1 Annexture-II Scope of Work and Other Terms Conditions Sl. 1. Removal Disconnection (i) Removal of existing heating elements, insulation brickwork of the side walls, roof, the doors and the bogie hearth. (ii) Disconnection and Removal of all old electrical cables and control cabinets 2. Repair 2.1 Furance Shell Repair : (i) Necessary repair of the furnace shell will be carried out before commencing new insulation work. 2.2 Repair alignment of both the doors of the furnace : (te : Party shall examine the condition of the door sealing / door alignment before submitting their offer.) (i) Both the doors are misaligned with the frame of the furnace. For this, plates, ribs, fixing bolts etc. are required be reset, re-adjusted and realigned. Whatever work is required achieve this objective shall be in the scope of the Party (ii) Re-Setting / balancing of counter-weight after the installation of new insulation system on the doors 2.3 Repair of Bogie : (i) Welding of steel plates wherever guide plates have broken off or rn away due constant use over the years (ii) Straightening and aligning of Bogie guide plates (iii) Straightening and repair of chain links of the Bogie hearth driving chain. iv) Overhauling of the bogie drive system including cleaning, greasing/lubrication
2 3. Painting: The furnace shall be painted in heat resistant silver aluminum oxide paint from the outside. 4. Installation (i) Installation of all supplied insulating materials on the walls, doors, and the roof shall be done by the Party (ii) Installation and masonry of all required and supplied refracry on bogie hearth, and the botm portion of the side walls (iii) Zone wise installation of all supplied heater elements on side walls, doors, and the bogie hearth (ii) Installation of all supplied Electrical items, instrumentation and controls 5. Connections : (i) Laying of all required power cables control wires (ii) Compensating cables of thermocouples shall be laid from the furnace temperature control instruments and the digital recorder. These cables preferably shall not have any joint in-between and if required, should be connected/terminated with appropriate K-type compatible plugs and sockets which should not interfere with the signal strength. (iii) Compensating cables of thermocouples for job temperature measurement shall be suitably terminated in a especially constructed enclosure at the bogie itself at operar side end with plug socket arrangement. (ii) Inter-connection of all electrical components 6. Resration of Existing Cooling system : In the lower part of chamber s side walls, there are uniformly arranged windows which by means of ducts laid in the lining are connected the air-inlet boxes, arranged along the side walls. Each of the boxes is connected a fan with a mor (10kW, 1500 rpm). Air circulation through the furnace is carried out downwards. On the side of inlet in front of the fans, there are two additional dampers which allow mixing of hot air exhaust from
3 the furnace and fresh air from the shop during cooling period. 6.1 Overhauling of both the blower fans and their operationalising and fitting with new V-belts 6.2 Resration and Overhauling of air duct system including installation of new insulation of air duct walls. specify new insulation details for air duct walls 6.3 Vents available on both the side walls of the furnace which are presently blocked shall be opened and resred and made operational for cooling 6.4 Retrofitting of pneumatically-operated dampers for controlling and mixing of furnace hot air with cold outside air (i) Two dampers (referred above at para 6) for each fan on both sides of the furnace are manually operated at present. These are be aumated through a new pneumatic system comprising of pneumatic cylinders, suitable pneumatic valves / pipes /filters etc. (ii) All the modification in dampers / new design / new dampers shall be in the scope of vendor (iii) Control of valves shall be through a Siemens PLC. PLC shall take temperature signal input from the master controller actuate pressure valves for adjusting the dampers (iv) Compressed air available at the shop floor at a pressure of about 4 bar shall be utilized for pneumatic operation of the dampers. 6.5 Overhauling of existing air vent system comprising of six holes with movable plugs designed for fresh air inlet placed at the roof of the furnace. These plugs are opened by means of manually-operated winches. (i) (ii) All the six vents shall be made leak proof by providing proper insulation around the periphery of the plug plate. Manual winches used operate the vents shall be overhauled and made operational. 6.6 Controlled cooling at the rate of 50 ºC/hr. is be achieved bring down the temperature of the furnace 150 ºC. Below this temperature, natural cooling of the job shall take place.
4 7. Commissioning of following items shall be carried out: (i) Thyrisrised controllers of each zone (ii) Master Temperature controller (iii) Slave Temperature controller of each zone (iv) Over Temperature controller of each zone (v) Temperature Recorders (vi) Furnace Cooling system (vii) Bogie Hearth Movement (viii) Doors lifting 8. Safety Interlocks Protection: (i) Bogie shall not be moved unless the doors are fully open. (ii) Bogie shall not be moved unless the compensation cables of thermocouples for the job temperature measurement are disconnected from their bogie junction box. (iii) Doors shall not be lifted unless heating elements are switched OFF (iv) Doors shall be operated only when the bogie is fully inside. (v) The furnace heating operation shall be interlocked with the Door operation so that heaters cannot be switched on unless the Bogie is completely inside and the doors are closed. However, a keyswitch inside the electrical cabinet shall be provided by-pass this interlocking for the use of maintenance personnel. (vi) The temperature controller shall have broken thermocouple feature so that the controller shall sp functioning and give alarm (Visible) in case of thermocouple failure. (vii) Over Temperature controller should switch Off the power supply heating elements of its zone in case of failure/breakdown of the respective Master/Slave controller (viii) All mors should be provided with thermal overload relays along with single phase preventing device. (ix) Safety of chart recorder shall be ensured in the event of electrical short circuiting of the job temperature thermocouple(s). As per furnace requirement 9. Alarm Annunciation
5 In the event of fault condition viz. broken thermocouple, over temperature or mor failure, an audio visual alarm annunciation system comprising a hooter and indication lamps should get activated. Three-tiered wer lamps as supplied vide Para 5./viii. of the scope of supply shall be installed at a suitable place on the furnace shell for convenient visibility. 10. MISCELLANEOUS WORKS: Supplier shall execute any other work found necessary complete the work but not stated explicitly above, along with all required material without any obligation. 11. ACCEPTANCE CRITERIA: Acceptance shall be at BHEL, Hardwar works after successful commissioning, testing and job proving and after achieving following criteria: (i) All furnace functions including sub-systems shall be demonstrated. Heating cycle for stress-relieving of two batches of fabricated components (decided by production deptt of BHEL) shall be established by heating the furnace load and temperature specifications. Rate of rise of temperature and cooling shall be ensured and demonstrated as per the tender specifications. (ii) Uniformity of the temperature of the jobs shall be within ± 5ºC. The same shall be ensured and demonstrated as part of Acceptance Criteria. 12. Down time of the Furnace shall intimate the tal downtime of the furnace required complete all the works as specified in the scope of work. However tal down time shall not exceed 60 days. An activity chart shall be submitted by the vendor detailing all the activities scheduled and time taken complete these. specify 13. Warranty :
6 shall stand warranty for all the materials supplied, all services provided and all the work executed for a period of 18 months from the date of successful commissioning of the furnace at BHEL, Hardwar 14. s obligation: (i) s shall visit the site, study the furnace and hold technical discussions with BHEL before submitting their bids. (ii) Any Material or work not specified in scope of supply/scope of work but required for successful modernization of the furnace may be advised and quoted by the Party along with their bid. changes shall be permissible after the placement of P.O. by BHEL and the same shall have supplied and commissioned free of cost. (iii) Party shall bring all required ols (power as well as hand ols), Meters and testing equipment as required for installation and commissioning. (iv) Party s experts shall be available at the site for a period of two weeks supervise independent operation of the furnace after the successful ance of the refurbished furnace. (v) All Welding rods and man power required for welding shall be party s responsibility. 15. BHEL's obligation: (i) Crane facility and lifting tackles like slings, rope, D-Shackles shall be provided free of cost. (ii) Electricity, welding set, Gas cutting equipment, Gases and holders shall be provided free of cost. (iii) Machining facility required for erection commissioning, subject the extent available in BHEL, shall be provided free of cost (iv) All civil work (except refracry works) shall be executed by BHEL subject prior intimation and drawing submission by the party. 16. Training : Party shall impart training on the new systems supplied and commissioned by them in situ BHEL technical staff, in following areas
7 (i) (ii) (iii) Instrumentation : For commissioning maintenance of Digital chartless recorders, Master and Slave temperature controllers Electrical and Electronics : For commissioning maintenance of Thyrisr controllers, PLC and control system Operation : For programming of temperature control for stress relieving of the fabricated components on the Master Temp. Controller, viewing and taking uploads of the reports and data from the digital chartless recorders, archiving of reports, printing of graphs on the laser printer and overall operation of the refurbished furnace. 17. PRE-DESPATCH INSTRUCTIONS Before despatch of the material, Party shall submit the Bill of Materials (BoM) BHEL. Only after clearance from BHEL, shall the Party despatch the material. BoM shall be sent sufficiently in advance of the delivery date so as enable BHEL study the same and comment. 18. QUALIFYING CONDITIONS 18.1 Only those vendors, who have supplied and commissioned at least one electrically heated chamber Bogie Hearth Furnace ( of minimum 400 KW capacity) with inside working volume of minimum 40 cubic meter with Insulation (ceramic fibre blankets/modules or vacuum formed boards or both), Heating Elements, Control instrumentation, Thyrisr/IGBT controllers, door trolley movement mechanisms for applications of stress relieving of fabricated components / casings in the past ten years (on the date of opening of tender) and such furnace is presently working satisfacrily for more than six months after commissioning (on the date of opening of tender ), should quote. OR Only those vendors, who have successfully revamped and modernized at least one electrically heated chamber Bogie Hearth Furnace ( of minimum 400 KW capacity) with inside working volume of minimum 40 cubic meter with Insulation (ceramic fibre blankets/modules or vacuum formed boards or both), Heating Elements, Control instrumentation, Thyrisr/IGBT-controllers, repair of Door trolley
8 movement mechanisms for applications of stress relieving of fabricated components / casings in the past ten years (on the date of opening of tender) and such furnace is presently working satisfacrily for more than six months after commissioning (on the date of opening of tender), should quote The following information should be submitted by the vendor about the companies where similar furnaces have been supplied or revamping work carried out. This is required from the vendor for qualification of the offer. (i) Name of the cusmer / company where furnace is installed/ revamped. (ii) Complete postal address of the cusmer. (iii) Month Year of commissioning. (iv) Broad specifications of the furnace(s) supplied (i.e., Chamber Size LxWxH, Payload, kw rating, Maximum temp.) and its application. (v) Name, designation, Phone, FAX no. and address of the contact person of the cusmer. (vi) Performance certificate from the cusmers regarding satisfacry performance of furnace supplied them (Original Certificate or through directly from the cusmer). The original performance certificate may be returned after verification by BHEL, if required. te: BHEL reserves the right verify information submitted by vendor. In case the information is found be false / incorrect, the offer shall be rejected.
Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT
An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli 620014, TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY NOTICE INVITING TENDER Phone:
More informationAnnexure - 1. Detectors: Fire Alarm Control Panel :
Item 1. Supply Part This Specification includes Supply, Warranty, Installation, Testing and Commissioning and integration of the Fire Alarm System mainly consisting of the Fire Alarm Control Panel (FACP),
More informationBHARAT HEAVY ELECTRICAL LIMITED, JHANSI
BHARAT HEAVY ELECTRICAL LIMITED, JHANSI Specification No. 7182/R2 Item No. ME-1/5/2639 Location BAY-6 Quantity ONE NO. NOTE : 1 VENDOR must submit complete information against clause No. 10.0 ( Qualifying
More informationDIRECTIVE NO: D-B
DIRECTIVE NO: D-B6 100604 1 LOW PRESSURE THERMAL FLUID PLANT AUTOMATED CONTROL SYSTEMS Date of Issue: June 4, 2010 General Details This directive is being issued to owners, licensed contractors, consulting
More informationTENDER DOCUMENT FOR SUPPLY OF EPOXY MIXING & POURING PLANT
BHARAT HEAVY ELECTRICALS LTD., CORPORATE R&D DIVISION VIKAS NAGAR, HYDERABAD-500093 (INDIA) Enquiry : Date : PURCHASE SECTION TECHNICAL SECTION SPEC.NO. 91 40 2377 8474 PHONE 91 40 2377 4494 Ext.7326 ST:ICH:08:001
More informationMAZAGON DOCK SHIPBUILDERS LIMITED
MAZAGON DOCK SHIPBUILDERS LIMITED (Formerly known as Mazagon Dock Ltd.) CIN : U35100MH1934GOI002079 (A Government of India Undertaking) Shipbuilders to the Nation Dockyard Road, Mazagon, Mumbai 400 010.
More informationKidde Nitrogen Inert Gas Clean Agent Fire Suppression System
1. GENERAL 1.1 INTENT OF SPECIFICATIONS A. This specification details the requirements for an engineered inert gas fire suppression system Model Kidde Nitrogen. These requirements, combined with good engineering
More informationSTATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)
STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC-213-100797 RACCOON CREEK STATE PARK (BEAVER COUNTY) I. SCOPE OF WORK: The Commonwealth of Pennsylvania, Department of Conservation
More informationSTANDARD TECHNICAL SPECIFICATION FOR LEVEL SWITCH (FLOAT/DISPALCER TYPE) VOLUME - IIB. SPECIFICATION No: PES
STANDARD TECHNICAL SPECIFICATION FOR LEVEL SWITCH (FLOAT/DISPALCER TYPE) - IIB SPECIFICATION No: PES-145-033 BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR PROJECT ENGINEERING MANAGEMENT DIVISION NOIDA,
More informationDC POWER DISTRIBUTION BOARD
DC POWER DISTRIBUTION BOARD February 2016 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.
More informationNOTICE INVITING TENDER
NOTICE INVITING TENDER Ref No.: SCOPEMINAR/MMO/18-19/183 Dated :- 06.12.2018 1. Online e-tenders are invited by Dy.General Manager, SCOPE on behalf of Constituents of SCOPE MINAR, Laxmi Nagar Delhi- 110092
More information5.0 ALARMS & TROUBLESHOOTING
5.0 ALARMS & TROUBLESHOOTING 5.1 - INTRODUCTION: Included in this section is a general guide for determining the possible causes of a failure and possible solutions. This guide is not intended to be all-inclusive.
More informationIndian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No.
Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi -110003, Ph. No. 011-49854100 TENDER NOTICE Sealed tender in two separate bids a) Technical bids,
More informationTENDER CRFQ NO (E-TENDER REF NO.13020)
ADDENDUM NO:2 AGAINST TENDER FOR DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND POST WARRANTY AMC OF RIM SEAL FIRE PROTECTION SYSTEM FOR BPCL- MUMBAI REFINERY (BPCL MR) TENDER CRFQ
More informationMAZAGON DOCK SHIPBUILDERS LIMITED
MAZAGON DOCK SHIPBUILDERS LIMITED (Formerly known as Mazagon Dock Ltd.) CIN : U35100MH1934GOI002079 (A Government of India Undertaking) Shipbuilders to the Nation Dockyard Road, Mazagon, Mumbai 400 010.
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating
More informationReplacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus
ADDENDUM FORM INVITATION TO TENDER: 2016-067 ADDENDUM NO: 1 DATE ISSUED: June 23, 2016 ISSUED BY: Monty Thibeault DESCRIPTION: Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus
More informationCONTENTS AUTOMATIC TRANSFER SWITCHES
CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training
More informationDovre 250 Cast Iron Gas Stove
Dovre 50 Cast Iron Gas Stove NATURAL GAS AND LPG INSTALLATION, SERVICING AND USER INSTRUCTIONS THIS PRODUCT IS FOR USE ONLY IN GREAT BRITAIN AND IRELAND These instructions are to be left with the customer,
More informationTime Extension: Tender submission deadline is extended up to 12:00 Hrs. of
ASSAM ELECTRICITY GRID CORPORATION LIMITED OFFICE OF THE MANAGING DIRECTOR Regd. Office: (FIRST FLOOR), BIJULEE BHAWAN, PALTANBAZAR; GUWAHATI - 781001 CIN: U40101AS2003SGC007238 PHONE: 0361-2739520 FAX
More informationPortable Banner Welder JC-2000-GM User Manual
Portable Banner Welder JC-2000-GM User Manual i. Applications It can be applicable for welding PVC-P PE TPO ECB CSPE EPDM PVDF and other Coated fabric covering, foil and homogeneous or coating sealing
More informationNFPA 80 Overview January 21, 2016
NFPA 80 Overview January 21, 2016 Kristin Bigda, P.E. Senior Fire Protection Engineer National Fire Protection Association Presenter Kristin Bigda, P.E. Senior Fire Protection Engineer, NFPA Building Fire
More informationField Start-Up Sheet Direct Fired Gas Equipment
Customer: Sales Representative: Model Number: Serial Number: Field Start-Up Sheet Direct Fired Gas Equipment ***Please Print*** INITIAL INSPECTION I. Installer Responsibilities 1. Remote Panel: All interconnecting
More informationESTEEM AUTOCLAVE SLIDING SINGLE DOOR:-
ESTEEM AUTOCLAVE SLIDING SINGLE DOOR ESTEEM AUTOCLAVE SLIDING SINGLE DOOR:- ESTA-108A For Sterilization of glass wares / containers, vessels, linen, rubber articles culture media etc. Sliding doors with
More informationBULLETIN. Temperature Controls (10/2013)
BULLETIN Temperature Controls (10/2013) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. This applies to Phase I & II only. Tenant Responsibility:
More informationSECTION (15767) - UNIT HEATERS
SECTION 23 82 39 (15767) - UNIT HEATERS PART 1 GENERAL 1.01 SUMMARY A. Section includes: 1. Unit Heaters. 2. Cabinet Unit Heaters. 3. Duct Heaters. 4. Baseboard Heaters. B. Related Sections: 1. Section
More informationTECHNICAL SPECIFICATIONS SWIVEL ARM GRINDING MACHINE
TECHNICAL SPECIFICATIONS SWIVEL ARM GRINDING MACHINE 1. PURPOSE : The Grinding machine is required for taper grinding of the Root and Shroud of the Turbine blades within close tolerances during assembly
More informationCAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning
CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning Presentation To: Canadian Fire Alarm Association (CFAA) National Capital Region
More informationSECTION AIR COILS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:
More informationRevised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*
1.0 Description of Services Required: Revised March 2015 Fire Alarm Systems Verification Schedule I(A) Services *Manditory Site visit required* Perform the annual fire alarm system and sprinkler system
More informationSECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationReport No EC. 1 Windsor Dials, Windsor, Berkshire, UK. SL4 1RS ATEX CERTIFICATION REPORT. Electronstandart-pribor
Report No. 3040249EC FM Approvals Ltd 1 Windsor Dials, Windsor, Berkshire, UK. SL4 1RS ATEX CERTIFICATION REPORT Product: Model and/or Type Reference: Flame Detector IPES-IR3 Description of the Product:
More informationHorizontal Glass Tempering Products
Horizontal Glass Tempering Products What is tempered glass? Tempered glass is two or more times stronger than annealed glass. When broken, it shatters into many small fragments which prevent major injuries.
More informationISO-9001:2008 FURNACES CATALOG. Phone: Fax: Web:
ISO-9001:2008 FURNACES CATALOG Phone: 281 496 0900 Fax: 281 496 0400 Email: sales@expotechusa.com Web: www.expotechusa.com 32 Digital control offers simple economical operation Ideal for ignition tests,
More informationMicroGuard RCI 514 OPERATORS MANUAL PICK FROM BOOM MODE B
MicroGuard RCI 514 OPERATORS MANUAL 12,700 1 77.8 36.9 6,100 61.0 Crane Setup FULL OUTRIGGERS PICK FROM BOOM MODE B 360 NO AUX HEAD REAR WINCH GREER COMPANY, 11135 South James, Jenks, OK 74037 Telephone
More informationCONSTRUCTION REQUIREMENTS
CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary
More informationNATIONAL BANKING GROUP WEST-1
NATIONAL BANKING GROUP WEST-1 TENDER FOR EMPANELMENT OF VENDORS FOR REFILLING AND SUPPLY OF NEW FIRE EXTINGUISHERS FOR BRANCHES AND OFFICES IN ZONES UNDER NBG WEST-1 BANK OF INDIA BUILDING 2 nd Floor,
More informationOperation and Maintenance Manual Chamber Conditioning Unit, CCU 06. Document Number: EC OM 6847 Revision: 3
Operation and Maintenance Manual Chamber Conditioning Unit, CCU 06 Part Number: KI40053 Document Number: EC OM 6847 Revision: 3 TABLE OF CONTENTS Table Of Contents Approval Sheet List of Abbreviations
More informationBULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)
BULLETIN Temperature Controls (Chilled Water) Phase III only (3/11/2010) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant Responsibility:
More information"This is only the scope of work for the project. For more information, interested parties should contact Procurement at
"This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a
More informationRancho Cucamonga Fire Protection District Prevention Bureau Standard
Rancho Cucamonga Fire Protection District Prevention Bureau Standard Title: Fire Alarm and Monitoring Systems Standard # 9-3 Effective: May 2002 Number of Pages: 7 Updated: December 2016 for consistency
More informationCBO-750 HYBRID-R OVEN Instructions Manual
CBO-750 HYBRID-R OVEN Instructions Manual ELECTRICAL DIAGRAM IS LOCATED BEHIND FRONT PANEL THIS OVEN MAY BE OPERATED OUTDOORS. ELECTRICAL DIAGRAMS ARE LOCATED BEHIND FRONT PANEL. KEEP THIS MANUAL FOR FUTURE
More informationL-08 LIFEBOAT RELEASE MECHANISM
Guideline No.:L-08(201510) L-08 LIFEBOAT RELEASE MECHANISM Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements,
More informationMetal Turbine Exhaust Joints An analysis of metal and fabric GTX expansion joints
The expansion joints, for a large Westinghouse turbine, are used between a hot turbine diffuser and cold HRSG inlet; the internal gas temperature is 1100ºF average. The two fabrics have thermal monitors
More informationTenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1
12/4/2017 Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1 This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant
More informationCAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS
2013 Randal Brown & Associates Engineering Ltd. 1 RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001-11 INTEGRATED
More informationEXPRESSION OF INTEREST CONSULTANCY SERVICES FOR GIVING FACELIFT TO BHEL GATES & LAND SCAPING OF SOUTH AVENUE AT BHEL-R.C.
EXPRESSION OF INTEREST CONSULTANCY SERVICES FOR GIVING FACELIFT TO BHEL GATES & LAND SCAPING OF SOUTH AVENUE AT BHEL-R.C.PURAM, HYDERABAD PREAMBLE BHEL Hyderabad is the leading Central Public Sector undertaking
More informationManitex Operation Manual
Manitex Operation Manual Introduction The Greer Insight system is designed for use as an aid to crane operation. Do not use this system without a properly trained operator who is knowledgeable in safety
More informationMiniature Hobby Boiler Inspection and Certification Requirements
State of Washington Department of Labor & Industries Boiler & Pressure Vessel Program 7273 Linderson Way S.W. Tumwater, Washington 98501 Miniature Hobby Boiler Inspection and Certification Requirements
More informationOperation Manual R205BV, R209BV
Operation Manual R205BV, R209BV 1 Safety Instruction The rotary evaporator is manufactured according to current methods and accepted safety regulations. However, risks still exist during the installation,
More informationEligibility Criteria for Participation [Qualification Requirement (QR)]
Eligibility Criteria for Participation [Qualification Requirement (QR)] 1. Only Manufacturers are eligible to Quote: a) Original manufacturers of High Voltage Detector in India will be eligible in the
More informationCO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE
CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 PPE-R/00.017 Version 2 RECOMMENDATION FOR USE Number of pages: 5 Approval stage : Approved on : Origin : Horizontal Committee, C2D Ad hoc group
More informationInstallation, Operation & Maintenance Instructions Annealing Ovens TLD models
Installation, Operation & Maintenance Instructions Annealing Ovens TLD models This manual is for the guidance of operators of the above Carbolite products and should be read before the oven is connected
More informationINTER - UNIVERSITY ACCELERATOR CENTRE (An Autonomous Centre of UGC) Aruna Asaf Ali Marg, New Delhi
INTER - UNIVERSITY ACCELERATOR CENTRE (An Autonomous Centre of UGC) Aruna Asaf Ali Marg, New Delhi - 110067 NOTICE INVITING E - TENDER Tender No: IUAC/NIT/35/VVVS/2018-19 Dated: 21/02/2019 Inter - University
More informationDUNHAM-BUSH. Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units.
DUNHAM-BUSH Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units. Job Name Unit Model Address & Location Unit Serial Number of Units Kindly complete,
More informationUniversity of Houston Master Construction Specifications Insert Project Name
SECTION 23 05 93 - TESTING, ADJUSTMENT AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section
More informationTitle 24, Part 6 Certification of Economizer Fault Detection and Diagnostics (FDD)
Title 24, Part 6 Certification of Economizer Fault Detection and Diagnostics (FDD) Title 24, Part 6 Section 120.2(i) requires that economizer FDD functions be installed on air cooled unitary air conditioning
More informationCALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.
CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. NAME OF TENDER: CONSTRUCT, DELIVER AND COMMISSION 3 (THREE) LIFT STATION ELECTRICAL LOCATION OF WORK: 3 Separate work sites in
More informationMaintenance Guide EMS Security Group Ltd. All rights reserved. MK154 Iss5 18/11/15 AJM
Maintenance Guide 2015 EMS Security Group Ltd. All rights reserved. MK154 Iss5 18/11/15 AJM Contents Overview 3 Pre-testing Guidelines 4 Daily Maintenance 4 Weekly Maintenance 5 Six Monthly Maintenance
More informationPRODUCT BULLETIN. Rev. A Monitoring Station offering PN Rev. B as a direct replacement. OVERVIEW / DESCRIPTION
PRODUCT BULLETIN ISSUE/DATE: March 28, 2008 rev A BULLETIN NUMBER: AQ032808 SUBJECT: Monitoring Station PRODUCT LINE: Aquafine UV Equipment TOPIC: REVISION TO THE 41114-1 MONITORING STATION OVERVIEW /
More information0.4 In the preparation of this standard, assistance has been derived from the following standards:
FOREWORD 0.1 Formal clauses will be added later. 0.2 The committee identified IS 10617(Pt 1), IS 10617(Pt 2) and IS 10617(Pt 3) for the first revision in the light of CFC free/hfc refrigerants and need
More informationSECTION SECURITY TESTING AND COMMISSIONING
SECTION 280800 - SECURITY TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 WORK INCLUDES A. General Description: This specification section covers the provision of preliminary testing, acceptance testing,
More information1.1 SECTION INCLUDES.1 Materials and installation for aboveground oil storage tanks..2 Section Waste Management and Disposal.
Page 1 of 8 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Materials and installation for aboveground oil storage tanks. 1.2 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management
More informationTerex Operation Manual
Terex Operation Manual Table of Contents Outline of Operation... 3 System Components... 3 Power-Up Self-Test... 5 Home Display... 5 The Configuration Display... 6 Home Button... 7 Man Button... 7 POL Button...
More informationLoss Prevention Standard
Loss Prevention Standard LPS 1531: Issue 1.1 companies installing or applying passive fire protection This Loss Prevention Standard is the property of BRE Global Ltd. and is made publicly available for
More informationTECHNICAL DATA SHEETS
TECHNICAL DATA SHEETS Dynamic Conveyor All-Metal Detector Detector Model: ACC7 Reliable Detection of ALL types of metal Steel Aluminum Copper Brass Stainless Steel -1- Special Features Quick lead time
More informationXRRS Specification Fire Ready Hood
XRRS Specification Fire Ready Hood ************************************************************************************************************************ Note to User: This document is subject to copyright
More informationRD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer
RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer Annexure-4 TECHNICAL SPECIFICATIONS FOR NITROGEN INJECTION FIRE PREVENTION AND EXTINGUISHING SYSTEM FOR OIL
More informationNATIONAL TRAINING BOARD (ELECTRICIAN) REGULATIONS 2008 BR 54/2008 NATIONAL OCCUPATIONAL CERTIFICATION ACT :38
BR 54/ NATIONAL OCCUPATIONAL CERTIFICATION ACT 2004 2004 :38 The National Training Board, with the approval of the Minister responsible for the National Training Board, in exercise of the powers conferred
More information5.07 Air Replenishment Systems
5.07 Air Replenishment Systems Reference: 2010 SFFC, Section 511.2 Definitions: CERTIFIED COMPRESSOR. A compressor used by a contractor for maintenance and testing of air replenishment systems that is
More informationSECTION GAS-FIRED RADIANT HEATERS
SECTION 23 55 23 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph
More informationSERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY
Bousquet Technologies Inc. 2121, Nobel, Ste Julie, Quebec, Canada, J3E1Z9 SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL Oil-Fired air heater for industrial and commercial use. FOR YOUR SAFETY Do not
More informationINSTALLATION INSTRUCTIONS
INSTALLATION The 2SD04700124 Smoke Detector Kit contains the parts and hardware to mount the smoke detector in the following applications: A. Supply Air Stream (Blower Compartment) B. Return Air Stream
More informationBULLETIN. Temperature Controls (VAV) (3/11/2010)
BULLETIN Temperature Controls (VAV) (3/11/2010) This bulletin is to advise you of the fees and responsibilities associated with Tenant s temperature controls. Tenant Responsibility: 1. Unit power is by
More informationCAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015
CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015 Fire Commissioning in Canadian Codes and Standards BACKGROUND Why Commissioning?
More informationItem/clause/Page no. Description as per tender. To be read as
Date- 02.11.2012 Amendment-2 Work - Tender for SITC of HT/LT substation equipments installation and allied electrical works for lecture theatre complex, FCI campus, University of Allahabad, Allahabad.
More informationSuggested Specification: Benchmark 1.5 Low NOx Gas-Fired Hydronic Boiler(s)
Furnish and install as shown on AERCO International plans and operation and maintenance manuals, with all applicable codes and authorities having local, state and federal jurisdiction, Benchmark Series
More informationI. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018
Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018 Prepared by: EH&S The probability of casualties and major structural damage increases when fire
More informationBrown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS
SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett
More informationA. Section Common Motor Requirements for HVAC Equipment: Fan motors.
SECTION 235533 - FUEL-FIRED UNIT HEATERS PART 1 GENERAL 1.1 SECTION INCLUDES A. Gas fired unit heaters. B. Oil fired unit heaters. C. Tubular infrared heaters. 1.2 RELATED REQUIREMENTS A. Section 230513
More informationAutomatic Sublimation Transfer Machine Manual Model. No.: ASTM-40/48/64
Automatic Sublimation Transfer Machine Manual Model. No.: ASTM-40/48/64 MIC CONTENTS I. Assembly Drawing -----------------------------------------------------------------------------------2 II. Technical
More informationCeiling Mount Air Purification System
Ceiling Mount Air Purification System HA-CMP-G2-R/HA-CMP-G2-OV Owner s Manual Table of Contents HealthyAir Series 1219 Filters 1 Important Safety Instructions 2 Technical Specifications 3 Packaging Reference
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,
More informationAS/NZS IEC :2013
AS/NZS IEC 61347.2.13:2013 (IEC 61347-2-13, Ed.1.0 2006, MOD) Australian/New Zealand Standard Lamp controlgear Part 2.13: Particular requirements for d.c. or a.c. supplied electronic controlgear for LED
More informationWINE COOLER INSTRUCTION MANUAL
CW-35D WINE COOLER INSTRUCTION MANUAL PLEASE READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE USE. FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN BODILY INJURY, AND/OR PROPERTY LOSS. RETAIN INSTRUCTION
More informationCRU-S Series Stainless Steel Condensate Recovery Unit
IM-UK-CRU-S UK Issue 1 CRU-S Series Stainless Steel Condensate Recovery Unit 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Storage, shutdown and equipment protection
More informationBold items are particular to the City of Euless
EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 8/2004 Fire Chief Lee Koontz Fire Marshal Paul Smith EFD-FMO 3-1 2003 International Fire & Building Code as Amended NFPA Standards
More informationOPERATION MANUAL KP4041 POLY SCRAP COMPACTOR
OPERATION MANUAL KP4041 POLY SCRAP COMPACTOR IBIS INTERNATIONAL Thank you for purchasing the KP4041 Poly Scrap Compactor. IBIS appreciates your confidence in our product, and promises to support its operation
More informationS a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e
5.07 Air Replenishment Systems (2016) Reference: SFFC, Section 511.2. Purpose: The purpose of this bulletin is to describe the requirements for air replenishment systems intended to be used to fill firefighters'
More informationSOUND RECEPTION SYSTEM
STANDARD FOR CERTIFICATION No. 2.9 SOUND RECEPTION SYSTEM APRIL 2009 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD (DNV) is an autonomous and independent foundation
More informationD-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING
D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationC. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.
SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers
More informationSUBJECT: Effective Date: Procedure Number:
SUBJECT: Effective Date: Procedure Number: Facilities Operations/ Utilities and Energy 9/1/2015 FS 2015 UES0002 Services Division of Responsibility Procedure APPLICABILITY/ACCOUNTABILITY: Supersedes: Page
More informationResponsibility No. Item description CC TPI Owner 5. Instrument items 5.1 Installation of equipment 5.1.1 Pre-installation check 1) Foundation and setting bolts - Dimension - Visual check 2) Visuals check
More informationSECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION
SECTION 15990 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the Specifier in correctly specifying Mechanical System Testing Adjusting
More informationWatt-Muncher Load Bank Manual WATT-MUNCHER. Portable Load Bank. 6 June 2018 Simplex Service Page 1 of 13
WATT-MUNCHER Portable Load Bank 6 June 2018 Simplex Service 800-637-8603 Page 1 of 13 This manual was last revised: 6 June 2018 For up-to-date information on this product or others, please contact Simplex
More informationLaser Safety Subgroup Charter
Laser Safety Subgroup Charter Laser Safety is one of several Subgroups of the Environmental Safety & Health Working Group of the DOE Energy Facilities Contractors Group (EFCOG) Mission The Laser Safety
More informationISO Acceptance tests for Nd:YAG laser beam welding machines Machines with optical fibre delivery Laser assembly
INTERNATIONAL STANDARD ISO 22827-1 First edition 2005-10-15 Acceptance tests for Nd:YAG laser beam welding machines Machines with optical fibre delivery Part 1: Laser assembly Essais de réception pour
More informationProcedure for the Approval of New Fire Detection and Alarm Technologies
VdS Guidelines for Automatic Fire Detection and Fire Alarm Systems VdS 3469en Procedure for the Approval of New Fire Detection and Alarm Technologies VdS 3469en : 2016-01 (01) Publisher and publishing
More informationLABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS
SECTION 22 20 00 LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements",
More information