- Ashlie Norman
- 5 years ago
- Views:
Transcription
1 October 26, :00 pm 1
2 Increase knowledge of the Pinellas- Anclote (West) Watershed Work together to improve drainage systems in the watershed Involve residents in developing potential solutions Provide recommendations to the County Administrator 2
3 Provide update of recent activities Present follow-up information based on the previous Task Force Meeting Present information on project funding Break into working groups based on areas 3
4 End workgroup sessions and reconvene as a group Review next steps Set timeframe for next meeting 4
5 5
6 6
7 7
8 Began Pumping Early 2 pumps on Little for Duck Slough Existing pump set up at Winston Pond Pump at Highland Loop on floats Opened BMP1 and other Duck Slough Gates Set Up Sand Bag Location Crews Once Rains Began Started pump at Persea in Thousand Oaks Started pump at Winston Pond in Beacon Hill Once Flooding Began Set new pumps 8
9 9
10 RESIDENTS IDENTIFIED ISSUES AND POTENTIAL SOLUTIONS 5/16/
11 PASCO COUNTY STAFF FOLLOWED UP ON THE INFORMATION 11
12 Resident identified issues become Maintenance or Capital Projects 12
13 13
14 Six pipe projects were completed using a contractor in FY16. These Failing culverts are typically contracted because of potential liabilities with replacement. Pipe Project Fjord Way Rudder Way Weasel Dr. Tumbleweed Dr. Ivy Ln Lake Forest Circle Contractor Southern Road & Bridge Southern Road & Bridge Southern Road & Bridge Southern Road & Bridge Southern Road & Bridge Southern Road & Bridge Total 14
15 Six pipe projects are currently underway. Crews have started work on the Hollyridge / Cumber project. Pipe Project Plum Tree Rd Lotus Dr. Valley Court Rushmore Dr. Hollyridge / Cumber Topsail Trail Contractor Douglas N. Higgins Douglas N. Higgins Ajax Paving Inc Douglas N. Higgins Douglas N. Higgins Douglas N. Higgins Total 15
16 Jarvis St. Meadowlane Dr. Mimosa Dr. Pineapple Ln St. George Pl Tampa Downs Blvd Tower Rd. Tumbleweed Dr. Alabama Rd. Bessemer Dr. Cecelia Dr. Hamm Dr. Lacey Dr. Lakewood Dr. Pasco Lake Dr. Porter Road Wood Duck Drive 34 In-house culvert replacements 16
17 17
18 Port Richey Watershed Property Acquisition Hammock Creek / Sea Pines Forest Hills Cypress Creek PACE Analysis Pumping & Hard Pipe 18
19 19
20 Area with frequent flooding issues. A failed CMP pipe was found and replaced with 2400 LF of 24 ADS Ploy Pipe which discharges south to an outfall. 20
21 21
22 22
23 23
24 24
25 25
26 26
27 Martell St West Inlet View Once a General Contractors license is on hand for Lighting Hydraulics will replaced: 1. This sections of 36 CMP pipes w a 42 HDPE pipe 2. Martell St east drainage inlet, only, will be replaced w 42 HDPE pipe. Thru contract ( Lighting Bay Hydraulics) this sections of 36 CMP pipes along w drainage inlet have been e replaced w 42 HDPE pipe. Martell St Surface View Martell St Murrow St Mexicali St Martell St East Inlet View Note: Martell St west inlet and the 32 HDPE pipe heading west are NOT schedule to be replaced thru contract
28 Original 36 CMP was repaired by inserting a 32 HDPE 32 Martell St West Inlet Thru contract (Lighting Bay Hydraulics) this sections of 36 CMP pipes along w drainage inlet have been e replaced w 42 HDPE pipe. Note: Martell St west inlet and 32 HDPE pipe, heading west, are NOT schedule to be replaced thru contract Martell St Martell St Pipe Run View Murrow St Mexicali St Once a General Contractors license is on hand for Lighting Hydraulics will replaced: 1. This sections of 36 CMP pipes w a 42 HDPE pipe 2. Martell St east drainage inlet, only, will be replaced w 42 HDPE pipe. Original 36 CMP schedule to be replaced by a 42 HDPE w/in 2 weeks 36
29 29
30 Engineering/permitting have been completed for this project. Project includes upsized pipes, new pipes, reconstructed inlets and curbing. Construction applied for in FY18 at $2,000,000 This project, along with the Forest Hills Outfall project, which must precede it, would lower anticipated flooding levels such that all 14 of the at-risk residential structures in the Forest Hills west basin would be removed from the 100-year floodplain 30
31 Engineering and permitting have been completed for this project. SWFWMD Cooperative Funding application for Construction was applied for in FY18 at $750,000. This project would result in lowering anticipated storm-water flooding levels by lowering the tail-water in the south pond of the Forest Hills West neighborhood, reducing anticipated flooding hazard for 13 of the 14 at-risk residential structures 31
32 This project is expected to reduce stormwater flooding levels such that all neighborhood residential structures would be removed from the 100-year floodplain 32
33 33
34 34
35 35
36 36
37 Reports by Group Analysis of Meeting Information Distribution and Review by Taskforce Members Public Comment of Meeting Format Date for next Taskforce Meeting 37
38 38
39 39
Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed
Pasco County Watershed Meeting for Flood Impacted Areas March 15, 2017 Regency Park Library, 9701 Little Road, New Port Richey, Pasco County The following is a summary of the meeting held on March 15,
More informationQUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project
QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project PROJECT OVERVIEW Windsor Woods, Princess Anne Plaza and The Lakes are neighborhoods located in what was once
More informationTOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06
TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE DIVISION OF ENGINEERING 251 Preventorium Road Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 919-1080 Howell, NJ 07731-0580
More informationMunicipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights
ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey
More informationCity of Dade City AMEC Project No Dade City Stormwater Master Plan September 2012 Page 32
Page 32 3.0 MAJOR DRAINAGE SYSTEMS The 1965 Master Plan Report for Storm Drainage Facilities ( 1965 Master Plan ) identified six primary subwatersheds within the Dade City study area. Each of these areas
More informationcontinues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.
The Duck Pond Watershed is located in northern Hillsborough County in an area in which a number of land and water management issues are currently being addressed by citizen's action groups and state, regional
More information2016 WORKSHOP LVR Field Trip
2016 WORKSHOP LVR Field Trip ***Note*** Many of the sites on this tour were NOT related to, or funded by, the DGLVR program. They are being shown to encourage discussion about the kinds of projects that
More informationLong Branch-Wayne Local Park Renovation Project
Montgomery Parks Long Branch-Wayne Local Park Renovation Project Community Meeting #2 September 20, 2016 Oak View Elementary School 7:00-9:00 PM Welcome / Team Introductions M-NCPPC (Montgomery Parks)
More informationSOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT
VILLAGE OF SCARSDALE WESTCHESTER COUNTY, NEW YORK COMPREHENSIVE STORM WATER MANAGEMENT SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT In association with WESTCHESTER COUNTY FLOOD MITIGATION PROGRAM Rob
More informationFlooding Hearing: Long and Short Term Strategies
Services of the San Francisco Public Utilities Commission Flooding Hearing: Long and Short Term Strategies Presentation to San Francisco Board of Supervisors Public Safety and Neighborhood Services Subcommittee
More informationCITY OF VALPARAISO STORMWATER MASTER PLAN
CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August
More informationQUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project
QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project Project Overview... 2 Thalia Creek (Windsor Woods) Tide Gate... 6 Club House Road Drainage Project... 9 Updated
More informationFlorida Stormwater Association 2015 Annual Conference June 17 19, 2015
Presented by: Patricia Gertenbach, P.G. E Sciences Ryan Mitchell, P.E. E Sciences Danielle Straub, P.E. City of Melbourne Florida Stormwater Association 2015 Annual Conference June 17 19, 2015 Presentation
More informationTIRZ 17/Redevelopment Authority Capital Improvements Plan Projects
Gessner Widening: T-1701 What: Widen the road from a six-lane divided boulevard to an eight-lane divided boulevard street section, increase turn lanes, update traffic signal system, improve drainage by
More informationSTORMWATER UTILITY PRESENTATION November 18, 2014
STORMWATER UTILITY PRESENTATION November 18, 2014 AGENDA 1. Introduction 2. What is Stormwater 3. What is the problem with polluted runoff? 4. Local Environmental Initiatives 5. Current status to fund,
More informationThe City of Boynton Beach
The City of Boynton Beach presents Kinder-Gentler Stormwater Management Today s Presenters James A. Cherof, City Attorney Paul M. Fleming, Senior Project Manager Dale S. Sugerman, Assistant City Manager
More informationProject Descriptions for FY 15
Department of Transportation and Stormwater Services Stormwater Engineering and Design Division Project Descriptions for FY 15 43 rd Street Outfall PH II Pond Regional Drainage Improvement Flooding Relief
More informationUpdate on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.
AGENDA ITEM H-7 continued from 4/18 Public Works STAFF REPORT City Council Meeting Date: 4/18/2017 Staff Report Number: 17-081-CC Informational Item: Update on the Bayfront Canal Bypass Project Recommendation
More informationStormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division
Stormwater Regulations & Considerations Morse Study Area Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations Development Considerations Floodplain
More informationCOLLIER BOULEVARD (CR 951) CORRIDOR
Project(s) Goals Improve Traffic Circulation, Capacity & Safety Focus on Safety During Design & Construction Address Public Concerns Design an Aesthetically Pleasing Project Limit Environmental Impacts
More informationAppendix A Basin Inventory Summary
Appendix A Basin Inventory Summary Surface Water Management Element A-1 BASIN INVENTORY SUMMARY Pinellas County is divided into 52 individual watersheds. The following Basin Inventory Summary includes
More informationConst. ROADS - Description
Road Projects make up the bulk of the capital expenditures for the township. For the term of this CIP, road projects total $9,843,000 or 72.0% of the total capital expenditures for all capital projects
More information2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects
2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects Preservation / Structural Improvement Projects in 2018 Ravine
More informationBexar County Public Works Department Flood Control Program
Bexar County Public Works Department Flood Control Program Bulverde Rd. at Mud Creek Trib. A (SC-27) February 23 rd, 2016 Agenda Introductions Bexar County Flood Control (Engineering and PR) Office of
More informationAnne Arundel County s Severn River Watershed Implementation Strategy. Severn River Association
Anne Arundel County s Severn River Watershed Implementation Strategy Severn River Association Watershed Protection and Restoration Program Anne Arundel County Department of Public Works August 18, 2014
More informationGuiding Principles and Strategies for Penny IV Investments
Page 1 of 5 Building a Better Pinellas The Penny improves the day-to-day quality of life for those who live, work, play, and do business in Pinellas County by providing improved roads, bridges and trails,
More informationStormwater Project Meeting
Stormwater Project Meeting City of South Burlington Presentation by: David P. Wheeler and Emmalee T. Cherington, Assistant Stormwater Superintendents Tom DiPietro, Deputy Director of Public Works City
More informationMitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction
Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative Introduction Mitchell Ranch South is a proposed single family (detached) residential development on
More informationStormwater Master Plan Update. City Council Briefing January 8, 2019
Stormwater Master Plan Update City Council Briefing January 8, 2019 1 Stormwater Master Plan Update January 8, 2019 Agenda Background for Update Stormwater Modeling and Calibration Visualizations of Results
More informationSection 1 TABLE OF CONTENTS
Section 1 TABLE OF CONTENTS... [M]ineral fertilizer is essential to feed around half of the world s population, and will be fundamental to ensure global food security through the 21 st century. 2013 U.N.
More informationNYC Green Infrastructure Program
NYC Green Infrastructure Program Parks Without Borders May 24, 2016 NYC Water Quality Improvement Program $10B investment since the early 2000s has yielded the highest water quality observed in the NYC
More informationCARMODY PARK MASTER PLAN
the site Smith Reservoir Cottonwood Lake Kendrick Lake Carmody Rec Center Carmody Middle School Pool Court Play Carmody Pond Sanderson Ditch Sports Fields Foothills Ice Arena Open Field why a master plan?
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar
More informationA G E N D A Council Update Training Room September 26, :45 p.m.
CITY OF THORNTON CITY MANAGER S OFFICE A G E N D A Council Update Training Room September 26, 2017 5:45 p.m. A. Boards and Committees Reports (Estimated 20 Minutes) 1. Rangeview Library District Meeting
More informationConstruction Engineering & Inspection
Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over
More informationUSF System Campus Master Plan Updates Goals, Objectives and Policies
2015-2025 USF System Campus Master Plan Updates Goals, Objectives and Policies Tampa Goals, Objectives, and Policies Table of Contents Executive Summary 2015 2025 USF Campus Master Plan Update Introduction
More informationCAPITAL PROGRAM UPDATE
2015-2016 CAPITAL PROGRAM UPDATE Celebrate 2015 & Anticipate 2016 Biennium Invitation to Do Things Differently Partnerships More Important than Ever Communication Tonight s Presentation 2015 2016 Projects
More informationItem # Meeting Date: February 27, 2014 AGENDA MEMORANDUM To: From: Planning Commission Sandy Vossler, Planner II, Development Services Department Date: February 26, 2014 Title: The Lanterns Planned Development
More informationStatus Report for Parks and Recreation Capital Projects
Attachment #2 Town of Chapel Hill Status Report for Parks and Recreation Capital Projects Prepared by Bill Webster, Assistant Director Chapel Hill Parks & Recreation Department March 19, 2009 1. Athletic
More informationCity of Richland Stormwater Management Plan
City of Richland Stormwater Management Plan City of Richland Public Works Department 840 Northgate Drive Richland, WA 99352 2015 Nancy Aldrich Special Projects Coordinator City of Richland Public Works
More informationSustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5
Green Infrastructure Site Evaluation Friday, October 25 th, 2013 Sustainable Stormwater Management through Green Infrastructure Jersey City Public School #5 FORMAT: (15 minutes) An Introduction to Stormwater
More informationGetting the Locals to Go Along. Keys to Tulsa s Successful Floodplain Management
Getting the Locals to Go Along Keys to Tulsa s Successful Floodplain Management Presented by: Ronald D. Flanagan, CFM Principal Planner Flanagan & Associates, LLC Land-Use & Natural Hazards Planning Consultants
More informationPublic Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment
November 26, 2014 Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment Study Area & Drainage System Legend Coronation Project Park
More informationPlay areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.
City of Thornton Parks & Open Space Cherrywood Park Thornton, CO Architect: Design Concepts Construction of this seven-acre City park, located adjacent to Adams Twelve Five Star Prairie Hills Elementary
More informationROAD PAVING VARIOUS LOCATIONS LANE KM
ROAD PAVING VARIOUS LOCATIONS 9.317 LANE KM $1,465,200 General: $1,465,200 BASED ON CONDITION ASSESSMENTS OF THE ENTIRE ROAD NETWORK; USING ASSET MANAGEMENT PRINCIPLES, ROADS THAT ARE SUITABLE FOR REPAVING
More informationPortland International Airport Storm Water Master Plan April 6, 2016
Portland International Airport Storm Water Master Plan April 6, 2016 Susan Aha Senior Manager, Water Resources Brian Freeman Manager, Civil Engineering 1 Presentation Overview Why is storm water important
More informationThe bid shall include the following items: 1) Bidder s Name. Address. Telephone Number. Address. 2) The amount of the bid per acre to Mow.
Beautification and Rough Mowing Services Bid #066-17 The City of Lucas is seeking bids for Beautification and Rough Mowing Services on 30 acres of land. The Mowing Season is 40 week long between March
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Garden State Parkway, Interchange 67, at Bay Avenue, CR 554 NS0210 NS0210 This project will provide new and modified movements to the Garden State Parkway, Interchange 67 at Bay Avenue (CR 554). Currently,
More informationStorm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.
September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements
More informationARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET
A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -
More informationRequest for an Exception to the Napa County Road and Street Standards
F Request for an Exception to the Napa County Road and Street Standards Shed Creek Winery Use Permit P16-327 and Use Permit Exception to the Conservation Regulations P17-178 Planning Commission Hearing
More informationTigard. City TIGARD STORMWATER. ofn MASTER PLAN. Respect and Care Do the Right Thing Get it Done. Tualatin River Watershed Council
City ofn Tigard Respect and Care Do the Right Thing Get it Done TIGARD STORMWATER MASTER PLAN Tualatin River Watershed Council January 4, 2017 Tigard Stormwater Master Plan Why It s Needed Long Overdue:
More informationUrban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA
Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Lecture Today Urban Water management terms Examples of water management in urban areas Field
More informationIndex to Projects by Project Name
Index to Projects by Project Name 2062 1701 & 1711 Concord Avenue Purchase and Demolition of Structures 85 1279 1024 UF-802 UF-803 Affordable Housing 77 Annual CIP/TIP Management Program 105 Arnold Industrial
More informationPublic Information Centre. Welcome
Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff
More informationThe Benefits and Challenges Associated with Green Infrastructure Practices
The Benefits and Challenges Associated with Green Infrastructure Practices Thomas M. Evans ASLA, LEED AP Regional Green Infrastructure Design Services Director OWEA Technical Conference, June 20, 2013
More informationStormwater Outfall Inventory and Mapping City and Borough of Juneau
Stormwater Outfall Inventory and Mapping City and Borough of Juneau Date of field work: 5/08-9/08 Purpose of Project: The intent of the project was to inventory and assess existing outfalls along impaired
More informationWest Chester Borough Stream Protection Fee (SPF) Overview
West Chester Borough Stream Protection Fee (SPF) Overview Chester County Engineers Fall Conference November 2016 Outline Stormwater Runoff Why is it a problem in West Chester? How are we going to address
More informationCatherine Bray John Buss Manager City of Tallahassee/Stormwater Management
Florida Stormwater Association EXCELLENCE AWARD for STORMWATER PROGRAMS and PROJECTS NOMINATION FORM I. Nomination Information Nomination Category (please check only one box): Program (Department/Division)
More informationMOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010
MOBILE CITY PLANNING COMMISSION LETTER OF DECISION Archbishop of Mobile 400 Government St. Mobile, AL 36602 Re: Case #SUB2010-00075 (Subdivision) 3650 Springhill Avenue (Northwest corner of Springhill
More informationADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS
ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213
More informationStafford VDOT Cooperative Activities
Stafford VDOT Cooperative Activities February 21, 2012 General Areas of Cooperation Financial Road Safety & RTMP Design County Projects VDOT Projects Street Acceptance Rural Addition/Rural Paving Maintenance
More information5-Year Street Reconstruction Plan ( )
5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationTown of Yucca Valley Capital Improvement Projects Report July 24, 2014
Town of Yucca Valley Capital Improvement Projects Report July 24, 2014 SR 62 Traffic and Pedestrian Improvements from Apache Trail to Palm Avenue (PLHD) The project includes construction of curbs, gutters,
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the
More informationAbbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK
Municipality of Anchorage Community Council Survey ABBOTT LOOP COMMUNITY PARK This state funding request would be used to implement the remaining elements of the Community Park Master Plan Vision including
More informationPLANNING COMMISSION Work Session Meeting Agenda
PLANNING COMMISSION Work Session Meeting Agenda 5200 85TH AVENUE NORTH BROOKLYN PARK MN 55443 PHONE (763) 424-8000 FAX (763) 493-8391 Wednesday, September 27, 2017-7:00 P.M. Brooklyn Township Room If due
More informationFall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More informationCapital Projects in and near Odenton Town Center
Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately
More informationMaryland Association of Floodplain and Stormwater Managers. State of the State - Stormwater Management October 12, 2017
Maryland Association of Floodplain and Stormwater Managers State of the State - Stormwater Management October 12, 2017 Sediment, Stormwater, & Dam Safety Program Sediment and Stormwater Program Review
More informationFOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?
FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, 2018 Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP? Sign up for RCKC CONNECT to receive message alerts for road construction,
More informationTOWN OF WHITBY REPORT RECOMMENDATION REPORT
TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Council REPORT NO: PL 95-09 DATE OF MEETING: October 13, 2009 PREPARED BY: Planning/Public Works Joint Report FILE NO(S): N/A LOCATION: N/A REPORT
More informationLower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018
Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018 Public Involvement Summary: The planning process includes opportunities
More informationTOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 30, 2015 A. MUNICIPAL CAPITAL PROJECTS
TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE 4567 Route 9 North, 2 nd Floor Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 414-3243 Howell, NJ 07731-0580 Web: www.twp.howell.nj.us
More informationCarrboro Greenways Commission January 9 th, 2007
Carrboro Greenways Commission January 9 th, 2007 Statewide The flooding of Crabtree Valley in the early 1970 s (right before Crabtree Valley Mall was set to open) caused city, state, and federal officials
More informationPCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK
PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM
More informationA Review of Green Infrastructure Projects Implemented in the Grand Traverse Region
A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org Our Mission: The
More informationTHREE-YEAR CAPITAL IMPROVEMENT PLAN FY
THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering
More informationMetroParks Board Meeting 2018 Capital Improvement Projects
MetroParks Board Meeting 2018 Capital Improvement Projects Stephen L. Avery Planning & Operations Director Last Edited: 3.12.18 Presentation Outline MetroParks Mission Statement Strategic Master Plan MetroParks
More informationVentura County Stormwater Technical Guidance Manual
Ventura County Stormwater Technical Guidance Manual City of San Buenaventura Standard Construction Details c. Technical Guidance Manual for Stormwater Quality Control Measures d. County of Ventura Standard.
More informationNotice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project
of an Environmental Impact Report and Scoping Meeting for the As the Lead Agency, the County of San Mateo (County) will prepare an Environmental Impact Report (EIR) for the (project), and would like your
More informationFY Capital Improvement Program Arroyo Projects
FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 Hahamongna - Implement Master Plan - Oak Grove Area Improvements (7756) Hahamongna - Implement Master
More informationA LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS
A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS Chapter 1: 1.1 to LID 1.2 Manual Purpose and Application 1.3 Environmental Benefits of LID 1.4 Economic Benefits of LID Case
More informationManaging Stormwater within the Road Right-of-Way: An Urban NAI Approach
Turgay Dabak, Joni Calmbacher, Sara DeGroot, Andrea Ryon Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Presentation Outline Project Background Project Overview BMPs Evaluated
More information13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road
13. corner of 159 th Street and Quivira Road 1. APPLICANT: HNTB Corporation is the applicant for this request. 2. REQUESTED ACTION: The applicant is requesting approval of a preliminary plat for a 383-lot
More informationPOLE BRIDGE ROAD NEAR FIVE LOT FARM
Drainage Improvements Village of Avon Pole Bridge Road near Five Lot Farm December 2014 POLE BRIDGE ROAD NEAR FIVE LOT FARM Pole Bridge Road is the eastern border of the Village south of NYS route 5 &
More informationI-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status
I-95 Girard Avenue Interchange Project Status Construction is underway for Phase 1 and 2. Phase 3 construction will begin early 2014. Overall Project Area and Schedule GR0: Completed GR0: Completed in
More informationCAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013
Office of Capital Planning and Development; 130 Oak Creek Building; Corvallis, Oregon 97331-2001 CPC STAFF REPORT: SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN
More informationROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP)
ROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP) 1.0 INTRODUCTION This Stormwater Management Program (SWMP) for Rogue Valley Sewer Services (RVS) has been developed to meet the Municipal
More information2017 Asphalt Contractors Association of Florida Pavement Awards
2017 Asphalt Contractors Association of Florida Pavement Awards Special Projects Any project of a special or unique nature requiring specialized equipment, techniques, materials, time restrictions, or
More informationFloodplain Technical Memorandum
Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter
More informationPrado Ranch North Common Open Space Tentative Map. Washoe County Planning Commission July 3, 2018
Prado Ranch North Common Open Space Tentative Map Washoe County Planning Commission July 3, 2018 Site Characteristics Intersection of Chickadee and Lemmon Drive ~1 mile north of Deodar/Lemmon Drive intersection
More informationSECTION 4(f) DE MINIMIS DOCUMENTATION
SECTION 4(f) DE MINIMIS DOCUMENTATION Illinois Route 60/83 IL 176 to the intersection of IL 60 (Townline Road) Lake County P-91-084-07 Mundelein Park and Recreation District Project Limit SECTION 4(f)
More informationDESIGN CRITERIA PACKAGE
RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA
More informationMASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS
MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct
More informationMariposa Lakes. Planned Community. Project Overview. Stockton, CA
Planned Community Stockton, CA Project Overview March 2007 Summary of Proposed Community is a master-planned community proposed for development on approximately 3,810 acres in southeast Stockton. In 2004,
More informationMcDaniel Creek Master Plan
McDaniel Creek Master Plan UNIVERSITY AVE., PITTSBURGH NEIGHBORHOOD AND THE MCDANIEL CREEK WATERSHED 60 ANSLEY MALL AND THE CLEAR CREEK GREENWAY 61 INTRODUCTION The BeltLine Subarea 6 site lies within
More informationAugust 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT
7 August 13, 2009 TO: FROM: Mayor and Council City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT The Director of Public Works and his fine staff prepared and submitted to you a good overview
More informationSTORMWATER UTILITY FREQUENTLY ASKED QUESTIONS
STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS What is Stormwater? Stormwater is water that falls to the ground during a precipitation event. When land is undeveloped or covered with vegetative surface,
More information