Certificate. Production Quality System MODULE D. Certificate No. P 112
|
|
- Elvin Dixon
- 5 years ago
- Views:
Transcription
1 Certificate Production Quality System MODULE D Certificate No. P 112 Telefication, operating as Body under the Directive 96/98/EC, (including amending Directive 2014/93/EU) hereby declares that the produced products of the company: Furuno Electric Co. Ltd. Nishinomiya Hyogo Perf. Japan comply with the certification criteria as laid down in RD_040 and RD_041 implementing the Production Quality System requirements of the Marine Equipment Directive 96/98/EC. The certification covers the Production Quality System as well as the specified product categories as described in annex 1, provided with this certificate. : 9 May 2016 Date of first issue: 25 May 1999 Expiration date: 25 June Zevenaar, 9 May 2016 M.T.P.M. Wouters van den Oudenweijer Director Telefication Certification
2 Page 1 of 4 A.1/5.3 NAVTEX NX-700 A.1/ W GMDSS MF/HF SSB and DSC-watch keeping FS-5075 A.1/ W GMDSS MF/HF SSB and DSC-watch keeping FS-2575 A.1/4.14 GPS equipment GP-150/GP-150 dual A.1/5.13 A.1/5.4 A.1/5.1 A.1/5.2 Inmarsat-C satellite earth station Felcom 18 VHF radiotelephone with integrated DSC & ch70 watch keeping FM-8900S A.1/ W GMDSS MF/HF SSB and DSC-watchkeeping FS-1575 A.1/4.14 GPS Equipment GP-170 A1/4.50 DGPS Equipment GP-170 A1/4.32 AIS Equipment FA-150 A1/4.32 AIS Equipment FA-170 A1/4.47 Simplified Voyage Data Recorder (S-VDR) VR-3000S Registration No. USCG approval No. Body /AA/01 Aug 18, 2015 Apr 21, /AA/07 Nov 27, 2015 July 07, /AA/07 Nov 27, 2015 July 07, /AA/ /EC0560/ Aug 18, 2015 May 27, /AA/04 Aug 18, 2015 May 15, /AA/05 Aug 18, 2015 May 15, /AA/05 Nov 27, 2015 May 7, MED-B /EC0575/ MED-B-9507/EC0560 Dec 15, 2014 Dec 05, MED-B-9568 Dec 15, 2014 Dec 05, MED-B /EC0575/ MED-B-9781/EC0560 MEDB00000EV /EC0575/ MEDB00000EV/EC0560 Mar 13, 2015 Jun 30, Jan 18, 2016 Jan 17, /001/ /15 Apr 29, 2015 Apr 28,
3 Registration No. Page 2 of 4 A.1/4.6 Echo-sounding equipment FE-800 MED-B /EC0575/MED-B-9054/EC0560 June 10, 2014 June 10, FE /001/ / /EC0735/ /EC0560 A1/4.7 Speed and distance measuring equipment (SDME) GS-100 MED-B /EC0575/MED-B-9151/EC0560 July 09, 2014 July 09, DS-60 MEDB000008R /EC0575/MEDB000008R/EC0560 Oct 15, 2015 Oct 15, DS /001/ / /EC0735/ /EC0560 A.1/4.29 Voyage data recorder (VDR) VR-7000 MED-B /EC0575/MED-B-9205/EC0560 Oct 07, 2014 Sep 30, A/1/4.30 Electronic chart display and information system (ECDIS) with backup, and raster chart display system (RCDS) FMD-3100 MED-B-8808 Apr 08, 2014 Apr 08, MED-B-8966 FEA-2xx7 4581/001/ /13 FMD-3200/3200- BB/FMD-3300 MED-B-9308 Jan 28, 2015 May 14,
4 Page 3 of 4 A.1/4.33 Registration number Track control system (working at ship s speed from minimum manoeuvring speed op to 30 knots) MED-B-9236 TC-3001 TKC /EC0575/ MED-B-9236/EC0560 Oct 01, 2014 Oct 01, TC1000-E 4581/001/ / /EC0735/ /EC0560 Oct 02, 2013 Oct 01, MEDB00000AJ TC-3001 EMRI /EC0575/ MEDB00000AJ/EC0560 Feb 02, 2016 Feb 01, A.1/4.34 Radar equipment CAT /EC0575/ /EC /EC0575/ /EC /EC0735/ /EC0560 A.1/4.35 Radar equipment CAT /EC0575/ /EC /EC0735/ /EC0560 MEDB00000FC /EC0575/ MEDB00000FC/EC0560 A.1/4.36 Radar equipment CAT /001/ / /EC0735/ /EC0560 MEDB000008T /EC0575/ MEDB000008T/EC0560
5 Registration number Page 4 of 4 A.1/4.37 Radar equipment for high-speed craft applications (CAT 1H and CAT 2H) MED-B-8966 MEDB00000FD A.1/4.38 Radar equipment CAT 1C, CAT 2C, CAT 1HC for HSC, CAT 2HC for HSC (with chart option) MED-B-8896 A.1/4.41 Transmitting heading device THD (GNSS method) GS-100 MED-B-9193 July 10, 2014 July 10, SC /001/ /13 SC /001/ /13 A.1/4.57 Bridge navigational watch alarm system (BNWAS) BR-500 MED-B-8053 Nov 15, 2012 Nov 15, BR-1000 MED-B-8054 Nov 15, 2012 Nov 15, : 9 May 2016 Expiration date: 25 June 2017 M.T.P.M. Wouters van den Oudenweijer Director Telefication Certification
ANNEX. to the. COMMISSION DELEGATED REGULATION (EU) /... of XXX
EUROPEAN COMMISSION Brussels, 9.1.2018 C(2017) 9017 final ANNEX 1 ANNEX to the COMMISSION DELEGATED REGULATION (EU) /... of XXX supplementing Directive 2014/90/EU of the European Parliament and of the
More informationOfficial Journal of the European Union
19.3.2018 L 75/3 COMMISSION DELEGATED REGULATION (EU) 2018/414 of 9 January 2018 supplementing Directive 2014/90/EU of the European Parliament and of the Council as regards the identification of specific
More informationC e r t i f i c a t e
C e r t i f i c a t e of EC Type-examination (Module B) Certificate Nº: 09212007/AA/01 Product Category: A.1/5.13 With respect to Marine Equipment Directive 96/98/EC and the amending Directive 2008/67/EC,
More informationInternational Maritime Group. All You Need At Sea
International Maritime Group All You Need At Sea International Maritime Group PG, Red Sea & India www.img-ca.com 5 Focusing on About Us 7 Products 9 Services Brands Certifications 11 14 16 About Us Contact
More informationThrane & Thrane A / S
Thrane & Thrane A / S Titel: T&T Products with Wheelmark - T&T TYPE NUMER DESCRIPTION MODULE TYPE NUMER MODULE INMARSAT C - SOLAS/GMDSS Capsat H2095C TT-3020C Transceiver TT-3606E Message Terminal DT4646E
More informationCOMMISSION DIRECTIVE 98/85/EC of 11 November 1998 amending Council Directive 96/98/EC on marine equipment
L 315/14 COMMISSION DIRECTIVE 98/85/EC of 11 vember 1998 amending Council Directive 96/98/EC on marine equipment (Text with EEA relevance) THE COMMISSION OF THE EUROPEAN COMMUNITIES, Having regard to the
More informationNotified Body No.: 0575
Certificate No: MEDB00001BE Application of: Council Directive 96/98/EC of 20 December 1996 on Marine Equipment as amended by directive (EU) 2015/559, issued as "Forskrift om Skipsutstyr" by the Norwegian
More informationEC TYPE EXAMINATION (MODULE B) CERTIFICATE
LRV02..206.09 EC TYPE EXAMINATION (MODULE B) CERTIFICATE This is to certify that: LLOYD'S REGISTER VERIFICATION LIMITED (LRV), designated as a notified body under the terms of the Merchant Shipping (Marine
More informationApplicable international instruments for construction, performance and testing requirements 1
Product Coverage For Mutual Recognition Life saving appliances Lifebuoy self-activating smoke signals (pyrotechnics) Rocket parachute flares (pyrotechnics) Hand flares (pyrotechnics) Buoyant smoke signals
More informationUSCG-EU MRA EC TYPE EXAMINATION (MODULE B) CERTIFICATE
LRV02..206.09 USCG-EU MRA EC TYPE EXAMINATION (MODULE B) CERTIFICATE This is to certify that: LLOYD'S REGISTER VERIFICATION LIMITED (LRV), designated as a notified body under the terms of the Merchant
More informationEC TYPE EXAMINATION (MODULE B) CERTIFICATE
LRV02..206.09 EC TYPE EXAMINATION (MODULE B) CERTIFICATE This is to certify that: LLOYD'S REGISTER VERIFICATION LIMITED (LRV), designated as a notified body under the terms of the Merchant Shipping (Marine
More informationEC TYPE EXAMINATION (MODULE B) CERTIFICATE (EC-US MRA)
HRVATSKI REGISTAR BRODOVA Croatian Register of Shipping EC TYPE EXAMINATION (MODULE B) CERTIFICATE (EC-US MRA) No. 03-001535/031232 THIS IS TO CERTIFY: That Croatian Register of Shipping did undertake
More informationNotified Body No.: 0575
Certificate No: MEDB00001BD Application of: Council Directive 96/98/EC of 20 December 1996 on Marine Equipment as amended by directive (EU) 2015/559, issued as "Forskrift om Skipsutstyr" by the Norwegian
More informationSuppliment tal-gazzetta tal-gvern ta Malta, Nru. 18,986, 9 ta Novembru, 2012 Taqsima B PRODUCT SAFETY ACT (CAP. 427)
B 3777 Suppliment tal-azzetta tal-vern ta Malta, Nru. 18,986, 9 ta vembru, 2012 Taqsima B L.N. 382 of 2012 PRODUCT SAFETY ACT (CAP. 427) of Marine Equipment (Amendment) s, 2012 IN exerce of the powers
More informationBR
BR-500 www.furuno.com Monitor watch officer's presence and receive early warning detections in case of an emergency Flash Beacon Watertight Motion Detector Meets the IMO resolution MSC.128(75) for Bridge
More informationTechnical Information
Subject Installation of VDR and AIS on Greek Flag Ships To whom it may concern Technical Information No. TEC-0586 Date 14 June 2004 In relation to the installation of VDR systems and AIS systems on Greek
More informationClassNK Technical Information No. TEC-0838 (iii) The dormant period, visual indication, first stage audible alarm, second stage remote audible alarm a
Subject Implementation of Bridge Navigational Watch Alarm System (BNWAS) (Excluding Japanese-flagged ships) To whom it may concern Technical Information No. TEC-0838 Date 8 December 2010 Paragraphs 2.2.3
More informationPreparing you for the new ECDIS regulations
Preparing you for the new ECDIS regulations Are you prepared for new ECDIS standards? The latest revision to the Electronic Chart Display and Information Systems The new regulations also encourage standardisation,
More information(Non-legislative acts) DIRECTIVES. COMMISSION DIRECTIVE 2013/52/EU of 30 October 2013 amending Council Directive 96/98/EC on marine equipment
14.11.2013 Official Journal of the European Union L 304/1 II (Non-legislative acts) DIRECTIVES COMMISSION DIRECTIVE 2013/52/EU of 30 October 2013 amending Council Directive 96/98/EC on marine equipment
More information(Non-legislative acts) DIRECTIVES. COMMISSION DIRECTIVE 2014/93/EU of 18 July 2014 amending Council Directive 96/98/EC on marine equipment
EN 25.7.2014 Official Journal of the European Union L 220/1 II (Non-legislative acts) DIRECTIVES COMMISSION DIRECTIVE 2014/93/EU of 18 July 2014 amending Council Directive 96/98/EC on marine equipment
More informationAIRCRAFT TECHNICAL SPECIFICATIONS Dornier / MSN 3079
AIRCRAFT TECHNICAL SPECIFICATIONS Dornier 328-100 / MSN 3079 GENERAL DESCRIPTION Aircraft Type / Model: Dornier 328-100 Operator: SATENA Serial Number: 3079 Previous Operator(s): None Date of Manufacture:
More informationGeneral Particulars Year built 2009 Nantong, China
Kuber General Particulars Year built 2009 Yard Nantong, China Flag Indian Class ABS Notation ABS A1 Barge Principal Dimensions Length Overall (with Stinger) 187.0 m Length Overall (excl. Stinger) 120.0
More informationC e r t i f i c a t e
C e r t i f i c a t e of Continued Compliance Certificate No.: 13229027/AA/00 In compliance with the procedure specified in RD_070, Telefication declares that the stated alarm equipment complies with the
More informationThis annex is valid from: to Replaces annex dated: Location(s) where activities are performed under accreditation
Location(s) where activities are performed under accreditation Head Office Edisonstraat 12A 6902 PK Zevenaar The Netherlands Location Certification Scheme Edisonstraat 12A 6902 PK Zevenaar The Netherlands
More informationThis annex is valid from: to Replaces annex dated: Location(s) where activities are performed under accreditation
Location(s) where activities are performed under accreditation Head Office Edisonstraat 12A 6902 PK Zevenaar The Netherlands Activities trading under the names and Kiwa Telefication Fire alarm/detection
More informationEquipment ATA 12 April 2016
05-00-01 Time limits and Maintenance Frequencies Various JUN 14 1 25-00-01 Charging Head Mk 2 & Accessories WKA26592 WKA26592A 25-60-15 Submersion Actuator K38215 58178-001 AUG 92 JAN 15 Initial Issue
More informationWLAC Facilities Committee Meeting. September 18, 2017
Campus Program Report WLAC Facilities Committee Meeting September 18, 2017 Page 1 DSA approved the plans on May 15, 2017. Notice to Proceed was issued June 8, 2017 and the project remains on schedule for
More informationRULES PUBLICATION NO. 35//P ONE MAN BRIDGE OPERATED (OMBO) SHIPS March
RULES PUBLICATION NO. 35//P ONE MAN BRIDGE OPERATED (OMBO) SHIPS 2017 March Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or extend the Rules and are mandatory
More informationAPPENDIX D Inspection Check List for Chartering Non-UNOLS Vessels
APPENDIX D Vessel Name: Owner: Address and Contact Information: Operator: Address and Contact Information: Licenses held: Vessel Type and General Description: Length Overall: Displacement: Tonnage [GT/GRT/NT]
More informationEC-TYPE EXAMINATION CERTIFICATE (MODULE B)
EC-TYPE EXAMINATION CERTIFICATE (MODULE B) Certificate No: MEDB000014A Revision No: 5 Application of: Directive 2014/90/EU of 23 July 2014 on marine equipment (MED), issued as "Forskrift om Skipsutstyr"
More informationSIMPLIFIED VOYAGE DATA RECORDER (S-VDR)
STANDARD FOR CERTIFICATION No. 2.9 SIMPLIFIED VOYAGE DATA RECORDER (S-VDR) APRIL 2009 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD (DNV) is an autonomous and
More informationSubj: CH-1 TO NVIC 08-04; GUIDE TO MARINE EQUIPMENT APPROVALS COVERED BY US - EC MRA & BY US - EEA EFTA MRA
U.S. Department o~. Homeland Security.~ "'» United States Coast Guard Commandant United States Coast Guard 2100 Second ST. SW Washington, DC 20593 Staff Symbol: G-PSE-4 Phone: (202) 267-1444 FAX: (202)
More informationGL-001. CIRM Guideline PERFORMANCE TEST PROCEDURE FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM (ECDIS) Edition 1.
CIRM Guideline GL-001 PERFORMANCE TEST PROCEDURE FOR ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM (ECDIS) Edition 1.0 September 2018 Comité International Radio-Maritime (CIRM) 202 Lambeth Road, London,
More informationDaikin Altherma Selection Report
Daikin Altherma Selection Report Produced on 20.10.2014 with Daikin Altherma Simulator V4.4.7 - database Central 9.7.9 Project name Energa Sistemi Reference Airabela Client name Energa Sistemi Revision
More informationRemodeling Market. Kermit Baker. Remodeling Futures Conference November 9, Harvard University JOINT CENTER FOR HOUSING STUDIES
Remodeling Market Trends and Update Kermit Baker Remodeling Futures Conference November 9, 2010 Remodeling Market Trends 1. Remodeling spending saw significant decline during recession; greatest fall-off
More informationManager Other (Specify) Gross Tonnage: Main Propulsion (kw): Generating Power (kw):
PLEASE READ THE ATTACHED IMO RESOLUTION A.1047(27) BEFORE COMPLETING THIS FORM Maritime Authority of the Cayman Islands 133 Elgin Avenue P.O. Box 2256 Grand Cayman KY1-1107 Cayman Islands Tel: +1 345 949
More informationNotified Body No.: 0098
Certificate No: MEDB00003SJ Application of: Directive 2014/90/EU of 23 July 2014 on marine equipment (MED). This Certificate is issued by DNV GL SE based on the notification of the Federal Maritime and
More informationMASTER PLAN KICK-OFF Open House #1A, April 28, 2015
"The beginning is the most important part of the work." Plato, The Republic MASTER PLAN KICK-OFF Open House #1A, April 28, 2015 YOUR CAMPUS PLANNING TEAM Campus Planners Landscape Architects Urban Designers
More informationBetter Buildings By Design 2013 Building the Renewable Energy Ready Home Solar Thermal Lessons Learned and Results
Image Courtesy of Harvestar Better Buildings By Design 2013 Building the Renewable Energy Ready Home Solar Thermal Lessons Learned and Results Doug Merrill, Sunward Systems Doug Merrill 20 + years of manufacturing
More informationSuppliment tal-gazzetta tal-gvern ta Malta Nru. 18,476, 4 ta Settembru, 2009 Taqsima B PRODUCT SAFETY ACT (CAP. 427)
VERŻJONI ELETTRONIKA B 2803 Suppliment tal-azzetta tal-vern ta Malta Nru. 18,476, 4 ta Settembru, 2009 Taqsima B A.L. 241 ta l-2009 PRODUCT SAFETY ACT (CAP. 427) of Marine Equipment s, 2009 IN exerce of
More informationRegulations of 29 December 1998 No concerning marine equipment (the Marine Equipment Regulations)
s of 29 December 1998 No. 1455 concerning marine equipment (the Marine Equipment s) Laid down by the Norwegian Maritime Directorate on 29 December 1998 pursuant to the Act of 9 June 1903 No. 7 relating
More informationLetter from GM BASIL AL HANBALI
3 Letter from GM To embark on a journey of success one needs the tools of preparedness, foresight and strategy. These lead to the path of growth and high quality operation. It is imperative to combine
More informationSOLUTIONS PROVIDER FOR THE SHIP AUTOMATION AND MARINE INSTRUMENTATION
Worldwide service from Rotterdam Marine Automation & Instrumentation Measurement & Control Systems Fire & Gas Detection Navigation Equipment Test & Calibration Equipment Sales Systems and Parts SOLUTIONS
More informationCarbon footprint of products ISO 14067
Carbon footprint of products ISO 14067 Klaus Radunsky, Austrian Federal Environment Agency Public Workshop ISO/TC 207 Environmental management Towards low carbon societies Need for efficient tools Monday,
More informationIdentification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data. June 10, 2014
Identification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data June 10, 2014 1 Agenda Background / Overview Solution Approach Groupings Criteria Sites Speed Weight
More informationGREEN INFRASTRUCTURE SIGNAGE VILLAGE OF GLENVIEW
Village of Glenview Appearance Commission STAFF REPORT October 15, 2014 TO: Chairman and Appearance Commissioners FROM: Community Development Department CASE #: A2014-130 LOCATION: PROJECT NAME: Various
More informationHow increased prices in bananas show people will move store for produce January Kantar Worldpanel
How increased prices in bananas show people will move store for produce January 2015 1 Background Bananas especially loose have been seen as a key battleground within retail over the last few years. The
More informationFree cooling on RTAF Chiller. Integrated option
Free cooling on RTAF Chiller Integrated option Water based free cooling principle. Use full aluminum (car radiator based) flat channel dry cooler exchangers. Modulate 3 way to reach required free cooling
More informationTechnical Information
Subject Carriage requirements for Bridge Navigational Watch Alarm System (BNWAS) (Excluding Japanese-flagged ships) To whom it may concern Technical Information No. TEC-0975 Date 29 November 2013 This
More informationVillage of Glenview Appearance Commission
Village of Glenview Appearance Commission STAFF REPORT January 13, 2016 TO: Chairman and Appearance Commissioners FROM: Community Development Department CASE #: A2016-005 LOCATION: PROJECT NAME: 611 Milwaukee
More informationEU DECLARATION OF CONFORMITY (Doc) issued in accordance with the MARINE EQUIPMENT DIRECTIVE (MED) and EU/US MRA
EU DECLARATION OF CONFORMITY (Doc) issued in accordance with the MARINE EQUIPMENT DIRECTIVE (MED) and EU/US MRA This is to certify that in compliance with the Directive 2014/90/EU of the European Parliament
More informationMake gelato and more delicious things right in front of your customers Let the show begin!
Make gelato and more delicious things right in front of your customers Let the show begin! Three simple ideas for winning over your current and future customers. 1 2 3 Gelato Make a few flavors always
More informationSecretary-General of the European Commission, signed by Mr Jordi AYET PUIGARNAU, Director
COUNCIL OF THE EUROPEAN UNION Brussels, 14 March 2014 (OR. en) 7758/14 ADD 1 MAR 51 COVER NOTE From: date of receipt: 13 March 2014 To: Secretary-General of the European Commission, signed by Mr Jordi
More informationannouncements 4/10/08
Psychrometrics & Design Strategies ARCH 331/431 Spring 2008 Lecture 4 announcements 4/10/08 course website: http://courses.washington.edu/arch3431/index.shtml Course materials (readings, assignments, lectures,
More informationSOUTHEND CARELINE ANNUAL REPORT
SOUTHEND CARELINE ANNUAL REPORT 2015-2016 Meet some of the CareLine Team Southend Careline TSA accredited 2015-2016 Southend Careline offers reassurance and peace of mind to our service users their family
More informationVillage of Glenview Appearance Commission
Village of Glenview Appearance Commission https://drive.google.com/file/d/0bwqoselr903slw1ovvdnd2nlzws/edit?usp=sharing STAFF REPORT August 13, 2014 TO: Chairman and Appearance Commissioners FROM: Community
More informationWestinghouse UK AP1000 GENERIC DESIGN ASSESSMENT Resolution Plan for GI-AP1000-IH-01 Internal Fire Safety Case Substantiation.
Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT Internal Fire Safety Case Substantiation MAIN ASSESSMENT AREA RELATED ASSESSMENT AREA(S) RESOLUTION PLAN REVISION GDA ISSUE REVISION Internal Hazards Civil
More informationCompany Introduction QUALIFICATION STATEMENT ( 주 ) KMS
Company Introduction QUALIFICATION STATEMENT ( 주 ) KMS Ⅰ. Company Overview KMS Corporation has made a ceaseless effort to become the key company in the disaster prevention industry in Korea based on its
More informationLEASEHOLD YEARLY PROPERTY SCHEDULE
This Yearly Property Schedule is simply a guide to managing your Facility. Please reallocate duties as they suit the management of your Facility, however, note that all tasks should be listed on the schedule
More informationEN 1 EN ANNEX. List of acronyms used
ANNEX ANNEX A General note for Annex A: SOLAS Regulations refer to SOLAS, as amended. General note for Annex A: Within certain item designations, column 5 shows some possible product variants under the
More informationCECIL WRIGHT. Project 12
f a n a t i c a l a b o u t y a c h t s Project 12 f a n a t i c a l a b o u t y a c h t s SPECIFICATION MACHINERY Type Flag Dimensions Tonnage Year Built Builder Exterior Designer Interior
More informationWLAC Facilities Committee Meeting. May 15, 2017
Campus Program Report WLAC Facilities Committee Meeting May 15, 2017 Page 1 DSA completed the initial review June 24, 2016 and the Design Builder is proceeding through the back check process. DSA reports
More informationLauzon Life Safety Consulting
Welcome to This Presentation By The WHEA Education & Professional Development Committee WHEA Lunch & Learn April 13, 2017 Lauzon Life Safety Consulting FIRE PLANS & DRILLS 1 Agenda Lauzon Life Safety Consulting
More informationSoutheast Extension to RidgeGate Parkway Scoping Booklet
Southeast Extension to RidgeGate Parkway Scoping Booklet PUBLIC SCOPING MEETING SCHEDULE Public Scoping Meeting Wednesday, November 2, 2011 6:00pm to 7:30pm City of Lone Tree Recreation Center Willow Room
More informationRt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017
Hydraulic Planning Advisory Panel September 14, 2017 Agenda Item 1: Introductions Hydraulic Planning Advisory Panel members Technical Team members 2 Agenda item 2: Public Interaction and Feedback Live
More informationEngineers and Contractors - Innovative Technologies to Achieve Highest GeoExchange System Efficiencies for Commercial Projects
Engineers and Contractors - Innovative Technologies to Achieve Highest GeoExchange System Efficiencies for Commercial Projects Presented by: Warren (Trey) Austin, PE, CEM, CGD, LEED-AP Geo-Energy Services,
More informationSivu 2/8 Rate data Description Suomi Shut off times total 0.0 h/day Weekends with shut off times yes Daytime rate of heat pump Time for daytime rate 5
Sivu 1/8 Design of a heat pump heating system with Aquarea Designer Project: Suomi 1 Date: Created by:?, (no data provided), (no data provided) Phone: (no data provided) Email: (no data provided) Building
More informationINSTRUCTIONS MANUAL FOR MED75HD - UPRIGHT GLASS DOOR FRIDGE
TC900E Version 7 Version230817 INSTRUCTIONS MANUAL FOR MED75HD - UPRIGHT GLASS DOOR FRIDGE PLEASE NOTE: THE VACCINE REFRIGERATOR WILL IMMEDIATELY GO INTO A DEFROST AFTER BEING POWERED ON Thank you for
More informationWelcome to the. Open House
Welcome to the 5th Street to Kinsman Road Open House November 14 5:30 7:00 p.m. Please sign in Project Overview In December 2016, City Council adopted SW 5th Street as the preferred alignment to connect
More information2008 Cessna Citation Sovereign S/N
HIGHLIGHTS AIRFRAME ENROLLED ON CESSNA PROPARTS AIRFRAME TOTAL TIME SINCE NEW 887.9 Hours (As of 23 January 2017) TOTAL LANDINGS SINCE NEW 751 Landings ENTRY INTO SERVICE DATE July 2008 HOME BASE Morristown,
More informationLifestyle Electric Thermal Radiator
Lifestyle Electric Thermal Radiator Complies with Lot 20 Eco-design Heating Directive 2009/12/EC. Effective January 2018 ALUMINIUM Euro Edition Issue 1 August 2017 Next Day Delivery Order before 3.00pm
More informationLifestyle Electric Thermal Radiator
Lifestyle Electric Thermal Radiator Complies with Lot 20 Eco-design Heating Directive 2009/12/EC. Effective January 2018 ALUMINIUM Euro Edition Issue 1 August 2017 Next Day Delivery Order before 3.00pm
More informationCROWN YEARLY PROPERTY SCHEDULE
This Yearly Property Schedule is simply a guide to managing your Facility. Please reallocate duties as they suit the management of your Facility, however, note that all tasks should be listed on the schedule
More informationUNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY
Revision No.: 3 Page 1 of 6 I. PURPOSE This policy establishes the steps required for performing the monthly fixed systems inspections and the semi-annual systems testing. Fixed systems include; wet chemical
More informationMED 96/98/EC QUALITY SYSTEM MODULE D CERTIFICATE
Page 1 I 2 Certificate number: SMS.MED.D/92/D.O MARINE DIVISION BUREAU VERITAS Notified Body No 0062 www. veri star.com MED 96/98/EC QUALITY SYSTEM MODULE D CERTIFICATE This certificate is issued under
More informationCHART PERUVIAN TECHNICAL STANDARDS
CHART PERUVIAN TECHNICAL STANDARDS Peruvian Technical Standards Elaborated by the Normative Technical Committee Rational Use of Energy and the Energy Efficiency - (December 2007) Electric Motors Industrial
More informationMatt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.
M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. Overview Measurement & Verification (M&V) Plan for New
More informationMonthly Report for July 2015
Monthly Report for July 2015 1 Building the Industry & Building Brands from Knowledge GfK Powerful, accurate, continuous insights MRA Experienced industry experts BMF The voice of the industry 2 Introduction
More informationBoulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017
Boulder County Comprehensive Drilling Plan Surface Owner Meeting Thursday, Oct. 19, 2017 Contact Crestone Crestone Peak Resources Quick Facts www.crestonepeakresources.com cdpboulder@crestonepr.com (720)
More informationEC TYPE EXAMINATION CERTIFICATE
Page 1 / 5 Notified Body 0062 - MARINE EQUIPMENT DIRECTIVE 96/98/EC File number: LSA 5338/27 Annex A1 Item number: A.1/1.27 USCG Module B number: 160.175 / EC0062 This certificate is not valid when presented
More informationList of Tokyo MOU Deficiency Codes 1
List of Tokyo MOU Deficiency Codes 1 As of 5 December 2017 Code Defective item 01 - Certificate & Documentation 011 - Certificate & Documentation - Ship Certificates 01101 Cargo Ship Safety Equipment (including
More informationM/V DİCLE SPV Special Purpose Vessel
M/V DİCLE SPV Special Purpose Vessel 2 GENERAL Type of Vessel Class Flag Port of Register Year of Built Special Purpose Vessel Russian Maritime Register of Shipping / KM*L2 ARMRS KM ê Ice 1 R2 Kazakhstan
More information* AT-Marine Oy was established Earlier AT-Marine Oy was Marine Department in Akkuteollisuus Oy and a member of Varta Group in
AT-MARINE IN BRIEF * AT-Marine Oy was established 25.11.1992. Earlier AT-Marine Oy was Marine Department in Akkuteollisuus Oy and a member of Varta Group in 1929-1995. * AT-Marine Oy has been a member
More informationRegional Open Space Conservation Plan. Regional Staff Committee January 18, 2018
Regional Open Space Conservation Plan Regional Staff Committee January 18, 2018 Schedule We are here Task 1 - Stakeholder Input & Work Plan Dev. v z 2016 2017 2018 Oct Nov Dec Jan Feb Mar Apr May Jun Jul
More information2 Safety valve. 3 Pressure gauge. 4 Thermometer. 8 Ball valves
Standard solar system for domestic hot water heating (please adapt chart according to standard systems in your country) Standard engineering in Germany for a household of 4 people: 4 6 m² of collector
More informationGROUNDING AVOIDANCE SYSTEM (GAS)
STANDARD FOR CERTIFICATION No. 2.9 GROUNDING AVOIDANCE SYSTEM (GAS) JANUARY 2003 Veritasveien 1, N-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD is an autonomous and independent
More informationRESOLUTION MSC.86(70) (adopted on 8 December 1998) ADOPTION OF NEW AND AMENDED PERFORMANCE STANDARDS FOR NAVIGATIONAL EQUIPMENT
MSC 70/23/Add.2 RESOLUTION MSC.86(70) STANDARDS FOR NAVIGATIONAL EQUIPMENT THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning
More informationStandardization Programme ( ) Building & Construction Standards Committee
Standardization Programme (2012-2013) Building & Construction Standards Committee Projects Title 2012 2013 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1 EN 12811: 2 EN 197-1:2011
More informationBoulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017
Boulder County Comprehensive Drilling Plan Surface Owner Meeting Thursday, Nov. 2, 2017 Contact Crestone Crestone Peak Resources Quick Facts www.crestonepeakresources.com cdpboulder@crestonepr.com (720)
More informationSpecial Topics on Residential HVAC
Special Topics on Residential HVAC by Armin Rudd USDOE Building America Program for EEBA Conference 2002 Phoenix, Arizona 10 October 2002 Page 1 of 25 Two Main Topics: 1. Cyclical trade-offs between building
More informationIn partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013
In partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013 Project Intro 2-miles of Harbor Boulevard Westminster/17 th Street to just north of Edinger Avenue Many people use the corridor
More informationMcQuay. Aircon Air Cooled Condenser. AMB, APB AMD, APD Vintage A. Last Manufacture: 1978
Replacement Parts List No. 055224800 Revision C 10/2017 McQuay Aircon Air Cooled Condenser AMB, APB 020-140 AMD, APD 008-030 Vintage A Last Manufacture: 1978 To find your Daikin Applied parts distributor,
More informationVillage of Glenview Appearance Commission
Village of Glenview Appearance Commission STAFF REPORT June 6, 2012 TO: Chairman and Appearance Commissioners FROM: Planning & Economic Development Department CASE #: A2012-044 LOCATION: PROJECT NAME:
More informationSF REC & PARK MOSCONE RECREATION CENTER: EAST SITE. Supervisor Mark Farrell District 2. Project Manager Dan Mauer Recreation and Parks Department
SF REC & PARK MOSCONE RECREATION CENTER: EAST SITE COMMUNITY WORKSHOP: MEETING #3 WEDNESDAY, FEBRUARY 10, 2016 Supervisor Mark Farrell District 2 Project Manager Dan Mauer Recreation and Parks Department
More informationAIRCRAFT SPECIFICATION SUMMARY
AIRCRAFT SPECIFICATION SUMMARY GENERAL Registration Number Aircraft Model MSN Owner Date of Delivery Data as of Date Aircraft Total Hours Aircraft Total Cycles Annual Utilization (FC/FH) (FH/FC) WEIGHT
More informationAppendix A. Reference Evapotranspiration (ETo) Table.
Appendix A. Reference Evapotranspiration (ETo) Table. Appendix A - Reference Evapotranspiration (ETo) Table* KINGS Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Caruthers 1.6 2.5 4.0 5.7 7.8 8.7
More informationMonthly Report for October 2015
Monthly Report for October 2015 1 Building the Industry & Building Brands from Knowledge GfK Powerful, accurate, continuous insights MRA Experienced industry experts BMF The voice of the industry 2 Introduction
More informationFUEL TYPE relating to UK deaths from unintentional carbon monoxide poisoning from to
FUEL TYPE relating to UK deaths from unintentional Unknown 3% Gas (portable) 15% Solid 31% Gas (mains) 36% Petrol/Diesel 14% Paraffin 0.4% Oil 1% This chart shows that gas is responsible for the greatest
More informationTechnical Data Sheet BNWAS. Bridge Navigational Watch Alarm System. Technical Data Sheet. General Features
Technical Data Sheet BNWAS Bridge Navigational Watch Alarm System Technical Data Sheet General Features Technical Data Sheet Bridge Navigational Watch Alarm System (BNWAS) New SOLAS regulations require
More informationTower Green HE Hybrid
Tower Green HE Hybrid Condensing Floor-standing Boilers A NEW A NEW Residential Heating plug & play XL TOWER GREEN HE HYBRID / Condensing Floor-standing Boilers Tower Green HE Hybrid: the hybrid technology
More information