1 UPDATE ON: Water Quality Enhanced BMPs / Landscaping January 2017

2 Technical Studies in Preparation Water Quality Assessment Report Hydrology Study Storm Water Data Report Flood Control Facilities Report Enhanced Landscaping Concepts BMPs (Storm Water Treatment) Planting / Aesthetics

3 Motion 22.1 Objectives Implement Additional BMPs Maximize Planting LA River Resources Ensure Consistency with RWQCB Permit Identify BMP Locations Enhance LA River Water Quality Add Trees, Shrubs, Foliage within R/W consistent with Caltrans Policy Landscaping Criteria: Drought Tolerant Superior Biosequestration Superior Biofiltration Exceed remove/replace ratio Minimize Impacts to Riverbanks, Native Landscaping, and Nearby Open Space Minimize Impacts to Trails and Pocket Parks

4 Water Quality What is Affected? Receiving Water Bodies Los Angeles River Estuary Reach 1 Reach 2 Compton Creek Rio Hondo Channel Reach 1 Dominguez Channel Los Angeles/Long Beach Inner Harbor

5 Current Regulations & Conditions Caltrans Statewide Storm Water Management Plan (SWMP) Amended July 2016 Complies with National Pollution Discharge Elimination System (NPDES) Permitting Requirements Provides Guidance on Best Management Practices (BMPs) Construction Site Design Pollution Prevention Treatment Control Corridor Storm Water Management Studies Caltrans Completed in 2009 for I-710 Identified Treatment Opportunities on Existing I Recently Installed Treatment BMPs within Project Limits: Biofiltration Swales/Strips Gross Solids Removal Devices (GSRD) Media Filters Infiltration/Detention Basins

6 System Overview: Existing P Storm Water Runs Off Roadway and is Collected in Inlets Water is Conveyed in Pipe Network to Pump Station Water is Pumped to an Outlet in the LA River Channel

7 System Overview: With Treatment BMP P Storm Water Runs Off Roadway and is Collected in Inlets Water is Conveyed in Pipe Network to BMP Treated Water is Conveyed to Pump Station Water is Pumped to an Outlet in the LA River Channel

8 Project Impacts to Water Quality Alternative 5C Impervious Surface Area: 17% Increase for Alternative 5C 26% Increase for Alternative 7 Increases in Impervious Surface Area Increase Pollutant Load BMP Alternative 7 Treatment Required to Maximum Extent Practicable: BMP Existing + New Run Off No Additional Right of Way Acquisition Involving Displacements Feasibility of Design

9 BMPs for Project Alternatives Alternative 5C Alternative 7 Candidate Treatment BMPs 40 Biofiltration Swales 32 Infiltration / Detention Basins 12 Media Filters 8 GSRDs Preliminary Estimates 74% of Total Paved Area is Treated $165M (All BMPs) Candidate Treatment BMPs 36 Biofiltration Swales 30 Infiltration / Detention Basins 12 Media Filters 8 GSRDs Preliminary Estimates 78% of Total Paved Area is Treated $302M (All BMPs)

10 Typical Treatment BMPs Infiltration Basins Biofiltration Swales Media Filters Larger Footprint Usually Placed in Wider Interchange Spaces Hydroseed Typical Landscaping Treatment Linear Footprint Usually Placed Along Roadways Hydroseed Typical Landscaping Treatment Smaller Footprint Usually Placed in Confined Areas Earthen Types Preferred if Space Permits

11 Enhancement Concept: Infiltration Basin Existing Southbound I-710 near Firestone Boulevard Thematic Elements Planting / Hardscape Mix Tank Screened Perspective

12 Enhancement Concept: Infiltration Basin Existing Southbound On Ramp at PCH Thematic Elements Planting / Hardscape Mix New Ramp Configuration Industry Uses Screened Perspective

13 Enhancement Concept: Biofiltration Swale Existing Southbound I-710 near Florence Avenue Thematic Elements Planting / Hardscape Mix New Ramp Configuration Perspective

14 Existing Landscaping Example: Imperial Highway: Existing Condition

15 Proposed Landscaping Example: Increase Number of Trees Added Shrubs and Ground Cover Landscaped Parkway North Side of Imperial Over River Over Freeway Class 1 Bikeway Multiple Trail Access Points

16 Effects on LA River Amenities: More Trail Access From Parkway From Wright Rd Access Point Enhancements Landscaping Lighting Wayfinding Signs Net Increase in Adjacent Open Space

17 Project Consistency with Motion 22.1 Objectives Implement Additional BMPs Maximize Planting LA River Resources More than 90 BMP Locations Identified BMPs Treat Existing and Proposed Run Off as Much as Possible Plan Complies with NPDES More Trees, Shrubs, Ground Cover within R/W Integrated with Treatment BMPs Effective Design Pollution Prevention BMP Minimizes Impacts to Riverbanks, Native Landscaping, and Nearby Open Space Increases Trail Access Enhances Access Points and User Experience

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County ORDINANCE NUMBER DRAFT 1 1 1 1 1 1 0 1 An ordinance amending Title 1 Environmental Protection of the Los Angeles County Code, establishing Low Impact Development standards. The Board of Supervisors of

More information

Selecting Appropriate Stormwater Control Measures for Your Development Project

Selecting Appropriate Stormwater Control Measures for Your Development Project Phase II Post-Construction Stormwater Requirements Workshop - February 10, 2014 Selecting Appropriate Stormwater Control Measures for Your Development Project Jill Bicknell, P.E., EOA, Inc. Outline of

More information

Post Construction BMPs

Post Construction BMPs Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases

More information

New Development Stormwater Guidelines

New Development Stormwater Guidelines New Development Stormwater Guidelines CITY OF MOUNTLAKE TERRACE Table of Contents Introduction... 2 Ecology s Minimum Requirements for stormwater management... 2 Description of the 9 Minimum Requirements...

More information

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013 Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design 4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design Specification Bioretention O & M Manual Draft Green

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose Pennsylvania Stormwater Best Management Practices Manual Chapter 1 Introduction and Purpose Chapter 1 Introduction and Purpose 1.1 Purpose of this Manual 1 1.2 How to Use this Manual...1 1.3 Overview

More information

Stormwater Basin Retrofit Project P-6 St. Peters, MO 30% Design Meeting Willott Square / Pegasus Farms

Stormwater Basin Retrofit Project P-6 St. Peters, MO 30% Design Meeting Willott Square / Pegasus Farms Stormwater Basin Retrofit Project P-6 St. Peters, MO 30% Design Meeting Willott Square / Pegasus Farms Matt Bardol, P.E., CFM, CPESC, D.WRE Meeting Agenda Stormwater Management & Water Quality Overview

More information

4.6. Low Impact and Retentive Grading

4.6. Low Impact and Retentive Grading 4.6. Low Impact and Retentive Grading Low Impact Grading techniques focus on utilizing existing topography during Site layout to minimize cost. Proposing structures, roads, and other impervious surfaces

More information

Green Gables. April 24, 2013

Green Gables. April 24, 2013 Green Gables Preliminary and Final Plat April 24, 2013 Development Team Green Gables Development Corporation (Owner/Developer) DTJ Design (Planner/Landscape Architect) Enertia Consulting Group (Civil Engineer)

More information

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook 67 67 General Terms Specific Terms 66 Low Impact Development Approaches Handbook The vocabulary of low impact development is evolving, and many terms are used interchangeably and to describe the same or

More information

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination I-494 Rehabilitation Project SP 2785-330 (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination State Project Number 2785-330 Federal Project No. NHPP-I494 (002) Trunk Highway:

More information

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project Presenter: Stacy Luell, Geosyntec Consultants Co-Authors: R. Batchelder, W. Tam, M. Hanna, M. Sadeghi

More information

New Tools/Resources for

New Tools/Resources for New Tools/Resources for C.3 Stormwater Compliance Laura Prickett, AICP, EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Outline of Presentation Updated C.3 Handbook Handbook outline

More information

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Urban Water Management and Soils (ESRM 311 & SEFS 507) Urban Water Management and Soils (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Lecture Today Some Urban Water management terms Examples of water management in urban

More information

Kearney Post-Construction Stormwater Program

Kearney Post-Construction Stormwater Program Kearney Post-Construction Stormwater Program Stormwater Treatment Facilities (STFs) Kearney Public Works Office August 10 and 17, 2017 Stormwater Treatment Facility (STF) Session Goals Understand STF Function

More information

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER CEQA scoping Meeting March 19 th, 2014 Winters City Council Chambers - 6:30 pm AGENDA FOR THE MEETING 6:30 Welcome (John Donlevy) 6:40 Overview

More information

7. SITE DESIGN, RETAINING

7. SITE DESIGN, RETAINING 7. SITE DESIGN, RETAINING WALLS AND DETENTION 99 CASTLE ROCK DESIGN CASTLE ROCK DESIGN 100 7. SITE DESIGN, RETAINING WALLS AND DETENTION Overview and Goals These guidelines apply to all residential, commercial,

More information

3. Are there any projects exempt from the definition of Regulated Projects?

3. Are there any projects exempt from the definition of Regulated Projects? STORMWATER REQUIREMENTS: OVERVIEW OF PROVISION C.3 Background: On October 14, 2009, the Regional Water Quality Control Board, San Francisco Bay Region, issued a municipal regional stormwater permit (MRP)

More information

Urban Stormwater Retrofit Program Highlights

Urban Stormwater Retrofit Program Highlights Urban Stormwater Retrofit Program Highlights Delaware Estuary Environmental Summit 2007 Prepared and Presented by: Liz Feinberg Project Funding: William Penn Foundation PA Coastal Zone Management Program

More information

Glenn Highway MP DSR. Landscape Narrative

Glenn Highway MP DSR. Landscape Narrative Glenn Highway MP 34-42 DSR Landscape Narrative Project Landscape Goals The Glenn Highway MP 34-42 Project extends through a variety of landscape types typical to the Matanuska-Susitna Valley. In general,

More information

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection Stormwater Retrofitting: The Art of Opportunity Presented by the Center for Watershed Protection What Are Stormwater Retrofits? Retrofits are stormwater management measures inserted in an urban or ultra-urban

More information

A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS

A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS Chapter 1: 1.1 to LID 1.2 Manual Purpose and Application 1.3 Environmental Benefits of LID 1.4 Economic Benefits of LID Case

More information

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT Source: City of Bend Chapter Organization 11.1 Purpose... 11-1 11.2 Applicability... 11-1 11.3 Low Impact Development Overview... 11-2 11.3.1 Key Strategies...

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213

More information

USF System Campus Master Plan Updates Goals, Objectives and Policies

USF System Campus Master Plan Updates Goals, Objectives and Policies 2015-2025 USF System Campus Master Plan Updates Goals, Objectives and Policies Tampa Goals, Objectives, and Policies Table of Contents Executive Summary 2015 2025 USF Campus Master Plan Update Introduction

More information

Post - Construction Hydromodification Development Requirements

Post - Construction Hydromodification Development Requirements Condensed Version - Interim Low Impact Development / Hydromodification Guidelines, City of Lompoc 1 Post - Construction Hydromodification Development Requirements I. PURPOSE A. The purpose of these requirements

More information

I-710 Freeway Corridor Urban Design Concepts and Analysis. Concepts in process (subject to change)

I-710 Freeway Corridor Urban Design Concepts and Analysis. Concepts in process (subject to change) I-710 Freeway Corridor Urban Design Concepts and Analysis Concepts in process (subject to change) May 13, 2010 Purpose of Today s Meeting Review information - Design Principles - Issues and Opportunities

More information

EXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015

EXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015 EXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015 BENEFITS Bring economic, community + environmental benefits Enhance property values Use

More information

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL Effective July 1, 2007 HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL EFFECTIVE JULY 1, 2007 FIFTH EDITION Lower Colorado River Authority TABLE OF CONTENTS DESIGN SPREADHEET

More information

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018 A. California Residential Code Requirement - Construction plans shall indicate how

More information

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management Introduction to Low Impact Development Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management http://hawaii.gov/dbedt/czm/resource/publication.php A Comprehensive

More information

Venice Pumping Plant Dual Force Main Project Draft EIR

Venice Pumping Plant Dual Force Main Project Draft EIR City of Los Angeles 5.9 LAND USE PLANS 5.9.1 Environmental Setting Venice Pumping Plant Dual Force Main Project Draft EIR The Project lies within the bounds of Los Angeles County and the City of Los Angeles.

More information

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water C. WATER 1. Surface Water Runoff See Section C.3, Flood Hazard/Mudflow Hazard, page 67. 2. Ground Water Determined not significant by the October 1984 and January 1999 Initial Studies conducted by the

More information

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA OCTOBER 7, 2015 CASE STUDY: CODE UPDATES IN ARCATA Arcata is a city located in Humboldt County immediately

More information

Low Impact Development: Guidance and Standards for Transportation Projects for the Santa Ana Region Riverside County Co-Permittees

Low Impact Development: Guidance and Standards for Transportation Projects for the Santa Ana Region Riverside County Co-Permittees Low Impact Development: Guidance and Standards for Transportation Projects for the Santa Ana Region Riverside County Co-Permittees October 2012 Table of Contents Section 1 Introduction... 1-1 A. Purpose

More information

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Lecture Today Urban Water management terms Examples of water management in urban areas Field

More information

What Are We Inspecting? Stormwater Treatment Measure Type and Design

What Are We Inspecting? Stormwater Treatment Measure Type and Design What Are We Inspecting? Stormwater Treatment Measure Type and Design Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program December 16, 2013 Outline of Presentation

More information

Importance of Master Planning Marcy Colclough

Importance of Master Planning Marcy Colclough Importance of Master Planning Marcy Colclough Senior Planner Southwest Michigan Planning Commission WHERE and HOW we develop Land affects Water Quality! 43.2 Acres total 20 Homes 35.8 Acres of open space

More information

Retrofitting Commercial Shopping Centers

Retrofitting Commercial Shopping Centers Retrofitting Commercial Shopping Centers Making an impact with LID Overview Commercial Development LID Retrofit Issues Tips and techniques Costs and O&M issues Commercial Development LID Retrofit Issues

More information

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual. 4.4. Filter Strips Filter Strips are densely vegetated lands that treat sheet flow storm water from adjacent pervious and impervious areas. They function by slowing runoff, trapping sediment and pollutants,

More information

Adopting the Manual of Best Management Practices for Stormwater Quality. Facts for Communities

Adopting the Manual of Best Management Practices for Stormwater Quality. Facts for Communities Adopting the Manual of Best Management Practices for Stormwater Quality Facts for Communities Adopting the Manual of Best Management Practices for Stormwater Quality September 2006 prepared for the Mid-America

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents City of Yelm Tahoma Terra Final Master Plan Development Guidelines Table of Contents Table of Contents... 1 Purpose... 2 Low Density Residential (R4-6)... 3 Moderate Density Residential (R6-10)... 5 Neighborhood

More information

J. Paul Guyer, P.E., R.A.

J. Paul Guyer, P.E., R.A. J. Paul Guyer, P.E., R.A. Paul Guyer is a registered civil engineer, mechanical engineer, fire protection engineer, and architect with over 35 years experience in the design of buildings and related infrastructure.

More information

STUDIO CITY SENIOR LIVING CENTER PROJECT ENV EIR APPENDIX H RIO CHECKLIST

STUDIO CITY SENIOR LIVING CENTER PROJECT ENV EIR APPENDIX H RIO CHECKLIST STUDIO CITY SENIOR LIVING CENTER PROJECT ENV 2001-1196-EIR APPENDIX H RIO CHECKLIST Los Angeles RIO Photo courtesy of Los Angeles Public Library Section 5 Property Improvement Guidelines 5-1 Section: 5.0

More information

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located Outlet Retrofit Hitzel Terrace The town owned parcel along Hitzel Terrace is a natural wetland area which currently provides some level of stormwater detention and peak-flow attenuation. The proposed project

More information

Model Stormwater Ordinances

Model Stormwater Ordinances Model Stormwater Ordinances Breakout Group 11 am to 12 pm Sadie Drescher Watershed Researcher & Planner Center for Watershed Protection April Turner Coastal Communities Specialist SC Sea Grant Consortium

More information

Transportation Project Guidance and Workshop

Transportation Project Guidance and Workshop Transportation Project Guidance and Workshop Riverside County Flood Control and Water Conservation District Santa Ana Region TPG Training Updated April 24, 2018 2 Introductions Speaker Introductions: Michael

More information

Maintenance Plan for Vegetated Portions of the MS4

Maintenance Plan for Vegetated Portions of the MS4 Maintenance Plan for Vegetated Portions of the MS4 Hawaii State Department of Transportation Highways Division, Oahu District Storm Water Management Program NPDES Permit No. HI S000001 April 2015 This

More information

DEALING WITH STORM WATER MANAGEMENT

DEALING WITH STORM WATER MANAGEMENT December 2012 DEALING WITH STORM WATER MANAGEMENT This fact sheet provides information on the guiding principles of storm water management practices, explains the difference between structural and non-structural

More information

Coffee Creek Park Development Low Impact Development (LID)

Coffee Creek Park Development Low Impact Development (LID) Coffee Creek Park Development Low Impact Development (LID) City of Duluth, St. Louis County, MN Presented By: Christopher J. Rousseau, P.E. February 27, 2008 Developer / Owner Information Trinity Development

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

A P P E N D I X D. Project Stormwater Plan Worksheets

A P P E N D I X D. Project Stormwater Plan Worksheets A P P E N D I X D Worksheets for Section 1: Basic Project Information This worksheet must be filled out for all projects required to implement the 2015 Post- Construction Stormwater Standards Manual. A

More information

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -

More information

Action Plan for Retrofitting Structural BMPs

Action Plan for Retrofitting Structural BMPs Action Plan for Retrofitting Structural BMPs Hawaii State Department of Transportation Highways Division, Oahu District Storm Water Management Program NPDES Permit No. HI S000001 August 2014 Action Plan

More information

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. Numerous ecosystem-based functional stormwater quantity and quality design alternatives are possible within the street ROW. Several

More information

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street Memorandum DATE November 10, 2011 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, and Delia

More information

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro State Water Board s Post Construction Stormwater Calculator Instructions for El Centro Important: This workbook must be completed for each Drainage Management Area (DMA) in the project site. For example,

More information

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012 Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012 Overview Brief History: Getting Started to Now GSI Program: What s Working? GSI Program: What needs Improvement?

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project of an Environmental Impact Report and Scoping Meeting for the As the Lead Agency, the County of San Mateo (County) will prepare an Environmental Impact Report (EIR) for the (project), and would like your

More information

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010 City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area

More information

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed On September 8 th, 2006 Minnesota's Lake Superior Coastal Program and the South St Louis Soil and Water Conservation

More information

APPENDIX A. Consistency of the Mountain Park Specific Plan with the Goals and Policies of the Anaheim General Plan

APPENDIX A. Consistency of the Mountain Park Specific Plan with the Goals and Policies of the Anaheim General Plan APPENDIX A Consistency of the with the Goals and Policies of the Anaheim General Plan I. Consistency of the Proposed Project with Land Use-Related Goals and Policies II. III. IV. Consistency of the Proposed

More information

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith Urban Stormwater Management Rebecca Leonardson Rui Teles Brooke Ray Smith Introduction Stormwater in Portugal Why urban stormwater is currently a problem What is green stormwater management? Why it is

More information

2012 Saginaw Bay Watershed Conference

2012 Saginaw Bay Watershed Conference 2012 Saginaw Bay Watershed Conference March 16, 2012 Russ Beaubien, P.E., CFM Low Impact Development Fundamentals Summary LID overview Education on LID Fundamentals of LID Examples of LID practices Other

More information

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL Neighborhood Drainage Infrastructure Improvements Using Green Initiatives Village of Hinsdale, IL Presentation Agenda Project Overview Goals and Objectives Design Approach Public Coordination Recap Questions

More information

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table Public Open House Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table The Grand Avenue Extension Location and Environmental Study will determine the location of the extension of

More information

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA Planned Community Stockton, CA Project Overview March 2007 Summary of Proposed Community is a master-planned community proposed for development on approximately 3,810 acres in southeast Stockton. In 2004,

More information

Pollutant Removal Benefits

Pollutant Removal Benefits Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs DCBP Appendix FINAL US Army Garrison, Hawaii October 2015 DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs Storm Water Management Plan DCBP Appendix B ACTION PLAN FOR RETROFITTING STRUCTURAL

More information

Reducing Runoff with Green Infrastructure. Lake George, NY May 5, 2011

Reducing Runoff with Green Infrastructure. Lake George, NY May 5, 2011 Reducing Runoff with Green Infrastructure Lake George, NY May 5, 2011 The Duties of a Stormwater Designer: Reduce Peak Runoff Rates Remove Pollutants from Runoff Reduce Runoff Volume Runoff Reduction from

More information

Intentionally Left Blank

Intentionally Left Blank Intentionally Left Blank CITY OF LOS ANGELES LOW IMPACT DVELOPMENT BEST MANAGEMENT PRACTICES HANDBOOK LOW IMPACT DEVELOPMENT (LID) CHECKLIST SMALL SCALE RESIDENTIAL (4 UNITS OR LESS) WPD Project Plan Checker:

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

Small Project Guidance Document

Small Project Guidance Document Small Project Guidance Document Introduction If you are considering a relatively small construction project on your property that creates new impervious area and you need to manage the stormwater that

More information

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET 7th Avenue Creek Master Plan Development Project MARKET City of St. Charles, IL IAFSM CONFERENCE March 14, 2018 7 TH AVENUE CREEK PROJECT AREA 2 2008 RAIN EVENT 3 RESIDENTIAL STRUCTURE FLOODING COMMERCIAL

More information

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK A. Authority As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.210, the Director of Planning and Development

More information

Yahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA

Yahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA Yahoo! Inc. CO-7 Site Location: 701 First Avenue Sunnyvale, CA Rocky swales Multi-story buildings reduce building footprint Access to the Bay Trail open space area including parking available for visitors

More information

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP PROJECT DESCRIPTION ENVIRONMENTAL SETTING Project Site Location The proposed project site is located within the City of Camarillo in Ventura County. As shown in Figure 1, the City of Camarillo is located

More information

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices. Management practices best Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. Long Beach Development Services Building a Better Long Beach

More information

Green Streets and Water

Green Streets and Water Green Streets and Water Creating liveable sustainable streets through new design and adaptation An exploration of SUDS and landscape issues Illman Young Landscape Design A landscape and environmental practice

More information

In the Plan Area, sustainable principles and strategies should be incorporated into the planning and design of buildings, streets and sidewalks, and

In the Plan Area, sustainable principles and strategies should be incorporated into the planning and design of buildings, streets and sidewalks, and Chapter 5 In the Plan Area, sustainable principles and strategies should be incorporated into the planning and design of buildings, streets and sidewalks, and public and private open spaces. 181 Chapter

More information

WESTERN ILLINOIS UNIVERSITY

WESTERN ILLINOIS UNIVERSITY WESTERN ILLINOIS UNIVERSITY Quad Cities Riverfront Campus Master Plan March 1, 2006 Preliminary Master Plan Total Site Build Out Western Illinois University Quad Cities Municipal Park Mississippi River

More information

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX G - Stormwater Study Findings & Stormwater Solutions LSU: MP Narrative July 2017 3.5 Open Space Existing Conditions The

More information

City of Sun Prairie Wetland Buffer Reduction Request

City of Sun Prairie Wetland Buffer Reduction Request City of Sun Prairie Wetland Buffer Reduction Request Westside Development Area January 9, 2017 Prepared by: City of Sun Prairie 300 E. Main Street Sun Prairie, WI 53590 BACKGROUND The City of Sun Prairie

More information

PennDOT Collaborates with Universities Along I-95 in Philadelphia to Understand SMP Maintenance, Lam and Henery, B51

PennDOT Collaborates with Universities Along I-95 in Philadelphia to Understand SMP Maintenance, Lam and Henery, B51 PennDOT Collaborates with Universities Along I-95 in Philadelphia to Understand SMP Maintenance, Lam and Henery, B51 Edwina Lam P.E., Conshohocken, PA Eric Henery P.E., Conshohocken, PA Project History

More information

RETAINING RUNOFF AT ITS SOURCE

RETAINING RUNOFF AT ITS SOURCE RETAINING RUNOFF AT ITS SOURCE Atlantic Beach Case Study Jose Maria Guzman, PE, D.WRE Jacksonville Environmental Symposium August 2013 Outline Overview of stormwater issues in Atlantic Beach, FL City s

More information

Site Design for Protecting Water Quality 2013 Award Winning Projects

Site Design for Protecting Water Quality 2013 Award Winning Projects C.3. Workshop, May 29, 2013 Site Design for Protecting Water Quality 2013 Award Winning Projects Vishakha Atre Santa Clara Valley Urban Runoff Program Current New Development and Redevelopment Requirements

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance Description Grass buffers are densely vegetated strips of grass designed to accept sheet flow from upgradient development. Properly designed grass buffers play a key role in LID, enabling infiltration

More information

DRAFT Civic Center Station Area Plan. Executive Summary

DRAFT Civic Center Station Area Plan. Executive Summary DRAFT Civic Center Station Area Plan Executive Summary This project is funded in part through the Metropolitan Transportation Commission s Station Area Planning Program. The preparation of this report

More information

Appendix E: Illustrative Green Infrastructure Examples

Appendix E: Illustrative Green Infrastructure Examples Appendix E: Illustrative Green Infrastructure Examples Integrating LID into San Francisco s Urban Landscape Figure E. High-density Residential Figure E. Low-density Residential Figure E. Mixed Use 7 Figure

More information

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School 930 Gallison Hill Rd, East Montpelier, VT Filter Berm, Sand Filter, Cistern / Rain Barrel, Gravel Wetland, Check

More information

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan County of Prince Edward Stormwater Management Program Date: E-Permitting Number: This stormwater management plan (Agreement) is hereby submitted by the Owner to specify the methods that will be implemented

More information

Bioretention cell schematic key

Bioretention cell schematic key Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct