MANUAL FOR ASSEMBLY OF BOILER VIADRUS G 300
|
|
- Jeremy Smith
- 5 years ago
- Views:
Transcription
1 MANUAL FOR ASSEMBLY OF BOILER VIADRUS G 300 Date of revision 8/2007
2 Contents: 1. Boiler use and advantages VIADRUS GLADIATOR G 300 Boiler Technical Data Generally Boiler Installation Boiler Body Installation List of parts needed Installation procedure Pressurizing boiler vessel Boiler Armature Installation Installation of burner plate Installation of the Closure Plate Installation of the Smoke Exit Neck Installation of Heating Media Takeoffs Boiler Jacketing Installation of the Control Box Box Description
3 Order Number of links: 5: 5 links 6: 6 links 7: 7 links 8: 8 links 9: 9 links 10: 10 links 11: 11 links 12: 12 links 13: 13 links 14: 14 links Order Specification Code (type designation) The way of delivery: S : compound/ assembled state R : decomposed/disassembled state G 300 X X X X Type of regulation: 4: Electropanel basic design 6: Electropanel - fixed OS 06 Burner type: 0: no burner 1: with burner In your order, it is necessary to specify parameters as per the requisite specification Code. 1. Boiler use and advantages Cast-iron sectional warm-water boiler VIADRUS G 300 is designed for heating the heat carrying substance (water) by the thermal energy which it gets from gas or liquid fuels burning process while using the appropriate pressure burners. These burners must correspond to : ČSN :1990 Burners for gas and liquid fuels ČSN :1986 Burners for gas fuels ČSN :1990 Burners for liquid fuels. The boiler is made exclusively for law-pressure warm-water systems of central heating with maximum working temperature of the heat-carrying substance (water) up to 115 C, at the maximum working overpressure of 4 bar and for burning the fuels as follows: - gas fuels - natural gas - liquid fuels - furnace oil extra light (TOEL) The boiler body is tested by applying the test overpressure of 8 bar. The boiler advantages are as follows: 1. Long service life of the cast-iron boiler body 2. A highly economical operation. The efficiency of combustion higher than 90,5 % for all kinds of fuels and in the whole performance range. 3. At request delivery including the burner. 4. A modern design. 5. A fully automated two-stage operation at the recommended types of burners. 6. Operation signalling, possibly the signals used for transfer into a superior control system and the boiler failures. Possibility to operate the boiler through a superior automatics or space temperature sensor. 7. At request there can be ordered the regulation elements designed for heat carrying substance(water) temperature up to 115 C (as standard they are delivered up to the temperature of 95 C). 8. Possibility of boilers concatenation. 9. Delivery in either an assembled or disassembled condition at customer s request 10. Depending on boiler room layout there can be designed opening of sealing and burner plate either to the left or right hand side. 11. Easily accessible sight glass and the probe for overpressure measuring in the combustion chamber. 12. In combination with recommended burners (see chapter Boiler technical parameters ) spares of environment because the combustion results meet in the whole performance line the rigid environmental standards and regulations. 3
4 2. VIADRUS GLADIATOR G 300 Boiler Technical Data Table 1 Thermo technical Parameters of the Boiler Calorific value of fuel Natural gas MJ/Kg Light Heating Oil (TOEL) MJ/Kg Boiler size (number of sections) pc Nominal Heating Power kw Nominal Thermal Power kw 113,2 138,5 163, ,3 239,6 264,8 290,1 315,4 340,7 Efficiency % 90,5 Fuel Consumption Natural gas m 3 /h 11,5 14,1 16,7 19,3 21,9 24,5 27,1 29,7 32,2 34,9 Extra light Heating Oil (TOEL) Kg/h As per data from burner manufacturer Volume of boiler water space L 56,4 65,4 74,4 83,4 92,4 101,4 110,4 119,4 128,4 137,4 Maximum water process overpressure bar 4 Maximum operating temperature of heating water C 95 (115) Combustion products technical data Required pressure mbar 0,05 Maximum overpressure in the burning chamber mbar 2 Combustion products temperature C 185 Combustion products mass - gaseous fuel: 9.5% CO2 Kg/h liquid fuel: 13% CO2 Kg/h Dimensions Depth of combustion chamber mm Heat transfer surface m 2 5,48 6,75 8,02 9,29 10,56 11,83 13,10 14,37 15,64 16,91 Minimum length of burner nozzle mm Maximum length of burner protrusion into chamber mm 50 φ Opening for burner *) mm Boiler width mm 750 Boiler height mm 1355 Boiler depth mm φ Smoke exhaust throat mm 225 φ Connector heat carrying media mm 80 Boiler Mass Kg *) Requesting different φ opening please specify in your order (optional) Table 2 Recommended Types of Burners for Natural gas and Biogas Boiler size (number of sections) pc Nominal Heating Power kw Recommended burners gaseous fuel combustion WEISHAUPT WG 20 N/1 - A WG 30 N/1 - C WG 40 N/1 - A INTERCAL SGN 44/2 SGN 55/2 SGN 66/2 SGN 77/2-350 BENTONE STG 146 BG 300 BG BG 300 M BG 300 BG BG 300 M BG 400 BG BG 400 M BG 450 BG BG 450 M BG 300 LN BG 400 LN BG 450 LN PBS Třebíč APH-M 02 PZN,PPN APH-M 04 PZN,PZ,PPN RIELLO GULLIVER BS 3D GULLIVER BS 4D RS 28 TC RS 38 TC Recommended burners liquid fuel combustion WEISHAUPT WL 20-A WL 30 - C WL 40 Z-A INTERCAL SL 44/2 SL 55/2 SL 66/2 SL 77/2 BENTONE ST 146 B 20K B 20K-2 B 30 B 30 2 B 40 B 40 2 B 45 2 PBS Třebíč AOH M 02 PN AOH M 04 PN RIELLO GULLIVER RG 3D GULLIVER RG 4D RL 28 TC RL 38 TC Unless the above recommended burners are used, the manufacturer does not guarantee achieving performance at specified parameters 4
5 Figure 1 Boiler G 300 Assembly Scheme 5
6 3. Generally Boiler VIADRUS G 300 is supplied in a disassembled state, i.e. individual sections on palette, boiler armature and auxiliaries in proper packaging container, jacket and insulation also in the packaging case. The following general rules apply to the assembling operation of boiler links: Boiler is to be built on a horizontally true bedding about 50 mm high; the dimensions of boiler should be exceeded also by 50 mm. During the individual link bonding, it is necessary to ensure that the sealing ledges are perfectly sealed using boiler sealant supplied The same care should be taken with respect to sealing the boiler to the smoke exhaust neck and smoke uptake L of boiler + min. 500 *) It is necessary to respect the selected type of burner layout requirements ( gas inlet, burner length etc.) Figure 2 Placement of Boiler G 300 in Boiler Room 4. Boiler Installation 4.1. Boiler Body Installation List of parts needed Number of sections Front, rear and 3 to 12 middle sections (as per size of the boiler) Number of boiler inserts 8-26 (as per boiler size) Boiler binder sealant Oil paint for painting boiler inserts Anchor bolts: 4 pc, length determined by the boiler size from 505 to 1495 mm (in 110 mm steps) Limiting insert Plugging stopper G 2 Plugging stopper G 2 with G ½ threading Thermostats well Thermometers well Manometer check valve Installation procedure Boiler is to be built on a horizontal bedding Position the rear link on the bedding and using suitable brace, support it Drilled openings of the insert holes in rear link should be thoroughly cleaned to remove remnants of conservation agent and impurities Outer edges of the said holes to be dulled by cabinet file, then paint the openings by oil paint or varnish Put inserts already painted by oil paint or varnish, into the appropriate openings and tap by using wooden mallet Insert must be properly and evenly put through Deposit boiler glue paste on prepared cleanly grinded off surfaces of the sections joint 6
7 Put the link over the protruding parts of the inserts in such a way that the inserts edge in easily into the link openings for inserts, tap in place by wooden mallet and using bonding tools, bind together CAUTION: Ensure that the spacing between individual sections remains during the whole process of binding together equal! Repeat the process to carry out binding of all remaining sections CAUTION: To bind at any one time more than one link is not permitted! Bonded boiler body should then be secured using anchor bolts CAUTION: Anchor bolt nuts to be tightened very lightly, to allow thermal dilation of the boiler body during operation Perimeter groove (dovetail) always created by binding of two sections should be thoroughly filled over the whole perimeter by boiler sealant plug G2 with thread G ½ front section central section anchor bolt boiler insertion rear section termostat well restrictive insertion 5-10 sections capillary thermometer well check valve plug G2 restrictive insertion sections 4.2. Pressurizing boiler vessel Lower opening of the front link is to be plugged off using stopper G 2 upper opening of the front link is to be plugged off using stopper G 2 with threading G ½ Affix the thermostat well into G ½ opening in the upper stopper Into existing holes G ½ in the castings of the front link affix: On the right hand side the well of manometer, and o the left, the check valve for the manometer All threaded joints to be sealed by hemp Insert the limiting insert into lower opening located on the rear link (heating water intake) for sizes of the boiler up to 10 sections, the said limiting insert is made of cast iron. It must be positioned such as to show the recess in the insert sideways and, the insert would be by its lug positioned into the collar of the preceding link joint. For sizes of the boiler over 10 sections, the said limiting insert is made of steel. It must be placed into the lower rear hole in last rear link, into the boiler body. Its position is delimited by the end-stops located on the limiting insert. Affix the flange with socket for possible pressure water connection, into the rear lower opening of the rear link. The upper opening in the rear link (takeoff of the heating water) should be closed by sealed flange equipped with the de-aerating valve. Open the de-aeration valve and fill the boiler vessel with cold water, then close the valve. 7
8 Perform the overpressure test using the 8 bar pressure over at least 15 minutes. During the overpressure test, there must not appear any leaks Carry out visual inspection 4.3. Boiler Armature Installation Installation of burner plate - Mount into the lower holes having M 12 threading in the front link: a) On the right hinges (bolt M12 x 65 with an eye) such that the distance of the eye opening axis from the edge of the link was 40 mm; on the left stud bolts M 12 x 80 for opening the burner plate to the right b) On the left hinges (bolt M12 x 65 with an eye) such that the distance of the eye opening axis from the edge of the link was 40 mm; on the right stud bolts M 12 x 80 for opening the burner plate to the left - Into the groove located in the burner plate, insert sealing flex-cord FS 000 φ 10 - Burner plate with supplied insulation is to be mounted on hinges, and φ 12 x 63 pegs positioned - Close the burner plate, inspect it for correct seating and position, and tighten the M12 nuts with wshers - Into the groove located in the burner plate, insert sealing flex-cord FS 000 φ 10 of length 810 mm - In accordance with the burner used, install the burner flange The latter is supplied in the standard styling without connecting threads but, optionally as per client's wishes, after the burner type selected is announced, a flange φ 150 (φ140,φ165) mm with connecting thread could be supplied. - Following instructions provided by the burner manufacturer (the burner installation set up is always included in the procedure for installation form the supplier), prepare the flange for affixing the burner insul. adapting piece burner plate small valve sight glass flange for burner Installation of the Closure Plate - Mount into the lower holes having M 12 threading in the front link: a) On the right hinges (bolt M12 x 65 with an eye) such that the distance of the eye opening axis from the edge of the link was 40 mm; on the left stud bolts M 12 x 80 for opening the burner plate to the right b) On the left hinges (bolt M12 x 65 with an eye) such that the distance of the eye opening axis from the edge of the link was 40 mm; on the right stud bolts M 12 x 80 for opening the burner plate to the left - Into the groove located in the burner plate, insert sealing flexcord FS 000 φ 10 of length 1,550 mm - Burner plate with supplied insulation is to be mounted on hinges, and φ 12 x 63 pegs positioned - Close the burner plate, inspect it for correct seating and position, and tighten the M12 nuts with washers insul. adapting piece sealing plate 8
9 Installation of the Smoke Exit Neck - Into the groove located in the burner plate, insert sealing flexcord FS 000 φ 10 of length 900 mm - Position the smoke exit socket assembly (throat castings and the explosive clack valve) over 3 pc of studs M 8 x 30 and fasten nuts M 8 with washers - Connecting boiler with the vent stack is done as per project documentation, using the smoke duct φ 225 mm, to be positioned over the exhaust vent sleeve, then connected with the chimney. draw-off orifice sealing explosion shutter - small cover Installation of Heating Media Takeoffs On the upper flange connector of the rear link seat the flange itself with heating water takeoff and sealing, then tighten using nuts M12 with washers On the lower flange joint position the flange with the sleeve 3 and another with ¾, for filling and draining tap furnished with the seals. So created joint tighten using M12 nuts with washers. CAUTION: Prior to installing the lower flange, inspect whether in the lug is not missing the limiting insert. Once the boiler is hot, re-tighten all the flange connections. heating water and drilled water flange with sealing drain valve G¾ heating water flange cover with sealing Filling of the heating system by water First, the whole heating system must be thoroughly flushed to cause removal of all impurities that may be deposited in the distributions or heating bodies and could subsequently become a source of pump damage. To fill the boiler and heating system, it is necessary to use clear, colorless water, free from foreign matter in suspension, without any oil or chemically aggressive substances. Circulating and replenishing water must correspond to: Table 3 Highest Allowable Limits for Heating Water as per ČSN :1992 Code. Hardness mmol/l 1 Ca 2+ mmol/l 0,3 Total concentration of Fe + Mn mg/l 3* *) recommended value 9
10 In case the hardness be outside of the specifications, water must be conditioned.. Experience shows that even multiple reheat of the hard water will not prevent deposition of salts on interior surfaces of the boiler vessel. Deposits of about 1 mm thick (limestone) will cause a loss of heat transfer from metal to water of about 10%. During the heating season, a stable level of water volume in the system must be ensured while being mindful that the heating system must be periodically de-aerated. Boiler and heating system water must never be discharged or bled from the system save for urgent and necessary situations such as maintenance, etc. Bleeding the conditioned water from the heating system and refilling it with new water is always associated with danger of an increased corrosion and calcite deposit formation. Should it be necessary to refill the water in the heating system, it is permitted only when the boiler is let to cool; this will prevent a potential crack failure of cast-iron sections. 5. Boiler Jacketing left front side jacket part w. insulation upper front jacket part w. insulation upper rear jacket part w. insulation rear lower jacket part w. insulation rear upper jacket w. insulation elektropanel electro-panel console right section console jacket front section side jacket part w. insulation left section console connecting console console of jacket right front side jacket part w. insulation - on the upper riser of front and rear section from inside screw on 4 screw M8 4 section consoles (2 left and 2 right) console of jacket left section console right section console 10
11 - Hang the side parts of the jacket cover with insulation over the upper cast lugs on the front and rear link in such a way that the front wall with cutouts for armature bolting leans tightly against the front link. - Side parts of the cover bolt from the front (in about a centre of the height of front wall), using M6 screws with rosette washers - Side parts of the cover on its front lower position, to be joined using the front portion of the cover jacket then the lower jacket part using the connecting gussets - Rear cover bottom part with insulation to be hanged using hooks inserted into the rectangular cutouts and, secure it by means of the sheet metal screws 2.9 x 9.5 to the side shrouds - Rear housing upper part with insulation position it on the edges of the side shrouding and screw it to them as well as to the bottom part using sheet metal screws 2.9 x Place upper insulation (freely laid belts of the material) over the upper surfaces of the boiler body, on the sides - Upper shroud lid with insulation to be inserted by its studs into requisite gussets located on side covers - front shroud lid to be inserted by its studs into requisite gussets located on the side covers 6. Installation of the Control Box 6.1. Box Description The control box is composed from the following basic parts: - Basic box with instrument panel - Operating hours I. and II. Step metering - Capillary manometer devices - Capillary thermometer - Control lights indicating operation in mode I - Regulatory Thermostat I. step and II of the burner - Regulatory Thermostat II. step - Signal light failure indicating a contact - Safety thermostat actuation on safety thermostat - Connector terminal 1 Main switch 2 Signalling of operation stage II. 3 Service thermostat stage I. 4 Safety thermostat 5 Service thermostat stage II. 6 Running hours counter stage I. and II. 7 Thermomanometer 8 Blind flanges 9 Fuse 10 A 10 Burner failure signalling 11 Heating water temperature exceeded signalling The Operation and installation manual is a part of delivery in case that a equithermal regulation is required. 11
12 12 For size 5 10 sections For size sections
13 1 jacket front section 2 front section 3 central section 4 rear section 5 boiler insertion 6 anchor bolt 7 plug with external thread 8 thermomanometer clack valve 9 sealing plate 10 insul. adapting piece 11 burner plate 12 insul. adapting piece 13 draw-off orifice 14 explosion shutter - small cover 15 2x reservoir 16 sealing 17 heating water flange cover 18 mica little window 19 mica small window sealing 20 heating water and drilled water flange 21 restrictive insertion 22 flange for burner electro-panel 24 thermomanometer 25 blind flange large 26 drain cock 27 small valve 28 rear lower jacket part 29 rear jacket part insulation 30 rear upper jacket 31 upper jacket part insulation 32 side jacket part 33 insul. of jacket side part 34 upper jacket part 35 upper jacket part insulation 36 cons. with cable trough 37 left section console 38 section console 39 jacket side part 40 side jacket part insulation 41 front side jacket part 42 upper front jacket part 43 upper jacket part insulation 44 electro-panel console 45 running hours counter 46 connecting console 47 network module 13
14 14
15 15
16 ŽDB GROUP a.s., závod Topenářská technika VIADRUS 16
1. Order and Auxiliaries
VIADRUS Hercules G U26 90 MANUAL FOR ASSEMBLY Návod OF BOILER k obsluze Contents: page 1. Order and Auxiliaries...3 1.1 Order...3 1.2 Delivery a accessories...3 2. Boiler Uses and Advantages...4 3. VIADRUS
More informationVI He ADrcules U26 RUS G 350 CALOR SRL -
VIADRUS Hercules G U26 350 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALLATION Table of contents: page 1. Boiler use and advantages... 3 2. Boiler VIADRUS G 350 technical data... 4 3. Description...
More informationINSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS
INSTALLATION AND OPERATING INSTRUCTIONS HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS INDEX 1. Technical information... page 3 2. Dimensional and technical characteristics... page 3 3. Packing
More informationPANTHER P Automatic Boiler Operator's Manual
KOVARSON s.r.o. Lhota u Vsetína 4 755 01, Vsetín tel. CZ: +420 571 420 926 tel. SK: +421 949 176 717 email: info@kovarson.cz PANTHER P Automatic Boiler Operator's Manual - 1 - Dear Customer, Thank you
More informationRemove the Testing Certificate from inside the combustion chamber and keep together with the instructions manual.
Remove the Testing Certificate from inside the combustion chamber and keep together with the instructions manual. The package of the 2R GT OF boiler contains instructions for installation, operation and
More informationRemeha. Fuel oil/gas boilers P 520. Installation and Service Manual A
Remeha Fuel oil/gas boilers EN Installation and Service Manual 300016859-001-A 63115 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It
More informationCa 6s and BCa 6s kw INSTALLATION AND OPERATING INSTRUCTIONS. Page 1 31/07/00
Ca 6s and BCa 6s 33-64 kw INSTALLATION AND OPERATING INSTRUCTIONS Page 1 CONTENTS: General specification Dimensions for Ca6s and BCa6s boilers. Boiler room clearance requirements Boiler block assembly
More informationSingle stage operation oil burner
Installation & Operating Manual Single stage operation oil burner WARNING NON-RETROFIT APPLICATIONS If this burner is being installed in a packaged unit (ie. burner comes with a boiler or furnace), follow
More informationSingle stage operation oil burner
Installation & Operating Manual Single stage operation oil burner WARNING NON-RETROFIT APPLICATIONS If this burner is being installed in a packaged unit (ie. burner comes with a boiler or furnace), follow
More informationSTONE TROUGH CONSOLE SINK
STONE TROUGH CONSOLE SINK INSTRUCTIONS CONTENTS Console Installation Sink Support 2 2 Backsplash 2 Undermount Sink Semi-Recessed Sink 3 4 Vessel Sink 5 Drain Installation 6 1 CONSOLE SINK Read entire Console
More informationVortex 15/21 Utility and Outdoor Module Vortex Combi 21 and Outdoor Vortex Combi 21
Part No. DOC 38 Rev. 02 January 2007 SUPPLEMENTARY INSTALLATION and SERVICING INSTRUCTIONS Vortex 15/21 Utility and Outdoor Module Vortex Combi 21 and Outdoor Vortex Combi 21 For use with Kerosene only
More information2.1 BOILER ROOM BOILER ROOM DIMENSIONS 2.3 CONNECTING UP SYSTEM 2.4 CONNECTING UP FLUE 2.5 ELECTRICAL CONNECTION
FONDERIE SIME S.p.A. of Via Garbo 27 - Legnago (VR) - Italy declares that its diesel-burning boilers are produced in accordance with the requirements of article 3 paragraph 3 of Directive PED 97/23/EEC
More informationSmoke extraction duct of sheet steel
Smoke extraction duct of sheet steel The accessories that are available, as for example inspection openings, steel grilles, plenum boxes, ceiling diffusers, splitter attenuators, bends, tees and connecting
More informationPart 2: Installation Instructions cl
Contents Page: Part 2: Installation Instructions cl. 381-382 1. Delivery scope............................... 3 2. General and Transportation safety precautions........... 3 3. Stand installation 3.1 Installing
More informationUNI. Cast-iron solid fuel boiler. Installation and operating instructions
UNI Cast-iron solid fuel boiler Installation and operating instructions Rev. June 2010 Content: 1. Introduction 2. Characteristics of boilers 3. Technical parameters 4. Delivery and accessories 5. Location
More informationVIADRUS A0C Manual for boiler operation and installation
VIADRUS A0C Manual for boiler operation and installation GB_2017_45 LP GB_2016_28 Content page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 3 3 Description... 5 3.1 Boiler
More informationHERCULES U 32 Manual for boiler operation and installation
HERCULES U 32 Manual for boiler operation and installation GB_2017_20 GB_2015_46 Content p. 1 Boiler Use and Advantages... 3 2 Technical parameters of the boiler... 3 3 Description... 5 3.1 Boiler Construction...
More informationVIADRUS HERCULES Hercules U U26 AND INSTALLATION
VIADRUS HERCULES Hercules U U26 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALLATION Table of contents: page 1. Boiler use and advantages... 3 2. Boiler technical data... 3 3. Description... 8
More informationINSTALLER INSTRUCTIONS
RS IT ES PT GB INSTALLER INSTRUCTIONS ENGLISH CONTENTS 1 DESCRIPTION OF THE BOILER............................................................................. 49 2 INSTALLATION............................................................................................
More informationNXR3. 70 / 290 kw HIGH-EFFICIENCY, PRESSURIZED, CAST IRON, OIL OR GAS BOILERS. 1. Standards - Regulations. 3. Assembly and installation
I N S T A L L A T I O N M A N U A L NR3 70 / 290 kw HIGH-EFFICIENCY, PRESSURIZED, CAST IRON, OIL OR GAS BOILERS 1. Standards - Regulations 2. General 3. Assembly and installation 4. Installing the options
More informationHERCULES Gre H e e n rc E u c l o e s T e 2 r 6
HERCULES Green Hercules Eco Therm U26 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALATION Contents: page 1. Produced variants of boiler... 3 2. Technical data of the boiler... 4 3. Boiler description...
More informationInstallation and maintenance instructions
Installation and maintenance instructions Oil and gas-fired special boilers Logano G5 WS For heating engineers Please read carefully prior to installation and maintenance. 6 70 67 76 (0/00) GB Contents
More informationEUTECTIC EC-10DV Series
EUTECTIC EC-10DV Series DIRECT VENT OIL-FIRED WATER BOILER/NO. 2 OIL VENTING INSTALLATION INSTRUCTIONS CONTENTS..........................................PAGE Basic Guidelines..........................................1
More informationHeating Equipment. gas boilers RX GB. installation and servicing instructions
Heating Equipment gas boilers RX GB installation and servicing instructions CONTENTS 1 TECHNICAL FEATURES AND DIMENSIONS 1.1 BOILER DESCRIPTION.............................................. page 1 1.2
More informationVIADRUS HERCULES U 26 Manual for boiler operation and installation
VIADRUS HERCULES U 26 Manual for boiler operation and installation GB_2016_48 2010 GB_ 2015_20_model 2010 Table of contents: page 1 Boiler use and advantages... 3 2 Boiler technical data... 3 3 Description...
More informationTECHNICAL MANUAL ASGX
TECHNICAL MANUAL ASGX MEDIUM/HIGH PRESSURE HOT WATER BOILER INDEX 1 TECHNICAL CHARACTERISTICS... 2 1.1 GENERAL... 2 1.2 TECHNICAL DATA... 2 2 ACCESSORIES... 3 2.1 PRESSURE... 3 Pressure gauge... 3 Operation
More informationInternet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #
INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #238-39387-00 THIS INSTRUCTION SUPPLEMENT IS ONLY INTENDED TO GIVE INSTALLATION INSTRUCTIONS AND INFORMATION RELATED TO THE INDUCED
More informationInstallation and maintenance instructions
Installation and maintenance instructions Calorific value forced draft sectional boiler Buderus Logano GE 615 Buderus Logano GE 615 Logano GE615 For installer Please read thoroughly prior to installation
More informationVIADRUS HERCULES U26 ECO Manual for boiler operation and installation
VIADRUS HERCULES U26 ECO Manual for boiler operation and installation GB_2015_21 GB_2016_48 Table of contents: page 1 Boiler use and advantages... 3 2 Boiler technical data... 3 3 Description... 6 3.1
More informationVIADRUS HERCULES U 24 Manual for boiler operation and installation
VIADRUS HERCULES U 24 Manual for boiler operation and installation GB_2014_21 Table of contents page 1. Technical information... 3 1.1 Usage... 3 1.2 Boiler advantages... 3 1.3 Boiler technical data...
More informationSIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A
cod. 6272262A GENERAL DATA Heating Data Heat Output Input (Adjustable) (Adjustable) Format 34i 11.2 34KW 45 145MJ/hr Format 34e 11.2 34KW 45 145MJ/hr General Specifications FORMAT 34i 34e Main burner injectors
More information1 VICTRIX ZEUS Superior kw I features
Wall-hung condensing VICTRIX ZEUS Superior kw I is the new range of wall-hung condensing boilers with 54 litre stainless steel storage tank available in two versions with nominal heat output of 26 kw and
More informationHercules U2 LIGNAT 6
Hercules LIGNATOR U26 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALLATION Table of contents: page 1. Boiler use and advantages... 3 2. LIGNATOR boiler technical data... 4 3. Description... 7 3.1
More informationTECHNICAL MANUAL CODEX. THREE PASS CONDENSING BOILER WITH LOW NOx
TECHNICAL MANUAL CODEX THREE PASS CONDENSING BOILER WITH LOW NOx 1 GENERAL...4 2 GENERAL WARNINGS...5 3 HANDLING AND LIFTING...6 4 TECHNICAL DATA...7 4.1 DIMENSIONS AND FITTINGS...8 5 INSTALLATION...9
More informationVIADRUS A2C Manual for boiler operation and installation
VIADRUS A2C Manual for boiler operation and installation GB_2016_31 GB_2016_28 Content: page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 4 3 Description... 8 3.1 Boiler
More informationVICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power
VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power VICTRIX 90 is the new wall-hung condensing boiler for room heating only, set-up for independent functioning and for that in cascade mode
More informationVIADRUS A0C Manual for boiler operation and installation
VIADRUS A0C Manual for boiler operation and installation GB_2017_30 GB_2016_28 Content page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 3 3 Description... 6 3.1 Boiler structure...
More informationRETROFIT APPLICATIONS ONLY
Installation & Operating Manual WARNING RETROFIT APPLICATIONS ONLY If this burner is being installed in a packaged unit (ie. burner comes with a boiler or furnace), follow the installation and set-up instructions
More informationPELLET BURNER PV 350
PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION
More informationOIL-FIRED CAST IRON HOT WATER BOILER. Parts and Optional Accessories
Models 3EW.65 3EW.75 3EW1.00 4EW.90 4EW1.25 4EW1.50 5EW1.20 5EW1.75 OIL-FIRED CAST IRON HOT WATER BOILER Parts and Optional Accessories EMPIRE II SERIES 3 Ordering Instructions Order Parts through your
More informationMODERATOR Vento Eko 15,20,25 kw
MODERATOR Vento Eko 15,20,25 kw INSTRUCTION MANUAL Manufacturer: Moderator Sp. z o.o., 17-200 Hajnówka, ul. 11 -go Listopada 16a, Poland Tel. +48/85/682 75 20; 682/85/682 75 21, Fax +48/85/682 75 29 biuro@moderator.com.pl,
More informationPC 640 GB. Built-in cooking tables 60 Instructions for installation and use
PC 640 GB Built-in cooking tables 60 Instructions for installation and use Congratualtions on choosing an Ariston appliance, which you will find is dependable and easy to use. We recommend that you read
More informationVIADRUS A0C Manual for boiler operation and installation
VIADRUS A0C Manual for boiler operation and installation GB_2016_31 GB_2016_28 Content: page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 4 3 Description... 11 3.1 Boiler
More informationInstallation and maintenance instructions
6303 88 07/2005 For heating engineers Installation and maintenance instructions Oil and gas-fired boilers Logano G25 US Please read carefully prior to installation and maintenance Table of Content Safety
More informationInstructions for Operation and Maintenance of Containers
Instructions for Operation and Maintenance of Containers Container Handling 1. Containers are designed for transport on a flat loading area that is 2.5 m wide, which enables support of the load-bearing
More informationPro-Clean Stratified Tank scope of delivery:
Foreword Hearty congratulations on your purchase of a product from TiSUN! We vouch for the high quality and long service life of our products with our name. Only licensed specialized companies that have
More informationINSTALLATION AND MANINTENANCE INSTRUCTIONS
INSTALLATION AND MANINTENANCE INSTRUCTIONS Appr. Nr. A 9503 T - 0085 AQ 0765 PEGASUS F2 T HIGH EFFICIENCY GAS-FIRED CAST-IRON BOILERS Models 51-68 - 85-102 2 Contents 1. General technical data 2. Dimensional
More information- 12, , TECHNICAL INSTRUCTIONS
HEATING TECHNIQUE Centrometal d.o.o. - Glavna, Macinec, Croatia, tel: +8 7, fax: +8 7 TECHNICAL INSTRUCTIONS for installation, use and maintenance of hot water boiler and installation of additional equipment
More informationGas 220 Ace Cascade Assembly Manual
Gas 220 Ace Cascade Assembly Manual 1 Dear Customer, Thank you very much for buying this appliance. Please read through the manual carefully before using the product, and keep it in a safe place for later.
More informationREF. NO Clamp Assembly 8 1 set Gasket (4 per set) S.S. Lock-washer 3/8 x 1/ Brass Impeller 3.
4.4 SUPPLY PUMPAK ASSEMBLY NOTE: This section applies only to systems, which include a supply pumpak. Only the H6, XA, and XC series systems contain a supply pumpak. If your system is a single zone, H6
More informationGasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1
Gasification boiler PYROLYT INSTRUCTION MANUAL ver. 1.1 THERMOSTAHL would like to thank and congratulate you on your purchasing this boiler device and ensure that you have made a good choice. PYROLYT boiler
More information1 ESMA, Inc. P. O. BOX 734 * SOUTH HOLLAND, IL * (800) * FAX (708)
1 2 Instructions for Ultrasonic Washer E789 (U.L. Approved) 1. INTRODUCTION The E789 Automatic Ultrasonic Washer automatically performs a cleaning cycle, the major steps of which are: Ultrasonic cleaning
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Keep these instructions with the boiler at all times. BOYERTOWN FURNACE CO. PO Box 100 BOYERTOWN, PA 19512 1-610-369-1450 www.boyertownfurnace.com 5-25-12 2 Danger Warning Caution
More informationInstallation Instructions for. OmniFount
Installation Instructions for OmniFount Congratulations, you have just purchased the finest watering fountain on the market. This unit is built to give you excellent service when properly installed and
More informationMANUAL. Page 1/44
MANUAL FOR INSTALLATION AND OPERATION OF A HEATING SYSTEM, CONSISTING OF HOT WATER WOOD PELLET BOILER FROM SERIES PELLETHERM V4 AND AUTOMATED WOOD PELLET BURNER FROM SERIES GP IV http:// www.greenecotherm.eu
More informationTechnical information Installation instructions. Modul-plus (F21-52) High performance calorifiers
Technical information Installation instructions Modul-plus (F21-52) High performance calorifiers These instructions apply to the following types: 5/6-Modul-plus F (21) 5/6-Modul-plus F (31) 5/6-Modul-plus
More informationBURNERS/ FLARES. VAREC BIOGAS 244W Series WASTE GAS BURNER & IGNITION SYSTEM
BURNERS/ FLARES VAREC BIOGAS 4W Series WASTE GAS BURNER & IGNITION SYSTEM The Varec Biogas 4W Series Waste Gas Burner is a highly reliable flare and ignition system ideal for use in burning excess biogas.
More informationREMKO CLK Mobile automatic heater
REMKO CLK Mobile automatic heater Operation Technology Spare Parts Edition GB M04 REMKO - powerful like a bear. Operating Instructions Read these instructions carefully before setting up/operating the
More informationINSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20
INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8
More informationC. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009.
SECTION 235100 - BREECHINGS, CHIMNEYS, AND STACKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fabricated breechings. B. Manufactured chimneys for gas fired equipment. C. Manufactured double wall chimneys for
More informationOPERATING and INSTALLATION MANUAL
OPERATING and INSTALLATION MANUAL STATIONARY ELECTRICAL WATER TANKS OKCE 160 NTR / 2,2 kw OKCE 200 NTR / 2,2 kw OKCE 250 NTR / 2,2 kw OKCE 300 NTR / 2,2 kw OKCE 300 NTR / 3-6 kw OKCE 200 NTRR / 2,2 kw
More informationabt W Lamp Paraffine Oil n. 0,125 l/h 12 V = (11-14,5 V) 220 x 285 x 115 mm
SPECIFICATIONS Heat output Fuel - consumption Supply voltage Current consumption - start, 2 minutes Dimensions abt. 1200 W Lamp Paraffine Oil n. 0,125 l/h 12 V = (11-14,5 V) abt. 0,4 A abt. 5 A 220 x 285
More informationInstallation Guide. Model: IC15- MF Model: IC15- MFSilent Model: IC30- MF Model: IC30- MFSilent
Installation Guide Model: IC15- MF Model: IC15- MFSilent Model: IC30- MF Model: IC30- MFSilent IMPORTANT SAFETY INFORMATION READ AND SAVE THESE INSTRUCTIONS WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC
More informationJ SERIES. Technical Specifications. Centrifugal Pumps for J Series Condensate & Boiler Feed Pumps. Features
Steam Traps Condensate Boiler Feed Valves Strainers Pumps J SERIES Centrifugal Pumps for J Series Condensate & Boiler Feed Pumps Technical Specifications The Sterlco J Series Centrifugal Pumps are designed
More informationCm Pelet-set - touch TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT
CENTROMETAL d.o.o. Glavna 12 40306 Macinec Croatia tel: +385 40 372 600; fax : +385 40 372 611 TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT Cm Pelet-set - touch (60-90 kw) For boilers: EKO-CK
More informationForced draught natural gas/propane burner
Installation, use and maintenance instructions GB Forced draught natural gas/propane burner Single stage operation CODE MODEL 20096942 G400 (2) - 11/2015 Original instructions TABLE OF CONTENTS Installation
More informationENTROPIE boiler TT300
ENTROPIE boiler TT300 20 60 MW 160 о С 16 bar Сontents Field application TT300 boilers... 82 Operation of ENTROPIE boiler TT300... 82 Boiler diagram...... 83 Diagram of boiler TT300... 84 Technical characteristics...
More informationInstallation and maintenance instructions
Installation and maintenance instructions Cast Iron Sectional oiler for use with Forced Draft urners. Logano GE55 For contractors Read carefully before carrying out installation and maintenance. 6 70 643
More informationASSEMBLY INSTRUCTIONS - NXS SERIES. INFRARED RADIANT TUBE HEATER Single and Two Stage Pull Through System (Negative Pressure)
ASSEMBLY INSTRUCTIONS - NXS SERIES OWNER / INSTALLER: For your safety this manual must be carefully and thoroughly read and understood before installing, operating or servicing this heater. INFRARED RADIANT
More informationMULTIPLEX SELF RECUPERATIVE gas burner
Installation - Maintenance MULTIPLEX SELF RECUPERATIVE gas burner SERIES MPSR The Nu-way Multiplex Recuperative System offers the alternative of a self-recuperative burner or a separate recuperator and
More informationPELLETS BURNER 15-60kW MOC
PELLETS BURNER 15-60kW MOC. Please read those documentation before first start up the unit. Improper burner start may lead to its damage and may create a danger for end user! Table of Contents: 1. Admission
More informationTechnical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT
Technical Data SD 4511A SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY 12586-2035 TYPE T14 & T14D TEMPERATURE PILOT PRINTED IN U.S.A. SD 4511A/9811 5 13 /16 D 4 7 /8 1 13 /16 T14 PILOT
More informationSECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS
SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from
More informationInstallation of Glass Lined Equipment
Installation of Glass Lined Equipment Information given herein is for guidance only and may not be complete. It is important that only trained and competent personnel are permitted to handle glass lined
More informationRS Chimney Fan for Solid Fuel Applications
Installation & Operating Manual RS Chimney Fan for Solid Fuel Applications USA CAN Product Information... Chapters 1 + 2 Mechanical Installation... Chapter 3 Electrical Installation... Chapter 4 Start
More informationTERMOCAST MAXI. Cast iron boiler for solid fuel firing. Installation and User Manual
TERMOCAST MAXI Cast iron boiler for solid fuel firing Installation and User Manual 2195 Thank you for purchasing Maxi boiler. Please read this manual carefully before installation and operation of your
More informationDH-Direct Fired Poultry Farm Diesel Heater
DH-Direct Fired Poultry Farm Diesel Heater Comparison of Diesel Heater to Gas Heater Diesel LPG Gas LPG Gas KW 43 70 120 Fuel consumption/hr 3 5.1 8.8 Heat output 37000 60000 100000 Cost of fuel/lit or
More informationInstallation Instructions
Installation Instructions TX English version of the assembly instructions for technicians. Read and follow the instructions and safety instructions! Subject to technical change. Fröling Heizkessel- und
More informationBoiler Technical Specifications (2013)
ACT Bioenergy Boiler Dimensions 0.5-0.85 Million Btu/h (150-250kW) Model CP500 CP600 CP750 CP850 Heat Output in MBtu/h (kw) 510 (150) 610 (180) 750 (220) 850 (250) Height ft (mm) 6 1 (1855) 6 1 (1855)
More informationMOHICAN. MOHICAN 4-Pass Water Boiler, HP, PSI Section
SPECIFICATION SHEETS Steam Sample Specification Water Sample Specification MOHICAN SPECIFICATION SHEET The following sample specifications are provided by Superior Boiler Works to assist you in providing
More informationCOMBUSTION AIR SYSTEM
COMBUSTION AIR SYSTEM MODEL: CAS-4JR This product is designed for use with any natural gas or LP burning furnace, water heater, or boiler with a 24 VAC control system. It may be used with a residential
More informationVIADRUS HERCULES ECO Manual for boiler operation and installation
VIADRUS HERCULES ECO Manual for boiler operation and installation GB_2015_11 SD Table of contents: page 1. Produced boiler variants...3 1.1 Purchase order...3 2. Boiler usage and advantages...3 3. Boiler
More informationInstallation Instructions
Instructions for Dryers Original Instructions Keep These Instructions for Future Reference. (If this machine changes ownership, this manual must accompany machine.) Part No. 514446ENR2 February 2015 Front
More informationINSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT
Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT Read All Instructions Thoroughly Before Beginning Installation WARNING
More informationWHE 2.24 / WHE 2.24 FF
EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3
More informationU S E R M A N U A L. Kabola Compact. Kabola Heating Systems BV Placotiweg 1E 4131 NL Vianen The Netherlands
U S E R M A N U A L Kabola Compact Kabola Heating Systems BV Placotiweg 1E 4131 NL Vianen The Netherlands www.kabola.nl Preface Congratulations on the purchase of your new Kabola Compact boiler. It s the
More informationTechnical Specification
Cochran Ltd Newbie Works, Annan, Dumfries & Galloway, Scotland, UK DG12 5QU Telephone: +44 (0)1461 202111 Fax: +44 (0)1461 205511 Email: info@cochran.co.uk www.cochran.co.uk Three Pass Wet back COCHRAN
More informationSingle stage operation forced draught natural gas/propane burner
Installation & Operating Manual Single stage operation forced draught natural gas/propane burner The following pages contain information, descriptions and diagrams for the proper installation and wiring
More informationWaste/Multi Oil Boilers from Flexiheat
Waste/Multi Oil Boilers from Flexiheat At a time of rising fuel costs, the Flexiheat FMOB universal/waste oil boiler range, which can burn nearly all vegetable, animal, conventional and waste oil, will
More informationU tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45
U tube models PTU 09, 2, 5, 25, 30, 35, 40, 45 & single linear tube models PTS 09, 2, 5, 25, 30, 35, 40, 45 installation, servicing & operating instructions INSTALLATION, SERVICING AND OPERATING INSTRUCTIONS
More informationINSTALLATION AND OPERATION MANUAL
INSTALLATION AND OPERATION MANUAL PRESSURISED STEEL BOILERS AR 30 AR 1000 RADIALAND - BOILER's INSTALLATION MANUAL version 1.0 / 15-02-2008 The company E. is outstanding in the field of central heating
More informationHome Stack Washer/Dryers
Home Stack Washer/Dryers Refer to Page 3 for Model Numbers Parts SWD456C_806093 www.alliancelaundry.com Part No. 806093R1 December 2016 Table of Contents Title Page Parts Ordering Information... 2 Serial
More informationEMPIRE II SERIES II Models 3EW.65 3EW.75 3EW1.00 4EW.90 4EW1.25 4EW1.50 5EW1.20 5EW1.75
EMPIRE II SERIES II Models 3EW.65 3EW.75 3EW1.00 4EW.90 4EW1.25 4EW1.50 5EW1.20 5EW1.75 OIL-FIRED CAST IRON HOT WATER BOILER Parts and Optional Accessories Ordering Instructions Order Parts through your
More informationDirect Vent Training & Installation Instructions for Venting 40/50 gallon models Telescoping Vent Kit (standard)
Choosing Location of the water heater This water heater is of the direct vent design. It takes all of its fresh air for combustion from outside the building which it is installed. It also vents the combustion
More informationVICTRIX Superior kw Export VICTRIX Superior kw X Export
Wall-hung condensing VICTRIX Superior kw is the instantaneous sealed chamber wallhung boiler with power of 32 kw which, thanks to condensation technology, is characterised for its high efficiency and guarantees
More informationMTP (MTPAL) AIR HEATERS TECHNICAL DOCUMENTATION
Do Žlábku 733, 514 01 Jilemnice Subject: MTP (MTPAL) Technical Documentation Page 1 of 13 MTP (MTPAL) AIR HEATERS TECHNICAL DOCUMENTATION Table of Contents: Page: 2 Warranty Certificate 3 Quality and Completeness
More informationIndex. Operating Instructions. Installation Instructions
Index Information on the boiler plate Boiler dimensions, Boiler packaging dimensions Technical parameters Introduction Ensuring safety of equipment and people, Head loses 2 3 4 5 6 Operating Instructions
More informationPowerstock Storage Tank
Powerstock Storage Tank Models ST300, ST500, ST750 & ST1000 INSTALLATION, COMMISSIONING AND SERVICING INSTRUCTIONS THE POWERSTOCK STORAGE TANK IS INTENDED FOR USE AS A COMMERCIAL APPLIANCE. PUBLICATION
More informationWater Boilers ME10EN, ME15EN. Table of Contents
Water Boilers ME10EN, ME15EN Operator Manual Model ME15EN Model ME10EN Safety Information...2 Rough-In Drawing...3 Installation...4 Priming...5 Cleaning...5 Table of Contents Adjustments...6 Maintenance...7
More informationTECHNICAL DATA. Wet 26a. February 22, 2009
February 22, 2009 Wet 26a 1. DESCRIPTION The Viking Alarm Check Valve serves as a check valve by trapping pressurized water above the clapper and preventing reverse flow from sprinkler piping. The valve
More information