existing
More informationADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center
ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR RFP No. 2030 Professional Design Services for CCC Le-Jao Student Resource Center COAST COMMUNITY COLLEGE DISTRICT COSTA MESA, CALIFORNIA COUNTY OF ORANGE COAST
More informationUniversity of Kentucky Physical Plant Custodial Master Plan PART B
University of Kentucky Physical Plant Custodial Master Plan PART B Last Updated: August 13, 2012 OVERVIEW Core Management Services has been selected as a strategic partner by the University of Kentucky
More informationBoard of Regents SPECIAL MEETING AGENDA AND MATERIAL November 19, 2012
Board of Regents SPECIAL MEETING AGENDA AND MATERIAL November 19, 2012 Facilities & Land Management Committee Agenda 1 UAA Campus Master Plan Amendment for the Engineering Parking Garage 3 SDA for the
More informationCENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN
Page 1 of 11 CENTRAL STATE HOSPITAL PLAN SUBJECT: PLANT OPERATIONS UTILITIES MANAGEMENT PLAN ANNUAL REVIEW MONTH: RESPONSIBLE FOR REVIEW: March CSH Safety Officer LAST REVISION DATE: November 2003 I. SCOPE:
More informationCampus Wide Fire Alarm Repairs
BID # 15-24 Campus Wide Fire Alarm Repairs SECTION "C" TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey 08818-3050 PREPARED
More informationMT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS
CARROLL COUNTY PUBLIC SCHOOLS LIFE CYCLE COST ANALYSIS SUMMARY DGS PROCEDURES FOR THE IMPLEMENTATION OF LIFE CYCLE COST ANALYSIS AND ENERGY CONSERVATION OCTOBER, 2010 G.A.I.#09090 GIPE ASSOCIATES, INC.
More informationConsent Agenda. Meeting of June 14,2018
continued on Page 2 and for automated HVAC building control system maintenance services from Honeywell International Inc., Improvement Fund (3029) in the amount of $12,898.75 from the General Library Improvements
More informationTGG, TBG, TEG, TUG, 3.9 TBS, Gene-Link series
Absorption Chillers TGG, TBG, TEG, TUG, 3.9 TBS, Gene-Link series Stable Chilled Water Outlet Temperature PID control is applied to maintain constant chilled water outlet temperature. When the cooling
More informationUpdate on University Avenue Study. September 21, 2015
Update on University Avenue Study September 21, 2015 Existing Building Capacity Analysis Desired Potential Programs for Corridor District University Commons 50,000 +/- GSF Consolidate Student Services
More informationTONY ESPOSITO LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY
LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY 1 1A. POWER DISTRIBUTION SYSTEMS a. EXECUTIVE SUMMARY b. SUMMARY DESCRIPTION
More informationSubmittal Data GA Line AYF Series Commercial and Specialty Chiller-Heaters 2 or 4 pipe Gas Fired Absorption Chiller-Heater Cooling and Heating
GA Line AYF Series Commercial and Specialty Chiller-Heaters 2 or 4 pipe Gas Fired Absorption Chiller-Heater Cooling and Heating The High Efficiency AYF60-119 units are 2 module appliances; each AYF is
More informationSECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...
SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...
More informationBrown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA
PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities
More information2014 Bond District-wide Facility Repairs
Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls
More informationChallenges and Methods of Estimating a Conceptual HVAC Design
Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.
More informationTHE COLLEGE AT BROCKPORT EVACUATION PROCEDURES IN NON-RESIDENTIAL BUILDINGS
THE COLLEGE AT BROCKPORT EVACUATION PROCEDURES IN NON-RESIDENTIAL BUILDINGS POLICY: All fire alarms, emergency voice notification system messages, etc., are to be taken seriously, especially in this time
More informationWelcome to the 2016 season!
Welcome to the 2016 season! Thank you for your interest in supporting Towne s Harvest Garden! THG is MSU s 3- acre, certified organic campus farm. 2016 will mark our 10 th growing season, and we are looking
More informationJunior Lobo Scavenger Hunt. Center of the Arts (1) <<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<< Tribute to Mother Earth Fountain (2) <<<<<<<<<<<<<<<<<<<<<<
Junior Lobo Scavenger Hunt Center of the Arts (1)
More informationMEETING NOTICE BOARD OF REGENTS OF THE UNIVERSITY OF WISCONSIN SYSTEM EXECUTIVE COMMITTEE
MEETING NOTICE BOARD OF REGENTS OF THE UNIVERSITY OF WISCONSIN SYSTEM EXECUTIVE COMMITTEE Friday, July 27, 2018 8:00 a.m. To be held by telephone conference 1511 Van Hise Hall 1220 Linden Drive Madison,
More informationAir Handler Installation Instructions Water Lines
Air Handler Installation Instructions Units must be installed with at least 1 clearance from combustible surfaces. It is recommended that the unit be set on blocks, pads, or legs. Unit should not be sitting
More informationSummer 2016 Summer 2017
Summer 2016 Summer 2017 Why? 4800kv transformer failure outside Thurston Hall Overview - This is the 4th and final phase of the large, complex multi year campus wide site utilities infrastructure upgrade
More informationTechnical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary
Technical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary William H. Gates Hall Seattle, WA Katherine Jenkins Lighting/Electrical Option October 27, 2006 Faculty Advisor: Ted
More informationCampus Planning and Capital Project Update. November 2017
Campus Planning and Capital Project Update November 2017 Campus Planning Updates Process Updates Master Planning Progress Space Planning Major Studies Real Estate Issues City Updates Process Updates Program
More informationMicroTech Series 200 Centrifugal Chiller
Protocol Data Information Packet Version 2.2 Group: Controls Date: March 1999 MicroTech Series 200 Centrifugal Chiller Data Communications Packet for Protocol 2002 McQuay International Revision History
More informationEmergency Evacuation Plans and Exercises. Risk Management Services
Emergency Evacuation Plans and Exercises Services Table of Contents I. Program Goals and Objectives... 2 II. Scope and Application... 2 III. Responsibilities... 2 IV. Emergency Evacuation Plans and Maps...
More informationHeat Recovery Units. EXTERNAL STATIC REQUIRED (in.h2o) (Pa) MOTOR (Bhp/Hp) (bkw/kw) SPEED (rpm)
Heat Recovery Units AIR HANDLING UNIT No. SERVICE AREA MANUFACTURER MODEL HRU-3 & HRU-4 B-Section Low Rate Ventilation Tempeff RG 16000 (9500) SUPPLY FAN - SIZE/TYPE AIRFLOW RATE (cfm) (l/s) TOTAL STATIC
More informationNEW CITY HALL COUNCIL MEETING PRESENTATION
NEW CITY HALL COUNCIL MEETING PRESENTATION COUNCIL MEETING JUNE 15, 2015 1 PROJECT APPROVAL On January 27 th, 2014 City Council approved CR22/2014; Administration was directed to PROCEED with the construction
More informationA.H.U / Fan Room (p1 of 2) (approx. sizing using rules of thumb)
A.H.U / Fan Room (p1 of 2) M1 STEP 1 Determine air flow req'd for each space, for total size of fan unit(s) in tons. Equation: Area (program) / (sf/ton) = tons req'd for space Classroom 8100sf / 350sf/ton
More informationMechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013
Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...
More informationVirginia Tech Standards for Building Automation System
March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia
More informationBetschart Mechanical, Inc
2/20/2014 5508 128 th St E, Suite 101, Puyallup, WA 98373 253.848.1854 www.betschartmech.com M I S S I O N S T A T E M E N T Betschart Mechanical, Inc. is dedicated to building value for our employees,
More informationGEN WORK BASE BID NO. 1. BB or CC MBE ALL WORK BASE BID NO. 0 ALT BID NO. 1B ALT BID NO. 0B ALT BID NO. 0C ALT BID NO. 0A ALT BID NO.
October 29, 2009 PAGE 1 OF 5 ALL WORK NO. 0 NO. 0A NO. 0B NO. 0C GEN WORK NO. 1 NO. 1A NO. 1B NO. 1C Boldt Company 19,597,000.00 276,000.00 15,262.00 36,000.00 12,987,000.00 276,000.00 15,262.00 2,500.00
More informationNYC Department of Education
Asset: LIBERTY HS - MANHATTAN, 250 WEST 18 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-29 11:32 AM 2018-02-01 10:16 AM Asset Data Are there fuel tanks?
More informationEncumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.
Branham High School Budget Remaining 1 906030 Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765,473.00 $635,342.00 $635,342.00 $130,131.00 $0.00 2 970205 Branham Interim Housing - 12 Portable
More informationShippensburg University
Shippensburg University Horton Hall HVAC Feasibility Study PREPARED FOR: Shippensburg University 1871 Old Main Dr. Shippensburg, PA 17257 SHIPPENSBURG PROJECT: SU-2017/25 RPA PROJECT: 17118.001 DATE: December
More informationWKU Educational Buildings Fire Log 2016
Academic Complex Ag. Expo Center 3 Ag. Riding Arena 2 Augustine Alumni Ctr. Baseball Clubhouse CEBS CEC Chapel Charles Taylor Center Cherry Hall 1 7/6/ 11:23 AM 2 12/17/ 3:54 PM 3 12/25/ 10:01 AM 1 6/15/
More informationWater Heaters. Solar Applications
Water Heaters Applications (Optional) 3-way diverting valve Pump Bypass for Cooling Water Bypass Return STONESTEEL is a registered trademark of Cemline Corporation CEMLINE CORPORATION P.O. BOX 55 CHESWICK,
More informationNORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan
NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan PBA Project No. 2014.0137.00 Prepared By: Wayne Kerbelis Terry Cleis September
More informationSNOWCOOL SYSTEMS INDIA PVT LTD.
SNOWCOOL SYSTEMS INDIA PVT LTD. PRESENTS LARGEST RANGE OF COOLING TOWERS CAPACITIES WATER FLOW 10 CMH TO 100000 CMH HOT WATER 35 C TO 85 C CONSTRUCTION FRP & RCC SINGLE & MULTIPLE CELLS CUBICAL & HYPERBOLIC
More informationFLORIDA STATE UNIVERSITY MASTER PLAN 3 Urban Design
FLORIDA STATE UNIVERSITY MASTER PLAN 3 Urban Design 2008 UPDATE URBAN DESIGN ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall Guide development of
More informationTHERMAL ICE STORAGE: Application & Design Guide
THERMAL ICE STORAGE: Application & Design Guide Table of Contents: 1. Introduction A. History of Thermal Energy Storage B. Operating and Cost Benefits 2. Applications A Fundamental System B. HVAC Cooling
More informationEB-M*-** Midsize Electro-Boiler BL509. EB-S-**/EB-WX-**-2 TS Standard Electro-Boiler BL506. EB-CX-** TS Commercial Electro-Boiler BL508
Electro-HELPS IX Boiler, Submittal Data Sheets These provide the mechanical technical details often required for architects/design engineers, shop drawings, etc. They are also useful in providing additional
More information