1 North Wales Wind Farm Connections Route Corridor Report May 2013

2

3 Contents Section 1.0 Section 2.0 Section 3.0 Section 4.0 Section 5.0 Section 6.0 Figures: Figure 1.1 Figure 1.2 Figure 4.1 Figure 4.2 Figure 4.3 Figure 4.4 Figure 4.5 Figure 4.6 Figure 4.7 Figure 4.8 Figure 4.9 Figure 4.10 Figure 4.11 Figure 4.12 Introduction Approach & Routeing Principals Overview of Routeing Methodology Application of Routeing Methodology Findings of Corridor Appraisal Conclusion Wind Farm Development Connection Types: Double Wood Poles, Steel Tower, Undergrounding Project Study Area Highest Environmental Value Technical Constraints Landscape Sensitivity (LANDMAP) Broad Route Corridors Biodiversity and Geology Landscape and Visual Resources Field Based Landscape Sensitivity Historic Environment Residential Amenity Flood Risk Appendices: Appendix 1: Appendix 2: Appendix 3: Forestry and Woodland The Holford Rules Visibility Appraisal Corridor Appraisal Tables Route Corridor Report 43

4 St Asaph Substation Moel maelogen Llys Dymper Gorsedd Bran Brenig Tir Mostyn Clocaenog Foel Goch Nant Bach Derwedd Bach Wern Ddu Braich Ddu Myndd Mynyllod Key: Key: County Boundary Study Area County Boundary Study Area TAN8 Strategic Renewables St Asaph Substation TAN8 Strategic Renewables St Asaph Substation Energy Areas Energy Areas Proposed Proposed Wind Wind Farm Substation Farm Substation Distribution Distribution Network Network Existing Existing Wind Wind Farm Farm 400kV Overhead 400kV Lines Overhead Lines Possible Possible Wind Wind Farm requiring Farm requiring SP Connection SP Connection 132kV Overhead 132kV Lines Overhead Lines 33kV Overhead 33kV Lines Overhead Lines Figure 01 - Wind Farm Development North Wales Wind Farms Connection

5 Section 1.0: Introduction Overview of the Project 1.1 In July 2005, the Welsh Assembly Government (WAG) published Technical Advice Note No 8 Planning for Renewable Energy (TAN 8). This document identified seven broad Strategic Search Areas (SSAs) for onshore wind farms in Wales. Four of these are in the SP Manweb network operating area. Of these, TAN 8 SSA A is in North Wales as shown in Figure Following publication of TAN 8, four wind farm developers have applied and agreed terms for SP Manweb to provide them with connections to the electricity grid network. As discussed in SP Manweb s Strategic Systems Options Report, after consideration of a number of options, these terms are based on SP Manweb providing a collector substation, to connect the power from the wind farms to a shared 132kV single circuit overhead line connection to the national transmission network at St Asaph. 1.3 The four contracted wind farm connections and their approximate Megawatt (MW) outputs are detailed below and shown in Figure 1.1. All wind farms are located within TAN 8 SSA A. Clocaenog Forest (SJ013578) RWE NPower renewables have submitted a Development Consent Order application to the Planning Inspectorate to develop a new wind farm in Clocaenog Forest in North Wales. The forest is managed by Forestry Commission Wales on behalf of the Welsh Assembly Government. Clocaenog Forest wind farm is expected to generate between 64 and 96 MW, from 32 turbines. The turbines will have a total height (to tip) of 145m. The application was submitted at the end of March Brenig (SJ021742) In February 2007, Brenig Wind Ltd received consent to build a 16 turbine wind farm at Llyn Brenig, with an installed generating capacity of 40MW. The turbines will have a total height (to tip) of 100m. Nant Bach (SJ989470) In July 2011, Vattenfall received consent to build an 11 turbine wind farm at Nant Bach, with an installed generating capacity of up to 27.5 MW. The turbines will have a total height to tip of 100m. The 33kV connection to the SP Manweb collector hub will run underground through the Clocaenog Forest. Derwedd Bach (SJ030500) Tegni received consent to build a 10 turbine wind farm at Derwedd Bach, with an installed generating capacity of 23 MW. The turbines will have a total height to tip of 120.5m. The windfarm connection to the SP Manweb collector hub will run underground through the Clocaenog Forest. 1.4 The proposed 132kV overhead line will connect into the recently extended SP Manweb substation at St Asaph (SJ021742). Because the connection can be accommodated within the SP Manweb ownership boundary, it is permitted under Part 17 Class G of the Town and Country Planning (GPD) 0rder 1995 and therefore no formal consent is required for the substation works at St Asaph. 1.5 As the project is required to connect new generation to the distribution network, the study is based on the current (April 2013) understanding of the status of the developers connection agreements. Under the terms of its distribution licence, SP Manweb is under contract to design and build the overhead line by the end of Route Corridor Report 1

6 Double Wood Poles p Double wood poles average 15m in height and are spaced on average 100m apart. 15m p The poles carry three cables with an additional earth wire. The conductors are supported on a steel structure which sits on top of the double wood poles. p This method of connection offers the greatest potential for sensitive routeing, in hilly, small scale landscapes. Steel Towers L4 p L4 towers average 26m in height and are spaced on average 180m apart. The tower is slender in profile with a narrow base (4m x 4m). The towers can either be single circuit, carrying a 132kV line on one side, or double circuit, carrying two 132kV lines, one on either side. p Steel towers offer less scope for sensitive routeing and are more suited to expansive, relatively flat landscapes. Their longer spans make them useful for crossing steep sided valleys which would be too steep for wood poles. 1.5m Minimum 2.0m Undergrounding p The trench for an underground cable is approximately 1.5m wide. In agricultural land the overall working width would be approximately 15-20m. Cables can be laid in ducts in roads or across agricultural fields. p Undergrounding may be appropriate where there are serious concerns about the potential adverse landscape and visual effects of an overhead line. Figure 1.2- Connection Types: Double Wood Poles, Steel Tower, Undergrounding 2 North Wales Wind Farms Connection

7 1.6 This Route Corridor Report, which has been prepared by Gillespies LLP on behalf of SP Manweb, forms part of SP Manweb s project development. Its aim is to: p Outline the type of development for which routeing is required. p Set out the routeing methodology used to develop the routeing options. p Identify and assess the technical, economic, planning and environmental constraints to be taken into account in developing routeing options. p Identify, describe and appraise routeing options, culminating in the selection of a Preferred Option. About SP Manweb 1.7 SP Manweb is part of the ScottishPower group of companies responsible for the distribution of electricity in North Wales and is the network license holder for North and Mid Wales and Merseyside, Cheshire and parts of Shropshire. SP Manweb also maintains and manages the network in the same areas. 1.8 Within North Wales, SP Manweb works with customers who may require a connection for additional electricity supply or are looking to provide generation, which needs to be exported onto the network. Section 16 of the Electricity Act 1989 requires SP Manweb to provide such connections as and when it is asked to do so by any of its customers and this can lead to new network being built in areas where it doesn t exist already. 1.9 SP Manweb has established an approach to developing connection projects, which takes account of statutory procedures as well as the company s own objectives for achieving wideranging consultation throughout the project planning stages. The process starts by considering strategic scheme alternatives for connecting a customer onto the electricity network and then, once a preferred alternative is identified, work begins on identifying and appraising a number of route options. This then progresses to the selection and identification of a Preferred Route prior to formal Environmental Impact Assessment (EIA) and production of an Environmental Statement (ES). Other Planned & Existing Wind Farms 1.10 Additional wind farm developers have also been in discussion with SP Manweb for connections onto the grid in and around SSA A. These developers are at different stages of the planning process and do not have signed connection agreements with SP Manweb. As such, they are not currently included in this project. The location and status of these projects (as of Spring 2013), together with existing wind farms in the area, is detailed below and shown in Figure 1.1. p Gorsedd Bran scheme refused on appeal. Llys Dymper submitted to Conwy Council. p Mynyd Mynyllod request for scoping submitted to IPC. p Moel Maelogen existing wind farm with 33kV overhead line to Llanwrst. p Tir Mostyn and Foel Goch existing wind farm with 33kV cable to Denbigh (25 turbines 21.25MW) 1.11 The routeing methodology has necessarily remained flexible to take account of these other wind farms and respond to any changes in the status of their connections. It will not now include any new wind farm connections as the circuit capacity is full with the four wind farms that have signed connection agreements. Any new wind farm will require a separate connection onto the Grid. Project Description 1.12 The proposed corridors from the collector substation in the vicinity of the wind farms to the national transmission network at St Asaph, would allow for the connection to be made by overhead lines, underground cables or a combination of the two. Overhead lines could be built on steel towers (pylons) or double wood poles however the farmland through which the majority of the line would be built is considered to be more suitable for wood poles than steel towers. Steel towers may be considered in selected locations for example, crossing steep sided valleys such as the Elwy. Wood poles are preferred where technically feasible as they are less visually intrusive, less likely to be visible on the skyline and are more flexible for detailed routeing, providing a better fit with the landscape. Undergrounding may be appropriate where there are technical difficulties or serious concerns about the potential adverse landscape and visual effects of an overhead line. Route Corridor Report 3

8 1.13 The wood pole overhead line design proposed for the 132kV circuit is of double wood pole (OHL ) design. These double wood poles have a maximum angle of line deviation of 35 degrees and are particularly suited to wind farm connections, which tend to be on higher ground and are subject to more adverse weather conditions. They are generally 15m in height (i.e. a 12.5m pole with 2.5m in the ground) and have an average span length of around 80m. However, both the height and span can be extended or reduced, as required to meet statutory clearance requirements or to address factors such as sloping ground. The poles carry 3-phase conductors (cables) in a single circuit network with an underslung earth wire, which incorporates a fibre optic cable for protection signaling and communication purposes. The four conductors are supported on a steel structure which sits on top of the double wood pole and are made of aluminium with the phase conductors having an overall diameter of 24mm and the earth/ fibre optic wire being 14mm in diameter Where necessary to overcome technical issues, steel towers may be used. These are lattice towers of the L4 series, which are used widely across the UK. They are generally 26m in height and support three conductors (wires) suspended from the side arms of each tower with a four earth/fibre optic wire usually carried across the top of the towers. The towers have a standard height of 26m with a span of approximately 200m, but these dimensions can be extended or reduced as required, to meet statutory clearance requirements or to address factors such as sloping ground Underground cables may also be required to overcome technical issues or in areas of highest visual sensitivity. The trench for the underground cable is approximately 1.5m wide, with a working width for installation of 15-20m if a haul road is required. Cables can be laid in ducts in roads or across agricultural fields The three proposed connection methods are illustrated in Figure 1.2. Role of this Document 1.17 This Route Corridor Report is part of a suite of documents, which will be developed over the course of the project and together demonstrate SP Manweb s commitment to developing a technically feasible and economically viable overhead line route, which causes the least disturbance to the environment and the people who live work and recreate within it. The suite of documents is outlined below, however these documents are not all currently complete and will be made available over time. p Strategic Options Report - This document provides evidence of the need for the wind farm connections and sets out the strategic system options considered by SP Manweb for connecting the wind farms to the distribution network. A summary of the options considered and conclusions reached is set out below. p North Wales Wind Farm Connection Strategic Environmental Alternatives - The purpose of this report is to inform the connection strategy by comparing a number of connection options from a landscape and visual perspective. p Relative Landscape Sensitivity in Relation to 132kV Overhead Lines - This sets out an appraisal of the study area in terms of its theoretical landscape sensitivity to accommodating overhead lines of the type proposed. p Route Corridor Report (this report) - This document forms the basis for the preapplication consultations and is supported by the Baseline Appendix, covering Landscape, Ecology and Cultural Heritage. p Substation Siting Report This document carries out an appraisal of the potential siting locations for the collector substation at Brenig. p Statement of Community Consultation (SOCC) - This document sets out the SP Manweb s agreed strategy for consultation - providing details of when, where, how and with whom does the consultation take place, including details of how feedback will be provided. p Feedback Report This report sets out the consultation undertaken and the feedback received to date. It will be followed by further feedback reports as the consultation process moves forward in line with the SOCC. p Consultation Report - This Reports document the outcome of the consultation(s) and SP Manweb s response to them. p Environmental Statement - The project falls within the scope of the Electricity Works (Environmental Impact Assessment) (England and Wales) Regulations 2000 (Amended 2008) and the Infrastructure Planning (Environmental Assessment Regulations) These require formal Environmental Impact Assessment (EIA), with production of an Environmental Statement (ES) and accompanying Screening and Scoping Reports. 4 North Wales Wind Farms Connection

9 Strategic Options 1.18 SPM s Strategic Options Report (May 2013) presents the system option studies undertaken to identify the new network and infrastructure required to facilitate the customer connections. As the capacity of the existing network in the area is already fully utilised by the existing connected wind generation, the North Wales Wind Farms connection will require new infrastructure in the form of an additional 132kV circuit and new 33/132kV substation A number of options were considered to connect the four wind farms onto the existing grid network. Existing grid substations sites with the potential to connect to were considered in Wrexham and Flintshire as well as the chosen site at St Asaph The evaluation set out in the Strategic Options Report has confirmed that a new 33/132kV substation and a new 132kV circuit from SSA A to St Asaph are the appropriate distribution network reinforcements. This option is considered to be the most efficient, co-ordinated and economical way to connect wind generation in North Wales. The route corridor studies have been undertaken on this basis. Undergrounding 1.21 SP Manweb has a licence obligation to develop an efficient, coordinated and economical system. An overhead line solution typically facilitates compliance with these obligations. Overhead line solutions are more economical than cable alternatives to develop, as well as providing shorter return to service times under fault conditions SP Manweb accepts however that the justification for undergrounding should be considered on a case by case basis. These considerations would take into account cost and system design requirements, and the specific factors involved in each particular proposal, such as areas of high technical environmental constraint and areas of the highest recognised amenity value For 132kV projects cost estimates for underground cables are approximately four times more expensive than overhead lines. This can vary depending on ground conditions with it being more expensive to install cables within roads. It must also be recognised that the use of cable sections within a connection introduces additional technical issues within the network In terms of high amenity value, the approach in this project has been to develop a routeing methodology with the objective of avoiding areas of highest environmental value where possible. This has resulted in route corridor options, as presented in the consultation, considered to be environmentally viable for the purposes of routeing overhead lines On the basis of the above, SP Manweb concludes that the economical cost of a wholly undergrounded option is not outweighed by the cost of the environmental impacts. However SP Manweb has not ruled out using some cable sections. The extent of cabling required will be guided by the outcome of more detailed environmental assessments in respect of the line design. Statutory Consenting Requirements 1.26 The Planning Act 2008 (as amended by the Localism Act 2011) (the Act) amended the existing planning system in England and Wales for consenting overhead lines The Act established the Planning Inspectorate within the National Infrastructure Directorate (NID) as the body responsible for examining and deciding development consents for large-scale infrastructure proposals, which qualify as Nationally Significant Infrastructure Projects (NSIPs). In accordance with Section 14(1)(b) of the Act, overhead lines installed above ground with a nominal voltage of greater than, or equal to, 132kV were considered NSIPs, to be determined by the Planning Inspectorate in accordance with the requirements of the Act. The overhead line component of this project falls within the parameters of a NSIP Applications will be determined in the context of the National Policy Statements, designated in July Those relevant to the North Wales Wind Farms Connections project are the Overarching National Energy Infrastructure Policy (EN-1) and draft Electricity Networks (EN-5) The Substation component of this project is not classed as a NSIP and the planning application will therefore be determined by the Local Authority, in this case Denbighshire County Council. The potential location of the substation is discussed in more detail in the separate Substation Siting Report. Structure of the Report The structure of the report is as follows: Section 1.0 Introduction Section 2.0 Approach & Routeing Principals Section 3.0 Overview of Routeing Methodology Section 4.0 Application of Routeing Methodology Section 5.0 Findings of Corridor Appraisal Section 6.0 Conclusion Route Corridor Report 5

10

11 Section 2.0: Approach & Routeing Principals SP Manweb s Statutory Duties 2.1 As holder of the distribution licence for North Wales, SP Manweb has a statutory duty, under Section 9 of the Electricity Act 1989, to: develop and maintain an efficient, coordinated and economical system of electricity transmission. 2.2 Under Section 38 and schedule 9 of the 1989 Act, when planning new works, SP Manweb is also required to: To have regard to the desirability of preserving natural beauty, of conserving flora, fauna and geological or physiographical features of special interest and of protecting sites, building and objects of architectural, historic or archaeological interest. Do what it reasonably can to mitigate any effect which the proposals would have on the natural beauty of the countryside or on any such flora, fauna, features, sites, buildings or objects. Approach 2.3 The approach adopted for this project builds on SP Manweb s experience in routeing overhead electricity transmission and distribution lines and uses established routeing methodologies. Recent SP Manweb projects in Wales include individual 132kV overhead line wood pole connections at Rhyl Flats (built), Llandinam (proposed) and Legacy/Oswestry (planned) and an ongoing major connection project for a number of wind farms in Mid Wales, comprising both tower and wood pole designs. 2.4 SP Manweb s approach is based on the principal that the major effects of an overhead line result from the individual or cumulative visibility of the towers or wood pole support structures along the route. The effects experienced by viewers vary depending on parameters such as viewing distance, cumulative effects, design, skyline position or backdrop. Since there is no technical way of reducing visual effects other than choice of towers or poles and only limited ways of achieving screening through planting, the most effective way of reducing visual intrusion is by careful routeing. 2.5 The approach developed for routeing the overhead line therefore takes account of the following: p The Holford Rules, together with the National Grid Company and Scottish Hydroelectricity Ltd (SHETL) clarification notes. p R. Marshall s and R. Baxter s 2002, Strategic Routeing and Environmental Impact Assessment for Overhead Electrical Transmission Lines. p Discussions held by SP Manweb with Conwy Council, Denbighshire Council and Wrexham Council. p Discussions held by SP Manweb with NRW, Cadw and Denbighshire Council. p Discussions held by SP Manweb with Forestry Commission Wales. p SP Manweb s recent experience of routeing overhead lines in Wales including the Mid Wales Connections Routeing Study (2009-ongoing), Llandinam ( ) and Tirgwynt ( ). 2.6 The methodology comprises a number of broadly sequential steps (see flow chart below). As the Preferred Route must be technically and economically viable, the following checks are undertaken at each step: p A review by SP Manweb s engineering design team p A review by SP Manweb in relation to other connections being developed within the study area. 2.7 It is important to note, however, that the methodology is iterative in nature, with the output of one stage informing the routeing and appraisal work of subsequent stages. Steps may be re-visited several times before a balance is achieved between technical, economic, planning and environmental considerations, with professional judgement being used to balance the factors. Flexibility is also required to allow any other connections that have been agreed, any changes to existing SP Manweb connections and any other connections that have come forward within the planning process. 2.8 Considerations, which have informed the development of the routeing methodology, are outlined below. Technical Considerations 2.9 Technical considerations relate to both construction and operation of the overhead line. They include the location of operational and proposed turbines, existing overhead lines, altitude, rock outcrops, flood risk areas, steep slopes and peat deposits. Whilst not all of these technical considerations are absolute constraints, there is a presumption to avoid them wherever possible. The approach taken is to identify preferred environmental options informed by a staged review of technical issues. Route Corridor Report 7

12 2.10 Further details in relation to these technical constraints are provided within Step C of Chapter 4.0. Economic Considerations 2.11 In compliance with Section 9 of the Electricity Act 1989, the proposed connections must be economical. This is interpreted by SP Manweb as meaning that as far as is reasonably possible, and all other things being equal, the connections should be as direct as they can be, and the routes should avoid areas where technical difficulty or compensatory requirements would render the schemes uneconomic. Planning Considerations 2.12 A number of current planning policies set the context within which electricity infrastructure proposals must be considered. These include UK wide and Welsh policy considerations such as the National Policy Statements (NPSs), the WAG Technical Advice Notes (TANs) and other planning policies and technical advice At a local level, the area is covered by two planning authorities. Denbighshire County Council covers the southern, eastern and northern parts of the study area and Conwy County Borough Council covers part of the western half. Both councils are currently in the process of producing Local Development Plans (LDP), to replace their current adopted development plans. Denbighshire have submitted their LDP to the Planning Inspectorate and are carrying out updates and Conwy are looking to adopt their LDP by August For Denbigh, the Unitary Development Plan is the current adopted plan. For Conwy the current adopted plans comprise the Clwyd Structure Plan Second Alteration (Conwy Version), the Gwynedd Structure Plan, the Colwyn Borough Local Plan and the Llandudno/Conwy District Plan. Until 2004, the Council was preparing the Conwy Unitary Development Plan, which would have replaced the four adopted plans. Following advice from the Welsh Assembly Government, work on this plan has now ceased. Whilst it carries less weight than an adopted plan, it is still used in some circumstances in deciding planning applications The local plans refer to a number of planning policies and land allocations, which may have implications for routeing overhead lines in the area. These include: p Flood Risk Areas p Housing Allocations p Employment Allocations p Mineral Sites p Green Barriers/Protected Open Spaces p Open Space/Recreational Allocations Environmental Considerations 2.16 Statutory duties imposed by Schedule 9 of the Electricity Act 1989 require licence holders to seek to preserve features of natural and cultural heritage interest and mitigate where possible any effects which their development may have on such features. The construction and operation of the overhead line will potentially have effects on the environment and the people who live, work and recreate within it, including effects on: p Geology and Hydrology p Soils, forestry and agriculture p Visual amenity and views p Landscape character p Tourism and recreation p Ecology including woodlands p Cultural heritage including archaeology p Traffic and transport p Residential amenity p EMF s and noise 2.17 Some of these environmental considerations are given more consideration at the later, more detailed, routeing and EIA stages. Consultation Feedback Considerations 2.18 The SOCC will set out the SP Manweb s agreed strategy for formal consultation, including details of how feedback will be provided throughout the development of the project. Statutory agencies with an environmental remit including NRW, CADW, the Environment Agency Wales and Denbighshire and Conwy County Councils were advised of the emerging corridor designs and invited to respond to assist SP Manweb with its choice of preferred corridor The SOCC will also set out how future Public consultation events will be managed and feedback from the five public exhibitions in June 2012, three meetings with Community Councils and a further public exhibition in January 2013 have been recorded and analysed in the Feedback Report This feedback has been used to appraise the proposed corridors and assist SP Manweb with its choice of preferred corridor. 8 North Wales Wind Farms Connection

13 Section 3.0: Overview of Routeing Methodology 3.1 This chapter sets out the methodology for the identification of potential route corridors, the appraisal of those corridors and the identification of a preferred route corridor. It adopts the methodology developed by LUC and Gillespies for the current Mid Wales Connections Project for SP Manweb, adjusted as required to be appropriate to the North Wales Wind Farms Connection project. Approach 3.2 The primary objective of route selection is to identify a technically feasible and economically viable overhead line route between specified points, which causes the least disturbance to the environment, and to the people who live, work, visit and enjoy the area. 3.3 The methodology for this study has been developed to meet the specific needs of this study although it builds upon SP Manweb s experience in planning and constructing new overhead line connections in Wales, England and Scotland and is based on both established methodologies and best practice. The approach is iterative and the steps taken may be revisited several times, applying professional judgement in order to achieve the best balance between environmental, technical and economic considerations. Consultation is an inherent part of the process as set out in the Statement for Community Consultation and supporting feedback reports. 3.4 SP Manweb s approach to routeing is based on the principle that the major effect of an overhead line relates to the visibility of the wooden poles or steel towers and the associated insulators and conductors. The effect experienced by a viewer will vary along the route corridor, dependant on factors including viewing distance, cumulative impact, design, skyline position and backdrop. Visual impact can be reduced through the choice of tower or pole(s) and through limited opportunities for screen planting; however the most effective way of reducing the degree of visual intrusion is by careful routeing. Key Steps & Objectives 3.5 The steps used in developing a methodology to identify potential routes for the overhead line were developed based on the hierarchical Holford Rules, which were adapted to reflect the characteristics of the study area. The key steps of the routeing methodology for this project are summarised below. Steps were undertaken sequentially, with each step informing the next, culminating in the identification of a Preferred Route for the connection. 3.6 Further details of each step are provided in Chapter 4.0: Implementation of The Routeing Methodology. 3.7 In developing the methodology, the main objectives were to: Technical Review p Develop a methodology, which takes account of commercial considerations and the regulatory framework. p Ensure that the project is responsive to changing design scenarios, which may emerge from SP Manweb connection agreements within TAN 8 SSA A. p Progressively refine the potential options for the route of the overhead line, culminating in a Preferred Route. 3.1Phase One Step A: Identification of Broad Study Area Step B: Identification of Areas of Highest Environmental Value Step C: Identification of Technical Considerations Step D: Identification of Route Corridor Search Area Step E: Identification of Route Corridors 3.1Phase Two Step F: Comparative Appraisal of Route Corridors Step G: Identification of Route Options Step H: Appraisal of Route Options to Identify Preferred Route Routeing Methodology Key Stages Consultation Route Corridor Report 9

14 Established Practice for Overhead Line Routeing The Holford Rules 3.8 It is generally accepted across the electricity industry that the guidelines developed by the late Lord Holford in 1959 for routeing overhead transmission lines, The Holford Rules, should continue to be employed as the basis for routeing high voltage overhead lines. The Holford Rules were reviewed circa 1992 by the National Grid Company (NGC) plc (now National Grid Transmission (NGT)) as owner and operator of the electricity transmission network in England and Wales, with notes of clarification added to update the Rules. 3.9 A subsequent review of the Holford Rules (and NGC clarification notes) was undertaken by Scottish Hydro Electric Transmission Limited (SHETL) and SP Transmission Ltd (SPT) in This review concluded that the Holford Rules should be used as originally formulated but with the NGC s notes of clarification modified and expanded to meet Scottish circumstances. Given the similarities between the Scottish and Welsh landscapes, the SHETL and SPT approach is considered relevant as the basis for this routeing study. References to the Holford Rules throughout this document therefore mean the Holford Rules (with NGC and SHETL notes). To relate to the Welsh situation, the SHETL and SPT notes have been amended where reference is made to designations. The Holford Rules and NGC and SHETL clarification notes are included in Appendix Whilst the Holford Rules relate specifically to steel tower lines, many of the principles can also be used as a guide to routeing wood pole connections. LANDMAP 3.11 LANDMAP 1 is an information system devised by the Natural Resources Wales (NRW), which comprises the nationwide collation and evaluation of information about the landscape, for use as a reference tool in developing landscape policy and assessing development schemes in the context of landscape impact. LANDMAP is advocated by Planning Policy Wales (PPW, 2002) which sets out the land use policies for the Welsh Government. PPW establishes the Government s objectives for conservation and improvement of natural heritage, in particular the protection of native habitats, trees and woodlands and landscapes with statutory designations LANDMAP provides detailed spatial information about five related datasets or aspects : p Geological Landscape: the study of the geology, geomorphology and hydrology of the area. p Landscape Habitats: the distribution of vegetation and habitats and the basis for landscape ecology. p Visual & Sensory: identifies those landscape qualities that are perceived through the senses. It deals with the individual physical attributes of landform and land cover, as well as their visual patterns of distribution and sensory characteristics, and the relationships between them in a particular area. p Historic Landscape: focuses on how archaeological and historical sites relate to each other and to the surrounding landscape. p Cultural Landscape: considers the relationship that exists between people and places; how people have given meaning to places, how the landscape has shaped their actions and their actions have shaped the landscape Information is provided at several levels, allowing examination of broader areas (Level 2) and then a more detailed examination at Level 3. LANDMAP datasets recently achieved complete coverage of Wales and are now able to be considered in emerging projects A series of LANDMAP Guidance Notes provide advice on how LANDMAP can be used within a particular context. Whilst there is no specific guidance on the use of LANDMAP in routeing overhead lines, SP Manweb views LANDMAP as an invaluable tool in informing each step of the routeing process, in part as a resource for baseline environmental information but particularly as an appraisal/evaluation tool in the more defined routeing stages. On this basis, LANDMAP is used to inform the determination of landscape sensitivity as part of the initial stages of the routeing study (namely Steps A-E) with the use of LANDMAP also being proposed for the appraisal of the route corridors (Step F). Further to this, LANDMAP will also be used during detailed routeing (Steps G and H) and again as part of the EIA phase in terms of the assessment of likely significant environmental effects arising from the North Wales Wind Farms Connection project in accordance with the Infrastructure Planning (Environmental Impact Assessment) Regulations LANDMAP data and background information is obtained from 10 North Wales Wind Farms Connection

15 Route Corridor Report 11

16 St Asaph Substation St Asaph Mynydd y Gaer (270m) Clwydian Range AONB Moel Fodiar (390m) Moel Tywysog (400m) Denbigh Foel Greon (390m) Foel Gasyth (378m) Pentre-Llanrhaeadr Vale of Clwyd Brenig Clocaenog Llyn Brenig Clocaenog Forest Key: Study Area St Asaph Substation Project Wind Farm Substation Town County Boundary Hill Peaks TAN 8 SSA - Area A AONB Forestry Comission Owned Open Access Land Wind Farm Turbines: Foel Goch Tir Mostyn Figure Project Study Area 12 North Wales Wind Farms Connection

17 Section 4.0: Application of Routeing Methodology Step A: Identification of Broad Study Area 4.1 The first step of the routeing process is to identify a broad study area, predominantly for the purposes of gathering data. In identifying the broad study area, it is important that this reflects known technical, economic, planning and environmental parameters at the outset, whilst retaining the flexibility to ensure that routeing is not constrained in any way by these parameters, through application of the iterative process outlined above. 4.2 The broad study area includes the maximum area across which a potential connection route was likely to be routed. It therefore included the proposed Clocaenog Forest and Brenig wind farms, which comprised the project as at December 2010, the northern part of TAN 8 SSA A and the existing St Asaph substation. Two additional wind farms at Nant Bach and Derwedd Bach are now included within the project, but as these lie to the south of the proposed study area and will be connected by underground cable the study area has not been extended to include them. 4.3 The study area is based upon making an informed decision about practical connection routes throughout the area, influenced by the distribution of higher ground and lower valleys. 4.4 Based on the parameters outlined above, the broad study area for the project is shown in Figure 4.1. The broad study area is the output of Step A. It was subject to review by SP Manweb, before being progressed to inform Step B. Step B: Identification of Areas of Highest Environmental Value 4.5 Areas of Highest Environmental Value were mapped to further focus the study area, to highlight potential search areas for broad route corridors and identify potentially constrained areas. 4.6 This approach reflects the guidelines presented in The Holford Rules (as referred to in NPS EN-5), which have been adapted to reflect the characteristics of the study area for this project as described below. However where the Holford Rules use the term amenity this routeing study uses the term environmental to reflect more recent thinking which aims to recognise the intrinsic value of such areas. 4.7 The Holford Rules are broadly hierarchical, with Rule 1 deemed the first rule to be considered in routeing. Rule 1 relates to the avoidance, where possible, of major areas of highest amenity value. Holford Rule 2 makes the following recommendation: avoid smaller areas of high amenity value or scientific interest by means of deviation. As the Holford Rules do not define what constitutes a major area (Rule 1) and the importance of an area is often irrespective of size, smaller areas (Rule 2) of high amenity value are also mapped at this stage alongside the larger areas. 4.8 The Holford Rules do not identify which designated areas constitute areas of highest amenity value. However, SHETL clarification note b) states that areas of highest amenity value require to be established on a project-by-project basis considering Schedule 9 of the Electricity Act, 1989 and provides examples to be considered. 4.9 The National Policy Statement EN-1 sets out a need to avoid the most important environmental sites, including those designated at international, European and national level. However the need to give due consideration to sites of regional and local importance is also outlined in EN-1, although these designations should not be used in themselves to refuse consent Areas of highest environmental value located within the broad study area, and therefore considered within the routeing process, comprise the international, European and national level designations listed below and shown on Figure 4.2: p Areas of Outstanding Natural Beauty (AONBs) p Special Areas of Conservation (SACs) p Sites of Special Scientific Interest (SSSIs) p National Nature Reserves (NNRs) p Regionally Important Geodiversity Sites (RIGS) p Scheduled Monuments (SAMs) p Historic Landscapes p Registered Parks and Gardens p Conservation Areas p Listed Buildings Route Corridor Report 13

18 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Tow n Listed Buildings Conservation Area Scheduled Monuments Registered Parks & Gardens Parks & Garden - Essential Setting AONB Figure Highest Environmental Value RIGs Areas SAC SSSI NNR Historic Landscapes 14 North Wales Wind Farms Connection

19 4.11 The following international and national level designations are not present within the broad study area: p National Parks p Ramsar Sites p Special Protection Areas (SPAs) p World Heritage Sites p Registered Battlefields (not presently defined in Wales) 4.12 Whilst Historic Parks and Gardens are nonstatutory designations, they are referred to in the notes accompanying Holford Rule 1, and these designated areas are included as Areas of Highest Environmental Value Similarly Conservation Areas (a local level designation) and clusters of Listed Buildings, are included as Areas of Highest Environmental Value, as these correspond generally with population centres and are listed as examples of areas of highest amenity value. Individual buildings will be considered during the later routeing stages when deviation around them is required The Supplementary Notes to the Holford Rules state avoid routeing close to residential areas as far as possible on grounds of general amenity. At this stage in the routeing study, principal settlements, towns and villages as identified in the relevant local plans (Denbighshire and Conwy) are mapped and included as constraints at this level as areas of primarily residential amenity Based on the geographic locations of the Areas of Highest Environmental Value in relation to the proposed wind farms and St Asaph substation, it is considered likely that broad corridors can be identified, which avoid passing through these areas As a material consideration in the determination of applications and given their non-statutory designated status, registered Historic Landscapes are also considered as Areas of Highest Environmental Value to be avoided where possible. Where such areas cannot be avoided, due to their size and location in relation to the wind farms, an appraisal, known as an ASIDHOL, of each registered Historic Landscape may need to be undertaken at the detailed routeing stage to seek to ensure that effects on these areas are minimised during routeing As discussed above, small areas of highest environmental value, as defined by Rule 2 of the 1 It is recognised that the legislative requirements for SACs (and SPAs) extend to the protection of the integrity of the site including qualifying habitats or species and these areas will be reflected at the detailed routeing stage. Holford Rules, have been mapped and included in this step of the routeing study. SHETL note a) on Holford Rule 2 also states that other areas of regional or local high amenity value should be identified from development plans. For this routeing study, these include the following areas identified as being of high local value: p Wildlife Trust Site (WTS) p Local Wildlife Site (LWF) p Ancient Woodlands 4.18 For clarity, the following local level designations are not present within the study area: p Local Nature Reserves (LNRs) Step C: Identification of Technical & Planning Constraints Technical Constraints 4.19 Areas of high ground and steep slopes form a technical and environmental constraint to routeing. Guidance provided by Rules 4 and 5 of the Holford Rules, states overhead line infrastructure is more widely visible when located on higher ground, particularly ridges and skylines To identify topography, a Digital Elevation Model (DEM) employed for mapping topography is used which maps gridded Ordnance Survey (OS) Panorama data with a resolution of 50m. To identify slope angles the slope is calculated from the Panorama DEM using ArcGIS Spatial Analyst Based on the above, topography and slope angle are categorised in relation to the technical constraint posed to routeing of wood poles and steel towers as advised by SP Manweb in the table below: Topographic Wood Pole Steel Tower Feature Constraint Constraint Slope Angle o <15 degrees No constraint No constraint degrees Minimise lengths (subject to detailed technical review) No constraint >22 degrees Avoid where possible Minimise lengths Height (AOD) <300m No constraint No constraint m Minimise lengths No constraint >450m Avoid where possible Minimise lengths Technical constraints are shown in Figure 4.3. Route Corridor Report 15

20 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Town Slope Angle Slope Between Slope Over 22 Height m AOD > 451m AOD Figure Technical Constraints 16 North Wales Wind Farms Connection

21 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Town County Boundary Landscape Sensitivity (LANDMAP) High (37-40) Medium-High (33-36) Medium (30-32) Medium-Low (26-29) Low (22-25) Figure Landscape Sensitivity (LANDMAP) Route Corridor Report 17

22 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Town County Boundary Red Corridor Green Corridor Blue Corridor Link: Links and Creates Blue / Red Corridor and Blue / Green Corridor Figure Broad Route Corridors 18 North Wales Wind Farms Connection

23 Step D: Identification of Route Corridor Search Area 4.22 Those areas which are not considered to be of Highest Environmental Value or technically constrained are considered to be viable for routeing at this stage Where Areas of Highest Environmental Value or technically constrained areas cannot be avoided entirely, the aim is to minimise the potential impacts on these areas. For example, where there was a requirement to pass over a topographical feature, the smallest practical extent was crossed via a low point or watershed. Linear environmental features (eg SSSI s which follow watercourses) were crossed at a perpendicular angle where feasible. Step E: Identification of Route Corridors 4.24 Taking into account the constraints identified above and informed by the intrinsic characteristics of the landscape, a number of route corridors were identified between the Brenig and Clocaenog Forest wind farm substations and the St Asaph substation This process comprised desk based work, initially taking account of guidance provided by the Holford rules and additionally considering: p The Tan 8 Strategic Search Areas p The sensitivity of the landscape to overhead line development informed by analysis of LANDMAP The use of LANDMAP and the TAN 8 Strategic Search Areas to inform routeing at this stage are discussed further below. TAN 8 SSAs 4.27 The TAN 8 SSAs were mapped as shown in Figure 4.1 to understand where a considerable degree of landscape change is, or will be happening driven by policy and national need for wind energy generation. As such the sensitivity of the landscapes in these areas to further changes through the development of connection infrastructure may be lower. The addition of new overhead line infrastructure may also constrain future wind farm development. However given the location of the Brenig and Clocaenog Forest wind farm substations on the northern edge of TAN8 SSA A this criteria does not usefully inform the routeing process for this project. LANDMAP 4.28 LANDMAP is used as an information tool to inform an appraisal of the theoretical sensitivity of the landscape within the broad study area to overhead lines. The method used is described in North Wales Wind Farms Connection; Relative Landscape Sensitivity in Relation to 132kV Overhead Lines (Gillespies on behalf of SP Manweb 2011). The approach builds on work produced by landscape architects at Gillespies and LUC for the on-going Mid Wales Connections Project and earlier projects at Llandinam and Tir Gwynt. The outcome of the appraisal is a map categorising the broad study area into one of five sensitivity categories, ranging from low through medium-low, medium, mediumhigh to high, as shown in Figure 4.4. This map is used to help identify the Route Corridor Search Area, and in more detail at the corridor appraisal stage as outlined below. Iterative Analysis 4.29 The desk based work, including multiple layers of mapped information (including topography, elevation, drainage pattern, environmental designations, and landcover, including forestry) were considered alongside field work to obtain a thorough understanding of the character of the landscape and its sensitivities The Areas of Highest Environmental Value and technically constrained areas were comparatively unrestrictive in identifying areas where potential Overhead Line Corridors should be avoided. Therefore it was also necessary to supplement the information obtained from the desk top appraisal with a more extensive field based critique of the study area landscape to develop and narrow down potential corridors This iterative routeing process culminated in the identification of three broad route corridors linking the proposed wind farms to the St Asaph substation as shown in Figure 4.5, all of which are considered to be both technically and environmentally viable at this preliminary stage. A link between corridors also introduces a further two combination routes, giving a choice of five potential corridors. Route Corridor Report 19

24 Broad Route Corridor descriptions Red Corridor 4.32 Initially this corridor runs north-east from the Brenig wind farm substation across the high ground north of Clocaenog Forest to a tee point at Hafotty-las where it joins with the corridor running north west from the Clocaenog Forest wind farm. From here it runs broadly parallel to the B4501 before swinging to a more northerly direction west of Saron, crossing the B5435 east of Nantglyn and continuing on through the farmland of the Rhos Hills. At Segrwyd Goch the corridor then turns to run in a north westerly direction, crossing the A543 north east of Groes. At Waen Fawr the corridor turns to continue in a more northerly direction across rolling and open farmland below Moel Fodiar to the west and Hafod Wood and Cefn Berain to the east. Llannefydd lies to the west of the corridor and as the corridor passes to the east of this settlement and Mynydd y Gaer it swings back to a north-easterly direction. The corridor then crosses the wooded valley of the River Elwy where it joins the route of a 33kV overhead line, which it then parallels as far as the existing 400kV overhead line near St Asaph Business Park. From here the line will be undergrounded into the existing SP Manweb St Asaph substation. Green Corridor 4.33 This corridor departs from Red Corridor (described above) to the east of Groes, running more directly north, passing to the east of Eriviat Hall and Park and to the west of Henllan. From here the corridor runs slightly to the north-west, re-joining Red Corridor west of Bont-newydd. Blue Corridor 4.34 This corridor departs from Red Corridor (described above) near Saron where, instead of swinging to the north-west, it continues to follow the B4501 through rolling farmland to the east of Foel Gasyth. At Peniel the corridor crosses the B4501, west of Segrwyd Ucha, and crosses the wooded valley of the River Ystrad near Kings Mill Wood. From here it runs northwards, skirting the western edge of Denbigh and the eastern edge of Denbigh Golf Club, before joining the route of a 33kV overhead line north of the town. It then runs broadly parallel to this line passing Plas Heaton to the west and Nant-y-Patrick to the east and crossing the Elwy valley at Chapel Wood. From the existing 400kV overhead line on the south-west side of St Asaph the line will be undergrounded into the existing SP Manweb St Asaph substation. Blue/ Red Link Corridor 4.35 This corridor departs from Blue Corridor (described above) near Peniel and cuts north west to join the Red Corridor at Bach, just above Serwyd Goch, following the Red Corridor to St Asaph Business Park. Blue/ Green Link Corridor 4.36 This corridor similarly departs from Blue Corridor near Peniel and cuts north west to join the Green Corridor at Bach, running north and following the Green Corridor to St Asaph Business Park. Step F: Comparative Appraisal of Route Corridors 4.37 The comparative environmental appraisal of the route corridors from the wind farms onto the existing network was undertaken in stages as set out below. p Identification of appraisal criteria, objectives and appraisal indicators as set out in Table 4.1: p Application of appraisal criteria to all corridors following the method for appraising in Table 4.1 to present the factual environmental appraisal baseline; p Comparative appraisal of corridor options for each connection, (Red, Green, Blue, Blue/Red and Blue/Green), to identify the corridor with the least environmental impacts; 4.38 A subsequent appraisal of the potential location for the collector substation will be carried out following selection of the preferred corridor, and including any potential cumulative effects The above methodology follows that developed by Gillespies and LUC on behalf of SP Manweb for the current Mid Wales Connections Project An appropriate level of information and appraisal for this strategic routeing stage of the project has been included, where further information is required to refine the project during the detailed line routeing and/or EIA stages this has been highlighted within the report The overall methodology is based on the three aspects influencing route selection; environment, technology and consultation. A review of the environmental criteria for each corridor and an appraisal of those criteria is carried out to determine the corridor which has the least environmental effects. The corridors are also reviewed by SP Manweb to assess any technical criteria which could affect the choice of corridor. Feedback back from the consultation process is appraised and the corridors are given an order of preference 20 North Wales Wind Farms Connection

25 for this aspect. The corridor selection is then determined by weighing the three aspects against each other to select the preferred corridor which has the preferred balance between environmental, technical and consultation response Table 4.1 gives the environmental criteria applied, the reason for the inclusion of those criteria (objectives) and an outline methodology for appraising each corridor against the criteria The criteria are identified to: p Continue to reflect both the overall routeing objective which is to identify technical and economical routes for electrical connections that meet the technical requirements of the electricity network and cause, on balance, the least disturbance to the environment and the people who live work and recreate within it p Continue to reflect the Holford Rules p Consider policy on the assessment of impacts set out in Part 5 of the overarching National Policy Statement for Energy EN-1 and Part 2 of National Policy Statement for Electricity Networks Infrastructure EN-5. NPS EN-5 is specific to electricity networks and specifically lists biodiversity and geological conservation (including ornithology), landscape and visual assessment and technology specific information. NPS EN-1, in setting out policy for a range of energy infrastructure, includes a range of criteria to be included in assessments and in addition to the ones already mentioned in EN-5, includes topics such as historic environments and flood risk. p Draw out distinctions between the corridors to enable the relative strengths and weaknesses of each to be identified The environmental appraisal is based on seeking to minimise impacts using a qualitative approach supported by quantitative information where appropriate. Qualitative appraisals with support from SPM have been made through applying professional judgement by ecologists, landscape experts and archaeologists to comment on biodiversity, landscape and visual impacts and historic environments respectively. Where expert professional judgement can be supported by data/ information in a quantitative format this has been included, for example the number of designated sites potentially affected. Table 4.1: Criteria for Environmental Appraisal of Route Corridors CRITERION SUB-CRITERIA METHOD FOR APPRAISING Length of Corridor None Calculate length using Geographical Information Systems (GIS). Biodiversity and Geological Conservation (Holford Rules 1 & 2 & Supplementary Note b.) NPS EN-1 and NPS EN-5 p Special Area Conservation (SAC) p Site of Special Scientific Interest (SSSI) p National Nature Reserve (NNR) p Wildlife Trust Sites (WTS) (WTNR) p Local Wildlife Site (LWS) p European Protected Species and Ornithology p Peatland Habitats GIS based quantitative assessment and qualitative appraisal i.e. descriptive text in relation to potential for a route to be identified to avoid direct and indirect impacts on these designated areas. Strategic scale appraisal of European Protected Species and ornithological activity within the study area and professional judgement applied in relation to potential routeing issues. Potential effects on peat are considered to relate to loss of peatland habitats e.g. blanket bog. Route Corridor Report 21

26 CRITERION SUB-CRITERIA METHOD FOR APPRAISING Landscape and Visual Amenity (Holford Rules 1, 2, 3, 4 & 5 & Supplementary Note b.) EN1 and EN5 Historic Environment (Holford Rules 1 & 2 & Supplementary Note b.) EN1 p AONB GIS based quantitative assessment and qualitative appraisal including descriptive text in relation to potential for a route to have indirect impacts on these designated areas i.e. if corridor located <10km. LANDMAP Outstanding Areas Appraised via GIS based quantitative assessment i.e. length of corridor within a LANDMAP Outstanding area and qualitative appraisal i.e. descriptive text in relation to potential for a route to be identified to avoid the area within the corridor. Field Based Landscape Sensitivity: Field work undertaken by landscape architects p Landform (Holford 4 and 5) Semi-quantitative appraisal of length of corridor p Landcover/Landscape Pattern judged to be of each category of sensitivity, then (Holford 5 and 6) application of professional judgement to highlight p Settlement Pattern Holford 1 and 2) opportunities and implications for routeing. p Scenic Quality (Holford 1 and 2) p Scale p Human Influence p Perceptual/Sensory Aspects (Holford 1 and 2) p Landscape Condition p Skylines and Settings (Holford 4) p Views and Visibility p Visitor Attraction e.g. local railway, Views from key recreational and visitor attractions, setting of attractions to visitors e.g. gardens open to the public, National and e.g. historic attractions such as Regional Trails, National Trust sites etc are Denbigh Castle appraised - potential visibility of the corridor from p Recreational Resource i.e. National/ these areas is highlighted through professional Regional Trail and Cycleways. judgement and presented in a qualitative format. p Scheduled Monument (SAM) p Listed Building (LB) p Conservation Area (CA) p Registered Historic Park and Garden (incl. essential setting and principal views) (HPG) p Registered Historic Landscapes (RHL) Caravan/camping sites and rights of way are acknowledged to be located throughout the study area and will therefore be considered at the detailed line routeing stage. GIS based quantitative assessment and qualitative appraisal i.e. descriptive text in relation to potential for a route to be identified avoiding these designated areas within the corridor. Appraisal to include preliminary assessment of setting/principal views of designations. Requirement for ASIDOHLs to be discussed and agreed with Cadw. Residential Amenity (Holford Rule 7, Supplementary Note a.) 2.45Settlements and Properties GIS is used to identify the location of settlements and residential properties within 1km of the corridor. Professional judgement is then applied to identify qualitatively if the geographic distribution of these properties can be avoided at detailed routeing stage on the grounds of general amenity. 22 North Wales Wind Farms Connection

27 CRITERION SUB-CRITERIA METHOD FOR APPRAISING Flood Risk Flood Zones B and C Flood Zones B and C are considered. EN1 Forestry and Woodland (Holford Rules 4 & 5) p Ancient and Semi-Natural Woodland p Other Forestry and Woodland GIS based qualitative appraisal woodland areas in relation to Ancient and Semi-Natural Woodland data and March 2011 National Forest Inventory (NFI) data Further information in relation to each criterion is provided below. i. Length of Corridor 4.47 Holford Rule 3 states that other things being equal, choose the most direct line, with no sharp changes of direction and thus few angle towers. This indicates that a shorter length of corridor is likely to lead to lower potential environmental impacts than a longer route, once other constraints and issues have been examined. The length of each Route Corridor is calculated as part of the appraisal. ii. Biodiversity and Geological Conservation 4.48 Figure 4.6 indicates designated sites and locations of other areas of biodiversity and geological conservation interest included within the appraisal in accordance with Rule 1 and Rule 2 of the Holford Rules. As the figure shows, the identification of route corridors seeks to avoid areas of nature conservation value where possible. However, due to their size, nature and location, some of these are difficult to avoid in this process. Where relevant, these are identified in the appraisal and the potential implication for future routeing and assessment, i.e. scope to avoid these at the detailed routeing stage, noted The appraisal has been carried out using GIS based identification of the location and nature of the important area, in relation to the route corridor and then considering the potential for a route to be identified that avoids these areas within the corridor. This enables an appraisal of how constraining such areas might be whilst having regard to the reason why particular sites are designated or highlighted as being of conservation importance The Supplementary Note b) of the Holford Rules relating to Designations of Regional and Local Importance states where possible choose routes which cause the least disturbance to Areas of Great Landscape Value and other similar designations of Regional or Local Importance. For this study, these areas of relevance for nature conservation are Wildlife Trust Sites(WTS) and Local Wildlife Sites (LWS). At this strategic level, this appraisal has been carried out with reference to the Baseline Report, which will be updated to feed into the Environmental Statement, prepared for SP Manweb by Gillespies in association with Peak Ecology Whilst towers and poles can be readily constructed on peat, potential environmental effects associated with construction on peat are considered to relate to loss of peatland habitats and loss of carbon storage with implications for climate change. NRW has produced a LANDMAP based Phase 1 Habitat for the whole of Wales. From this, peatland related habitats are mapped and used as a proxy for peatlands and a semi-quantitative appraisal undertaken. iii. Landscape and Visual Amenity 4.52 In accordance with Rule 1 of the Holford Rules and the Routeing Objective, routeing should seek to avoid compromising the purposes of designations of nationally designated landscapes such as Areas of Outstanding Natural Beauty and National Parks. Whilst the routeing stages have ensured no proposed corridors are located within a nationally designated landscape, there are some areas of the Clwydian Range AONB where the overhead line may be visible and the distance of a corridor to these areas is highlighted. The AONB is mapped on Figure 4.1. As outlined above, the Supplementary Note b) of the Holford Rules relating to Designations of Regional and Local Importance states where possible choose routes which cause the least disturbance to Areas of Great Landscape Value and other similar designations of Regional or Local Importance. Special Landscape Areas (SLAs 2 ), and other locally designated landscapes are being replaced in the Local Development Frameworks (LDFs), and it is understood that local landscape designations will be superseded 2 A non-statutory designation applied by the local planning authority to define areas of high landscape importance. Route Corridor Report 23

28 St Asaph Substation St Asaph Denbigh Clocaenog Brenig Key: Study Area St Asaph Substation Project Wind Farm Substation Tow n County Boundary Route Corridors Red Corridor Green Corridor Blue Corridor Figure Biodiversity and Geology Link: Links and Creates Blue / Red Corridor and Blue / Green Corridor #* Wildlife Trust Sites SAC SSSI NNR Local Wildlife Site (LWS) Peatland Habitat (LANDMAP phase 1 survey) Windfarm Habitat Management Plan Areas: T.B.C - awaiting layer 24 North Wales Wind Farms Connection

29 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Town County Boundary Route Corridors Red Corridor Green Corridor Blue Corridor Link: Links and Creates Blue / Red Corridor and Blue / Green Corridor LANDMAP 'Outstanding' Areas Historic Landscape Landscape Habitats Cultural Landscape Visual & Sensory AONB National Footpath Regional Trail National Cycle Route Regional Cycle Route NCN Link Cycle Route Figure Landscape and Visual Resources Route Corridor Report 25

30 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Town Field Based Landscape Sensitivity: Medium High Sensitivity Medium Sensitivity Medium Low Sensitivity Figure 4.8- Field based Landscape Sensitivity 26 North Wales Wind Farms Connection

31 by the application of Quality Assured LANDMAP data following LANDMAP Guidance Note 1. As the Denbighshire UDP ( ) is due to be replaced by the Local Development Plan and does not identify any Special Landscape Areas no local landscape designations are mapped and taken account of during this stage of routeing. The Conwy Local Development Plan- Revised Deposit 2011 Strategic Policy NTE/1 seeks to respect, retain and enhance the local character and distinctiveness of the Landscape Character Areas. It recognises that LANDMAP will be used to review and amend Landscape Character Areas as that information becomes available and no locally designated landscape areas identified within the LDP Whilst areas evaluated as LANDMAP Outstanding and High areas were taken account of during identification of the route corridors (steps A E above), these do not form constraints to avoid where possible as: i) some of the wind farms requiring connection are located within these areas, and ii) LANDMAP does not currently identify areas with the same status as designated sites To aid the appraisal of corridors LANDMAP areas evaluated as Outstanding for all five aspects as shown on Figure 4.7 have been taken account of. This is appraised using GIS based quantitative assessment, i.e. length of corridor within the area and qualitative appraisal, i.e. descriptive text in relation to potential for a route to be identified to avoid areas of higher sensitivity to overhead lines A desk based theoretical landscape sensitivity study was undertaken to inform Phase 1 of the routeing process, based on LANDMAP data. This was an initiative proposed in consultation with NRW as a tool for applying LANDMAP and for which no other sensitivity mapping existed previously. The development and outcome of this study is detailed in the North Wales Wind Farms Connection: Relative Landscape Sensitivity in Relation to 132kV Overhead Lines (March 2011). Following on from this, a detailed field based study was undertaken to inform Phase 2 routeing. This sought to identify at a more local scale, the relative sensitivity of areas within which the corridors are located, to overhead line routeing. Sensitivity is assessed as low, medium-low, medium, medium-high or high The methodology used for judging sensitivity in the field is based on consideration of a number of criteria. These have been applied to the selected route corridors in order to enable comparisons to be made. The findings of the field-based landscape sensitivity assessment differ from those of the LANDMAP derived sensitivity in a number of ways. Overall, the field-based assessment is considered to better reflect the relative landscape sensitivity of the corridors within the study area, as informed by desk based study and targeted field based evaluation undertaken by experienced landscape architects who are familiar with the proposed development. This is thought to be a more appropriate and focused basis for appraisal, compared with one based purely on theoretical sensitivity The field based landscape sensitivity of the identified corridors to overhead lines is mapped on Figure Further Notes on Clarifications to The Holford Rules c) states minimise the visual effect perceived by users of roads and public rights of way, paying particular attention to the effects of recreational, tourist and other well-used routes. On this basis, views from National Trails, roads, and visitor attractions have been taken into consideration when appraising route corridors, whereby potential visibility of the overhead line from these areas has been highlighted through professional judgement and presented in a qualitative format. This includes trails such as the Clwydian Way, key tourist roads such as the B4501 and locally known scenic viewpoints, such as Llyn Brenig and Moel Fodiar, which may also comprise nature conservation sites and gardens open to the public where their setting may potentially be affected. National/Regional walking and cycling trails are mapped on Figure 4.7 along with key roads and viewpoints marked on the OS map. iv. Historic Environment 4.59 The identification of route corridors sought to avoid areas of cultural heritage value where possible, for example Listed Buildings, Scheduled Ancient Monuments and Conservation Areas. However, owing to their numbers, size and location, some of these were difficult to avoid in their entirety, and potential implications for future routeing and assessment will be considered in more detail at the detailed routeing stage This appraisal involved GIS based identification of the location and type of each designated cultural heritage asset including its setting and principal views where relevant, supported by descriptive text in relation to the potential for a route to be identified within the corridor to avoid these. Cultural heritage features included within the appraisal of the Historic Environment are shown on Figure 4.9. At this strategic level, this appraisal has been carried out with reference to the Baseline Report, which will be updated to feed into the Environmental Statement, prepared for SP Manweb by Gillespies in association with CPAT. Route Corridor Report 27

32 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Tow n Route Corridors Figure Historic Environment Red Corridor Green Corridor Blue Corridor Link: Links and Creates Blue / Red Corridor and Blue / Green Corridor Listed Buildings Conservation Area Scheduled Monuments Registered Park & Gardens Park & Garden - Essential Setting Historic Landscapes 28 North Wales Wind Farms Connection

33 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Tow n Route Corridors Red Corridor Green Corridor Blue Corridor Link: Links and Creates Blue / Red Corridor and Blue / Green Corridor Settlements Residential Properties Figure Residential Amenity Route Corridor Report 29

34 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Tow n Figure 11 - Flood Risk Route Corridors Red Corridor Green Corridor Blue Corridor Link: Links and Creates Blue / Red Corridor and Blue / Green Corridor Flood Zones B and C 30 North Wales Wind Farms Connection

35 4.61 Cadw, NRW and the International Council on Monuments and Sites UK have collaborated to produce a Register of Landscapes of Historic Interest in Wales, the use of which is outlined in the Guide to Good Practice on Using the Register of Landscapes of Historic Interest in Wales in the Planning and Development Process, Cadw (2007). The Register, which contains 58 historic landscapes in total, was issued in two parts, with 36 outstanding and 22 special historic landscapes; although the Guide states that both are considered to be of equal value and all registered historic landscapes should be considered in the same way The Guide states that all Landscapes of Historic Interest identified on the Register are of national importance in the Welsh context, and although the Register does not currently impose statutory controls, Cadw has advised that these may be given statutory status in the near future. There are three Historic Landscapes in the study area; the Denbigh Moors, the Vale of Clwyd and the Lower Elwy Valley and the constituent character of the first two of these designations are reflected in their Historic Landscape Character Areas (HLCAs). A HLCA has not been prepared for the Lower Elwy Valley Given the broad nature of the route corridors and the status of the detailed technical design, in seeking to assess the likely effects on registered Historic Landscapes at this stage, SP Manweb s advisers have developed a preliminary approach, and a strategic level assessment has been undertaken. This appraisal is undertaken through GIS based quantitative assessment i.e. the area likely to be visually affected as a proportion of the Historic Landscape. v. Residential Amenity 4.64 In addition to avoiding settlements in accordance with the Holford Rules (Rule 7 and residential areas supplementary note a)), proximity to both settlements and individual properties is taken account of within the appraisal of route corridors, with the aim of avoiding proximity to residential properties as far as possible on the grounds of general amenity. The location of residential properties has been mapped as shown on Figure 4.10 and the potential for avoiding effects on residential amenity during detailed routeing has been identified through professional judgement. This work has been supported by an appraisal of potential impacts on visual amenity which is included in Appendix 2: North Wales Wind Farms Connection: Route Corridor Visibility Appraisal The Route Corridor Visibility Appraisal mapped the location of residential properties within the corridor and a 1km buffer, locating the principle view from each property and the nature of that view. The resulting plans were used to identify areas of potential impact to inform the corridor appraisal process. vi. Flood Risk 4.66 In relation to potential conflicts with policy relating to flooding, flood zones B and C for Wales have been mapped using GIS and the potential for avoiding locating steel towers and wood poles within the floodplain identified as shown on Figure vii. Forestry and Woodland 4.67 Two of the Notes in respect of Rules 4 and 5 of the Holford Rules state where possible follow open space and run alongside, not through woodland or commercial forestry and consider opportunities for skirting edges of copses and woods. Protect existing vegetation, including woodland and hedgerows.. In addition to protected woodland such as ancient and semi-natural woodland, woodland and commercial forestry identified within the National Forest Inventory (NFI) is also being avoided where possible during routeing. Forestry and woodlands have been mapped as shown on Figure 4.12 and the potential for avoiding these areas during detailed routeing identified. Additional Considerations - Technical Review: 4.68 As shown in the routeing flow chart in Section One, SP Manweb s methodology includes technical feedback. Therefore, the comparative appraisal has included a review of possible technical issues within each corridor SP Manweb s technical team has considered criteria which it considers influences the general buildability of connections as follows: p length; p altitude (i.e. ground conditions and exposure to climate/weather); p topography; p windfarm development areas; p access (for construction and maintenance); p proximity to existing electrical infrastructure; p major road/railways crossings; p flood risk areas and/or river crossings; p proximity to dwellings For each to the identified corridors these criterion have been considered assuming the majority of the line would comprise double wood poles, with possible sections of undergrounding and/or steel towers being used as appropriate as the line design develops. Route Corridor Report 31

36 St Asaph Substation St Asaph Denbigh Brenig Clocaenog Key: Study Area St Asaph Substation Project Wind Farm Substation Tow n Route Corridors Figure 12 - Forestry and Woodland Red Corridor Green Corridor Blue Corridor Link: Links and Creates Blue / Red Corridor and Blue / Green Corridor Ancient and Semi Natural Woodland Wales National Forest Inventory 32 North Wales Wind Farms Connection

Route Alignment Options Summary Report

Route Alignment Options Summary Report Brechfa Forest Connection Project February 2014 Summary report 1. RSK Environment Ltd (RSK) was commissioned by Western Power Distribution (WPD) to provide environmental consultancy support services for

More information

Assessing the impact of smallscale wind energy proposals on the natural heritage

Assessing the impact of smallscale wind energy proposals on the natural heritage Scottish Natural Heritage Assessing the impact of smallscale wind energy proposals on the natural heritage Guidance March 2016 Version 3 1 Contents 1. Introduction. 3 2. Encouraging a spatial approach

More information

Our approach to the design and routeing of new electricity transmission lines

Our approach to the design and routeing of new electricity transmission lines Our approach to the design and routeing of new electricity transmission lines 2012 National Grid s job is to connect people to the energy they use to warm and light their homes, to connect factories and

More information

3. Neighbourhood Plans and Strategic Environmental Assessment

3. Neighbourhood Plans and Strategic Environmental Assessment 1. Introduction This report sets out a draft Screening Determination for the Preston Parish Council s Neighbourhood Plan and has been prepared by rth Hertfordshire District Council. The purpose of the

More information

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015 Oxford Green Belt Study Summary of Final Report Prepared by LUC October 2015 Project Title: Oxford Green Belt Study Client: Oxfordshire County Council Version Date Version Details Prepared by Checked by

More information

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Cotswolds AONB Landscape Strategy and Guidelines. June 2016 Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

LANDMAP Methodology Overview

LANDMAP Methodology Overview LANDMAP Methodology Overview June 2017 Jill Bullen, Senior Landscape Specialist jill.bullen@cyfoethnaturiolcymru.gov.uk 0300 065 4706 (Please note this is an information document and not a training presentation)

More information

GUIDELINES FOR THE ROUTEING OF NEW HIGH VOLTAGE OVERHEAD TRANSMISSION LINES

GUIDELINES FOR THE ROUTEING OF NEW HIGH VOLTAGE OVERHEAD TRANSMISSION LINES The Holford Rules Guidelines on overhead line routeing were first formulated in 1959 by Sir William later Lord, Holford, who was a part-time member of the CEGB. National Grid has reviewed these guidelines,

More information

Special Landscape Area (Great Orme and Creuddyn Peninsular). Agricultural land (grade 3a). TPO A14 (1982) - group of trees (G4) on east boundary.

Special Landscape Area (Great Orme and Creuddyn Peninsular). Agricultural land (grade 3a). TPO A14 (1982) - group of trees (G4) on east boundary. TAN 24 and TAN 5: Technical Advice Note (TAN) 24: The Historic Environment (2017) Guidance on how the planning system considers the historic environment during development plan preparation and decision

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

Rannoch 132 / 33 kv Substation Extension

Rannoch 132 / 33 kv Substation Extension Who we are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the networks in the north of Scotland the electricity transmission network

More information

Examination of South Cambridgeshire Local Plan

Examination of South Cambridgeshire Local Plan Matter SC6A - Policy SS/5 Waterbeach New Town Historic England( formerly English Heritage) 874 Rep Nos 59748, 60250, 60253 Examination of South Cambridgeshire Local Plan Historic England, Hearing Statement

More information

Potential sources of guidance for EIA opinions and consents for Glastir Woodland Creation schemes

Potential sources of guidance for EIA opinions and consents for Glastir Woodland Creation schemes EIA guidance Potential sources of guidance for EIA s and consents for Glastir Woodland Creation schemes Every Glastir Woodland Creation plan requires an Environment Impact Assessment (EIA) to assess whether

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This

More information

Definition of Cumulative Landscape and Visual Effects

Definition of Cumulative Landscape and Visual Effects SECTION 5: GUIDANCE FOR ASSESSING CUMULATIVE LANDSCAPE AND VISUAL EFFECTS 5.1 Although this landscape sensitivity and capacity study has identified that parts of the National Park may be able to accommodate

More information

Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation

Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation Having reviewed the documents, the Society has made the following response: Housing Delivery Q 7. Do you agree

More information

PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008

PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008 PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008 Extraction of minerals, including building and roofing stone, from the land requires planning permission under the

More information

Policy DM19: Development and Nature Conservation

Policy DM19: Development and Nature Conservation Avonmouth Wetland Habitat Project October 2010 and December 2011 (the Cresswell study). Policy Links Bristol Local Plan Core Strategy Lead Policy BCS4: Avonmouth and Bristol Port BCS9: Green Infrastructure

More information

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site

More information

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016) Introduction This background paper sets out a methodology for the definition of settlement boundaries in the North Northumberland Coast Neighbourhood Plan. The neighbourhood plan is planning positively

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

Dorenell Wind Farm 132 kv Grid Connection

Dorenell Wind Farm 132 kv Grid Connection Who We Are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the electricity networks in the north of Scotland the electricity transmission

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Identify matters regarding the project which inform the preparation of the Environmental Impact Statement (EIS);

Identify matters regarding the project which inform the preparation of the Environmental Impact Statement (EIS); 3 SCOPING THE EIS 3.1 INTRODUCTION 1 Consultation is an important part of the Environmental Impact Assessment (EIA) process; in this context, consultation with statutory agencies, interested parties, the

More information

TOPIC PAPER 2: Links to other sustainability tools

TOPIC PAPER 2: Links to other sustainability tools TOPIC PAPER 2: INTRODUCTION 1.1 Landscape Character Assessment can inform a range of other sustainability tools and methodologies. Equally these other tools may assist in reaching decisions concerning

More information

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009 DESIGN MANUAL FOR ROADS AND BRIDGES CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009 SUMMARY OF CORRECTION HA 200/08 VOLUME 11, SECTION 1, PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL

More information

Development in the setting of the Cotswolds AONB

Development in the setting of the Cotswolds AONB COTSWOLDS CONSERVATION BOARD POSITION STATEMENT Development in the setting of the Cotswolds AONB.1. Introduction Areas of Outstanding Natural Beauty (AONBs) are designated by the Government for the purpose

More information

WALES ONLY INTERIM ADVICE NOTE 135/10 (W) LANDSCAPE AND VISUAL EFFECTS ASSESSMENT

WALES ONLY INTERIM ADVICE NOTE 135/10 (W) LANDSCAPE AND VISUAL EFFECTS ASSESSMENT Interim Advice Note 135/10 (W) Landscape and Visual Effects Assessment INTERIM ADVICE NOTE 135/10 (W) LANDSCAPE AND VISUAL EFFECTS ASSESSMENT WALES ONLY Summary This Interim Advice Note provides instructions

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies The criteria for assessing sites for future housing and business development in Dunsfold are set out below. (Development criteria, covering what it is

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(iii) 13/81 Erection of sports hall, associated changing facilities, offices

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report 7. The Landscape 7.1 Introduction The purpose of this section of the EIS Scoping Report is to describe the scope of work and methods to be applied in the identification and assessment of landscape and

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Pontcysyllte Aqueduct & Canal

Pontcysyllte Aqueduct & Canal S U P P L E M E N T A R Y P L A N N I N G D O C U M E N T Pontcysyllte Aqueduct & Canal WORLD HERITAGE SITE Supplementary Planning Document Adopted June 2012 Updated August 2013 Supplementary Planning

More information

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED). FAO: D. Williams Isle of Anglesey County Council Council Offices Llangefni Anglesey LL77 7TW 16 November 2017 DCRM Ref. No: WN0904-QUD-OS-LET-00002_English Dear Mr Williams TOWN AND COUNTRY PLANNING ACT

More information

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive

More information

Suffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation

Suffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation Suffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation Having reviewed the issues and options documents, the Society has made the following response: Part 1 - Strategic

More information

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

BRE Strategic Ecological Framework LI Technical Information Note 03/2016 BRE Strategic Ecological Framework Technical Information Note 03/2016 September 2016 Contents 1. Introduction 2. Aims of BRE s Strategic Ecological Framework 3. How SEF is different from previous approaches

More information

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) PROPOSAL: LOCATION: APPLICANT: Amendments to the design of a scheme for a 49.99MW battery

More information

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4 Number: 4 Application Number: C15/0034/37/LL Date Registered: 21/05/2015 Application Type: Full - Planning Community: Llanaelhaearn Ward: Llanaelhaearn Proposal: Location: Summary of the Recommendation:

More information

Mid Wales (Powys) Conjoined Wind Farms Public Inquiry:

Mid Wales (Powys) Conjoined Wind Farms Public Inquiry: Mid Wales (Powys) Conjoined Wind Farms Public Inquiry: Application by RES UK & Ireland Limited, dated 27 March 2009 for consent under Section 36 of the Electricity Act 1989 to construct and operate a 100MW

More information

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey PLANNING I DESIGN I ENVIRONMENT 1.0 INTRODUCTION TEP conducted Site

More information

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

Balcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report

Balcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report Balcombe Neighbourhood Plan Habitats Regulations Assessment Screening Report Produced for Regulation 14 of the Neighbourhood Planning (General) Regulations 2012 17 th July 2015 1.0 Introduction 1.1 This

More information

Perth and Kinross Council Development Management Committee 24 April 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 24 April 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 24 April 2013 Report of Handling by Development Quality Manager Alterations,Carpenter House, Carpenter Street, Perth, PH1 5GB Ref. No: 13/00303/FLL

More information

Great Easton Neighbourhood Plan Statement of Basic Conditions

Great Easton Neighbourhood Plan Statement of Basic Conditions Great Easton Neighbourhood Plan 2017-2031 Statement of Basic Conditions OCTOBER 2016 GREAT EASTON PARISH COUNCIL Contents 1.0 Introduction....Page 2 2.0 Summary of Submission Documents and Supporting Evidence..

More information

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN BASIC CONDITIONS STATEMENT December 2018 CEF 4 Legal Requirements This statement has been produced by the NDP Working Group on behalf of Repton Parish Council

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Wind energy development in the South Pennines landscape

Wind energy development in the South Pennines landscape Wind energy development in the South Pennines landscape Programme for today Background Policy context South Pennines landscape Impacts of wind energy development The South Pennines Wind Energy Landscape

More information

Wildlife and Planning Guidance: Local Plans

Wildlife and Planning Guidance: Local Plans Wildlife and Planning Guidance: Local Plans This Leaflet is one of a series of 4 Wildlife and Planning Guidance Leaflets and is intended to provide useful information to assist you to campaign effectively

More information

TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997

TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 APPEAL AGAINST REFUSAL OF PLANNING PERMISSION FOR CONSTRUCTION OF WIND FARM, CONSISTING OF ERECTION OF 12 NO. WIND TURBINES, HEIGHT OF 70 METRES TO HUB, ASSOCIATED

More information

IFA2 UK Onshore Development Planning Statement. May 2016

IFA2 UK Onshore Development Planning Statement. May 2016 IFA2 UK Onshore Development Planning Statement May 2016 IFA2 UK Onshore Development Planning Statement Document reference IF2-ENV-STM-022 Version 1.0 Prepared by Address TEP on behalf of National Grid

More information

High Speed Rail (London- West Midlands)

High Speed Rail (London- West Midlands) High Speed Rail (London- West Midlands) Draft Environmental Minimum Requirements Annex 3: Draft Heritage Memorandum November 2013 ESA 4.4 High Speed Rail (London- West Midlands) Draft Environmental Minimum

More information

12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE

12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE 12 TH ANNUAL CHILTERNS AONB PLANNING CONFERENCE ENGLISH HERITAGE: HISTORIC ENVIRONMENT GOOD PRACTICE ADVICE MARTIN SMALL HISTORIC ENVIRONMENT PLANNING ADVISER ENGLISH HERITAGE Policy ENGLISH HERITAGE GOOD

More information

Change Paper / Date CAIRNGORMS NATIONAL PARK AUTHORITY

Change Paper / Date CAIRNGORMS NATIONAL PARK AUTHORITY Change Paper / Date CAIRNGORMS NATIONAL PARK AUTHORITY Title: Prepared by: REPORT ON CALLED-IN PLANNING APPLICATION FIONA MURPHY (PLANNING OFFICER DEVELOPMENT MANAGEMENT) DEVELOPMENT PROPOSED: REFERENCE:

More information

Foreword. Síle de Valera, TD, Minister for Arts, Heritage, Gaeltacht and the Islands

Foreword. Síle de Valera, TD, Minister for Arts, Heritage, Gaeltacht and the Islands Foreword This Code of Practice is a significant milestone in the protection of the archaeological heritage. It marks an agreement between my Department and the National Roads Authority, one of the largest

More information

HISTORIC ENVIRONMENT SCOTLAND

HISTORIC ENVIRONMENT SCOTLAND HISTORIC ENVIRONMENT SCOTLAND HISTORIC ENVIRONMENT POLICY Strategic Environmental Assessment Environmental Report 10 September 2018 We are committed to ensuring this publication is accessible to everyone.

More information

List of Policies. SESPlan. None applicable. Consolidated Scottish Borders Local Plan 2011: POLICY G1 - QUALITY STANDARDS FOR NEW DEVELOPMENT

List of Policies. SESPlan. None applicable. Consolidated Scottish Borders Local Plan 2011: POLICY G1 - QUALITY STANDARDS FOR NEW DEVELOPMENT List of Policies Local Review Reference: 15/00021/RREF Planning Application Reference: 15/00616/FUL Development Proposal: Installation of 16no solar photovoltaic (PV) panels to roof Location: Raebank,

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Wildlife and Planning Guidance: Neighbourhood Plans

Wildlife and Planning Guidance: Neighbourhood Plans Wildlife and Planning Guidance: Neighbourhood Plans This Leaflet is one of a series of 4 Wildlife and Planning Guidance Leaflets and is intended to provide useful information to assist you to campaign

More information

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT PENRHYN QUARRY BETHESDA GWYNEDD Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT September 2010 PENRHYN QUARRY, BETHESDA, GWYNEDD Proposed development of an Inert Waste Recycling Facility

More information

Longmore House Salisbury Place Edinburgh EH9 1SH. 18 January 2008

Longmore House Salisbury Place Edinburgh EH9 1SH. 18 January 2008 We safeguard the nation s historic environment and promote its understanding and enjoyment Martin Dean Access and Countryside Projects Officer Development and Environmental Services Clackmannanshire Council

More information

GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY

GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY Volume II - Addendum On behalf of Guildford Borough Council PPG Ref : BNL.0287 April 2014 COPYRIGHT The conents of this document must not be copied or

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT 2017-18 Summary 1 Progress on local development documents 1 Local development documents adopted in the monitoring period 1st April 2017 31st

More information

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site Planning application pursuant to s.42 Town and Country Planning (Scotland) Act 1997 to amend the restoration scheme Volume

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

Draft Hailey Neighbourhood Plan

Draft Hailey Neighbourhood Plan Persimmon Homes (Wessex) Draft Hailey Neighbourhood Plan Representations to West Oxfordshire District Council s Regulation 16 Consultation December 2018 2 Copyright 2018 Persimmon Homes Ltd. All rights

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments SUMMARY This Advice Note provides

More information

LANDSCAPE CHARACTER ASSESSMENT

LANDSCAPE CHARACTER ASSESSMENT THE COUNTY DURHAM LANDSCAPE CHARACTER ASSESSMENT FOREWORD The landscape of County Durham is one of great contrast and diversity. From the North Pennines in the west to the Durham Coast in the east it contains

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text Chapter 1: Introduction Draft - March 2017 Prepared by: Address: Email: Website: Mott McDonald, The Urbanists and HLM

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:-

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:- 8. THE DISTRICT VILLAGES 8.1 Population About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:- Village No. of Persons Cottingham

More information

OVERVIEW OF PLANNING POLICY AND PROCEDURE RELATING TO BIODIVERSITY IN ENGLAND

OVERVIEW OF PLANNING POLICY AND PROCEDURE RELATING TO BIODIVERSITY IN ENGLAND OVERVIEW OF PLANNING POLICY AND PROCEDURE RELATING TO BIODIVERSITY IN ENGLAND Disclaimer: This document is a guide to legislation and procedure relating to biodiversity in England. It is offered to readers

More information

PLACE WORKSHOP REPORT. A+DS SNH sustainable placemaking programme

PLACE WORKSHOP REPORT. A+DS SNH sustainable placemaking programme PLACE briefing WORKSHOP REPORT A+DS SNH sustainable placemaking programme INTRODUCTION This report summarises the outcome of a Scottish Natural Heritage workshop on placemaking which was held on Wednesday

More information

HERITAGE POLICY...Safeguarding the Built Heritage. Conservation Plans. A Guide to the Preparation of Conservation Plans

HERITAGE POLICY...Safeguarding the Built Heritage. Conservation Plans. A Guide to the Preparation of Conservation Plans HERITAGE POLICY...Safeguarding the Built Heritage Conservation Plans A Guide to the Preparation of Conservation Plans 1 2 1.0 INTRODUCTION 1.1 Scotland has a diverse built heritage: ancient monuments and

More information

ABOUT CALA HOMES CALA HOMES

ABOUT CALA HOMES CALA HOMES WELCOME Welcome to this public consultation event for our proposed development on land to the east of Salisbury Road, in Hungerford. Thank you for taking the time to come along today. Homes and Wates Developments

More information

An Bord Pleanála. Eirgrid Plc. Meath County Council Cavan County Council Monaghan County Council

An Bord Pleanála. Eirgrid Plc. Meath County Council Cavan County Council Monaghan County Council An Bord Pleanála Ref: PL02.VS0002 Prospective Applicant: Eirgrid Plc. Local Authorities: Meath County Council Cavan County Council Monaghan County Council Nature of Application: Written opinion on information

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 2 ha 202/08 environmental impact assessment

volume 11 environmental assessment section 2 environmental impact assessment Part 2 ha 202/08 environmental impact assessment DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental section 2 environmental impact Part 2 ha 202/08 environmental impact SUMMARY This Advice Note provides guidance for undertaking statutory and

More information

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request TAYSIDE & CLACKMANNANSHIRE Tel: 01738 458582(direct line) Fax: 01738 458616 e-mail addresses: denise.reed@snh.gov.uk Niall Urquhart Team Leader Sustainability Clackmannanshire Council Kilncraigs Greenside

More information

South Worcestershire Development Plan. South Worcestershire Design Guide Supplementary Planning Document

South Worcestershire Development Plan. South Worcestershire Design Guide Supplementary Planning Document South Worcestershire Development Plan South Worcestershire Design Guide Supplementary Planning Document Statement of Consultation: Early Engagement Scoping Paper February 2017 1. Introduction 1.1 This

More information

Lower Sensitivity. VS Classification Level 2: Exposed Upland/Plateau

Lower Sensitivity. VS Classification Level 2: Exposed Upland/Plateau S02 Y Carneddau Reproduced from the Ordnance Survey map with the permission of Ordnance Survey on behalf of the Controller of Her Majesty s Stationery Office, Crown copyright Licence No. 100023387 Location

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background Summary of SMBC Asks 23/09/13 Background The Council has a developed a significant number of asks and propositions for consideration by HS2 Ltd and Government throughout further development of the HS2

More information

Neighbourhood Planning Guidance Local Green Spaces

Neighbourhood Planning Guidance Local Green Spaces Neighbourhood Planning Guidance Local Green Spaces Introduction This guidance note has been produced for communities preparing neighbourhood plans in North Dorset to help them to identify, assess and designate

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

Celbridge. Local Area Plan Statement. Planning Department Kildare County Council September 2017

Celbridge. Local Area Plan Statement. Planning Department Kildare County Council September 2017 Celbridge Local Area Plan 2017-2023 Dréachtphlean Ceantair Áitiúil Cill Droichid Planning Department Kildare County Council September 2017 SEA Statement Kildare County Council Celbridge Local Area Plan

More information

HORNSEA PROJECT THREE OFFSHORE WIND FARM

HORNSEA PROJECT THREE OFFSHORE WIND FARM HORNSEA PROJECT THREE OFFSHORE WIND FARM PHASE 1.B CONSULTATION EVENT OVERVIEW Spring 2017 Community Consultation Events: 2nd 10th March Table of Contents 1. Introduction 2. DONG Energy 3. Hornsea Project

More information

CAIRNGORMS NATIONAL PARK AUTHORITY

CAIRNGORMS NATIONAL PARK AUTHORITY Title: REPORT ON CALLED-IN PLANNING APPLICATION Prepared by: KATHERINE DONNACHIE (SENIOR PLANNING OFFICER, DEVELOPMENT MANAGEMENT) DEVELOPMENT PROPOSED: FULL PLANNING PERMISSION FOR REPLACEMENT BRIDGE

More information

Local Development Scheme

Local Development Scheme Local Development Scheme 2012 2016 The Local Development Scheme (LDS) is a project plan that outlines how and when the Authority will update its planning policies and other associated documents. It ensures

More information

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality

More information

Ebbsfleet Development Corporation

Ebbsfleet Development Corporation Title of Paper Planning and Housing Delivery Report September 2018 Presented by Sub-Committee Mark Pullin, Chief Planning Officer Planning Committee Purpose of Paper and Executive Summary This paper provides