1 Pollington Solar Farm RPS Design and Access Statement Gaelectric Renewable Energy Developments Ltd rpsgroup.com/uk

2 Design and Access Statement Proposed Solar Farm and Associated Infrastructure Pollington, East Yorkshire Date: April 2015 Our Ref: OXF8911 RPS 20 Western Avenue Milton Park Abingdon Oxon OX14 4SH Tel: rpsgroup.com/uk

3 QUALITY MANAGEMENT Prepared by: Luke Simpson Authorised by: Christopher LeCointe Date: 22 April 2015 Project Number/Document Reference: OXF8911/DAS COPYRIGHT RPS The material presented in this report is confidential. This report has been prepared for the exclusive use of Gaelectric Renewable Contents Energy Developments Limited and shall not be distributed or made available to any other company or person without the knowledge and written consent of RPS. rpsgroup.com/uk

4 CONTENTS 1 INTRODUCTION... 4 Introduction... 4 Scope of this Statement DESIGN EVOLUTION PROCESS... 5 Introduction... 5 Application Site Description... 5 Surrounding Area Description... 7 Relevant Policies... 8 Pre-application Consultation Design Evolution DESIGN RESPONSE Use Amount Layout Scale Landscaping Appearance ACCESS Introduction Site Access Heck and Pollington Lane / Long Lane A A CONCLUSIONS Figure 1.0 Site Location Plan Figure 3.0 Indicative Site Layout Figure 8911-LVIA-9 Landscaping Plan Appendix 1- Indicative 48 Panel Table Layout Plan & Elevations Appendix 2- DNO Control Building Plan & Elevations Appendix 3- Indicative Control Building & Elevations Appendix 4- Indicative Compound Plan and Elevations Appendix 5- Indicative Deer Fence and Gate Details Appendix 6- Typical CCTV Mast Elevation rpsgroup.com/uk

5 1 INTRODUCTION Introduction 1.1 This Design and Access Statement has been prepared by RPS Planning & Development on behalf of Gaelectric Renewable Energy Developments Limited ( the Applicant ), to assist East Riding of Yorkshire Council (ERYC) in their consideration of an application for planning permission for the development of a ground mounted solar farm with associated infrastructure at Land at Pollington Airfield, Heck and Pollington Lane, Great Heck, Goole, East Yorkshire, DN14 0DA ( the Development ). 1.2 The planning application is for the installation of solar panels with a generating capacity of up to 5MW mounted on metal frames with associated infrastructure, including client and DNO control buildings; up to 4no. inverter buildings; new and upgraded on site access tracks; underground cabling; temporary construction compound; perimeter fencing with infrared CCTV and access gates; and associated works. 1.3 The Application Site is 12.9 hectares. The Application Site is identified by the red-line on Figure The design and layout of the proposed Development are largely dictated by its function as a solar farm. The design of the proposed Development may be subject to limited amendment as the precise specification of the plant and equipment will not be able to be confirmed until ordered post planning. The Applicant is therefore seeking for a condition to be imposed on any consent granted enabling minor revisions to the design and layout of the Proposed Development within the parameters of the details contained within this Statement. Scope of this Statement 1.5 This Design and Access Statement has been written in accordance with CABE s document entitled Design and Access Statements: How to write, read and use them (CABE, 2006) 1. This Design and Access Statement is structured as follows: Section 2: Design Evolution Process: describes the site and surroundings, relevant planning policies, pre-application consultation and how the proposals has evolved within this context Section 3: Design Response: describes the proposed Development in terms of Use (what the buildings and spaces will be used for), Amount (how much would be built on site), Layout (how the buildings and spaces will be arranged on site), Scale (how big the buildings and spaces would be), Landscaping (how open spaces will be treated to protect the character of a place) and Appearance (what buildings and spaces will look like). Section 4: Access: Provides details of the access points and routes chosen. 1 CABE., Design and Access Statements: How to write, read and use them. London: CABE 4 rpsgroup.com/uk

6 2 DESIGN EVOLUTION PROCESS Introduction 2.1 In determining the design of the proposed Development the Applicant has considered the environmental and land use constraints, the planning policy context and the consultation responses received at the pre-application stage. This section of the Design and Access Statement describes that process and how the design of the development has subsequently evolved. Application Site Description 2.2 The site is located at National Grid Reference , It is irregular in shape, occupying an area of 12.9 hectares. 2.3 The Application Sites is located within part of the now disused Pollington Airfield located 1.5 km northwest of the village of Pollington and approximately 14 kilometres (km) to the west of the outskirts of Goole, East Yorkshire. 2.4 The Application Site comprises an area of open land within the site of Pollington Airfield, which is now disused. Part of the Application Site has recently been used for waste wood management and storage in association with an adjacent wood processing site, located to the west of the Application Site boundary. The land has since returned to open land and has been cleared and levelled. The Application Site is currently vacant. Access 2.5 Access to the Application Site is via the existing access off Heck and Pollington Lane which currently provides access to the existing wood processing site and pellet mill. Ownership 2.6 The area of land within the Applicant s control is denoted by the red and blue line in Figure 1.0. Administrative Geography 2.7 The Application Site is located wholly within the administrative boundary of East Riding of Yorkshire Council (ERYC) and Pollington Parish Council. Topography 2.8 A Topographic Survey (RPS, 2015a) 2 has been undertaken and submitted as part of this planning application. 2 RPS., 2015a. Topographic Survey: Drawing number UAH3017_A 5 rpsgroup.com/uk

7 2.9 The levels across the Application Site range between 8.0m Above Ordinance Datum ( AOD ), in the western corner of the Application Site, and 12.0m AOD in the centre of the Application Site. The topographic survey also identifies the following features: A bund is located upon the southern boundary of the Application Site. The bund is shown to be at a maximum level of 13.26m AOD, sloping downwards in an easterly direction to a minimum level of 12.10m AOD. A further bund is located upon the north eastern boundary of the Application Site, sloping downwards from a level of 11.87m AOD to a level of 11.23, trending in a south easterly direction. The access road to the Application Site is shown to slope upwards from Heck and Pollington Lane in a northerly direction. Public Rights of Way 2.10 There are no Public Rights of Ways (PRoW) or public roads located within the Application Site. Landscape 2.11 The Application Site is not located within an Area of Outstanding Natural Beauty (AONB) or a National Park. Details relating to existing Landscape Character are contained within the Landscape and Visual Impact Assessment (LVIA) (RPS, 2015b) 3 submitted as part of this planning application. Trees and Hedgerows 2.12 There are no trees or hedgerows within the Application Site (RPS, 2015c) 4. Flood Risk and Hydrology 2.13 Reference to the Environment Agency Flood Map (available online) 5 indicates that the Application Site is located within Flood Zone 1 whereby the annual probability of fluvial flooding is classified as a less than 1 in 1000 (>0.1% Annual Exceedance Probability). Ecological Designations 2.14 The site is not located within any designated area of ecological importance. 3 RPS., 2015b. Landscape and Visual Impact Assessment: Proposed Solar Farm and Associated Infrastructure at Pollington, East Yorkshire. (Section 4). 4 RPS., 2015c. Ecological Appraisal: Proposed Solar Farm and Associated Infrastructure at Pollington, East Yorkshire (Figure 3.2) 5 Environment Agency., 2015a. [Online] Available at: xtonly=off&lang=_e&topic=floodmap 6 rpsgroup.com/uk

8 Agricultural Land 2.15 The Application Site has recently been cleared and levelled. However, it is not currently in agricultural use and does not form part of any agricultural land holding. Contamination 2.16 The site is not known to be contaminated. Surrounding Area Description Administrative Geography 2.17 The administrative boundary of Selby District Council and North Yorkshire County Council is approximately 20m north west of the Application Site boundary at its closest point. The existing site access and part of the access track leading to the Application Site are within these administrative boundaries, although no development is proposed within them The Civil Parish boundary of Gowdall Parish Council is located directly north of the Application Site. To the east the Application Site is bound by the Civil Parish boundary of Heck Parish Council. Approximately 2km to the east of the Application Site is the administrative boundary of Snaith and Cowick Town Council. Neighbouring Buildings and Infrastructure 2.19 There are a limited number of residential properties in proximity to the Application Site. The closest residential property is located on Heck and Pollington Lane approximately 450m south of the Application Site To the west the nearest residential properties are Heck Hall Farm and Terrace approximately 500 m to the west of the Application Site North of the Application Site the M62 abuts the Application Site boundary and runs east to west. Beyond the M62 there are residential properties approximately 600m north west and 1km north east of the Application Site The nearest neighbouring residential properties to the east are located approximately 500m from the eastern corner of the Application Site The property to the west of the main complex entrance with Heck and Pollington Lane is controlled by Stobart and is not in residential use The area immediately surrounding the Application Site is characterised by arable land and industrial uses. Non-residential buildings in close proximity to the Application Site include the existing pellet mill and outdoor wood processing facility approximately 100m to the west. Numerous blockworks are located within the vicinity of the Application Site, with the closest being the H+H Celcon site to the south of Heck and Pollington Road, due south from the Application Site. The commercial premises of DNA Baits lies immediately south of the Application Site and is contained by earth bunds that surround the premises. Commercial premises, to the east of DNA Baits and south of the Application Site are situated within and around the old aircraft hangar and associated buildings. Cherry Tree Mill 7 rpsgroup.com/uk

9 and the surrounding commercial premises are located off Snaith Road and Gowdall Lane, to the east of the Application Site A more detailed description of the neighbouring visual receptors is contained within the LVIA (RPS, 2015b) submitted as part of this planning application. Settlements 2.26 The nearest neighbouring settlement is Pollington with properties on Gowdall Road located approximately 500m east of the Application Site s eastern boundary. The primary settlement boundary of Pollington is located approximately 1.2km south east of the Application Site The Village of Great Heck which is located approximately 800m west of the Application Sites western boundary. Public Rights of Way 2.28 Six PRoW footpaths are located within 2 km of the development and the north western Application Site Boundary runs parallel to (but setback from) Pollington Footpath No. 10. This footpath has been bisected by the M62 which has restricted access. Landscape Designations 2.29 There are no AONBs or National Parks located within 50km of the Application Site Landscape Character and Landscape features are discussed in detail within the LVIA (RPS, 2015b) submitted as part of this application. Flood Risk and Hydrology 2.31 The M62 to the north of the Application Site is partly located within Flood Zone 3, which is land assessed as having a 1 in 100 or greater annual probability of river flooding (>1%), or a 1 in 200 or greater annual probability of flooding from the sea (>0.5%) in any year. Ecological Designations 2.32 There are no statutory sites within 2km of the Application Site. The closest site is Went Ings Meadows Site of Special Scientific Interest, 5.2 km from the Application Site. The Ecological Appraisal (RPS, 2015c) undertaken and submitted as part of this planning application provides more details on non-statutory designations at table 3.1. Relevant Policies The Planning and Compulsory Purchase Act (2004) 2.33 Section 38(6) of the Planning and Compulsory Purchase Act requires local planning authorities to determine planning applications in accordance with the provisions of the Development 6 Planning and Compulsory Purchase Act 2004, s.38(6) 8 rpsgroup.com/uk

10 Plan unless material considerations indicate otherwise. A judgement then has to be made on the extent to which a proposal conflicts with the Development Plan and whether any such conflicts are outweighed by other material considerations A full assessment of all relevant Development Plan policies and other material policy considerations, is contained within the Planning Statement (RPS, 2015d) 7 submitted as part of this planning application. Development Plan 2.35 The Development Plan relevant to the determination of this planning application, which is located entirely within the administrative boundary of ERYC, comprises the following: The saved policies of the Boothferry Borough Local Plan (East Riding of Yorkshire Area) (Adopted April 1999) 8 ; and The saved policies of the Joint Structure Plan for Kingston Upon Hull and the East Riding of Yorkshire (Adopted June 2005) The Development Plan policies form the main decision making documents in respect of this proposed Development. However, the emerging ERYC Development Plan Documents (DPDs) will eventually replace these documents and can also be given weight in the consideration of planning applications Boothferry Local Plan (BBC, 1999) Policy EN7, on New Development in the Open Countryside, states in full: New development in the open countryside will only be allowed when it: i) Is located and sited so as to minimise visual intrusion ii) Is of a scale and design appropriate to the rural area iii) Is, where practicable, built of traditional materials which reflect the character of the locality and where this is not practicable, using modern materials which are visually compatible with them, iv) Avoids bright or reflective surfaces 7 RPS., Planning Statement: Proposed Solar Farm and Associated Infrastructure at Pollington, East Yorkshire 8 Boothferry Borough Council.,1999. Boothferry Borough Local Plan *East Riding of Yorkshire Area): Adopted- April Beverley: East Riding Print & Design 9 Hull City Council and East Riding of Yorkshire Council., Joint Structure Plan for Kingston Upon Hull and the East Riding of Yorkshire. ( 9 rpsgroup.com/uk

11 v) Makes use of existing landscaping where possible or is adequately landscape as part of the proposal Joint Structure Plan (KUP & ERYC, 2005) Policy SP5 on, Design of New Development states in full: Development proposals should achieve a high standard of design that: (i) respects local landscape and settlement character including building styles and materials; (ii) integrates visually and physically with its surroundings; (iii) harnesses local heritage and landscape distinctiveness; (iv) maximises the use of sustainable construction material and techniques; (v) makes it easy and safe for people to move around and through the development; (vi) encourages a vibrant mix of uses either on the site or across a wider area; and (vii) facilitates walking, cycling and the use of public transport. Other Material Policy Considerations 2.39 The East Riding Local Plan is the name for the suite of planning documents that together will provide the long term plan for development in East Riding. Once individual documents are adopted they will be used to determine planning applications within the District. These documents, once adopted will replace the existing adopted Development Plan documents. The emerging Local Plan comprises the following document which is relevant to the consideration of this planning application: East Riding Local Plan: Proposed Submission Strategy Document (ERLP) (January 2014) Policy ENV1, on Integrating High Quality Design, states in part: All development proposals will: 1. Contribute to safeguarding and respecting the diverse character and appearance of the area through their design, layout, construction and use; and 2. Seek to reduce carbon emissions and make prudent and efficient use of natural resources, particularly land, energy and water. 10 ERYC., East Riding Local Plan: Proposed Submission Strategy Document [Online] Available at: 10 rpsgroup.com/uk

12 Pre-application Consultation 2.41 This planning application has been the subject of pre-application consultation with ERYC on 24 th February 2015, the local community and other consultees within the Local Planning Authorities and other organisations. None of the responses received had a direct impact upon the design of the proposed Development as the layout and design had been considered within the context of existing land use and environmental constraints prior to pre-application consultation. Design Evolution 2.42 No significant constraints have been identified within the Application Site itself as a result of any consultation or preliminary assessment prior to the submission of the planning application. Figure 2.1 shows the initially proposed layout prior to pre-application consultation with ERYC. This layout takes into consideration the existing uses surrounding the site including storage of straw on the adjacent former runways. Figure 2.1- Layout Although pre-application consultation did not identify any further constraints which necessitated revisions to the layout, the Applicant produced constraints mapping to reflect identified constraints to the layout of the proposed Development. These included the telecommunications mast, Pollington Footpath No.10 to the north west, the Flood Zone to the north and existing wood processing infrastructure and storage areas. 11 rpsgroup.com/uk

13 Figure Layout Figure 2.2 shows the revised layout taking into account the existing land use constraints as identified through the constraints mapping process. The layout has been amended to avoid the siting of PV panels within the area to the north adjacent to Footpath No.10 and the telecommunications mast A topographic survey (RPS, 2015b) 11 was subsequently undertaken In addition, residential properties on Gowdall Lane approximately 500 metres to the east of the Application Site, at Highfield off Gowdall Lane, were identified as being the most visually receptive to the proposed Development (RPS 2015c). Figure Layout 3 (Final Layout) 11 RPS., 2015a. Topographic Survey. Drawing number UAH3017_A 12 rpsgroup.com/uk

14 2.47 In order to minimise the visual impact of the proposed Development, particularly to the east of the Application Site, the layout of the PV panels was brought towards the west of the site away from properties to the east. The final layout at Figure 2.3 takes advantage of the existing landscaping bunds as identified on the Topographic Survey (RPS, 2015b) and enables an area of planting to be proposed to the east of the Application Site (discussed in Section 3 of this report under Landscaping ) The design of the PV panels, electrical buildings and associated infrastructure has been dictated by the Development s function as a solar farm. The design of these components is considered in detail within the following section of this Design and Access Statement. 13 rpsgroup.com/uk

15 3 DESIGN RESPONSE Use 3.1 The proposed Development is for a ground mounted solar farm with associated infrastructure. Amount Solar Panels 3.2 Solar panels will be orientated toward the south on metal mounting frames in table layout. Each table is expected to comprise 2 rows of 24 solar panels. DNO and Client Control Buildings 3.3 One Client Control Building is proposed and one Distributor Network Operator (DNO) building is proposed. Inverter Buildings It is proposed that approximately 4 Inverter compounds will be developed. Access and Site Tracks 3.4 The Development will be connected to the public road network via the existing access track that connects with Heck and Pollington Lane. No access upgrade works are required. The track which currently runs north-west to south-east through the Application Site will be upgraded. Temporary Construction Compound 3.5 A temporary construction laydown area is proposed. This area will be in temporary use for a period of approximately 3 months whilst the solar farm is constructed. Fencing and Security 3.6 Fencing is proposed to secure the Application Site. It is proposed that the fencing is located along the perimeter of the solar PV area. Two gated access points are proposed. CCTV cameras will be interspersed along the fencing perimeter. Temporary development 3.7 The solar farm will have a temporary operational lifetime of up to 25 years after which the land will be returned to its former use. Layout Solar Panels 3.8 Spacing of panel mounting posts will vary depending upon ground conditions. The panel tables will be separated by a distance of between 4.5 and 7.5 metres ( m ) as indicated on Figure rpsgroup.com/uk

16 DNO and Client Control Buildings 3.9 It is proposed that a DNO control building is located within the south-eastern corner of the Application Site adjacent to the Client control building and outside of the perimeter fencing. It is proposed that a Client control building is located to the south-eastern corner of the Application Site within the perimeter fence and directly adjacent to the southern site access. Inverter Buildings 3.10 It is proposed that approximately 4 Inverter compounds are located within the centre of the solar PV area. Access and Site Tracks 3.11 Existing access tracks will be utilised and therefore their location is already determined. Temporary Construction Compound 3.12 A temporary construction laydown area is proposed to the south-eastern corner of the Application Site. This will enable ease of access for construction staff and provide a suitable location for loading and unloading of construction materials. Fencing and Security 3.13 It is proposed that the fencing is located along the perimeter of the solar PV area. Fence posts will be mounted on concrete foundations. Two gated access points are proposed. The first is located to the north-western corner of the solar PV area and the second to the south-eastern corner Spacing between CCTV cameras will be dependent upon the specification of cameras used and specialist contractor design requirements. Scale Solar Panels 3.15 Panels will be angled at between 20 and 30 degrees and will be fixed with no moving parts. The panels will have a maximum height of between approximately 1.7m and 2.6m and will be raised between approximately 0.6m and 0.9m above ground level at their lowest point. DNO and Client Control Buildings 3.16 The DNO control building will be approximately 6.6m x 5m x 3.95m and will be of traditional or GRP construction The Client control building will be approximately 7.2m x 3m x 2.4m and will be of traditional or GRP construction. Inverter Buildings 3.18 The proposed dimensions of the inverter compound buildings will be approximately 6m x 3m x 3m. The inverter buildings will be semi-gloss painted in green. 15 rpsgroup.com/uk

17 Temporary Construction Compound Area 3.19 The construction compound area is temporary and is of a sufficient size to accommodate construction materials during laydown and welfare and other construction facilities. Fencing and Security 3.20 Fence posts will be mounted on concrete foundations. Superior premium wire deer fencing or similar will be erected to a maximum height of approximately 1.9m. The gates will be constructed of deer fencing and will have an access width of approximately 3.65m CCTV units will be mounted on galvanised posts incorporating an anti-climbing guard for enhanced security. The posts will be between approximately 4m and 4.5m above ground at their highest point. No security lighting is proposed as infrared cameras will be used. Landscaping 3.22 Mitigation and enhancement planting in the form of shrub planting is proposed to the east of the Application Site as detailed within the Ecological and Landscape Mitigation and Management Plan ELMMP ) (RPS 2015d) and shown on Figure 8911-LVIA-9. The ELMMP sets out how this proposed planting will be implemented and managed over the operational lifetime of the solar farm. The proposed planting measures assist in visually screening the proposed Development in addition to the existing landscaping bunds within the Application Site. The layout of the proposed Development has been designed to make use of these existing landscape features to reduce the visual impact of the proposed Development. Appearance 3.23 The LVIA (RPS, 2015b) provides an assessment of the visual impact of the proposed Development. Many of the proposed structures are typical of large-scale solar PV development and are consistent with their function as components of the solar farm. However, the appearance of each component of the development is addressed below. Solar Panels 3.24 The appearance of the solar panels is dictated by their function as components of a Solar Farm (see Appendix 2). The panels are static and face south. A Glint and Glare Assessment (Pager Power, 2015) 12 has been submitted as part of this planning application and concludes that there would be no significant adverse impact upon any residential receptor or public highway as a result of the proposed Development. DNO and Client Control Buildings 3.25 The appearance of the DNO control building is dictated by it s use as a component of the solar farm. Appendix 3 shows an indicative elevation and floor plan. 12 Pager Power., Solar Photovoltaic Glint and Glare Study: Pollington Airfield Solar PV Plant. 16 rpsgroup.com/uk

18 3.26 The appearance of the Client control building is dictated by its function as a component of the solar farm. Appendix 4 shows indicative elevations of the proposed building. Indicative Inverter Buildings 3.27 The inverter buildings will be painted in a semi-gloss green to ensure that they assimilate with the surrounding area. These buildings have flat roofs and are of a design which is appropriate to their function as a component of the solar farm as shown at Appendix 5. Access and Site Tracks 3.28 The access tracks into the site will be retained with the existing central track, which runs south-east to north-west, stone-rolled. Temporary Construction Compound Area 3.29 The temporary construction compound will be returned to areas proposed for planting as detailed within the ELMMP (RPS, 2015d) and outlined above in relation to Landscaping. The construction period is anticipated to last between 3 to 4 months. Indicative Fencing and Security 3.30 Superior Premium Wire Deer Fence is proposed as is shown at Appendix 6. The type of fencing proposed has been chosen because it maintains the security of the site whist also being in keeping with the semi-rural character of the surrounding area The proposed gates are of similar construction to the perimeter fencing The appearance of the proposed CCTV mounting posts and cameras is shown at Appendix 7. The cameras are infrared can therefore there is no lighting proposed as part of the Development. 17 rpsgroup.com/uk

19 4 ACCESS Introduction 4.1 This Section of the Design and Access Statement, on Access, is relevant insofar as the proposed Development is linked to the existing transport network via an existing access point. This access will be used for the construction of the proposed Development and for occasional visits the operational period for maintenance. A Construction Traffic Management Plan (CTMP) (RPS, 2015e) 13 has been submitted as part of this planning application and provides details in respect of the construction transport impacts of the Development. Site Access 4.2 Access to the Application Site will be taken via the existing access off Heck and Pollington Lane which currently provides access to the wood processing site and pellet mill. On site vehicle tracks will used with the central access track stone rolled. These tracks will be principally used during the construction phase with occasional access for routine maintenance during the operational period. 4.3 All HGV construction vehicles will follow the proposed route via Heck and Pollington Lane to the west of the Application Site, then Long Lane up to the A645, then the A645 west to the A19 before joining the M62 at Junction 34. It is likely the majority of staff vehicles will also follow this route, with the exception of construction workers that live locally to the east of the Application Site. Heck and Pollington Lane / Long Lane 4.4 Heck and Pollington Lane is a single carriageway road which primarily routes east to west providing a route between Gowdall Lane and Pollington village in the east and Long Lane and Great Heck village in the west. The lane is currently used by a number of existing industrial units located off Heck and Pollington Lane. Heck and Pollington Lane is a signed diversion route for high sided vehicles using the A645 to avoid the height restriction (14 3 ) where the rail line passes over the road. The CTMP (RPS, 2015e) outlines that this road is suitable for HGVs. A The A645 is an all-purpose single carriageway road routing primarily east to west from Crofton to Airmyn Grange via Featherstone, Pontefract, Knottingley, Eggborough and Snaith. Locally the road provides a link between the A19 in the west and the A1041 / A614 in the east. 13 RPS., 2015e. Construction Traffic Management Plan: Proposed Solar Farm and Associated Infrastructure at Pollington, East Yorkshire. 18 rpsgroup.com/uk

20 A The A19 is a single carriageway road routing between the A1 and Seaton Burn in the north and Doncaster in the south via Sunderland, Teesside, Thirsk and York. 19 rpsgroup.com/uk

21 5 CONCLUSIONS 5.1 The proposed Development involves a well-considered layout and design which has been informed by an assessment of the existing land use and environmental constraints of the Application Site and surrounding area. 5.2 The scale of the proposed Development is not out of character with the rural and industrial character of the surrounding areas. 5.3 The design of the proposed Development is largely dictated by its function as a solar farm. Given the relatively low height of the structures and panels proposed, the Development would not be a prominent feature within the landscape. The site is flat and benefits from levels of existing screening provided by natural and built landscape features within the Application Site and surrounding area. Planting measures are proposed to further mitigate the potential impact of the proposed Development. 5.4 The proposed Development utilises existing access tracks for construction and operation with the central track stone-rolled. Once operational the proposed Development will not require continuous human presence and only a limited number of transport movements will be generated. The site will be secured by deer stock fencing and CCTV cameras. 5.5 After an operational period of 25 years the solar farm would be decommissioned and the land would be restored to its former use. It is considered that the proposed Development accords with all relevant design and access policies at both local and national scales. 20 rpsgroup.com/uk

22 FIGURE 1.0- SITE LOCATION PLAN rpsgroup.com/uk

23 ± B $#% :8=9!8<.; &12; - :*?270 1*; :. 9*: *,, 8:- *7,.?2< 1 < 1. ;, 89. 8/ $#%C ; *99827< 6. 7<?2< 1 2< ;, 52. 7< *7-2; ; =+3., < < 8 < 1. <. :6 ; *7, 87-2< 287; 8/ < 1*< *99827< 6. 7< $#% *,,. 9< ; 78 52*+252< A /8: *7A =;. 8/ < 12; - 8, =6. 7< 8< 1. : < 1*7 +A 2< ;, 52. 7< *7-875A /8: < 1. 9=:98;.; /8:?12, 1 2<?*; 9:. 9*:. - *7-9:8> / :.,. 2> , < :872, *55A 2< 2; < 1. :., < ; :. ; 987; 2+252< A < 8 9:27< < 8, 8::., < ;, *5. "75A?:2< < ; 287; ;18=5- +. =;. - Legend 9952, *< 287 ;2<. *7-8?7. : +8=7- *:A 287 $. >. ;, :29< 72< 2*5 *<. '. ;<. :7 >. 7=. 25< 87 #*: "@/8:- ; 12:. "( & :9;8@ :9;0:8=9, 86 1., 4. - % 52. 7< *. 5., < :2, $. 7.?* :0A. > < ; 26 2<.#:83., < #855270< 87 %85*: *:6 &2< 5. %2<. 8, *< 287 #5*7 %< *< =; :*?7 A $! 8+ $. / %, *5. "( 20=:.!=6 +. : B :8? 89A:2 01< 5 5 :2 ; :. ;.6:> 2,. 7,. 78 B :8?7, 89A:201< 55 :201< ; :.7 ;. :>.- 2, 01<. 7;. 7= +.. -: # 1., A % *<. :. *<.- 9:25 $. > - rpsgroup.com " ) #855270< 87 %85*:)&., 1) :*?270;)

24 FIGURE 3.0- INDICATIVE SITE LAYOUT rpsgroup.com/uk

25 10m 15m East Farm Track Drain 5m c 2015 RPS Group Notes 1. This drawing has been prepared in accordance with the scope of RPS s appointment with its client and is subject to the terms and conditions of that appointment. RPS accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. 2. If received electronically it is the recipients responsibility to print to correct scale. Only written dimensions should be used. GREEN LANE Legend Application site Land owner boundary M62 Proposed site access tracks Conveyors Drain PV panels 9m Inverter station DNO control building Drain Client control building G O W D A Construction compound area Conveyors L L B R O A C H A645 Works Mast 10m Drain One module Indicative solar table layout Co Const & UA Bdy Rev Description Date Initial Checked 10m Airfield 10m disused 8m 20 Western Avenue, Milton Park, Abingdon, Oxfordshire, OX14 4SH T: +44(0) E: rpsox@rpsgroup.com F: +44(0) m 10m Depot Client Project Gaelectric Renewable Energy Developments Limited Pollington Solar Farm O:\8911 Pollington Solar\Tech\Drawings\ dwg m 10m 14m Pit dis The Bungalow Norpins HECK AND Crown copyright, All rights reserved License number Title Indicative Site Layout Status Drawn By FINAL AVG Job Ref A3 OXF8911 1: 5,000 PM/Checked by LS Date Created April 2015 Figure Number Rev rpsgroup.com O:\8911 Pollington Solar\Tech\Drawings\ dwg

26 FIGURE 8911-LVIA-9- LANDSCAPING PLAN rpsgroup.com/uk

27 15m 5 East Farm Track Track Drain 5m c 2015 RPS Group Notes 1. This drawing has been prepared in accordance with the scope of RPS s appointment with its client and is subject to the terms and conditions of that appointment. RPS accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. 2. If received electronically it is the recipients responsibility to print to correct scale. Only written dimensions should be used. GREEN LANE Legend Application site Land owner boundary M62 Proposed site access tracks PV panels 9m Drain Inverter station DNO control building Client control building Drain G O W D A Construction compound area Conveyors L L B R O A C H Shrub planting - 1.5m centres A645 Wildflower seed mix Works Mast 10m Existing bund Drain Existing grassland One module Indicative solar table layout Co Const & UA Bdy Rev Description Date Initial Checked 10m Airfield 10m disused 10m 10m 8m 20 Western Avenue, Milton Park, Abingdon, Oxfordshire, OX14 4SH T: +44(0) E: rpsox@rpsgroup.com F: +44(0) Client Gaelectric Renewable Energy Developments Limited 9m Depot Project Pollington Solar Farm O:\8911 Pollington Solar\Tech\Drawings\ dwg m 10m 14m Pit The Bungalow Norpins HECK Crown copyright, All rights reserved License number Title Status FINAL Job Ref OXF8911 Figure Number 8911/LVIA/9 Landscaping Plan Drawn By RM A3 1: 5,000 PM/Checked by LS Date Created April 2015 Rev - rpsgroup.com O:\8911 Pollington Solar\Tech\Drawings\ dwg

28 APPENDICES rpsgroup.com/uk

29 APPENDIX 1 Indicative 48 Panel Table Layout Plan & Elevations rpsgroup.com/uk

30

31 APPENDIX 2 DNO Control Building Plan & Elevations rpsgroup.com/uk

32

33 APPENDIX 3 Indicative Control Building & Elevations rpsgroup.com/uk

34

35 APPENDIX 4 Indicative Compound Plan and Elevations rpsgroup.com/uk

36

37 APPENDIX 5 Indicative Deer Fence and Gate Details rpsgroup.com/uk

38

39 APPENDIX 6 Typical CCTV Mast Elevation rpsgroup.com/uk

40

41 Contact Luke Simpson Senior Planner RPS Planning & Development 20 Western Avenue Milton Park Abingdon Oxon OX14 4SH T: +44 (0) rpsgroup.com

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) PROPOSAL: LOCATION: APPLICANT: Amendments to the design of a scheme for a 49.99MW battery

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

HUNGERFORD SOLAR FARM

HUNGERFORD SOLAR FARM HUNGERFORD SOLAR FARM Key Facts The site comprises approximately 26 acres/10.6 hectares of Grade 3 and 4 agricultural land, currently in arable use. It will have a generation capacity of approximately

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

APP/G1630/W/15/

APP/G1630/W/15/ Appeal Decision Site visit made on 20 October 2015 by William Fieldhouse BA (Hons) MA MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 20 November

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

The Site. Welcome to the public exhibition for Boothferry Road, Hessle.

The Site. Welcome to the public exhibition for Boothferry Road, Hessle. LINDEN HOMES Welcome to the public exhibition for Boothferry Road, Hessle. We would like to hear your views about our proposals before we submit a planning application later this year. If there is anything

More information

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT PENRHYN QUARRY BETHESDA GWYNEDD Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT September 2010 PENRHYN QUARRY, BETHESDA, GWYNEDD Proposed development of an Inert Waste Recycling Facility

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Test Valley Borough Council Southern Area Planning Committee 8 January 2019

Test Valley Borough Council Southern Area Planning Committee 8 January 2019 ITEM 11 APPLICATION NO. 18/02218/FULLS APPLICATION TYPE FULL APPLICATION - SOUTH REGISTERED 23.08.2018 APPLICANT Rugby Football Union SITE The Trojans Club, Stoneham Lane, Eastleigh, SO50 9HT, CHILWORTH

More information

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

WELCOME. Welcome and thank you for visiting today.

WELCOME.   Welcome and thank you for visiting today. WELCOME Welcome and thank you for visiting today. Bellway Homes Ltd (Yorkshire) are preparing a reserved matters planning application for a residential development of 293 homes at land North of Yew Tree

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 11 October 2016 by Mike Hayden BSc DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 21 November 2016 Appeal

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part

More information

Land to the North of Main Road, Wybunbury

Land to the North of Main Road, Wybunbury Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary November 2014 Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary Prepared on

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(iii) 13/81 Erection of sports hall, associated changing facilities, offices

More information

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Proposed Land Use: Total Site Area (Ha): Housing 1.85 Ha Description: It is understood that the owner has no plans to dispose of the site

More information

A payment of 1080 is due in this instance, for a meeting and follow up written response, and will be made by card over the phone.

A payment of 1080 is due in this instance, for a meeting and follow up written response, and will be made by card over the phone. JPPC ref: AG/6002 18 th September 2014 Planning Services Vale of White Horse District Council Benson Lane Crowmarsh Gifford Wallingford OX10 8ED Dear Sir/Madam REQUEST FOR PRE-APPLICATION ADVICE RE: RESIDENTIAL

More information

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION)

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION) AGENDA ITEM NO: Report to: PLANNING BOARD Date: 10 September, 2003 Report from: Borough Planning Officer Application Address: Proposal: Application No: Recommendation: Ward: File No: Applicant: Interest:

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

Rannoch 132 / 33 kv Substation Extension

Rannoch 132 / 33 kv Substation Extension Who we are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the networks in the north of Scotland the electricity transmission network

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 23 January 2017 by Gareth Wildgoose BSc (Hons) MSc MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 6 February

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

Contents. Annexes. Annex 1 Process Diagram for the discharge of the DCO Requirements. Annex 2 Design Sheet Power Generation Plant

Contents. Annexes. Annex 1 Process Diagram for the discharge of the DCO Requirements. Annex 2 Design Sheet Power Generation Plant Design Principles Document December 2014 Contents Summary... 2 Purpose of this Statement... 2 Design Parameters... 2 Guidance Documents... 3 Additional Design Considerations... 3 Public involvement and

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 3 October 2012 AUTHOR/S: Planning and New Communities Director S/1723/12/OL CAXTON AND ELSWORTH OUTLINE APPLICATION FOR ERECTION OF RESTAURANT/TAKEAWAY

More information

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot PART A Report of: DEVELOPMENT MANAGEMENT SECTION HEAD Date of Committee: 26 th June 2014 Site address: Rounton, 28, Nascot Wood Road Reference Number: 14/00497/REM Description of Development: Reserved

More information

UTT/16/1466/DFO GREAT DUNMOW MAJOR

UTT/16/1466/DFO GREAT DUNMOW MAJOR UTT/16/1466/DFO GREAT DUNMOW MAJOR PROPOSAL: LOCATION: APPLICANT: AGENT: Reserved matters approval for the accesses to the site and principal roads within the site including spine road following outline

More information

Small Heath Rail Sidings, Anderton Road, Small Heath, Birmingham, B11 1TG

Small Heath Rail Sidings, Anderton Road, Small Heath, Birmingham, B11 1TG Committee Date: 20/03/2014 Application Number: 2013/07749/PA Accepted: 04/03/2014 Application Type: Full Planning Target Date: 03/06/2014 Ward: Sparkbrook Small Heath Rail Sidings, Anderton Road, Small

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary PINEWOODS HOLIDAY PARK: HORSE PADDOCK June 2014 1 Introduction 1.1 The existing Pinewoods Holiday Park is located approximately 1 km to the north of Wells-nextthe-Sea on the north Norfolk coast. Pinewoods

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd Land North of Hall Road, Rochford Rochford District Council Planning Application Index Prepared on behalf of Bellway Homes Ltd April 2010 Land North of Hall Road, Rochford Rochford District Council Scope

More information

Final Revisions: Provision of single storey modular classroom and associated works.

Final Revisions: Provision of single storey modular classroom and associated works. LOCATION: St Catherines Catholic Primary School, Vale Drive, Barnet, Herts, EN5 2ED REFERENCE: B/01924/12 Received: 17 May 2012 Accepted: 28 May 2012 WARD(S): Underhill Expiry: 23 July 2012 Final Revisions:

More information

The term 'development' in the conditions below means the development permitted by this consent.

The term 'development' in the conditions below means the development permitted by this consent. APPENDIX 1 Conditions The term 'development' in the conditions below means the development permitted by this consent. 1 Approved plans The development hereby permitted shall be carried out in accordance

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY CONTENTS Introduction...1 Site Setting and Description...3 Proposed Development...3 Proposed Time Extension...4 Proposed Lateral Extension...4 Improvement of the main access road (Downs Lane)...4 Restoration

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

RULE 6 (6) STATEMENT OF CASE

RULE 6 (6) STATEMENT OF CASE RULE 6 (6) STATEMENT OF CASE Former Allerthorpe Park Golf Club, Allerthorpe, YO42 4RL Submitted on Behalf of Allerthorpe Parish Council Appeal by Turnwalk Ltd. and Park Leisure 2000 Ltd. Appeal Reference:

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

4 Residential and Urban Living Zones

4 Residential and Urban Living Zones 4 Residential and Urban Living Zones Refer to Chapters 11 to 20 for additional rules that may apply to these zones. 4.1 OBJECTIVES AND POLICIES Objective Res1 Policy 1 Policy 2 Policy 3 Policy 4 Policy

More information

LOCATION: LAND OPPOSITE TYN Y PISTYLL WEST OF DELPH ROAD PENYCAE WREXHAM LL14 1TU

LOCATION: LAND OPPOSITE TYN Y PISTYLL WEST OF DELPH ROAD PENYCAE WREXHAM LL14 1TU APPLICATION NO: P/2015 /0092 COMMUNITY: Cefn WARD: Cefn LOCATION: LAND OPPOSITE TYN Y PISTYLL WEST OF DELPH ROAD PENYCAE WREXHAM LL14 1TU DESCRIPTION: INSTALLATION AND OPERATION OF SOLAR FARM (UP TO 5MW)

More information

Welcome to the Public Consultation Exhibition

Welcome to the Public Consultation Exhibition Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised

More information

PLANNING DECISION NOTICE

PLANNING DECISION NOTICE PLANNING DECISION NOTICE TOWN AND COUNTRY PLANNING ACT, 1990 Applicant WILLITON VILLAGE HALL STEERING COMM. C/O ALISON CALLOWWAY 54 NORTHCROFT WILLITON TAUNTON TA4 4RT Date Registered 11/08/2006 Application

More information

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Departure from the Development Plan. Town Council objection to a major application. DETERMINE Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

Ongar. Residential Sites. Vision for Ongar

Ongar. Residential Sites. Vision for Ongar 5.58 Located in the east of the district, is a District Centre of medieval origin that boasts a retail and service offer benefiting the local community and those in other settlements further afield. 5.59

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 9 January 2013 AUTHOR/S: Planning and New Communities Director S/2270/12/FL FEN DRAYTON 850m long flood defence embankment ranging in

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:-

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:- 8. THE DISTRICT VILLAGES 8.1 Population About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:- Village No. of Persons Cottingham

More information

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 5 June 2013 AUTHOR/S: Planning and New Communities Director S/0747/13/FL HISTON Construction of Car Park at Histon Baptist Church, Station

More information

LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017

LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017 LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017 Smith Limited Suite 9C Joseph s Well Hanover Walk Leeds LS3 1AB T: 0113 2431919 F: 0113 2422198 E: planning@peacockandsmith.co.uk

More information

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012.

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012. LOCATION: 15A Pyecombe Corner, London, N12 7AJ REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012 Final Revisions: APPLICANT: PROPOSAL:

More information

REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016

REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016 LOCATION: Allianz Park, Greenlands Lane, London, NW4 1RL REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016 WARD(S): Mill Hill APPLICANT: Saracens Copthall Ltd. PROPOSAL: Extension

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location The Avenue Tennis Club The Avenue London N3 2LE Reference: 16/6509/FUL Received: 10th October 2016 Accepted: 10th October 2016 Ward: Finchley Church End Expiry 5th December 2016 Applicant: Mrs

More information

4 RESIDENTIAL ZONE. 4.1 Background

4 RESIDENTIAL ZONE. 4.1 Background 4 RESIDENTIAL ZONE 4.1 Background The residential areas within the City are characterised by mainly lowrise dwellings sited on individual allotments. Past architectural styles, settlement patterns and

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Ward: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works.

Ward: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works. Parish: Southbourne Ward: Southbourne SB/16/00205/OUT Proposal Site Outline application with all matters reserved. Erection of 5 no. dwellings and associated works. Dunkirk South Lane Southbourne Emsworth

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Application Recommended for Approval Hapton with Park Ward

Application Recommended for Approval Hapton with Park Ward Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: LA11/2015/0263/O Outline Planning

More information

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE? 1 INTRODUCTION Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. This is the third round of information events that we have undertaken on the project, following

More information

Blenheim Lane. Nottingham Energy Park. Informal Planning Guidance January Approved By: Portfolio Holder for Planning & Transportation

Blenheim Lane. Nottingham Energy Park. Informal Planning Guidance January Approved By: Portfolio Holder for Planning & Transportation Blenheim Lane Former Allotments Site Nottingham Energy Park Approved By: Portfolio Holder for Planning & Transportation Informal Planning Guidance January 2012 Cities Revealed Copyright by The Geoinformation

More information

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon. 138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1

More information

LETTER OF OBJECTION LAND TO THE SOUTH WEST OF FORGE GARAGE, HIGH STREET, PENSHURST, KENT, TN11 8BU

LETTER OF OBJECTION LAND TO THE SOUTH WEST OF FORGE GARAGE, HIGH STREET, PENSHURST, KENT, TN11 8BU Senior Planning Officer Andrew Byrne Sevenoaks District Council Community & Planning Services PO Box 183 Argyle Road Sevenoaks Kent TN13 1GN 04 November 2011 Your Ref: 11/02258/FUL For the attention of

More information

3 Abbey View Mill Hill London NW7 4PB

3 Abbey View Mill Hill London NW7 4PB Location 3 Abbey View Mill Hill London NW7 4PB Reference: 15/03203/HSE Received: 26th May 2015 Accepted: 16th June 2015 Ward: Mill Hill Expiry 11th August 2015 Applicant: Proposal: Mr Richard Benson Alterations

More information

Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation

Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation Having reviewed the documents, the Society has made the following response: Housing Delivery Q 7. Do you agree

More information

CHRISTOPHER WICKHAM ASSOCIATES Town Planning Consultancy

CHRISTOPHER WICKHAM ASSOCIATES Town Planning Consultancy ROCHFORD CORE STRATEGY EXAMINATION STATEMENT BY CHRISTOPHER WICKHAM ASSOCIATES (4961) ON BEHALF OF INNER LONDON GROUP (9917) POLICY H1 THE EFFICIENT USE OF LAND FOR HOUSING REPRESENTATION ID: 16190 CHRISTOPHER

More information

64 Mineral Extraction Area Rules

64 Mineral Extraction Area Rules 64 Mineral Extraction Area Rules 64.1 Introduction For the purposes of this Chapter: Active Area, in relation to a Mineral Extraction Area (MEA), is that part of the Mineral Extraction Area which is owned

More information

List of Policies. SESPlan. None applicable. Consolidated Scottish Borders Local Plan 2011: POLICY G1 - QUALITY STANDARDS FOR NEW DEVELOPMENT

List of Policies. SESPlan. None applicable. Consolidated Scottish Borders Local Plan 2011: POLICY G1 - QUALITY STANDARDS FOR NEW DEVELOPMENT List of Policies Local Review Reference: 15/00021/RREF Planning Application Reference: 15/00616/FUL Development Proposal: Installation of 16no solar photovoltaic (PV) panels to roof Location: Raebank,

More information

ALLERTHORPE NEIGHBOURHOOD PLAN

ALLERTHORPE NEIGHBOURHOOD PLAN Allerthorpe s Neighbourhood Plan sets out a vision for the Parish for the next 15 years (2018 2033) that builds on and reflects the opinions and views of parish residents. VISION In 2033 Allerthorpe will

More information

DELEGATED REPORT. LOCATION Land At Hawley Common Minley Road Blackwater Camberley Surrey

DELEGATED REPORT. LOCATION Land At Hawley Common Minley Road Blackwater Camberley Surrey DELEGATED REPORT APPLICATION NO. 16/03200/FUL LOCATION Land At Hawley Common Minley Road Blackwater Camberley Surrey PROPOSAL APPLICATION FOR TEMPORARY PLANNING PERMISSION FOR USE OF LAND FOR FILMING AND

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Brookside Walk Children's Play Area, London, NW4

Brookside Walk Children's Play Area, London, NW4 LOCATION: Brookside Walk Children's Play Area, London, NW4 REFERENCE: H/05584/13 Received: 26 November 2013 Accepted: 11 December 2013 WARD(S): Hendon Expiry: 05 February 2014 Final Revisions: APPLICANT:

More information

Land East of Cromwell Lane

Land East of Cromwell Lane Land East of Cromwell Lane VISION DOCUMENT AUGUST 2016 The proposals for Land East of Cromwell Lane will be defined by existing landscape features, ensuring that the development offers a quality place

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

North York Moors National Park Authority Planning Committee

North York Moors National Park Authority Planning Committee Item 8 North York Moors National Park Authority Planning Committee 12 December 2013 Consultation from Redcar and Cleveland Borough Council on proposed Wind Farm at Bank Field Guisborough 1. Purpose of

More information

PLANNING, DESIGN AND ACCESS STATEMENT

PLANNING, DESIGN AND ACCESS STATEMENT PLANNING, DESIGN AND ACCESS STATEMENT PROPOSED FREE RANGE CHICKEN SHED AT LAND NORTH OF GLANMYDDYFI, PENTREFELIN, LLANDEILO On behalf of Our Ref: 0161.a Date: February 2018 Prepared by: JDE 1.0 INTRODUCTION...3

More information

TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997

TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 APPEAL AGAINST REFUSAL OF PLANNING PERMISSION FOR CONSTRUCTION OF WIND FARM, CONSISTING OF ERECTION OF 12 NO. WIND TURBINES, HEIGHT OF 70 METRES TO HUB, ASSOCIATED

More information

49 Broughton Avenue London N3 3EN

49 Broughton Avenue London N3 3EN Location 49 Broughton Avenue London N3 3EN Reference: 17/3448/RCU Received: 30th May 2017 Accepted: 1st June 2017 Ward: Finchley Church End Expiry 27th July 2017 Applicant: Mr P Atwal Proposal: Erection

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

It is recommended that the Committee resolve to APPROVE the application and grant planning permission subject to the following conditions:

It is recommended that the Committee resolve to APPROVE the application and grant planning permission subject to the following conditions: LOCATION: Phase 2A Millbrook Park (Site of Former Inglis Barracks), Mill Hill East, London, NW7 1PZ REFERENCE: H/04606/12 Received: 04 December 2012 Accepted: 17 December 2012 WARD: Mill Hill Expiry: 18

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

PDP DESIGN & ACCESS STATEMENT

PDP DESIGN & ACCESS STATEMENT PDP The Planning & Design Partnership Planning.. Architecture.. Interiors.. Landscape The Chicory Barn Studio, The Old Brickyards, Moor Lane, Stamford Bridge York, The East Riding Of Yorkshire, YO41 1HU.

More information

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4 Number: 4 Application Number: C15/0034/37/LL Date Registered: 21/05/2015 Application Type: Full - Planning Community: Llanaelhaearn Ward: Llanaelhaearn Proposal: Location: Summary of the Recommendation:

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD

WELCOME. Olney Road, Lavendon INTRODUCTION. The Site. The Application. The Need for Housing. A Sustainable Location LAVENDON TURVEY OLNEY ROAD 0 WELCOME INTRODUCTION Gladman Developments Ltd have successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial and industrial

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Director of Development Services

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Director of Development Services SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Development and Conservation Control Committee 1 st June 2005 AUTHOR/S: Director of Development Services S/0743/05/F - Great Shelford Extension and Conversion

More information