Suffolk Coast & Heaths AONB Boundary Variation Project

Size: px
Start display at page:

Download "Suffolk Coast & Heaths AONB Boundary Variation Project"

Transcription

1 Suffolk Coast & Heaths AONB Boundary Variation Project 24 September 2014, David Vose, Jonathan Dix Background The project to formally consider a variation to the boundary of the SC&H AONB boundary

2 Suffolk Coast & Heaths AONB background to the proposal AONB designated in 1969 SC&H AONB defined Additional Project Area Tendring and Essex joined partnership in 1993 A long standing aspiration to extend the boundary into Essex Policy TCR10A in 1993 Tendring Local Plan Policy NR3 in 2001 Essex Structure Plan LUC undertook boundary work in 2003 Emerging Tendring Local Plan has Policy PLA5

3 Additional Project Area

4 Making the aspiration a reality A long history of representations to Natural England and predecessor bodies, culminating in: Sept 2011: report produced: Suffolk Coast and Heaths AONB Candidate Area Proposal for Boundary Variation Alison Farmer Assoc. July 2013: proposal that Natural England makes an AONB Variation Order to include almost 36 km2 of land comprising tidal estuary and coastal farmland and woodland along the Southern Stour valley. December 2013: Natural Board approved the initiation of a project to determine for itself whether the AONB boundary should be varied July 2014: Natural England project team established

5 Suffolk Coast & Heaths AONB Boundary Variation Project Legal framework & background The task (& guidance) Next steps for SC&H

6 Legal Framework National Parks and Access to the Countryside Act 1949 amended for AONBs subsequently, currently determined by Countryside and Rights of Way Act 2000

7 Legislation requires Natural England to address the following: 1. Does the landscape have sufficient natural beauty? 2. Is it desirable to designate this landscape as AONB? 3. Where should the boundary be drawn?

8 Guidance

9 The initial assessment process in summary Define Area of Search Define an Evaluation area Identify Candidate Area which meets the criterion for Natural Beauty Consider issues relevant to the desirability of designation Undertake any other required statutory assessments (eg possible requirement for SEA & EqIA) Identify draft detailed boundaries within Candidate Area Undertake consultations including statutory Make any required amendments to the proposals and boundaries Submit to Natural England Board for approval

10 The formal designation process in summary (1) ( If Natural England Board approve the designation variation) Natural England produce draft legal orders (which in this case would be to vary the boundary of the SC&H AONB) The draft Order is put on deposit : an opportunity for anyone wishing to do so to make written representations (objecting to, supporting or suggesting amendments) Following any final amendments, Natural England make the legal Orders

11 The formal designation process in summary (2) Legal Orders are then submitted to the Secretary of State SoS may decide to hold a public Inquiry SoS may decide to confirm the Orders, with or without modifications. She may also decide not to confirm the Orders. If minded to confirm, a Confirmation Order is produced specifies any modifications and when any new designation comes into effect A period of Notice follows during which anyone may challenge the decision

12 Some technical points in a little greater detail: Defining Natural Beauty Characterisation and evaluation use landscape character assessment techniques to gather information in a structured way Characterisation divides the landscape to form a spatial framework Evaluation makes judgements on the value of the landscape (for AONBs the value is Natural Beauty) However please note Natural Beauty is not: Landscape character Characteristic natural beauty Natural landscape untouched by man

13 Character Assessment of Stour Area

14 Natural Beauty Factors and Indicators Assessment covers a range of factors and indicators which can contribute ti high levels of nb Landscape Quality Scenic Quality Relative Wildness Relative Tranquillity Natural Heritage Features Cultural Heritage Features

15 The desirability of designation The decision whether it is desirable to designate is at the heart of the legislation. The issues for Natural England to determine include: Does the area satisfy AONB technical criteria? Is it of such significance that AONB purposes should apply to it? What are the issues affecting the area s special qualities Can AONB purposes be best pursued through the management mechanisms, powers and duties which come with AONB designation? Are there other relevant factors which tend to suggest whether it is or is not desirable to designate the area?

16 The desirability of designation The more directly or substantially a factor bears upon the achievement of AONB purposes the more weight Natural England is likely to give it in the decision whether or not it is desirable to designate Issues that are likely to be raised in consultation include: Perceptions about the potential implications of designation. These are likely to include socio-economic issues & planning County boundaries and identity Area specific issues and local campaigns Some of these issues are very likely to be given less weight.

17 Boundary Setting Considerations Appendix 4 of our Guidance contains guidelines to use when setting a boundary covering the following Transitional areas: the boundary should be tightly drawn Types of boundary: easily distinguishable permanent physical boundary Other boundaries: avoid using LA and/ or landholding boundaries Inclusion of settlements: only if within a wider tract of qualifying land Integrity of settlements: avoid cutting a settlement in two Incongruous development: excluded unless of a temporary or transient nature Land allocated for major development: normally exclude Features of interest: include where practicable

18 Statutory Consultation The questions to be asked: Do you agree that each area has sufficient natural beauty? Do you agree that it is desirable to designate the proposed area as an extension to the SC&H AONB? Do you agree with the proposed boundary?

19 Where we are now: A proposed Candidate Area as produced by Alison Farmer Associates And promoted by the SC&H AONB Partnership

20 Next Steps Natural England s Suffolk Coast & Heaths AONB Boundary Variation Project is required to: Determine which statutory assessments are required Review the Candidate Area proposed by the AONB partnership: does this area contain sufficient natural beauty to be considered for designation? Is this the full extent of the area that should be considered? Evaluate issues relevant to a consideration of the desirability of designation Identify proposed detailed boundaries Submit proposed boundaries to our Executive Board for approval to go out to statutory consultation

21 Technical Advisory Group To provide professional/ technical advice and assistance to Natural England in developing its proposals to vary the boundary of the Suffolk Coast & Heaths AONB Advice to be without prejudice to the Local Authorities subsequent views on the emerging proposals.

22 In summary... Developing a rigorous and defendable process is critical Ensuring that we have as a good an evidence base as possible is essential Key decisions must always be made by the Natural England Board Analysis and other technical aspects of the project are time consuming and therefore 2 to 3 years is likely to be needed Ultimately the boundary will only change if a future Variation Order is confirmed by the Secretary of State

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016) Introduction This background paper sets out a methodology for the definition of settlement boundaries in the North Northumberland Coast Neighbourhood Plan. The neighbourhood plan is planning positively

More information

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015 Oxford Green Belt Study Summary of Final Report Prepared by LUC October 2015 Project Title: Oxford Green Belt Study Client: Oxfordshire County Council Version Date Version Details Prepared by Checked by

More information

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Cotswolds AONB Landscape Strategy and Guidelines. June 2016 Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction

More information

Assessing the Significance of the key characteristics of Historic Landscape Character Areas: a Discussion Paper

Assessing the Significance of the key characteristics of Historic Landscape Character Areas: a Discussion Paper Assessing the Significance of the key characteristics of Historic Landscape Character Areas: a Discussion Paper Background The 11 distinct Historic Landscape Types in the East Devon AONB have been used

More information

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive

More information

3. Neighbourhood Plans and Strategic Environmental Assessment

3. Neighbourhood Plans and Strategic Environmental Assessment 1. Introduction This report sets out a draft Screening Determination for the Preston Parish Council s Neighbourhood Plan and has been prepared by rth Hertfordshire District Council. The purpose of the

More information

WOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD)

WOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD) Agenda Item No. 5 EECUTIVE - 15 JANUARY 2015 Executive Summary WOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD) The report outlines the various responses to the consultation on the Design Supplementary

More information

Effingham Neighbourhood Plan 1. Basic Conditions Statement

Effingham Neighbourhood Plan 1. Basic Conditions Statement Effingham Neighbourhood Plan 1 Basic Conditions Statement Effingham Neighbourhood Plan 2016: Basic Conditions Statement 2 Contents This statement has been prepared by Effingham Parish Council to accompany

More information

EAST OF ENGLAND OFFICE

EAST OF ENGLAND OFFICE Mr Philip Isbell Direct Dial: 01223 582751 Mid Suffolk District Council 131 high Street Our ref: P00524468 Needham Market Ipswich Suffolk IP6 8DL 18 January 2017 Dear Mr Isbell T&CP (Development Management

More information

MAKING SENSE OF PLACE

MAKING SENSE OF PLACE MAKING SENSE OF PLACE Landscape Character Assessment Summary Guidance for England and Scotland MAKING SENSE OF PLACE People can welcome development if it is well designed and contributes to quality of

More information

Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation

Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation Having reviewed the documents, the Society has made the following response: Housing Delivery Q 7. Do you agree

More information

LANDSCAPE CHARACTER ASSESSMENT

LANDSCAPE CHARACTER ASSESSMENT THE COUNTY DURHAM LANDSCAPE CHARACTER ASSESSMENT FOREWORD The landscape of County Durham is one of great contrast and diversity. From the North Pennines in the west to the Durham Coast in the east it contains

More information

Designations protecting the historic designed landscape

Designations protecting the historic designed landscape Historic Landscape Project Designations protecting the historic designed landscape A. Key national designations affecting the historic environment: 1. Listed buildings 2. Scheduled Monuments (generally

More information

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS These plans may provide opportunities as well as concern for recreational boating. They are currently being revised and consulted on. This document explains how we can engage in the process. Shoreline,

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

Call for Proposals. Heritage, natural capital and ecosystem services: case studies. Project No: Date of Issue: Tuesday 14 th November 2017

Call for Proposals. Heritage, natural capital and ecosystem services: case studies. Project No: Date of Issue: Tuesday 14 th November 2017 Call for Proposals Heritage, natural capital and ecosystem services: case studies Project No: 7705 Date of Issue: Tuesday 14 th November 2017 Summary Historic England is seeking expressions of interest

More information

North York Moors National Park Authority Planning Committee

North York Moors National Park Authority Planning Committee Item 8 North York Moors National Park Authority Planning Committee 12 December 2013 Consultation from Redcar and Cleveland Borough Council on proposed Wind Farm at Bank Field Guisborough 1. Purpose of

More information

Examination of South Cambridgeshire Local Plan

Examination of South Cambridgeshire Local Plan Matter SC6A - Policy SS/5 Waterbeach New Town Historic England( formerly English Heritage) 874 Rep Nos 59748, 60250, 60253 Examination of South Cambridgeshire Local Plan Historic England, Hearing Statement

More information

Archaeology and Planning in Greater London. A Charter for the Greater London Archaeology Advisory Service

Archaeology and Planning in Greater London. A Charter for the Greater London Archaeology Advisory Service Archaeology and Planning in Greater London A Charter for the Greater London Archaeology Advisory Service THE PURPOSE OF THE CHARTER This Charter sets out how English Heritage will provide archaeological

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Suffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation

Suffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation Suffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation Having reviewed the issues and options documents, the Society has made the following response: Part 1 - Strategic

More information

Habitat Regulations Assessment (HRA) Screening Determination. May 2017

Habitat Regulations Assessment (HRA) Screening Determination. May 2017 Cholsey Parish Council Cholsey Neighbourhood Plan Habitat Regulations Assessment (HRA) Screening Determination May 2017 Cholsey Neighbourhood Plan Page! 1 of! 10 SASR - HRA v1.1 Page Left Intentionally

More information

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN BASIC CONDITIONS STATEMENT December 2018 CEF 4 Legal Requirements This statement has been produced by the NDP Working Group on behalf of Repton Parish Council

More information

Ebbsfleet Development Corporation

Ebbsfleet Development Corporation Title of Paper Planning and Housing Delivery Report September 2018 Presented by Sub-Committee Mark Pullin, Chief Planning Officer Planning Committee Purpose of Paper and Executive Summary This paper provides

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting October 15, 2005 DATE: September 28, 2005 SUBJECT: Request to Advertise the adoption of the 2005 Clarendon Sector Plan C. M. RECOMMENDATION:

More information

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT 2017-18 Summary 1 Progress on local development documents 1 Local development documents adopted in the monitoring period 1st April 2017 31st

More information

Great Easton Neighbourhood Plan Statement of Basic Conditions

Great Easton Neighbourhood Plan Statement of Basic Conditions Great Easton Neighbourhood Plan 2017-2031 Statement of Basic Conditions OCTOBER 2016 GREAT EASTON PARISH COUNCIL Contents 1.0 Introduction....Page 2 2.0 Summary of Submission Documents and Supporting Evidence..

More information

Wind energy development in the South Pennines landscape

Wind energy development in the South Pennines landscape Wind energy development in the South Pennines landscape Programme for today Background Policy context South Pennines landscape Impacts of wind energy development The South Pennines Wind Energy Landscape

More information

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4 Number: 4 Application Number: C15/0034/37/LL Date Registered: 21/05/2015 Application Type: Full - Planning Community: Llanaelhaearn Ward: Llanaelhaearn Proposal: Location: Summary of the Recommendation:

More information

Local Development Scheme

Local Development Scheme Local Development Scheme 2012 2016 The Local Development Scheme (LDS) is a project plan that outlines how and when the Authority will update its planning policies and other associated documents. It ensures

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

LANDMAP Methodology Overview

LANDMAP Methodology Overview LANDMAP Methodology Overview June 2017 Jill Bullen, Senior Landscape Specialist jill.bullen@cyfoethnaturiolcymru.gov.uk 0300 065 4706 (Please note this is an information document and not a training presentation)

More information

Plaistow and Ifold Neighbourhood Plan Pre-Submission Consultation Draft

Plaistow and Ifold Neighbourhood Plan Pre-Submission Consultation Draft Mrs Beverley Weddell Clerk to Plaistow And Ifold Parish Council Lock House Lodge Knightons Lane Dunsfold, GU8 4NU. Dear Mrs Weddell, Our ref: Your ref: Telephone Fax HD/P5402/ 01483 252040 18 th October

More information

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways: 12 th Meeting of the Conference of the Parties to the Convention on Wetlands (Ramsar, Iran, 1971) Punta del Este, Uruguay, 1-9 June 2015 Resolution XII.10 Wetland City 1 Accreditation of the Ramsar Convention

More information

3/29 Rhu Marina Reporter David Russell. Body or person(s) submitting a representation raising the issue (including reference number):

3/29 Rhu Marina Reporter David Russell. Body or person(s) submitting a representation raising the issue (including reference number): Development Plan Reference: 3/29 Rhu Marina Reporter David Russell The Council s submission to the Reporters starts on page 194 of the report. It is in four parts, 1. Summary of representations, 2. Modifications

More information

BLEWBURY NEIGHBOURHOOD DEVELOPMENT PLAN STATEMENT OF BASIC CONDITIONS

BLEWBURY NEIGHBOURHOOD DEVELOPMENT PLAN STATEMENT OF BASIC CONDITIONS BLEWBURY NEIGHBOURHOOD DEVELOPMENT PLAN STATEMENT OF BASIC CONDITIONS Introduction 1.1 This statement has been prepared to accompany the submission of the Blewbury Neighbourhood Development Plan ( the

More information

TOPIC PAPER 2: Links to other sustainability tools

TOPIC PAPER 2: Links to other sustainability tools TOPIC PAPER 2: INTRODUCTION 1.1 Landscape Character Assessment can inform a range of other sustainability tools and methodologies. Equally these other tools may assist in reaching decisions concerning

More information

Draft Resolution XII.10

Draft Resolution XII.10 12 th Meeting of the Conference of the Parties to the Convention on Wetlands (Ramsar, Iran, 1971) Punta del Este, Uruguay, 1-9 June 2015 Ramsar COP12 DR10, Rev. 2 21:45, 8 June Draft Resolution XII.10

More information

Response to Review Panel Stage 2 Consultation on Designated Landscapes in Wales. UK Environmental Law Association s Wales Working Party

Response to Review Panel Stage 2 Consultation on Designated Landscapes in Wales. UK Environmental Law Association s Wales Working Party Response to Review Panel Stage 2 Consultation on Designated Landscapes in Wales UK Environmental Law Association s Wales Working Party The UK Environmental Law Association (UKELA) aims to make the law

More information

Guidance for Wind Turbine Development in the Dorset AONB

Guidance for Wind Turbine Development in the Dorset AONB Photo 1: Rew Manor Farm, West Dorset, chalk downland landscape (Planning application ref: 1/D/09/001280 1 ) Scale & siting: 12m to hub / 16m to blade tip. A well sited small scale turbine, grouped with

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

Landscape Planning in the National Park Policy and decision making Landscape Character Assessment Historic Landscape Character Assessment Landscape

Landscape Planning in the National Park Policy and decision making Landscape Character Assessment Historic Landscape Character Assessment Landscape Landscape Planning in the National Park Policy and decision making Landscape Character Assessment Historic Landscape Character Assessment Landscape Sensitivity Green Infrastructure The purposes and duty

More information

Guidance for Wind Turbine Development in the Dorset Area of Outstanding Natural Beauty

Guidance for Wind Turbine Development in the Dorset Area of Outstanding Natural Beauty DRAFT January 2012 Guidance for Wind Turbine Development in the Dorset Area of Outstanding Natural Beauty Photo 1: Rew Manor Farm, West Dorset, chalk downland landscape (Planning application ref: 1/D/09/001280

More information

Suffolk Coast & Heaths Area of Outstanding Natural Beauty Management Plan Landscapes for Life Logo SCH AONB Logo

Suffolk Coast & Heaths Area of Outstanding Natural Beauty Management Plan Landscapes for Life Logo SCH AONB Logo Suffolk Coast & Heaths Area of Outstanding Natural Beauty Management Plan 2018-2023 Landscapes for Life Logo SCH AONB Logo 1 CONTENTS FOREWORD SECTION 1: Introduction and Document Purpose 1.1 Introduction

More information

Green Infrastructure planning must be evidence led, thus the importance of this stage in collating your information and responses.

Green Infrastructure planning must be evidence led, thus the importance of this stage in collating your information and responses. Green Infrastructure Consultation Proforma Recipients: Andy Maginnis (Countryside Services) regarding access, recreation and tourism Ed Dursley (Transport) regarding access and movement Steve Bloomfield

More information

11/04/2016. NPPF Paragraph 128. NPPF Paragraph 128. NPPF Paragraph 128. NPPF Paragraph 128. NPPF Paragraph 128

11/04/2016. NPPF Paragraph 128. NPPF Paragraph 128. NPPF Paragraph 128. NPPF Paragraph 128. NPPF Paragraph 128 Good practice in the preparation and understanding of NPPF-compliant heritage assessments/statements Stephen Bond, Heritage Places 1 NPPF Paragraphs 133-135 133: Where a proposed development will lead

More information

Neighbourhood Planning Guidance Local Green Spaces

Neighbourhood Planning Guidance Local Green Spaces Neighbourhood Planning Guidance Local Green Spaces Introduction This guidance note has been produced for communities preparing neighbourhood plans in North Dorset to help them to identify, assess and designate

More information

Ipswich Issues and Options for the Ipswich Local Plan Review, August 2017, Public Consultation

Ipswich Issues and Options for the Ipswich Local Plan Review, August 2017, Public Consultation Ipswich Issues and Options for the Ipswich Local Plan Review, August 2017, Public Consultation Having reviewed the issues and options documents, the Society has made the following response: Part 1 Strategic

More information

Planning Policy Statement 7: Sustainable Development in Rural Areas

Planning Policy Statement 7: Sustainable Development in Rural Areas December 2003 Consultation Response Planning Policy Statement 7: Sustainable Development in Rural Areas A response by Friends of the Earth Introduction Friends of the Earth has a strong interest in the

More information

Development in the setting of the Cotswolds AONB

Development in the setting of the Cotswolds AONB COTSWOLDS CONSERVATION BOARD POSITION STATEMENT Development in the setting of the Cotswolds AONB.1. Introduction Areas of Outstanding Natural Beauty (AONBs) are designated by the Government for the purpose

More information

Balcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report

Balcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report Balcombe Neighbourhood Plan Habitats Regulations Assessment Screening Report Produced for Regulation 14 of the Neighbourhood Planning (General) Regulations 2012 17 th July 2015 1.0 Introduction 1.1 This

More information

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 Table of Contents Introduction... 3 Background to Review... 3 Comparison of the Schedules to the General Residential Zone... 7 Methodology... 7 Policy Context...

More information

Basic Conditions Statement Exmouth Neighbourhood Plan

Basic Conditions Statement Exmouth Neighbourhood Plan Exmouth Neighbourhood Plan 2018-2031. On behalf Exmouth Neighbourhood Plan Steering Group July 2018 Table of Contents 1. Introduction... 4 2. Legal Requirements... 5 3. Why there is a need for a Neighbourhood

More information

Draft Hailey Neighbourhood Plan

Draft Hailey Neighbourhood Plan Persimmon Homes (Wessex) Draft Hailey Neighbourhood Plan Representations to West Oxfordshire District Council s Regulation 16 Consultation December 2018 2 Copyright 2018 Persimmon Homes Ltd. All rights

More information

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Town of Cobourg Heritage Master Plan. Statutory Public Meeting Town of Cobourg Heritage Master Plan Statutory Public Meeting April 25 th 2016 Presentation Overview 1. Introduction 2. Project background and schedule overview 3. Review of strategic direction content

More information

Edward R. Sajecki Commissioner of Planning and Building

Edward R. Sajecki Commissioner of Planning and Building Corporate Report Clerk s Files Originator s Files CD.03.POR DATE: TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: February 27, 2012 Edward R. Sajecki Commissioner

More information

LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017

LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017 LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017 Smith Limited Suite 9C Joseph s Well Hanover Walk Leeds LS3 1AB T: 0113 2431919 F: 0113 2422198 E: planning@peacockandsmith.co.uk

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016 Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest

More information

CA//17/02777/FUL. Scale 1:1,250. Planning Services Canterbury City Council Military Road Canterbury Kent CT1 1YW

CA//17/02777/FUL. Scale 1:1,250. Planning Services Canterbury City Council Military Road Canterbury Kent CT1 1YW O CA//17/02777/FUL Scale 1:1,250 Map Dated: 15/03/2018 Planning Services Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 16 PLANNING COMMITTEE APPLICATION NUMBER: SITE LOCATION:

More information

Awarding body monitoring report for: Institute of Legal Executives (ILEX) February 2008 QCA/08/3734

Awarding body monitoring report for: Institute of Legal Executives (ILEX) February 2008 QCA/08/3734 Awarding body monitoring report for: Institute of Legal Executives (ILEX) February 2008 QCA/08/3734 2008 Qualifications and Curriculum Authority 2 Contents Introduction...4 Regulating external qualifications...4

More information

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background Summary of SMBC Asks 23/09/13 Background The Council has a developed a significant number of asks and propositions for consideration by HS2 Ltd and Government throughout further development of the HS2

More information

UNCLASSIFIED. Risk of Flooding from Reservoirs - Severn River Basin District

UNCLASSIFIED. Risk of Flooding from Reservoirs - Severn River Basin District UNCLASSIFIED Flood Risk Maps Risk of Flooding from Reservoirs - Severn Why have we produced these maps what can they be used for? Under the Flood Risk Regulations Natural Resources Wales have worked in

More information

WILMCOTE NEIGHBOURHOOD PLAN

WILMCOTE NEIGHBOURHOOD PLAN WILMCOTE NEIGHBOURHOOD PLAN 1. Introduction. 1.1 David Holmes Planning Ltd has been instructed to advise Wilmcote Parish Council, who wish to prepare a Neighbourhood Plan. In particular we are asked to

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008

PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008 PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008 Extraction of minerals, including building and roofing stone, from the land requires planning permission under the

More information

Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council

Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council Blandford + Neighbourhood Plan 2 Pre-Submission Plan Consultation (November 2018) Representations submitted on

More information

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Environmental Services Division

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Environmental Services Division CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Environmental Services Division TO: Chair and Members Public Works Committee COMMITTEE DATE: July 12, 2018 SUBJECT/REPORT NO: WARD(S) AFFECTED: PREPARED BY: SUBMITTED

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

Appendix A. Planning Processes. Introduction

Appendix A. Planning Processes. Introduction 1 Planning Processes Introduction This appendix outlines a number of planning processes which are used in the Auckland Region to support the effective management of development in the region s rural and

More information

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1 ~!VAUGHAN NOV Z 5 2016 November 21, 2016 Mr. Denis Kelly, Regional Clerk The Regional Municipality of York 17250 Yonge Street Newmarket, ON L3Y 6Z1 Dear Mr. Kelly: RE: NEW KIRBY GO STATION IN BLOCK 27

More information

California Preservation Foundation Historic Resources 101 HISTORIC RESOURCES GROUP

California Preservation Foundation Historic Resources 101 HISTORIC RESOURCES GROUP California Preservation Foundation Historic Resources 101 WHAT IS A HISTORIC RESOURCE? A building, structure, object, site, landscape or a related grouping or collection of these (district) that is significant

More information

Norfolk Coast Partnership

Norfolk Coast Partnership Norfolk Coast Partnership TOWARDS A CO-ORDINATED APPROACH TO INTEGRATED LANDSCAPE PLANNING IN NORFOLK Final Report December 2006 CHRIS BLANDFORD ASSOCIATES Environment Landscape Planning in association

More information

Chalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK

Chalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK Chalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK How to apply Please complete our application form, together with

More information

Wildlife and Planning Guidance: Local Plans

Wildlife and Planning Guidance: Local Plans Wildlife and Planning Guidance: Local Plans This Leaflet is one of a series of 4 Wildlife and Planning Guidance Leaflets and is intended to provide useful information to assist you to campaign effectively

More information

Longmore House Salisbury Place Edinburgh EH9 1SH. 18 January 2008

Longmore House Salisbury Place Edinburgh EH9 1SH. 18 January 2008 We safeguard the nation s historic environment and promote its understanding and enjoyment Martin Dean Access and Countryside Projects Officer Development and Environmental Services Clackmannanshire Council

More information

GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY

GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY Volume II - Addendum On behalf of Guildford Borough Council PPG Ref : BNL.0287 April 2014 COPYRIGHT The conents of this document must not be copied or

More information

BUSINESS PLAN CEN/TC 125 MASONRY EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 125 MASONRY EXECUTIVE SUMMARY Page: 1 BUSINESS PLAN CEN/TC 125 MASONRY EXECUTIVE SUMMARY The scope of CEN/TC 125 is "Standardization in the field of masonry units of clay, calcium silicate, dense aggregate concrete, lightweight aggregate

More information

Town and Country Planning Act 1990 Section 79 and Town and Country Planning (Inquiries Procedure) (England) Rules 2000

Town and Country Planning Act 1990 Section 79 and Town and Country Planning (Inquiries Procedure) (England) Rules 2000 Town and Country Planning Act 1990 Section 79 and Town and Country Planning (Inquiries Procedure) (England) Rules 2000 Statement of Case of Royal Botanic Gardens, Kew Application by Starbones Ltd. Land

More information

ENGLISH HERITAGE STRATEGY MAKING THE PAST PART OF OUR FUTURE

ENGLISH HERITAGE STRATEGY MAKING THE PAST PART OF OUR FUTURE ENGLISH HERITAGE STRATEGY 2005 2010 MAKING THE PAST PART OF OUR FUTURE ENGLISH HERITAGE STRATEGY 2005 2010 English Heritage is the Government s statutory adviser on the historic environment. Our role is

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(iii) 13/81 Erection of sports hall, associated changing facilities, offices

More information

Wildlife and Planning Guidance: Neighbourhood Plans

Wildlife and Planning Guidance: Neighbourhood Plans Wildlife and Planning Guidance: Neighbourhood Plans This Leaflet is one of a series of 4 Wildlife and Planning Guidance Leaflets and is intended to provide useful information to assist you to campaign

More information

INTRODUCTION BACKGROUND

INTRODUCTION BACKGROUND INTRODUCTION 1 1 INTRODUCTION 18 INTRODUCTION 1 1.1 BACKGROUND The Dublin Docklands Development Authority (DDDA) is required to conduct a Strategic Environmental Assessment (SEA) of the review of the Draft

More information

National Planning Policy Framework

National Planning Policy Framework National Planning Policy Framework February 2019 Ministry of Housing, Communities and Local Government ( ( (!"#$%&"'()'"&&$&*()%'$+,( -."/01%.2( ( ( @$"0"/1"9(12(@&$

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 6 November 2017 by Rachel Walmsley BSc MSc MA MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 19 th January

More information

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) PROPOSAL: LOCATION: APPLICANT: Amendments to the design of a scheme for a 49.99MW battery

More information

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd. Environmental Impact Assessment for Waterway Restoration Projects Chris John, Technical Director Ecus Ltd. Environmental Impact Assessment for Waterway Restoration Projects What is Environmental Impact

More information

PRIORITIES COMMITTEE MEETING

PRIORITIES COMMITTEE MEETING PRIORITIES COMMITTEE MEETING Meeting Date: October 28, 2014 Agenda Item #: 11.1 Mature Neighbourhood Strategy Phase 2 Report Purpose To provide the Priorities Committee with a progress update on the Mature

More information

5 Eastlake Close, Petersfield, Hants, GU31 4ES SDNP/18/01399/TPO

5 Eastlake Close, Petersfield, Hants, GU31 4ES SDNP/18/01399/TPO 5 Eastlake Close, Petersfield, Hants, GU31 4ES SDNP/18/01399/TPO PART 2 SOUTH DOWNS NATIONAL PARK AUTHORITY PLANNING COMMITTEE REPORT OF THE HEAD OF PLANNING Applications to be determined by the council

More information

Our approach to the design and routeing of new electricity transmission lines

Our approach to the design and routeing of new electricity transmission lines Our approach to the design and routeing of new electricity transmission lines 2012 National Grid s job is to connect people to the energy they use to warm and light their homes, to connect factories and

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE

12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE 12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE MARTIN SMALL HISTORIC ENVIRONMENT PLANNING ADVISER ENGLISH HERITAGE Policy ENGLISH HERITAGE GOOD

More information

Proposal: Proposed new access road. The application site is Council owned land and the decision level is at Planning and Licensing Committee.

Proposal: Proposed new access road. The application site is Council owned land and the decision level is at Planning and Licensing Committee. Reference: 16/01492/FUL Ward: Warley Site: Lion Lodge South The Avenue Warley Essex CM13 3RZ Proposal: Proposed new access road Plan Number(s): 1:1250 LOCATION PLAN; MB.DJA 1 OF 1; Applicant: Mr M Bryan

More information

A DRAFT ALLOTMENT POLICY FOR STIRLING COUNCIL

A DRAFT ALLOTMENT POLICY FOR STIRLING COUNCIL DRAFT Stirling Council Allotment Policy Appendix 1 A DRAFT ALLOTMENT POLICY FOR STIRLING COUNCIL - 2010 1 Introduction 1.1 Allotments are an important asset, providing a wide range of benefits to both

More information

Appropriate Assessment in relation to County Donegal Draft Heritage Plan

Appropriate Assessment in relation to County Donegal Draft Heritage Plan Appendix 12 - Consultation Response a) Sinead Harkin Central Planning Unit Donegal County Council County House Lifford County Donegal Dear Ms Harkin, Appropriate Assessment in relation to County Donegal

More information

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012.

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012. LOCATION: 15A Pyecombe Corner, London, N12 7AJ REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012 Final Revisions: APPLICANT: PROPOSAL:

More information

Section 6. Monitoring plan to evaluate progress and give feedback and appendices

Section 6. Monitoring plan to evaluate progress and give feedback and appendices Section 6 Monitoring plan to evaluate progress and give feedback and appendices Suffolk Coast and Heaths Management Plan 6.1 Performance on meeting plan objectives and implementing action targets 6.1.1

More information

2014/0590 Reg Date 26/06/2014 Chobham

2014/0590 Reg Date 26/06/2014 Chobham 2014/0590 Reg Date 26/06/2014 Chobham LOCATION: PROPOSAL: TYPE: APPLICANT: OFFICER: ASCOT PARK POLO CLUB, WESTCROFT PARK FARM, WINDLESHAM ROAD, CHOBHAM, WOKING, GU24 8SN Erection of a two storey detached

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies Page 1 of Report PB-81-17 SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies TO: FROM: Committee of the Whole Planning and Building Department Report Number: PB-81-17

More information