1 COMMISSIONING AND START-UP TESTS OF ALPHA-CONTAMINATED SOLID WASTE SORTING, CEMENTING, AND INTERIM STORAGE FACILITIES AT BELGOPROCESS (BELGIUM) R.C. GLIBERT G. NUYT G. LAMOTTE BELGONUCLEAIRE, 4 avenue Ariane, 1200 BRUXELLES Belgium CL. RENARD A. DE GOEYSE ONDRAF/NIRAS, 14 avenue des Arts, 1210 BRUXELLES Belgium R. GOETSCHALCKX B. GHYS BELGOPROCESS, Gravenstraat, 2480 Dessel - Belgium ABSTRACT The alpha-contaminated solid waste generated in Belgium results from past activities in the fuel cycle (R & D +Reprocessing and MOX fabrication pilot plants) and present operation of BELGONUCLEAIRE s MOX fuel fabrication plant. After the main steps in the management of alpha-contaminated solid waste were established, BELGONUCLEAIRE, with the backing of BELGOPROCESS and ONDRAF/NIRAS, started the design and construction of the T & C and interim-storage facilities for this alpha waste. The accumulated solid alpha radwaste containing a mixture of combustible and non-combustible material will be sorted. After sorting, both the accumulated and recently-generated non-combustible alpha waste will be embedded in a cement matrix. The erection of the sorting and cementing units which include glove-boxes and the interim storage building for conditioned packages was completed at BELGOPROCESS, at the beginning of year Start-up operations for both facilities have been performed. Operating tests of the sorting and cementing units were completed in July 2002 and inactive operation campaigns were started in August The results of the tests and inactive campaigns are given. Overall testing of the storage building supervised by the Safety Authorities was successfully performed at the end of 202 after completion of the operating tests on the equipment. The present paper summarizes the main information collected during the tests and campaigns, some of which has led to modifications of the equipment originally installed. INTRODUCTION The alpha-contaminated waste generated in Belgium results from past activities in the fuel cycle (R & D + Reprocessing and MOX fabrication pilot plants) and present operation of BELGONUCLEAIRE s MOX fuel fabrication plant. EUROCHEMIC, a pilot reprocessing plant, was operated till 1974 and generated alpha solid waste. The decommissioning programme of this plant, which started after its closure, also generated alpha-solid waste. 17/03/2003
2 Research and Development in the fuel cycle and the operation of a MOX fabrication pilot plant erected on the site of the Belgian Research Centre (SCK CEN) have also contributed to the production of alphasolid waste. Presently the main producer of alpha waste is BELGONUCLEAIRE s MOX plant in operation since 1972 and back fitted in 1985 to increase the capacity to 35 thm/year. RADIOACTIVE WASTE TO BE TREATED The Pu Contaminated Solid Waste (PCSW) is normally generated inside the glove-boxes in which it is sorted by category and put into small packets (a few litres) packaged in welded double PVC bags. In the past, the initial small packets obtained were packaged in 30-l canisters. The solid suspect alpha waste was placed in the free spaces in these 30-l canisters. Later, the small packets were packaged in a 220-l drum without adding any further suspected solid waste. Between the beginning of solid alpha waste production (in the 70 s) and the end of 1998, the way to package and to sort by type (combustible or non combustible) at the producer s site has evolved. The specifications, which are now imposed by ONDRAF/NIRAS, are now fixed. As a result, a significant amount of waste ( 400 m 3 ) generated before the end of 1998 must be re-sorted in order to meet the present specifications. The solid suspect alpha waste placed in the free space of the 30 l canisters will be removed after inspection of the small welded packets (contaminated alpha waste). The small packets in the 30-l-containers and the 220-l drum will be sorted into non-combustible and combustible waste. The non-combustible waste will be placed in 400-l drums, embedded in a cement matrix and transferred to an interim storage building. The combustible waste will be placed in 220-l drums prior to further conditioning. DESCRIPTION OF THE FACILITIES Sorting and Cementing Facilities Sorting and Cementing Facilities The sorting and cementing facilities are installed in an existing building at BELGOPROCESS, which has been refurbished. The layout of the sorting and cementing facilities is given in Fig. 1. Automatic monitoring of the facilities is performed using a process controller with three operating modes :
3 1) automatic sequences 2) manual servo-driven operation is possible outside the automatic operation sequences but automatic safety systems are maintained 3) intervention (all operations can be carried out without the safety devices). Sorting Unit The sorting unit consists of 4 glove-boxes equipped for the safe introduction of 30 l and 220 l packages of mixed waste, for their handling, their inspection (surface contamination, metal detection) and their sorting into suspect waste, combustible and non-combustible contaminated waste. The 30-l containers are introduced into the glove-box GB1 via a hatch equipped with a lock system. The 220-l drums containing the mixed waste are placed on a tipping system, which, after rotating through 135 brings the drum to be docked to glove-box GB3. The lid is grasped by suction cups fitted to a gasket seal and packets slide by gravity into glove-box GB3. An inflatable gasket ensures the leaktightness of the docking of the drum to the glove-box. The suspect waste is collected in a 220-l drum, which is docked to a glove-box. An empty 220-l drum with a lid is brought on a conveyor wagon to the docking position under GB2. The design of this docking system is identical to that for GB3. After filling and off-docking, the 220-l drums are transferred to existing treatment and conditioning facilities at BELGOPROCESS. The contaminated waste contained in small packets is transferred from GB3 to GB4 where it is sorted into combustible and non-combustible waste. A metal detector placed around the tunnel between the two glove-boxes detects the packets that contain metallic parts. Included with the waste for cementation are a series of 400-l drums enclosing 220-l drums containing non-combustible waste. Glove-box GB4 is fitted with a system that can drill a hole in the lids of the 220-l drums placed within the 400- l drums thereby enabling introduction of the cement. The non-combustible waste is placed in 400-l drums developed for long-term storage. Each drum, which is equipped with an internal basket and a double lid, is a sheet metal worked drum. This standard fabrication necessitated the development of a coupling system permitting safe docking and off docking to a glove-box (alpha tightness). After measurement of the Pu content by NDA (Non-Destructive Analyses : active and passive neutron alpha measurement), the 400- l drum is transferred to the cementation unit. Cementation Unit The cementation unit consists of an embedding glove-box (GB. 5) and a cement preparation and transfer system (closed loop). Embedding glove-box
4 The 400-l drum to be cemented, which is fitted with an internal lid, is placed on a Flip-Flop type two-position roller conveyor, which transfers the drum to the coupling position of the GB5 glove-box. The latter is similar to that of GB4. A cementation funnel is activated by a jack fitted with a camera and ultrasonic (US) level detectors. The cementation tube (pipe) is motorised and can be locked in either of two positions : operating or idle. Cement Preparation The preparation is performed in a cold zone. After preparation, the cement is introduced in a closed loop fed by a pump. Cement Filling and Monitoring After preparation, a qualified pre-defined amount of cement is introduced into the 400-l drum. Monitoring of the cement level is ensured by US detection in the presence of an operator. After a cementation campaign, the secondary waste (liquid and solid) resulting from emptying and downwashing is collected and recycled. After filling, the drum, which is equipped with an internal lid, is off-docked and transferred to a room for the cement to harden (2-3 days). It is then fitted with a second lid and monitored for any potential surface contamination. The transferable alpha surface contamination must be less than 0.04 Bq/cm². Interim Storage Building for the Conditioned Alpha Radwaste In order to store the 400-l drums, an interim storage hall facility is foreseen at the BELGOPROCESS site. This building is mainly intended for the interim storage of the following two categories of conditioned waste. LAGA-L category : low activity alpha-contaminated conditioned waste. RAGA-L category : low activity radium-contaminated waste. This waste results from processing and conditioning operations carried out in the BELGOPROCESS facilities. BELGATOM was awarded a contract by ONDRAF/NIRAS to design and to ensure the follow-up at the manufacturing subcontractor s premises and during erection at the BELGOPROCESS site. The building has two separate halls for each category (LAGA-L / RAGA-L), technical rooms and a reception/unloading hall (see Figs. 2 and 3). The capacity of this building is about 4000 m 3, 2000 m 3 of which are for the LAGA-L category. It is an engineered facility built to last for a period of at least 70 years. The stored waste must remain fully retrievable with a view to subsequent transportation and disposal. The reception/unloading zone is located on one side of these two halls, the other being left free to allow for future extension of the storage halls. The 400-l drums are stacked fourhigh. A space of 0.05 m is left between the packages and a corridor, at least 0.8 m wide, is left clear around each stack.
5 The packages are lifted from their transport vehicle by means of a 30 kn overhead travelling crane in the reception hall and put on a wagon. The wagon transfers each package, via an air lock to a roller conveyor, which acts as a buffer storage. This operation is automated by means of a process controller located in the control room, which has three operating modes (automatic, manual servo-driver and intervention). From this conveyor, a 30 kn overhead crane with telescopic arm takes the package to storage. A room for inspection of the package is provided. The technical rooms include ventilation, electrical equipment and a control room. COMMISSIONING AND START-UP TESTS OF THE SORTING AND CEMENTING UNITS The commissioning and start-up test phase started at BELGOPROCESS in January This phase followed the in-workshop erection and leak-tightness testing of the glove-boxes as well as a series of operating tests aimed at checking the basic performances of the most important sub-units. The equipment was then re-assembled at BELGOPROCESS and the same tests were performed. A cold test phase aimed at testing the entire facility under normal operating conditions is now in progress. Leak-Tightness Tests Leak-tightness tests were performed for GB 1 to 4 and GB 5 with a depressurization of 1000 Pa. The measured leak rate was less than 10-3 vol/h. No special problems were encountered during the tests. Operating Tests These tests were successfully performed on the sub-units and in some cases led to introducing improvements. 220-l docking unit test Two 220-l docking units are foreseen for the sorting facility. Removal of suspected waste from GB2 and introduction of the waste to be sorted into GB3 using a standard 220- l drum. From the transfer wagon (GB2) and from the tipping system (GB3) the coupling operations were tested in automatic mode. The gripping suction cups for the lid of the drum were strengthened to attain the necessary wrenching strength. 6 extra suction cups were required to reach a maximum wrenching strength of 600 kg. 400-l docking unit test Two 400-l docking units are foreseen for the sorting and cementing facilities : removal of contaminated non combustible waste from GB4 and the cementing of the 400-l drum from GB5. The 400-l drum of standard fabrication fitted with its internal lid is placed on the transfer system.
6 The transfer system is comprised of a Flip-Flop type roller conveyor (2 drums awaiting cementation) and a lifting table fitted with centring air cushions. Once the drum is positioned on the conveyor, the transfer and coupling operations are carried out in an automatic sequence. The gripping system for the internal lid which was initially comprised of a ball grapple has been replaced by a six-finger peripheral gripping mechanism operated by a ring gear motor. The internal lid fitted with a gasket seal is applied to the door. This system has proved to be very reliable during the tests. Cementation funnel and feed pipe The cementation funnel is fitted to the coupled 400-l drum using jacks. It is fitted with a camera and a level detector. The feed pipe which was operated manually during the initial tests has now been motorised. Cement filling of the drum and monitoring of the levels (low, normal and high) and automatic shutdown of the valve at high have been demonstrated. COMMISSIONING AND START-UP TESTS ON THE INTERIM STORAGE FACILITY The Civil Works of the building started in March 2001 and completed in June The commissioning and start-up tests of the interim storage equipment at BELGOPROCESS started in June This phase was preceded by in-workshop operating tests on the equipment.. Overhead Cranes The overheadcranes in the reception/unloading zone and in the storage halls have been assembled. Tests on these cranes operated from the control room were started in mid-august. Transport Wagon and Roller Conveyor The transport wagon and the roller conveyor have been assembled. Tests were started in September 2002 and have been concluded with an operating test of the entire system. The following sequential tests programmed by a process controller have been checked (automation, safety and performance) for each storage hall: - opening of the air lock door, - removal and transfer of the drum onto transport wagon by means of the reception overhead crane, - opening of the door of the roller conveyor and transfer of the drum, - stopping and centring of the drum in the removal position by the crane in the storage hall. Overall testing of the storage building supervised by the Safety Authorities was successfully performed at the end 2002 after completion of the operating tests on the equipment. CONCLUSION The tests carried out so far have shown that both facilities meet the design criteria.
7 Modifications of the equipment originally installed in the sorting and cementing units have led to introducing improvements particularly the docking system to glove-box. Active commissioning of both facilities is scheduled for 2003.
8 17/03/2003
9 Ventilation RAGA-L Reception RAGA-L Radium+ alpha waste package Air Lock Transport wagon Package inspection Ventilation LAGA-L Roller conveyor LAGA-L Alpha waste package Poisoned Storages Figure 2. Lay-out of building
10 Overhead crane 30 kn Overhead crane 30 kn Reception Control room Storage hall Air-Lock Transport wagon Roller conv. Figure 3 Section of building 155
11 A3X : Sorting Unit General View Building 155 : Storage Hall 17/03/2003
12
WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA. Westinghouse Cementation Facility of Solid Waste Treatment System 13503
Westinghouse Cementation Facility of Solid Waste Treatment System 13503 Torsten Jacobs* and Dr. Jörg Aign* * Westinghouse Electric Germany GmbH, Global Waste Management, Tarpenring 6, D- 22419 Hamburg,
More informationDECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK)
DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK) J. Benkert, F. Willman Westinghouse Electric Germany GmbH Mannheim / D K. Brockmann, I. Hillebrand Research
More informationRadioactive Spent Ion-Exchange Resins Conditioning by the Hot Supercompaction Process at Tihange NPP 10043
ABSTRACT Radioactive Spent Ion-Exchange Resins Conditioning by the Hot Supercompaction Process at Tihange NPP 10043 Serge Vanderperre, Baudouin Centner and David Charpentier Nuclear Department, Tractebel
More informationControl of nuclear material hold-up: the key factors for design and operation of MOX fuel fabrication plants in Europe
IAEA-SM-367/8/04 Control of nuclear material hold-up: the key factors for design and operation of MOX fuel fabrication plants in Europe By the members of the ESARDA MOX Working Group J Beckers, Belgonucléaire,
More informationMaterial Handling MACHINES & SYSTEMS
Material Handling MACHINES & SYSTEMS MATERIAL HANDLING MACHINES Panel Feeders Midwest Automation manufacturers a wide variety of material handling machines for the wood and composite panel industries.
More informationQualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation
Qualification Guide BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation BPEC 600/5270/3 - Level 2 NVQ Diploma in Plumbing and Heating BPEC
More informationLESSONS LEARNED WITH THE DISMANTLING OF THE KARLSRUHE REPROCESSING PLANT (WAK) G. Dutzi, L Finsterwalder, C. R. Jungmann, H. Wiese
ABSTRACT LESSONS LEARNED WITH THE DISMANTLING OF THE KARLSRUHE REPROCESSING PLANT (WAK) G. Dutzi, L Finsterwalder, C. R. Jungmann, H. Wiese Wiederaufarbeitungsanlage Karlsruhe Betriebsgesellschaft mbh
More informationContainment of Basket Filtration Centrifuges ABSTRACT
Containment of Basket Filtration Centrifuges ABSTRACT In the pharmaceutical and fine chemical industries, new products are becoming increasingly potent. Operator exposure to the potent product and the
More informationEMPTYING, DISMANTLING AND DEMOLITION OF RADIOACTIVE WASTE DISPOSAL "ALFR" ON SITE OF NPP RHEINSBERG
EMPTYING, DISMANTLING AND DEMOLITION OF RADIOACTIVE WASTE DISPOSAL "ALFR" ON SITE OF NPP RHEINSBERG ABSTRACT F. Krause, M. Schönherr Energiewerke Nord GmbH (EWN) Kernkraftwerk Rheinsberg D-16831 Rheinsberg
More information1. STANDARD CONTINUOUS LAMINATING MACHINE FOR THE PRODUCTION OF FLAT WALL PANELS
Proposal and Specification for the supply of continuous Caterpillar Laminating Press to manufacture insulated Wall and DPR Roof panels from Mineral Wool and Expanded Polystyrene (EPS) and PIR/PUR (PU BLOCK)
More informationTechnique and common sense to the expertise
Textile catalogue Technique and common sense to the expertise For more than 30 years, TECHNIC ONE is specialized in the realization of turn-key projects. Our philosophy is to support you throughout your
More informationP23 MELT CONFINED SPACE LOG
SPACE DESCRIPTION DESIGNATION ACCEPTABLE ENTRY PROCEDURES #10004758 NON PERMIT #1 BELT PIT Conveyors with moving parts, pulleys, gears & rollers Conveyors are guarded. If guards are removed, lockout of
More informationGeneral Characteristics.3. S.M.A.R.T System Set-up...5. Start-up Procedures.6. Shut-down Procedures 8. General Maintenance..8
1-800-661-3842 1 TABLE OF CONTENTS General Characteristics.3 How the S.M.A.R.T System Works..3 S.M.A.R.T Technical Specifications..3 Erecting the S.M.A.R.T System..4 S.M.A.R.T System Set-up...5 Start-up
More informationBATTERY POWERED BACKPACK VACUUM
BATTERY POWERED BACKPACK VACUUM Operation Instructions Read all instructions before using this appliance IMPORTANT SAFETY INSTRUCTIONS Per CFR 49, Lithium Ion batteries are considered hazardous goods.
More informationRadioactive Spent Ion-Exchange Resins Conditioning by the Hot Supercompaction Process at Tihange NPP Early Experience
Radioactive Spent Ion-Exchange Resins Conditioning by the Hot Supercompaction Process at Tihange NPP Early Experience - 12200 Johan Braet, David Charpentier, Baudouin Centner, Serge Vanderperre Nuclear
More informationMonozukuri Technology for Home Appliances
Hitachi Review Vol. 64 (2015), No. 2 157 Featured Articles Monozukuri Technology for Home Appliances Toru Ozawa Shinichi Wakui, Dr. Eng. Mitsuhisa Kawamata Hisaya Sakazaki OVERVIEW: This article discusses
More informationGARAGE VAC OWNERS MANUAL READ BEFORE OPERATING YOUR SYSTEM
GARAGE VAC OWNERS MANUAL READ BEFORE OPERATING YOUR SYSTEM IMPORTANT SAFETY INSTRUCTIONS When using an electrical appliance, basic precautions should always be followed, including the following: * Read
More informationHEIN-HESØ cleanliness in perfection Worldwide distribution of German/Danish quality Our recipe for success customer orientation
HEIN-HESØ cleanliness in perfection HEIN-HESØ GmbH has been at the service of its discerning customers as a competent partner for individual industrial cleaning plants for 25 years now. The second generation
More informationHANDSS-55: A TRU WASTE REPACKAGING SYSTEM FOR THE SAVANNAH RIVER SITE
HANDSS-55: A TRU WASTE REPACKAGING SYSTEM FOR THE SAVANNAH RIVER SITE ABSTRACT C. M. Frazee, Idaho National Engineering and Environmental Laboratory M. E. Brennan, Westinghouse Savannah River Site The
More informationERGO BACKPACK VACUUM OWNER S MANUAL
ERGO BACKPACK VACUUM OWNER S MANUAL Model: VACBP1 120V 12A, 1400W ETL US Canada Atrix 1350 Larc Industrial Blvd. Burnsville, MN 55337 www.atrix.com sales@atrix.com Telephone: 952.894.6154 Toll Free Telephone:
More informationINDIVIDUAL DRIVE, CHAIN DRIVE AND U- SEAL MECHANISM IN ROLLER HEARTH NORMALISING FURNACE
INDIVIDUAL DRIVE, CHAIN DRIVE AND U- SEAL MECHANISM IN ROLLER HEARTH NORMALISING FURNACE Akash Kumar Mechanical Engineering Dronacharya College of Engg. Gurgaon, Haryana Abstract:- This project deals with
More informationAtrix Back Pack Vacuum
1 Atrix Back Pack Vacuum OWNER S MANUAL Model: VACBP1 120V 12A, 1400W ETL US Canada Model: VACBP2 230V 6A, 1400W EAC Atrix International, Inc. 1350 Larc Industrial Blvd. Burnsville, MN 55337 www.atrix.com
More informationIndustrial Dust Aspiration Solutions. For optimal protection of plant and environment.
Bühler GmbH DE-92339 Beilngries Deutschland T + 49 8461 701 0 F +49 8461 701 133 grain-logistics@buhlergroup.com Buhlergroup.com/grain-logistics GL_CB_Dust_Aspriation_Systems_EN_14004_02 Dust Aspiration
More informationPLASMAC Ltd. Units 11&12 Aylesbury Business Centre Chamberlain Road Aylesbury Bucks. HP19 8DY. UK
PLASMAC Ltd. Units 11&12 Aylesbury Business Centre Chamberlain Road Aylesbury Bucks. HP19 8DY. UK Phone +44 (0)1296 398 698 Fax +44 (0)1296 395 110 Web www.plasmac.co.uk E-Mail sales@plasmac.co.uk Plasmac
More informationTramp Oil. Removal Equipment Equipment designed for removing oil from water based fluids ERIEZ. ...Only from Eriez. Tramp Oil. Removal Equipment:
...Only from Eriez FB-200B Tramp Oil Removal Equipment: Oil Skimmer Oil Skimmer Jr. Coalescer Tank-Side Coalescer Portable Coalescer Portable Jr. Centrifuge Portable ERIEZ Tramp Oil Removal Equipment Equipment
More informationThe original VAD development work at A Finkl & Sons,
STEELMAKING AND CASTING Renaissance of the VHD (VAD) plant Following re-evaluation of the VHD (VAD) vacuum heating degassing (vacuum arc degassing) process, INTECO has made a number of design modifications
More informationMODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS)
MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS) FOR PROPER AND SAFE USE OF THIS CHEMCHAMP EQUIPMENT, PLEASE FOLLOW THIS DOCUMENT AND LOCAL AUTHORITY. KEEP THIS DOCUMENT FOR FUTURE REFERENCE.
More informationPVC Ductwork Model. Installation and Maintenance for
Installation and Maintenance for PVC Ductwork Model WARNING! These installation instructions are for qualified and experienced technicians in the H.V.A.C. and Fire Protection field only. Failure to follow
More informationWM 05 Conference, February 27 March 3, 2005, Tucson, AZ
ACCELERATED DESIGN AND FABRICATION OF A MOBILE DRUM VENT SYSTEM FOR TRU RETRIEVAL ACTIVITIES IN HANFORD 200 WEST AREA LOW- LEVEL BURIAL GROUND TRENCHES T. Wickland, L. Anderson Nuclear Filter Technology
More informationTHE ROLE OF SUCTION IN THE PERFORMANCE OF CLAY FILL RONALD F. REED, P.E. 1 KUNDAN K. PANDEY, P.E. 2
THE ROLE OF SUCTION IN THE PERFORMANCE OF CLAY FILL RONALD F. REED, P.E. 1 KUNDAN K. PANDEY, P.E. 2 Abstract Plastic clay is commonly used as fill. Proper placement is the key to the performance of the
More informationInstallation, Operation and Maintenance Instructions
MMPM-440D Installation, Operation and Maintenance Instructions HIGH InTENSITY Magnetic Filter ERIEZ MAGNETICS HEADQUARTERS: 2200 ASBURY ROAD, ERIE, PA 16506 1402 U.S.A. WORLD AUTHORITY IN SEPARATION TECHNOLOGIES
More informationCombivac Operating Instructions Combivac
Combivac 17-36 Operating Instructions Combivac General Table of contents General...2 Table of contents...2 Information about the operating instructions...3 Liability...3 Notices in the operating instructions...3
More informationBiomass Drum Dryer LMK 2000 Model
Biomass Drum Dryer LMK 2000 Model Drum dryer of sawdust and biomass SPB5, SPB10, SPB20, SPB30 versions The equipment is designed to dry material of vegetable and biological origin e.g. wood sawdust, wood
More informationPotato processing systems
Potato processing systems Our company For 5 generations, Spiessens has aimed for quality and durability. Originally an expert in the development of farming machinery, Spiessens steadily evolved into the
More informationUGU, A VERSATILE EVAPORATOR IN NUCLEAR INDUSTRY. B. G. Christ RWE NUKEM GmbH Alzenau, Germany
UGU, A VERSATILE EVAPORATOR IN NUCLEAR INDUSTRY B. G. Christ RWE NUKEM GmbH Alzenau, Germany M. Köver Slovenské electráne SE-VYZ Jaslovske Bonunice, Slovakia ABSTRACT This paper describes a versatile system
More information(12) United States Patent
(12) United States Patent USOO7356873B2 (10) Patent No.: US 7,356,873 B2 Nielsen (45) Date of Patent: Apr. 15, 2008 (54) HIGHLY EFFICIENT AUTONOMOUS 3,592,566 A 7, 1971 Beardslee VACUUM CLEANER 3,906,585
More information(12) Patent Application Publication (10) Pub. No.: US 2007/ A1
(19) United States US 20070151580A1 (12) Patent Application Publication (10) Pub. No.: US 2007/0151580 A1 Salamanca (43) Pub. Date: Jul. 5, 2007 (54) ROBOT SYSTEM AND METHOD FOR CATHODE WASHING IN INDUSTRIAL
More informationUnderstand and apply domestic central heating system installation and maintenance techniques
Level: 2 Credit value: 10 URN: Y/602/2888 Unit aim This combination unit provides basic learning in the installation, maintenance, decommissioning and soundness testing of a basic range of wet central
More informationHEAT REMOVAL TESTS FOR THE HIGH PERFORMANCE VAULT STORAGE SYSTEM OF SPENT NUCLEAR FUEL
HEAT REMOVAL TESTS FOR THE HIGH PERFORMANCE VAULT STORAGE SYSTEM OF SPENT NUCLEAR FUEL M. Oda*, M. Shimizu*, N. Kumagai*, H. Kanai**, M. Tanabe** *Nuclear Fuel Cycle Group, Power & Industrial Systems R&D
More informationFire Risk Assessment
Fire Risk Assessment Maritime Studios Pendennis Rise Falmouth TR11 4FB Carried out by: Date: October 2015 Review Date: October 2016 Les Carter CMIOSH Health & Safety Consultant Mobile 07831 636751, Email
More informationREPACKAGING A TRANSURANIC WASTE STREAM FOR WIPP DISPOSAL
REPACKAGING A TRANSURANIC WASTE STREAM FOR WIPP DISPOSAL David R. Yeamans, Kapil K. Goyal, Matthew J. Roybal, Chemical Sciences and Technology Division, Los Alamos National Laboratory, Los Alamos, New
More informationM 115 M 150 M 150 A M 130 M 180 M 180 A SERIE. Undercounter dishwashers Vegetable washers. Glasswashers. Pass through. dishwashers.
SERIE M 115 M 150 M 150 A M 130 M 180 M 180 A Glasswashers Undercounter dishwashers Vegetable washers Pass through dishwashers Pot-washers Flight machines SERIE Lamber solution, high performance and easy
More informationTermEfekt USER S MANUAL AIR HEATER. Model PGA 14
Przedsiębiorstwo Produkcyjno-Wdrożeniowe ARAJ sp. z o.o. 55-080 Kąty Wrocławskie, ul. Mireckiego 30 POLAND USER S MANUAL AIR HEATER TermEfekt Model PGA 14 Kąty Wrocławskie, 2004 Product identification
More informationIllustration shows item no Z Original operating manual. Operating manual. BlueMobil eco. Item no: Z-3278
Illustration shows item no Z-3278 Operating manual BlueMobil eco Item no: Z-3278 Original operating manual Important Copyright It is essential that you read this manual thoroughly before the initial operation
More informationMaterial Handling Standard Operating Procedure
Introduction Animal Care Systems technology is unique in the animal research industry. However, handling the equipment in washrooms is quick and straightforward. This document details the dirty-to-clean
More information4 August Islington Fire Protection Transpower NZ Limited
4 August 2011 Islington Fire Protection Contents 1. Introduction...1 General Approach...2 2. General Notes...3 3. Description of Building Areas...4 Use, Layout, Fire Load, Criticality and Division...4
More information3HP MOBILE CYCLONE DUST COLLECTOR MANUAL FILTER CLEANING MANUAL
3HP MOBILE CYCLONE DUST COLLECTOR MANUAL FILTER CLEANING MANUAL LAGUNA TOOLS 2072 Alton Parkway Irvine, California 92606 Ph: 800.234.1976 www.lagunatools.com 2018, Laguna Tools, Inc. LAGUNA and the LAGUNA
More informationYou ll love our containers Plastics (Pty) Ltd For Container Solutions!
www.msplastics.co.za Plastics (Pty) Ltd You ll love our containers For Container Solutions! 5 L JERRY CAN 186.5mm x 130mm x 278mm(H) 38mm 120-200g 38mm ratchet cap Fits into the standard 5L corrugated
More informationANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL
Annex 2, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL Section 1 Application 1 The following new sentence is added to the end of paragraph 1.2:
More informationTECHNICAL INFORMATION DOGASEPTIC
TECHNICAL INFORMATION DOGASEPTIC Cup filling and sealing machine Hygiene Standards ultra-clean, aseptic Machine Types DS 42P, DS 62P, DS 82P, DS 101P COMPLETE LINE We offer the project design of a complete
More informationEach burner shall be equipped with a Micro-Processor Based Burner Management Flame Safeguard and Parallel Positioning Control System.
Product Guide Specification Nexus Integrated Burner Control System 1. General 1.1 Overview Each burner shall be equipped with a Micro-Processor Based Burner Management Flame Safeguard and Parallel Positioning
More informationWM 06 Conference, February 26 - March 2, 2006, Tucson, AZ. Final Treatment Center Project for Liquid and Wet Radioactive Waste in Slovakia
Final Treatment Center Project for Liquid and Wet Radioactive Waste in Slovakia K. Kravarik, M. Stubna, A. Pekar, T. Krajc, M. Zatkulak, Z. Holicka VUJE, Inc. Okruzna 5, 918 64 Trnava, Slovak Republic
More informationCable Drum Machine. Operation Manual 110ES SERIES. Cleans 1 1/4" to 3" lines up to 25'
Cable Drum Machine Operation Manual 110ES SERIES Cleans 1 1/4" to 3" lines up to 25' Used For: Sinks, Showers &Tub Drains WARNING - Read All Instructions, When Using Electric Tools, Basic Safety Precautions
More informationDEVELOPMENT OF AN INTERIOR FINISH WORK ROBOT , Shibuya, Shibuya-ku, Tokyo, 150, JAPAN
335 DEVELOPMENT OF AN INTERIOR FINISH WORK ROBOT Sumio Fukuda, Masayuki Takasu, Sigeyuki Kojima Mechatronics Research Office Tokyu Construction Co., Ltd. 1-16-14, Shibuya, Shibuya-ku, Tokyo, 150, JAPAN
More informationOPERATION & MAINTENANCE MANUAL TX600
OPERATION & MAINTENANCE MANUAL TX600 RTI TECHNOLOGIES, INC. 4075 East Market Street York, PA 17402 Manual P/N 035-80118-00 (Rev B) ! TABLE OF CONTENTS! TX600 Before Using Page 2 Safety Precautions Page
More informationA. This section includes design and performance information for fire protection and suppression systems.
SECTION 21 00 10: FIRE PROTECTION SYSTEM DESIGN 1. SUMMARY A. This section includes design and performance information for fire protection and suppression systems. 2. GENERAL A. All fire protection materials
More information4.1 Need For Ironing / Pressing
Subject: Garment Machinery and Equipment Unit 4: Post-production machinery Quadrant 1 e-text Learning Objectives The learning objectives of this unit are: Describe garment finishing. Review equipment used
More informationMain components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens
Main components The bigger the need of heat output is. the bigger the components (storage. boiler. chimney etc.) In private houses the output need of the boiler is about 25 40 kw and in farms from 60 kw-
More informationEKO Line Pellet Boiler Wood Pellet Storage Solutions And Pellet Dosage Systems
EKO Line Pellet Boiler Wood Pellet Storage Solutions And Pellet Dosage Systems 1 EkoLine Wood Pellet Boilers EKOLINE boilers have been designed specifically for the purpose of heating water to temperatures
More informationairblastechtips Technical Tips for the Surface Treatment Industry
SELECTING ABRASIVE BLASTING CABINETS An abrasive blasting cabinet is a machine into which the object or workpiece to be processed is placed. Blasting then occurs either automatically or manually. If manually,
More informationCirculation heaters for ATEX/IECEx hazardous areas or in non-atex version
for ATEX/IECEx hazardous areas or in non-atex version * Non contractual picture Warning It is imperative to read these instructions carefully before installing or maintaining the equipment. MI500EN 09/2017
More informationThe Experts in Vacuum Solutions
The Vmax is a direct-drive, gravity-fed, self-contained, oil-sealed, air- or water-cooled, vacuum system utilizing a liquid ring vacuum pump. A Vmax system can incorporate either a single-stage or a two-
More informationLow Noise Type Hydraulically Driven Engine Cooling Fan System
Kazuhiro Maruta Nobumi Yoshida Recently a hydraulically driven engine cooling fan is becoming a mainstream technology as one of the means to bring down the level of noises generated by construction equipment.
More informationREFRIGERATOR MODELS: WRF560SFYW02 (White) WRF560SFYH02 (White Ice) WRF560SFYB02 (Black) WRF560SFYM02 (Monochromatic Stainless)
REFRIGERATOR MODELS: WRF560SFYW02 (White) WRF560SFYH02 (White Ice) WRF560SFYB02 (Black) WRF560SFYM02 (Monochromatic Stainless) 03/11/2014 2014 Whirlpool Corporation Part W10682392 Rev. B CABINET PARTS
More informationEnsure. Single inlet Dual inlet -
W10677398B NOTE The manufacturer reserves the right for any modifications on the product which might be deemed necessary or useful without informing about it in this IFU. Thank you for choosing a Hisense
More informationCDC266 Reverse Action
40000194.qxd 11/3/04 5:30 pm Page 1 GB User Instructions CDC266 Reverse Action 40000194.qxd 11/3/04 5:30 pm Page 2 WARNING Check that the product has no visible signs of damage before use. If damaged do
More informationImplementation of Auto Car Washing System Using Two Robotic Arms
Implementation of Auto Car Washing System Using Two Robotic Arms Pranoti Utekar 1, Sayali Naik 2, Monika Wadekar 3, S.G. Watve 4 U.G. Students, Department of Electronics and Telecommunication Engineering,
More informationCIATCOOLER LJA. Chilled water production units USE. Attractive design, Compact and quiet
Attractive design, Compact and quiet Many customisable configurations possible For indoor installation New reliable technologies Version with Plug and Cool hydraulic module Cooling capacity: 23 to 140
More informationPAMA PRODUCT PASTEURIZATION, HEATING AND COOLING SYSTEMS
PAMA PRODUCT PASTEURIZATION, HEATING AND COOLING SYSTEMS PAMA HIGH PERFORMANCES WITH NO WASTE Pama pasteurizers are a cut above competitors products thanks to the innovative and exclusive philosophy for
More informationAUTOMATIC WASTE SEGREGATOR PROJECT REFERENCE NO: 38S0128
AUTOMATIC WASTE SEGREGATOR PROJECT REFERENCE NO: 38S0128 COLLEGE : M S RAMAIAH INSTITUTE OF TECHNOLOGY BRANCH : ELECTRONICS AND INSTRUMENTATION ENGINEERING GUIDE : ASST. PROF. M K PUSHPA STUDENTS : MS.
More informationSperansa 2008: Round table: Nuclear and sustainable development Universitad Politecnica de Valencia \UPV - Passive safety systems -
Universitad Politecnica de Valencia \UPV - Passive safety systems - complete+annex.doc 1 1.1 Definition of Passive Safety Systems...3 2. Passive safety systems for core decay heat removal....4 2.1 Pre-Pressurized
More information7165 Dust Collector Owner s Manual
7165 Dust Collector Owner s Manual Oliver Machinery M-7165 12/2016 Seattle, WA Copyright 2003-2017 info@olivermachinery.net www.olivermachinery.net CONTENTS IMPORTANT SAFETY RULES----------------------------------------------------------------
More informationRadioactive Contamination Monitor
Radioactive Contamination Monitor Toru Hasegawa Tadao Hashimoto Manabu Hashimoto 1. Introduction At nuclear power plants, surface contamination inspection monitors are installed at the boundaries of radiation
More informationROTO-PACKER The Originals. Made by HAVER. Progress and Quality for the 21st Century HAVER & BOECKER HAVER & BOECKER. Information HAVER & BOECKER
HAVER & BOECKER HAVER & BOECKER Progress and Quality for the 21st Century The HAVER ROTO-PACKER series RL designates a rotating valve type bag filling machine (with 3, 4, 6, 8, 10 or 12 spouts) according
More informationFTNON Magnetic Onion peeler
Magnetic Onion peeler Yield - Hygiene - Convenience Yield Hygiene Convenience. These are the key features of the new onion peeling machine developed by in collaboration with Gills Onions and the American
More informationSMART FIRE CURTAINS INTISI7. for invisible fire protection closures
SMART FIRE CURTAINS INTISI7 for invisible fire protection closures 2 INTISI INTISI ı Fire Engineered FABRICS was founded with the aim of being a technological partner for the development and production
More informationREFRIGERATOR MODELS: WRF560SMYW02 (White) WRF560SMYB02 (Black) WRF560SMYM02 (Monochromatic Stainless)
REFRIGERATOR MODELS: WRF560SMYW02 (White) WRF560SMYB02 (Black) WRF560SMYM02 (Monochromatic Stainless) 03/20/2014 2014 Whirlpool Corporation Part W10693370 Rev. A CABINET PARTS 03/20/2014 2 Part W10693370
More informationDocument Code: 1 (15) Issuing date: Status:
Document Code: 1 (15) Project : MULTI FUEL CFB BOILER SIMULATOR Author: Approved: Language: HSK Document title: SYSTEM DESCRIPTION BOILER WATER SYSTEM Submitted for: Customer reference: Other information:
More informationANALYSIS OF HUMAN FACTORS FOR PROCESS SAFETY: APPLICATION OF LOPA-HF TO A FIRED FURNACE. Paul Baybutt Primatech Inc. and
ANALYSIS OF HUMAN FACTORS FOR PROCESS SAFETY: APPLICATION OF LOPA-HF TO A FIRED FURNACE by Paul Baybutt Primatech Inc. and Joel Haight The Pennsylvania State University Abstract Layers of Protection Analysis
More informationHealth and Safety Documents in connection with offshore oil and gas operations
Health and Safety Documents in connection with offshore oil and gas operations DWEA guideline 65.1.13 January 2017 The most important rules on Health and Safety Documents for installations with connected
More informationHot water super class HDS 12/18 4S *AU
Hot water super class HDS 12/18 4S *AU Our new medium and super class hot water high-pressure cleaners not only clean exceptionally well, they are also extremely rugged and simple to operate. The new ECO
More informationTH450A-CRB TH550A-CRB THP550-CRB/TS3000
TH450A-CRB TH550A-CRB THP550-CRB/TS3000 INSTRUCTION MANUAL CLEAN TYPE INDUSTRIAL ROBOT SPECIFICATIONS Notice Make sure that this instruction manual is delivered to the final user of Toshiba Machine s industrial
More informationMSMCR. Counter-Rotating Blenders. I Application. I Principle of operation
MS I Application Counter-rotating blenders are used for mixing and homogenizing dispersed products at a controlled temperature with an optimum performance, regardless of the product viscosity. These units
More informationSierra Europe Srlu Technical Specification AL5000 mobile baler
AL5000 mobile baler General description of the Sierra AL5000 mobile baler In the world of scrap metal processing, equipment value and capability are essential to a profitable business, and the Sierra AL5000
More informationBoiler. Fire tube Boiler:
Boiler What is Boiler? A closed metallic vessel in which the water is heated beyond the boiling temperature by the application of heat by the combustion of fuels to convert it into steam. The function
More information5HP CYCLONE DUST COLLECTOR MANUAL
5HP CYCLONE DUST COLLECTOR MANUAL LAGUNA TOOLS 2072 Alton Parkway Irvine, California 92606 Ph: 800.234.1976 www.lagunatools.com 2018, Laguna Tools, Inc. LAGUNA and the LAGUNA Logo are the registered trademarks
More informationInline Cup Filler. AFIC - Series
M a c h i n e r y Inline Cup Filler AFIC - Series Inline Cup Filler Principle Function: The highly flexible and hygienic Inline Cup Filler, from the series AFIC, is solidly built and easy to operate. This
More informationand Closed Circuit Blaster
and Closed Circuit Blaster The Clemco Easy Load Systems are designed to eliminate the awkward, back-breaking and potentially injury-causing practice of lifting and maneuvering heavy bags of abrasive into
More informationAn Embedded System for Detecting Seed Flow in the Delivery Tube of a Seed Drill
ISBN 978-93-84468-20-0 Proceedings of International Conference on Advances in Chemical, Biological & Environmental Engineering (ACBEE) Singapore March 29-30, 2015, pp. 236-241 An Embedded System for Detecting
More informationFull Automatic Cup Printer
Model: DO-7 Full Automatic Cup Printer Cup printer model DO-7 Main Features Seven color-dry offset UV dryer on mandrel Automatic cup storage with capacity of 1700 to 2500 cups (expandable up to 6000 cups)
More informationPUGMILL/MIXER. Instruction Manual NVS-07
92895B PUGMILL/MIXER Instruction Manual NVS-07 Attention After carefully reading this manual, be sure to store it in a safe and convenient place for easy reference. Before using this unit, please read
More informationPERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1968 CHEVROLET IMPALA
specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1968 CHEVROLET IMPALA CONTROL & OPERATING INSTRUCTIONS The controls on your new Perfect
More informationKTM-TROXLER TROXLER. Winery machinery Technology in stainless steel. Innovations for your future made by -TROXLER
KTM-TROXLER TROXLER Winery machinery Technology in stainless steel Innovations for your future made by -TROXLER 1 Contents KTM red winemaking systems 3-5 Bottling and sealing machine 6-7 Sealer 8-10 Sulphuriser
More informationLMV51 Control. Specifications. Document No. LV February 7, Product Description. Sample Specification
SCC Inc. LMV51 Control Product Description February 7, 2017 The LMV51 is a microprocessor-based burner management system with matching system components for the control and supervision of forced draft
More informationr n n p t i h m a f f e e
USER S OPERATION MANUAL X08060287B Before operating this unit, please read this manual thoroughly, and retain for future reference NOTE The manufacturer reserves the right for any modifications on the
More informationIAEA Workshop Decommissioning Technologies July 2009 Karlsruhe, Germany. Decommissioning of Hot Cells at the Karlsruhe Reprocessing Plant (WAK)
IAEA Workshop Decommissioning Technologies 06-10 July 2009 Karlsruhe, Germany Decommissioning of Hot Cells at the Karlsruhe Reprocessing Plant (WAK) Dr. W. Dander Head of Department Dismantling and Decommissioning
More informationService Bulletin Trucks Date Number Page
Mack Trucks, Inc. Allentown, PA USA (Does not apply to Mack Trucks Australia) (Supersedes SB215025 dated 03/27/07) Service Bulletin Trucks Date Number Page 11/04/08 SB215025 1(25) Cooling System Revisions
More informationSECTION AUXILIARY HEATER
14-301.03/ 1 2010MR12 SECTION 14-301.03 GENERAL DESCRIPTION The Thermo 300 auxiliary heating system is used in conjunction with the vehicle s heating system, in order to heat the passenger compartment
More informationIllustration shows item no Z Original operating manual. Operating manual. BlueMobil 60. Item no: Z-3285
Operating manual BlueMobil 60 Item no: Z-3285 Original operating manual Illustration shows item no Z-3285 Important Copyright It is essential that you read this manual thoroughly before the initial operation
More informationPulse Jet Baghouse ASTEC PULSE JET BAGHOUSE. for Asphalt Facilities
Pulse Jet ASTEC PULSE JET BAGHOUSE for Asphalt Facilities ASTEC PULSE JET BAGHOUSE FOR ASPHALT MIXING PLANTS Astec baghouses deliver superior performance and efficiency, while helping your plant meet
More information