1 Contact Information Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone
2 WSU Utilities WSU primary systems are all based on district type utilities rather than individual systems: Provides better service at lower maintenance and ownership cost Higher efficiencies Fewer components More professional attention available for a larger service area.
3 College Ave Steam Plant (CASP)
4 Grimes Way Steam Plant (GWSP)
5 Steam System Utilities The campus district steam system consists of two main plants: College Avenue and Grimes Way Steam supply and condensate return pipelines are routed through walking tunnels. There are some small individual heating systems distributed around campus, but the steam system serves the majority of campus square footage.
6 Boiler Plants College Avenue Steam Plant (CASP) Most recent remodel in 2003 with two new packaged 99MBTU gas-fired boilers Grimes Way Steam Plant (GWSP) 2004 three new gas/oil-fired packaged boilers, 99MBTU each permitted for natural gas and #2 fuels. Boilers and fuel storage are all equipped with appropriate fire control and suppression equipment.
7 Boiler Plants (continued) Future Considerations Reuse of previously abandon equipment. Implementation of Condensing Economizers and local hot water loops. Combined Heat and Power
8 Steam System Schematic Campus Buildings Grimes Way Steam Plant Metered Condensate College Ave. Steam Plant 100 psi Steam Distribution Collected condensate TANK All make up water and condensate are generated and processed at the Grimes Way plant. College Ave uses condensate return exclusively for feed water.
9 AHU Steam Coil Schematic Temperature Control Valve(s) coil Traps 18 min Condensate Rec.
10 Steam Station Schematic 100 psi Steam supply Flash Tank 100 to 15 psi PRVs Trap(s) FD
11 Steam and Condensate Steam piping is typically schedule 40. Runs through tunnels and in spite of it being nearly 100 years old it is in very good condition with minor deterioration-the result of effective water treatment and a decent return percentage. (20% or better) Tunnel design incorporates expansion and restraint methods Condensate control through traps and changes in section for piping. All condensate is pumped into common return piping which carries the condensate via gravity to College Avenue plant. Condensate not utilized at the College Avenue plant is pumped to the Grimes Way plant through piping in the tunnels. The campus condensate system is piped with schedule 80 steel pipe.
12 Steam tunnel showing 4160 electrical, steam and condensate, Data and Telecom wiring
13 Steam and Condensate Design Issues Thrusting, anchoring and expansion joints are often misunderstood Continual debates regarding tunnels or direct buried piping. Very little familiarity with ASME B31.1, the design guideline and code basis for steam piping practice.(piping and pressure vessels) Condensate Trapping is also misunderstood. Different pressures have different selection and installation procedures. Resist the temptation to lift condensate. Pressure relief connections require drip ell for structural reasons. Expansion joints. Distance and thrusting. Piping connections and take offs from tunnel to buildings. Oversizing water heaters and other steam devices. Venting condensate pumps The campus condensate system is piped with schedule 80 steel pipe.
14 Chilled Water System Initial plant built in 1975 with 11 Buildings connected 3000 tons capacity Current system 85 buildings connected 12,000 tons capacity 20,000 ton/hours of thermal storage Free cooling and process cooling applications System is modeled with software to keep track of present and future capacity issues. Pressure test requirements are a part of all new installations-200 psi Future: Adding chillers to stay current with N + 1 Redundancy Line extensions to maintain reasonable pressure loss-system operates at 15 to 20 # differential pressure Planned expansion to accommodate the 50 Year Master Plan
15 Design parameters and goals 1 Maximize temperature differential ELIMINATE ROUGH SERVER ROOMS RESOLVE SINGULAR COOLING EDICTS BY CUSTOMERS SELECT OPTIMUM COOLING COILS Minimize pressure drop MAINTAIN MIN PIPE SIZE FOR MAINS USE TERTIARY LOOPS MAX TEMP DIFFERENTIAL
16 Design parameters and goals 2 Sequence chillers with capacity SELECT CAPACITY-FULL OR PARTIAL DETERMINE FLOW RATE AT THAT CAPACITY SET PRIMARY FLOW-SECONDARY FLOW WILL FOLLOW Optimize chiller efficiency CONDENSOR WATER FLOW COOLING TOWER CAPACITY-LIMITS BALANCE DAY TIME LOAD AGAINST CHILLED STORAGE TANK RECOVERY TIME
17 Design parameters and goals 3 Find opportunities to utilize central chiller plant for other functions: Free cooling THERMAL STORAGE TANK PLATE HEAT ECHANGER REVERSE FLOW WATER COILS IN 100%OSA BUILDINGS Heat recovery WATER SOURCE HEAT PUMPS-HOUSING GROUND SOURCE PROJECT CHILLED BEAM APPLICATIONS USING RETURN WATER FROM AHUs TO PROVIDE SOURCE WATER FOR BEAMS. REDUCE WATER CONSUMPTION
18 Chiller Plant` Chiller Plant` Chilled Water System Satellite Chillers TANK Campus Cooling Loads
19 MAIN CHILLER PLANT ON WEST SIDE OF CAMPUS COMPLETED 1975 MOST RECENT UPDATE TONS
20 EAST CAMPUS CHILLED WATER PLANT AND THERMAL STORAGE FACILITY COMPLETED 2009 AND 1991 RESPECTIVELY
21 Plate Heat Exchanger for Winter Process Cooling Installed 2013
22 BURIED CHILLED WATER LINES TYPICALLY PVC, DUCTILE IRON, TRANSITE, BURIED 6FT BELOW GROUND LEVEL NOT INSULATED TYPICALLY LOCATED IN STREETS
23 Staffing refrigeration techs to keep up on 80 building chillers 2014 reduced to 4 refrigeration techs due to consolidation of equipment Crew is responsible for upkeep of cooling towers, circulating pumps, strainers, coils and general chiller maintenance. Maintenance contracts are used for major chiller maintenance and repairs
24 DRAWING OF THERMAL STORAGE TANK CUT AWAY OF INSIDE OF TANK
25 TYPICAL COOLING TOWER
26 1500 TON CARRIER CHILLER EAST PLANT
27 WATER TREATMENT AND CONSERVATION EQUIPEMENT RO SKID, SAND FILTER, CHEMICAL TREATMENT, IRON FILTER
28 BIGGEST CHILLER - CARRIER 2200 TON INDUSTRIAL MODEL ALL CHILLERS USE ENVIRONMENTALLY FRIENDLY REFRIGERANTS
29 CHILLED WATER FREE ENERGY DESIGN REVERSE FLOW IN CHILLED WATER COIL FOR 100% OSA LAB BUILDINGS AND USE FOR PROCESS COOLING IN THE WINTER.
30 East Campus Distribution Pump
31 West Chiller Plant-5200 tons
32 Typical Water Treatment Skid
33 Thermal Storage Schematic Variable Flow Equipment Pump Bypass Flow Meter TANK Variable Flow Distribution pump Secondary Flow Meter Primary Flow Meter
34 Chiller System Schematic Variable Flow Equipment Pump Bypass Flow Meter Chiller Variable Flow Distribution pump Secondary Flow Meter Primary Flow Meter
35 AHU Coil Schematic Balance Valve coil Temperature Control Valve Flow Control Valve
A. Detail drawing M1 Standard Chilled Water Schematic 1.03 DESCRIPTION OF THE PULLMAN CAMPUS CENTRAL CHILLED WATER LOOP SYSTEM:
33 60 00 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. These standards and procedures apply to the use and interface requirements of the Washington State University Central Chilled Water (CCW) system.
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and
More informationHigh Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO
High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO 2012 1 Learning Objectives for this Session Get acquainted with typical systems used in the
More informationExisting Mechanical System Operation
majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable
More informationIndustrial Fiberglass Specialties, Inc. 521 Kiser Street Dayton, OH Tel: Fax:
06-26-00 Page #1 of 6 This guide provides specific information about the material requirements, design criteria, assembly and testing methods recommended to assure a successful steam condensate return
More informationPRESSURE MOTIVE PUMP (PMP) APPLICATIONS
DRAINAGE of a SINGLE SOURCE of for a CLOSED LOOP SYSTEM PURPOSE: For removing condensate from below steam heat transfer equipment when a modulating valve is used for control and stall conditions will exist.
More informationAndrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3
Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located
More information21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device
DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity
More informationSteam Systems 101. Understanding Your Energy Systems Better. May 5, 2016
Steam Systems 101 Understanding Your Energy Systems Better May 5, 2016 Introductions Background in Heating/Power plants associated with large industrial and central plants associated with campus distribution
More informationCHILLED WATER SYSTEM 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods
230510 CHILLED WATER SYSTEM PART 1: GENERAL 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS A. Section 230000 Basic HVAC Requirements B. Section 230500 HVAC Basic Materials and Methods C. Section
More informationTOTAL SYSTEM EFFICIENCY: SYSTEM APPLICATIONS & DESIGNS. David Grassl PE Mechanical Engineer Principal
TOTAL SYSTEM EFFICIENCY: SYSTEM APPLICATIONS & DESIGNS David Grassl PE Mechanical Engineer Principal Similar to traditional boiler systems, condensing boiler systems have many designs they can operate
More informationElement D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section includes criteria for the design of building heat generating systems including all isolation valves and steam piping and fittings, steam specialties, control
More informationHEAT GENERATION 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods
230520 HEAT GENERATION Cornell s Design and Construction Standards provide mandatory design constraints and acceptable or required products for all construction at Cornell University. These standards are
More informationSteam Ancillary Equipment. Primary Steam System, Water Treatment and Auxiliary Steam System Equipment
Steam Ancillary Equipment Primary Steam System, Water Treatment and Auxiliary Steam System Equipment WITH ANCILLARY EQUIPMENT Steam Header with Accumulator Gas Train Assembly Single Point Gas Supply Trap
More informationCONTENTS. B. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More information9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A
Nicholas Thornton, CEM 1 Overview Today s Goals Introductions HVAC Electrical Technology Q&A 2 1 Today s Goals An overview, a crash course Maybe a few tangents (ASK QUESTIONS!) Show typical arrangements
More informationUpdate In Progress. Division 23 Heating, Ventilation, and Air Conditioning Page Section FLUID SYSTEMS EQUIPMENT PART 1 GENERAL
Section 23 20 00 FLUID SYSTEMS EQUIPMENT PART 1 GENERAL 1. CHILLERS Page 23 20 00-1 A. Provide chiller packages with centrifugal compressors, or screw compressors, and water cooled condensers. B. Design
More informationDISTRIBUTION SYSTEMS. Water Piping and Pumps
DISTRIBUTION SYSTEMS Water Piping and Pumps Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They are targeted
More informationC. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.
SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.
More informationNEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80
NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 Carrier Software Systems Carrier Corporation Syracuse, New York rev October 10, 2013 Copyright 2013 Carrier Corporation, All Rights Reserved Page
More informationWater Fuel + Air for combustion Blowdown
Water 1. Going through a water treatment system 2. Condensate is re-used & will be mixed with fresh water in deaerator 3. Mixture of this water is sent to a heat exchanger inside the boiler chimney (Economizer)
More informationANNEX 6. Refinery No. 1 New Area. Problems Existing in the Current Condensate Return System of the New Area of Refinery No.1
ANNEX 6 In FP the project was divided in two phases, but due to financial difficulties, Phase II is still not implemented. Below is what happened in Phase I of the Project, which will be replicated in
More informationB. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationFINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois
FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE Palatine, Illinois Grumman/Butkus Associates Energy Efficiency Consultants and Sustainable Design Engineers 820 Davis Street, Suite 300 Evanston, Illinois
More information007100S01 - PROGRAM DESIGN CRITERIA
Related Division Contents: 00 PROGRAM DESIGN 01 GENERAL INFORMATION 33 CENTRAL STEAM PIPING AND EQUIPMENT 21 FIRE PROTECTION PIPING AND EQUIPMENT 33 MAIN CAMPUS CENTRAL CHILLED WATER SYSTEM 07 ROOFING
More informationSubmitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner
ESL-TR-99/12-09 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Commerce (TAMU-Commerce) Commerce, Texas Submitted to Texas
More informationCommercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark
Commercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark Introduction: Energy use is the single largest operating expense in commercial office
More informationShippensburg University
Shippensburg University Horton Hall HVAC Feasibility Study PREPARED FOR: Shippensburg University 1871 Old Main Dr. Shippensburg, PA 17257 SHIPPENSBURG PROJECT: SU-2017/25 RPA PROJECT: 17118.001 DATE: December
More informationTechnical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer
Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section
More informationUniversity of Iowa Indoor Practice Facility Outside-the-box HVAC OUTLINE AND LEARNING OBJECTIVES:
University of Iowa Indoor Practice Facility Lincoln Pearce, PE KJWW Engineering David Hahn University of Iowa Chilled Water Plant October 13, 2014 OUTLINE AND LEARNING OBJECTIVES: Project scope Design
More informationNew PHE applications in construction & HVAC.
New PHE applications in construction & HVAC Static head isolation Static Head isolation A temperature gradient present in different levels Different sizing of AHU / FCU required Reduces pressure head in
More informationSTATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK
STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE ACHP 254 Domestic & Commercial Heating II Prepared By: CHARLES STEAD Updated By: Michael J. Newtown, P.E. CANINO SCHOOL
More informationFFH Series. Steam Fired Instantaneous Feed Forward Water Heaters
FFH Series Steam Fired Instantaneous Feed Forward Water Heaters CEMLINE CORPORATION P.O. BOX 55 CHESWICK, PENNSYLVANIA 15024 Phone: (724) 274-5430 FAX: (724) 274-5448 www.cemline.com Operation of Cemline
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section
More informationSTEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationB. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
More informationAll Chiller Products. Water Cooled and Air Cooled Modular Chillers Available in 208, 230, 460 & 575 Volts Application Ranges from 30 to 1,000 Tons
All Chiller Products Water Cooled and Air Cooled Modular Chillers Available in 208, 230, 460 & 575 Volts Application Ranges from 30 to 1,000 Tons ClimaCool modular chillers. No compromises. They re not
More informationThe Book of AERMEC NRL Sequence of Operation
The Book of AERMEC NRL Sequence of Operation Heating and cooling operation. 2 Sequence of operation Aermec air to water chiller/heat pump use Hydronic s in conjunction with refrigerant to provide heating
More informationDIVISION 15 MECHANICAL
DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with
More informationAIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University
AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort
More informationSeries. Chillers and. Features: Application Flexibility Minimizes Installation Time and Reduces Cost
LL Chillers and Outdoor Mechanical Rooms Air-Cooled Features: Air-cooled condenser chillers with capacities from 35-345 tons Evaporative-cooled condenser chillers with capacities from 35-540 tons Variable
More informationCondensate Pumps Jones Boulevard Limerick Airport Business Center Pottstown PA Tel:
www.watsonmcdaniel.com 428 Jones Boulevard Limerick Airport Business Center Pottstown PA 19464 Tel: 610-495-5131 129 Return Introduction Return System Shown below is a simplified view of a steam system
More informationSubmitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University
More informationTopic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline
ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces
More informationTHE PRESSURIZED CONDENSATE RECOVERY SYSTEM:
BEST PRACTICE NO. 51 THE PRESSURIZED CONDENSATE RECOVERY SYSTEM: the solution to increasing a steam system s thermal cycle efficiency Pressurized condensate systems can provide plants with a minimum of
More informationNYC Department of Education
Asset: P.S. 22 - STATEN ISLAND, 1860 FOREST AVENUE, New York, 10303 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-08 8:51 AM 2017-12-18 4:14 PM Asset Data Are there fuel tanks?
More informationSAFETY PLUMBING PACKAGES. Quality Products & Value Packages SUSTAINABILITY. Residential Solutions ANTI-SCALE SYSTEMS FIRE PROTECTION
Quality Products & Value Packages Residential Solutions FIRE PROTECTION COMFORTSUSTAINABILITYCONTROL PRESSURE REGULATORS TRENCH DRAINSHVAC SYSTEMS SAFETY ANTI-SCALE SYSTEMS HEATING & COOLING CONTROLS PLUMBING
More informationA hydronic system controls comfort by delivering heated or cooled fluid to the conditioned space through pipes.
Introduction to Hydronics A hydronic system controls comfort by delivering heated or cooled fluid to the conditioned space through pipes. Hydronic heating systems use hot water or steam to deliver the
More informationComputing Services Center
Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationCHP-turbine room. CHP can capture almost EXTRACTED STEAM 20 PSI HIGH-PRESSURE STEAM 1250 PSI HEAT EXCHANGER HOT WATER SUPPLY F
5 6 HIGH-PRESSURE STEAM is routed from the wood-chp boiler to the turbine. TURBINE BLADES spin at nearly 00 revolutions per second. Steam acting on the turbine blades creates mechanical energy in the TURBINE.
More informationWHY THE REMOVAL OF NONCONDENSABLE GASES AND AIR IS CRITICAL IN A STEAM SYSTEM
BEST PRACTICE NO. 30 WHY THE REMOVAL OF NONCONDENSABLE GASES AND AIR IS CRITICAL IN A STEAM SYSTEM Air and noncondensable gases are one of the major problems in a steam system that can cause production
More informationNYC Department of Education
Asset: P.S./I.S. 194 - BRONX, 2365 WATERBURY AVENUE, New York, 10462 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:34 AM 2018-02-01 10:02 AM Asset Data Are there fuel tanks?
More informationPlumbing Technology/Plumber CIP Task Grid
1 Secondary Task List 100 DEMONSTRATE PERSONAL SAFETY IN THE TRAINING LABORATORY 101 Follow rules for fire safety. 102 Follow rules for housekeeping safety. 103 Follow shop rules. 104 Follow rules for
More informationMethod to test HVAC equipment at part load conditions
IPLV Method to test HVAC equipment at part load conditions For water cooled chillers: 100% load ( % hrs) + 75% ( Hrs ) + 50% ( Hrs ) + 25% ( Hrs ) = IPLV value Manufacturer can favor this number by tweaking
More informationSeries 1140 and 1141 Temperature Regulators
Hoffman Specialty Installation & Maintenance Instructions HS-504(E) Series 1140 and 1141 Temperature Regulators! CAUTION FOLLOW ALL INSTALLATION AND OPERATING INSTRUCTIONS. TURN OFF WATER OR STEAM BEFORE
More informationA. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSINGLE STAGE MULTI STAGE NANO MICRO
SINGLE STAGE Single stage air-cooled chillers are built with a compact design that is simple to operate and maintain. All chillers are built on a rugged and fully welded, powder coated steel platform,
More informationAdsorption Chillers Energysmart Green Cooling
Adsorption Chillers Energysmart Green Cooling New Partners in innovation Leaders in Dehumidification... Worldwide Power Partner Inc USA www.bryair.com Recover Low Grade Process Waste Heat For Energy Smart
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section
More informationPITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS
PITTSBURG STATE UNIVERSITY HVAC and BUILDING AUTOMATION SYSTEM STANDARDS CHILLERS In new construction, liquid-cooled models are preferred for systems larger than 100 ton. o Trane, York and McQuay brands
More informationSAMPLE. added benefit of reduced operating costs during low demand periods, such as spring and fall.
Chapter 4 Variable-speed pumps. A variable-speed pump varies the flow rate by maintaining a constant pressure differential as zone valves open and close. A sensor measures the difference in pressure between
More informationTOTAL SYSTEM EFFICIENCY: CONDENSING BOILER SYSTEM MYTH BUSTING. David Grassl PE Mechanical Engineer Principal
TOTAL SYSTEM EFFICIENCY: CONDENSING BOILER SYSTEM MYTH BUSTING David Grassl PE Mechanical Engineer Principal There are many reasons why engineers have been led to believe that condensing boilers do not
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationAHU Air Handling Unit Fundamentals. j.ilangumaran
AHU Air Handling Unit Fundamentals j.ilangumaran Objectives Review primary components of an AHU Understand the basic progression and advantages of advanced AHU control Understand the basic control sequences
More informationDesign Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET
Design Standard Detailed specifications follow. PART 1 CHW AND HHW SUPPLY TEMPERATURE RESET 1.1 The Utilities & Energy Services Department (UES) at Texas A&M University is actively identifying and implementing
More informationFLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK
FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated
More informationENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY
SUPERIOR IAQ LOW FIRST COST BEST ROI ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY Pinnacle manages 100% of a building s ventilation and indoor humidity load in a single package. Chilled beams have
More informationAHRI Certification Program Scopes - COOLING
Air-to-Air Energy Recovery Ventilators (AHRI Std. 1060) Automatic Commercial Ice-Cube Machines and Ice Storage Bins (AHRI Stds. 810 & 820) Central Station Air-Handling Units (AHRI Std. 430) Commercial
More informationSECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...
SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...
More informationD. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationDOCUMENT TABLE OF CONTENTS
DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026
More informationWater Piping and Pumps
Technical Development Program DISTRIBUTION SYSTEMS Water Piping and Pumps PRESENTED BY: Michael Ho carriertdp@gmail.com 424-262-2144 Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section
More informationBoiler Condensate Return Basics. Presented by Steve Connor February 24, 2016
Boiler Condensate Return Basics Presented by Steve Connor February 24, 2016 What We Are Covering Today? Brief review of the total steam system Why a proper condensate return system is so important Condensate
More informationChapter-8 Capacity Control of Refrigeration Systems
Chapter-8 Capacity Control of Refrigeration Systems Chapter-8 Capacity Control of Refrigeration Systems ၈.၁ Compressor Control Chiller Control and Chilled Water Plant Control Refrigeration system control
More informationEnergy Efficiency Considerations in Refrigeration Systems
Energy Efficiency Considerations in Refrigeration Systems Donall O Brien Industrial Energy Consultant Why Focus on Refrigeration? Refrigeration & Cooling is responsible for approx. 20% of all Electricity
More informationMAXIMUM SERIES. Maximum Series portable chillers can be used on a variety of process applications that require 20 F to 70 F chilled water.
Temperature Control Units Water & Oil 30-500 F Portable Chillers Air & Water-Cooled 20-70 F Central Chillers Air & Water-Cooled Packages & Modules 20-70 F Pump Tank Stations Chilled or Tower Water 200-3600
More informationVariable Refrigerant Flow (VRF) Systems
Variable Refrigerant Flow (VRF) Systems Flexible Solutions for Comfort Carrier Corporation Syracuse, New York January 2013 TABLE OF CONTENTS INTRODUCTION... 2 VRF TECHNOLOGY... 2 ADVANTAGES OF A VRF SYSTEM...
More informationHigh Capacity Instantaneous Steam Fired Water Heater
MODEL F High Capacity Instantaneous Steam Fired Water Heater Features Compact High Capacity Design Packaged System Water heater is factory assembled on an all welded steel mounting frame to save time and
More informationAC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT
AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT Central Chiller Plant (with Cooling Tower and Chilled Water distribution) The other AC configuration is called a Chilled Water or Larger Cooler system. It
More informationDescription of All Alternatives Considered-
Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142
More informationTOTAL SYSTEM EFFICIENCY: CONTROL STRATEGIES & SYSTEM DISTRIBUTION. David Grassl PE Mechanical Engineer Principal
TOTAL SYSTE EFFICIENCY: CONTROL STRATEGIES & SYSTE DISTRIBUTION David Grassl PE echanical Engineer Principal This is the second paper in the total system efficiency series that will detail various control
More informationHVAC 101. H V A C S y s t e m s
H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost
More informationEnd-Use Data Collection Requirements Data Trend Type
End-Use Data Collection Requirements Data Trend Type Building Electrical: building electrical (main bldg. feed) HVAC Cooling: Total building electrical consumption data shall be submetered through the
More informationSummary Comparison of Simulation Program Features
Summary Comparison of Simulation Program Features FEATURE DOE2.2 equest TRACE 700 HAP Public/Proprietary Public Domain Proprietary Proprietary Proprietary Simulation Method 8760 hours 8760 hours 8760 hours
More informationMechanical System Redesign. Dedicated Outdoor Air System. Design Criteria
Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed
More informationJune Copyright Climatec
June 2013 Copyright Climatec GUIDLINES FOR CENTRAL PLANT OPTIMIZATION The following document provides guidelines which if followed will maximize the energy savings potential for a central plant available
More informationTECHNICAL. Series 18. Pump Packages
TECHNICAL S Y S T E M S Series 18 Pump Packages Series 18 Pump Packages Standard Features Close-coupled, end-suction, centrifugal pumps Mounted and wired pump starters Hand-Off-Auto switch for each pump
More informationPhillips. HORIZONTAL AND VERTICAL ASSEMBLIES For Ammonia (R-717) and Halocarbon Refrigerants
Phillips REFRIGERATION MECHANICAL PUMP RECIRCULATORS BULLETIN MPR-03E Engineering Data VALVES VESSELS SYSTEMS CONTROLS HORIZONTAL AND VERTICAL ASSEMBLIES For Ammonia (R-717) and Halocarbon Refrigerants
More informationThe M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO
The M & V Guided Recommissioning Process MOO Energy & Water Conservation Program September 2015 EWC Agenda MOO EWC Overview Our approach Progress Fault Detection Zone & customer feedback Variance reporting
More informationSmardt vs. McQuay Comparison of Standard Options and Other Benefits < 400 tons
Smardt vs. McQuay Comparison of Standard Options and Other Benefits < 400 tons Mike Hayes Director of Sales Smardt vs. McQuay Staging valves for models with 3 or more compressors Level sensor exv control
More informationPackaged Semi-Instantaneous Steam Fired Water Heater
MODEL STX Packaged Semi-Instantaneous Steam Fired Water Heater Shell and Tube Style Heater Features Reliable Only high grade materials used in construction to ensure long operating life Heat exchange pressure
More informationEZ Plate Instantaneous
EZ Plate Instantaneous Packaged Instantaneous Domestic Hot Water Generator Energy Source: Boiler Water PVI.com Packaged Instantaneous Domestic Hot Water EZ Plate Instantaneous is a factory-packaged, skid-mounted
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.
More informationTGG, TBG, TEG, TUG, 3.9 TBS, Gene-Link series
Absorption Chillers TGG, TBG, TEG, TUG, 3.9 TBS, Gene-Link series Stable Chilled Water Outlet Temperature PID control is applied to maintain constant chilled water outlet temperature. When the cooling
More informationTechnical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,
Purpose 355 West Queens Road Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: 604-990-2480, building@dnv.org The purpose of this document is to provide
More informationTechnical Assignment 3 11/15/04. Executive Summary
Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria
More informationENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory
Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,
More informationPackaged Instantaneous Domestic Hot Water Generator Energy Source: Boiler Water
Packaged Instantaneous Domestic Hot Water Generator Energy Source: Shown with optional boiler water valve and electronic feed-forward control. Operates with low boiler water supply and return temperatures
More informationOPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"
OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER Electric Heater Company Base Model "BWXP" HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203)
More informationTray ST5. Tray Type Deaerator Pressurized.005 cc/liter. industrialsteam.com
Tray ST5 Pressurized and Atmospheric Deaerators Tray Type Deaerator Pressurized.005 cc/liter COUNTER FLOW TRAY design provides guaranteed removal of all dissolved oxygen in excess of.005 cc/liter from
More information