1 Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004 Table of Content: Page 1 ~ Single Line Diagram 1 2 ~ Electrical System Narrative ~ Lamp and Ballast Table 4 4 ~ Major Mechanical Equipment Electrical 5 5 ~ NEC Load Calculation 6-10 Lighting ~ Electrical Faculty Consultant: Professor Martin Moeck
2 Single Line Diagram
3 Electrical System Narrative The electrical power distribution configuration for the is a radial system. The exterior pad mounted transformer, owned by PSE & G Utility, steps down the electricity from delta utility voltage to 480Y/277 building utilization voltage. The electricity enters the building through one main feeder and into one main distribution panel with a 2000A three pole circuit breaker with ground fault protection. The 480Y/277V, three phase, four wire, 50K A.I.C. Main Distribution Panel services other distribution panels and equipment throughout the building. All fluorescent lighting is run at 277V; Main mechanical equipment is run at 480V. All computer labs are serviced through dedicated panel boards with two full sized neutral conductors and a dry type step down transformer with K-factor protection. All remaining loads running at 120V are serviced by 208/120V dry type transformers to panels located in one of the electrical room or closets in the building. For lighting and receptacle panels: All panels for use at 240 V AC maximum incorporate circuit breakers with a minimum rating of 10K A.I.C.; All panels for use at 480/277V incorporate circuit breakers with a minimum rating of 25K A.I.C. (Building specifications, section ) Emergency Power Systems: Emergency power is activated by an Area Monitor Panel that monitors when an area protected bye a normally off emergency lighting is turned off inadvertently or by a general power failure. In the event of a power outage, the Area Monitor Panel activates an outdoor 200KW diesel powered, single ball bearing, four pole generator with a stationary glycol cooled, compression ignition, four cycle engine. The generator is equipped with a 24V electric starting system and a lead acid battery. Overcurrent protection is provided by a 500A, 3pole circuit breaker. The generator is connection to three automatic transfer switches and one normally off 208/120V panel located in the main electrical room. The first 100A, 3 phase automatic transfer switch services a normal/emergency distribution panel that provides 277V emergency lighting. The second 150A, 3 phase automatic transfer switch services a Normal/Standby Distribution Panel that provides power to hot water circulation pumps, the buildings one elevator, and two 208/120V emergency power panels. The third automatic transfer switch services the buildings fire protection. Fire protection is provided by a 20 HP fire pump. The feeder for the fire pump feeds off of the building s main line before the Main Distribution Panel. Overcurrent Protective Devices: The main feeder to the Main Distribution Panel receives overcurrent protection in the form of 2000A, 3 pole, main circuit breaker with ground fault protection. The majority of panels are main lug with a circuit breaker at the Main Distribution Panel. Panels off of distribution panels requiring step down transformers contain enclosed circuit breakers after the transformer. Overcurrent protection for the elevator is provided by a 60A, three pole fused disconnect switch. Fused switch combination starters are used for the jockey pump and the hot water circulation pumps.
4 Electrical System Narrative (Continued) Location of Equipment: The main distribution panel and emergency controls are located in the main electrical room on the first floor. All motor controls for the Mechanical and HVAC systems are located in the mechanical room also located on the first floor. Three more secondary electrical rooms, contain secondary distribution, receptacle, lighting, and computer panels. Typical Lighting Systems: The typical lighting systems for the interior of the are fluorescent troffers, compact fluorescent downlights, and direct/indirect linear fluorescent pendants operating at 277V. Incandescent, low voltage, aisle lighting is found in the auditorium with its dimming being controlled from a dimming panel located in a nearby dimming booth. The exterior lighting contains High Pressure Sodium sources mounted on the walls, with Metal Halide sources illuminating the parking area. Power Factor Correction: This electrical system contains no power factor correction systems nor have I heard any indication of any being installed after construction and operation. However, specifications call for individual pieces of equipment to utilized high power factors. Important Design Requirements: Reliability during school time hours is an important design factor. Being in a down town district, security is a main concern. In the event of a power outage, power must be maintained for security and lighting systems immediately to provide security for the students and faculty of the school.
5 Lamp & Ballast Table
6 Major Mechanical Equipment Table - electrical loads
7 Major Mechanical Equipment Table electrical loads
8 NEC Building Design Load Calculation Major Mechanical Motors:
9 NEC Building Design Load Calculation (Continued) Receptacle Load: Takeoffs per section per floor Lighting Load:
10 NEC Building Design Load Calculation (Continued) Miscellaneous Equipment:
11 NEC Building Design Load Calculation (Continued) Feeder ampacity from total load: Comparison of NEC Load to Existing Feeder & Main Distribution Panel: Existing feeder is sized as 5 sets of 4#600kcmill From NEC Table , 600kcmill copper conductors, under 75 degrees C are rated for 420 Amps. 5 x 420 A = 2100 A My value of is lower than 2100A therefore, the feeder is properly sized. The difference can be attributed oversizing of feeders that I did not account for. The overcurrent protection is rated for 2000A. Since the NEC load is below 2000A the panel is appropriately protected. The main feeder and main distribution panel are properly sized.
ELECTRICAL EXISTING CONDITIONS AND DESIGN ANALYSIS
Executive Summary ELECTRICAL EXISTING CONDITIONS AND DESIGN ANALYSIS Sara Lappano Ltg./Elec. Corron Cultural Center Middletown, VA Faculty Advisor: Dr. Moeck 11.4.2002 As in the prior lighting technical
More informationBuilding Electrical System Overview
Philip Mackey L/E Dr. Mistrick Holy Cross Hospital North Addition Silver Spring, MD 0/3/05 Building Electrical System Overview Executive Summary: The following report describes the existing emergency power
More informationTechnical II Report Electrical Systems
Technical II Report Electrical Systems Kelly Chan Consultant: Prof T. Dannerth, P.E. Part A Drawings Drawings needed for single-line diagram EE1.01 title sheet (electrical drawings) EE2.09 penthouse/roof
More informationCorbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth
Corbin Building Technical Assignment 2 Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth 10/26/2011 Technical Report II 1 Executive Summary The following report is an overview
More informationExecutive Summary. CNBC Global Headquarters Christine Cajilig
Executive Summary This report contains an analysis and description of the existing electrical distribution of the including the distribution type, emergency power, uninterruptible power system, over current
More informationTechnical Report Two
Technical Report Two Yale Sculpture Building Advisors: Ted Dannerth Richard Mistrick Date: October 31, 2006 Electrical Systems Existing Conditions and Building Load Summary Report Executive Summary: This
More informationElectrical System (N) PANELBOARD "L1" VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING
Electrical System After re-designing the lighting system for the children s computer, circulation and storytelling areas, the electrical system had to be redesigned as well. These are the new panel board
More informationBrown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA
PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities
More informationCurrently, all electrical upgrades would be voluntary, but there are situations in which upgrades would be required.
Executive Summary The current electrical system is functional but requires some understanding in order to avoid overloading circuits. Certain outlets can be used for space heaters while others cannot and
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT
More informationChandler City Hall Chandler, Arizona
Chandler City Hall Chandler, Arizona AE481W: Architectural Engineering Senior Thesis Wednesday October 27 th, 2010 Stephanie Romanias Lighting/Electrical Faculty Consultant Dr. Kevin Houser/Professor Dannerth
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,
More informationElectrical Systems Existing Conditions and Building Load Summary Report
The building was constructed a few years ago to act as both a Headquarters and to be a display of what the product they manufacture can accomplish when put to work. The building features both office and
More informationBuilding Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
More informationSECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.
SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance
More informationElectrical Systems. Electrical Plans. Electrical Plans. Essential to ensure. National Electrical Code (NES) Consider electrical needs.
Electrical Systems Electrical Plans Essential to ensure Proper wiring National Electrical Code (NES) Electrical Plans Consider electrical needs Office equipment Lighting E t t i t t Entertainment systems
More informationMichigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1
Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping
More informationNewark, Delaware Architectural Engineering Senior Thesis Portfolio. Electrical Analysis
Electrical Analysis The AstroPower Headquarters building was constructed a few years ago to act as both a Headquarters and to be a display of what the product they manufacture can accomplish when put to
More informationDESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES
2.07 ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.07 It is expected that the electrical design professional will conform to accepted good engineering design practices.
More informationPANELBOARDS & BUILDING DISTRIBUTION
262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic
More informationElectrical Design Guidelines Table of Contents
C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6
More informationFranklin Square Hospital Center
Franklin Square Hospital Center Baltimore, MD Thesis Proposal Cassandra Watson + Electrical Electrical Advisor Professor Dannerth Advisor Dr. Mistrick 16 December 2009 Table of Contents Executive Summary...
More informationSTATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES
STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES Articulation Agreement Identifier: ELT 118 (2005-1) Identifier is the postsecondary course prefix followed by Plan-of-Instruction
More informationSCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL
SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm
More informationShepherd University Wellness Center AE 481 Revised Thesis Proposal
A E 481 REVISED THESIS PROPOSAL Shepherd University Wellness Center AE 481 Revised Thesis Proposal Shepherdstown, West Virginia Lighting/ Electrical Option Dr. Houser and Professor Dannerth March 24, 2011
More informationRocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004
Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 1. A 2 PVC conduit was installed in the ground prior to setting a factory manufactured home on the foundation. The required service
More informationLindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2
Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as
More informationNEC Study Guide CORRECT: C NEC (A)(1)
1 According to the NEC, the maximum distance from the point of entrance to the building that the water pipe may be used as a grounding electrode interconnect is: A. 3' B. 4' C. 5' D. 6' CORRECT: C NEC
More informationDivision 26 ELECTRICAL TABLE OF CONTENTS
Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND
More informationBASIC ELECTRICAL ENGINEERING FOR CE
EE24 BASIC ELECTRICAL ENGINEERING FOR CE LECTURE NO. B-2 Basic Electrical Code Provisions Codes/Standards/Organizations PEC Philippine Electrical Code NEC National Electrical Code IEEE - Institute of Electrical
More informationTONY ESPOSITO LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY
LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY 1 1A. POWER DISTRIBUTION SYSTEMS a. EXECUTIVE SUMMARY b. SUMMARY DESCRIPTION
More informationBusiness Customer Information. Account Number (9 digits) Account Holder Name Phone (As shown on your utility bill) Service Street Address
Commercial Lighting Rebate Application Please complete the application including existing and installed information. Application will be returned without valid purchase receipt/invoice or if equipment
More informationAPPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL
This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with
More information2009 ELECTRICAL CODE REQUIREMENTS
2009 ELECTRICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Inspection Request Line (231) 533-3510 Electrical requirements
More informationELECTRICAL SYSTEMS ASSESSMENT Hanover High School
ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,
More informationRelated Sections: TBD. Effective Date: January 1, 2016
Description: The purpose of the section is to highlight the current applicable UMCP Design Standards for the design, selection and, installation of lighting fixtures within buildings. Related Sections:
More informationPlease refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing
The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior
More informationDIVISION 16 ELECTRICAL SYSTEMS
DESIGN AND CONSTRUCTION STANDARDS DIVISION 16 DIVISION 16 Division 16 of the Carnegie Mellon University Design and Construction Standards Manual addresses the following requirements for electrical systems
More informationElement D Services Electrical
PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.
More informationShepherd University Wellness Center AE 481 Thesis Proposal
A E 481 THESIS PROPOSAL Shepherd University Wellness Center AE 481 Thesis Proposal Shepherdstown, West Virginia Lighting/ Electrical Option Dr. Houser and Professor Dannerth December 10, 2010 Executive
More informationOregon Non-Residential Building Energy Code
Oregon Non-Residential Building Energy Code Interior Connected Lighting Power Requirements The requirements for interior lighting power are one of the most important sections of the Oregon Energy Code.
More informationNATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY
A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -
More informationRenovate MCRC Facilities Great Lakes, IL
6. ENGINEERING SYSTEMS REQUIREMENTS D50 ELECTRICAL SYSTEM DESCRIPTION The electrical repair work includes the design and construction of the electrical distribution system for the B3200 Marine Corps Reserve
More informationUltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW
12/23/16 Rev 9 UltraLITE Model ELU General Specification 4.2 KW to 5 KW UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 1.0 General General Specification This specification describes
More information.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.
Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code
More informationLighting Solutions. from a Leader in Light Source Technology
Lighting Solutions from a Leader in Light Source Technology About Venture Lighting Venture Lighting International, an Advanced Lighting company, was founded in 1983 as a metal halide, high intensity discharge
More informationChang Liu Lighting + Electrical M.A.E./B.A.E. Integrated Degree. Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson
M.A.E./B.A.E. Integrated Degree Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson Renzo Museum of American Art Executive Summary This report provides an analysis of the electrical
More informationDUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD LIGHTING FIXTURES AND CIRCUITRY & SWITCHING SECONDARY SCHOOLS 1. GENERAL 1.1.1. Consultants MUST prepare a Summary of Fixtures which will include catalogue
More informationUniversity Park, PA. The Pennsylvania State University Architectural Engineering Lighting and Electrical Faculty Advisor: Dr.
University Park, PA The Pennsylvania State University Architectural Engineering Lighting and Electrical Faculty Advisor: Dr. Martin Moeck A Building Overview The main spaces include: Convenience Store
More informationCITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY
CITY & COUNTY OF ENVER COMMUNITY PLANNING & EVELOPMENT BUILING PERMIT POLICY Number: NEC 590 Issued ate: July 29, 2014 Page: 1 of 5 Reference: BCA Section 103.8, NEC 590, and NEC 525 Scope: This policy
More informationConstruction Management at Risk Services. New North East Branch Library Project. August 3, 2018
Construction Management at Risk Services New North East Branch Library Project ADDENDUM 01 August 3, 2018 1. The attendance sheets (4 pages) from the Pre-Bid Conference are attached. 2. The proposals may
More informationSECTION LIGHTING CONTROL DEVICES AND CONTROL PANELS
SECTION 26 09 23 LIGHTING CONTROL DEVICES AND CONTROL PANELS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Remote control lighting relays. 2. Lighting contactors. 3. Switches. 4. Switch plates.
More informationLord Stirling Community School
Lord Stirling Community School Schematic Design Proposal AE Senior Thesis Nehal M. Youssef About the Building A new face for an old town The building of the Lord Stirling Community School was the beginning
More information2018 Lighting Retrofit Rebate Instructions. City of Arlington
If you have questions while completing this form, please contact your hometown electric utility weekdays during business hours for assistance. Phone: 507-964-2378 Fax: 507-964-5973 Email: cityhall@arlingtonmn.com
More informationCHAPTER 8 ELECTRICAL
CHAPTER 8 ELECTRICAL 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1
More informationEligible Prescriptive Measures List:
Eligible Prescriptive Measures List: Business, Non-Profit, Institutional Energy Savings Program Products must meet the Canadian Certification Standards as outlined by the Standards Council Canada for product
More informationCHAPTER 20 SERVICE EQUIPMENT
SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Updated section on Manufacturers 3 1. 6/15/16 Updated division section from 16120 to 26 05 00, - mgl44
More informationNYC Department of Education
NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 135 - QUEENS, 207-11 89TH AVENUE, New York, 11427 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20
More informationELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015
ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015 Basic Safety (Construction Site Safety Orientation) (12.5 Hours) (Module ID 00101-15) Presents basic jobsite safety information to prepare workers for
More informationFES - Series Portable Electric Heaters. YES - Series Suspended Electric Heaters CONTENTS
FOSTORIA INDUSTRIES, INC. A DIVISION OF FES - Series Portable Electric Heaters YES - Series Suspended Electric Heaters (FES-1524-3E shown) IMPORTANT SAFETY INFORMATION INSIDE Serious injury or death possible.
More informationVenture Lighting s Line of LED Solutions. Professional Grade LED from The Leader in HID
Venture Lighting s Line of LED Solutions Professional Grade LED from The Leader in HID About Venture Lighting Venture Lighting International, an Advanced Lighting company, was founded in 1983 as a metal
More informationSECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES
PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Lighting and appliance panelboards 1.02 RELATED SECTIONS A. 16475,
More informationLED Retrofit Lighting Rebate 2017 Rebate Application
Commercial and Industrial LED Retrofit Lighting Rebate 2017 Rebate Application Business Member Information Connexus Energy 14601 Ramsey Blvd NW Ramsey, MN 55303 ConnexusEnergy.com 763.323.2600 Company
More informationElectrical Inspection Lighting & Power
0921 Light Fixtures & Controls Fixtures, controls, conduit, wiring, etc. Interior classroom and corridor lighting consists of T12 fluorescent lamps with magnetic ballasts. In the classrooms the luminaires
More informationIEC and NCCER Mapping for Year 1
Craft: 26102-14 Safety IEC and NCCER Mapping for Year 1 Perform a visual inspection on various types of ladders 102.4 STATE GENERAL SAFETY CONSIDERATIONS IN ELECTRICAL INSTALLATIONS (LADDER SAFETY, SLECTION
More informationll. Consistency Questions
Our Goal is FOR ALL STAKEHOLDERS TO HAVE A SUCCESSFUL PROJECT with us and that together we keep people and structures safe and buildings economically viable to serve the needs of our community. We strive
More informationPage 1 of General
Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors
More informationDuke University Medical School. Duke School of Nursing
Duke School of Nursing Lighting and Electrical Depth Proposal and Breadth Topics Proposal for Spring 2008 Semester December 18 th, 2007 Table of Contents Executive Summary....................................
More informationHARRY RANSOM HUMANITIES RESEARCH CENTER
HARRY RANSOM HUMANITIES RESEARCH CENTER Additions and Renovations MICHAEL ANTHONY LOMBARDI Lighting/Electrical Emphasis Dr. Richard Mistrick, Advisor The Pennsylvania State University HARRY RANSOM HUMANITIES
More informationIntroduction Consultant shall incorporate the material in the DSS into the project specifications.
DIVISION 16 - ELECTRICAL Section 16000 - General Discussion Introduction Consultant shall incorporate the material in the DSS into the project specifications. Refer any questions, clarifications regarding
More informationLUCE 1 TL. specifications: internal. specifications: external. ordering logic. builder. Job/Location:
LUCE 1 TL indoor / damp Job/Location: Contractor: Prepared By: Job Type: Date: The LUCE-1TL thinline emergency ballast is designed to provide emergency illumination to existing or new fluorescent luminaires.
More informationELECTRICAL POWER SYSTEMS
Scope The various Codes applicable to the University's electrical power system are mainly based upon a model of a single utility service, connected to a single premise. The University s electrical system,
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Lighting. Basis of Design
Basis of Design This section applies to the design and installation of lighting systems. Design Criteria Select interior lighting to achieve initial system efficiencies greater than 64 lumens per watt.
More informationSECTION (16140) - WIRING DEVICES
SECTION 26 27 26 (16140) - WIRING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Receptacles, Connectors, Switches, and Finish Plates. B. Related Sections: 1. Section 00 31 13.43 (00370) -
More informationLED Lighting: Technology Selection and System Commissioning Course Number: CXENERGY1519
AABC Commissioning Group AIA Provider Number: 50111116 LED Lighting: Technology Selection and System Commissioning Course Number: CXENERGY1519 Michael Chow, P.E., CxA, LEED AP BD+C, Metro CD Engineering
More informationNote: The office/work area is not in the scope of the PER. Existing Condition
ROBERT G. DASHIELL, JR., P.E., INC. Consulting Engineers 1225 West 26 th Street, Norfolk, Virginia 23508 (757) 623-5012 September 14, 2016 Draft Electrical Portion of the PER Petersburg Main Sanitary Sewage
More informationITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual
ITC 2000 HEATING CONTROL CABINET Installation & Operation Manual VTI, Incorporated 24 McMillan Way Newark, DE 19713 Phone (302) 738 0500 FAX (302) 738 6594 Revision Level 0.03 Manual No. 90003314 June,
More informationINNOVATIVE TRAINING SYSTEMS FOR FUTURE ENGINEERS
INNOVATIVE TRAINING SYSTEMS FOR FUTURE ENGINEERS CHAPTER 15: TRAINING SYSTEMS FOR ELECTRICAL INSTALLATIONS 527 Training Panel to Electrical Protective Measures 528 Training Panel to Installation Tests
More informationWhite Paper SPDs for Essential Power Systems in Health Care Facilities
White Paper s for Essential Power Systems in Health Care Facilities s FOR ESSENTIL POWER SYSTEMS IN HELTH CRE FCILITIES N OVERVIEW OF PROTECTION NEEDS Health care facilities provide critical services to
More informationHEATING & COOLING SPLIT SYSTEM HEAT PUMP & AIR CONDITIONER 14 SEER INTERTHERM SERIES
SPLIT SYSTEM HEAT PUMP & AIR CONDITIONER 14 SEER INTERTHERM SERIES 1-year warranty on parts and labor. 5-year compressor warranty. If Registered a 10 year limited parts warranty applies. Designed for maximum
More informationElectrical Program. Electrical Laws & Rules. Electrical RCW WAC B. Permits Inspections Access Description Directions Comments.
Electrical Laws & Rules Licensing Electrical Work Scope Administrator Duties Certification Supervision RCW 19.28 WAC 296-46B Permits Inspections Access Description Directions Comments Electrical Program
More informationMOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School
MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water
More informationWhat s a Watt? Grades 3 5. Concept: Conservation reduces our energy demands. Thee cost of electricity to run different electrical devices varies.
What s a Watt? Grades 3 5 Concept: Conservation reduces our energy demands. Thee cost of electricity to run different electrical devices varies. Objective: Students Will: observe that different appliances
More information1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.
September 2012, rev. 00 26 2416 Panelboards PART 1. GENERAL 1.01 Summary A. Section includes: 1.02 Definitions 1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load
More informationELECTRICAL - V DESCRIPTION 16.1 GENERAL
16.1 GENERAL 16.1.1 DESCRIPTION ELECTRICAL - V16000 16.1 GENERAL 16.1.1 Description This section identifies minimum requirements that shall be met for all electrical applications in the design and construction
More informationInformational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017
Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 It has come to the attention of the electrical authorities having jurisdiction (AHJs) at the DOE sites there is inconsistency
More information3. Provide revised typed circuit directory in panelboards that have circuits removed.
DIVISION 26 - ELECTRICAL 26 0501 MINOR ELECTRICAL DEMOLITION A. Coordinate utility service outages with the UND Electrical Department. B. Verify the abandoned wiring and equipment serve only abandoned
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Lighting. Basis of Design
Basis of Design This section applies to the design and installation of lighting systems. Design Criteria Select interior lighting to achieve initial system efficiencies greater than 64 lumens per watt.
More informationLighting Solutions from a Leader in Light Source Technology
Lighting Solutions from a Leader in Light Source Technology 2016 Venture Lighting International About Venture Lighting Worldwide innovator, manufacturer and supplier of energy efficient lighting materials,
More informationCeiling Mount Sensors B4-B9. Occupancy and Vacancy Sensors B10-B15 B16-B17. Wall Mount Occupancy Sensors B-1
Occupancy and Vacancy Sensors ENERLITES offers a wide variety of lighting sensors. They are designed to bring convenience to your life and business while helping to reduce energy consumption in commercial,
More informationLighting Retrofit Rebate
Lighting Retrofit Rebate 2017 Rebate Application Elk River Municipal Utilities, PO Box 430, Elk River, MN 55330 Ph: 763-441-2020 Business Information Company name Billing address Installation address (if
More informationA. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.
DIVISION 26 ELECTRICAL SECTION 26 51 13 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings. B. Luminaire
More information2013 Nonresidential Appendices Appendix NA8-1. Appendix NA8 Luminaire Power... 1 NA8.1 Luminaire Power... 1
2013 Nonresidential Appendices Appendix NA8-1 Nonresidential Appendix NA8... 1 NA8.1 Luminaire Power... 1 NA8.1 Luminaire Power The following tables contain a limited list of lamp and ballast combinations.
More informationTechnical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary
Technical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary William H. Gates Hall Seattle, WA Katherine Jenkins Lighting/Electrical Option October 27, 2006 Faculty Advisor: Ted
More informationUniversal Dimmer. 31E2RUD Series ROTARY CONTROL. Installation Instructions. Integrally Switched Rotary Controlled INTEGRALLY SWITCHED 240V
ROTARY CONTROL INTEGRALLY SWITCHED 240V Universal Dimmer Integrally Switched Rotary Controlled 31E2RUD Series Installation Instructions REGISTERED DESIGN REGISTERED PATENT Table of Contents 1.0 Product
More informationDIVISION 16 ELECTRICAL
DIVISION 16 ELECTRICAL This division contains the following elements: 1.1 General Electrical Requirements. 1.2 Electrical Distribution System. 1.3 Power Distribution System. 1.4 Lighting System. 1.5 Emergency
More informationMachinery Room Electrical Best Practices
Machinery Room Electrical Best Practices Brad Heeres Angus-Young Associates February 8, 2007 Understand and comply with applicable codes and standards The National Electrical Code requirements for a safe
More informationNYC Department of Education
NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 80 AX(PETR COMPL-BLDG E)-S.I., 715 OCEAN TERRACE, New York, 10301 Inspection Id Inspection Type Time In Last Edited EE : Electrical
More information