1 Performance and safety features of a 2 x cbm LPG-import terminal built in China Dr. Manfred Kuver Christof Fey Li Qin Yi Executive Vice President Tractebel Gas Engineering GmbH Deputy Engineering Dept. Manager Tractebel Gas Engineering GmbH General Manager Shanghai Golden Conti Petrochemical Co. Ltd. Abstract: This paper shall describes the performance and safety features of the largest LPG above ground import terminal in the Shanghai area and was started up in mid The storage tanks of cbm each are of a modern double containment design with pre-stressed concrete outer tank and low temperature carbon steel inner tank. The two fully refrigerated tanks are connected by pipeline to a secondary site with four spherical tanks truck and bottle filling plant.

2 PERFORMANCE AND SAFETY FEATURES OF A 2 X CBM LPG TERMINAL 1. INTRODUCTION The LPG market in P.R. China has grown considerably in the last few years. As the local refineries could not meet the demand of the market, huge amounts of LPG have to be imported. In the mid 90 s the bottleneck for import was that no refrigerated terminals were available. Only small quantities could be traded through fully pressurised terminals with maximum capacities of about m 3. A number of FSO s with capacities of up to m 3 were serving as buffer import storage in order to try to satisfy the import demand. As a logical consequence a number of refrigerated terminals were planned and put into operation at the end of the 90 s. Starting in 1996 and completing in 1999 Tractebel Gas Engineering (TGE) built a 2 x m_ refrigerated LPG Terminal on a turn-key basis at Jinshanwei near Shanghai, China. The plant was built for Shanghai Golden Conti Petrochemical Corporation, a joint venture of Shanghai Petrochemical Corporation, Mitsubishi, and Continental Grain Company. The terminal is intended to be used as an import and distribution terminal. The following main operations are provided: LPG storage operation Ship unloading operation BOG reliquefaction operation Send out operation to a spherical tank farm Send out operation to coastal tankers The terminal was erected on a green field site i.e. all auxiliaries and infra structure had to be provided too. Dr. Kuver -1-

3 2. PERFORMANCE DATA 2.1 LPG STORAGE OPERATION The imported LPG is stored in two tanks, each with a size of 50,000 m_. One tank is dedicated for propane, the other for butane (see sketch 1). The design for both tanks is identical, i.e. design pressure is 5 to 200 mbar g, design temperature 45/+38 C. The boil-off rate for the tanks is 0.05 wt% at a product temperature of 45 C and 38 C ambient temperature. 2.2 SHIP UNLOADING sketch 1 For ship unloading operations two hydraulically operated marine loading arms are provided, one dedicated for propane, the other for butane. Each loading arm is connected with the respective tank via a 16 ship unloading line of approx. 1 km length. The ship unloading operation is designed for an unloading rate of m_/h propane and butane at a pressure in the ships cargo tanks of 100 mbar g. The ship unloading operation is performed without vapour return. Dr. Kuver -2-

4 2.3 BOG RELIQUEFACTION Each tank is equipped with its own Boil Off Gas (BOG) reliquefaction system. The systems are designed for the reliquefaction of the boil-off gas from the tanks as well as for the displaced volume and flash gas which is generated during ship unloading operation. The reliquefaction capacity required for each tank is about 800 kw, taking also into account that one send out pump is running in bypass operation. Each BOG reliquefaction system consists of two oil injected, single stage screw type compressors with oil system, compressing the vapour phase from the tank to condensation pressure. After compression the injected oil is separated from the LPG down to 5 ppm by means of a two stage oil separation system. Thereafter the LPG is condensed at approx. 40 C and released back to the tank. 2.4 SEND OUT TO SPHERICAL TANK FARM Both tanks are connected via two approx. 35 km long pipelines with a spherical tank farm consisting of four spheres of 1,500 m_ volume each. Making use of one intank pump and a booster pump the pressure of the product can be increased and the LPG is injected into the pipelines. Prior to feeding the propane into the pipeline it is heated up to approx. 3 C. Butane is injected into the pipeline without heating. The send out takes place at a pressure of approx. 30 bar g. Each send out system is designed for a send out rate of 50 t/h. At the spherical tank farm it is possible either to store the products in dedicated propane or butane spheres or both products can be mixed inline and stored in a dedicated sphere for the mixture. The product from the spheres is exported to trucks, bottles, or can be used as feed for a cracker. Dr. Kuver -3-

5 2.5 SEND OUT TO COASTAL TANKERS Propane as well as butane can be sent out to coastal tankers. For this operation the product pumped with the intank pumps is led to one ship loading arm via one ship loading line of 1.5 km length. Prior to propane ship loading the product is heated from 42 C to approx. 3 C. Vapour from the ship is returned to the terminal where it is condensed against the ship loading stream and sent back to the ship. To perform the max. ship loading rate of 300 t/h both intank pumps of one tank have to sent out in parallel. If mixed product is to be loaded, the ship will be fed with butane first and thereafter with propane. Product composition is controlled by a flow integrator closing a valve in the ship loading line when the pre-selected quantity has been sent to the ship. 2.6 SIMULTANEOUS OPERATION The terminal provides a high degree of flexibility allowing the owner immediately to react to the market demand. Ship unloading operation with both products, send out operation to the spherical tank farm with both products, and ship loading operation can be performed simultaneously or as a single operation. 3. SAFETY FEATURES The terminal was built taking into account the latest recognised technical standards and fulfilling the regulations of the P.R. China. 3.1 SAFETY FEATURES OF THE STORAGE TANKS Tank Concept The British Standard BS 7777 distinguishes between the following three major design concepts for storage tanks: Dr. Kuver -4-

6 Single Containment Tank Either a single tank or a tank comprising an inner tank and an outer container designed and constructed so that only the inner tank is required to meet the low temperature ductility requirements for storage of the product. The outer container (if any) of a single containment storage tank is primarily for the retention and protection of insulation and to contain the vapour purge gas pressure, but is not designed to contain refrigerated liquid in the event of leakage from the inner tank. A single containment tank is normally surrounded by a low bund wall... to contain any leakage. /1/ (see sketch 2). Double Containment Tank sketch 2 A double tank designed and constructed so that both the inner tank and the outer tank are capable of independently containing the stored refrigerated liquid. To minimize the pool of escaping liquid, the outer tank or wall is located at a distance not exceeding 6 m from the inner tank. The inner tank contains the refrigerated liquid under normal operation conditions. The outer tank or wall is intended to contain the refrigerated liquid product leakage from the inner tank, but it is not intended to contain any vapour resulting from the product leakage from the inner tank. /1/ (see sketch 3). sketch 3 Dr. Kuver -5-

7 Full Containment Tank GAS-TECH 2000 Houston A double tank designed and constructed so that both the inner tank and the outer tank are capable of independently containing the refrigerated liquid stored. The outer tank or wall should be 1 m to 2 m distant from the inner tank. The inner tank contains the refrigerated liquid under normal operation conditions. The outer roof is supported by the outer tank. The outer tank is intended to be capable both of containing the refrigerated liquid and of controlled venting of the vapour resulting from any leakage after a credible event. /1/ (see sketch 4). sketch 4 The selection of design concept is done by the plant owner comparing safety and environmental aspects with economic issues. The LPG terminal is located next to the Shenshan crude oil terminal of Shanghai Petrochemical Corporation, i.e. a failure of the tank may jeopardise safe operation of the crude oil terminal. The original tender asked for a double wall, single containment tank (inner tank made of low temperature carbon steel, outer tank made from normal carbon steel) with breather tank built according to API 620 Appendix R. Both tanks were surrounded by an impounding wall. Liquid inlet and outlet nozzles had been located at the tank bottom. During the bidding procedure, TGE introduced an alternative proposal with a double containment design in accordance with European safety standards. The tanks have the following main features (sketch 5): Dr. Kuver -6-

8 sketch 5 The inner tank, which is located on a wooden load distribution ring, is made of low temperature carbon steel. The tank bottom insulation is made from foam glass, which is installed inside the load distribution ring. The tank wall insulation, made from Polystyrene panels, is attached to the outer side of the steel tank. The roof insulation is made from mineral wool which is installed on a suspended deck. The inner tank with insulation is located in a reinforced pre-stressed concrete container. In case of inner tank failure the liquid LPG is kept inside the concrete container, which is liquid tight. For safe operation of the terminal there are no tank nozzles in the liquid phase. All tank nozzles are located on the tank roof. This tank concept offers the following advantages compared to the original tank concept: The safety distance between the two tanks could be reduced from one times the tank diameter to half the tank diameter. Due to the smaller safety distance the land consumption for the two tanks is reduced and there is now space for the erection of a third tank with a volume of 30,000 m_. There is no need for an impounding wall around the two tanks. The reinforced pre-stressed concrete container protects the tank against impact of flying objects. Because there is no bottom nozzle in the liquid phase, LPG spillage to the atmosphere is prevented. For a bottom outlet there is always the potential risk of major liquid leakage to the atmosphere because of a failure at the first flange connection or a failure of the stuffing box of the first valve. Such a leak is impossible to tighten and a considerable quantity of LPG is released to the atmosphere creating a hazardous scenario if the LPG is ignited. The higher safety standard combined with the more economic utilisation of the tank area finally convinced the client to implement the TGE proposal. Dr. Kuver -7-

9 3.1.2 Overpressure protection The tanks are designed for an overpressure of 200 mbar g. In order to avoid an overpressure in the tank there are several measurement and control protection measures implemented. During normal storage operations without ship unloading the tank pressure is kept between 110 mbar g and 70 mbar g by a BOG compressor re-liquefying the BOG from the tank. During ship unloading however the tank pressure may increase up to 140 mbar g. At this pressure a pressure control valve installed in the ship unloading line starts to control the flow to the tank in order to avoid a further increase of tank pressure. If, nevertheless, the tank pressure increases further the ship unloading will be interrupted by closing the shut-off valve in the ship unloading line at a pressure of 160 mbar g. At a pressure of 175 mbar g a control valve opens the line from the storage tank to the flare and at 180 mbar g a safety shut down with two out of three selection closes all import and export lines to isolate the tank and opens the control valve to the flare 100 %. As a final overpressure protection a set of pressure relief valves (one in operation, one as installed spare) opens to the atmosphere Vacuum protection The tanks are designed for a vacuum of 5 mbar g. During normal operation the BOG re-liquefaction plant is switched off at a tank pressure of 70 mbar g. If, nevertheless, the tank pressure drops further evaporated LPG is injected into the tank at a pressure of 60 mbar g and there will be a safety shut down with two out of three selection closing all import and export lines to isolate the tank. At a pressure of 40 mbar g nitrogen is injected into the tank in order to build up the tank pressure again. As a final vacuum protection two vacuum relief valves (one in operation, one as installed spare) open at a vacuum of 2.5 mbar g Overfilling Protection To avoid overfilling of the tanks each tank is equipped with two independent level measurements and one level switch. In case of danger of overfilling a two out of three level switch will close all filling lines Roll-over Protection Due to import of a LPG quality which differs from the quality already stored in the storage tank there is the possibility of stratification in the tank. If there are two adjacent layers where the upper one is colder than the lower one there is risk of roll-over, resulting in a sudden evaporation of a huge amount of product. Such phenomena can also occur if product is stored over a longer period of time. In this case stratification can take place due to heat ingress from the tank bottom. To detect such stratification in an early stage there are nine temperature elements installed at different elevations in the liquid. A temperature alarm is issued if the lower temperature measurement of two adjacent temperature elements indicates a higher temperature than the upper one. In this case the operators have to stop the product send out immediately and run both discharge pumps in parallel in bypass operation. For this purpose the pump bypasses are designed for the max. flow rate of the intank pumps. Thus the tank volume can be circulated with a flow rate of about 600 m_/h. This means, that the volume of a full tank can be circulated in approx. 80 hours. Because the stratification will built up over a longer period of time this circulation is an adequate measure for the protection against roll-over. Dr. Kuver -8-

10 3.1.6 Butane Storage in Winter Time As described above both tanks are equipped with a suspended deck on which the mineral wool as tank roof insulation is installed. Due to low ambient temperature (min C) the tank roof itself can cool down to a temperature below saturation temperature of butane (approx. 3 C). This would result in condensation of butane at the tank roof. The condensed butane would drop down on the suspended deck. The insulation becomes wet and the insulation quality deteriorate. Furthermore there is the risk of mechanical damage of the tank because the suspended deck is designed for a load of dry mineral wool and does not accept liquid product on it. As a second effect the pressure in the storage tank would decrease dramatically resulting in a vacuum. To avoid both, i. e. overloading of the suspended deck and vacuum in the tank, the TGE patented winterising concept is implemented. This systems decreases the dew point of the vapour phase above the suspended deck by injecting vapour of low molecular weight hydrocarbons. In this case propane from the second tank is taken. With in tank pumps it is pumped from the propane tank to an electrical evaporator. The evaporated product is then injected into the tank dome of the butane tank. To make sure that the propane is equally distributed a sophisticated piping system is installed above the suspended deck of the tank. The dew point is determined by analysing samples taken from different locations in the tank dome. The winterising is initiated prior to start of the cold season. Propane is led to the tank dome of the butane tank until the dew point of the mixture is below the min. ambient temperature. Due to a concentration gradient between the product above and below the suspended deck there is a certain convection of mixture from above towards below the suspended deck and of butane from below towards above the suspended deck. This convection takes place at the gaps of the nozzle penetrations through the suspended deck. Furthermore some mixture is sucked into the compressor suction line by compressor operation. Therefore frequent samples are analysed to verify that the mixture is still sufficient to avoid condensation. If the mixture is diluted by butane such, that condensation at the tank roof is not excluded anymore, again propane vapour has to be fed to the tank dome in order to re-establish a non-condensation condition. 3.2 PROCESS SAFETY FEATURES Ship Loading / Unloading Arms For safe ship loading / unloading the ship loading arm as well as the two ship unloading arms are equipped with a double ball valve / emergency release coupling (DBV/ERC) installation. In case the gas carrier drifts out of the operational range of the marine loading arm, at first an alarm is generated and the ship loading / unloading is interrupted by closing the double ball valve combination at the marine loading arm and by closing the shut off valve in the ship loading / unloading line. If the ship drifts further ship and marine loading arm are disconnected by the emergency release coupling. This ensures that the marine loading arms can be operated safely and there is no risk of major damage of the loading arm due to the drift of the gas carriers. The closing of the double ball valve combination reduces the liquid spillage to the trapped volume between the two ball valves in case of disconnection. Furthermore the DBV/ERC enables the gas carrier to escape quickly in case of danger (e.g. fire at the jetty). In this case normal disconnection of the connection flanges, which takes a considerable time, is not required. Dr. Kuver -9-

11 3.2.2 Intank Pumps As described above all tank nozzles are located on the top of the tank. Because there is no nozzle in the liquid phase a leakage at a flange connection only results in vapour leakage. Due to this nozzle arrangement submerged motor pumps are necessary for the product send out. The pumps deliver the product to a discharge nozzle at the top of the tank where the send out piping is connected. The power for the pumps is also supplied via the top of the tank. The pump is connected with the junction box via the electrical cables and two gas tight feeders with a distance piece in between. The distance piece is purged with nitrogen to avoid the formation of an explosive mixture in case of feed thru leakage Booster Pumps For the send out to the spherical tank farm, booster pumps are required to achieve the necessary pressure for pipeline injection. For this purpose a horizontal canned motor pump had been chosen. This type of pump offers a high degree of reliability combined with a high safety standard. Due to the construction of the pump - the motor is an integral part of the pump - there is no mechanical seal which can leak or fail LPG Heating Prior to the product send out the LPG is heated to +1 C. The heating is performed by steam. The condensate is routed to the drain system (client did not want to feed it back to the boiler). For a safe and economical heating process an indirect heating system was chosen. Therefore two heat exchangers, which are saddled on each other, are connected by several pipes on the shell side. In one case a heat exchanger with one big shell and two U-bundles is installed. On the shell side of the lower heat exchanger ethanol is evaporated against condensing steam. The evaporated ethanol is condensed again in the upper heat exchanger, while the LPG is heated on its tube side. This installation offers the following advantages in respect to the plant safety compared with a direct heating with steam: If the indirect heat exchanger is in operation and if there is a failure (crack) of a tube of either bundles there will be no leakage of flammable gases or liquids to the atmosphere. A crack results in a pressure increase of the shell side. If the indirect heat exchanger is not in operation and if there is a failure (crack) of a tube of the upper bundle there will be no leakage of flammable gases to the atmosphere. A crack results in a pressure increase of the shell side. If the indirect heat exchanger is not in operation and if there is a failure (crack) of a tube of the lower bundle there will be only a leakage of flammable liquid to the disposal system. In the disposal system the flammable liquid is diluted and the danger of ignition is minimized. Furthermore the quantity of ethanol in the shell side, which can spill into the drain, is restricted. A failure (crack) of a tube of a direct heat exchanger always results in a leakage of LPG to the sewing system. The quantity that spills into the sewer is dependent of the time until countermeasures are taken. An ignition of the spilled LPG can take place at a location far away from the source of leakage. The freezing of the steam / steam condensate is excluded, because it is separated by the inter-medium ethanol from the cryogenic LPG. If there were a direct heating the steam / steam condensate system Dr. Kuver -10-

12 can freeze. If there is steam, condensate is trapped in the heat exchanger and cold LPG flows on the other side Blow down / flare system For a safe and environmentally friendly disposal of waste gases a blow down and flare system is installed. To avoid inadmissible pressure increase in equipment and piping, pressure safety valves are installed, releasing the LPG to the blow down system. All lines with a "locked-in" liquid volume of more than 40 litres are equipped with a thermal expansion valve also connected to the blow down system. The blow down gases are led to a blow down vessel where liquid and vapour phase are separated from each other. The liquid phase is evaporated by a steam tracing of the blow down vessel and thereafter led to the flare together with the vapour phase from the safety valves. At the flare the gases are combusted smokelessly. 3.3 SAFETY INSTALLATIONS Gas Detection In a LPG terminal there is always the potential risk of accumulation of explosive gases, e.g. due to failure of a gasket resulting in LPG leakage into the atmosphere. To detect any accumulation of those explosive gas mixtures in the plant in an early stage gas detectors are installed at strategical locations. These gas detectors generate an alarm at 15 % LEL alerting the operations personnel to look for the source of the gas. If there is a heavy leakage the accumulation may increase beyond 15 % LEL. To avoid that an explosion takes place the plant is shut down and brought to its safe position at 40 % LEL. The following areas are protected by gas detection installation: Jetties Tank roofs Compressor shelter Apparatus area Pump platform Control room building Fire Detection In case of fire it is most important that the operations personnel are informed immediately to commence fire fighting measures. Therefore a fire detection system is installed in areas with an accumulation of flange connections and at machines with mechanical seal. The fire detection system consists of a PE hose which is pressurised. In case of fire the hose melts and the pressure drop effects a pressure alarm in the control room. Dr. Kuver -11-

13 A fire detection system is installed in the following areas: GAS-TECH 2000 Houston Tanks Compressor shelter Fire Fighting For the supply of fire fighting water three fire fighting pumps are installed with a capacity of 680 m_/h each pump. Sea water is used as fire fighting water. Different kinds of fire fighting equipment are installed all over the plant. On the tank roof and in the compressor shelter a fixed sprinkler system is installed. The primary task of the sprinkler system is to cool the equipment which is adjacent to the fire. The system is designed for 4.2 l/m_min for the sprinkler system on the tank roof and 10 l/m_min for the sprinkler system in the compressor shelter. Six manual operated monitors with a capacity of 3,000 l/min each are installed around the two tanks to have a well concentrated fire water jet to extinguish a limited fire and to cool the concrete container of the tanks. Additionally each jetty is equipped with two remote controlled fire fighting monitors installed on stand post. These monitors are mainly for fire fighting purposes on the gas carriers. For the supply of additional fire fighting water hoses can be connected to hydrants which are installed at various places in the plant. 4. Conclusion The Shanghai refrigerated LPG terminal is a modern installation with a high safety standard according to European level. The design is based on the latest recognised technical standard taking into account the safety requirements which are required because of the location next to the Shenshan crude oil terminal. Especially the design of the two tanks is very economical, because it combines the most advanced safety features with low investment cost. Literature /1/ British Standard BS 7777: Flat-bottomed, vertical, cylindrical storage tanks for low temperature service, Part 1: Guide to the general provisions applying for design, construction, installation and operation, 1993 Dr. Kuver -12-

International Safety Guide Chapter 30 for Inland Navigation Tank-barges and Terminals. Chapter 30 FIRE-FIGHTING

International Safety Guide Chapter 30 for Inland Navigation Tank-barges and Terminals. Chapter 30 FIRE-FIGHTING Chapter 30 FIRE-FIGHTING This Chapter discusses events which may follow cargo spillage and the procedures which can be adopted to protect life and property in such circumstances. It also describes the

More information

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES FLAME AND GAS DETECTION FOR LNG FACILITIES Liquefied natural gas (LNG) is a generic name for liquefied hydrocarbon gas composed primarily of methane. When natural gas is cooled to approximately -260 F,

More information

MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN

MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN MB05. RESPOND TO EMERGENCIES BASIC KNOWLEDGE OF EMERGENCY PROCEDURES, INCLUDING EMERGENCY SHUTDOWN Content of the lecture 1. DRILLS AND EMERGENCY EXERCISES (general requirements) 2. Emergency procedures

More information

STANDARDS FOR VAPOUR EMISSION CONTROL SYSTEMS ( MARPOL reg VI/15 )

STANDARDS FOR VAPOUR EMISSION CONTROL SYSTEMS ( MARPOL reg VI/15 ) STANDARDS FOR VAPOUR EMISSION CONTROL SYSTEMS ( 92-98 MARPOL reg VI/15 ) MSC/Circ.585 16 April 1992 1 The Maritime Safety Committee, at its sixtieth session, recognized the necessity of the international

More information

Fire protection on chemical manufacturing sites

Fire protection on chemical manufacturing sites CFPA-E No 18:2008 Fire protection on chemical manufacturing sites FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation

More information

APPLICATION OF HYDROCARBON REFRIGERANTS IN LOW TEMPERATURE CASCADE SYSTEMS

APPLICATION OF HYDROCARBON REFRIGERANTS IN LOW TEMPERATURE CASCADE SYSTEMS APPLICATION OF HYDROCARBON REFRIGERANTS IN LOW TEMPERATURE CASCADE SYSTEMS B. M. ADAMSON Refrigeration Engineering Pty Ltd PO Box 1197 Unanderra NSW 2526 Australia Fax +61 2 4262 3001; Email: ben_adamson@refeng.com.au

More information

VAPOUR RECOVERY DURING FUEL LOADING. Ben Adamson Principal Engineer Refrigeration Engineering Pty Ltd, NSW Australia

VAPOUR RECOVERY DURING FUEL LOADING. Ben Adamson Principal Engineer Refrigeration Engineering Pty Ltd, NSW Australia VAPOUR RECOVERY DURING FUEL LOADING Ben Adamson Principal Engineer Refrigeration Engineering Pty Ltd, NSW Australia ben_adamson@refeng.com.au ABSTRACT Volatile fuels such as gasoline and naphtha, and to

More information

Safety is more than just being careful: it

Safety is more than just being careful: it Remote controlled monitors - a smart and reliable answer for a safer protection Nico Zorzetto, Director Export e Marketing Sanco Spa Safety is more than just being careful: it includes knowing what is

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL Annex 2, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL Section 1 Application 1 The following new sentence is added to the end of paragraph 1.2:

More information

Submerged Pumps and Expanders with Magnetic Coupling for Hazardous Applications

Submerged Pumps and Expanders with Magnetic Coupling for Hazardous Applications Proceedings of the First Middle East Turbomachinery Symposium February 13-16, 2011, Doha, Qatar Submerged Pumps and Expanders with Magnetic Coupling for Hazardous Applications Vinod Patel Chief Technical

More information

Explosion Protection Engineering Principles

Explosion Protection Engineering Principles Handbook of Fire and Explosion Protection Engineering Principles for Oil, Gas, Chemical and Related Facilities Second edition Dennis P. Nolan ELSEVIER AMSTERDAM BOSTON HEIDELBERG LONDON NEW YORK OXFORD

More information

DRY BULK HANDLING SYSTEM

DRY BULK HANDLING SYSTEM DRY BULK HANDLING SYSTEM Parson Marine Equipment is established in Singapore since July 2005. Our team of engineers have more than 25 years of experiences in providing customised integrated dry and wet

More information

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20 Piping Layout Design Introduction The performance requirements of the equipment are developed by design teams which normally include members from the different departments such as process, engineering,

More information

Technical Discussion on

Technical Discussion on Technical Discussion on Closed drain system Knock Out Drum system Common venting system Water Seal Drum Remote Ignition system Flare system By D DAS Need of CD, KOD,Water Seal Drum,Remote Ignition system

More information

BOILER HOUSE PRODUCTS GMS

BOILER HOUSE PRODUCTS GMS GMS BOILER HOUSE PRODUCTS Contents Page 2 Introduction 3 Condensate Pumpsets 6 Blowdown Vessels 8 Boiler Feed Tanks Page 10 Chemical Dosing Pots 11 Vent Heads 11 De-Aerator Heads Introduction to Boiler

More information

Repair instruction and handling for Isobutane (R600a) refrigerant.

Repair instruction and handling for Isobutane (R600a) refrigerant. Repair instruction and handling for Isobutane (R600a) refrigerant. Refrigerant Isobutane R600a Isobutane is a colourless gas with a slight odour. It is also known as cigarette lighter fuel and camping

More information

BLABO. Non-man entry tank cleaning and oil recovery system. Automated tank cleaning and. Designed for large, containing crude oil or heavy fuel oil

BLABO. Non-man entry tank cleaning and oil recovery system. Automated tank cleaning and. Designed for large, containing crude oil or heavy fuel oil BLABO Non-man entry tank cleaning and oil recovery system Automated tank cleaning and aboveground oil storage recovery tanks solutions Designed for large, containing crude oil or heavy fuel oil health,

More information

Notice on the implementation of the amendments to the FSS Code in resolution MSC.339(91)

Notice on the implementation of the amendments to the FSS Code in resolution MSC.339(91) C C S 通函 Circular China Classification Society (2013) Circ.111 /Total No.397 25/07/2013 (total pages:18) To relevant departments of CCS Headquarters, Shanghai Rules and Research Institute, plan approval

More information

Installation and Commissioning Manual

Installation and Commissioning Manual Manual Advance Buffer Vessels for Ground Source Heat Pump Systems Installation and Commissioning Manual Copyright 2015 Kensa Heat Pumps Ltd Page 1 of 12 Contents Page Section Description Page 1... Safety

More information

Cast Line Heaters The Benefits of This Space Saving Electric Heater

Cast Line Heaters The Benefits of This Space Saving Electric Heater WHITE PAPER Cast Line Heaters The Benefits of This Space Saving Electric Heater Introduction Cast line heaters, or cast-in heaters, offer an alternative to the more common inline process heaters that have

More information

Arrangements of cold exchangers or cold accumulators in cryogenic separation or liquefaction plants.

Arrangements of cold exchangers or cold accumulators in cryogenic separation or liquefaction plants. CPC - F25J - 2017.08 F25J LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS {OR LIQUEFIED GASEOUS} MIXTURES BY PRESSURE AND COLD TREATMENT {OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE

More information

Technology for Vacuum Systems. Instructions for use

Technology for Vacuum Systems. Instructions for use page 1 of 8 Technology for Vacuum Systems Instructions for use GKF 1000i Cold trap page 2 of 8 Content Safety information!...3 General information...3 Intended use...3 Setting up and installing the cold

More information

EEMUA E Learning and Publications Catalogue

EEMUA E Learning and Publications Catalogue EEMUA E Learning and Publications Catalogue E learning courses and publications can be purchased online at https://www.eemua.org/shop.aspx Alternatively, please contact EEMUA by telephone +44 (0)20 7488

More information

Compressed air preparation Compressed air storage Moisture management. Catalog #1

Compressed air preparation Compressed air storage Moisture management. Catalog #1 Compressed air preparation Compressed air storage Moisture management Catalog #1 This Catalogue is valid from May 2015. All previous catalogues lose their validity with the publication of the new catalogue.

More information

IMO. Resolution A.951(23) Adopted on 5 December 2003 (Agenda item 17) IMPROVED GUIDELINES FOR MARINE PORTABLE FIRE EXTINGUISHERS

IMO. Resolution A.951(23) Adopted on 5 December 2003 (Agenda item 17) IMPROVED GUIDELINES FOR MARINE PORTABLE FIRE EXTINGUISHERS INTERNATIONAL MARITIME ORGANIZATION E IMO ASSEMBLY 23rd session Agenda item 17 A 23/Res.951 25 February 2004 Original: ENGLISH Resolution A.951(23) Adopted on 5 December 2003 (Agenda item 17) IMPROVED

More information

Jet ejectors for the oil industries. Vacuum solutions for refineries and the petrochemical industries

Jet ejectors for the oil industries. Vacuum solutions for refineries and the petrochemical industries Jet ejectors for the oil industries Vacuum solutions for refineries and the petrochemical industries Vacuum distillation From plant planning to commissioning Vacuum distillation is used in oil refineries

More information

Refrigeration Technology in Building Services Engineering

Refrigeration Technology in Building Services Engineering Unit 70: Unit code: T/600/0459 QCF Level: 3 Credit value: 10 Guided learning hours: 60 Unit aim Refrigeration Technology in Building Services Engineering This unit develops an understanding of the principles,

More information

How to deal with ...R410A MITSUBISHI ELECTRIC R32 R125 R410A AIRCONDITIO NING

How to deal with ...R410A MITSUBISHI ELECTRIC R32 R125 R410A AIRCONDITIO NING How to deal with R32 R125 R410A...R410A MITSUBISHI ELECTRIC AIRCONDITIO NING R410A Contents What is R410A?......................................... 3 Expressions...........................................

More information

Points to be Considered when Purchasing a Steam Jet Vacuum Pump

Points to be Considered when Purchasing a Steam Jet Vacuum Pump Steam Jet Vacuum Pump 1. Suctin flow determination 2. Required suction pressure 3. Direct contact versus surface type condenser 4. Installations 4.1 Barometric 4.2 Semi-barometric 4.3 Non-barometric 5.

More information

Annex of the Certificate (Page 1/7) Scope of Accreditation

Annex of the Certificate (Page 1/7) Scope of Accreditation Annex of the Certificate (Page 1/7) Scope of Accreditation As a "Type A" Inspection Body Address : Şerifali Mah. Açıkyüz Sok. No:2-3 Ümraniye 34775 İSTANBUL/TÜRKİYE Phone : 0 216 313 14 20 Fax : 0 216

More information

QENOS ALTONA SAFETY CASE COMMUNITY INFORMATION BULLETIN 2012

QENOS ALTONA SAFETY CASE COMMUNITY INFORMATION BULLETIN 2012 QENOS ALTONA SAFETY CASE COMMUNITY INFORMATION BULLETIN 2012 WHO IS QENOS? The Qenos ALTONA sites are licensed as a Major Hazard Facility (MHF) under the Victorian Occupational Health and Safety (OHS)

More information

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION DuPont Formacel Z-2 FOAM EXPANSION AGENT TECHNICAL INFORMATION Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications Flammability of Formacel Z-2 and Other Alternative

More information

CI/SfB X. RHeco Series CONDENSING GAS FIRED UNIT HEATERS

CI/SfB X. RHeco Series CONDENSING GAS FIRED UNIT HEATERS CI/SfB 56.83 X RHeco Series CONDENSING GAS FIRED UNIT HEATERS RHeco Series CONDENSING GAS FIRED UNIT HEATERS Introduction Features & Benefits Model Range Reznor continue their tradition of manufacturing

More information

RESOLUTION MSC.292(87) (adopted on 21 May 2010) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS

RESOLUTION MSC.292(87) (adopted on 21 May 2010) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS RESOLUTION MSC.292(87) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee, NOTING resolution MSC.98(73)

More information

RESOLUTION MSC.339(91) (adopted on 30 November 2012) AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE)

RESOLUTION MSC.339(91) (adopted on 30 November 2012) AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee, NOTING resolution MSC.98(73), by which it

More information

Above Ground Fuel Tank Requirements

Above Ground Fuel Tank Requirements FIRE DEPARTMENT in cooperation with Above Ground Fuel Tank Requirements The purpose of this document is to provide information about general Fire Code requirements for above ground storage within the unincorporated

More information

Ontario Fire Code SECTION 5.10 COMBUSTIBLE DUST PRODUCING PROCESSES. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.10 COMBUSTIBLE DUST PRODUCING PROCESSES. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.10 COMBUSTIBLE DUST PRODUCING PROCESSES Illustrated Commentary Office of the Ontario Fire Marshal Combustible Dust Illustrated Commentary 1 Mechanical Exhaust Systems 5.10.1.1.

More information

Karlsruher Glastechnisches Werk KGW-ISOTHERM

Karlsruher Glastechnisches Werk KGW-ISOTHERM Karlsruher Glastechnisches Werk KGW-ISOTHERM Germany 76185 Karlsruhe Gablonzer Straße 6 Tel. 0049 / 721 / 95897-0 Fax. 0049 / 721 / 95897-77 E-Mail: info@kgw-isotherm.de Internet: kgw-isotherm.com Operating

More information

Multifunction pump for handling gaseous liquids in process engineering

Multifunction pump for handling gaseous liquids in process engineering Multifunction pump for handling gaseous liquids in process engineering Pumping liquids with a high gas content can be problematic, causing sharp losses in head and flow or even total cessation of pump

More information

FoamFatale INTRODUCTION OF A NOVEL HIGH END TECHNOLOGY FOR LARGE ATMOSPHERIC STORAGE TANK FIRES. TFEX 1 Ltd.

FoamFatale INTRODUCTION OF A NOVEL HIGH END TECHNOLOGY FOR LARGE ATMOSPHERIC STORAGE TANK FIRES. TFEX 1 Ltd. INTRODUCTION OF A NOVEL HIGH END TECHNOLOGY FOR LARGE ATMOSPHERIC STORAGE TANK FIRES TFEX 1 Ltd. FoamFatale technology makes it possible to make a huge step forward in protecting the environment against

More information

Ashirwad Carbonics (India) Private Limited

Ashirwad Carbonics (India) Private Limited Ashirwad Carbonics (India) Private Limited Co2 Production Plant Technical Literature Our precision engineered range of CO2 Generation Plant is available in various capacities and models as per the clients

More information

LGCNCOE Study Guide: Fixed Gas Detection

LGCNCOE Study Guide: Fixed Gas Detection LGCNCOE Study Guide: Fixed Gas Detection References Regulatory International Gas Carrier Code (IGC) regulation 13.6 Gas Carrier Code (GC) regulation 13.6 Existing Gas Carrier Code regulation 13.6 46 CFR

More information

Survey of electrical equipment installed in hazardous areas on tankers

Survey of electrical equipment installed in hazardous areas on tankers (June 2015) Survey of electrical equipment installed in hazardous areas on tankers 1. Application The recommendations in this document apply for survey of electrical installation in hazardous areas on

More information

Safety Considerations for Hydrogen Installations

Safety Considerations for Hydrogen Installations Safety Considerations for Hydrogen Installations Nick Barilo PNNL Hydrogen Safety Program Manager Northeast Outreach - April 2016 1 Hydrogen Properties and Behavior A gas at ambient conditions Hydrogen

More information

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. 1 MHG Heating Ltd ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR Telephone 08456 448802 Fax 08456 448803

More information

DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK)

DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK) DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK) J. Benkert, F. Willman Westinghouse Electric Germany GmbH Mannheim / D K. Brockmann, I. Hillebrand Research

More information

Multi-Elec COMPACTE BOILER

Multi-Elec COMPACTE BOILER Multi-Elec COMPACTE BOILER TECHNICAL MANUAL 03/2013 CODE: 560956 CE Directive 2006/95/CEE British Standard EN 60335-1 (C 73800) FOR TECHNICAL HELP/ADVICE Call 0161 621 5960 or email info@atlanticboilers.com

More information

BASIC BOILERS NAME :- DATE :-

BASIC BOILERS NAME :- DATE :- BASIC BOILERS NAME :- DATE :- This examination was conducted under conditions that allowed a fair and honest test of the candidate s knowledge and ability. Exam supervisor C:\Tassie Steam\N01basicboiler

More information

This chapter is devided into two sections:

This chapter is devided into two sections: This chapter is devided into two sections: Page Installation requirements........................................................................ 127 The installation process..........................................................................

More information

HAZARDOUS AREA CLASSIFICATION AND SELECTION OF EQUIPMENT FOR SAFE USE THEREIN FROM AN ELECTRICAL VIEWPOINT

HAZARDOUS AREA CLASSIFICATION AND SELECTION OF EQUIPMENT FOR SAFE USE THEREIN FROM AN ELECTRICAL VIEWPOINT HAZARDOUS AREA CLASSIFICATION AND SELECTION OF EQUIPMENT FOR SAFE USE THEREIN FROM AN ELECTRICAL VIEWPOINT Olof Bekker Pr. Eng. BSc. Eng. BML S.MSAIEE, M.NACE Engineering Manager, Electrical COMMITMENT

More information

MODULE 2. Water-Based Suppression System Basics

MODULE 2. Water-Based Suppression System Basics MODULE 2 Water-Based Suppression System Basics Based on the Ohio Building Code (OBC) National Fire Protection Association (NFPA) & Ohio Fire Code (OFC) 1 WATER-BASED SUPPRESSION SYSTEM BASICS-PART ONE

More information

LP GAS LEKAGE ALARM. M. G.. D. D. Wickramasinghe 1*, N. Abhayasinghe 2

LP GAS LEKAGE ALARM. M. G.. D. D. Wickramasinghe 1*, N. Abhayasinghe 2 - 32 - LP GAS LEKAGE ALARM M. G.. D. D. Wickramasinghe 1*, N. Abhayasinghe 2 1* Corresponding Author, Department of Electronic and Computer Engineering, Sri Lanka Institute of Information Technology (SLIIT),

More information

Propane Flame Projector Safety instructions and operating manual

Propane Flame Projector Safety instructions and operating manual Bigflame Propane Flame Projector Safety instructions and operating manual 1 Flame projector Bigflame Safety instructions Caution The directions in this manual must be followed strictly. It is imperative

More information

DEHYDRATION AND DESALTING

DEHYDRATION AND DESALTING DEHYDRATION AND DESALTING Wet Crude Oil Crude oil from a GOSP may contain very small droplets of salty water Many of these droplets are held in suspension by a thin film of oil that surrounds them. These

More information

Metropolitan. Steam Boiler. Suitable for Pressure Jet or Rotary Cup burners Oil, gas or dual fuel firing. Outputs kg/h

Metropolitan. Steam Boiler. Suitable for Pressure Jet or Rotary Cup burners Oil, gas or dual fuel firing. Outputs kg/h Metropolitan Steam Boiler Suitable for Pressure Jet or Rotary Cup burners Oil, gas or dual fuel firing Outputs 1845-21 700 kg/h 1 Metropolitan - Steam Boiler The Metropolitan is a range of high pressure

More information

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier OM004 Installation, Operation and Maintenance Instructions for Electric Storage Calorifier The operating and maintenance instructions contained within this package are for standard electric storage calorifiers

More information

PIPING SYSTEM EQUIPMENTS

PIPING SYSTEM EQUIPMENTS PIPING SYSTEM EQUIPMENTS Introduction Equipments are devices that provide power, process and store materials. Equipments in piping systems depend on the specific industries using them. Specialized equipment

More information

Membrane Dryer. Air inflow rate KMM Series to m 3 /min

Membrane Dryer. Air inflow rate KMM Series to m 3 /min Membrane Dryer Air inflow rate KMM Series 0.08 to. m /min Why is it necessary to dry compressed air? The atmospheric air drawn into a compressor is a mixture of gases that always contains water vapour.

More information

LIST OF OISD STANDARDS (April 2016)

LIST OF OISD STANDARDS (April 2016) LIST OF OISD STANDARDS (April 2016) 1. OISD-STD-105 Work Permit System 2. OISD-STD-106 Pressure Relief & Disposal System 3. OISD-RP-108 Recommended Practices on Oil Storage and Handling 4. OISD-STD-109

More information

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!! Sample Written Program For Your Company For BOILER SAFETY Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-781-1446 Email: info@se-safety.com Purpose Boiler Safety Program The

More information

Introduction of the Design Features of Cryogenic Pumps and Expanders for FSRU Applications

Introduction of the Design Features of Cryogenic Pumps and Expanders for FSRU Applications Introduction of the Design Features of Cryogenic Pumps and Expanders for FSRU Applications Enver Karakas Project Engineering Manager Ebara International Corporation Cryodynamics Division Sparks, NV USA

More information

S&T HEAT EXCHANGERS Part II: Main Parts, Conical Transitions, Shell & Heads, Nozzle Design.

S&T HEAT EXCHANGERS Part II: Main Parts, Conical Transitions, Shell & Heads, Nozzle Design. S&T HEAT EXCHANGERS Part II: Main Parts, Conical Transitions, Shell & Heads, Nozzle Design. STUDY NOTES Instructor: Javier Tirenti training@arvengconsulting.com www.arvengconsulting.com Table of contents

More information

TMCI Padovan Evaporators

TMCI Padovan Evaporators TMCI Padovan Evaporators Evaporators Our range includes 4 types of evaporators: Forced Circulation Falling Film Evaporators Plates Thin Film Concentration systems Evaporator choosing criteria: product

More information

Ammonia Supply Systems for SCR

Ammonia Supply Systems for SCR Ammonia Supply Systems for SCR WPCA/Duke NOx Seminar June 7, 2005 Dr. Norman C. Foster Why is Ammonia Required? Ammonia (NH 3 ) is the Reducing Agent for NOx 2 NH 3 + 2 NOx + ½O 2 2 N 2 + 3 H 2 O N0 x

More information

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME:

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME: (For Vendor Registration Purpose) SHEET 1 of 6 1.00.00 GENERAL INFORMATION 1.01.00 The general guidelines as illustrated in the subsequent clauses of this section shall be applicable for air cooled condenser

More information

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-5-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Watlow heaters are built to comply with UL and CSA dielectric requirements, it may be

More information

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS INDEECO Circulation Heaters are designed to provide years of trouble free operation if properly installed and maintained. Please read and follow these instructions for installing and maintaining the heater.

More information

Efficient Steam System Design

Efficient Steam System Design Efficient Steam System Design The word Efficient is often used to describe the general performance of a system. However it is important to distinguish between efficiency and effectiveness. Efficiency is

More information

Kelsow Work Instruction. Buffalo Venture FPSO Fire Protection Systems

Kelsow Work Instruction. Buffalo Venture FPSO Fire Protection Systems Kelsow Work Instruction Buffalo Venture FPSO Fire Protection Systems Table of Contents Abbreviations and Definitions....................................................... 2 Overview............................................................................

More information

DIRECTIVE NO: D-B

DIRECTIVE NO: D-B DIRECTIVE NO: D-B6 100604 1 LOW PRESSURE THERMAL FLUID PLANT AUTOMATED CONTROL SYSTEMS Date of Issue: June 4, 2010 General Details This directive is being issued to owners, licensed contractors, consulting

More information

Trade of Plumbing. Module 2: Domestic Hot and Cold Water Service Unit 10: Hot Water Supply Phase 2

Trade of Plumbing. Module 2: Domestic Hot and Cold Water Service Unit 10: Hot Water Supply Phase 2 Trade of Plumbing Module 2: Domestic Hot and Cold Water Service Unit 10: Hot Water Supply Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 2 Domestic

More information

1. Know your process. The following guidelines will help you navigate what can be a challenging and time consuming task.

1. Know your process. The following guidelines will help you navigate what can be a challenging and time consuming task. Many processes today require an indirect method of heating, which implies the use of a heat transfer medium, instead of circulating the process directly into a heater. Thermal oil, water, glycol mixtures,

More information

MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES

MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES Copyright Material PCIC Europe Paper No. PCIC Europe LO-70 Allan Bozek EngWorks, Inc. 1620 49 th Avenue, SW Calgary, AB T2T

More information

Bringing Hydrocarbon to the Market Training & Certification

Bringing Hydrocarbon to the Market Training & Certification Bringing Hydrocarbon to the Market Training & Certification GIZ Proklima side-event 24 th Meeting of the Parties 13 th November 2012, Geneva Switzerland Rolf Huehren Rolf.huehren@proklima.net GIZ Proklima,

More information

INTRODUCTION TO DUSTS AND THEIR EXPLOSIVE PROPERTIES

INTRODUCTION TO DUSTS AND THEIR EXPLOSIVE PROPERTIES INTRODUCTION TO DUSTS AND THEIR EXPLOSIVE PROPERTIES Olof Bekker Pr. Eng. BSc. Eng. BML S.MSAIEE, M.NACE Engineering Manager, Electrical and Facilities DUST EXPLOSION! 1 DEFINITION Dust consists of small

More information

Fixed Fire Extinguishing Equipment and Systems

Fixed Fire Extinguishing Equipment and Systems Fixed Fire Extinguishing Equipment and Systems Sea Term 2016 Massachusetts Maritime Academy January 2016 DESIGN AND INSTALLATION OF FTXED SYSTEMS Fire extinguishing systems are designed and installed

More information

RULES FOR STATUTORY SURVEY OF SEA-GOING SHIPS. FIRE-FIGHTING EQUIPMENT AND ESCAPE EQUIPMENT 2017 January

RULES FOR STATUTORY SURVEY OF SEA-GOING SHIPS. FIRE-FIGHTING EQUIPMENT AND ESCAPE EQUIPMENT 2017 January RULES FOR STATUTORY SURVEY OF SEA-GOING SHIPS PART VIII FIRE-FIGHTING EQUIPMENT AND ESCAPE EQUIPMENT 2017 January GDAŃSK Part VIII Fire-fighting Equipment and Escape Equipment January2017, of the Statutory

More information

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109 LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME 1. OISD-STD-105 Work Permit System 2. OISD-STD-106 Pressure Relief & Disposal System 3. OISD-RP-108 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

More information

Adca Training. Part 2

Adca Training. Part 2 Adca Training Part 2 This presentation is only a guideline, that can only be completed by a trained personnel. (This document s total or partial use and/or reproduction is only allowed if the reference

More information

Wet alarm valve stations

Wet alarm valve stations VdS Guidelines for water extinguishing systems VdS 2100-01en Requirements and test methods VdS 2100-01en : 2011-05 (02) Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln,

More information

CRU-S Series Stainless Steel Condensate Recovery Unit

CRU-S Series Stainless Steel Condensate Recovery Unit IM-UK-CRU-S UK Issue 1 CRU-S Series Stainless Steel Condensate Recovery Unit 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Storage, shutdown and equipment protection

More information

Falling-film evaporators.

Falling-film evaporators. Falling-film evaporators. State-of-the-art falling-film evaporators for efficient steam utilisation in beet and cane sugar factories and sugar refineries. 2 BMA Passion for Progress For over 160 years,

More information

2x58 MW Coal Fired Power Plant at Mauritius

2x58 MW Coal Fired Power Plant at Mauritius 2x58 MW Coal Fired Power Plant at Mauritius The coal-fired power plant produces electricity by the burning of coal and air in a Circulating Fluidized Bed Combustion Boiler (CFBC), where it heats water

More information

Process Simulation and Optimization of Cryogenic Operations Using Multi-Stream Brazed Aluminum Exchangers

Process Simulation and Optimization of Cryogenic Operations Using Multi-Stream Brazed Aluminum Exchangers Page 1 of 12 Process Simulation and Optimization of Cryogenic Operations Using Multi-Stream Brazed Aluminum Exchangers JOHN C. POLASEK, Bryan Research & Engineering, Inc., Bryan, Texas STEPHEN T. DONNELLY,

More information

FUNCTIONAL SAFETY IN FIRE PROTECTION SYSTEM E-BOOK

FUNCTIONAL SAFETY IN FIRE PROTECTION SYSTEM E-BOOK FUNCTIONAL SAFETY IN FIRE PROTECTION SYSTEM E-BOOK USEFUL TERMINOLOGY BASIC PROCESS CONTROL SYSTEM (BPCS) System which responds to input signals from the process, its associated equipment, other programmable

More information

Process Hazard Analysis Facility Siting Checklist

Process Hazard Analysis Facility Siting Checklist Process Hazard Analysis Facility Siting Checklist Facility: Date: Team Members: Note: For compliance, OSHA expects specific justification for each individual situation/condition. GENERAL CONSIDERATIONS

More information

THE THOMPSON MODEL A STEAMER NEW UNIT ASSEMBLY INSTRUCTIONS

THE THOMPSON MODEL A STEAMER NEW UNIT ASSEMBLY INSTRUCTIONS THE THOMPSON MODEL A STEAMER NEW UNIT ASSEMBLY INSTRUCTIONS Included with this unit are 1 propane regulator, 1 propane hose assembly, 1 filler plug wrench and 100' of steam hose. In order to operate this

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 12 Chemical Recovery Vessels Edition 2005 The following Rules come into force on September 1 st, 2005 Germanischer Lloyd Aktiengesellschaft

More information

Tel: Fax: Website:

Tel: Fax: Website: Vacuum Dehydration Oil Purification System(Oil Purifier) The water and particles contamination in lubrication, hydraulic and dielectric oils badly affect the oils performance and threaten system reliability.

More information

Technical Development Program

Technical Development Program Technical Development Program COMMERCIAL HVAC CHILLER EQUIPMENT Water-Cooled Chillers PRESENTED BY: Omar Rojas Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

More information

HEAT PUMPS WITH HYDROCARBONS AS REFRIGERANTS FOR SMALL RESIDENTIAL BUILDINGS

HEAT PUMPS WITH HYDROCARBONS AS REFRIGERANTS FOR SMALL RESIDENTIAL BUILDINGS HEAT PUMPS WITH HYDROCARBONS AS REFRIGERANTS FOR SMALL RESIDENTIAL BUILDINGS E. Wobst, Professor, Main Department of Refrigeration & Cryogenics, Institute for Air-Conditioning and Refrigeration, Dresden,

More information

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y LS BARGE PUMP. Vertical high-flow pump

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y LS BARGE PUMP. Vertical high-flow pump N N O V A T I O N E F F I C I E N C Y Q U A L I T Y LS BARGE PUMP LS BARGE For more than 60 years the name Ruhrpumpen has been synonymous worldwide with innovation and reliability for pumping technology

More information

Government Gazette Staatskoerant

Government Gazette Staatskoerant Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID AFRIKA Regulation Gazette No. 10177 10701 Regulasiekoerant Regulation Gazette Vol. 621 24 March Maart 2017 No. 40713 PART 1

More information

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements.

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements. 4.7 FIRE PROTECTION AND EMERGENCY RESPONSE This section addresses the fire protection and emergency response resources related to the proposed Project. These resources include the existing services and

More information

Instruction manual CCU 5-P. Table of contents

Instruction manual CCU 5-P. Table of contents Instruction manual Version: 1.0040.40 Updated: 09/02/2018 Replaces: CCU 5-P Table of contents Introduction... s. 2 Design / Construction... s. 3 Flammable gases and liquids... s. 4 Safety... s. 4 Service

More information

The Experts in Vacuum Solutions

The Experts in Vacuum Solutions The Vmax is a direct-drive, gravity-fed, self-contained, oil-sealed, air- or water-cooled, vacuum system utilizing a liquid ring vacuum pump. A Vmax system can incorporate either a single-stage or a two-

More information

PURGER INSTALLATION AND OPERATION BULLETIN PUR-SB17-02 SERVICE BULLETIN

PURGER INSTALLATION AND OPERATION BULLETIN PUR-SB17-02 SERVICE BULLETIN VALVES VESSELS SYSTEMS CONTROLS PURGER INSTALLATION AND OPERATION BULLETIN PUR-SB17-02 SERVICE BULLETIN System drawings shown in this bulletin are for illustration purposes only. Refrigeration systems

More information

AIR-CONDITIONING SERVICE COMPRESSOR REPLACEMENT AND FLUSHING THE AIRCONDITIONING SYSTEM

AIR-CONDITIONING SERVICE COMPRESSOR REPLACEMENT AND FLUSHING THE AIRCONDITIONING SYSTEM AIR-CONDITIONING SERVICE COMPRESSOR REPLACEMENT AND FLUSHING THE AIRCONDITIONING SYSTEM AIR CONDITIONING BASICS COMPRESSOR REPLACEMENT OVERVIEW AND IMPORTANT INSTRUCTIONS The air conditioning compressor

More information

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document By the Authority Vested By Part 5 of the United States Code 552(a) and Part 1 of the Code of Regulations 51 the attached document has

More information

contents iii Drilling Tools 27 Adjustable Choke 27 Automatic Drillers 29 MWD and LWD Tools 30 How They Work 30 Uses 30

contents iii Drilling Tools 27 Adjustable Choke 27 Automatic Drillers 29 MWD and LWD Tools 30 How They Work 30 Uses 30 Figures v Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Pipe Handling Equipment 3 Kelly Spinners 3 Maintenance 6 Spring Slips and Power Slips 7 Maintenance 9 Automatic Pipe Handlers

More information