1 Piping Layout Design Introduction The performance requirements of the equipment are developed by design teams which normally include members from the different departments such as process, engineering, maintenance, etc. The equipment can be divided into two groups: standard and custom. Standard equipments can be bought from vendors once their requirements are finalized. Examples are pumps, compressors, fans, etc. Custom equipments are designed and built from performance requirements by vendors or in-house. Vendors provide performance and installation specifications for their products. In piping drawings, equipments need not be drawn in details, often outline drawings with nozzles are adequate. But it is absolutely essential that the volume or space assigned to them is at least equal to the physical volume of the equipments bounding boxes. The bounding box for equipment is defined by the three principal dimensions of the equipment. The principal dimensions of the equipment are the overall sizes in a local 3D rectangular coordinate system for it. In addition to the three principal dimensions, interface feature sizes and location dimensions are also important and required in piping drawings. Interface features contain faces that are attachment points for piping connectors, instruments, and other devices. Others are mounting bases or faces that allow the equipments to be attached to foundations or other surfaces. Both the sizes and location dimensions on these features are required in piping drawings. Fire Safety Concerns Tanks and vessels must be laid out with fire prevention and containment in mind. Accordingly, recommendations of National Fire Protection Association (NFPA) and Occupational Safety and Health Administration (OSHA), and other regulatory bodies must be adhered to. Table 1 gives some guidelines. 1. Flammable liquid facilities should be isolated from important buildings or equipment. 2. Flammable liquids must be confined to closed containers, equipment and piping systems. They should be designed such that (a) uncontrolled escape of vapor from liquid is prevented, (b) accidental discharge of liquid can be shut-up rapidly, and (c) escaping liquid can be confined to the smallest possible area. 3. Tanks containing flammable liquid in open areas must be spaced to meet regulatory requirements. 4. Check insurer requirements 5. Ensure adequate ventilation to keep vapor concentration below the lower flammability limit. 6. Provide explosion panels in buildings to relieve explosion pressure and reduce structural damage. 7. Consider providing water sprays or sprinkler system around flammable liquid tanks 8. Valves for emergency use should be the quick-acting types. CONDITIONS Flammable or combustible liquid storage tanks (greater than 150 in diameter) Crude petroleum 126,000 gal max tank size, Non-congested locale Unstable flammable and unstable combustible liquid storage tanks Liquefied petroleum gas container from flammable or combustible liquid storage tank Liquefied petroleum gas container outside diked area containing flammable or combustible liquid storage tank(s) Tanks surrounded by other tanks Table 1: Tank spacing guidelines MINIMUM TANK GAP Greater of 3 or one-sixth of sum of adjacent tank diameters 3 one-half of sum of adjacent tank diameters from center of dike wall. If LPG container is smaller than 125 gal (US) and each liquid storage tank is smaller then 660 gal, exception applies Authority limit 1

2 Tanks and Vessels 1. Clear space from top to ground is required around tanks and towers for lowering devices by davit or crane. Davits are used to handle removable internals and should be placed on the side away from the pipe rack. 2. Towers should have column davits if top of tower is over 50-0 from grade. Access-ways on towers should be accessible from davits. 3. Vertical tanks and vessels should have access-ways at the top or bottom. Horizontal tanks and vessels should have them at one ends. 4. Largest vertical vessel determines locations of other equipments. 5. The edge of the largest tower should be a minimum of 10-0 from rack column centerline. 6. Towers over 10-0 in diameter need special care when placing access-ways or two davits may be needed. 7. Bottom of tower base ring is 6 above grade. 8. Piping lines should have a minimum of 12 or 3 to 4 times pipe diameter gap from vessel walls. 9. Brace supports for piping line should be about 12 long. Length above 18 needs special design. 10. Piping of tanks and vessels should start from the highest point. Larger pipes should be routed first. 11. Platforms, ladders, and access-ways should be clear of piping areas. 12. Minimum clearance between platform base plate and vessels is Appropriate vents, drains and steam clean-outs are needed on tanks and vessels. 14. Vessels should have relief valves. 15. Nozzle schedule should list and provide dimensions for all attachments on tanks/vessels 16. Nozzle projection on equipment should be the same, except special requirements dictate otherwise. 17. Inlets should be at the top of vertical tanks and vessels and outlets should be at the bottom. 18. Inlets and outlets should be at opposite ends of horizontal tanks and vessels. 19. Horizontal heat exchanger footing should be 13-6 from closet rack centerline. 20. Top grout should be no less than 2-6 for horizontal vessels. 21. Saddle thickness should be about 15% (rounded up to nearest 3 ) of vessel length. Pumps 1. Locate pumps close to access-ways, roads, and driveways for access and maintenance reasons. 2. Locate pumps under pipe racks where ever possible. 3. Place pumps on the same side as vessels and tanks of pipe rack. 4. Pumps should be placed close to hot or cold liquid sources to minimize pipe insulation. 5. Maintenance clear space is 3 for pumps and other equipment. 6. Drive end of pumps should have 5-6 clearance space. 7. Bottom of base plate is at 6 above grade. 8. Pump discharge centerline should be 2 min. (4 preferred) from pipe rack column centerline and a minimum of 1 above grade highest point. 9. Arrange multiple pumps parallel with discharge centerlines aligned. This allows more efficient location of auxiliary piping and drainage. 10. Relieve pumps of loads and stresses by providing supports for all piping, e.g pipe racks. 11. Consider locating pumps at vessel base if operating temperature is 204 o C (400 o F) or more. 12. Pipe suction line of carbon steel is 12 or more above grade but 8 or more for alloy steel. 13. Suction lines should be as short as possible. Use large radius bends if bends are unavoidable. 14. Straight portion of suction line before nozzle should be at least three times line diameter. This tends to prevent turbulence at pump suction. 15. Elbows on pump suction side should be placed in a vertical plane instead of the horizontal to minimize turbulence at pump suction. 16. If vertical suction pipe is required, use eccentric reducers with the flat side at the bottom to avoid air pockets at pump suction. For horizontal suction line, the flat side of eccentric reducers should be on top when placed. 17. Vents must be provided on the suction side to relieve lines of gases and air if eccentric reducers cannot be used. 18. Minimize pipe runs on pump suction side. 2

3 19. Suction line should slope slightly downwards toward the pump suction. 20. Gate and check valves are required at pump discharge line. 21. Horizontal valve handwheel should point towards maintenance or access area. 22. Ensure adequate NPSH (Net Positive Suction Head) for pump. NPSH is the dimension from bottom of vessel to pump centerline. Add 2 for suction line loss. Heat exchangers 1. Top of foundation s grout should be the same for all exchangers and 2-6 above highest point of grade. This may go up to 3-0 or more for tube-shell exchangers with large nuzzles. 2. A minimum clearance of 1-0 is needed between line insulation and grade. 3. Adequate tube removal space is needed for maintenance. Back head line of exchangers should be 8-0 from rack column centerline. 4. Back concrete footings or saddles of exchangers should line up. 5. Back saddle bolt holes centerlines should be 5-6 from the back head line as a rule. Reactors and Furnaces 1. Reactors should be at least 25 from other equipment, however 50 is preferred. 2. Furnaces should place 50 from hydrocarbon holding equipment. 3. Pulling area space for furnaces with tubes should be tube length plus Snuffing steam manifold should be at least 50 from a heater or furnace 5. Manual fuel shut off valves should be 50 away. 6. Control valves can be at the base of the furnace or near the rack. 7. Floor of vertical furnaces should be 7 from grade. 8. Flare stacks located 200 from nearest equipment. Platforms, Ladders and Stairways 1. Vessel platforms, secondary service levels in structures, furnaces and storage tanks may need ladders. 2. Vertical vessels need circular or hexagonal platforms supported by brackets from the side of the vessels. 3. Ladders, platforms, access-ways, etc should be located on the same side of tanks and vessels. 4. Platforms are needed for all elevated equipment, controls beyond reach from grade, and should have rails on all open sides. 5. Platforms should be about 2-6 to 3-0 below manhole center. 6. Platforms are usually 3 wide with 3-6 high handrails. 7. Platforms are spaced such that ladders are not more than 30 in vertical run 8. Ladder has 7 to 8 headroom clearance from ground. 9. Locate ladder and platform positions. Indicate if fabricator will provide platform and ladder. 10. Escape ladders are needed from service levels or platforms. 11. Exit spacing on service levels should be at most 75 (22.5 m) from main or secondary exit. 12. Side exit ladders are preferred for platforms. 13. Flare stacks need ladders for inspection and top maintenance. 14. Self-closing gates needed at ladder openings on all platforms. 15. Ladders 15 or more above grade need cages. 16. Stacks should be at least 70 (21 m) away from closest equipment. 17. Stacks and vents discharging hazardous vapor continuously should be 10 (3 m) high above platform. 18. Stacks and vents discharging hazardous vapor intermittently should be 10 (3 m) high above platform if within 35 (10.5 m) of closest equipment. 19. Non-hazardous vapors (air, steam) should be directed away from personnel. 20. Stairways required to service levels in structures, buildings, compressor houses, furnace decks requiring frequent access. 21. Storage tanks with diameter of 15 (4.5 m) and higher than 20 (6 m) require stairways for access. 3

4 Instruments 1. Special consideration to be given to configuration, location and orientation. 2. Important valves must be easily accessible for operation and maintenance (servicing, repair, and replacement). 3. Locate hand-operated valves so that they can be operated from access-ways and maintenance area. Allow a minimum of 2-6 for operating space. 4. Locate automatic after locating hand-operated valves. 5. Avoid use of manual actuators like chain operator except when absolutely necessary. 6. Operating valves at elevation 7-6 and higher above grade or platform need chain operator 7. Locate valves on horizontal runs of pipes. Fluids can become trapped above valves on vertical runs if they are closed. Provide drainage for valves on vertical runs of pipes. 8. Locate valves outside of pipe racks 9. Glass level vials should be located where they can be seen easily. 10. Locally mounted instrument (directly attached to equipment) must be easy to reach, clearly visible and readable, preferably when operating associated valves. 11. Instrument loops should be properly labeled and numbered. 12. Always check with instrumentation and electrical department for loop information. 13. Pressure connections are best located above liquid level in the vessel. 14. Liquid level controller should be located clear of any turbulence from nozzles. 15. Orifice flow meter needs operating space of 2-6 x 6 in plan view. The meter is assumed located midway in zone. Height clearance of 2 is recommended. 16. Level controls, control valves, motor-operated valves, battery limit valves, relief valves, valves 3 and larger, and observation doors should be accessible from grade or platform. 17. Valves 3 and smaller, level gages, pressure and temperature instruments, and hand holes may be accessed from fixed ladders. 18. A minimum clearance of 4 above hand-wheels maximum height is necessary. 19. Control station should be placed close to the equipment it serves. 20. Control station should be located at or near grade or platform. Above Grade Piping 1. Not for pipeline pumping stations, sewers and most water-cooling systems. 2. Long run pipes are routed overhead. 3. Short run pipes (e,g. suction lines) may run on grade but must clear access ways. 4. Piping should allow equipment removal without removing associated controls and their piping. 5. Piping line spacing should be based on regular operating conditions. 6. Piping layout should be flexible so as to accommodate expansions in pipes and hence reduce thermal stresses. 7. Piping layout should avoid using expansion bellows if possible. 8. Un-insulated pipes through dikes, under roads or railways should be coated and wrapped. 9. Insulated pipes through dikes, under roads or railways should be enclosed in metal pipe sleeves. 10. Off-site area piping may run about 18 (450 mm) above grade with adequate maintenance access. 11. Off-site pipe racks should be adjacent to storage tanks. Piping within dikes should be routed directly except for flexibility and tank settlement. Pipe Racks 1. Provide 20% extra space in rack 2. Use single level rack for height requirement of 24 or less. Space column at Consider two level designs with 4 gap for height requirement more than For two level designs, main pipe way is strutted and runs midway between the two levels. 5. Maximum center distance between supports is Pipe sizes of 4 or smaller need supplementary supports (pick-ups). 7. If fireproof is required, consider cast-in place concrete as alternative for economy. 8. Keep cooling water lines out of rack if possible as they make rack larger. 9. If lines are 10 or more, they should be underground. In freezing climates, locate all lines underground. 10. Overhang should be about 2 to minimize column size. 4

5 Summary Reciprocating compressors should be at least 6 from pipe rack column center line. Back head line of heat exchangers should be 8 from rack column center line. Reactors should be at least 25 from other equipment. Manual fuel shut off valves should be 50 away. Floor of vertical furnaces should be 7 from grade. A minimum of 2-6 clear space should be provided for valve operation. A clear space of 3 should be provided around equipment. Motor drive ends should have 5-6 clear space. The bounding box is used to determine the basic space requirement for a device. Valves for emergency use on flammable fluid containers should be of the quickacting type. Pump should be located close to access-ways. Pumps should be placed close to hot or cooled liquid sources to minimize pipe insulation. A minimum of 2 should be added to pump head losses for suction line losses. The largest vertical vessel determines the locations of others in the same unit. Rack column centerline should be 10 from the edge of the largest tower in a unit. All nozzles on equipment should have the same projection, except special requirements dictate otherwise. Saddle thickness should be 15% of vessel length. Tube removal area minimum length for centrifugal compressors should be the tube length plus 12. Tanks, vessels, and pumps should be placed on the same side of a pipe rack. The minimum space gap between combustible or flammable liquid containers is the greater of 3 ft. or one-sixth the sum of adjacent tank diameters. The minimum space gap between liquefied petroleum gas container and combustible or flammable liquid containers is 20. Flammable facilities should be isolated from important buildings and equipment. Pump piping should be properly supported to relieve the pumps of load or stress. NPSH stands for Net Positive Suction Head. The discharge center lines of parallel pumps should be aligned. Bibliography 1. Shumaker, T. M., Process Pipe Drafting, Goodheart-Willcox, Illinois, Parisher, R. A. and Rhea, R. A., Pipe Drafting and Design, 3 rd Edition, GPD Elsevier, Bausbacher, E. and Hunt, R., Process Plant Layout and Piping Design, PTR Prentice Hall, New Jersey, Sherwood, D. R. and Whistance, D. J, The Piping Guide: For the Design and Drafting of Industrial Piping Systems, 5

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT

More information

PIPING SYSTEM EQUIPMENTS

PIPING SYSTEM EQUIPMENTS PIPING SYSTEM EQUIPMENTS Introduction Equipments are devices that provide power, process and store materials. Equipments in piping systems depend on the specific industries using them. Specialized equipment

More information

Design and Construction Standards SECTION PLUMBING EQUIPMENT

Design and Construction Standards SECTION PLUMBING EQUIPMENT SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES: A. Water heaters. B. Packaged water heating systems. C. Water storage tanks. D. Water softeners. E. Pumps. F. Circulators. 1.2 REFERENCES

More information

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements.

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements. 4.7 FIRE PROTECTION AND EMERGENCY RESPONSE This section addresses the fire protection and emergency response resources related to the proposed Project. These resources include the existing services and

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

EEMUA E Learning and Publications Catalogue

EEMUA E Learning and Publications Catalogue EEMUA E Learning and Publications Catalogue E learning courses and publications can be purchased online at https://www.eemua.org/shop.aspx Alternatively, please contact EEMUA by telephone +44 (0)20 7488

More information

GASEOUS HYDROGEN SYSTEMS

GASEOUS HYDROGEN SYSTEMS CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 GENERAL 701.1 Scope. The installation of gaseous hydrogen systems shall comply with this chapter and Chapters 30 and 35 of the Fire Compressed gases shall

More information

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from

More information

1. Know your process. The following guidelines will help you navigate what can be a challenging and time consuming task.

1. Know your process. The following guidelines will help you navigate what can be a challenging and time consuming task. Many processes today require an indirect method of heating, which implies the use of a heat transfer medium, instead of circulating the process directly into a heater. Thermal oil, water, glycol mixtures,

More information

Water Spray Systems: NFPA 15

Water Spray Systems: NFPA 15 Water Spray Systems: NFPA 15 WILLIAM HICKS MSc, CFEI, CFPS, IAAI-CFI, MIFireE, EFO, CFOD, F-IAFI Associate Professor Eastern Kentucky University William.Hicks@eku.edu System Maintenance Objectives Identify

More information

SECTION ELECTRIC WATER HEATERS

SECTION ELECTRIC WATER HEATERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

C. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009.

C. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009. SECTION 235100 - BREECHINGS, CHIMNEYS, AND STACKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fabricated breechings. B. Manufactured chimneys for gas fired equipment. C. Manufactured double wall chimneys for

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

Explosion Protection Engineering Principles

Explosion Protection Engineering Principles Handbook of Fire and Explosion Protection Engineering Principles for Oil, Gas, Chemical and Related Facilities Second edition Dennis P. Nolan ELSEVIER AMSTERDAM BOSTON HEIDELBERG LONDON NEW YORK OXFORD

More information

Rental Boiler Specifications (Nebraska Boiler)

Rental Boiler Specifications (Nebraska Boiler) Rental Boiler Specifications (Nebraska Boiler) ESI's 72,000 pph trailer-mounted watertube steam boilers are designed and built in accordance with ASME Code. Each boiler is arranged for natural gas or #2

More information

FIXED PROTECTION FOR OIL AND CHEMICAL PLANTS

FIXED PROTECTION FOR OIL AND CHEMICAL PLANTS GAP.12.2.1.2 A Publication of Global Asset Protection Services LLC FIXED PROTECTION FOR OIL AND CHEMICAL PLANTS INTRODUCTION Fixed water spray, deluge, foam-water and sprinkler systems are essential parts

More information

Chapter 17 Test. Directions: Write the correct letter on the blank before each question.

Chapter 17 Test. Directions: Write the correct letter on the blank before each question. Chapter 17 Test Name: Date: Directions: Write the correct letter on the blank before each question. Objective 1: Describe initial factors to consider when suppressing structure fires. 1. Which strategy

More information

Introduction. Program Description. Section C.20 University of South Carolina Safety Program Guide FLAMMABLE AND COMBUSTIBLE LIQUIDS

Introduction. Program Description. Section C.20 University of South Carolina Safety Program Guide FLAMMABLE AND COMBUSTIBLE LIQUIDS Section C.20 University of South Carolina Safety Program Guide FLAMMABLE AND COMBUSTIBLE LIQUIDS Introduction This Program Guide applies to the storage of flammable and combustible liquids. This guide

More information

SECTION ELECTRIC WATER HEATERS

SECTION ELECTRIC WATER HEATERS SECTION 22 36 01 ELECTRIC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6 BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6 1. Purpose This policy sets forth requirements for preventing and detecting fires, sounding an alarm, and suppressing fires. Fire protection

More information

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why

More information

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No SECTION 213113 - ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717)

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717) City of York Qdot Engineering 101 S. George St 116 E Gas Ave York, PA 17405 York, PA 17405 (717) 849-2329 (717) 744-8315 INSPECTION CHECKLIST Residential Mechanical 2009 Codes This checklist is intended

More information

INSTALLATION INSTRUCTIONS TXV Coils for Manufactured Housing EMA

INSTALLATION INSTRUCTIONS TXV Coils for Manufactured Housing EMA TXV Coils for Manufactured Housing EMA NOTE: Read the entire instruction manual before starting the installation. SAFETY CONSIDERATIONS Improper installation, adjustment, alteration, service, maintenance,

More information

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION DuPont Formacel Z-2 FOAM EXPANSION AGENT TECHNICAL INFORMATION Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications Flammability of Formacel Z-2 and Other Alternative

More information

on a 98 percent AFUE furnace, less water vapor passes into the vent.

on a 98 percent AFUE furnace, less water vapor passes into the vent. Welcome to the training module for vent and combustion air system design and installation for the new 35 inch condensing furnace. This module will take about 20 minutes to complete. 1 This training module

More information

General Industry Safety and Health Checklist Guidelines. Building and Premises. Loss Control Bulletin

General Industry Safety and Health Checklist Guidelines. Building and Premises. Loss Control Bulletin The purpose of a monthly self-inspection program is to identify unsafe conditions in the work environment and unsafe employee actions. Management can then correct these safety hazards, reducing the potential

More information

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals. SECTION 23 21 23 - HYDRONIC PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Family Foster Home Fire Safety Evaluation Checklist Instructions

Family Foster Home Fire Safety Evaluation Checklist Instructions Family Foster Home Fire Safety Evaluation Checklist Instructions Please read these instructions prior to commencing your inspection. This checklist is provided to specific Foster Family Homes for the purpose

More information

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED

More information

INSTALLATION INSTRUCTIONS TXV Coils EDM, EDD, EDA

INSTALLATION INSTRUCTIONS TXV Coils EDM, EDD, EDA TXV Coils EDM, EDD, EDA These instructions must be read and understood completely before attempting installation. It is important that the Blower and Duct System be properly sized to allow the system to

More information

Flammable Liquids!!!!!

Flammable Liquids!!!!! Sample Written Program For Your Company For Flammable Liquids Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-718-4957 Email: info@se-safety.com Flammable Liquids Purpose Proper

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

12711 TOWNEPARK WAY / LOUISVILLE, KY / / FAX

12711 TOWNEPARK WAY / LOUISVILLE, KY / / FAX 12711 TOWNEPARK WAY / LOUISVILLE, KY 40243 800-665-4251 / 502-962-2883 / FAX 502-244-4046 THERMAL FLUID SYSTEM SPECIFICATIONS Items appearing in red are vendor data that is required with proposal. 1. Thermal

More information

INSTALLATION INSTRUCTIONS TXV Coils EBD, EBA

INSTALLATION INSTRUCTIONS TXV Coils EBD, EBA TXV Coils EBD, EBA These instructions must be read and understood completely before attempting installation. It is important that the Blower and Duct System be properly sized to allow the system to operate

More information

Department of Public Safety

Department of Public Safety Terry E. Branstad Governor Kim Reynolds Lt. Governor Department of Public Safety Roxann M. Ryan Commissioner Liquid Propane Informational guide to submitting plans Plans are to be submitted to: State Fire

More information

INSTALLATION INSTRUCTIONS TXV Coils EBU, EBA

INSTALLATION INSTRUCTIONS TXV Coils EBU, EBA TXV s EBU, EBA These instructions must be read and understood completely before attempting installation. It is important that the Blower and Duct System be properly sized to allow the system to operate

More information

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016 SECTION 23 21 23 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section.

More information

LIST OF OISD STANDARDS (April 2016)

LIST OF OISD STANDARDS (April 2016) LIST OF OISD STANDARDS (April 2016) 1. OISD-STD-105 Work Permit System 2. OISD-STD-106 Pressure Relief & Disposal System 3. OISD-RP-108 Recommended Practices on Oil Storage and Handling 4. OISD-STD-109

More information

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109 LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME 1. OISD-STD-105 Work Permit System 2. OISD-STD-106 Pressure Relief & Disposal System 3. OISD-RP-108 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

More information

-SAMPLE- Safety Inspection Checklist: Manufacturing

-SAMPLE- Safety Inspection Checklist: Manufacturing -SAMPLE- Safety Inspection Checklist: Manufacturing Prepared by: Midwest Builders Casualty The following procedures are not intended to be an exhaustive treatment of the subject, and should not be interpreted

More information

Cast Line Heaters The Benefits of This Space Saving Electric Heater

Cast Line Heaters The Benefits of This Space Saving Electric Heater WHITE PAPER Cast Line Heaters The Benefits of This Space Saving Electric Heater Introduction Cast line heaters, or cast-in heaters, offer an alternative to the more common inline process heaters that have

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

APPENDIX D LOSS PREVENTION CHECKLIST

APPENDIX D LOSS PREVENTION CHECKLIST Dow's Fire & Explosion Index Hazard Classification Guide, Seventh Edition by American Institute of Chemical Engineers Copyright U.S.A. 1994 APPENDIX D LOSS PREVENTION CHECKLIST 1. 2. 3. 4. scope This checklist

More information

2007 ASME Boiler & Pressure Vessel Code 2007 Edition July 1, 2007

2007 ASME Boiler & Pressure Vessel Code 2007 Edition July 1, 2007 AN INTERNATIONAL CODE 2007 ASME Boiler & Pressure Vessel Code 2007 Edition July 1, 2007 VI RECOMMENDED RULES FOR THE CARE AND OPERATION OF HEATING BOILERS ASME Boiler and Pressure Vessel Committee Subcommittee

More information

VSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation.

VSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation. Brochure# 228E 122011 TYPE VSA SEWAGE PUMP Capacities to 100 gpm, Heads to 120, Horsepower range 3/ thru 0, 3 thru discharge, 1750 and 1150 operation. HIGHLIGHTS Wet-Pit Installations Pumps Suspend From

More information

CHAPTER 3 BASIC STEAM CYCLE

CHAPTER 3 BASIC STEAM CYCLE CHAPTER 3 BASIC STEAM CYCLE To understand steam generation, you must know what happens to the steam after it leaves the boiler. A good way to learn the steam plant on your ship is to trace the path of

More information

contents iii Drilling Tools 27 Adjustable Choke 27 Automatic Drillers 29 MWD and LWD Tools 30 How They Work 30 Uses 30

contents iii Drilling Tools 27 Adjustable Choke 27 Automatic Drillers 29 MWD and LWD Tools 30 How They Work 30 Uses 30 Figures v Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Pipe Handling Equipment 3 Kelly Spinners 3 Maintenance 6 Spring Slips and Power Slips 7 Maintenance 9 Automatic Pipe Handlers

More information

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers Bulletin 1200/4 (Revised 5/12) Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers INNOVATORS IN HEAT TRANSFER I. INSTALLATION OF HEAT EXCHANGERS A. HEAT EXCHANGER SETTINGS 1)

More information

Installation Instructions T 9822 Gas Dryer. en - US, CA. To prevent accidents

Installation Instructions T 9822 Gas Dryer. en - US, CA. To prevent accidents Installation Instructions T 9822 Gas Dryer To prevent accidents en - US, CA and appliance damage read these instructions before installation or use. M.-Nr. 07 431 110 2 WARNING For your safety the information

More information

Knowledge Objectives (2 of 2) Fuel Gas Systems. Skills Objectives. Introduction. Fuel Gas Systems (1 of 6) 12/20/2013

Knowledge Objectives (2 of 2) Fuel Gas Systems. Skills Objectives. Introduction. Fuel Gas Systems (1 of 6) 12/20/2013 Fuel Gas Systems Knowledge Objectives (1 of 2) Explain the impact of fuel gases on fire and explosion investigations. Discuss the characteristics of fuel gases. Identify common fuel gas system components.

More information

Fire Prevention Plan

Fire Prevention Plan Fire Prevention Plan TABLE OF CONTENTS Section Title Page 1.0 Objective. 3 2.0 Background 3 3.0 Assignment of Responsibility.. 4 4.0 Plan Implementation..... 5 5.0 Types of Hazards...... 6 6.0 Training........

More information

REFRIGERANT PIPING

REFRIGERANT PIPING SECTION 232300 - REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CENTRIFUGAL PUMPS. STATE the purposes of the following centrifugal pump components:

CENTRIFUGAL PUMPS. STATE the purposes of the following centrifugal pump components: Pumps DOE-HDBK-1018/1-93 CENTRIFUGAL PUMPS CENTRIFUGAL PUMPS Centrifugal pumps are the most common type of pumps found in DOE facilities. Centrifugal pumps enjoy widespread application partly due to their

More information

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 Building Services Piping. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Jet Compressors. Circulate Steam Boost Low-Pressure Steam Compress and Mix Gases in Desired Proportion

Jet Compressors. Circulate Steam Boost Low-Pressure Steam Compress and Mix Gases in Desired Proportion s Circulate Steam Boost Low- Steam Compress and Mix Gases in Desired Proportion S&K s are used in the process, paper, petroleum, power, gas, and other industries to circulate steam, boost low-pressure

More information

Table of Contents CHAPTER 10 ADMINISTRATIVE RULES FOR CERTIFICATION OF CHILD CARE FACILITIES FIRE STANDARDS FOR FAMILY CHILD CARE HOME

Table of Contents CHAPTER 10 ADMINISTRATIVE RULES FOR CERTIFICATION OF CHILD CARE FACILITIES FIRE STANDARDS FOR FAMILY CHILD CARE HOME Table of Contents CHAPTER 10 ADMINISTRATIVE RULES FOR CERTIFICATION OF CHILD CARE FACILITIES FIRE STANDARDS FOR FAMILY CHILD CARE HOME Section No. Subject Page No. 1 Authority and Purpose 10-1 2 Definitions

More information

September 1, Sincerely, Mike Montgomery Fire Marshal. M.S. Montgomery Fire Marshal

September 1, Sincerely, Mike Montgomery Fire Marshal. M.S. Montgomery Fire Marshal M.S. Montgomery Fire Marshal September 1, 2010 This document describes rules changes affecting the operation and fire safety in foster homes licensed and regulated by the Texas Department of Family and

More information

SECTION DOMESTIC WATER HEATERS

SECTION DOMESTIC WATER HEATERS SECTION 223500 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work. Buchtel/Perkins Community Learning Center GPD -2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 SECTION 15513 CONDENSING BOILERS PART I- GENERAL 1.1 RELATED

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document of 79 1/27/2016 2:09 PM Public Input No. 1-NFPA 59-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/API and replace with API. (2) ANSI/UL

More information

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES FLAME AND GAS DETECTION FOR LNG FACILITIES Liquefied natural gas (LNG) is a generic name for liquefied hydrocarbon gas composed primarily of methane. When natural gas is cooled to approximately -260 F,

More information

Inspection Checklist Mechanical Rough in

Inspection Checklist Mechanical Rough in Property Owner Name: Property Address: Permit Number: Inspectors Name: Review Date: Permits and Plans 1. Job address is posted in a visible location. (R319.1) 2. Permit and approved plans are on site and

More information

Fire Prevention Plan

Fire Prevention Plan Fire Prevention Plan TABLE OF CONTENTS Section Title Page 1.0 Objective. 3 2.0 Background 3 3.0 Assignment of Responsibility.. 4 4.0 Plan Implementation..... 5 5.0 Types of Hazards...... 6 6.0 Training........

More information

Page 1 of Relevant Provincial Jurisdictional legislation.

Page 1 of Relevant Provincial Jurisdictional legislation. Page 1 of 15 1. Act, Regulations and Codes (6.7%): To locate information relating to the staffing, operation, maintenance, inspection, and testing of the refrigeration plant and its equipment using reference

More information

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!! Sample Written Program For Your Company For BOILER SAFETY Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-781-1446 Email: info@se-safety.com Purpose Boiler Safety Program The

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

SECTION FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 FUEL-FIRED, DOMESTIC WATER HEATERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

INTRODUCTION THIS MANUAL INCLUDES IMPORTANT SAFETY INFORMATION

INTRODUCTION THIS MANUAL INCLUDES IMPORTANT SAFETY INFORMATION INSTALLATION AND OPERATING INSTRUCTIONS FOR THE HARDY Fuel Oil Furnace Models D-140 & D-350 HARDY MANUFACTURING COMPANY, INC. 12345 ROAD 505 PHILADELPHIA, MS 39350 PHONE: (601) 656-5866 FAX: (601) 656-4559

More information

Module 3: Liquid Fossil Fuel (Petroleum) Lecture 25: Refinery Equipments

Module 3: Liquid Fossil Fuel (Petroleum) Lecture 25: Refinery Equipments 1 P age Module 3: Liquid Fossil Fuel (Petroleum) Lecture 25: Refinery Equipments 2 P age Keywords: Pipe still heater, heat exchangers, distillation tower, pumps Refinery equipments Introduction In refinery,

More information

Installation and Maintenance Instructions

Installation and Maintenance Instructions Commercial & Industrial Positive Pressure or Condensing AL 29-4C Stainless Steel High Challenge Special Gas Vent Also for Natural Draft Appliances 3",4",5",6",7",8",9",10" and 12" Diameter Special Gas

More information

SAMPLE SPECIFICATIONS

SAMPLE SPECIFICATIONS Page 1 of 6 3-03 SAMPLE SPECIFICATIONS The following sample specifications are provided by Superior Boiler Works to assist you in providing your customer with the specific needs for that application. The

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.

More information

1.1 SECTION INCLUDES.1 Materials and installation for aboveground oil storage tanks..2 Section Waste Management and Disposal.

1.1 SECTION INCLUDES.1 Materials and installation for aboveground oil storage tanks..2 Section Waste Management and Disposal. Page 1 of 8 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Materials and installation for aboveground oil storage tanks. 1.2 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management

More information

SECTION HEATING BOILER FEEDWATER EQUIPMENT

SECTION HEATING BOILER FEEDWATER EQUIPMENT SECTION 23 53 00 HEATING BOILER FEEDWATER EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes boiler feedwater pumps, de-aerators, accessories, controls and tanks. 1.2 REFERENCES A. ASME (American

More information

MODULE 2. Water-Based Suppression System Basics

MODULE 2. Water-Based Suppression System Basics MODULE 2 Water-Based Suppression System Basics Based on the Ohio Building Code (OBC) National Fire Protection Association (NFPA) & Ohio Fire Code (OFC) 1 WATER-BASED SUPPRESSION SYSTEM BASICS-PART ONE

More information

BURNERS/ FLARES. VAREC BIOGAS 244W Series WASTE GAS BURNER & IGNITION SYSTEM

BURNERS/ FLARES. VAREC BIOGAS 244W Series WASTE GAS BURNER & IGNITION SYSTEM BURNERS/ FLARES VAREC BIOGAS 4W Series WASTE GAS BURNER & IGNITION SYSTEM The Varec Biogas 4W Series Waste Gas Burner is a highly reliable flare and ignition system ideal for use in burning excess biogas.

More information

PROJ. NO SECTION REFRIGERANT PIPING

PROJ. NO SECTION REFRIGERANT PIPING SECTION 23 23 00 REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Venting of Gas Fired Equipment RV

Venting of Gas Fired Equipment RV PLEASE DO NOT BOOKMARK ANY ANYTIMECE WEBPAGES! Our system will remember the last page you viewed when logging out and back in but please DO NOT exit out when taking a test. Your place will NOT be saved.

More information

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT Technical Data SD 4511A SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY 12586-2035 TYPE T14 & T14D TEMPERATURE PILOT PRINTED IN U.S.A. SD 4511A/9811 5 13 /16 D 4 7 /8 1 13 /16 T14 PILOT

More information

CHAPTER 10 STEAM AND HOT WATER BOILERS

CHAPTER 10 STEAM AND HOT WATER BOILERS CHAPTER 10 STEAM AND HOT WATER BOILERS 1001.0 Purpose. The purpose of this chapter is to establish and provide minimum standards for the protection of public welfare, health, safety, and property by regulating

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.01 SECTION INCLUDES A. Water heaters. B. Packaged water heating systems. C. Domestic water heat exchangers. D. Water storage tanks. E. Water softeners. F. Reverse osmosis equipment. G.

More information

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION CHAPTER 14 FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION SECTION FC 1401 GENERAL 1401.1 Scope. This chapter shall govern fire safety measures during the construction, alteration, or demolition

More information

SPX SERIES PACKAGED AIR CONDITIONING/HEAT PUMP UNITS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

SPX SERIES PACKAGED AIR CONDITIONING/HEAT PUMP UNITS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS SPX SERIES PACKAGED AIR CONDITIONING/HEAT PUMP UNITS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS **WARNING TO INSTALLER, SERVICE PERSONNEL AND OWNER** Altering the product or replacing parts with

More information

Armstrong J Series Float, Thermostatic Steam Traps, Condensate Controllers & Liquid Drainers Installation and Maintenance Manual

Armstrong J Series Float, Thermostatic Steam Traps, Condensate Controllers & Liquid Drainers Installation and Maintenance Manual Armstrong J Series, Thermostatic Steam Traps, Condensate Controllers & Liquid Drainers Installation and Maintenance Manual This bulletin should be used by experienced personnel as a guide to the installation

More information

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES Page 226119-1 SECTION 226119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE PUMP REVIEW Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments;

More information

SEMICONDUCTOR FABRICATION FACILITIES

SEMICONDUCTOR FABRICATION FACILITIES CHAPTER 18 SEMICONDUCTOR FABRICATION FACILITIES SECTION 1801 GENERAL 1801.1 Scope. Semiconductor fabrication facilities and comparable research and development areas classified as Group H-5 shall comply

More information

EASY INSTALLATION GUIDE. The greatest amount of attention should be devoted to the suction piping

EASY INSTALLATION GUIDE. The greatest amount of attention should be devoted to the suction piping EASY INSTALLATION GUIDE Installations That May Cause Operation Problems Suction Piping: The greatest amount of attention should be devoted to the suction piping NPSH (Net Positive Suction Head): Net Positive

More information

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION CHAPTER 23.45 Sections LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION 23.45.100 Local amendments to the International Fire Code, 2006 Edition... 2 23.45.102.1 Construction and design provisions...

More information

Section 2, Reference publications: Updated the referenced publications to the current editions.

Section 2, Reference publications: Updated the referenced publications to the current editions. Summary of Substantive Changes between the 2014 and the 2015 editions of ANSI Z21.10.3 CSA 4.3 Gas fired water heaters, volume III, storage water heaters with input ratings above 75,000 Btu per hour, circulating

More information

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016) 2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016) Reference: Documents referenced for this bulletin are as follows: San

More information

Savard Labor & Marine Staffing, Inc. Fire Prevention Program Rev3/14

Savard Labor & Marine Staffing, Inc. Fire Prevention Program Rev3/14 Fire Prevention Program Purpose The Company Fire Safety Plan has been developed to work in conjunction with company emergency plans and other safety programs. This includes reviewing all new building construction

More information

A. Product Data: Include rated capacities, furnished specialties and accessories.

A. Product Data: Include rated capacities, furnished specialties and accessories. BASE BID: SECTION 15542 FUEL-FIRED RADIANT HEATERS PART 1 - GENERAL 1.1 SUMMARY A. Furnish and install a Co-Ray-Vac Low Intensity Vented Infrared Radiant Vacuum Gas Heating System. System must be certified

More information

Ratio Architects, Inc. Section Refrigerant Piping

Ratio Architects, Inc. Section Refrigerant Piping SECTION 232300 - REFRIGERANT PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Refrigerant pipes and fittings. 2. Refrigerant piping valves and specialties. 3. Refrigerants. 1.2 ACTION SUBMITTALS

More information

REFERENCE SYLLABUS. For FIRED PROCESS HEATER OPERATOR S. CERTIFICATE of COMPETENCY EXAMINATION AB-239. Edition 3, Revision 1, Issued

REFERENCE SYLLABUS. For FIRED PROCESS HEATER OPERATOR S. CERTIFICATE of COMPETENCY EXAMINATION AB-239. Edition 3, Revision 1, Issued For CERTIFICATE of COMPETENCY EXAMINATION AB-239 Edition 3, Revision 1, Issued 2018-07-13 Visit our Website at www.absa.ca GENERAL INMATION Introduction: As provided for under the Power Engineers Regulation,

More information

LGCNCOE Study Guide: Fixed Gas Detection

LGCNCOE Study Guide: Fixed Gas Detection LGCNCOE Study Guide: Fixed Gas Detection References Regulatory International Gas Carrier Code (IGC) regulation 13.6 Gas Carrier Code (GC) regulation 13.6 Existing Gas Carrier Code regulation 13.6 46 CFR

More information