Hall A Tritium Target (HATT) Operator Training. Skill PHY020
|
|
- Theresa Park
- 5 years ago
- Views:
Transcription
1 Hall A Tritium Target (HATT) Operator Training Skill PHY020
2 Overview Introduction and User Interface (GUI) Principles of Operation JT-valve controls PID and Heater Controls Target Motion Alarms and response FSD system IOC Reboot Controlled access User help and More information
3 Introduction Controls for the HATT and Hall A/C cryotargets are very similar. Hall A/C operator training and Tritium Target Operator training are required for operating the HATT Controls are located on the poltarac machine Use standard poltar login In directory: /home/poltar/desktop/t2targ The HATT needs ESR 15K He to cool the target HX The gas target and solid targets are conductively cooled through the HX The HATT operators responsibilities are very similar to those of the cryotarget operator. The ESR is now running very close to its total capacity Expect reliability issues and be a good cryo-citizen. Operation of the target shall be by the procedure TGT-PROC
4 Principles of Operation The operating temperature of the HATT is 40K nominally. 15K He from the ESR is used to cool the target This must be warmed to ~40K to prevent liquefaction of T2 We raise the temperature of the coolant by using a heater on a PID loop Similar to cryotarget loop heater The return temperature of the He must be kept below ~28K at the inlet to the ESR. Both Hall A and Hall C flow is mixed prior to this inlet. Initially we will return from the HATT with colder than 28K gas but this requirement may change as we learn more during operations To ensure that the return temperature is cold enough flow from a bypass loop is mixed with the flow cooling the target HX.
5 TS X Principles of Operation SUPPLY JT CRYO SCHEMATIC HEATER 15K SUPPLY TS X RETURN TEMP 20K RETURN WARM RETURN TS x JT VALVE CV-1 JT VALVE CV-3 BYPASS HEATER WR VALVE BYPASS JT TARGET HEAT SINK SCATTERING CHAMBER TS X TS X TEMP SENSOR Target operators must keep the return temperature within acceptable limits. At the moment that limit is less than 28K. As we learn from operations with ESR this may be changed.
6 Target Ladder T2 Cell HX (Heat Sink) Gas Cells Dummy and Optics Solid Targets
7 Main GUI VERY IMPORTANT Inlet Temperature between 12 and 14K Outlet Pressure Between 2.5 and 3 atm.
8 Cryostat Status This page contains most of the important information at a glance The flow schematic shows temperatures, heater power, JT settings, etc. Vacuum and cryo flows are included. This is an excellent representation of the target system.
9 JT-Valve Controls Control of individual JT-valves for the T2 target is the same as for the normal cryotarget. Open the bypass JT so that the majority of the He refrigerant flow will pass to the cold return Open the supply JT enough to give ~50W of heater overhead. There are multiple points of entry to the JT-valve control window-which is the same as the cryotarget The JT-valve control box in the counting house is still active.
10 Temperature, PID and Heater Controls The heater PID controls are the same for the T2 target and Cryotarget We will nominally set the heater PID temperature to 40K This may be tuned depending on what we observe during operations. Operators are not to change the PID control temperature unless instructed to do so by a target expert or member of the Cryo Group. Adjust the supply JT-valve such that there is about 50W of heat on the heater. There will be some thermal lag on the heat sink thermometry. The thermometry is not as accurate for the tritium target HX as it is for the cryotargets.
11 Target Motion The target motion system for the tritium target is the same as the cryotargets. Remember to inform MCC of the need to move the target as target motion triggers and FSD Ensure that the target is in the HOME position prior to any access to the Hall. The target motion controls are located on the left side of the main GUI. Just like the cryotarget. The crash button on the console in the counting house is still active and will KILL motion if actuated.
12 EPICS Alarms and Response The HATT alarms are very similar to the cryotarget alarms. The alarm handler APP is started from the GUI in the same way as for the cryotarget. The EPICS alarms are on Inlet and outlet He temperatures HX (heat sink) temperatures Heater Power Vacuum pressure Cryo temps, pressures, and flows. As always call a target expert if an alarm will not reset (clear). Continued
13 EPICS Alarms and Response There are two new signals from CRYO CTD6624 -> T1 outlet temperature Range is 12 to 14K This is labeled inlet temperature on the main GUI CPI60MP -> Compressor capacity Range is 2.5 to 3 ATM This is labeled outlet pressure on the main GUI If these alarm and will not clear: Call the target on call or Call the Tritium Program Manager Cryo shall be notified ASAP to deal with this situation. This may result in adjustments over the phone.
14 FSD System The standard cryotarget user should be familiar with the vacuum pressure and target motion FSDs. There are 4 additional FSDs in the HATT. Tritium Air Monitor When this FSD faults the operator must call the target expert on call. Call the MCC and Tritium Program Manager (D. Meekins) as well. Temperature controller 1 This will fault if any temperature exceeds the set point. This is to protect the cell from high temperatures (in excess of 150K). The likely cause of this will be and ESR failure of some kind. Temperature controller 2 Redundant to Temperature controller 1 with same function Beryllium window coolant flow. This will fault on low flow. Call the target expert on call if a fault does not clear immediately.
15 FSD System 24 V CMN S1 TARGET MOTION S2 Be WATER FLOW S3 VACUUM PRESSURE MECHANICAL S12 VACUUM PRESSURE COLD CATHODE FSD CH-1 TARGET MOTION FSD CH-2 Be WATER FLOW FSD CH-3 VACUUM PRESSURE FLOW SWITCH TEMP SWITCH S4 HX-1 S5 HX-2 S6 He IN - 1 S7 He OUT FSD CH-4 TEMPERATURE - 1 PRESSURE SWITCH LAKESHORE TEMPERATURE FSD FSD CH-5 TEMPERATURE - 2 SAFETY INTERLOCK S8 HX-3 S9 HX-4 S10 He IN - 2 LAKESHORE TEMPERATURE FSD 2 S11 He OUT FSD CH-6 TRITIUM AIR MONITOR VME MODULE 1H04 FSD CARD LOCATED IN RACK 1H75B02 NOTE: ALL SWITCHES ARE NORMALLY CLOSED IN THE NO-FAULT CONDITION UNLESS OTHERWISE NOTED S12 TAM-1 S13 TAM-2 TAM NORMALLY OPEN CLOSED ON FAULT S14 AIR PUMP FLOW
16 Alarm Box in Counting House Vent Line Purge Flow Chamber vacuum Lifter Emergency Stop Boxes are the same as for the cryotarget with the exception of the new alarm on the purge flow. Contact the target expert on call if one of these alarms faults; even if that alarm is not in service (i.e. H2 and D2 Low Pressure, or Vent Line Low pressure).
17 Rebooting the Target IOC Why? Heartbeat lost, stripcharts flat, white medm readouts, etc. Don t panic. You can do this! Call MCC for beam off. Reboot IOC from reboot GUI Wait 2 min. Check PID working again. Network up? Get Beam back. Log it. Hall A: hacweb7 Hall C: hcvme4 username: hacuser Courtesy G. Smith
18 Controlled Access Because of the nature of the tritium target, a controlled access is more involved for the target operator than for the standard cryotarget. Prior to asking for controlled access the target must be moved to the HOME position. This moves the thin walled target well away from the chamber window opening. The MCC operator will verify that the target is in the HOME position before going to controlled access. This procedure will also be used when taking the Hall to restricted access. Access inside the fence requires Hall A work coordinator and RadCon approval (or coverage depending on the situation).
19 User Help and More Information Name Work Cell Home J.P. Chen Greg Smith Silviu Covrig 6410 (843) Dave Meekins Chris Keith Target Cell Phone Tritium Target wiki:
Active Scanning Beam 2: Controlling Delivery
martin.grossmann@psi.ch PSI Winter School for Protons 2010 1 Active Scanning Beam 2: Controlling Delivery Martin Grossmann, C. Bula, M. Eichin, K. Jäggy, G.Martin, A. Mayor, M. Rejzek Center for Proton
More informationSetting the New Standard in Chiller Technology ±0.1 C ZEROPOINT CHILLER SERIES
L i t r o n T o t a l L a s e r C a p a b i l i t y Setting the New Standard in Chiller Technology ±0. C ZEROPOINT CHILLER SERIES Litron s Zeropoint Series Setting the New Standard in Advanced Chiller
More informationCryogenics. Overview of the Jefferson Lab 12GeV Upgrade. J. Creel, K. Dixon, P. Knudsen, J. Wilson Jr.
Cryogenics Overview of the Jefferson Lab 12GeV Upgrade D. Arenius,, V. Ganni, J. Creel, K. Dixon, P. Knudsen, J. Wilson Jr. Stanford Linear Accelerator Center May 9-11, 2006 Cryogenic Operations Workshop
More informationSlow Controls. N. Baltzell 5 th 1 st CLAS12 Experiment Workshop March 28, 2017
Slow Controls N. Baltzell 5 th 1 st CLAS12 Experiment Workshop March 28, 2017 1 Overview Organization Biweekly Meetings: 9:00 on Fridays in L210A Wiki: https://clasweb.jlab.org/wiki/index.php/clas12_slow_controls
More informationSIMPLIFIED HOME SECURITY AND CONTROL
SIMPLIFIED HOME SECURITY AND CONTROL HOME CONTROLLER USER GUIDE HOME CONTROLLER Mediacom introduces a whole new level of security for the things that matter most in your life. Whether you re home or away,
More informationCovidien Articulating Absorba Tack Foil Pouch Leak Tester Owner s Manual IPE SN Rev 1
Covidien Articulating Absorba Tack Foil Pouch Leak Tester Owner s Manual IPE SN 12497 Rev 1 MANUFACTURER: INNOVATIVE PRODUCTS & EQUIPMENT, INC. 5 PROGRESS AVE TYNGSBORO, MASSACHUSETTS 01879 U.S.A Revision
More informationInstallation Manual for. Series HWM and Non-ETI HYDRONIC WATER MODULE with SC and SD COMPRESSOR UNITS and R-410 REFRIGERANT
EarthLinked TXV Kit Installation Manual for Series HWM and Non-ETI HYDRONIC WATER MODULE with SC and SD COMPRESSOR UNITS and R-410 REFRIGERANT CONTENTS PAGE Pre-Installation 3 Hydronic Water Module Conversion
More informationEl63 Laser Acceleration at the NLCTA
El63 Radiation Personnel Protection System Design Document El63 Laser Acceleration at the NLCTA October 12,2005 Subject: Personnel Protection System (PPS) Access Control'System for the El63 Experimental
More informationRev B, 9/2/2009. Kodiak Chiller Overview
930-0001 Rev B, 9/2/2009 Kodiak Chiller Overview Presentation Outline Phone: 781-933-7300 Lytron Technical Support Contact Information 3 Introduction 4 Part I: Unpacking 5 Part II: Installation 7 Part
More informationFAULT CODES. Included in this section are instructions to Reset the two Hot Tank Overload Devices (High Safety Limit).
FAULT CODES Fault Code Index 1. Blue Chilling LED Flashing Cold Sensor Fault 2. Red Heating LED Flashing Hot Sensor Fault 3. Green LED Flashing Filter Service Alert 4. All but Power Button LEDs Flashing
More informationAmmonia Detection System Codes and Design Specifications
Ammonia Detection System Codes and Design Specifications January 15, 2018 Revision 6 Ammonia detection system codes and design specifications Following is a discussion of ammonia detection system design
More informationCryogenics for Neutral Beam Injector System
Cryogenics for Neutral Beam Injector System Ch. Chakrapani, S.K.Sharma, A.K.Chakraborty, B.Sridhar, Vishnu.B. Patel, Siddharth Sheth, N.V.M.Rao, Mainak. B, G.B.Patel, M.J.Singh Janardhan.U, S.Rambabu,
More informationSubstation Monitoring System
Substation Monitoring System SF6 Gas Density Monitoring System Description Introduction As a result of recent European legislation on the control of greenhouse gasses, utilities and manufacturers alike
More informationInstallation Manual for CCS Cased Coils with SC, SD, SW Compressor Units and R-410A Refrigerant
EarthLinked TXV Kit Installation Manual for CCS Cased Coils with SC, SD, SW Compressor Units and R-410A Refrigerant CONTENTS PAGE Pre-Installation 3 Cased Coil Conversion 4 System Start-Up 17 TXV CCS-410-KIT
More informationFDA241, FDA221 Siemens ASD
FDA241, FDA221 Siemens ASD Patented Technology Compatible with the Siemens FDnet/C-NET loops (requires FDCC221S option) Advanced dual Wavelength optical detection (Blue & Infra-red) Configurable as a Standalone
More informationFDA241, FDA221 Siemens ASD
FDA241, FDA221 Siemens ASD Patented Technology Sinteso TM Cerberus PRO Compatible with the Siemens FDnet/C-NET loops (requires FDCC221S option) Advanced dual Wavelength optical detection (Blue & Infra-red)
More informationAPC Refrigeration Distribution Unit (RDU) Guide Specifications
APC Refrigeration Distribution Unit (RDU) Guide Specifications PART 1 GENERAL 1.01 SUMMARY A. These specifications describe requirements for a system designed for cooling of IT equipment. The system shall
More informationEarthLinked SW Series Compressor Unit R-410A Quik-Start Instructions
EarthLinked SW Series Compressor Unit R-410A Quik-Start Instructions CONTENTS PAGE Pre-Installation 3 Placement & Mechanical Information 4 System Application Options 10 Antifreeze Protection 14 Electrical
More informationA n hybrid liquid nitrogen system for the cooling. of the ESO O mega C A M detector
A n hybrid liquid nitrogen system for the cooling of the ESO O mega C A M detector J.L. Lizon*, A. Silber, G. Jakob European Southern Observatory, Karl-Schwarzschild-Strasse 2, 85748 Garching bei München,
More informationChange History Log. Rev Revision Sections Affected Description of Change /22/08 All Initial Version
Change History Log Rev Revision Sections Affected Description of Change Number Date 000 4/22/08 All Initial Version page 2 of 11 EXECUTIVE SUMMARY 1.1 Scope: The purpose of this document is to define the
More informationPS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE 11/03/2015 Rev 00
PS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE 11/03/2015 Rev 00 1 Contents INTRODUCTION... 3 WARNING LABELS AND SAFETY INSTRUCTIONS... 4 PARALLEL RACK NOMENCLATURE... 5 GENERAL RACK DESCRIPTION...
More informationTHE EVOLUTION OF CONTROL APP & CLOUD PORTAL
THE EVOLUTION OF CONTROL APP & CLOUD PORTAL APP MAIN APP FUNCTIONS EMERGENCY Facilitates the work of installers and company maintenance operators. Allows control of the functions of all lights of the system.
More informationOperation Manual. Programmable Logic Controller
Operation Manual Programmable Logic Controller Part No. 9983-0000-E01 / January 2018 OPERATION MANUAL TABLE OF CONTENTS CUSTOMER SERVICE 3 CONTACT INFORMATION 3 ORDER INFORMATION 3 INTRODUCTION 4 THE PROCESS
More informationabode Web app Functionality
abode Web app Functionality System mode display controls the state of the alarm system. The user can change the mode of the system by simply clicking on the desired mode. When arming the system with the
More informationTYCO VALVES & CONTROL Dual Painting System
TYCO VALVES & CONTROL Dual Painting System Thierica Equipment #12095-010 OPERATION/SEQUENCE OF EVENTS INDEX START-UP... 3 LOAD / UNLOAD STATION OPERATIONS... 4 SHUT-DOWN... 5 PAGE DESCRIPTIONS... 6-25
More informationheat interface units A BOILER WITHOUT A FLAME
A BOILER WITHOUT A FLAME heat interface units Communal Heat Networks A central boiler house will generate heat which is distributed through a network of pipe to each home or apartment in the building.
More informationAPC BC300 Series 40kW 208/450/480V User Guide
APC BC300 Series 40kW 208/450/480V User Guide Copyright 2002 APC Denmark ApS This manual is subject to change without notice and does not represent a commitment on the part of the vendor Thank You Thank
More informationSystem 800 Addressable Fire Detection & Alarm System
SECTION 5: page 1 Section 5: System 800 Addressable Fire Detection & Alarm System SECTION 5: page 3 10 reasons to specify 800 1 Plug and Play A user friendly panel not requiring special software tools
More informationTriton Series High Efficiency Boiler
Triton Series High Efficiency Boiler AJAX BOILER INC. Triton Series High Efficiency Boiler The new Atlas Triton Series boilers perform dependably and quietly, offering the most cost effective solutions
More informationSafety Control Modules for Emergency Stop Circuits FF-SRS5988 FF-SRS5935 FF-SRS5925 FF-SRS5934 FF-SRS5924 TYPICAL APPLICATIONS APPROVALS DIMENSIONS
Safety Control Modules for Emergency Stop Circuits TYPICAL APPLICATIONS APPROVALS DIMENSIONS Single Channel Emergency Stop Module E-Stop circuits up to Category 2 (EN 954-) Sliding door protection Conveyors
More informationAutoclave Operations Manual
UNIVERSITY OF ILLINOIS AT URBANA/CHAMPAIGN - COMPOSITES MANUFACTURING LAB Autoclave Operations Manual Version 1 Written by KRH 2/21/2011 Contents ACCS... 4 Alarms... 7 Main Display Tabs... 7 Process Control
More information10 K Airborne Cryocooler and
10 K Airborne Cryocooler and High Efficiency Heat Exchangers W. Gully, P. Hendershott, E. Marquardt, D.S. Glaister, and C. Wilson Ball Aerospace & Technologies Corp. Boulder, CO, 80306-1062 ABSTRACT Ball
More informationAXCELIS NV-GSD-HE EQUIPMENT DATASHEET
AXCELIS NV-GSD-HE Tool ID M7THE707 OEM/Model AXCELIS NV-GSD-HE Serial Number 900282 Process IMPLANT - HE Vintage August, 2006 Wafer Size 200 mm AG Semiconductor Services sales@agsemiconductor.com www.agsemiconductor.com
More informationLCLS-II Vacuum Design and Manufacturing
LCLS-II Vacuum Design and Manufacturing Guidelines and an Approach to Implementation G. Lanza, D. Gill, L. Young, S. Saraf SLAC National Accelerator Laboratory OLAV, May 9 th 2017 Doc. N. SLAC-PUB-16975
More informationHALL D WORKER SAFETY AWARENESS TRAINING (SAF113)
SVN: docs/reviews/experimentalreadinessreview HallD/ERG June 29, 2017 HALL D WORKER SAFETY AWARENESS TRAINING (SAF113) Updates and Revisions June 29, 2017 page 1: Added change log page 10: Replaced emergency
More informationDoc. No. SP R0. CXI Reference Laser. Prepared by: Jean-Charles Castagna Signature Date Design Engineer
ENGINEERING SPECIFICATION DOCUMENT (ESD) Doc. No. SP-391-000-73 R0 System LUSI SUB-SYSTEM CXI Prepared by: Jean-Charles Castagna Signature Date Design Engineer Co-Authored by: Paul Montanez Signature Date
More informationProfessionally Monitored Service User Guide
Midco SmartHOME Professionally Monitored Service User Guide Learn how to protect the things that matter most with this instruction guide for professionally monitored Midco SmartHOME service. 07 Midcontinent
More informationPlasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide
Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide Description: The Plasma-Therm 790 is configured for RIE (Reactive Ion Etching) processing of Silicon substrates. Substrates up to 8 inches
More informationInstallation Manual for ETI AVS Series and NON-ETI Air Handlers with SC or SD Compressor Units and R-410A Refrigerant
EarthLinked TXV Kit Installation Manual for ETI AVS Series and NON-ETI Air Handlers with SC or SD Compressor Units and R-410A Refrigerant CONTENTS PAGE Pre-Installation 3 Air Handler Conversion 4 System
More informationExploratory Lab Testing of a Residential-Scale Combined Space and Water Heating CO 2 Heat Pump
Exploratory Lab Testing of a Residential-Scale Combined Space and Water Heating CO 2 Heat Pump ACEEE Hot Water Forum 2017 Session 1B February 27 Ben Larson ben@ecotope.com Problem Statement(s) HFC refrigerants
More informationPS SERIES PARALLEL RACK SYSTEM START UP GUIDE
PS SERIES PARALLEL RACK SYSTEM START UP GUIDE 5/16 Rev. A 57-02508 1 Contents INTRODUCTION... 3 WARNING LABELS AND SAFETY INSTRUCTIONS... 4 PARALLEL RACK NOMENCLATURE... 5 GENERAL RACK DESCRIPTION... 6
More informationTesting of the IBM z-series Modular Refrigeration Unit. Terrence Quinn IBM Integrated Supply Chain Procurement Engineering
Testing of the IBM z-series Modular Refrigeration Unit Terrence Quinn IBM Integrated Supply Chain Procurement Engineering Overview: This presentation will describe the methodology and hardware used in
More informationDevelopment of a measurement and control system for a 10 K refrigerator based on Siemens PLC S7-300
Development of a measurement and control system for a 0 kw@0 K refrigerator based on Siemens PLC S7-300 J Li,, L Q Liu, T Liu 3, X D Xu, B Dong, W H Lu, W Pan, J H Wu and L Y Xiong Key Laboratory of Cryogenics,
More informationCELLTROL II BIOREACTOR CONTROL SYSTEM OPERATIONS MANUAL
Operation Manual Celltrol II Bioreactor Control System Page 1 of 33 Table of Contents 1) Introduction... 3 1.1) Scope of Document... 3 1.2) Control System Overview... 3 1.3) Introduction to Celltrol II...
More informationUsing the Dome On/Off Plug-In Switch with SmartThings. Table of Contents
+ Using the Dome On/Off Plug-In Switch with SmartThings 773-794-1300 support@domeha.com www.domeha.com Table of Contents Installing the Device Handler 2 Main Page 3 Settings Page 4 Turn on a Lamp When
More informationKurt J. Lesker in the Cryogenic Community. Dr. Glynn Dyson Cryogenics Cluster Day 19 th September 2014
Kurt J. Lesker in the Cryogenic Community Dr. Glynn Dyson 19 th September 2014 Overview Introduction to the Kurt J. Lesker Company (KJLC) KJLC in the Cryogenic Community Deposition Methods Axxis Coating
More informationHEAT EXCHANGER FORMULAS & EXAMPLE
Formulas for Heat Exchanger System using a Modulating Control Valve Definition of Terms and Units: E = Mean Heat Transfer Rate or Heat Load (Btu/hr) E D = Design Heat Load (Btu/hr) U = Overall Heat Transfer
More informationFLAMINGOS Camera Dewar Cooldown On Kitt Peak
FLAMINGOS Camera Dewar Cooldown On Kitt Peak Dick Joyce Version 1.04, 2012 July 30 FLAMINGOS Camera Cooldown, V 1.04, 2012 July 30 Page 1 of 7 1. Introduction This manual is a guide to cooling down the
More informationAXCELIS NV-GSD-HE EQUIPMENT DATASHEET
AXCELIS NV-GSD-HE Tool ID M9IHE101 OEM/Model AXCELIS NV-GSD-HE Serial Number 90009 Process IMPLANT - HE Vintage January, 1995 Wafer Size 200 mm AG Semiconductor Services sales@agsemiconductor.com www.agsemiconductor.com
More informationEVLA Memorandum 107 Failure Pathology of EVLA WIDAR Correlator Support Systems October 18 th, 2006 Bob Broilo, Brent Carlson
EVLA Memorandum 107 Failure Pathology of EVLA WIDAR Correlator Support Systems October 18 th, 2006 Bob Broilo, Brent Carlson INTRODUCTION The WIDAR correlator being developed for the EVLA project will
More informationD-TECT 2 IP. GJD230 IP Motion Detector
D-TECT 2 IP GJD230 IP Motion Detector PACKAGE CONTENTS 1 x D-TECT 2 IP 1 x Drilling template for fixing holes 3 x 31.75mm wall plugs 3 x 31.75mm screws 2 x Spare sliding curtains 2 x Tamper feet 1 x Tamper
More informationLaserFOCUS VLF-250 Engineering Specification
Vision Fire & Security LaserFOCUS VLF-250 Engineering Specification May 2004 Part Number 20296 LaserFOCUS VESDA 2 VESDA LaserFOCUS Contents Scope...4 Description...4 General...4 Approvals...4 Codes, Standards
More informationVAC PLC. System Description
VAC PLC System Description Contents 1 General... 5 1.1 Expressions and phrases... 5 1.2 Locations... 5 1.3 Abbreviations and terms... 6 1.4 Function... 6 1.5 Parts... 7 1.5.1 PLC... 7 1.5.2 Point IO...
More informationNovember 11, City of Sparks 215 S. 21 st St. Sparks, NV
November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of
More informationWATER-TUBE POOL HEATERS
XTHERM, TYPE P - MODELS 2505-4005 SUGGESTED SPECIFICATIONS Catalog No.: 6000.70 Effective: 09-15-16 Replaces: NEW WATER-TUBE POOL HEATERS - GENERAL 1.1 SUMMARY A. Section includes condensing, gas-fired
More informationFEI Nova 200 Dual Beam system maintenance
David Haviland A 1(6) FEI Nova 200 Dual Beam system maintenance 1 General This document describes regular maintenance of the FEI Nova 200 Dual Beam system at Albanova Nanofabrication Facility. All work
More informationIQ PANEL USER GUIDE SMARTHOME.
IQ PANEL USER GUIDE SECURITY & SMARTHOME www.schmidtsecurity.com USING YOUR SYSTEM: BASICS Navigation Move from page to page and access information on each page using finger touches, swipes, and scrolling.
More informationMODEL NUMBER: SRCOOL60KCW
The SRCOOL60KCW is not a standalone unit. It must connect to an existing building chilled water system to operate. SmartRack 60 kw 208 230V 50/60 Hz In-Row Precision Cooler, Chilled Water Type MODEL NUMBER:
More informationGuide Specifications
Guide Specifications Hot Water fired Adsorption Liquid Chillers Bry-Air Adsorption Chiller Overview The chiller shall be a Bry-Air ADC series. The chiller shall consist of a robust, compact, packaged chiller
More informationModSync Sequencing System Installation & Operation Manual. For use with Fulton Steam Boilers.
ModSync Sequencing System Installation & Operation Manual For use with Fulton Steam Boilers. Revision 3.0 8/21/2008 - 2 - Table of Contents Introduction Page 4 Features Page 4 Sequence of Operation Page
More information2.A MANIFOLD SHUNTS MINI SHUNTS
2.A MANIFOLD SHUNTS MINI SHUNTS ROTH HEATING SYSTEMS 2A. MANIFOLD SHUNTS Roth Manifold Shunts 4"/5.8cv and 1"/7.0cv Preassembled, manually adjusted, proportional temperature mixing station with built-in,
More informationUser s Manual. THE iq Drive SYSTEM USER S INFORMATION IMPORTANT. Variable Speed Ultra-High SEER Split System IMPORTANT NOTE
User s Manual Variable Speed Ultra-High SEER Split System These units have been designed and tested for capacity and effi ciency in accordance with ARI standards. These outdoor air conditioning units are
More informationHEAT TROL ELITE SERIES HWE-Single Stage, HWE-MOV, HWE-Mulit Stage Hot Water Reset Control for Light Commercial and Residential Applications Provides q
SIGNAL REPEATER RC2100 WI-CON Wireless Heating Control for Steam and Hot Water Boilers No sensor wiring required Intelligent sensing algorithm saves energy Low limit control and alarm alert operator of
More informationEarthLinked CC Series Compressor Unit R-410A Quik-Start Instructions
EarthLinked CC Series Compressor Unit R-410A Quik-Start Instructions CONTENTS PAGE Pre-Installation 3 Placement & Mechanical Information 4 System Application Options 11 Desuperheater Kit 15 Anti-Freeze
More informationHIGH EFFICIENCY FIRETUBE CONDENSING GAS BOILER
This manual must be left with owner and should be hung on or adjacent to the boiler for reference. US HIGH EFFICIENCY FIRETUBE CONDENSING GAS BOILER MODELS CHS-85 through CHS-399 APPENDIX A CONTROLLER
More informationEarthLinked HC Series Compressor Unit R-410A Quik-Start Instructions
EarthLinked HC Series Compressor Unit R-410A Quik-Start Instructions CONTENTS PAGE Pre-Installation 3 Placement & Mechanical Information 4 System Application Options 11 Antifreeze Protection 14 Electrical
More informationMaintenance and Reliability Design Aspects SNS 2K Refrigeration System
Maintenance and Reliability Design Aspects SNS 2K Refrigeration System Dana M. Arenius, JLab Cryogenics Systems Group Donald Richied, SNS Cryogenics Systems Group Cryo2004 Operations Workshop March 29-April
More informationSPECIAL SPECIFICATION 1646 Digital Loop Vehicle Detector Unit
1993 Specifications CSJ s 2552-03-033 & 2552-1 SPECIAL SPECIFICATION 1646 Digital Loop Vehicle Detector Unit 1. Description. This Item shall govern for furnishing and installing digital loop vehicle detector
More informationWATER-TUBE POOL HEATERS
XTHERM, TYPE P - MODELS 1005A-2005A SUGGESTED SPECIFICATIONS Catalog No.: 6000.63B Effective: 3-01-15 Replaces: 9-01-09 WATER-TUBE POOL HEATERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes condensing,
More information3.2 Cryoplant and Cryodistribution
3.2 Cryoplant and Cryodistribution 3.2.1 System Description 1 3.2.1.1 Cryoplant 1 3.2.1.2 LHe Plant 4 3.2.1.3 80K He Loop and LN 2 Subsystem 5 3.2.1.4 Cryodistribution System 6 3.2.1.5 System of Cryogenic
More informationXT-70 Control Panel 3
Manual XT-003.5 Copyright BTU Ventilation 2013 XT-70 Control Panel 3 3 FORWARD The new XT Series Control Panel from BTU Ventilation is built from the ground up for the 21st century farm manager. Simplicity
More informationD-TECT 3 IP. GJD260 IP Motion Detector
D-TECT 3 IP GJD260 IP Motion Detector PACKAGE CONTENTS 1 x D-TECT 3 IP 1 x Drilling template for fixing holes 3 x 31.75mm wall plugs 3 x 31.75mm screws 2 x Spare sliding curtains 2 x Tamper feet 1 x Tamper
More informationControl System Studio - CSS - Alarm Handling
Control System Studio - CSS - Alarm Handling Kay Kasemir, Ph.D. ORNL/SNS kasemirk@ornl.gov June 2011 at KEK Managed by UT-Battelle Previous Attempts at SNS ALH; manual summary displays; generated soft-iocs
More informationPicoTrack PCT-200CRS Standard Operating Procedure
PicoTrack PCT-200CRS Standard Operating Procedure CORAL Name: ptrack Model: PicoTrack PCT-200CRS Coat-Develop Track Location: ICL Photo Room Purpose: Coat and Develop Photoresist Author: K. Payer, November
More informationModular Chiller Systems. Application Guide
Modular Chiller Systems Application Guide Table of Contents Introduction.... 1 References/Nomenclature Conventions... 2 Terms & Definitions.... 2 Module Size Selection...3 Water Source, Cooling Only and
More informationDEFA HOME. User Manual Base Unit PRO
DEFA HOME User Manual Base Unit PRO Table of Contents Overview 5 Logging into the app 9 Home 10 Calendar 13 Adding an event 14 Editing an event 15 Zones 16 Switch mode 17 Thermostat mode 19 Regulator
More informationMetal hydride storage system for MICE experiment at Rutherford Appleton Laboratory. Technical specification.
DRAFT Metal hydride storage system for MICE experiment at Rutherford Appleton Laboratory. Technical specification. MICE Collaboration Contact persons: Dr Thomas Bradshaw Head of Cryogenics Section Tel:
More informationAuto Technology Company Cyclic Corrosion Test Chamber
Auto Technology Company Cyclic Corrosion Test Chamber Built for Versatile and Repeatable Testing The Auto Technology Cyclic Corrosion Test (CCT) Chamber creates a variety of environments in an exposure
More informationZM2 OPERATING AND MAINTENANCE INSTRUCTIONS
ZM2 OPERATING AND MAINTENANCE INSTRUCTIONS CONTENTS 1. System Overview 2. User responsibilities 3. First Line controls and indications 3.1 Logging on to the fire alarm system 3.2 Checking system status
More information573 Dew Point Mirror. Industrial Chilled Mirror Hygrometer. Typical applications:
Industrial Chilled Mirror Hygrometer Integral frost/dew point measuring head Internal sample pump Optimal Response Injection System ForceFrost TM function Ice-Test user calibration verification User configurable
More informationTECHNICAL DATA DOUBLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC/ PNEUMATIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.
Page 1 of 9 1. (Refer to Figures 1-3.) Viking Electric/Pneumatic Double Interlocked Preaction Systems utilize a Viking deluge valve controlled by a pneumatic actuator (E.1), normally held closed by supervisory
More informationBUILDING MANAGEMENT SYSTEMS. Introduction to Building Management Systems
BUILDING MANAGEMENT SYSTEMS Introduction to Building Management Systems The Building Management System is used for all the functions carried out by the building including energy services security monitoring,
More informationChapter 8: Troubleshooting. 8: Troubleshooting 8 TROUBLESHOOTING... 3
8: Troubleshooting 8 TROUBLESHOOTING... 3 8.0 NO HEAT... 3 8.1 NO OR LOW FLOW CONDITION... 3 8.2 NOZZLE DOES NOT PICK UP COMPONENT... 3 8.3 NO MOTION... 3 8.4 MACHINE ALARM CONDITIONS & ALARM SCREEN...
More informationBuilding Automation System
University of New Hampshire University of New Hampshire Scholars' Repository Division 25 Integrated Automation Chapter 5 Technical Construction and Renovation Standards 8-1-2014 250000 - Building Automation
More information2012 Toolbar & NH3 Operators Manual
2012 Toolbar & NH3 Operators Manual P/N 320379 Amity Technology, LLC 2800 7th Avenue North Fargo, ND 58102 (701) 232-4199 www.amitytech.com This Page Left Intentionally Blank Page 2 2012 Toolbar/NH3 Manual
More informationIon Gateway Cellular Gateway and Wireless Sensors
Page 1 of 9 Account & Network Setup If this is your first time using the Ion Gateway online system site you will need to create a new account. If you have already created an account you can skip to the
More informationTri-Stack Smart System
Tri-Stack Smart System TM Notes & Warnings - The protection provided by this equipment may be impaired if it is not used in the manner specified herein. - Ensure all wiring meets applicable national and
More informationSECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of
More informationPS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE. Master Rack Compressor Sequencer 7/21/2017
PS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE Master Rack Compressor Sequencer 7/21/2017 1 2 Contents INTRODUCTION... 4 WARNING LABELS AND SAFETY INSTRUCTIONS... 5 PARALLEL RACK NOMENCLATURE...
More informationFlexPS. Architectural & Engineering. Specification for FlexPS. Architectural/Engineering Specification for a
Architectural/Engineering Specification for a Fence-Mounted Perimeter Intrusion Detection System FlexPS Disclaimer Senstar, and the Senstar logo are registered trademarks, and FlexPS, Silver Network and
More informationAdditional Cooling Stage (FT174-43) Adds the location points and plumbing for a fourth heat exchanger.
Modules, Options and Accessories Options (to be defined at time of order) Flowmeter Option (FT174-40) The standard unit displays an estimated flow rate calculated from the feed pump speed. This is accurate
More informationV1.21: (Required for All Dryers with Static Sampler or Incoming MST Sensor, Good for All Dryers)
QuadraTouch Pro Software Update Change Log Official Release vs. Beta Release (How to tell): Tools -> System Tools -> System Information and look for Official Release or Beta Release in the bottom right
More informationLCLS Front End Enclosure PPS Engineering Specification
Printed copies of this document must be verified as being current prior to use by checking the effective date on the Systems Document Master List. Table of Contents 1.0 Introduction... 2 2.0 General Information...
More informationMODULAR CHILLER. R410a R22
Ra R 3 Ra/-0 R/-0 New ppearance New Y-shape design, more fashion IR-COOLED SERIES (Ra) Compressor ir cooling side heat exchanger Best scroll compressor, low sound power level, By using calculation model
More informationISIS Design Division Electrical Engineering. S Birch. September 2012.
S Birch. September 2012. Mitigation against EMI/RFI noise on Detector cabling and Data Acquisition Electronics. Brief overview of an IEC 61508 Neutron Instrument Personnel Protection Interlock System.
More informationDIVISION WALL-HUNG STAINLESS STEEL HEATING BOILERS
XPAK FT TYPE H - MODELS 088AR-398A SUGGESTED SPECIFICATIONS Catalog No.: 2100.91 Effective: 05/01/15 Replaces: new DIVISION 23 52 33.13 WALL-HUNG STAINLESS STEEL HEATING BOILERS PART 1 - GENERAL 1.1 SUMMARY
More informationTECHNICAL DATA. 319a. January 27, 2012
January 27, 2012 319a 1. DEsCrIpTIoN (Refer to Figures 1-3.) Viking Electric/Pneumatic Double Interlocked Preaction Systems utilize a Viking deluge valve controlled by a pneumatic actuator (E.1), normally
More informationK-Controller Brochure.qxp_ Controller Brochure 2/27/17 3:03 PM Page 4 Versa IC Platform
Versa IC Platform VERSA IC Integrated Control Platform Raypak s VERSA IC combines modulating temperature control, safety limits, and ignition programming into one user- friendly Integrated Control Platform.
More informationGencoa Limited, Physics Road, Liverpool, UK 2. Gencoa USA, Davis, CA, USA 3. Nano4Energy, Madrid, Spain 4. Universidad Autonoma de Madrid, Spain
Luxel.com A NOVEL SENSOR FOR Selenium VAPOUR DEPOSITION MONITORING AND CONTROL V. Bellido-Gonzalez 1, D. Monaghan 1, J. Brindley 1, B. Daniel 1, R. Brown 1, F. Papa 2, A. Wennberg 3, I. Fernández 3, M.Leon
More informationHR Heated HB Blower. Smart Solutions for Drying Compressed Air. Dual Tower Heat Reactivated Desiccant Air Dryer
Smart Solutions for Drying Compressed Air Dual Tower Heat Reactivated Desiccant Air Dryer HR Heated HB Blower 800.943.794 www.engineeredairproducts.com Engineered Air Products Moisture in compressed air
More information