1 Roadside Design Guardrail Design Licking County Engineer s Office April 16, 2014
2 Roadside Design
3 National Roadside Fatalities (Most Harmful Event) Other 20% Trees 50% Barriers 8% Utility Embankment and Ditches 9% Poles 13%
4 Design Options In Order of Preference 1. Remove the obstacle 2. Redesign the obstacle so that t it can be safely traversed 3. Relocate the obstacle to a location where it is less likely to be struck 4. Make the obstacle breakaway 5. Shield the hazard with longitudinal barrier 6. Delineate the obstacle
5 Possible vs. Practical The Roadside Should Be Made As Safe as Practical
6 Barrier Warrants
7 EMBANKMENT WARRANT
8 Crash Testing Safety performance of fbarrier designs can be shown through standardized testing. Full scale crash testing is the standard method used.
9 Crash Testing Some criteria for passing a crash test: to determine if barrier is capable of containing the vehicle (structural test) if occupant deceleration and ride-down velocities are survivable (occupant test) no debris penetrating the vehicle or deforming the passenger compartment vehicle remains stable, it does not roll nor redirected back into traffic
10 MASH-08 Update Criteria Test Vehicle Specifications - Small car increases from 1,800# to 2,420#. - Pickup truck increases from 4,400# to 5,000#. - TL-4 truck increases from 18,000# to 22,000#. - No longer use vehicles older than 6 years.
11 Semi-Rigid Barriers Strong Post, Blocked-out W-Beam guardrail (ODOT Type 5) W-Beam rail with 6 3 post spacing, offset blocks, in strong soil.
12 W-Beam Guardrail SCD GR-2.1
13 W-Beam Guardrail Components: W-beam rail 12 ½ feet long Wood or steel posts usually 6 feet long Wood or plastic blockouts Soil support
14 W-Beam Guardrail Purpose of the: Rail - provides tension to capture and redirect vehicles Post hold the rail at the appropriate p height and absorb impact energy Blockout keep vehicle wheel from catching the post Soil provides resistance to the posts
15 W-Beam Guardrail Various blockout shapes
16 Roadside Design Guardrail Placement
17 Length of Need A guardrail must extend in front of a hazard to protect vehicles leaving the road in advance of the hazard.
18 Length of Need
19 Guardrail Deflection Once barrier is warranted and needed, the deflection distance may dictate t the type of barrier (flexible, semi-rigid, or rigid) to install. ODOT uses 5' 6 for w-beam guardrail.
20 Guardrail Deflection Type 5A guardrail has a post spacing of 3-1.5
21 Type 5 Guardrail 27 Tall Guardrail determined NOT crashworthy y( (too short) 29 Acceptable per NCHRP 350 Too Short
22 Guardrail Height 29 inches to top of rail +/- 1 10:11 shoulder slope
23 Post Embedment Posts resist impacts if installed deep h tto h t enough have soilil support
24 Maintain Rail height Reduce wheel snag potential
25 Post Embedment 9 ft. long posts should be specified at locations where the distance from the face of the barrier to the slope break point is less than 2 ft. (L&D 906) 6 ft. post everywhere else unless specified.
26 MGS with a MASH truck
27 Type 5 (27 ¾ ) with a MASH truck
28 Roadside Design Guardrail Anchors
29 Anchors Standard Construction Drawings GR-4.1 Type A Anchor GR-4.2 Type T Anchor
30 Anchors Guardrail works best if impact energy is allowed to be transferred both downstream and upstream through rail elements by utilizing the tensile capabilities of the w-beam material.
31 Anchors In a crash near the guardrail end, the anchor holds the guardrail in tension. The anchor prevents the rail from flapping and allowing the vehicle to go through.
32
33 Type A Turned-down ends are anchors. Previously considered crash worthy, but now limited to lower speed and lower volume roads.
34 SCD GR-4.1
35 Type A The Type A anchor assembly used as an approach or trailing guardrail end treatment in any of the following situations (L&D ): On non-nhs arterials, collectors and local roads with a design year ADT of 4000 or less. On any roadway outside the clear zone. On any non-nhs roadway with a design speed of less than 50 mph.
36 Type T
37 Can Cause Terrible R lt
38 Type T The Type T anchor assembly may be used on any roadway in any of the following situations (L&D ): On trailing ends of guardrail runs on multi-lane lane roadways, where located outside the clear zone of opposing traffic. In guardrail runs where directional changes are made using a radius of less than 25 ft. (see L&D Figures and 603-4). On the ends of guardrail runs on drive approaches (see L&D Figure 603-3).
39 Type T
40 Intersections It is often difficult to protect di driveways or side roads: Sharply pycurved guardrail has not passed crash testing, because of the high angles of impact Angles can almost be 90 degrees, which usually exceeds the strength of the steel rail If it does capture the vehicle, blunt head-on crash forces usually exceeds occupant survivability
41 Intersections Typical driveway treatment.
42 Intersections Typical driveway treatment at a bridge.
43 Sometimes You Just Get Lucky
44 Sometimes You Just Get Lucky
45 Sometimes You Just Get Lucky
46 Questions???
CHAPTER 10 ROADSIDE SAFETY
CHAPTER 10 ROADSIDE SAFETY Introduction 10-4 Clear Zone 10-4 Figure 10-1 Recovery Area and Clear Zone Examples Table 10-1 Clear Zone for 3R Projects on National Highway System Table 10-2 Clear Zone for
More informationMASH Implementation for Guardrail
MASH Implementation for Guardrail Katherine Smutzer Standards Engineer, INDOT Purdue Road School March 7, 2017 Content in this presentation is for information only. Changes to INDOT design guidance and
More informationBridge Railing Research for Local Bridges
Bridge Railing Research for Local Bridges Scott Rosenbaugh Research Engineer Midwest Roadside Safety Facility University of Nebraska-Lincoln 2017 Nebraska Bridge Conference Kearney, NE 4-12-2017 1 Background
More informationTown of Weston Guardrail Overview Report
Town of Weston Guardrail Overview Report July 28, 2016 Prepared for: Town of Weston Weston, MA 02493 Submitted by: Nitsch Engineering 2 Center Plaza, Suite 430 Boston, MA 02108 Nitsch Engineering Project
More informationNumerical simulation of single- and doublefaced W-beam guardrails under vehicular impacts on six-lane divided freeways
Surface Effects and Contact Mechanics XI 49 Numerical simulation of single- and doublefaced W-beam guardrails under vehicular impacts on six-lane divided freeways H. Fang 1, N. Li 1, M. Gutowski 1, M.
More informationAPPENDIX I SECTION I-1-INTRODUCTION... I-1
APPENDIX I SECTION I-1-INTRODUCTION... I-1 SECTION I-2- BARRIER SYSTEMS AND TERMINALS... I-2 W-Beam Guardrail General Criteria... I-2 GR-10 Guardrail over Culvert in Low Fills... I-4 High Tension Cable...
More informationTRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM
VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Barrier Systems SPECIFIC SUBJECT: Guardrail System Spot Repair Condition Ratings
More informationMidwest Guardrail System (MGS) W-Beam to Thrie-Beam Transition
Paper No. 07-2628 Midwest Guardrail System (MGS) W-Beam to Thrie-Beam Transition By Karla A. Polivka University of Nebraska E527 NH (0656) Lincoln, NE 68588 Phone: (402) 472-9070 Fax: (402) 472-2022 kpolivka2@unl.edu
More informationTEMPORARY DESIGN GUIDANCE FOR GUARDRAIL
TEMPORARY DESIGN GUIDANCE FOR GUARDRAIL Note: These temporary guidelines have been written in attempt to cover questions that may arise with moving towards use of the Midwest Guardrail System and the Manual
More informationENGINEERING DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION GENERAL SUBJECT: BARRIER SYSTEMS SPECIFIC SUBJECT: TRAFFIC ENGINEERING DIVISION MEMORANDUM GUARDRAIL SYSTEM SPOT REPAIR Damage Condition Ratings and Repair Strategies
More informationCHAPTER 14: GUARDRAIL and BARRIERS
CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards
More informationGUARDRAIL REPLACEMENT HIGHWAY SAFETY PROGRAM. prepared by. Michael R. Monnig SAFETY ENGINEER
M S- S{;c; GUARDRAIL REPLACEMENT HIGHWAY SAFETY PROGRAM prepared by Michael R. Monnig SAFETY ENGINEER Highway Safety Engineering Section Maintenance Operations Division Texas State Department of Highways
More informationIMPROVEMENTS TO THE WEAK-POST W-BEAM GUARDRAIL
Paper No. 01-2282 IMPROVEMENTS TO THE WEAK-POST W-BEAM GUARDRAIL by Malcolm H. Ray Associate Professor Worcester Polytechnic Institute Klas Engstrand Graduate Research Assistant Worcester Polytechnic Institute
More informationPonderosa Pine Round Posts as Alternative to Rectangular SYP Posts in Retrofit G4(2W) Guardrail Systems
INNOVATIONS IN ROADSIDE SAFETY HARDWARE AND FEATURES Ponderosa Pine Round Posts as Alternative to Rectangular SYP Posts in Retrofit G4(2W) Guardrail Systems KARLA A. LECHTENBERG RONALD K. FALLER JOHN D.
More informationVALIDATION OF FINITE ELEMENT MODELS OF INJURY RISK IN VEHICLE-ROADSIDE BARRIER CRASHES
VALIDATION OF FINITE ELEMENT MODELS OF INJURY RISK IN VEHICLE-ROADSIDE BARRIER CRASHES Qian Wang, Hampton C. Gabler Virginia Tech-Wake Forest, Center for Injury Biomechanics Blacksburg, VA 24061 ABSTRACT
More informationWHAT S WRONG WITH ROADSIDE DESIGN?
WHAT S WRONG WITH ROADSIDE DESIGN? IN T R O D U C T IO N Sally A n n F ree Staff Researcher Center for Auto Safety The Center for Auto Safety is an independent, nonprofit, public interest organization
More informationGUARDRAIL. December
GUARDRAIL December 2017-1 If you EVER have any questions regarding guardrail, end treatments and/or pay items please contact the Project Design Services Engineer or the Design Standards Engineer. It is
More informationGUARDRAIL. Project Design Services Unit September
GUARDRAIL Project Design Services Unit September 2018 http://ihub/projectdelivery/design/index.html GUARDRAIL If you EVER have any questions regarding guardrail, end treatments and/or pay items please
More informationInjury Risk in Frontal Crashes with Guardrail and Guardrail End Terminals
Injury Risk in Frontal Crashes with Guardrail and Guardrail End Terminals Contact Information: Submitted to rd Annual Meeting of The Transportation Research Board By Nicholas S. Johnson and Hampton C.
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationColumn headings match the SEQ descriptions Both ends of guardrail accounted for All notes accounted for and make sense SP/funding splits shown
GUARDRAIL GUARDRAIL - TABS Column headings match the SEQ descriptions Both ends of guardrail accounted for All notes accounted for and make sense SP/funding splits shown TRAFFIC BARRIER REMOVE SALVAGE
More informationSET03a-b THRIE-BEAM BULLNOSE END TERMINAL ELEVATION PLAN SHEET NO. DATE: BEGIN STANDARD THRIE BEAM GUARDRAIL CONSTRUCTION 31 5/8" 804 B B.
BEGIN STANDARD THRIE BEAM GUARDRAIL CONSTRUCTION 177" 4496 9 31 5/8" 804 B B RTM02a 414 3/8" 10525 75" 1905 (TYP) RTM07e 0" [0] RADIUS 37 1/2" 953 (TYP) RTM07d 409 1/2" [10401] RADIUS 2 3 4 5 6 7 8 PLAN
More informationGreen Book 7 th Edition Summary of Changes. Jim Rosenow NCITE Geometric Design Committee August 30, 2018
Green Book 7 th Edition Summary of Changes Jim Rosenow NCITE Geometric Design Committee August 30, 2018 Outline 1. The drama 2. Chapter 1 rewrite 3. The rest of the book 2 Outline 1. The drama 2. Chapter
More informationChapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES
CHAPTER 1 GENERAL DESIGN GUIDELINES 1.0 INTRODUCTION This Publication has been developed to provide current, uniform procedures and guidelines for the application and design of safe, convenient, efficient
More informationVALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION
MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...
More informationRaft Island Right of Way Vegetation and Tree Management Plan
Raft Island Right of Way Vegetation and Tree Management Plan October 13, 2010 Introduction With the advent of underground utilities executed on the Island some 10 years ago, cessation of power line right
More informationSGR53 SIDE-MOUNTED WEAK-POST GUARDRAIL ATTACHED TO CULVERT PLAN VIEW ELEVATION VIEW DETAIL B DETAIL A SHEET NO. DATE: 37 1/2" 953 (TYP) 150" 3810
PLAN VIEW 150" 3810 37 1/2" 953 (TYP) C A B C 8-FBB01 RWB01a FWR01 FWR01 RWB01a RWM04a RWM04a PSF01 FBX08a PSF01 FBX08a DETAIL A DETAIL B 1 of 7 12/5/2016 INTENDED USE The Side-Mounted Weak-Post Guardrail
More informationCITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS
SECTION 10 STREETS CITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS 10.1 INTRODUCTION The criteria presented in this section shall be used in the evaluation of the allowable
More informationCONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE
CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
More informationStatistical In-Service Safety Performance Evaluation of Guardrail End Treatments
Statistical In-Service Safety Performance Evaluation of Guardrail End Treatments Research Report For Wisconsin Department of Transportation Madhav V. Chitturi, Ph.D. William Bremer Kelvin R. Santiago-Chaparro
More informationUse of Guardrails on Low Fill Bridge Length Culverts
62 TRANSPORTATON RESEARCH RECORD 1198 Use of Guardrails on Low Fill Bridge Length Culverts T. J. HRSCH AND DALE BEGGS When multiple box culverts span more than 2 feet, the American Association of State
More informationPURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE and ROADWAY IMPROVEMENT PROJECT
PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE and ROADWAY IMPROVEMENT PROJECT PERRY AND LEROY TOWNSHIPS, LAKE COUNTY, OHIO (PID 5669/PID 85131) PREPARED BY: MICHAEL BAKER JR., INC. 1228 EUCLID AVENUE SUITE
More informationMEMORANDUM. Jim Tomberlin, Mountain Valley Properties
MEMORANDUM TO: CC: Jim Tomberlin, Mountain Valley Properties GR Fielding, Pitkin County Engineer Brian Pettit, Pitkin County Public Works Director Dan Cokley, SGM FROM: Lee Barger, SGM DATE: June 16, 2016
More information900 Roadside Safety Landscaping Guidelines
Table of Contents 901 PURPOSE... 1 901.1 GENERAL... 1 901.2 BACKGROUND... 1 901.3 ADDITIONAL INFORMATION... 1 902 GENERAL SAFETY... 1 903 PLAN REQUIREMENTS... 1 903.1 PRELIMINARY FIELD REVIEW... 1 903.2
More informationGREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION
County: Linn County, IA GREEN SHEET Location: IA 100, from its terminus at Edgewood Rd. to US 30 southwest of Cedar Rapids Route: IA 100 Extension Project No.: NHS-100-1(36) 19-57 OLE Project Managers:
More informationCounty of El Dorado Standard Plans
County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20
More information2 August 14, 2013 Public Hearing APPLICANT: CRESCENT COMMUNITY CENTER CORP. PROPERTY OWNER: S. L. ETHERIDGE, LLC
2 August 14, 2013 Public Hearing APPLICANT: CRESCENT COMMUNITY CENTER CORP. PROPERTY OWNER: S. L. ETHERIDGE, LLC REQUEST: Conditional Use Permit (religious use) STAFF PLANNER: Karen Prochilo ADDRESS /
More informationVDOT Vegetation Management Policy
VDOT Vegetation Management Policy Appropriation Act Item 436 H (2010) Report to the Chairmen of House Appropriations and Transportation Committees and Senate Finance and Transportation Committees Virginia
More informationDesign Guidance for Construction Work Zones on High-Speed Highways
Design Guidance for Construction Work Zones on High-Speed Highways Kevin M. Mahoney Penn State University AASHTO Subcommittee on Construction Meeting August 2, 2006 San Juan, Puerto Rico Panel, NCHRP 3-69
More informationFire & Life Safety Requirements For Fire Department Access and Water Supplies
Fire & Life Safety Requirements For Fire Department Access and Water Supplies This brochure is being provided as a resource only. The items listed inside are the requirements most generally cited on plans
More informationYour town s subdivision or land use ordinance standards should reference the following street standards, for example:
Your town s subdivision or land use ordinance standards should reference the following street standards, for example: Streets shall be designed to move traffic safely and in a way that minimizes environmental
More informationAPPENDIX F: DETAIL DRAWINGS
APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900
More informationCreating Complete Roadway Corridors:
Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee
More informationConcord, BRF-X-5099 (021), Draft Alternative Analysis
THE CITY OF CONCORD in conjunction with the STATE OF NEW HAMPSHIRE, DEPARTMENT OF TRANSPORTATION BUREAU OF ENVIRONMENT and the FEDERAL HIGHWAY ADMINISTRATION Concord, BRF-X-5099 (021), 12004 Draft Alternative
More informationBerkshire Regional Planning Commission Clearinghouse Review Report
August 19, 2013 SUBJECT: Reconstruction of Housatonic Street, Dalton, MA EOEA#: 15083 LOCATION: Dalton ESTIMATED COST: $8.1 million REVIEW TYPE: ENF PROPONENT: MassDOT and Town of Dalton COMMENTS DUE:
More informationFire Department Access and Water Supply
Fire Department Access and Water Supply CHAPTER 18 Chapter 18 was reorganized for the 2003 edition and now includes most site design issues in one location. The access and fire lane requirements previously
More informationJOB CREATION PROJECTS
SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each
More informationTitle 11 Streets and Sidewalks
Chapter 11.01 - Definitions Title 11 Streets and Sidewalks Low Impact Development (LID) - A stormwater and land use management strategy that strives to mimic predisturbance hydrologic processes of infiltration,
More informationSILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.
STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE
More informationA Captain Dies and Two Fire Fighters Are Injured in a Motor-Vehicle Crash - Texas
A Captain Dies and Two Fire Fighters Are Injured in a Motor-Vehicle Crash - Texas SUMMARY On October 5, 1999, a Captain (the victim), the driver, and a fire fighter from Engine 33 responded to a medical
More informationPREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY
PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY SEPTEMBER 2016 Introduction The Platteview Road Corridor Study was led by the Metropolitan Area Planning Agency (MAPA) with assistance from
More informationNuts and Bolts (or Gravel and Asphalt) of the Main Street Project
Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project What is the Main Street Project? The Main Street Project is a roadway project that addresses pavement, infrastructure and safety issues
More informationRoadside Mowing. Spot mowing of noxious weeds should be done as necessary to reduce propagation.
Public Works Department Road and Bridge Division Roadside Mowing 1.0 Policy The primary purpose for planting and maintaining a vegetative cover on roadside areas is to prevent erosion of the soil. It is
More informationPublic Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B
Public Meeting US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Mark Leiferman Chief Road Design Engineer April 28, 2014 Why
More informationPublic Information Centre. Welcome
Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff
More informationSTANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS
STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B
More informationNew Stanton Project Update July 3, 2012
New Stanton Project Update July 3, 2012 The Needs BACKGROUND INFO I-70 Geometric Concerns Substandard Horizontal & Vertical Clearance at Center Ave. Bridge (The Center Avenue Bridge is Replaced in all
More informationDefinitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.
Definitions Access Management: A combination of physical techniques and transportation policies used to control the flow of traffic between roads and the surrounding lands. Alternative City Form Scenarios:
More informationDesign Speed / Target Speed Primer. Jim Rosenow AASHTO Technical Committee on Geometric Design June 12, 2018
Design Speed / Target Speed Primer Jim Rosenow AASHTO Technical Committee on Geometric Design June 12, 2018 Predecessor research NCHRP Project 15-25 NCHRP Project 15-47 2 Predecessor research NCHRP Project
More informationFederal Project No.: PM03369
Order : N26 Schedule of Items Page: 2 Oversight/State Project : (NFO) 6460-006-206, N501 Federal Project : PM03369 0010 513 00100 0020 303 00125 MOBILIZATION LUMP SUM LUMP SUM GRADING LUMP SUM LUMP SUM
More informationUniversity of California at Davis California Department of Transportation. Report Number: CA AHMCT Research Report: UCD-ARR
University of California at Davis California Department of Transportation Development Of New Kinds Of Mobile Safety Barriers George Burkett Vue Her Professor Steven A. Velinsky: Principal Investigator
More information4 January 11, 2012 Public Hearing APPLICANT:
. 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk
More informationProspect Community Plan Update Public Meeting November 2, 2017 OVERVIEW PROSPECT BEAUTIFICATION/CONNECTIVITY PLAN
Prospect Community Plan Update Public Meeting November 2, 2017 OVERVIEW PROSPECT BEAUTIFICATION/CONNECTIVITY PLAN Presentation Overview Introduction Project History Project Goals/Objectives Project Progress
More informationAccess Management: An Overview
Figures 1-5 Below Evolution of development along a highway. In the early stages, land along the road is used for farming with little traffic generated. As time passes, the highway corridor becomes a de
More informationDESIGN SCENE SUBJECT INDEX
DESIGN SCENE SUBJECT INDEX CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS
More information5.4 Development Incentives for All Commercial and Industrial Districts (except the TC: Town Center District).
5.4 Development Incentives for All Commercial and Industrial Districts (except the TC: Town Center District). The following Development Incentives are provided in order to encourage flexibility and creativity
More informationMoving The Metro. A special construction update for the metro Omaha area.
Moving The Metro A special construction update for the metro Omaha area. ebraska Department of Roads Spring/Summer 2017 I-80 / I-480 / US-75 Interchange The improvements on this project consist of bridge
More information3. Additional driveways may be permitted where determined by the Planning Commission to adequately accommodate traffic or ensure public safety.
ARTICLE 10 ACCESS MANAGEMENT Section 10.01 Purpose. The purpose of this Article is to protect the substantial public investment in the City s street system by preserving the traffic capacity of existing
More information2. AGENCY COORDINATION AND PUBLIC INVOLVMENT
2. AGENCY COORDINATION AND PUBLIC INVOLVMENT This chapter discusses the process carried out for conducting agency coordination and public involvement activities. TECHNICAL ADVISORY COMMITTEE A Technical
More informationEXHIBIT A STEAMBOAT SPRINGS FIRE PREVENTION SERVICES ADMINISTRATIVE POLICY & PROCEDURE MANUAL
EXHIBIT A STEAMBOAT SPRINGS FIRE PREVENTION SERVICES ADMINISTRATIVE POLICY & PROCEDURE MANUAL SECTION: 4 POLICY NO.: 1257.1 DATE: April 1, 2006 PAGE: 1 SUBJECT: Fire Apparatus Access Road Standards for
More informationV. EROSION CONTROL. -Drainage swales separation -Under rip-rap protected -Under rip-rap unprotected
V. EROSION CONTROL This section describes three different types of erosion control applications where geotextiles can be used in conjunction with some form of stone or other energy dissipating material
More informationF. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:
Section 20.945.040 General Design Standards for Surface Parking Areas. A. Review Authority. Parking lot design and drainage shall be subject to review and approval of the City Transportation Manager. B.
More informationAccess Management and Site Plan Review. Robert W. Hofrichter Asst Administrator, Transportation and Mobility Planning Division April 2014
Access Management and Site Plan Review Robert W. Hofrichter Asst Administrator, Transportation and Mobility Planning Division April 2014 Access Management 2 Access Management What is Access Management?
More informationDYNAMIC TESTING OF MGS W6X8.5 POSTS AT DECREASED EMBEDMENT
DYNAMIC TESTING OF MGS WX8. POSTS AT DECREASED EMBEDMENT Submitted by Tyler L. Schmidt Undergraduate Research Assistant Robert W. Bielenberg, M.S.M.E., E.I.T. Research Associate Engineer John D. Reid,
More informationProject Purpose. Project Need
Project Purpose The purpose of the project is to implement a bridge improvement solution that corrects the existing safety problem at the Strasburg Pike Bridge. The project will provide a structurally
More informationSH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017
Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year
More informationSIGN PLACEMENT-ELEVATION VIEW: FREEWAY SIGN PLACEMENT-ELEVATION VIEW: FREEWAY ROADSIDE SIGN LOCATIONS & SUPPORT SPACING NOT TO SCALE
HINGE POINT EACH POST (TYP) HINGE POINT EACH POST (TYP) (MIN.) EDGE OF FORESLOPE 4" STEEL COLUMN 6" WOOD POST 4" (STEEL COLUMN) 6" (WOOD POST) 4' MIN. THRU TRAVELED 7'MIN. THRU TRAVELED MIN. 5' LATERAL
More informationP A R K L E T 2016 PILOT PROJECT
GRAND FORKS, NORTH DAKOTA P A R K L E T 2016 PILOT PROJECT City of Grand Forks Planning & Community Development Department LIVE, LEARN, WORK, PLAY, AND STAY The purpose of the Grand Forks Parklet Application
More informationPennsy Greenway Trail
Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad
More informationUrban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges
222221 2.0 DRIVE-THROUGH FACILITIES Background In recent years, drive-through facilities have grown significantly in popularity with drive-through restaurants, in particular, being established on numerous
More informationLABOR-BASED ROUTINE ROAD MAINTENANCE (LBRRM)
LABOR-BASED ROUTINE ROAD MAINTENANCE (LBRRM) A GUIDE TO THE PRACTICAL TASKS 1 Important Drainage Components Camber 2 THE IMPORTANCE OF DRAINAGE Keep water off the running surface and clear of the road
More informationArticle 7.05 Manufactured Home Park Districts
Article Manufactured Home Park Districts.01 Intent The purpose of the MHP Manufactured Home Park District is to give recognition to the fact that manufactured homes can provide satisfactory living conditions
More informationMunicipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study
Reconstruction of Regional Road 45 (Creek Road) Between Regional Road 27 (River Road) and Regional Road 63 (Canborough Road) in the Township of Wainfleet Municipal Class EA Study Public Information Centre
More informationINDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES
INDEX EXECUTIVE SUMMARY...1 INTRODUCTION...2 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS... 4-5 EXISTING UTILITIES... 6-7 MEDIAN BREAKS AND TURN LANE STORAGE REQUIREMENTS...8 PRELIMINARY DESIGN
More informationEvolution of Filtrexx Living Walls. A Closer Look at Our GreenLoxx Living Wall Systems.
Evolution of Filtrexx Living Walls A Closer Look at Our GreenLoxx Living Wall Systems. 1 Our Foundation is Compost Socks Recycling and Low Impact Development Movement LOCAL RECYCLED MATERIALS Create CERTIFIED
More informationReconstruction Project. Wayzata Task Force Meeting September 3, 2009
CSAH 101 Reconstruction Project Wayzata Task Force Meeting September 3, 2009 Agenda 700 7:00 Re-Introductions ti 7:05 2008 Activity Recap / 2009 Activities-to-date 7:10 Discussion of Layout Revisions (per
More informationSuccessful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach
Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach Hazem Gheith and Vinnie Treatment, Water Division, ARCADIS-US Hunter Kelly, Department of Sewage and Drainage,
More informationMidtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening
Midtown Corridor Alternatives Analysis Appendix A - Initially Considered Alternatives Screening Arterial BRT on Lake Street - Overall Rating: RATING Metropolitan Council recommendations stated in the Transportation
More informationTESTING OF M203x9.7 (M8x6.5) AND. S76x8.5 (S3x5.7) STEEL POSTS - POST COMPARISION STUDY FOR THE CABLE MEDIAN BARRIER
TESTING OF M3x9.7 (Mx.) AND S7x. (S3x.7) STEEL POSTS - POST COMPARISION STUDY FOR THE CABLE MEDIAN BARRIER Submitted by Beau D. Kuipers, B.S.M.E., E.I.T. Graduate Research Assistant John D. Reid, Ph.D.
More informationFederal Project No.: OC-095-1(365), OC-095-1(367)
Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-964-415, C501 Federal Project : OC-095-1(365), OC-095-1(367) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING CONSTRUCTION
More informationBypass #16 - Bend Parkway (new alignment for US 97) (MP )
Bypass #16 - Bend Parkway (new alignment for US 97) (MP 134.76-141.83) Description: The Parkway is on new alignment for US 97 through Bend. US 97 is a Statewide Highway on the National Highway System that
More informationTe c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements
Te c h S p e c 3 Edge Restraints for Interlocking Concrete Pavements Introduction Edge restraints are an essential component of interlocking concrete pavements. Restraints hold the pavers tightly together,
More informationAASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION
AASHTO SUBCOMMITTEE ON DESIGN June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION CENTRAL FLORIDA INTERSTATE 4 FACTS Trucks and Others 12% Tourist
More informationI-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280
I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange THIRD
More informationDEPARTMENT OF PUBLIC WORKS & UTILITIES
CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS & UTILITIES URBAN SERVICES STANDARDS AND GUIDELINES January 2017 Craig Fulton, P.E., Director TABLE OF CONTENTS "URBAN SERVICES STANDARDS AND GUIDELINES"
More information(BRIDGE NO. 36C-0223)
City of Palo Alto Newell Road Bridge Replacement (BRIDGE NO. 36C-0223) TYPE SELECTION REPORT DRAFT November 2012 City of Palo Alto Newell Road Bridge Replacement (BRIDGE NO. 36C-0223) TYPE SELECTION REPORT
More informationLow Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent
Grass Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] May be used on short, steep
More informationForm DOT F (8-72) Technical Report Documentation Page 3. Recipient's Catalog No. 1. Report No. 2. Government Accession No. FHW A/TX-95/1392-9F
1. Report No. 2. Government Accession No. FHW A/TX-95/1392-9F 4. Title and Subtitle EFFECTIVE PLACEMENT OF DETECTORS FOR COMPUTERIZED TRAFFIC CONTROL SUMMARY REPORT 7. Author(s) Donald L. Woods and Neilon
More informationARTICLE 6 ACCESS AND RIGHT-OF-WAY REQUIREMENTS; AND STREET IMPROVEMENT AND CONSTRUCTION REQUIREMENTS
ARTICLE 6 ACCESS AND RIGHT-OF-WAY REQUIREMENTS; AND STREET IMPROVEMENT AND CONSTRUCTION REQUIREMENTS 6.1 ACCESS 6.1.1 When land is subdivided into larger parcels than ordinary building lots, such parcels
More informationFifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design
1 Fifth and Detroit Street Design May 2017 Capital Improvements Committee Agenda 2 Review Street Configuration Prior Meeting Review Outreach Synopsis Functional Street Design Refinements Curb Edge, Turning