Berkshire Regional Planning Commission Clearinghouse Review Report
|
|
- Rudolph Holt
- 5 years ago
- Views:
Transcription
1 August 19, 2013 SUBJECT: Reconstruction of Housatonic Street, Dalton, MA EOEA#: LOCATION: Dalton ESTIMATED COST: $8.1 million REVIEW TYPE: ENF PROPONENT: MassDOT and Town of Dalton COMMENTS DUE: August 27, 2013 PROJECT DESCRIPTION: The proposed project involves the reconstruction of a 1.9-mile section of Housatonic Street in Dalton, beginning at the intersection of Routes 8 & 9 / Main Street to just west of the intersection of Housatonic Street with Route 8. The proposed work will reconstruct and widen the roadway, improve roadway drainage, improve intersection and roadway geometrics, increase safety and provide improved pedestrian and bicycle connectivity. The final result of the project will be 11- foot wide travel lanes, five- foot (5 ) shoulders on each side, and a concrete sidewalk on the north side of the roadway for much of its length The proposed roadway improvements include pavement reclamation through a majority of the corridor, along with box widening, full depth reconstruction and realignment to a point just east of the Housatonic River Bridge. This will result in a new roadway alignment, both vertical and horizontal, improved sight distance and meet the 40-mph design speed criteria. This project does not include any bridge improvements. The ENF states that the project is proceeding through the MEPA review process because it exceeds the following MEPA review thresholds: 1) the project entails widening an existing roadway by four or more feet for one-half or more miles, 2) the cutting of five or more living public shade trees of 14 or more inches in diameter and 3) includes the alteration of a ½ acre or more of wetlands. CONSIDERATIONS AND POTENTIAL ISSUES: Transportation Impacts The proposed Housatonic Street project provides positive and beneficial improvements to the regional transportation system. The project will widen the roadway, improve existing roadway geometry, improve roadway drainage, replace poor pavement, provide for non-motorized travel through the rehabilitation of sidewalks and box widening to provide for 5 shoulders along each side of Housatonic Street. Housatonic Street is classified as an Urban Collector in the Federal Aid Classification System and the proposed 40 MPH design speed is reasonable. However, given the much wider feel of the proposed roadway, provided by addition of the 5 shoulders and in some areas new sidewalk, combined with the much improved pavement condition, the Page 1 of 5
2 Town should be aware that speeding will be an issue and should provide for strict enforcement of the speed limit. The ENF indicates that a 5 5 sidewalk and/or provisions for a future 5 5 concrete sidewalk will be constructed along the north side of Housatonic Street. However, the site plans indicate that there are no sidewalk improvements for a section of roadway west of Depot Street. The project narrative does not mention the missing segment (approximately 2,500 ) of sidewalk between South Carson Avenue and Depot Street, yet the discussion on existing conditions and land use mentions that Housatonic Street serves school children accessing the middle school through various modes of transportation including busses, cars, bicycles and by foot. Additionally, pedestrian accommodations are not included at any of the bridges on Housatonic Street as they are not part of the project. The ENF does not specify when these missing sidewalk connections, which are almost 30% of the total length of the project, will be made nor does it indicate when proposed future sidewalks will be constructed. More elaboration should have been included in the document. Additionally, the design places the sidewalk immediately adjacent to the curb. The lack of any offset between the curb and sidewalk discourages pedestrian use due to safety perceptions attributed to being close to traffic travelling at 40 MPH. It is stated that traffic volumes are expected to increase from 5,413 ADT (average daily traffic) in 2012 to 8,044 ADT in It is our position that this increase of 48% is exaggerated given that regional and national trends in vehicle miles travelled are actually decreasing. Even if these predictions are attained, the air quality impacts associates with this increase are considered as being negligible. The project includes roadway widening, approximately 5 6 over the length of this project. This will provide for 5 wide shoulders on each side of the road and will accommodate bicyclists. BRPC is pleased to see that these accommodations have been incorporated into the project design. Environmental Impacts The wetland impacts are fairly extensive for a project of this size, totaling 3,225 square feet (sf) of permanent bordering vegetated wetlands (BVW), 54,622 sf of riverfront and 199,688 sf (approx. 4.5 acres) of BVW buffer. Some bank and land under water will also be affected. The ENF indicates that most of the BVW impacts are associated with seven intermittent stream systems that flow into the East Branch Housatonic River, while the riverfront areas are associated with the river crossings. Inserting a table into the ENF outlining the areas of impact would have been helpful, especially given that more than four acres of BVW buffer appear to be permanently altered. At BRPC s request, the Town of Dalton did provide a table of wetland impacts to clarify the total impacts. Reviewing the plans with the table, it appears that much of the impacts are due to widening of the road. Page 2 of 5
3 Four of the intermittent streams are conveyed across the road through culverts, and the project is proposing to replace two of these with natural bottomed culverts. The ENF does not identify which two will be open bottomed nor why all four are not being replaced with open bottoms. MassDOT staff have indicated to BRPC that the two culverts that will remain piped are small (24 and 30 ) and that open bottoms for culverts of this size are not practical. The roadway will continue to channel road runoff through stormdrain systems, and deep sump catch basins are proposed along the length of the project to capture some sediment. The project also proposes a sediment forebay to further reduce sediment discharge. To mitigate wetland impacts, replication areas for 3,600 sf wetlands and 52 feet of bank will be constructed. The wetlands replication area is proposed where an existing stand of invasive phragmites is located. Proposing to create a beneficial native wetland at this site is laudable, but will undoubtedly require removal of existing invasive plants and several years of monitoring and active removal of new phragmites sprouts. The project has gone through the local wetland and DEP appeals permitting process and has received its Order of Conditions from the Dalton Conservation Commission. The Special Conditions issued by the Conservation Commission requires: 1) the wetland replication is to be constructed at the beginning of the project, 2) an annual vegetated growth report of the replication area to ensure coverage, and 3) that a culvert cleaning plan be developed for the town. The project met MEPA threshold, {301 CMR 11.03(6)(b)2.b.} removal of existing live trees greater than fourteen (14 ) inches in diameter, specifically the removal of approximately eleven (11) public shade trees greater than fourteen (14 ) inches at breast height. The summary of mitigation measures for the preferred alternative does not mention the planting of replacement trees, although the plans show several areas where trees will be removed and replanted. MassDOT and the town should review the planting plan to ensure that the trees planted are tolerant of road conditions and are not expected to interfere with overhead power lines. Consistency with Local & Regional Plans The Housatonic Street project is included in the Berkshire Metropolitan Planning Organization s FFY Transportation Improvement Program (TIP) for construction in 2016 and continuing through For clarification purposes, this project was previously programmed for construction beginning in FFY 2013 and continuing through 2014; however, delays with finalizing the design resulted in this project being pushed back. The ENF does not reference the inclusion of this project in the 2012 Berkshire Regional Transportation Plan (RTP); however, this project is included in the 2012 RTP. This project is consistent with RTP objectives of improving safety, maintaining existing roadways, and supporting the use of non-motorized forms of travel. As stated throughout the ENF, improved sidewalks and shoulders to promote walking and biking throughout the town is a goal of the Town of Dalton s Comprehensive Master Plan. Page 3 of 5
4 COMMENTS AND RECOMMENDATIONS: As an overall comment, which has been made in the past concerning MassDOT roadway projects, MassDOT projects should be required by MEPA to go through MEPA review prior to reaching the 100% design stage. For all practical purposes having projects reviewed at this late stage severely limits the opportunities to fully avoid, reduce, or mitigate issues subject to MEPA jurisdiction. MassDOT should be instructed to modify its design process to bring projects to MEPA prior to the 100% design stage (75% design is probably a reasonable benchmark). Similarly, MassDOT should not be pursuing wetland permits prior to the MEPA process. Transportation Share the road signage and pavement markings should be included as part of the project s improvements. The ENF site plans show future sidewalk along most of the Carson-to-Depot Street segment (except for an approximately 500 foot gap where no sidewalk is proposed, now or in the future), but BRPC has learned from the proponent that the project is no longer providing provisions for even a future sidewalk. According to the proponent there is no provision for a sidewalk because the existing bridge does not have pedestrian accommodations. Sidewalk can only be constructed in locations that have a reasonable and ADA compliant terminus. We disagree with this reasoning. We recommend that the design and construction of sidewalk along the road s length (with the exception of the bridge) be conducted as part of this current project, as it will be the most cost-effective manner in which to do so. Sidewalk should be provided in this project, with a note that bicyclist and pedestrian accommodations will be added to the bridge during any substantial future bridge work. While we are sensitive to the fact that it is more costly to provide sidewalks for the entire length of the project and that there will continue to be a very short gap crossing the bridge, this project should provide as much sidewalk as possible without reconstructing the bridge. It makes no financial sense to design and prep (clear & grub, loam and seed) areas for sidewalk for almost 1/3 of the project length but not then to construct them, or to leave such a sizable gap. In fact, the narrative states that the project is not being proposed to be constructed in phases. In support of the GreenDOT Complete Streets initiative and the Town of Dalton s Master Plan, MassDOT should at a minimum design the sidewalk for the missing segment and provide a date specific commitment for these improvements if they are not constructed as part of this project. We also note that five years ago South Street in Dalton was reconstructed in much the same manner as is being proposed on Housatonic Street, with wider shoulders and a sidewalk on one side of the road. However, in the previous project the town constructed a sidewalk along the entire length of South Street, despite the fact that no sidewalk was provided along the road for the short stretch under the existing narrow railroad bridge. Like South Street, a sidewalk should be provided on both sides of the existing bridge on Housatonic Street. We also note that while Page 4 of 5
5 accommodation for bicyclists is being provided right up to the bridge on both sides, the bridge itself does not have adequate width to totally safely accommodate bicycles. Dalton should have a speed enforcement program in place and strictly enforce the posted speed limit once this project is completed. Environment In addition to the vegetation growth monitoring required by the Dalton Conservation Commission, the BRPC requests that monitoring for, and continued removal of, invasive species be conducted at the wetland and bank replication sites beyond the two-year timeline ordered by the Dalton Conservation Commission. It will take several years of dedication to insure that phragmites will not become re-established at the site. BRPC suggests that monitoring and removal of invasive plants be conducted for at least three years after complete re-establishment of the site with indigenous wetland plant species. The proponent should identify all opportunities to add shade trees to the corridor, which will help to mitigate the wider feel of the new roadway and provide cooling shade and community character along the corridor. The MassDOT should provide to the Dalton Tree Warden and Conservation Commission a planting plan that states how replanted trees will be cared for in their first few critical years and the protocols by which sick or dead replacement trees will be replanted if they fail. Replacement trees should be selected which are native, tolerant of roadside conditions (compaction, heat, winter salt), are not expected to be susceptible to invasive species, and which can adapt to expected climate change. Gingko trees are not native,, and sugar maples will likely struggle due to intolerance of roadside conditions and continued climate change, and white pines suffer in areas where salt spray is heavy (the area down slope of the road on the corner of Main and Housatonic street will be prone to spray). We are unsure what water elms are, but only native hybrid disease-resistant elms should be considered. We note that little leaf lindens are not native to the Berkshires, but lindens were actively planted throughout the town, so these may be appropriate in this instance. Typically replacement of trees is with at least a 2:1 ratio. These comments were approved by the BRPC Clearinghouse Review Committee on August 19, 2013, as authorized by the BRPC Executive Committee on August 8, Page 5 of 5
Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge
Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge MEPA Meeting, EEA#14702 Wednesday, March 2, 2011 6:30 PM Dr. Martin Luther King, Jr. School 100 Putnam Avenue, Cambridge, MA Rendering by:
More informationYour town s subdivision or land use ordinance standards should reference the following street standards, for example:
Your town s subdivision or land use ordinance standards should reference the following street standards, for example: Streets shall be designed to move traffic safely and in a way that minimizes environmental
More informationPennsy Greenway Trail
Town of Schererville Pennsy Greenway Trail DES. #s: 0401062, 1173595 & 1382661 Construction of Pennsy Greenway Trail beginning at Wilhelm Street and continuing northwest along the former Penn Central railroad
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationChapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES
CHAPTER 1 GENERAL DESIGN GUIDELINES 1.0 INTRODUCTION This Publication has been developed to provide current, uniform procedures and guidelines for the application and design of safe, convenient, efficient
More informationCommonwealth ofmassachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office
Commonwealth ofmassachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office ReCEIVED DEC 2 8 ZOIl Environmental Notification Form For Office Use
More informationCOMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING
COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING Subject: Recommendation Prepared by: PRELIMINARY DESIGN REVIEW OF LOCUST STREET BRIDGE CONSTRUCTION & COURT AVENUE,
More informationCOMPLETE GREEN STREET CHECKLIST
COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.
More informationProposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under
More informationRIVERSIDE, Newton MA June 9, 2011
June 9, 2011 TONIGHT S AGENDA: 1.Project Update (5 min.) 2.Master Plan Update (10 min.) 3.Environmental Update (5 min.) 4.Traffic Plan Update (25 min.) Questions PROJECT STATUS UPDATE Responding / Clarifying
More informationCreating Complete Roadway Corridors:
Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee
More informationExecutive Summary. NY 7 / NY 2 Corridor
Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions
More informationAsbury Chapel Subdivision Sketch Plan
Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential
More informationTRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES
TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future
More informationDESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED
DESIGN PUBLIC HEARING MAY 10, 2018 AT GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED Reconstruction of Granby Road/West State Street (Route
More informationThe Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass
The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn
More information2 ALTERNATIVES AND OPTIONS
2 ALTERNATIVES AND OPTIONS This chapter documents the process used to develop improvement concepts for Oregon Avenue and describes the resulting project alternatives and options, which were developed in
More informationWelcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:
Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative
More informationPublic Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B
Public Meeting US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B Mark Leiferman Chief Road Design Engineer April 28, 2014 Why
More informationDESIGN PUBLIC HEARING APRIL 24, 2018 MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED
DESIGN PUBLIC HEARING APRIL 24, 2018 AT MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ROUTE 32/32A GILBERTVILLE VILLAGE RECONSTRUCTION PROJECT Roadway Project Management Section
More informationPROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.
PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH
More informationThe Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies
Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural
More informationNuts and Bolts (or Gravel and Asphalt) of the Main Street Project
Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project What is the Main Street Project? The Main Street Project is a roadway project that addresses pavement, infrastructure and safety issues
More informationGREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION
County: Linn County, IA GREEN SHEET Location: IA 100, from its terminus at Edgewood Rd. to US 30 southwest of Cedar Rapids Route: IA 100 Extension Project No.: NHS-100-1(36) 19-57 OLE Project Managers:
More informationPublic Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.
Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776)
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on
More informationChapter 3 Site Planning and Low Impact Development
CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),
More informationMcDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014
Introduction / Written Statement McDonald s Restaurant - Purcellville McDonald s Corporation is proposing to redevelop the existing McDonald s eating establishment with a drive-through located at 121 N
More informationVALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION
MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...
More informationCottage Grove Road Reconstruction. City of Madison Engineering
Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015 Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs
More informationPublic Information Centre. Welcome
Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff
More informationAlternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:
Race Road/Jessup Village Planning Study (H550601) Project Newsletter Spring 2015 Project Description The Study Team, consisting of staff from Anne Arundel County (Department of Public Works and Department
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar
More informationAGENDA ACTION ITEMS INFORMATION ITEMS
NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, March 21 st, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION
More information2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015
AGENCY: 2016 REVISIONS COMMENT FORM Section Title Number Chapter 1 Introduction Comment 1.1 CDOT Mission Statement 1.2 Purpose of Rules and Regulations for Construction in the Public Way 1.3 Chicago Department
More information15. Wetlands Chapter Overview Introduction
15. Wetlands 15.1. Chapter Overview 15.1.1. Introduction Pursuant to Presidential Executive Order 11990 entitled Protection of Wetlands, the United States Department of Transportation (USDOT) developed
More informationNorthern Branch Corridor SDEIS March 2017
Northern Branch Corridor SDEIS March 2017 15. 15.1. Chapter Overview 15.1.1. Introduction This chapter discusses changes to the Preferred Alternative resulting in the potential for project improvements
More informationRezoning Transportation Analysis Petition Number: General Location Identifier:
From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Kory Hedrick, PE, PMP Khedrick@charlottenc.gov 704-432-6511 CDOT s review of this rezoning petition is intended to
More informationNorthern Branch Corridor SDEIS March 2017
14. Water Quality 14.1. Chapter Overview 14.1.1. Introduction This section discusses changes to the potential for activities associated with the development and operation of the Preferred Alternative to
More informationINFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities
7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure
More informationNORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary
Executive Summary Background As congestion continues to affect mobility in the region, the Ozarks Transportation Organization (OTO) is particularly concerned with traffic movement. The North-South Corridor
More informationTable of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.
Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General
More informationWelcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012
Welcome Comprehensive Plan & Transportation Plan Open House November 7, 2012 Agenda Proposed future land use plan Comprehensive Plan strategies Traffic forecasts Future traffic operations Possible future
More informationAdvance Engineering & Surveying PLLC
Advance Engineering & Surveying, PLLC Consulting in: Civil & Environmental Engineering Land Surveying Land Development 11 Herbert Drive Phone: (518) 698-3772 Latham, N.Y. 12110 Email:ncostape@gmail.com
More informationWELCOME TO OPEN HOUSE TWO November 28, 2018
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting
More informationMetropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax
Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts 02111 617-451-2770 fax 614-482-7185 www.mapc.org Serving the 101 Cities and Towns in the Metropolitan Boston Region MEMORANDUM
More informationAccess Management: An Overview
Figures 1-5 Below Evolution of development along a highway. In the early stages, land along the road is used for farming with little traffic generated. As time passes, the highway corridor becomes a de
More information2040 Long Range Transportation Plan
2040 Long Range Transportation Plan Adopted: April 15, 2013 APPENDIX D HIGHWAY NEEDS PLAN PROJECTS FREDERICKSBURG Existing and Committed Projects Fall Hill Avenue/Mary Washington Blvd. (Fredericksburg)
More information7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES
7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an
More informationPedestrian Trails Within Regulated Areas
New Jersey Department of Environmental Protection Pedestrian Trails Within Regulated Areas Joslin Tamagno, Environmental Specialist Division of Land Use Regulation, Bureau of Inland Regulation www.nj.gov/dep/landuse
More informationMendota Heights 2040 Comprehensive Plan Draft Vers
4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs
More informationPARKLET PROPOSAL PACKAGE & PROCESS
500.3 I PARKLETS The term parklet refers to a small temporary constructed seating or community gathering area over an on-street parking space or an extension of the sidewalk into the operating State highway
More informationAt Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)
MEMORANDUM Archuleta County Development Services Planning Department 1122 HWY 84 P. O. Box 1507 Pagosa Springs, Colorado 81147 970-264-1390 Fax 970-264-3338 TO: Archuleta County Planning Commission FROM:
More information5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS
5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically
More informationMunicipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study
Reconstruction of Regional Road 45 (Creek Road) Between Regional Road 27 (River Road) and Regional Road 63 (Canborough Road) in the Township of Wainfleet Municipal Class EA Study Public Information Centre
More informationPublic Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table
Public Open House Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table The Grand Avenue Extension Location and Environmental Study will determine the location of the extension of
More informationResponse to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo)
Environmental Science & Assessment, LLC MEMORANDUM DATE: August 13, 2010 TO: Oregon City Planning CC: Jill Long Lane Powell FROM: RE: Jack Dalton Response to Comments (July 28, 2010 Oregon City Determination
More informationRESPONSES TO PUBLIC CONCERNS AND QUESTIONS
RESPONSES TO PUBLIC CONCERNS AND QUESTIONS Stations and Summary Questions for Public Meeting #2 June 23, 2015 General Questions / Concerns: 1. Is there any way this development can raise revenue for the
More informationMunicipality of Anchorage, Alaska Parks & Recreation Department
Municipality of Anchorage, Alaska Parks & Recreation Department 632 W. 6 th Avenue, Suite 630 P.O. Box 196650 Anchorage, AK 99519 Tel 907-343-4355 URL www.muni.org/departments/parks MEMORANDUM Date: October
More informationS SUMMARY S.1 PREFACE S.2 PURPOSE AND NEED S.3 PROJECT BACKGROUND
S SUMMARY S.1 PREFACE The Federal Highway Administration (FHWA) and the District Department of Transportation (DDOT), in cooperation with the National Park Service (NPS), are proposing the rehabilitation
More informationOpen House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK
Open House 10.12.16 RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK MEETING AGENDA Great Rivers Greenway and Project Partners River des Peres Greenway Overview Project
More informationOverall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.
Overall Map Summit Chicago Bloomington-Normal Lincoln New Station Planned New Station Planned Dwight Pontiac Joliet Pedestrian overpass and second platform planned Higher speed service began in this section
More informationLOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions
LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX G - Stormwater Study Findings & Stormwater Solutions LSU: MP Narrative July 2017 3.5 Open Space Existing Conditions The
More information1 PURPOSE AND NEED 1.1 PURPOSE OF THE PROPOSED ACTION 1.2 NEEDS FOR THE PROPOSED ACTION
1 PURPOSE AND NEED The Federal Highway Administration (FHWA) and the District Department of Transportation (DDOT), in cooperation with the National Park Service (NPS), are proposing the rehabilitation
More informationSECTION 5: REACH RECOMMENDATIONS/MAPS
SECTION 5: REACH RECOMMENDATIONS/MAPS This section describes areas of concern and provides specific recommendations for each project reach. Locations of stormwater drains were from GIS coverage supplied
More informationChapter 2: Strategies for Local Governments Chapter 3: Site Assessment and Design for Low Impact Development. Break Out Group 10:30 am to 12 pm
Chapter 2: Strategies for Local Governments Chapter 3: Site Assessment and Design for Low Impact Development Break Out Group 10:30 am to 12 pm A Low Impact Development Manual for Coastal South Carolina
More informationCOMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL
COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL The following checklist summarizes development guidelines and standards. See the appropriate section for a complete explanation of the
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction
More information5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22
5. Father Hennepin Blufs Park and Hennepin Island As described in existing conditions portion of Chapter 2, Father Hennepin Blufs Park lies on the upland portion of the park and Hennepin Island spans the
More informationTransportation Research Center
Increasing Design Flexibility in the AASHTO Green Book Your Department Name Presentation to AASHTO Subcommittee on Design Doug Harwood, MRIGlobal July 2017 Transportation Research Center Resolution of
More informationTOWN OF EASTON. MASSACHUSETTS CJffiCE Of the fjown c4dminiit'tato't
TOWN OF EASTON MASSACHUSETTS CJffiCE Of the fjown c4dminiit'tato't DAVID A. COLTON Town Administrator May 27,2011 Alan Anachecka-Nasemann Senior Project Manager Regulatory Division, Permits and Enforcement
More information5-Year Street Reconstruction Plan ( )
5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek
More informationDEPARTMENT OF PUBLIC WORKS & UTILITIES
CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS & UTILITIES URBAN SERVICES STANDARDS AND GUIDELINES January 2017 Craig Fulton, P.E., Director TABLE OF CONTENTS "URBAN SERVICES STANDARDS AND GUIDELINES"
More informationFY Capital Improvement Program Arroyo Projects
FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 Hahamongna - Implement Master Plan - Oak Grove Area Improvements (7756) Hahamongna - Implement Master
More informationEdenfield Avenue Green Street Demonstration Project Neighborhood Meeting
Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting Road Reconstruction Elements Grant Background What is a
More informationCITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS
SECTION 10 STREETS CITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS 10.1 INTRODUCTION The criteria presented in this section shall be used in the evaluation of the allowable
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationSection 11 Grading and Drainage Standards
Section 11 Grading and Drainage Standards 11.1 INTRODUCTION The proper grading, conveyance, storage and release of storm water is critical to maintain the integrity of the Property. Drainage facilities,
More informationFDOT D4 Complete Streets
FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,
More informationEXECUTIVE SUMMARY. Introduction
EXECUTIVE SUMMARY Introduction State Route 68 is a designated scenic route that connects the world-renowned Monterey Peninsula to US Highway 101 and the Salinas Valley. SR 68 is a key route for bicycle,
More informationHILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date
HILLSBOROUGH COUNTY Greenways and Trails Plan Update Executive Summary Date PURPOSE AND PROJECT OVERVIEW The Hillsborough County Greenways Master Plan (1995) and the City of Tampa s Greenways and Trails
More informationSH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017
Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year
More informationRoute 7 Reconstruction and Widening, Wilton. State Project Nos & 124. Wolf Pit Road to just north of Olmstead Hill Road
Route 7 Reconstruction and Widening, Wilton State Project Nos. 161-118 & 124 Wolf Pit Road to just north of Olmstead Hill Road Tonight s Agenda Introduction Bill Brennan, Wilton First Selectman Construction
More informationPublic Meeting May 20, 2014
Public Meeting May 20, 2014 Overview Study Purpose Study Area Overview Strategies Potential Opportunities Implementation and Discussion Skeo Solutions Raleigh Walkable Watershed Pilot 2 Purpose Develop
More informationAppendix G Response to Comments
Appendix G Response to Comments This appendix contains the comments received during the public circulation and comment period (May 27, 2008 to July 11, 2008). The comments have been numbered (Comment Set
More informationPROJECT BACKGROUND. Preliminary Design Scope and Tasks
PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationRoute 1 Corridor Study
Route 1 Corridor Study Westbrook, Connecticut A Vision for the Connecticut Shoreline Public Informational Meeting July 28, 2015 Lower Connecticut River Valley Council of Governments Fitzgerald & Halliday,
More informationProject Narrative For Fruita RV Resort Conditional Use Permit
Project Narrative For Fruita RV Resort Conditional Use Permit Date: November 18, 2016 Prepared by: Robert W. Jones, II, P.E. Vortex Engineering & Architecture, Inc. 2394 Patterson Rd., Ste. 201 Grand Junction,
More informationCAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013
Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN
More informationCity of Waco Stormwater Management Regulations
1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial
More informationMeeting Purpose: Date and Time: Location: Attendance: Handouts:
Meeting Purpose: Date and Time: Location: Attendance: Handouts: PA Turnpike / I-95 Interchange Project Design Advisory Committee (DAC)/Public Officials Meeting #8 April 12, 2012 at 1:30 p.m. Project Office,
More informationWorking Group Meeting
April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome
More informationSection 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004)
11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363 4210 Fax: (916) 363 4230 M e m o r a n d u m To: Julie Myrah, Branch Chief Date: May 5, 2017 California Department of Transportation
More informationARTICLE 13 STREETS General
ARTICLE 13 STREETS 13.1 General Streets shall be designed to suit their functions. Many streets have purposes other than vehicular traffic. As an alternative to current N.C. Department of Transportation
More informationSBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I
SBCAG STAFF REPORT SUBJECT: Cabrillo-UPRR Bridge Project MEETING DATE: March 17, 2016 AGENDA ITEM: 5I STAFF CONTACT: Fred Luna RECOMMENDATION: Authorize the chair to sign a Memorandum of Understanding
More informationDescription of Preferred Alternative
Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative
More informationCITY OF VALPARAISO STORMWATER MASTER PLAN
CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT DATE: January 26, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the
More information4-Town Comprehensive Plan DRAFT 7/30/07
4-Town Comprehensive Plan DRAFT 7/30/07 Acknowledgements ning Committee Town of Harrisburg Norman Roof Randy Nicol Town of Martinsburg Terry Thisse Paul Kelly Town of Montague Jan Bagdanowicz Wendy Perry
More information