TOWN COUNCIL / PLANNING COMMISSION

Similar documents
A larger version of this map is located on the last page of this PDF.

Anatomy of A Vibrant Downtown. Anatomy of a Vibrant Downtown

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Port Lavaca Future Land Use

The transportation system in a community is an

Comprehensive Plan Advisory Panel Meeting #3

THE COUTURE AT A GLANCE $122 MILLION TOTAL PROJECT COST 44 STORIES / 700,000 SQUARE FEET PUBLIC PLAZAS, PARK & PEDESTRIAN BRIDGES 302 MARKET RATE

DRAFT PLAN PRESENTATION

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

Dyersville Downtown Plan. Open House October 24, 2017

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

EXISTING COMPREHENSIVE PLAN

IMAGINE CLEARWATER. Community Workshop 3. November 2016

CHAPTER 7: Transportation, Mobility and Circulation

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada

Presentation of the Staff Draft. July 17, 2014 SSRVP Team, Area 3

Summary of Public Input & Discussion of Alternatives

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

Making TOD Work in the Heart of Suburban Sprawl

THEMES, VISION, + PRINCIPLES

ASPEN HILL Minor Master Plan Amendment

Implementation Guide Comprehensive Plan City of Allen

PLAN ELEMENTS WORKSHOP. April 5, 2016

Policies and Code Intent Sections Related to Town Center

New Auburn Village Center Study Auburn, Maine

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

Denver Moves: Transit Task Force

The Lower SaLuda Greenway

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

The Auburn Plan Designing the Future of Auburn February 28, 2005

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

Route 1 Corridor Study

Status Report: MD 355 Project

The Five Components of the McLoughlin Area Plan

THE 355/270 CORRIDOR:

About Momentum Midland

City of Kingston. North King s Town Secondary Plan Open House + Workshop #1 February 28, 2018

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

Marpole Community Plan. Parks and Open Space

TAHOE CITY VISION PLAN June 2012

Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room

4- PA - LD - LIVELY DOWNTOWN. LD - Background

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

INDEPENDENCE BOULEVARD AREA PLAN. June 24, 2008

Pedestrian and Bike Bridge LOGO

Silverdale Regional Center

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

Waterfront West December 6, 2016

City of Long Beach. creating vibrant and exciting places

Johnson Street Bridge Public Realm Update

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Municipal Plan*Assessment

South Davis County COMMUNITY SPOTLIGHT

V. Vision and Guiding Principles

Tonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey

Public input has been an important part of the plan development process.

Tri-County Transportation & Land Use Study. Steering Committee Meeting May 14, 2009

Public may provide comments on the GDP within the next two weeks (December 24)

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

Stadium District Masterplan

Independence Boulevard Area Plan Planning Committee Public Comment May 18, 2010

Corridors. Re-vitalize our Corridors and Gateways

TOWN OF NEW CASTLE - Master Plan Update

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

Beaverton City Council: Work Session. SIDEDistrict. May 6, 2014

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017

Windsor, Connecticut Plan of Conservation & Development DRAFT PLAN SUMMARY

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Danvers High Street I-1 District Study

Clovis Urban Greening Plan. Community Workshop #2 Northwest

Description of Preferred Alternative

RESEDA - WEST VAN NUYS COMMUNITY PLAN

8implementation. strategies

City Council March 27, Parks, Recreation, and Trails Master Plan

WAC #7 3/14/14. Coachella General Plan Update

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

Illustrative Development Plan

Plano Tomorrow Vision and Policies

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

LINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

COMPREHENSIVE PLAN & UNIFIED DEVELOPMENT ORDINANCE

WESTERN ILLINOIS UNIVERSITY

International Blvd. TOD Plan Public Workshop #1

Elm Street Business District: Streetscape and Signage Plan

INDEPENDENCE BOULEVARD AREA PLAN. Economic Development Committee Overview May 25, 2010

3. STRATEGY FOR NEIGHBORHOOD SUSTAINABILITY

South King County High Capacity Transit Corridor Report. Figure Other Infrastructure

Transcription:

Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011

Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L. Fleming Project Manager Bay Area Economics Economic Analysis Matt Kowta, MCP Principal Gary Davis Group Civil Engineering Gary Davis, PE Principal Easton McAllister, PE Senior Project Engineer LSC Transportation Transportation & Traffic Planning Gordon Shaw, PE AICP Principal Bruce Boyd Architecture Bruce E. Boyd Principal

PROPOSED SCHEDULE 2010 2011 July Aug Sept Oct Nov Dec Jan Feb Task 1: Analysis of Existing Conditions + Opportunities Task 2: Alternative Plan Preparation Task 3: Prepare Draft Plan Task 4: Final Plan = COMMUNITY WORKSHOPS

Project Goals: Redevelop and reuse the site Celebrate the Truckee River as a public asset Provide a catalyst for overall improvement of the corridor as a gateway to central Truckee Integrate public uses into the site Provide public access to the Truckee River Assure a positive transition between site and surroundings Establish the site as a western gateway to downtown Assure improvements are sustainable and energy efficient

Existing Site Conditions

Site Analysis: Physical Factors Environmental mitigation complete in 2012 (?) Steep slope to river = opportunity Views to south and west Surrounding land uses create compatibility challenges Railroad tracks and river constrain access West River Street access improvements needed Poor soil conditions Noise from railroad and West River Street

Regulatory & Policy Review Downtown River Revitalization Strategy (2005) Downtown Truckee Specific Plan (1997) Truckee Trails and Bikeways Master Plan (2007) Truckee 2025 General Plan (2006) Truckee Development Code (Zoning)

Downtown River Revitalization Strategy (Adopted by Town Council October 2005) General Goals and Features River as Connector that Links Community Together Developed Areas and Undeveloped Areas Create Distinct Places: Active, Passive, Natural Three Activity Areas Two Public Plazas Habitat Restoration and Bank Stabilization Figure 8 Circulation System Public / Private Implementation

Suggested Appropriate Improvements Central River Plaza Retail Office Live-Work Restaurant

Downtown Specific Plan & Zoning (Adopted by Town Council 1997) Relevant Adopted Features Commercial, Residential, and Open Space Land Uses Commercial Density (FAR): No Limit Site Coverage: No limit Building Height Limit: 50 feet West River Street: Parking, Bicycle Lanes and Sidewalks Parking Strategies

Market Analysis: Potential Uses Based on Market and Site Characteristics Restaurant : Destination restaurant focused on the river Office: Upper end; Medium-sized suites; potential owneroccupant option Residential : Capitalize on riverfront location, trails and amenities Phased Development : May maximize value of site Modest Development Potential : Will not create excessive competition

Community Workshop #1 September 15, 2010

1 SMALL GROUP DESIGN TEAMS (45 minutes) Location of Open Space Public Gathering Spaces Location of Buildings Types of Uses (Restaurants, Retail, Residential, Office) Street Trees and Planting Areas Location of Parking Location of Trails and Sidewalks Amenities (Art, Water Features, Skate Rink) 2 SMALL GROUP REPORT BACK (20-30 minutes)

Team #1 Plan

Team #2 Plan

Team #3 Plan

Team #4 Plan

Team #5 Plan

Team #6 Plan

Team #7 Plan

Community Workshop #1 Summary of Quantitative Results - Buildings Element Votes Restaurant 6 Mixed-Use 4 Residential 3 Library 3 Retail 2

Community Workshop #1 Summary of Quantitative Results - Streets & Parking Element Votes Parking North of West River Street 7 Parking On-site 4 Crosswalks on West River Street 4 Bike Lane West River Street 3

Community Workshop #1 Summary of Quantitative Results - Open Space Elements Element Votes Major Central Open Space 6 Public Art 5 Pathways Across Site 4 Terraces to River 3 Walkway Along River 3 Public Deck / Viewing Area 3 Town Plaza 2 Pavilion 2 Skywalk Across Rail Lines 2 Tunnel Beneath Rail Lines 2

16 Common Design Principles 1) Major Central Open Space Oriented to the River 2) Destination that will Activate the Space 3) Buildings on the West Property Line or along West River Street 4) Views into Site from West River Street 5) Parking: North of West River Street 6) Relationship to River: Predominantly Visual 7) Public Walkway Along the River 8) Site Sloped Toward River to Achieve Multiple Goals

16 Common Design Principles (cont.) 9) Physical Connection to Downtown Across Rail Lines 10) Mill Street Right-Of-Way as Pedestrian / Bicycle Corridor 11) Sensitivity to Riverside Drive Neighborhood (scale, land use) 12) Pedestrian and Bicycle Improvements on West River Street 13) Focal Point at End of Riverside Drive 14) Recognize Riverside Drive as Important Access to Site 15) Multiple Pedestrian Crosswalks on West River Street 16) Mixed-Use Development on the North Side of West River Street

Alternative 1: Open Space with Restaurant

Alternative 1: Site Cross-Section

North Lake Boulevard Commons Beach Park Tahoe City

North Lake Boulevard West River Site Scale Comparison

Gateway Plaza

Flexible Use Plaza

Terraced Seating

Public Art

Riverfront Restaurant and Waterbar

Riverfront Trails and Overlooks

Signage and Gateway Elements

Bridges Help Define Sense of Place

Truckee Lumber Company (ca. 1885)

Alternative 1: Restaurant Elevations

Alternative 1: Statistical Summary Site Area (includes pump house area): +/- 70,000 SF Open Space (NIC West River Street sidewalks): +/- 41,000 SF Restaurant --Indoor: 5,000 SF --Outdoor: 1,200 SF Parking --On-site: 23 (dedicated spaces) --On-site (plaza / overflow): Approximately 22 spaces --On-street: 19 (within 225 feet of site)

Existing View West from Riverside Drive

Alternative 1: View West from Riverside Drive

Alternative 2: Open Space with Mixed Use (Future Vision)

Alternative 2: Site Cross-Section

Safe Pedestrian Crossings and Parking Access

West River Street Building Character

Street Side (North) Park Side (South) Alternative 2: Mixed-use Building Elevations

Alternative 2: Statistical Summary Site Area (includes pump house area): +/- 70,000 SF Open Space (NIC West River Street sidewalks): +/- 45,000 SF Restaurant --Indoor: 5,000 SF --Outdoor: 1,200 SF Mixed Use along West River Street --Retail / Café: 6,700 SF --Office (above): 6,700 SF Parking --On-site: 5 (disabled and drop-off only) --On-street: 17 (within 225 feet of site) --Off-site: 160 (north of West River Street)

Existing View West from Riverside Drive

Alternative 2: View West from Riverside Drive

Development Pro-Formas Based on current economic conditions Do not include costs for land Compare development costs to value of completed project Target a 10 to 15 percent profit on development cost

Construction Cost Comparison Alt. 1 Alt. 2 Street Improvements (All Public) $269,000 $246,000 Mobilization, Site Preparation and Earthwork (Mostly Public) $632,000 $632,000 Site Improvements (Mostly Public) $2,184,000 $2,161,000 Utilities and Infrastructure (All Private) $228,000 $254,000 Buildings (All Private) $1,281,000 $3,760,000 Total $4,600,000 $7,100,000 Note: All costs include 25% contingency.

Private Development Costs Include: Building Costs All Utilities and Infrastructure Costs Pro-rata Allocation for Mobilization, Site Preparation and Earthwork Costs Share of Public Improvement Costs (for parking) Fees, Permits, Financing, Developer Overhead No Street Improvement Costs

Findings and Considerations Alternatives 1 and 2 fall short of targeted profit, at about break-even, but should improve with economy Improvements in revenues or costs will begin to attract developer interest Incentives can improve feasibility and can be structured to provide return on Town investment over time Public investment will help achieve long-term vision for the site as catalyst for West River Street revitalization

Findings and Considerations (cont.) Public investment may come from outside sources Although not expected to generate substantial funds for public site improvements, development will generate other ongoing benefits: o o o Catalyze private investment elsewhere in area Generate increased property tax; other revenues Private assistance for maintenance of public space

Questions and Comments

END

General Plan 2025 (Adopted by Town Council 2006) Relevant Adopted Policies Policy Action A6.5: Implement the recommended programs of the 2005 River Revitalization Strategy Land Use Principle: Promote mixed-use development in commercial areas.