Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1

Size: px
Start display at page:

Download "Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1"

Transcription

1 Gasification boiler PYROLYT INSTRUCTION MANUAL ver. 1.1

2 THERMOSTAHL would like to thank and congratulate you on your purchasing this boiler device and ensure that you have made a good choice. PYROLYT boiler is a fail-proof product made of the highest quality materials by the large, known and reliable production factory. THERMOSTAHL brand guarantees satisfaction for the customer. Please read this Operation and Maintenance Documentation (OMD) and get familiarized with the terms and conditions of the guarantee before installing and operating the boiler. 1. GENERAL INFORMATION The Operation and Maintenance Documentation constitutes an integral part of the boiler and should be delivered to the user with the device. Installation should be carried out in accordance with the recommendations contained in this documentation as well as applicable standards and best construction practices. Operational use of the boiler based on this documentation shall guarantee safe and failure-free operation and shall constitute the basis for possible guarantee claims. The Manufacturer (Thermostahl) shall reserve the right to modify production engineering, technical data, dimensions, appearance and boiler equipment without prior notice. THERMOSTAHL shall not be responsible for damages resulting from improper installation of the device and for failure to comply with the terms and conditions set forth in the Operation and Maintenance Documentation. 2. SCOPE OF DELIVERY (SHIPPING CONDITION) PYROLYT boiler shall be delivered as follows: 1. The complete boiler body with the boiler doors and two ceramic plates, 2. Packaging with the casing, thermal insulation with harnesses and turnbuckles for its clamping, 3. Control panel (charged separately), 4. Cleaning tools, 5. Technical manual. 3. TECHNICAL CHARACTERISTICS, INTENDED USE OF THE BOILER, TYPES OF FUELS PYROLYT boiler type is a low-temperature, steel water. It is designed to be fired by wood and briquette. Boiler operation is based on the process of gasification. The woods are placed on the upper combustion chamber of the boiler, where it is the process of drying and preheating. The fan supplies primary and secondary air necessary for combustion. The combustion takes place in a direction downwardly because of reverse flame, in which the wood is gasified by forced air flow from the primary air. Special ceramic plates accept the thermal loading amounting to 1200 o C. Flue gases are directed by smoke tubes into the smoke chamber and subsequently to the chimney. With the method of gasification achieved efficiency to 92% resulting in fuel economy by 25-30% compared to a conventional wood boiler. Moreover there is a very small amount of ash. When loading wood the user should open the damper

3 (by-pass) by the lever. The smoke will leave by the tamper to the chimney. All boilers have heat exchanger for cooling the boiler and protect them in case of overheating. The boiler design allows achieving high efficiency and the efficient combustion guarantees minimum exhaust emission of harmful substances and fuel economy. Combustion process Phase 1: Drying of wood. Phase 2: Gasification of wood at 450 o C. Phase 3: Burning of mixture of gasified woods with the secondary air at 560 o C. Phase 4: Combusting with increasing flame temperature at 1200oC, at the lower combustion chamber. Phase 5: Outlet the exhaust gases through the torch at 165 o C Boiler design Boiler Body PYROLYT gasification boiler is made of St 37.2 steel plates according to DIN Non-metallic parts are made of special materials with high temperature resistant and designed in that way to have long life time and strength ant to protect the metallic parts of boiler against the high temperatures. The boiler is separated in 3 parts; The upper chamber for wood feeding, drying of wood and gasification of wood, the ceramic plate where burning the gasified woods with the secondary air and the lower combustion chamber where the flame transfers the heat to the water. The produced flue gases are directed by three triangle paths into the smoke chamber and subsequently to the chimney. An extractor is equipped at the back side of boiler and helps the air to come into the boiler from the front opening. The opening for the air is able to close in case that the boiler temperature reaches a limit. A draught regulator with a chain close the opening and the air cannot came into the combustion chamber. The quantity of air is controlled by two switches with screws, one for the primary and one for the secondary air. The outer of the boiler body is coved with glass wool insulation and metallic covers. Doors The boiler has 3 doors. The first one allows the access to the upper chamber. It is used for the feeding of boiler with woods. The second one is the middle door and is used for the cleaning of the openings for the primary and secondary air and finally the third one is the lower door and is used for cleaning of the bottom ash. The amount of bottom ash in the boiler is about 1 to 2% of the total amount of fuels. The lower door is also equipped with a window for inspection of flame during the operation of boiler. Ceramic plates The boiler is equipped with two ceramic plates. The ceramics are constructed to resist at very high temperature. During the operation the temperature of flame reaches up to 1200 o C. The first one is a ceramic plate with jets where the secondary air is mixed with the gasified woods. The second ceramic plate is placed at the bottom of the combustion chamber, receives the flame with the high temperature, protects the boiler against the high temperatures and transfers the heat equally to the boiler water.

4 a. b. a. ceramic with jets, b. ceramic plate Smoke chamber The smoke chamber is at the back side of boiler. The flue gases are directed down of the ceramic plate and through an opening goes to the smoke chamber after a route through the smoke tubes. The smoke tubes are in contact with the boiler water so the flue gases transfer their heat to the water. After that the flues exhaust to chimney and then to the environment. The smoke chamber has also and a damper. The tamper connects the feeding chamber with the smoke chamber. That helps the exhausts to leave from the feeding chamber to the chimney and not to the boiler room during the start of boiler and during the feeding process. The damper opens manually with a lever. Before the user opens the door to fill the boiler with woods they should pull the lever to open the damper. Then there is no danger to fill the boiler room with smoke and the user could fill the boiler. When the user completes the filling of the boiler, closes the door and pushes the lever. The damper closes and the gasification process starts. The smoke chamber has four covers for cleaning and inspection Technical characteristics

5 1 Control panel 2 Dumber lever 3 Feeding door 4 Smoke tubes cleaning lever 5 Opening for primary air entry with a thermostatic mechanism 6 Primary air controller 7 Middle door 8 Secondary air controller 9 Combustion chamber door for inspection and cleaning 10 Flame inspection window 11 Extractor 12 Smoke chamber 13 Smoke chamber cleaning cover Τ1 Input of hot water Τ2 Output of cold water Τ3 Drain tap 1/2" Τ4, Τ5 Safety serpentine connections Τ6 Connection for temperature sensor Ø1 Flue diameter 3.3. Technical data Type Power Max pressure Water capacity Heating surface Weight Combust. chamber volume Wood max. length kw Mcal/h bar lit m 2 kg lit mm PYROLYT , PYROLYT , PYROLYT , PYROLYT , PYROLYT , PYROLYT , PYROLYT , PYROLYT , Type PYROLYT 23 PYROLYT 35 PYROLYT 47 PYROLYT 58 PYROLYT 69 PYROLYT 81 PYROLYT 93 PYROLYT 116 Cooling serpentine (T4-T5) in Back pressure Pa Min.water inlet temperature Required chimney convection Exhaust gases mass flow Internal water pressure drop (ΔT=20 o C) Max burning time Efficiency o C Pa g/sec mbar h % ½ ½ ½ ½ ½ ¾ ¾ ¾

6 3.4. Dimensions Type Α Β C D E F G H I K L Φ1 Τ1- Τ2 T3- T4- T5 Feeding door dimensions mm mm mm mm mm mm mm mm mm mm mm mm in in mm ¼ ½ 350x ¼ ½ 350x ¼ ½ 350x ½ ½ 350x ½ ½ 350x ½ 350x ½ 350x Fuels PYROLYT boiler is designed to burn woods and briquettes. You should be very carefully with the woods that you use for the boiler. PYROLYT gasification boiler is designed to burn wood with a percentage of humidity up to 20% and briquettes, which are made of wood only, with humidity up to 10%. Woods with high amount of water create condensation in the boiler leading to corrosion. Be sure that the woods that you will use are dry and the amount of humidity is under the allowable limits. Use woods from oak, beech or pine and do not mix them in the feeding chamber. Use only one kind of wood in every feeding. This will provide a constant combustion of fuel. Fuel Heating Value Allowable diameter Max percentage of humidity Allowable ash percentage kwh/kg mm % % Woods 4 4, <20 - Wood briquettes 5,2 - <10 <4 ATTENTION: Do not use inappropriate fuels. There is danger for the health and for the boiler. Do not as fuels woods that contain chemicals or explosive materials, MDF, household waste etc. Use only woods and wood briquette suitable for your boiler. During the manual feeding of the boiler, you should place the woods with the smaller diameter at the bottom and after the biggest woods. This will help start the boiler and offers a smooth operation of boiler.

7 4. Design and installation recommendations The boiler (boilers) should be installed in the boiler room specially designated and adapted for that purpose Boiler placement recommendations The boiler should be placed in the vertical position. The boiler should be installed as close to the chimney as possible. All distances of the boiler (boilers) from the boiler room s walls and the distances between the boilers should ensure easy access to the boiler (boilers). The distance of the boiler front from the wall should ensure assembly and disassembly of the burner and cleaning of the smoke tubes Boiler room recommendations The boiler room should comply with the requirements set forth in the PN87/B standard Built-in solid fuel boiler rooms. Moreover, it should comply with requirements of Technical conditions relating to buildings provided for in the Building Code (Official Journal No. 75 of 2000, item 690). The dimensions of the boiler room should comply with the requirements relating to heat loads, fire protection regulations and allow for them to be fitted out, operated and maintained in compliance with the OHS regulations. The minimum height of the boiler room: for boilers to 100 kw m for boilers from 100 to 230 kw m for boilers from 230 to 400 kw m for boilers over 400 kw m The minimum distances of the boiler from the front wall: for boilers to 100 kw m for boilers over 100 kw m The distance of the boiler from the rear wall should ensure proper access to the boiler. The minimum distances of the boiler from the side wall: for boilers to 300 kw m for boilers over 300 kw m These distances should be twice as long from the side of the feeder. The boiler room s floor should be: dust-free and non-flammable (paved with terracotta tiles or painted), laid out with an inclination to the floor drain or cooling well. The boiler room should have natural exhaust ventilation carrying off the air outside and supply of combustion air (the so-called Z-shaped ventilation duct) with the outlet placed 0.3 m above the floor level.

8 The section area of the exhaust opening should be calculated making allowance for the ventilation air flow to be at least 0.5 m 3 /h per 1 kw of the installed nominated power. The section area of the air supply duct should be calculated on the basis of the quantity of air required for combustion, which should be 1.6 m 3 /h per 1 kw of the installed nominated power and additional air required for the needs of the natural ventilation (0.5 m 3 /h per 1 kw), which in total gives at least 2.1 m 3 /h per 1 kw of the installed nominated power in the boiler room. Use of mechanical ventilation is not allowed. No flammable materials may be stored in the boiler room. The boiler room should have window openings of the total area not less than 1/15th of the floor area. The boiler room s door should be made of metal, without door lock, opening outside under pressure, with the clear width of min. 0.9 m Hydraulic system installation The system should be installed in accordance with the applicable regulations and best construction practices. The boiler can only be operated in the open system heating installations, The open pressure vessel should be placed 2-3 m above the highest point of the central heating system and protected against frost. No cut-off valves should be installed between the boiler and pressure vessel. The boiler room s hydraulic system should ensure minimum temperature of return water to the boiler (for solid fuel and gas 60 o C, for furnace oil-50 o C*). To this end, a mixing valve with the boiler pump must be installed of the capacity of c. 40% of the nominal flow of water through the boiler. A desludger or strainer should be installed in the return water system before the boiler. The temperature sensors of the systems protecting against exceeding the allowable temperature should be installed directly on the boiler at its highest point. Symbols T1 Hot water outlet Τ2 Return water inlet Τ3 Drain tap 1/2" Τ4 Heat exchanger input Connection with thermostatic safety valve Τ5 Output of hot water from heat exchanger in case of boiler overheating Hydraulic connections of boiler

9 Installation of boiler with open type expansion tank Symbols 1,2,3,4,5,6,7,8,9 Ball valve 10,11 Radiator switch 12 Radiator 13,14,15 Safety valve 16 Automatic water fill valve 17 Drain tap 18 Cold water supply valve 19, 20, 21, 22, 23, 24 Check valve Β Buffer tank VE Open type expansion tank PCI Circulator of heating system PRC Recirculation pump PB Circulator for buffer tank RP Pressure reducer F Y-type strainer A Automatic air vent FD Water filter

10 Installation of boiler with closed type expansion tank Symbols 1,2,3,4,5,6,7,8,9 Ball valve 10,11 Radiator switch 12 Radiator 13,14,15 Safety valve 16 Automatic water fill valve 17 Drain tap 18 Cold water supply valve 19, 20, 21, 22, 23, 24 Check valve Β Buffer tank VE Closed type expansion tank PCI Circulator for heating system PRC Recirculation pump PB Buffer tank circulator RP Pressure reducer F Y-type strainer A Automatic air vent FD Water filter 4.4. Installation safety 3 bar safety kit It consists of a collector, manometer, safety valve and automatic air vent. It is fixed to the input of hot water. For safety reasons, if not installed any of the following protective systems must be installed and the second valve. Regularly check the correct operation of safety valves. In case of wear or damage, replace them immediately with new ones. 3 bar safety kit.

11 By-pass system with load units Boiler has to operate for a temperature difference 10 to 15 o C and to insecure that the temperature of the return water is over 50 o C. This insures the smooth operation of the boiler and generally the right operation, the constant performance and the long lifetime. To insure that the temperature difference will be between 10 and 15 o C the installation needs a recirculation pump and a 3-way thermostatic valve. This system insures the right temperature of return water and also the right temperature of water at the radiators. The ESBE series LTC100 is a load unit designed to protect the boiler from return temperatures that are too low. Maintaining a high and stable return temperature enables a higher level of boiler efficiency, reduced tarring and increased life span of the boiler. The integrated pump offers boiler protection and optimal tank loading. The LTC100 is used in heating applications where solid fuel boilers are used to feed storage tanks. The load unit consists of an integrated pump and thermic valve, designed to make both assembly and handling easy. The load unit is protected by an insulation shell and is fitted with easily readable thermometers. The valve regulates on two ports, which makes it easy to install and does not require any balancing valve in the bypass pipe. The LTC100 has an integrated auto-circulation function which makes the unit operational even during power failure or pump failure. The circulation function is blocked at delivery, but can easily be activated if required. The valve contains a thermostat which begins to open connection A at an outgoing mixed water temperature in connection AB of 50 C, 55 C, 60 C, 65 C, 70 C or 75 C. Connection B is fully closed when the temperature in connection A exceeds the nominal opening temperature with 10 C. ESBE LTC 100, load unit. Overheating protection system In a solid fuels installation with closed type expansion tank it is required to ensure the protection against overheating, which mainly result from uncontrolled use of wood or an electrical power failure. When boiler temperature reaches o C the valve opens and allows the entry of cold water into the heat exchanger serpentine. The heat exchanger is connected with one thermostatic valve. The sensor is positioned into the boiler and when the temperature of boiler reaches a temperature the valve opens and cold water come into the serpentine. The cold water into the serpentine takes the heating of the boiler and as a result the temperature of the boiler decreases. The hot water of the serpentine goes to the drain. The valve responds directly to temperature differences

12 and its operation is complete mechanic without electric or spare parts. After the decrease of boiler temperature under a limit the valve closes again and the water stops to come into the serpentine. If the web pressure is over 6 bar it is necessary to install a pressure reducer before the installation. Noted that this valve does not replace the safety valve and it is important to install safety valves too (at least 2). Temperature and pressure relief valve The T&P valve has a temperature sensor and provides double safety against temperature (90 o C) and pressure (3 bar). The output of the valve should be connected with the drain for the disposal of the overheated water. The T&P valve should be connected nearby to the boiler and necessary at the outlet. It provides safety in case of closed type expansion tank installation but it is not replace the overheating safety system. Technical data: Temperature (limit) 90 ο C Pressure (limit) 3 bar Connection ½ Discharge rating: 10 kw Dimensions A B C D E F ½ Ø Thermal protection of the boiler The boiler should be operated within the supply and return water temperature differences in the range of C. Because of the lifecycle of the boiler, it should be operated with the return water temperature not lower than 60 C. In practice, it is difficult to meet this condition because the average atmospheric conditions during the entire heating season require lower settings. In order to ensure the required return water temperature the following solutions are suggested:

13 Higher settings on the boiler (possible only with low external temperatures). Recommended use of a mixing system based on the application of a three-way mixing valve with a boiler circulator (the solution ensuring the proper temperature of both the return water and the central heating system) Boiler water requirements: water for filling up boilers and heating installations should comply with the requirements of the PN-93/C standard, the boiler water should have the following parameters: - ph value > total hardness < 20of - free oxygen content < 0,05 mg/l - chlorides content < 60 mg/l. the used water treatment technology for filling up the heating installation should comply with the requirements referred to above, In the event of failing to comply with the above-mentioned requirements, THERMOSTAHL may withdraw the guarantee for the installed boiler (boilers) Chimney system It should be installed as an acid-proof, double-wall, insulated chimney, or in the case of chimneys made of brick, comply with the requirements of the PN89/B standard; the technical parameters of the chimney should ensure its protection against the effects of the condensate resulting from cooling of the flue gas. Use of acid-proof chimney inserts (tin, stoneware, etc.) is recommended. The section of the chimney can be calculated following the formula provided below: D = 20(3+P) 1/2 [m 2 ]; where: D-diameter in mm, P-boiler power rating in kw. The chimney diameter may not be less than the diameter of the flue. Connecting several boilers to one common chimney flue is not recommended. The connection of the boiler to the chimney should be thermally insulated and run the shortest possible way with the least possible number of pipe elbows, with the appropriate height of the flue towards the chimney. The chimney should be freely open towards the top and built at least 1 m above the roof, The diameter of the flue gas duct should be selected (calculated) in accordance with the recommendations of the manufacturers of the chimney inserts, however it should not be less than the diameter of the boiler flue. Installation of an inspection door for removing combustion residues should be envisaged, The entire length of the chimney should be maintained clean, Before connection the boiler to the chimney the user should obtain a positive opinion of the chimney cleaners specialist.

14 A graph for selecting the chimney diameter in relation to the boiler power rating and the chimney height, including the provided values of the chimney draught.

15 4.7. Digital Electronic Controller PWC-1000 Operating instructions Button A1 A2 : They are used to increase and decrease the desired maximum water temperature. Button A3 : It is used for entering and exiting from the menu. For entering into the menu short pressing is required, and for exiting long pressing. Button A4 : It is used to turn on and off the controller (long pressing). It is also used for starting and stopping the ignition process (short pressing). After entering the menu buttons A1 and A2 are used to change the value of the selected parameter, and buttons A3 and A4 are used to change the parameter we want to alter. Settings 01 TEMP.WATER Maximum water temperature. 02 TEMP.EXHAUST Maximum exhaust temperature. 03 TEMP.CIRCULATOR Water temperature that the circulator pump starts to operate. 04 TEMP.Bypass Water temperature that the bypass valve starts to operate. 05 FAN AIR MAX 06 DT WATER 07 DT EXHAUST 08 IGNITION TIME Maximum power amount of the fan (%) in the full burning process. Temperature difference below the maximum water temperature that the fan power starts to decrease. Temperature difference below the maximum exhaust temperature that the fan power starts to decrease. Maximum time of the process ignition. Fan power is determined only by the ignition air setting at this process. 09 IGNITION AIR Power amount of the fan (%) in the ignition process. 10 Off TIME 11 Off EXHAUST 12 CONS.PERIOD Time that exhaust temperature must be below the 11-Off exhaust so that the controller is set into end of fuel process. Exhaust temperature value that determines when the fuel has ended. Repeating time of the process flame conservation. In this process the fan power works at 09-ignition air so that the flame is conserved. 13 CONS.DURATION Duration of the process flame conservation.

16 5. Operation and maintenance 5.1. Start of the boiler Before firing the boiler ensure the following: The installation is complete and correct and there is any problem at the hydraulic network. The electrical installation is complete and correct. The connection of flue gas tube is correct without problems and with the suitable insulation. The sensors are well positioned to the boiler. The hydraulic network is complete and there is the correct pressure. The circulator is connected and working properly. The expansion tank is connected properly and ensures enough expansion of the water. The boiler valves are open. There is sufficient ventilation of the installation. No flammable or explosive materials around the boiler. If you notice any damage or malfunction at the boiler contact your installer or the company. Use as fuel wood or briquettes. Make sure the wood is dry (humidity <20%) to ensure better combustion, better performance and protect the boiler. Note the size of the woods. Make sure the length is such that it fits in the feeding chamber. If there are larger than the length of the chamber cut them. First start of the boiler The ceramic plates which are inside the boiler have a quantity of water inside their structure from the production process. The water is evaporated during operation of the boiler. But at the first operations, the boiler should not be working at full load, because the water content can be vaporized and create gaps in the ceramic structure that will lead to cracks and possible breakage of the ceramic plates. So it is recommended the heating of ceramic plates to evaporate the water content and then operate at full load. The process for removing humidity from ceramic is as follows: Place a small amount of kindling and a few small woods into the upper (feeding) chamber. Open the damper of the upper chamber with the help of the special lever that is on the front side and the upper right of the boiler. Be sure that you do not fill the boiler with woods, but put a small quantity of woods, enough for 20 to 30 minutes of combustion. After the operation allow the boiler to cool for 2-3 hours and repeat the process. It is recommended to repeat the process 3 times to ensure that the ceramics are dry. If the boiler is not used in summer then the process will be repeated again before the start of use. Start of the boiler Before starting the boiler check the whole installation and that it complies with all safety rules. Pull the lever at the front and upper - right part of the boiler and open the damper of the boiler. Open the feeding door and put some firelighters, some twigs and some thin woods at the bottom of the feeding chamber, on the ceramic plate and

17 ignite them. Close the feeding door and open the third door to provide air. When the woods are on fire feed the boiler with woods. During feeding insert woods with smallest diameter on the bottom and the biggest on the top. Ensure that the woods are on fire and close tightly the doors of the boiler. Close the dumber pushing the lever and start the ventilator. Ensure that the doors are closed and there not leave smoke or sparks Combustion settings The flame should have suitable dimensions and cover the combustion chamber. The effective operation of the boiler depends largely on the settings of primary and secondary air. If the primary air is excessive, much ash will fall into the combustion chamber. The flame will be very strong and fast and make noise while wood consumption would be high. If the primary air is not enough then the flame will be low and slow and moving by air currents and will be attracted by the chimney. It will not cover the entire surface of the chamber, while the production of ash will be small. If the secondary air is excessive then the flame is small and blue. If the secondary air is enough then the flame would be great, embracing the entire combustion chamber and will be red and opaque Maintenance Daily maintenance On a daily basis you need to check the integrity of the boiler room and the correct operation of the boiler. Check that the pressure in the network is correct and that all safety devices are in good condition and functioning properly. The boiler should be cleaned daily by the combustion residues (ash and unburned residues). Clean both upper chamber and combustion chamber. Clean walls and ceramic plate on the upper chamber and throw the ash in the combustion chamber. Remove the ash from the combustion chamber. CAUTION! The ash may contain hot residues which may cause fire in the final disposal. Finally, check the integrity of the ceramic plates. Weekly maintenance Weekly cleaning of the boiler includes thorough cleaning of the combustion chamber and the upper chamber. Open the dumber and then open the feeding door, wipe the ash from the chamber and throw it to the combustion chamber. With a brush clean ceramic plate lying between the two chambers. Ensure that ashes do not include hot residues before its disposal. Use a scraper for cleaning the walls of the chambers of any deposits. If ashes have accumulated underneath the ceramic plate in the combustion chamber, remove it and clean the chamber. Refit the ceramic in the chamber with special attention to proper placement. Before you clean, leave the boiler switched off for at least one or two hours to cool. In continuous operation, it is recommended to be cleaned once every 4 days. Monthly maintenance During the monthly cleaning clean the smoke chamber. The smoke chamber has openings for cleaning. Unscrew the screws and clean the deposits of ash. With a scraper remove smoke and ash from the walls of the smoke chamber. Collect them of the side opening. After the cleaning, close the openings tight. Check the tightness of the openings and the condition of the sealing cord. Replace it if it is necessary.

18 Season maintenance Finally, during the annual maintenance of the boiler at the end of the period of use (spring) check the entire heating system (boiler, piping, connections, valves, etc.) in order to function correctly. Repair any damages or harms to the network. Clean thoroughly the boiler, ceramic plates, the smoke chamber, the chimney, and additionally clean the fan of any existence ashes inside. 6. Troubleshooting Type of defect Cause of defect Procedure Backflow of flue gas into the boiler room Low temperature water in the boiler despite intensive burning Boiler temperature too high Too high temperature of the flue 1. Blocked chimney, no or weak chimney draught. 2. Improper supply and exhaust ventilation of the boiler room. 3. Incorrectly adjusted boiler fan. 4. Improper boiler start-up. 5. Incorrect connection of the boiler with the chimney. 6. Incorrectly closed, adjusted boiler door. 1. Improper fuel too low calorific value or damp fuel. 2. Incorrectly selected boiler in relation to the size of the building. 3. No/weak chimney draught. 4. Incorrect adjustment of the boiler settings. 5. Improper or blocked air supply installation. 6. Too low quantity of primary air. 1. Water loss in the system. 2. Blocked circulator/ electricity supply problem. 3. Overloading of boiler. 1. Too high chimney draught. 2. Incorrect heat transfer due to dirty combustion chamber. 3. Incorrectly selected, too small boiler power rating. 1. Measure the chimney draught, clean the chimney, check the combustion parameters, λ=1,8-2,0. 2. Check the operation of the supply and exhaust ventilation. 3. Adjust the fan. 4. Fire the boiler in accordance with the manual. 5. Make a proper connection of the boiler with the chimney. 6. Check whether the boiler door seal adheres to the boiler on its entire length. 1. Use fuel of high calorific value and moisture content in accordance with the manual. 2. Check selection of the boiler and the system. 3. Check whether the combustion chamber, smoke tubes and chimney are not dirty, clean them. 4. Adjust the boiler. 5. Check the condition of the air supply installation. 6. Adjust or clean the fan. 1. Admit water after cooling of the boiler. 2. Check the circulator/check that the electric parts are appropriate connected. 3. Do not feed the boiler, wait until the boiler temperature drop. 1. -Check the chimney system whether is suitably selected. - Close the dumber in case that you forget it open. 2. Clean the combustion chamber and smoke tubes. 3. Check the appropriateness of boiler selection in relation to the

19 Too high consumption of fuel Flame image 1. red 2. blue 3.with noise 4.small flame The chimney smokes Condensation inside the boiler The fan does not start Poor combustion 1. Incorrectly installed central heating system. 2. Incorrect selection of the boiler in relation to the building. 3. Fuel of low calorific value. 4. Improper parameters of boiler operation. 1. Lack of secondary air. 2. High secondary air supply. 3. High primary air supply. 4. Lack of primary air. 1. Low secondary air supply 2. If it still smokes Condensation of air and exhaust gases during ignition of the boiler 2. Very low return temperature 3. Fuel with very high amount of moisture 4. Low chimney draft 5. Small section of chimney 6. Faulty connection to the chimney 7. Concentrates or rain entering the chimney 1. Fan failure 2. Burned out fan 1. The fan feeds too little air 2. Too little chimney draught 3. Incorrect air supply system building. 1. Check the central heating system. 2. Carry out a short energy audit 3. Replace the fuel with the appropriate fuel. 4. Set proper parameters for boiler operation. 1. Increase the supply of secondary air. 2. Decrease the supply of secondary air. 3. Decrease the supply of primary air. 4. Increase the supply of primary air. 1. Completely open of secondary air opening 2. completely open of secondary air opening and reduce the primary air supply. 1. During ignited adjust the boiler temperature above 70 o C and keep it for a few hours 2. The boiler must be protected from low return temperature with a three-way valve. The minimum return temperature is 50 o C. 3. Use dry fuel with moisture<20% 4. Check the chimney and clean it if it is necessary 5. Check the sizing of the chimney in accordance with the instructions 6. Ensure tight connection of the boiler to the chimney 7. Check the installation of the chimney and place protective hat if it is necessary 1. Check electrical connection of the fan. Check the capacitor of the fan engine. 2. Replace the fan with a new one. 1. Clean the fan, adjust the quantity of air with the adjusting screw. 2. Measure the chimney draught. Install a draught generator. 3. Check the patency of the air supply duct.

Pellet and Biomass boiler BIODROP (BD) INSTRUCTION MANUAL. ver. 1.1

Pellet and Biomass boiler BIODROP (BD) INSTRUCTION MANUAL. ver. 1.1 Pellet and Biomass boiler BIODROP (BD) INSTRUCTION MANUAL ver. 1.1 Table of Contents 1 GENERAL INFORMATION 4 2 SCOPE OF DELIVERY (SHIPPING CONDITION) 4 3 TECHNICAL CHARACTERISTICS, INTENDED USE OF THE

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service

More information

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+ INSTALLATION AND OPERATING INSTRUCTIONS Ariterm 60+ CONTENTS General.... 2 Installation.... 4-5 Installation of temperature limit valve... 6 Measurements and connections... 7 Technical specifications and

More information

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4 Wood gasification process... Wood as a fuel... Boiler construction - its elements...4 Boiler construction - materials...4 EKO advantages...4 Boiler construction - schematics... Boiler dimensions... Boiler

More information

INSTRUCTIONS MANUAL FOR USE AND MAINTENANCE

INSTRUCTIONS MANUAL FOR USE AND MAINTENANCE INSTRUCTIONS MANUAL FOR USE AND MAINTENANCE Carbel models: C-60 Plus C-70 Plus C-80 Plus C-100 Plus C-70 Plus Double-sided C-80 Plus Double-sided C-100 Plus Double-sided CARBEL C/ Ciudad de Cartagena,

More information

Installation, operation and care Firewood boiler Vedolux 40 UB

Installation, operation and care Firewood boiler Vedolux 40 UB Installation, operation and care Firewood boiler Vedolux 40 UB 2008-09-23 Ver 2 Replaces: 05-11 VEDOLUX 40 UB Notes 0809 To be completed when the Vedolux 40 UB is installed Serial number:... Installation

More information

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL Heating, Air Conditioning, Ventilation Отопление-Кондиционеры-Вентиляция MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL 1. Usage MTM 8-30 universal oil heater is designed for heating commercial rooms

More information

USER MANUAL 9kW LILLY PELLET STOVE

USER MANUAL 9kW LILLY PELLET STOVE USER MANUAL 9kW LILLY PELLET STOVE Table of Contents.Overview of Stove Parts... 2.Technical Characteristics... 3 3.Important Information... 4 4.Pellet Specification...5 5.Technology... 6 6.Installation...

More information

MG SERIES - ENERGY CLASS A. Meeting the. MG series 1 / 7

MG SERIES - ENERGY CLASS A. Meeting the. MG series 1 / 7 Meeting the MG series 1 / 7 Dear clients, Thank you for placing your confidence in our company and congratulations for your choice! You have purchased one of the many products of Gekas Metal company, intended

More information

Operating and installation instructions for Fire Lotus H586

Operating and installation instructions for Fire Lotus H586 Operating and installation instructions for Fire Lotus H586 Version 1, 24 May 2016 Introduction Congratulations on your new Lotus Fire. We hope and believe that it will give you many hours of warmth.

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20 INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8

More information

INSTRUCTIONS FOR INSTALLATION AND USE OF ZINO 700,900,1100

INSTRUCTIONS FOR INSTALLATION AND USE OF ZINO 700,900,1100 INSTRUCTIONS FOR INSTALLATION AND USE OF ZINO 700,900,1100 English 09-2011 WARNING : THE SUPLIER TAKES NO RESPONSIBILITY FOR ANY POSSIBLE DAMAGE, POOR WORKING APPLIANCES AND ACCIDENT AS A RESULT OF INCORRECT

More information

BIOPLEX MCL-BIO INSTALLATION AND SERVICE MANUAL

BIOPLEX MCL-BIO INSTALLATION AND SERVICE MANUAL BIOMASS-SOLID FUEL RETORT BOILER BIOPLEX MCL-BIO INSTALLATION AND SERVICE MANUAL VERSION: 2.1 UPDATE: 10.10.2013 Contents 1. GENERAL INFORMATION... 3 1.1. Proper use of the appliance... 3 1.2. Safety warnings...

More information

TECHNICAL AND OPERATIONAL DOCUMENTATION

TECHNICAL AND OPERATIONAL DOCUMENTATION METAL AND BOILER FACTORY 28-100 Busko-Zdrój, Owczary, ul Przemysłowa 3 Tel No +4841 378 46 19, fax +4841 370 83 10 TECHNICAL AND OPERATIONAL DOCUMENTATION SAS MULTI FLAME BURNER ADAPTED FOR BURNING OF

More information

Importance of a Draught Regulator

Importance of a Draught Regulator Importance of a Draught Regulator The purpose of a chimney (stack) is to generate a draught (draft) that will transport smoke and fumes away from the point of combustion. The chimney design and arrangement

More information

Rocket heater GAMERA

Rocket heater GAMERA Rocket heater GAMERA High efficiency heater on hard fuel Manufacturer: AGNON Ltd., Bulgaria Hissarya, 4 Han Kubrat STR. +359 885 525 464 WWW.GAMERA.EU ROCKETGAMERA@GMAIL.COM ATTENTION! Read the following

More information

Boiler Technical Specifications (2013)

Boiler Technical Specifications (2013) ACT Bioenergy Boiler Dimensions 0.5-0.85 Million Btu/h (150-250kW) Model CP500 CP600 CP750 CP850 Heat Output in MBtu/h (kw) 510 (150) 610 (180) 750 (220) 850 (250) Height ft (mm) 6 1 (1855) 6 1 (1855)

More information

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO .Technical specifications Boiler power DESCRIPTION Water content in a boiler Required draft Supply

More information

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 EN OPERATING MANUAL OIL HEATER TRT-BA-IDE20-30-50-60-80-TC-001-EN Table of contents Information on the use of this manual... 1 Scope of delivery... 1 General safety...

More information

Kyung Dong Oil Boiler. Contents. 1. General Warnings Safety Warnings

Kyung Dong Oil Boiler. Contents. 1. General Warnings Safety Warnings Contents 1. General Warnings --------------------- 1 2. Safety Warnings ----------------------- 2 3. Parts and structure --------------------- 7 4. Safety Device ------------------------- 9 5. Checkups

More information

Problem Cause Remedial action. Gauge glass There was excess chemical dosage The normal ph recommended was 9.5 to See photo 3 & 4.

Problem Cause Remedial action. Gauge glass There was excess chemical dosage The normal ph recommended was 9.5 to See photo 3 & 4. CASE STUDIES OF STEAM SYSTEM AUDIT IN SOME PLANTS By K.K.Parthiban, Venus Energy Audit System Introduction This article outlines the outcome of auditing of steam system conducted in process Industries.

More information

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders Operation and maintenance manual for the KSP Spark series boilers equipped with feeders Thank you for purchasing PEREKO heating boiler. This documentation applies to the KSP Pelet boilers with fuel feeder

More information

AIREX 2S WOOD PYROLYSIS SUCKING FAN

AIREX 2S WOOD PYROLYSIS SUCKING FAN AIREX S WOOD PYROLYSIS SUCKING FAN To optimize green energy AIREX S constitutes the evolution of the firewood boilers range: total gasification inverted flame with sucking fan especially suitable to the

More information

Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H

Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H 1. 2. 3. 4. 5. 6. 7. Fire box door Ash pan door Air inlet control Fuel drawer Side flue gas connector Oven door with double glass Protective cover for

More information

USER S INFORMATION MANUAL

USER S INFORMATION MANUAL USER S INFORMATION MANUAL UPFLOW & DOWNFLOW/HORIZONTAL CONDENSING GAS FURNACES SAFETY Recognize this symbol as an indication of Important Safety Information If not installed, operated and maintained in

More information

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17 MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17 CE Tested by the DIN EN 13240 15a B-VG Austria Type 1 Color Emajl d.o.o. Alaginci 87 a 34000 Požega Croatia www.color.hr team@color.hr 1 Attention!

More information

ISO 9001 TUV CERT CE

ISO 9001 TUV CERT CE ISO 9001 TUV CERT CE INSTRUCTION MANUAL CONTENT 2 1. Boiler application 2. Principle of work 3. Description of the controller 3.1. Front panel of EKOSTER 2 3.2. Main functions of EKOSTER 2 4. Gasification

More information

USER S INFORMATION MANUAL (2,4)SG13B

USER S INFORMATION MANUAL (2,4)SG13B USER S INFORMATION MANUAL (2,4)SG13B Series Gas Heating/Electric Cooling Package Unit Congratulations......your outdoor heating/cooling package unit is a valuable piece of equipment, designed and manufactured

More information

Installation & Manual. Model T-25

Installation & Manual. Model T-25 Installation & Manual TR Central Heating Stove With Solid Fuel Model T-25 Tested according to DIN EN 13240 For product efficiency and emission values, see the declaration of conformity! TABLE OF CONTENTS

More information

Combined boiler. for solid fuel and pellets

Combined boiler. for solid fuel and pellets Combined boiler ATTACK WOOD&PELLET for solid fuel and pellets W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK

More information

Wood-burning boiler CBB. User Guide E

Wood-burning boiler CBB. User Guide E EN Wood-burning boiler User Guide 300008541-001-E . Contents 1 Symbols used...........................................................................3 2 Important recommendations...............................................................3

More information

JÄSPI Solid Fuel Boiler

JÄSPI Solid Fuel Boiler JÄSPI Solid Fuel Boiler JÄSPI Solid Fuel Boilers Firewood used in solid fuel heating is a cost-efficient, renewable, and environmentally friendly energy source. The length of firewood can vary from 0.3

More information

INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER

INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER INSTRUCTION MANUAL Content 1. Boiler application...3 2. Principle of work...3 3. Description of the controller...4 3.1. Front panel of

More information

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN To respected customer, We are very pleased for your trust and your decision to buy our product. You made a good choice,

More information

PELLETS BURNER 15-60kW MOC

PELLETS BURNER 15-60kW MOC PELLETS BURNER 15-60kW MOC. Please read those documentation before first start up the unit. Improper burner start may lead to its damage and may create a danger for end user! Table of Contents: 1. Admission

More information

INSTRUCTIONS FOR INSTALLATION, SETTING AND USE

INSTRUCTIONS FOR INSTALLATION, SETTING AND USE BUILT-IN FIREPLACE INSTRUCTIONS FOR INSTALLATION, SETTING AND USE 1. BUILT-IN FIREPLACE SPECIFICATION - WIDE 730 mm - DEPTH 426 mm - HEIGHT 543 mm - NOMINAL POWER 11 KW - CHIMNEY POT DIAMETER Ø 180 mm

More information

TECHNICAL MANUAL. Multifuel Stove Model EW1MF. To be retained by the user for future reference. Serial Number. Document EW1MF 0209

TECHNICAL MANUAL. Multifuel Stove Model EW1MF. To be retained by the user for future reference. Serial Number. Document EW1MF 0209 TECHNICAL MANUAL Multifuel Stove Model EW1MF To be retained by the user for future reference Serial Number. Document EW1MF 0209 Thank you for purchasing an ACR Heat Products stove. The Earlswood stove

More information

INSTRUCTION. for installation and operation of solid fuel fireplace

INSTRUCTION. for installation and operation of solid fuel fireplace INSTRUCTION for installation and operation of solid fuel fireplace SKLADOVA TEHNIKA Division Bitova tehnika 2 Ivan Momchilov St. 5100 Gorna Oryahovitsa CONTENTS 1.Introduction...3 2.Assembling of the fireplace...3

More information

Bosch 80% AFUE Gas Furnace BGS80 Model

Bosch 80% AFUE Gas Furnace BGS80 Model Bosch 80% AFUE Gas Furnace BGS80 Model 4-Way Multipoise Category I Fan-Assisted Furnace User's Information Manual 3124627 2 Bosch 80% AFUE Gas Furnace User's Information Manual Data subject to change 06.2018

More information

Fully-automatic Gas tankless Water Heater USER'S MANUAL FOR MODEL EZ-101 ISO9001 certified

Fully-automatic Gas tankless Water Heater USER'S MANUAL FOR MODEL EZ-101 ISO9001 certified Fully-automatic Gas tankless Water Heater USER'S MANUAL FOR MODEL EZ-101 ISO9001 certified Thank you for purchasing our fully-automatic gas-fired tankless water heater. Please completely read this Manual

More information

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200 INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200 CE INSTRUCTION MANUAL Content 1. Boiler application...3 2. Principle of work...3 3. Description of the controller...4 3.1. Front panel of EKOSTER 2...4 3.2.

More information

Troubleshooting and Maintenance: Wood Stoves

Troubleshooting and Maintenance: Wood Stoves Troubleshooting and Maintenance: Wood Stoves What product should I use to clean the glass? There exist many specialized products on the market. The majority works very well. They are usually sold at both

More information

INSTRUCTION MANUAL. for installation and operation of solid fuel cookers. Victoria and Victoria Lux

INSTRUCTION MANUAL. for installation and operation of solid fuel cookers. Victoria and Victoria Lux INSTRUCTION MANUAL for installation and operation of solid fuel cookers Victoria and Victoria Lux VICTORIA-05 Ltd. CONTENTS 1. Introduction... 3 2. Technical specifications and description... 3 3. Cooker

More information

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler Gas boiler UPON COMPLETION OF THE INSTALLATION THE INSTALLER MUST INSTRUCT THE OWNER AND OPERATOR ON THE FUNCTIONALITY AND THE PROPER OPERATION OF THE BOILER AND THE HEATING SYSTEM. INSTALLER MUST REVIEW

More information

Index I. INSTALLATION DIAGRAM... WIRING DIAGRAMS...

Index I. INSTALLATION DIAGRAM... WIRING DIAGRAMS... Index I. INSTALLATION DIAGRAM... 4 II. III. WIRING DIAGRAMS...... 1. Wiring diagram AC 3-N-400 50/60 Hz... 2. Wiring diagram AC 3-230 50/60 Hz...... 3. Wiring diagram AC 230 50/60 Hz... 4. Series 30 electrical

More information

SAUNA HEATER INSTALLATION AND OPERATING MANUAL

SAUNA HEATER INSTALLATION AND OPERATING MANUAL SAUNA HEATER INSTALLATION AND OPERATING MANUAL Type Stoveman 13 Models 13R; 13R-M; 13; 13-M; 13R-LS; 13R-M-LS; 13-M-LS; 13-LS Heating output in the sauna room 15.4 kw Sauna room cubage 6-13 m³ Fuel Wood

More information

USER S MANUAL, MAINTENANCE MANUAL INSTALLATION INSTRUCTIONS

USER S MANUAL, MAINTENANCE MANUAL INSTALLATION INSTRUCTIONS D F:\Home\RD\ME\FUNNY\FUNNYGB.WP IN-FIRE Jubilee USER S MANUAL, MAINTENANCE MANUAL INSTALLATION INSTRUCTIONS 07DHIFFUA 03/99-1 - Dear Customer! Congratulations on the purchase of your new Bodart & Gonay

More information

model No: ir20.v2 FUSE

model No: ir20.v2 FUSE InstructioNS for: model No: ir20.v2 INFRARED PARAFfIN / KEROSENE / diesel HEATER 70000Btu 230V Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according

More information

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty.

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty. ARREDO E BENESSERE So old fashioned... An intelligent choice When on a cold winters night the warm glowing flames of the KALDUS boiler are there to welcome you back home, you will be pleased that you decided

More information

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens Main components The bigger the need of heat output is. the bigger the components (storage. boiler. chimney etc.) In private houses the output need of the boiler is about 25 40 kw and in farms from 60 kw-

More information

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set For boilers CentroPlus 25/35 and CentroPlus-B 25/35 (solid fuel and wood pellets fuel firing) TUPSCP-K-11-2016-ENG CONTENTS 1.Introduction 2. Status

More information

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!! Sample Written Program For Your Company For BOILER SAFETY Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-781-1446 Email: info@se-safety.com Purpose Boiler Safety Program The

More information

Corn Flame Energy Corn Stove Model 3000

Corn Flame Energy Corn Stove Model 3000 Corn Flame Energy Corn Stove Model 3000 Installation and Operation Guide Read thoroughly before starting installation Save this manual for future reference SAFETY NOTICE If this stove is not properly installed,

More information

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. 1 MHG Heating Ltd ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR Telephone 08456 448802 Fax 08456 448803

More information

ecomax 200 W Boiler regulator FOR SOLID FUEL BOILERS WITH A FAN OPERATION AND MAINTENANCE MANUAL ISSUE:

ecomax 200 W Boiler regulator FOR SOLID FUEL BOILERS WITH A FAN OPERATION AND MAINTENANCE MANUAL ISSUE: Boiler regulator ecomax 200 W FOR SOLID FUEL BOILERS WITH A FAN OPERATION AND MAINTENANCE MANUAL ISSUE: 1.3 APPLICABLE TO SOFTWARE 10.034 10.035 10.036 2010-04-14 TABLE OF CONTENTS 1 Safety... 4 2 General

More information

Installation, operation and care. Pellmax UB. Burner not included Replaces:

Installation, operation and care. Pellmax UB. Burner not included Replaces: Installation, operation and care Burner not included 2011-11-11 ver: Replaces: Contents 11.11 otes...3 General...4 Function...4 Technical data...5 System principle Pellmax with radiator and tank-in-tank

More information

INDEX RECOMMENDATIONS AND SUGGESTIONS... 4 CHARACTERISTICS... 5 INSTALLATION... 6 USE... 9 MAINTENANCE... 11

INDEX RECOMMENDATIONS AND SUGGESTIONS... 4 CHARACTERISTICS... 5 INSTALLATION... 6 USE... 9 MAINTENANCE... 11 INDEX EN RECOMMENDATIONS AND SUGGESTIONS... 4 CHARACTERISTICS... 5 INSTALLATION... 6 USE... 9 MAINTENANCE... 11 2 RECOMMENDATIONS AND SUGGESTIONS The Instructions for Use apply to several versions of this

More information

BIX B-One 100 kw INSTALLATION GUIDE

BIX B-One 100 kw INSTALLATION GUIDE BIX B-One 100 kw INSTALLATION GUIDE Dear Customer, We thank you for choosing our product. The Bix B-One 100 Kw is a burner of advanced concept and technology, with a high reliability and construction quality.

More information

Operation and maintenance manual. for charging boilers: KSW Alfa, KSW Alfa Plus, KSW Master, KSW Prima

Operation and maintenance manual. for charging boilers: KSW Alfa, KSW Alfa Plus, KSW Master, KSW Prima Operation and maintenance manual for charging boilers: KSW Alfa, KSW Alfa Plus, KSW Master, KSW Prima Thank you for purchasing PEREKO boiler. This documentation applies to KSW ALFA, KSW ALFA PLUS, KSW

More information

USERS MANUAL FOR GAS BOILERS

USERS MANUAL FOR GAS BOILERS USERS MANUAL FOR GAS BOILERS PLEASE READ THE MANUAL CAREFULLY: IT CONTAINS IMPORTANT INFORMATION REGARDING SAFETY, INSTALLATION, USE AND MAINTENANCE OF THE APPLIANCE MODELS: NOVADENS 24 NOVADENS 24C NOVADENS

More information

FGR. Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM. FGR-8 through FGR-22 (25 HP to 1000 HP)

FGR. Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM. FGR-8 through FGR-22 (25 HP to 1000 HP) FGR Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM FGR-8 through FGR-22 (25 HP to 1000 HP) Gas, Light Oil or Combination MANUFACTURED BY JOHN ZINK COMPANY, LLC

More information

ENTROPIE boiler TT300

ENTROPIE boiler TT300 ENTROPIE boiler TT300 20 60 MW 160 о С 16 bar Сontents Field application TT300 boilers... 82 Operation of ENTROPIE boiler TT300... 82 Boiler diagram...... 83 Diagram of boiler TT300... 84 Technical characteristics...

More information

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK CONTENTS EN ATTACK DPX THE WOOD GASIFYING BOILER... 4 1 INTRODUCTION... 6 2 3 4 1.1 GENERAL DESCRIPTION...

More information

Varde Shape. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas

Varde Shape. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas Varde Shape Smoke Control Kit Additional Installation and User Instructions for use in Smoke Control Areas These instructions for fitting and operating the Smoke Control kit must be read in conjunction

More information

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART # INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #238-39387-00 THIS INSTRUCTION SUPPLEMENT IS ONLY INTENDED TO GIVE INSTALLATION INSTRUCTIONS AND INFORMATION RELATED TO THE INDUCED

More information

TermEfekt USER S MANUAL AIR HEATER. Model PGA 14

TermEfekt USER S MANUAL AIR HEATER. Model PGA 14 Przedsiębiorstwo Produkcyjno-Wdrożeniowe ARAJ sp. z o.o. 55-080 Kąty Wrocławskie, ul. Mireckiego 30 POLAND USER S MANUAL AIR HEATER TermEfekt Model PGA 14 Kąty Wrocławskie, 2004 Product identification

More information

Flue Fire Prevention Awareness

Flue Fire Prevention Awareness Flue Fire Document_R1 Page 1 of 11 2009-03-25 (C) Recommendations Version: 1 Flue Fire Prevention Awareness Introduction Beech Ovens are one of the leading manufacturers of stone hearth ovens in the world.

More information

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove HEATING TECHNIQUE Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611 TECHNICAL INSTRUCTIONS for regulation, use and maintenance of pellet stove CentroPelet

More information

LEIHDC70SC - LEIHDC70BB LEIHDC70BC. Instructions Manual.

LEIHDC70SC - LEIHDC70BB LEIHDC70BC. Instructions Manual. LEIHDC70SC - LEIHDC70BB LEIHDC70BC Instructions Manual www.rangemaster.co.uk INDEX EN RECOMMENDATIONS AND SUGGESTIONS...3 CHARACTERISTICS...4 INSTALLATION...5 USE...8 MAINTENANCE...9 2 RECOMMENDATIONS

More information

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A... 70 80 99-00-O Residential Gas Condensing Boiler ZBR//8/35/4-3A... ZWB8/35/4-3A... 70 80 993 (03/03) CA/US Operating Instructions Contents Contents Key to symbols and safety instructions............................

More information

PER-EKO type KSW & KSW PLUS Instruction Manual

PER-EKO type KSW & KSW PLUS Instruction Manual TABLE OF CONTENTS INTRODUCTION..... 3 1. GENERAL INFORMATION..... 3 1.1. Application.. 3 1.2. Fuel..... 3 1.3. Dimensions & technical parameters........ 4 2. BOILER TECHNICAL SPECIFICATION...... 4 2.1.

More information

USER MANUAL. 80 cm 2 burners, glass hob AKC 820C/BLM

USER MANUAL. 80 cm 2 burners, glass hob AKC 820C/BLM USER MANUAL 80 cm 2 burners, glass hob AKC 820C/BLM For your safety These instructions have been drawn up for your safety and that of others. You are therefore requested to read them carefully before installing

More information

INFRARED PARAFfIN / KEROSENE / model No: ir20.v2 1. SAFETY INSTRUCTIONS RECOMMENDED FUSE RATING: 5AMP

INFRARED PARAFfIN / KEROSENE / model No: ir20.v2 1. SAFETY INSTRUCTIONS RECOMMENDED FUSE RATING: 5AMP InstructioNS for: INFRARED PARAFfIN / KEROSENE / diesel HEATER model No: ir20.v2 Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according to these

More information

WS-5530SS WS-5536SS WS-5542SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED.

WS-5530SS WS-5536SS WS-5542SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED. www.windsterhoocom UNDER CABINET SERIES User s Manual WS-5530SS WS-5536SS WS-5542SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED. This unit

More information

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A Remeha Fuel oil/gas boilers EN Installation and Service Manual 300016859-001-A 63115 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It

More information

Aquaflam Wood boiler stoves and fireplace inserts

Aquaflam Wood boiler stoves and fireplace inserts www.hsflamingo.com Aquaflam Wood boiler stoves and fireplace inserts AQUAFLAM wood boiler stoves and fireplace inserts from the HS Flamingo workshop have many above-standard features. These innovative

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL INSTALLATION AND OPERATION MANUAL PRESSURISED STEEL BOILERS AR 30 AR 1000 RADIALAND - BOILER's INSTALLATION MANUAL version 1.0 / 15-02-2008 The company E. is outstanding in the field of central heating

More information

INSTRUCTIONS MANUAL FOR USE AND MAINTENANCE

INSTRUCTIONS MANUAL FOR USE AND MAINTENANCE INSTRUCTIONS MANUAL FOR USE AND MAINTENANCE Carbel models: KRONOS 100 KRONOS 80 KRONOS 70 CARBEL C/ Ciudad de Cartagena, 22 46988 Polígono Industrial Fuente de Jarro (Paterna) Valencia Tel. 96 1340716

More information

1. Contents Principle General information Parts list Assembly Technical drawing... 18

1. Contents Principle General information Parts list Assembly Technical drawing... 18 1. Contents 1. Contents... 2. Principle... 2 3. General information... 3-7 4. Parts list... 8 5. Assembly... 9-17 6. Technical drawing... 18 2. Principle All instructions provided with products must be

More information

Instructions Manual CTB CTB 9407

Instructions Manual CTB CTB 9407 Instructions Manual CTB 6407 - CTB 9407 INDEX EN RECOMMENDATIONS AND SUGGESTIONS... 3 CHARACTERISTICS... 4 INSTALLATION... 5 USE... 7 MAINTENANCE... 8 2 RECOMMENDATIONS AND SUGGESTIONS The Instructions

More information

USER MANUAL. 60cm, 3 burners, Hob AKC 630

USER MANUAL. 60cm, 3 burners, Hob AKC 630 USER MANUAL 60cm, 3 burners, Hob AKC 630 For your safety These instructions have been drawn up for your safety and that of others. You are therefore requested to read them carefully before installing

More information

DEVRON SERIES MULTI FUEL FIRED GASIFICATION HOT WATER BOILERS DEVRON-30, DEVRON-40 OPERATION, USE AND MAINTENANCE MANUAL

DEVRON SERIES MULTI FUEL FIRED GASIFICATION HOT WATER BOILERS DEVRON-30, DEVRON-40 OPERATION, USE AND MAINTENANCE MANUAL DEVRON SERIES MULTI FUEL FIRED GASIFICATION HOT WATER BOILERS DEVRON-30, DEVRON-40 OPERATION, USE AND MAINTENANCE MANUAL Rev A: JUNE 2017 INDEX 1- INTRODUCTION... 3 2- WARNINGS... 3 3- DECLARATION OF CONFORMITY...

More information

Diocese of Cleveland Facilities Services Corporation

Diocese of Cleveland Facilities Services Corporation Diocese of Cleveland Facilities Services Corporation BOILER MAINTENANCE and SERVICING SEASONAL MAINTENANCE - to be performed by trained boiler technician or boiler contractor only: 1. Disassemble the low

More information

Installation and Operating Instructions

Installation and Operating Instructions Installation and Operating Instructions Models: Verso 4G Hob As part of Parmco Appliances commitment to improving and updating product ranges, we reserve the right to alter, change and update technical

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

Operation and maintenance manual for the boilers with feeder. Q-Per

Operation and maintenance manual for the boilers with feeder. Q-Per Operation and maintenance manual for the boilers with feeder Q-Per Thank you for purchasing PEREKO boiler. This technical documentation applies to feeder boilers from the Q-PER series and contains all

More information

PELLET BURNER PV 350

PELLET BURNER PV 350 PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION

More information

TERMOCAST MAXI. Cast iron boiler for solid fuel firing. Installation and User Manual

TERMOCAST MAXI. Cast iron boiler for solid fuel firing. Installation and User Manual TERMOCAST MAXI Cast iron boiler for solid fuel firing Installation and User Manual 2195 Thank you for purchasing Maxi boiler. Please read this manual carefully before installation and operation of your

More information

INSTALLATION, OPERATION AND MAINTENANCE. ARITERM SWEDEN AB Installation, Operation & Maintenance /28

INSTALLATION, OPERATION AND MAINTENANCE. ARITERM SWEDEN AB Installation, Operation & Maintenance /28 INSTALLATION, OPERATION AND MAINTENANCE ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18-1/28 CONTENTS IMPORTANT INFORMATION 4 4 5 Notification to building authority Inspection Sweeping

More information

Varde Aura. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas

Varde Aura. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas Varde Aura Smoke Control Kit Additional Installation and User Instructions for use in Smoke Control Areas These instructions for fitting and operating the Smoke Control kit must be read in conjunction

More information

Protection and Control of Solid Fuel Boilers

Protection and Control of Solid Fuel Boilers Protection and Control of Solid Fuel Boilers thermal relief valves thermostatic valves and pump stations draft regulators www.regulus.eu BOILER PROTECTION AGAINST OVERHEATING Solid fuel boilers may get

More information

Bergen PRPMXXXX. Smoke Control Kit Additional Installation and User Instructions for use in Smoke Control Areas

Bergen PRPMXXXX. Smoke Control Kit Additional Installation and User Instructions for use in Smoke Control Areas Bergen Smoke Control Kit Additional Installation and User Instructions for use in Smoke Control Areas These instructions for fitting and operating the Smoke Control kit must be read in conjunction with

More information

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve Connection and energy management compact unit 2850 series ACCREDITED CALEFFI 01259/14 GB ISO 9001 FM 21654 ISO 9001 No. 0003 Function The connection and energy management compact unit enables combining

More information

OPERATING INSTRUCTIONS with safety features

OPERATING INSTRUCTIONS with safety features Solid fuel boiler TKK3 with wood pellet burner TERMEC 70-90 KW OPERATING INSTRUCTIONS with safety features Prhova ka bb 22310 imanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs

More information

Boiler. Fire tube Boiler:

Boiler. Fire tube Boiler: Boiler What is Boiler? A closed metallic vessel in which the water is heated beyond the boiling temperature by the application of heat by the combustion of fuels to convert it into steam. The function

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL INSTALLATION AND OPERATION MANUAL Approved for use in Smoke Control Areas Eco Design Ready MODEL : - CARRON REVOLUTION 5 Document REV Version 3 Dated 16 th November 2018 External Air Supply High Efficiency

More information

STILE BEAUTY AND TECHNOLOGY

STILE BEAUTY AND TECHNOLOGY STILE BEAUTY AND TECHNOLOGY STILE, in line with your style Designer White Bordeaux Silver Grey MODEL Nominal input kw Nominal output kw Output to the water min. / max. kw HYDRONIC PELLET FIRE SPACE HEATING

More information

MODEL SORDO SORDO SORDO SORDO 80 Flatline

MODEL SORDO SORDO SORDO SORDO 80 Flatline GEBRUIKSAANWIJZING MODE D EMPLOI OPERATING INSTRUCTIONS WARMTE RECUPERATOR TYPE INSERT RECUPERATEUR DE CHALEUR TYPE INSERT HEATING APPLIANCE INSERT TYPE MODEL SORDO 60 475.6311.100 SORDO 70 475.7311.100

More information

BUILT-IN GLASS HOB MODEL: EGH-G8592G(BK) EGH-G8593G(BK) Owner s Manual Please read this manual carefully before operating your set.

BUILT-IN GLASS HOB MODEL: EGH-G8592G(BK) EGH-G8593G(BK) Owner s Manual Please read this manual carefully before operating your set. BUILT-IN GLASS HOB MODEL: EGH-G8592G(BK) EGH-G8593G(BK) Owner s Manual Please read this manual carefully before operating your set. Retain it for future reference. Record model number and serial number

More information

User s Manual WS-4830SS WS-4836SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED.

User s Manual WS-4830SS WS-4836SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED. www.windsterhood.com User s Manual UNDER CABINET SERIES WS-4830SS WS-4836SS NOTE: PLEASE INSPECT HOOD IMMEDIATELY UPON RECEIVING. CLAIM OF DAMAGE AFTER 7 DAYS OF DELIVERY WILL BE DENIED. This unit is designed

More information