Certification All contractors shall be licensed to perform work in district area

Size: px
Start display at page:

Download "Certification All contractors shall be licensed to perform work in district area"

Transcription

1 Wil-Fra-Mar Building 320 East Vermont Street Indianapolis IN (fax) General Provisions A/E Spec # Standard Project Certification All contractors shall be licensed to perform work in district area Coordinate Coordinate work in this Section with Section Alternatives Coordinate work in this Division with work being performed by other Contractors is necessary Coordinate work in this Section with Section Summary of the Work Temporary Work A/E Spec # Standard Project Shop Drawings Conformance Temporary lighting shall conform to current OSHA and NEC standards for type and wiring. Coordinate Coordinate with Section Temporary Facilities Page 1 of 38

2 IPS Electrical Design A/E Spec # Standard Project Compliance All work in this Division shall comply with National, State and Local Electrical Codes Experience Electrical Contractors bidding project shall have been in business doing projects equal to or greater is size for a minimum of 5 years Apprentice shall not work on "LIVE" circuits with out Joneyman Electrician present. Industrial Technology areas shall have own panel board with a minimum of 8 pushbuttons in room for shunt tripping of panel board. Rigid conduits are required in Boiler Rooms, Outdoor and Damp locations. On larger schools provide portable generator connection at service with Kirk-Key interlocks. Service conduits above ground are to be rigid. Minimum size of conduit 3/4" A/E shall do a Fault/Coordination study to set and coordinate trip settings. Follow current NEC code for GFCI protection No MC cable A Foreman must be present on the job site at all time Do not leave "LIVE" panels unattended. Page 2 of 38

3 Basic Material and Methods A/E Spec # Standard Project Test Reports Coordinate Coordinate work with Section Alternatives that may affect the Work of this Section Coordinate work with Division 2 Site Work that may affect the Work of this Section Raceway A/E Spec # Standard Project Conduit A/E Spec # Standard Project Unless otherwise noted provide (4) 3/4" spare EMT conduit for each flush mounted distribution panel board. Coordinate conduit type with building design and IPS Master Specifications Page 3 of 38

4 Wire and Cable A/E Spec # Standard Project All work shall conform to requirements of NEC Cable sheath colors are as follows: Red - Fire Alarm - no wire larger than #14 AWG will be permitted White - Security/Video/Data Blue - Data Orange - Fiber Green - Telephone Coordinate cable type and color coding with IPS Master Specifications Use of "BX", "AC" or "MC" cable is not permitted Aluminum Conductors are not permitted All cables shall be plenum rated Power System Wire Connections and Devices A/E Spec # Standard Project O.Z. Electrical Manufacturing Co. Burndy Engineering Company Thomas & Betts Company Design Standard O.Z. Electrical Manufacturing Co. Compression lugs shall be equal to T&B and series Page 4 of 38

5 Medium Voltage Cables, Splices, Terminations A/E Spec # Standard Project Wire and Cable American Insulated Wire Corporation B.I.C.C. The Okonite Company Tpirelli Cable Corporation Southwire Splicing and Terminating Burndy Corporation Cadweld (Ericl Products, Inc.) Cooper Power Systems MAC Products, Inc. Minnesota Mining and Manufacturing Company (3M) The Okonite Company Raychem Corporation Thomas and Betts Corporation Pull Boxes A/E Spec # Standard Project Size and gauge of boxes shall conform to the NEC Install where boxes will be accessible, but not to be conspicuous. Coordinate Coordinate exact locations of pull boxes with other trades. Page 5 of 38

6 Outlet Boxes A/E Spec # Standard Project Conformance Outlet Boxes shall conform to the NEC Coordinate Coordinate size and location of boxes with schedule in IPS Master Specification Section Wiring Devices A/E Spec # Standard Project Hubbell Pass & Seymour Leviton Cooper Wiring Devices Key switches are required in Hallways/Corridors, Restrooms, and Locker rooms. In Hallways/Corridors use a 3-way switching method with key switches in the center and normal switches by doors for Fire Dept. use. Make sure not all lights are turned off by normal snap switches. Hubbell is the only accepted manufacturer for key switches. Coordinate Coordinate manufacturer and model number with schedule in IPS Master Specification Section Page 6 of 38

7 Lighting Control Devices A/E Spec # Standard Project Field quality-control test reports Operation and Maintenance Data Contactors and Relays Automatic Switch Co. GE Lighting Controls Hubbell Lighting, Inc. Square D Co.; Power Management Organization Allen Bradley ITE Siemens Cutler Hammer Photoelectric Relays Intermactic, Inc. Paragon Electric Co., Inc. Testing Systems shall be field tested prior to Building Substantial Completion Training Factory-authorized representative shall train Owner's maintenance personal and the systems Wall packs only for emergency lighting No battery ballasts No Central batteries systems Page 7 of 38

8 Motors A/E Spec # Standard Project Marathon Baldor GE US Motors All motors to be high efficiency type Starters, Disconnects, and Controllers A/E Spec # Standard Project Westinghouse G.E. Company Square D company ITE Siemens Allen Bradley Furnas Page 8 of 38

9 Switchboards A/E Spec # Standard Project Square D Company General Electric Co. Cutler-Hammer ITE Siemens All Electrical Distribution Equipment shall have Copper busses with bolt in breakers Main service switches over 1000 amps shall have GFCI protection School shall have one main service disconnect Hinged covers required Switches over 1200 amps shall be bolted pressure type, high pressure contact (HPC) unacceptable. A/E shall do a Fault/Coordiantion study to set and coordinate trip settings. All Branch Switches to have visible blade construction, shrouded blades unacceptable. Metering System Switchboards shall have CM3350 metering system manufactured by Square D. No Equal. Metering System Options to Include Disturbance Detection of surges and sags lasting. Ethernet communication card with both fiberoptic and 10baseT connections with web server. 63 rd harmonic resolution 128 samples /cycle Downloads capable of being done via RS-485 up tp 38.4K Baud, or optional Ethernet ports up to 100M Baud Boolean alarms combine up to other alarms with AND, NAND, NOT, OR, and XNOR Onboard Logging 8MB non-volatile memory record pre-set parameters at 100 msec interval during events Page 9 of 38

10 Panelboards and Cabinets A/E Spec # Standard Project Square D Company General Electric Co. Cutler-Hammer ITE Siemens Fusible Panelboards shall be equal to Square D Co. model QMB Computer boards shall have an 200% neutral isolated ground Units shall have Copper busses with bolt in breakers Hinged covers required Any circuit over 100 amps shall be fused and fed from switchboard Installation of Switchboards, Panelboards and Cabinets A/E Spec # Standard Project Internal heaters if required Immediate disconnect at service conduits entrance to the building or service encased in concrete. Nema 3R top in damp locations No outdoor gear Chillers and Electric heat to have separate utility meters if seasonal shutdown is feasible and IPL is agreeable Page 10 of 38

11 Switches A/E Spec # Standard Project Cutler-Hammer General Electric Co. Square D Company ITE Siemens Outdoor security lights to be on photo cell with no timers Coordinate Coordinate switch type with schedules in IPS Master Specifications Fuses and Fuse Holders A/E Spec # Standard Project Extra Material Provide wall mounted fuse cabinet or baked enamel finish, located where directed. Furnish 10% of each size and type, but not less than one (1) set of three (3) each of each size and type of fuses used in all motor control centers, power panels, disconnects, and the like, rated 600 amperes or less, and including those fuses and fuse supplied by others with integrated equipment. Contractor shall furnish Owner one (1) set of three of each size and type of all fuses installed in the main distribution center. For all fuses larger than 601 amperes, furnish two (2) spare fuses of each size. Bussman Ferraz-Shawmut Distribution fuses - Class "J" Service fuses - Class "L" Page 11 of 38

12 Circuit Breakers A/E Spec # Standard Project Westinghouse General Electric Co. Square D Company ITE Siemens Keep breakers to 100 Amps or less Coordinate Coordinate Circuit Breaker type with schedules in IPS Master Preventative Maintenance and Refurbishment of Circuit Breakers Standard Project A/E Spec # Personnel Qualifications Contractor to provide list of the qualified personnel who will perform the inspection, refurbishment, testing. List the years of experience and training of each of the personal. Similar Projects The Contractor shall provide details of not less than (2) similar projects as part of the Shop Drawing process Test Results Test results in accordance with the manufacturer's written recommendations. High voltage maintenance Energy Systems Maintenance Permier Power Certification Must be tested by Qualified Test Technicians - trained in National Electrical Testing Association (NETA) procedures and specifications Page 12 of 38

13 Hangers and Support Devices A/E Spec # Standard Project Coordinate Coordinate load limits with IPS Specifications Hangers shall be individual ring or clevis type, one-hole straps or multiple trapeze hangers. No more than two (2) struts shall be installed on hangers Material shall be similar to Uni-strut or equal Emergency Generator System A/E Spec # Standard Project Special Product One year from date of project Substantial Completion Schematic wiring drawing, dimension drawings and interconnection diagrams Kohler Onan Caterpillar Generator shall be load tested prior to Substantial Completion Fuel: Natural Gas. 100kw or larger use Diesel Generator shall have a remote annunciator panel located as directed Connect computer loads sump pumps and Technology type equipment to generator. Page 13 of 38

14 Power Factor Correction Capacitors A/E Spec # Standard Project s shall be certified by the manufacturer that all points in the specifications shall be met ABB Aerovoc Inc. Commonwealth Sprage Capacitor Inc. General Electric Company Square D Staco Energy Products Co. Power Survey Manufacturer shall be a member of NEMA Capacitors shall meet of exceed standards, equal to or in excess of those specified by NEMA, AIEE, MEC, or ANSI Furnish one (1) central system at service - no individual motor units Floor mounted capacitors shall be provided with a 5-1/2" high concrete pad MV Fused Load Interrupter Switch Refurbishment A/E Spec # Standard Project If switch is subject to moisture retro-fit humidistat controlled heaters in switch Verify Verify all door interlocks and devices are functional Page 14 of 38

15 Service and Distribution A/E Spec # Standard Project Secondary power distribution system will be 208V/120V, 3 phase 4 wire, wye 480V/277V 3-phase 4-wire or 480V 3-wire shall be used for equipment or motor loads only Branches to fluorescent lighting in general will be 120V Surge Suppressor (TVSS) A/E Spec # Standard Project Special Product 5 years parts and labor from date of project Substantial Completion Current Technologies Liebert Cutler Hammer Square D Company Siemens Intermatic Inc. (All devices must have covers) Mount in Service and Panelboards Incorporate on main switchgear Page 15 of 38

16 Grounding A/E Spec # Standard Project Compliance Grounding system shall be in full compliance with all provisions of the National Electrical Code and NFPA 70 For linear ground grid, use 15' rods 15' apart with minimum bare 4/0 bare AWG. Bury cables and rods minimum 3' deep in soil/grade For triangular ground grid use 15' copper rods 15' apart minimum Dry-Type Transformer A/E Spec # Standard Project s shall be certified by the manufacturer that all points in the specifications shall be met Cutter-Hammer General Electric Company Hevi-Duty Square D Company ITE Siemens Floor mounted transformers shall be provided with a 5-1/2" high concrete pad Must be acceptable ambient DB level at minimum load Install K-13 rated transformers on all computer Panelboards Page 16 of 38

17 Oil Filled Transformers A/E Spec # Standard Project s shall be certified by the manufacturer that all points in the specifications shall be met Cutter-Hammer General Electric Company Hevi-Duty Chance Kuhlman McGraw-Ed Miagra H.K. Porter Vantran RTE Cooper Manufacturer shall be a member of NEMA Transformers shall meet or exceed standards, equal to or in excess of those specified by NEMA, MEC, or ANSI C/T's incorporated in pad mounts if they are service transformers Transformer shall pad mounted and protected by bollards Page 17 of 38

18 Motor Control Centers A/E Spec # Standard Project Special Product 1 year from date of project Substantial Completion Shop Drawings Manufacturer's Certifications Schematic and elementary diagrams Square D Company General Electric Company Cutler-Hammer Siemens Testing Each unit shall be operationally field tested Adjustable solid state overload relays required Copper buss required Motors over 2 hp shall have single phase protection Furnish 10% spare fuses (not less than 6) of each type and rating shown on the Contract Drawings per Specifications Units over 1000 amp shall have GFCI protection Work In Existing Buildings A/E Spec # Standard Project Shut down of any electrical systems require a minimum of one (1) week notice to the Owner and District Electrical Forman (Mike Fox) Contact Numbers: Electric Shop: Dispatch: Mike Fox (cell): Page 18 of 38

19 Lighting A/E Spec # Standard Project The contractor shall provide and/or install sample fixtures, upon request of the Architect/Engineer for each fixture Photometric data for each fixture Outdoor and Security lighting shall be on photo cell with no timers No modular plug wiring systems Coordinate specifications with drawings and schedules Fixtures shall be direct wired - no master slave systems Rooms shall have multi level switching All fixtures shall be accessible with normal hand tools and 8' ladder Locate fixtures so that scaffolding or ladders over 8' are not required to change lamps Lamps, Ballasts, Accessories A/E Spec # Standard Project Report of ballast check All ballast shall be checked prior to Substantial Completion SP41 T-8 lamps District standard All ballasts to be rapid start unless otherwise approved by Owner F32T8 Tri phosphor 3050 lumens (acceptable) All ballasts to be electronic and meet all energy standards Coordinate lamps, ballasts, and accessories with lighting fixtures Page 19 of 38

20 Stage Dimming System A/E Spec # Standard Project Special Product One (1) year from date of project Substantial Completion Shop Drawings Klieg Brothers Lighting Co. Lighting Methods Inc. Color Tran Altman Lighting, Inc. EDI MX Series and Twilite System dimming equipment SSRC SL Series distribution equipment Coordinate Coordinate system requirements and approved model numbers for equipment with IPS Master Specifications Dimming Rack Install Dimming rack in room with filtered A/C Upon any renovations do the following Install 3 wire ground circuits Replace border lights with 4 color units White, Blue, Red, Green Replace all cords including all cords to flying color bars Remove all asbestos wiring Neutral required for each branch circuit Install "Road Show" switch with 200 amp shunt trip Floor pocket to have grounded outlets Install proper stain relief on all cords All cables shall be marked with metal tags indicating circuit number corresponding to dimmer terminal strip Page 20 of 38

21 Football - Lighting Pole A/E Spec # Standard Project Finish samples for selection by Architect All poles to have safety cable that runs the length of pole to tie safety climbing lanyards to Poles to have cage with climbing pegs Metal Halide fixtures with remote panel board/ballast at pole base Carbon Monoxide Control and Alarm System A/E Spec # Standard Project Shop Drawings Maintenance Manuals ACME Engineering Products, Inc. Mine Safety Appliances Company Greystone Vulcain, Inc. Back-Up Battery System shall include rechargeable back-up battery, minimum capacity four (4) hours Dock Areas Dock areas to have separate system Provide Spare Components Five (5) cans of analyzed gas for periodic field calibration checks and motorized dampers, smoke control and smoke evaluation control systems. Six (6) sets of spare fuses of each type One (1) remote sensor station Page 21 of 38

22 keeping System A/E Spec # Standard Project Shop Drawings Samples for color selection by Architect Daktronics Fair-Play BB Sportable ALL boards to have hinged rock shield Provide "school name" on board LED type lamps Lightning Protection System A/E Spec # Standard Project Complete Design Drawings Shop Drawings Advanced Lighting Technology Thompson Lighting Protection Harger Lightning Protection East Coast Lightning Equipment Capitol Lighting Lightning Protection Page 22 of 38

23 Fire Alarm and Detection System A/E Spec # Standard Project Special Product The equipment manufacturer shall make available to the owner a maintenance contract proposal to provide a minimum of two (2) inspections and tests per year in compliance with NFPA-72H guidelines Extra Material Vendor shall provide 10% of each type device for spare parts Shop Drawings The system manufacturer shall be responsible for furnishing engineering drawings which indicate the interlocking of all equipment external to the various control panels. Wiring Diagram Complete wiring diagram of the system Pyrotronics MXL IQ Notifier AFP200, AM2020, AM1010 The entire installed system and all integrated system operations shall be within the guidelines of Underwriter's Laboratories, Inc. Criteria Equipment shall be manufactured by ISO 9001 certified company All systems shall have an RS-232 port and panel mounted printer Coordinate Coordinate system equipment and operations with IPS Master Specifications The system shall be coordinated with all wall mount electromagnetic door holders Coordinate with Section "Alternatives" that may affect the work of this Section Spare Capacity System shall have 20% spare capacity System Circuit Wiring Conductors shall be no less than 18 AWG (1.02mm) and no larger than 14 AWG (1.63mm) on system circuit wiring Page 23 of 38

24 Training Contractor or Manufacturer's Representative shall provide two, 1-hour training sessions for building personnel and four, 4-hour training sessions for telecommunications department personnel Security System A/E Spec # Standard Project Shop Drawings Security Head in shall be Vista 50, Vista 128b Ademco SM4100 RS-232 card Panasonic multiplexer WJFS616 All outside ground floor rooms shall have motion detection if an outside exit door or window is present in room Pelco EM1450 enclosure arm Ademco 6139 keypads Panasonic WVCP234 digital camera Altronics ALTV624 camera power supplies Altronics SMP3 power supplies Panasonic WJ-NT104 Camera servers Pelco DF8A camera dome with ceiling plate Pelco EH outdoor enclosure with sunshield Ademco Quest 2000 motion detectors Computer by Contractor current model with CD rom 64M ram (3) serial ports network card Keyboard and Mouse (8) port switch (1) 3-1/2" floppy (2) parallel ports Screw terminal blocks Page 24 of 38

25 Clocks A/E Spec # Standard Project Atomix - American Signal 12 inch (round) Usually bought and installed by Owner Telephone System "TTC" A/E Spec # Standard Project Nortel Norstar OX32MICS (small buildings) Elementaries Meridian Option II (Large buildings) MS & HS Elementary Office phones 7324, classroom 7208 Coordinate 4" PVC conduit MS/HS Office phones 2008 and 2316, classrooms 2500 wall mount Page 25 of 38

26 Central Sound System "CS" A/E Spec # Standard Project Catalog Cuts of all products Shop Drawings Bogen Multicom 2000 Dukane MCS 350 Rauland Telecenter ICS Coordinate Coordinate Section Alternatives if needed Coordinate equipment with IPS Master Specifications Page 26 of 38

27 Dining/P.E. Gym Sound System A/E Spec # Standard Project List of projects and experience Location of local service facility and name(s) of trained testing personnel Shop Drawings Catalog Cuts of all products Cassette Tape Deck Tascam 202mk3, or equal CD Changer Tascam CD-305, or equal Equalizers Rane RPM 26v, or equal Feedback Suppresser (may not be needed) Sabine FBX-1020Plus, or equal Loudspeakers Atlas/Soundolier Model FC series, CF series, or equal Mixers TOA A-900MK2, or equal Power Amplifiers TOA P-9xxMK2 series, or equal, Crown ComTech series, or equal Experience Contractor shall have a minimum of five (5) years experience in similar size projects Frequency Response 70 Hz to 2,000 Hz, plus/minus 3 db Intelligibility %ALCons equal to or less than 10% (room empty) Service Contractor shall have local service facility within sixty (60) miles of the Owner's district boundaries, with authorized service personnel. Service personnel shall have TEF 20 equipment for testing and be trained in the operation of the testing equipment Sound Coverage Uniformity Plus/minus 3 db Page 27 of 38

28 Sound Pressure Level 86 db SPL with 6dB of headroom Testing Contractor shall provide testing of entire system with Architect/Engineer and Owner's Representative present Coordinate Coordinate equipment with IPS Master Specifications IPS Master Specification list single manufacturer, coordinate approved manufacturers Page 28 of 38

29 Gym Sound System "GSS" A/E Spec # Standard Project Shop Drawings Catalog Cuts of all products List of projects and experience Location of local service facility and name(s) of trained testing personnel Assistive Listening System Telex ST-200, or equal Telex ST-200, or equal Cassette Tape Deck Tascam 202mk3, or equal CD Changer Tascam CD-305, or equal Equalizers Rane RPM 26v, or equal Feedback Suppresser (may not be needed) Sabine FBX-1020Plus, or equal Loudspeakers Eastern Acoustic Works (EAW) MQ series, or equal Mixers TOA A-900MK2, or equal Power Amplifiers Crown K series, Crest CKS series or equal Wireless Microphone System Shure UC4/ Shure UC2/87, or equals Experience Contractor shall have a minimum of five (5) years experience in similar size projects Frequency response 100 Hz to 4,000 Hz, plus/minus 3 db Intelligibility %ALCons equal to or less than 12% (room empty) Page 29 of 38

30 Service Contractor shall have local service facility within sixty (60) miles of the Owner's district boundaries, with authorized service personnel. Service personnel shall have TEF 20 equipment for testing and be trained in the operation of the testing equipment Sound Coverage Uniformity Plus/minus 3 db Sound Pressure Level 107 db SPL with 6dB of headroom Testing Contractor shall provide testing of entire system with Architect/Engineer and Owner's Representative present Coordinate Coordinate equipment with IPS Master Specifications IPS Master Specification list single manufacturer, coordinate approved manufacturers Page 30 of 38

31 Auditorium Sound System "AS" A/E Spec # Standard Project List of projects and experience Catalog Cuts of all products Shop Drawings Location of local service facility and name(s) of trained testing personnel Assistive Listening System Telex ST-200, or equal Automatic Mixer IED 4800, EV 2508, or equal Cassette Tape Deck Tascam 202mk3, or equal CD Changer Tascam CD-305, or equal DAT Deck Tascam DA-40, or equal Effects Loudspeakers Renkus-Heinz Model TR series, or equal Equalizers Shure P4800, Rane RPM 26v, or equal Lobby Loudspeakers Atlas/Soundolier Model FA134, or equal Main Cluster Loudspeakers Renkus-Heinz CE series, or equal Manual Mixers TOA A-900MK2, or equal Mixing Console Soundcraft K1 24 Channel, or equal Power Amplifiers Crown K series, Crest CKS series or equal Theatrical Intercom System Clear-Com MS-232, or equal Wireless Microphone System Shure UC4/ Shure UC2/87, or equals Page 31 of 38

32 Experience Contractor shall have a minimum of five (5) years experience in similar size projects Frequency response, assistive listening system 100 Hz to 6,000 Hz, plus/minus 3 db Frequency response, main system 50 Hz to 15,000 Hz, plus/minus 3 db Intelligibility %ALCons equal to or less than 6% (room empty) Service Contractor shall have local service facility within sixty (60) miles of the Owner's district boundaries, with authorized service personnel. Service personnel shall have TEF 20 equipment for testing and be trained in the operation of the testing equipment Sound Coverage Uniformity Plus/minus 3 db Sound Pressure Level 96 db SPL with 6dB of headroom Testing Contractor shall provide testing of entire system with Architect/Engineer and Owner's Representative present Coordinate Coordinate equipment with IPS Master Specifications IPS Master Specification list single manufacturer, coordinate approved manufacturers Page 32 of 38

33 Football Sound System "FSS" A/E Spec # Standard Project Catalog Cuts of all products Shop Drawings Location of local service facility and name(s) of trained testing personnel List of projects and experience Assistive Listening System Telex ST-200, or equal Cassette Tape Deck Tascam 202mk3, or equal CD Changer Tascam CD-305, or equal Equalizers Rane RPM 26v, or equal Feedback Suppresser (may not be needed) Sabine FBX-1020Plus, or equal Field Intercom System Clear-Com WBS-6, Telex BTR-500, or equal Interior Loudspeakers Atlas/Soundolier C10A, or equal Main Filed and Concessions Area Loudspeakers Community R2 and WET series, or equal Mixers TOA A-900MK2, or equal Power Amplifiers Crown ComTech series, or equal Wireless Microphone System Shure UC4/ Shure UC2/87, or equals Experience Contractor shall have a minimum of five (5) years experience in similar size projects Frequency response 100 Hz to 2,500 Hz, plus/minus 3 db Page 33 of 38

34 Intelligibility %ALCons equal to or less than 10% Service Contractor shall have local service facility within sixty (60) miles of the Owner's district boundaries, with authorized service personnel. Service personnel shall have TEF 20 equipment for testing and be trained in the operation of the testing equipment Sound Coverage Uniformity Plus/minus 3 db Sound Pressure Level 92 db SPL with 6dB of headroom Testing Contractor shall provide testing of entire system with Architect/Engineer and Owner's Representative present Coordinate IPS Master Specification list single manufacturer, coordinate approved manufacturers Coordinate equipment with IPS Master Specifications Page 34 of 38

35 16782A - Television Distribution System A/E Spec # Standard Project Shop Drawings Location of local service facility and name(s) of trained testing personnel List of projects and experience Amplifiers Blonder Tongue, or equal Directional Couplers TrueSpec, or equal F Connectors Pico Macom, or equal Trunk Cable, Runs greater than 500 feet, RG-6 Helix , or equal Trunk Cable, Runs less than 500 feet, RG-11 Comscope 2285k, or equal Bandwidth 20 MHz to 300 MHz Experience Contractor shall have a minimum of five (5) years experience in similar size projects Maximum Signal Loss through System 40 db Service Contractor shall have local service facility within sixty (60) miles of the Owner's district boundaries, with authorized service personnel. Service personnel shall have TEF 20 equipment for testing and be trained in the operation of the testing equipment Testing Contractor shall provide testing of entire system with Architect/Engineer and Owner's Representative present Trunk Attenuation (Channel 13) Not more than 2.1 db Trunk Attenuation (Channel 83) Not more than 4.5 db Page 35 of 38

36 Coordinate Coordinate equipment with IPS Master Specifications Page 36 of 38

37 16782B - Television Distribution System A/E Spec # Standard Project Location of local service facility and name(s) of trained testing personnel List of projects and experience Operational Manuals Shop Drawings Blonder Tongue Jerrold Amplifiers Blonder Tongue, or equal Directional Couplers TrueSpec, or equal F Connectors Pico Macom, or equal Trunk Cable, Runs greater than 500 feet, RG-6 Helix , or equal Trunk Cable, Runs less than 500 feet, RG-11 Comscope 2285k, or equal Bandwidth 20 MHz to 300 MHz Experience Contractor shall have a minimum of five (5) years experience in similar size projects Maximum Signal Loss through System 40 db Service Contractor shall have local service facility within sixty (60) miles of the Owner's district boundaries, with authorized service personnel. Service personnel shall have TEF 20 equipment for testing and be trained in the operation of the testing equipment Testing Contractor shall provide testing of entire system with Architect/Engineer and Owner's Representative present Trunk Attenuation (Channel 13) Not more than 2.1 db Page 37 of 38

38 Trunk Attenuation (Channel 83) Not more than 4.5 db Coordinate Coordinate equipment with IPS Master Specifications Design Standards Blonder Tongue used as design standards for Specifications in IPS Master Specifications Television Equipment A/E Spec # TV Mounting Brackets Peerless Industries: Combination ceiling plate and TV mount bracket - JM S 2650D and Combination wall mount bracket and TV mount bracket - JMW2650D with extension column Hand Dryers A/E Spec # Standard Project Shop Drawings Electric Aire Model "F" Bobrick Model "B-751" Excel Model "R76-C" World Dryer Install Prision grade units only Mounting heights shall comply with Americans with Disability Act (ADA) Install as indicated on drawings Page 38 of 38

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

SECTION PUBLIC ADDRESS SYSTEMS

SECTION PUBLIC ADDRESS SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Amplifier and control equipment B. Input equipment C. Raceways and communications cable D. List of equipment for gym PA system E. List of equipment for cafeteria

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

Division 26 ELECTRICAL TABLE OF CONTENTS

Division 26 ELECTRICAL TABLE OF CONTENTS Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND

More information

1.1 Preferred Manufacturers are manufacturers of products that have worked well for the University on past projects.

1.1 Preferred Manufacturers are manufacturers of products that have worked well for the University on past projects. DIVISION 26 (ELECTRICAL) PREFERRED MANUFACTURERS GENERAL INFORMATION 1.1 Preferred Manufacturers are manufacturers of products that have worked well for the University on past projects. 1.2 This list is

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: Attachment G LIGHTING CONTROL SPECIFICATIONS (Download Document separately) LIGHTING CONTROL SPECIFICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 12/23/16 Rev 9 UltraLITE Model ELU General Specification 4.2 KW to 5 KW UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 1.0 General General Specification This specification describes

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 27 COMMUNICATIONS SECTION PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 27 COMMUNICATIONS SECTION PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS SECTION 275116 - PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Preamplifiers. 2. Power amplifiers. 3. Microphones. 4. Control console. 5. Loudspeakers.

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018 SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ). SECTION 28 13 00 - ACCESS CONTROL PART I - GENERAL 1.1 SUMMARY A. This specification section describes the furnishing, installation, commissioning, and programming of a complete, turnkey, hardwired Andover

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.07 ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.07 It is expected that the electrical design professional will conform to accepted good engineering design practices.

More information

ELECTRICAL DESIGN GUIDELINES SECTION GUIDELINE SPECIFICATIONS-DUVAL COUNTY PUBLIC SCHOOL

ELECTRICAL DESIGN GUIDELINES SECTION GUIDELINE SPECIFICATIONS-DUVAL COUNTY PUBLIC SCHOOL The design guidelines, which follow, are intended to supplement the Educational Specifications and State Requirements for Educational Facilities (SREF). All electrical service (temporary, new, disconnection

More information

SECTION LIGHTING CONTROLS

SECTION LIGHTING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 09 23 LIGHTING CONTROLS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

1. Division 26 Section Electrical General Requirements. 2. Division 26 Section "Wiring Devices" for wall-box dimmers and manual light switches.

1. Division 26 Section Electrical General Requirements. 2. Division 26 Section Wiring Devices for wall-box dimmers and manual light switches. PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 REFERENCES... 2 1.4 DEFINITIONS... 2 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 3 1.7 COORDINATION... 3 1.8 DELIVERY, STORAGE, AND

More information

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. DIVISION 26 ELECTRICAL SECTION 26 27 26 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. B. Specialty switches and outlets

More information

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings. DIVISION 26 ELECTRICAL SECTION 26 51 13 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings. B. Luminaire

More information

SECTION (16140) - WIRING DEVICES

SECTION (16140) - WIRING DEVICES SECTION 26 27 26 (16140) - WIRING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Receptacles, Connectors, Switches, and Finish Plates. B. Related Sections: 1. Section 00 31 13.43 (00370) -

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors 1. SUMMARY AND BACKGROUND: Princeton Joint Unified School District located in Princeton

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete

More information

SECTION LIGHTING CONTROL DEVICES

SECTION LIGHTING CONTROL DEVICES SECTION 16145 LIGHTING CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1 Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: SECTION 26 09 23 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION LOW VOLTAGE LIGHTING CONTROLS

SECTION LOW VOLTAGE LIGHTING CONTROLS SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

SECTION ENCLOSED CONTROLLERS

SECTION ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,

More information

Page 1 of General

Page 1 of General Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors

More information

DIVISION 16 ELECTRICAL SYSTEMS

DIVISION 16 ELECTRICAL SYSTEMS DESIGN AND CONSTRUCTION STANDARDS DIVISION 16 DIVISION 16 Division 16 of the Carnegie Mellon University Design and Construction Standards Manual addresses the following requirements for electrical systems

More information

DIVISION 16 ELECTRICAL

DIVISION 16 ELECTRICAL DIVISION 16 ELECTRICAL Saratoga Springs / standards / 02-2004 Page - 0 ELECTRICAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.01 SECTION INCLUDES A. Grounding electrodes and conductors, equipment

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

Introduction Consultant shall incorporate the material in the DSS into the project specifications.

Introduction Consultant shall incorporate the material in the DSS into the project specifications. DIVISION 16 - ELECTRICAL Section 16000 - General Discussion Introduction Consultant shall incorporate the material in the DSS into the project specifications. Refer any questions, clarifications regarding

More information

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51 TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices. SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance

More information

Electrical Inspection Service & Distribution

Electrical Inspection Service & Distribution 0911 Distribution Panels & Switchgear Equipment, conduit, feeders, and grounding 480 Volt Switchboard: This switchboard contains the utility meter and two main, service, circuit breakers. One circuit breaker

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

SECTION INTRUSION DETECTION

SECTION INTRUSION DETECTION (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) SECTION 28 16 00 INTRUSION

More information

Section PERIMETER SECURITY SYSTEMS

Section PERIMETER SECURITY SYSTEMS Section 28 16 43 PERIMETER SECURITY SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Provide and install a perimeter security system as herein specified for the purpose of detecting entry into a designated security

More information

Emery County Senior Center Green River 06/07

Emery County Senior Center Green River 06/07 SECTION 260923 - LIGHTING CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

A. Shop Drawing submittals shall include, but not be limited to, the following:

A. Shop Drawing submittals shall include, but not be limited to, the following: SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Updated section on Manufacturers 3 1. 6/15/16 Updated division section from 16120 to 26 05 00, - mgl44

More information

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A. System: UL listed B. Conform to requirements of NFPA 101

More information

B. Shop Drawings: List of legends and description of materials and process used for premarking wall plates.

B. Shop Drawings: List of legends and description of materials and process used for premarking wall plates. SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Renovate MCRC Facilities Great Lakes, IL

Renovate MCRC Facilities Great Lakes, IL 6. ENGINEERING SYSTEMS REQUIREMENTS D50 ELECTRICAL SYSTEM DESCRIPTION The electrical repair work includes the design and construction of the electrical distribution system for the B3200 Marine Corps Reserve

More information

IN2 Lighting Control Devices

IN2 Lighting Control Devices Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Lighting Control Devices Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals

More information

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Lighting and appliance panelboards 1.02 RELATED SECTIONS A. 16475,

More information

WINDSOR FOREST HIGH SCHOOL HVAC REPLACEMENT ADDENDUM #2 SAVANNAH CHATHAM COUNTY PUBLIC SCHOOL SYSTEM FEBRUARY 18, 2016

WINDSOR FOREST HIGH SCHOOL HVAC REPLACEMENT ADDENDUM #2 SAVANNAH CHATHAM COUNTY PUBLIC SCHOOL SYSTEM FEBRUARY 18, 2016 SECTION 26 2030 - LIGHTING FIXTURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 1 Specification Sections,

More information

The following information shall become and form part of the contract documents.

The following information shall become and form part of the contract documents. October 4, 206 To: Attention: Re: All Bidders All Bidders JCBE Gymnasium HVAC Upgrades BC#: 206433 Edmonds Project No.: BHM6090 All bidders, The following information shall become and form part of the

More information

SECTION LIGHTING CONTROL DEVICES AND CONTROL PANELS

SECTION LIGHTING CONTROL DEVICES AND CONTROL PANELS SECTION 26 09 23 LIGHTING CONTROL DEVICES AND CONTROL PANELS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Remote control lighting relays. 2. Lighting contactors. 3. Switches. 4. Switch plates.

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

PART GENERAL 1.01 SECTION INCLUDES

PART GENERAL 1.01 SECTION INCLUDES Specification Number: 26 24 16.06 Product Name: Emergency Lighting Control NQ Circuit Panelboards: 240 Vac, 48 Vdc Maximum SECTION 26 24 16.06 Emergency Lighting Control NQ Circuit Panelboards: 240 Vac,

More information

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Nameplates and labels B. Wire and cable markers C. Conduit markers 1.2 REFERENCES A. NFPA 70 - National Electrical

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 3323 - CENTRAL BATTERY EQUIPMENT [for Evanston campus only] PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION POWER SUPPLIES AND DISTRIBUTION

SECTION POWER SUPPLIES AND DISTRIBUTION SECTION 17460 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for Power Supplies and Power Distribution for Station communications. 1.02 REFERENCE STANDARDS A. American National Standards

More information

DIVISION 16 BASIC MATERIALS, METHODS, AND REQUIREMENTS SECTION 16A-1

DIVISION 16 BASIC MATERIALS, METHODS, AND REQUIREMENTS SECTION 16A-1 DIVISION 16 BASIC MATERIALS, METHODS, AND REQUIREMENTS SECTION 16A-1 PART 1: GENERAL 1.1 SUMMARY.1 This section covers materials, methods, and requirements common to all electrical work..2 When it becomes

More information

FDF Foam Pump Controllers Features

FDF Foam Pump Controllers Features FDF100 Diesel Engine Foam Pump Controllers 1-1 Product Description The FDF Series of Foam Pump Controllers are designed for use with foam concentrate injection, foam transfer and water mist systems for

More information

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R Region Project Page 1 PART 1 - GENERAL 1.1 REFERENCES.1 CAN/ULC-S524-2006, Standard for the Installation of Fire Alarm Systems..2 CAN/ULC-S525-2007, Audible Signal Device for Fire Alarm Systems..3 CAN/ULC-S526-2007,

More information

A. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section.

A. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section. SECTION 16770 PAGE 1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section. B. Division 16

More information

A. This Section includes transfer switches rated 600 V and less, including the following:

A. This Section includes transfer switches rated 600 V and less, including the following: SECTION 16415 - TRANSFER SWITCHES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Transfer Switch Features

Transfer Switch Features 1-1 Product Description The Automatic Transfer Switch Option may be added to any FD type Fire Pump Controller whenever automatic transfer from normal to alternate power is required. The automatic Transfer

More information

Electrical System (N) PANELBOARD "L1" VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING

Electrical System (N) PANELBOARD L1 VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING Electrical System After re-designing the lighting system for the children s computer, circulation and storytelling areas, the electrical system had to be redesigned as well. These are the new panel board

More information

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth Corbin Building Technical Assignment 2 Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth 10/26/2011 Technical Report II 1 Executive Summary The following report is an overview

More information

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 28 31 00 FIRE ALARM AND SMOKE DETECTION SYSTEMS A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A.

More information

Port of Portland Conveying Equipment Guidelines

Port of Portland Conveying Equipment Guidelines Role: Consultant for the Port Design Guidelines Port of Portland Conveying Equipment Guidelines ELEVATOR, ESCALATOR, AND MOVING WALK DESIGN OVERVIEW The Division 14 specification sections include appropriate

More information

Related Sections: TBD. Effective Date: January 1, 2016

Related Sections: TBD. Effective Date: January 1, 2016 Description: The purpose of the section is to highlight the current applicable UMCP Design Standards for the design, selection and, installation of lighting fixtures within buildings. Related Sections:

More information

ESTIMATE SET-UP PACKAGE BID SCHEDULE ENTRY AND MAINTENANCE

ESTIMATE SET-UP PACKAGE BID SCHEDULE ENTRY AND MAINTENANCE BIDDING INFORMATION BID DATE: PROJECT NAME: ADDRESS: ESTIMATE SET-UP PACKAGE BID SCHEDULE ENTRY AND MAINTENANCE ESTIMATE NO.: CITY: STATE: ZIP: PRIME: PROJECT MANAGER: PROJECT TYPE: SUB: $ SIZE: BID TIME:

More information

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems 5/25/16 rev 6 elite Model ELN General Specification 550 W to 1.5 KW elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems 1.0 General General Specification This specification

More information

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION 1. GENERAL SPECIFICATION 1.1 The contractor shall provide an Intelligent AlarmLine Linear Heat Detection System to perform the following functionality: A. Fire Alarm, Supervisory and Trouble-Event Initiation

More information

Transfer Switch Features

Transfer Switch Features 1-1 Product Description The Automatic Transfer Option may be added to any FD type Fire Pump Controller whenever automatic transfer from normal to alternate power is required. The automatic Transfer and

More information

East Central College

East Central College SECTION 260923 LIGHTING CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers. September 2012, rev. 00 26 2416 Panelboards PART 1. GENERAL 1.01 Summary A. Section includes: 1.02 Definitions 1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load

More information

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -

More information

B. Section Transfer Switches: Automatic transfer switch.

B. Section Transfer Switches: Automatic transfer switch. SECTION 263213 - ENGINE GENERATORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Packaged engine generator set. B. Exhaust silencer and fittings. C. Remote control panel. D. Battery and charger. E. Weatherproof

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED

More information

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work.

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work. PART 1 GNRAL 1.1. APPLICABL PROVISIONS A. The General, Supplementary and other Conditions of the Contract, modifications to the General Conditions, the Drawings, and the applicable provisions of the other

More information

Soft Start Series MP700 Solid State, Reduced Voltage

Soft Start Series MP700 Solid State, Reduced Voltage Metron Fire Pump Controls and Accessories Soft Start Series MP700 Solid State, Reduced Voltage Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s

More information

STATEMENT OF WORK. System Description:

STATEMENT OF WORK. System Description: STATEMENT OF WORK Scope of Work: To install a paging/sound system throughout the Rapid City Swim Center (RCSC). This work shall includes all labor, material equipment and related services necessary to

More information

CONTENTS AUTOMATIC TRANSFER SWITCHES

CONTENTS AUTOMATIC TRANSFER SWITCHES CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training

More information

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features:

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features: PART 1 - GENERAL 1.1 SUMMARY A. This Section includes fast-transfer central battery inverters with the following features: 1. Emergency-only circuits. 1.2 DEFINITIONS A. LCD: Liquid-crystal display. B.

More information

SECTION GENERATOR PARALLELING CONTROLS

SECTION GENERATOR PARALLELING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

3. Provide revised typed circuit directory in panelboards that have circuits removed.

3. Provide revised typed circuit directory in panelboards that have circuits removed. DIVISION 26 - ELECTRICAL 26 0501 MINOR ELECTRICAL DEMOLITION A. Coordinate utility service outages with the UND Electrical Department. B. Verify the abandoned wiring and equipment serve only abandoned

More information

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3 HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California 95833 September 15, 2016 Woodland Joint Unified School District Spring Lake Area Elementary School HMC No. 3535003.000 DSA Appl.

More information

Across-the-Line SERIES MP300 Combined Manual and Automatic

Across-the-Line SERIES MP300 Combined Manual and Automatic Across-the-Line SERIES MP300 Combined Manual and Automatic Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s Standard for Centrifugal Fire Pumps

More information

Spring Test 6 due 04/26/2013

Spring Test 6 due 04/26/2013 Spring Test 6 due 04/26/2013 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. The article that covers TV wiring installations in residences

More information

SECTION ISOLATED POWER SYSTEMS

SECTION ISOLATED POWER SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information