1 "Fire detection in rolling stock" Functional proof procedure for the positioning of fire detectors in rooms accessible to persons, in Guideline / Inspection Procedure Rev. No. Date Responsible Comment /03/2007 ARGE Adoption /06/2007 ARGE First Update /11/2009 ARGE Second Update /09/2012 ARGE Third Update This Guideline is the result of a cooperation of the Detection Technology Consortium (ARGE) comprising the following companies: Title: ARGE Guideline - Part 1 Revision: 4.0 Valid from: 17/09/2012 Page 1 of 29 ID: TÜV Rail_RW Creator: ARGE Creation date: 19/06/2012 Phone: 49 (0) Fax: +49 (0) Juergen.heyn@tuv-sued.de TÜV SÜD Rail GmbH Ridlerstraße Munich Germany

2 List of Contents ARGE Guideline - Part 1 1. GENERAL Preface Field of Application Supplementary Guidelines and Regulations (Informative) Editorial work of the Guideline Area of Validity 8 2. TEST SPECIFICATION FOR THE FUNCTIONAL PROOF OF DETECTOR POSITIONING AND DETECTOR SELECTION 9 3. PERFORMING THE ASSESSMENT FOR DETECTOR POSITION AND SELECTION Requirements for system validation Vehicle parameters System parameters Test equipment parameters Preparing and performing the tests Passenger and staff areas Technical areas Test Report REVISIONS OF THE GUIDELINE LITERATURE REFERENCES 15 LIST OF APPENDIXES 16 APPENDIX 1 ABBREVIATIONS, DEFINITIONS AND TERMS 17 APPENDIX 2 TEMPLATE F-1 "RESULT DOCUMENTATION OF DETECTION TEST" 19 APPENDIX 3 TEMPLATE F -2 "DOCUMENTATION OF THE DETECTION TEST" 20 APPENDIX 4 MINIMUM REQUIREMENTS OR PREREQUISITES FOR PERFORMING THE FUNCTION PROOF OF FIRE DETECTORS 21 APPENDIX 5 SPECIFICATION OF TEST EQUIPMENT FOR FUNCTION TESTS OF FIRE DETECTORS 22 APPENDIX 6 TEST FOG GENERATION FOR PERFORMING THE FUNCTION TEST ON FIRE DETECTORS (SMOKE DETECTION) 24 APPENDIX 7 - SPECIFICATION OF THE DETECTOR POSITIONING IN SMALL INSTALLATION SPACES / CONTROL CABINETS (TEMPERATURE SENSING) 27 APPENDIX 8 SPECIFICATION FOR THE PROOF OF THE DETECTOR POSITIONING (TEMPERATURE SENSING) IN LARGE INSTALLATION COMPARTMENTS (E.G. ENGINE ROOMS) AND AT EQUIPMENT INSTALLED OUTSIDE (E.G. UNDERFLOOR AREAS) BY NUMERICAL FIRE SIMULATION 28 APPENDIX 9 PARTICIPANTS OF THE CONSORTIUM (ARGE) 29 Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 2 of 29

3 1. General ARGE Guideline - Part 1 The Guideline serves the functional proof of fire detection systems related to the determination of their response times at their mounting positions. It regards criteria such as smoke, heat and radiation from possible fire incidents in rolling stock. The assessment focuses on the positioning of fire detectors in passenger areas as well as inside technical areas of rolling stock. 1.1 Preface The Technical Specifications for Interoperability (TSI), the current codes of practice and the future European standard EN include requirements for the installation of fire detection systems. Few requirements for assessment procedures are also included in the EN Whereas the purpose of EN is to define requirements for rolling stock in terms of running capability in case of a fire. The ARGE Guideline, however, focuses on fulfilling the safety objective "Safety of Persons". Thus, the assessment procedures are more conservative compared to the standard requirements of EN (requirements of running capability in case of fire on board of rolling stock). To provide complete planning guarantee for the installation of fire detection systems in rolling stock, system specific requirements for design, construction and proof are needed. This Guideline identifies the required criteria for the practical proof. Objectives With respect to the safety objectives defined on the basis of laws, regulations and codes of practice, a fire event should be detected already during the formation phase (e.g. smoldering fire) or as quickly as possible after ignition (e.g. liquid fire). Thereby the focus lies on protection of passengers and staff in rolling stock. The objective is to create health conditions acceptable for a safe evacuation from the vehicles, which is also intended by TSI and the expected EN To ensure a space of relative safety, threshold values listed in the following table must be met: Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 3 of 29

4 Table: Indices and reference values for quantitative protection objectives Smoke gas percentage Threshold value Exposure time about 15 min incl. safety factor Exposure time about 5 min incl. safety factor Carbon monoxide < 1400 ppm 200 ppm 500 ppm Carbon dioxide < 6.0 vol.-% 2 vol.-% 3 vol.-% Oxygen > 12 vol.-% 14 vol.-% 12 vol.-% Smoke gas temperature < 65 C 50 C 50 C These values were derived under consideration of the information from: /R-17/ Guideline - Engineering methods for fire prevention, Division 4 of the vfdb (05/2009) /R-18 / Guidline "design fires" VdS 2827 (05/2000), VdS Damage Prevention, Cologne The measurements are performed in the area affected by the fire in a height of about 1.6 m and in about 2.0 m distance from the ignition source. The objective is a consistent, repeatable inspection method for fire detection devices in rolling stock, applicable in equipment areas as well as in passenger areas. Other assessment methods or not validated methods are currently not repeatable or not yet sufficiently specified with regard to the protection objectives (EN 50553) and therefore only of limited suitability. Acceptance The Guideline is accepted by the regulatory authorities of Germany (Federal Railway Authority - EBA), Austria (Federal Ministry for Transport, Innovation and Technology - BMVIT) and Switzerland (Federal Office of Transport - BAV). In addition, via the crossacceptance process for vehicle registration, the Guideline is being applied Europewide. The Guideline already is accepted in many countries as acknowledged code of practice. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 4 of 29

5 Figure1: Schematic of smoke and temperature development of a fire (development starting with a smoldering fire to the full flame fire) 1.2 Field of Application This Guideline is used for verifying the correctness or expediency of the detector positions, whereby smoke as well as hot gases or flames must be detected within the defined time in the probable fire scenarios. o It is recommended to use the Guideline for the system design, i.e. determining the position of the detectors with respect to the potential fire starting points and the related fire development as well as to the operationally possible environmental conditions. This can be done by the manufacturer/ supplier of the fire detection system or by the vehicle manufacturer. o The application of the Guideline for proofing the specified function serves the final proof of the detector position and detector selection in terms of confirming compliance with the time limit for fire detection. The assessment must be acknowledged by officially recognized experts in collaboration with the manufacturers/ suppliers, so that a verified audit trail is available for the approval body. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 5 of 29

6 1.3 Supplementary Guidelines and Regulations (Informative) In connection with the common practice in achieving operation permission, an 120focusing on the requirements of the German-speaking area is made. As mentioned above, however, there are possibilities for cross acceptance based on operational coordination between the permitting authorities in Europe. In the following, only the fundamental rules, regulations, standards and directives with possible criteria concerning fire detection systems are identified. Generally, the assurance of safe operation of rolling stock is required by laws. /R-1/: /R-2/: General Railway Act AEG (Germany, 12/27/1993) Federal Law Gazette I pp. 2378, 2396; 1994 I, p 2439; amended by Article 1 of the Act of June 27, 2012 (Federal Law Gazette I p 1421) Federal Railway Law EisbG (Austria, 13/02/1957, as of 07/2006 with amendment of 26/07/2006) /R-3/ Railway Law EBG (Switzerland, 01/01/2010) /R-4/: /R-5/: /R-6/: Railway Construction and Operation Rules EBO (Germany, 05/08/1967) as well as administrative regulations for the acceptance of railway vehicles VwV in accordance with 32 paragraph 1 EBO within the jurisdiction of the Federal Railway Authority, with the last change from Article 1 ÄndVO 19 March 2008 (Federal Law Gazette I, p 467) Light Rail Construction and Operating Regulation BOStrab (Germany, 12/11/1987) with latest amendment: Article 1 Regulation of 8 November 2007 by: (Federal Law Gazette I p 2569) Light Rail Regulation (Austria) Regulation of the Federal Minister for Science and Transportation on the construction and operation of trams (Tram Ordinance StrabVO), latest update 06/08/2002 /R-7/: Magnetic railways-construction and Operating Regulation MbBO (Germany, (Federal Law Gazette I p 2329) /R-8/: Railway Regulation EBV (Switzerland, 23/11/1983 as at 01/07/2012) /R-9/: Directive 96/48/EC European Council, "Interoperability of the Trans-European high-speed rail system" (Europe 23/07/1996) and the related TSI HS RST (2008/232/EC) Fire prevention requirements will be defined by the future European standard EN 45545, part 4 and 6. Current national standards will be superseded hereby. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 6 of 29

7 /R-10/: CEN TS Railway applications - Fire protection on railway vehicles, Part 4 "Fire safety requirements for railway rolling stock design" resp. EN (expected in February 2013) /R-11/: CEN TS Railway application Fire protection on railway vehicles, Part 6 "Fire control and management systems" resp. EN (expected in February 2013) With regard to cross-border traffic, the railway authorities have agreed within the UIC (International Union of Railways) on common requirements for rail vehicles. These are generally regarded as acknowledged codes of practice, since also the operational aspects are taken into account. /R-12/ UIC (January 1991), Regulations concerning fire prevention and fire fighting measures in passenger-carrying railway vehicles or assimilated vehicles used on international services including 2nd amendment until 01/07/1994 /R-13/: UIC 566 (April 2007), Loadings of coach bodies and their components /R-14/ UIC 642 (September 2001), Special provisions concerning fire prevention and fire fighting measures on motive power units and driving trailers used in international traffic /R-15/: UIC 660 (August 2002), Regulations to ensure the technical compatibility of high-speed trains Further codes of practice which relate to the subject of fire detection are listed below. These will be regarded and adapted with a focus on fire risk assessment and on fire development assessment, and on basic requirements for fire detection systems. /R-16/: EN "Railway applications - Requirements for running capability in case of fire on board of rolling stock" (February 2012) /R-17/: EBA Guideline 2010 "Regulations for fire safety assessment of railway vehicles in Germany" (August 2010) /R-18/: DIN EN "Railway applications - Specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS)", (March 2000) /R-19/ VdS 2827 Design fires for fire simulations and fire prevention concepts (Germany, Austria, Switzerland May 2000) Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 7 of 29

8 /R-20/ Technical report TB 04/01 of vfdb Guideline for engineering methods of fire prevention, as of May 2009 /R-21/ VdS 2489 Fire detection systems automatic fire detection systems, requirements and inspecting methods (Germany, Austria, Switzerland, May 2000) /R-22/ DIN V Control technology Fundamental safety aspects to be considered for measurement and control equipment (May 1994) /R-23/: DIN EN Tests for fire risk assessment - instructions, general guidance (October 2000) 1.4 Editorial work of the Guideline The content of the Guideline and its revision is the editorial responsibility of TÜV SÜD Rail GmbH (TR-TW/MUC). The quality assurance process is defined in the "Quality Manual of TÜV Rail Technology" (QSH) which is based, among other sources, on /R-24/: EN ISO/IEC General requirements for the competence of testing and calibration laboratories (August 2005). 1.5 Area of Validity The Guideline applies to rolling stock and rail vehicles which are equipped with fire detection devices. The guideline can also be applied to comparable technical systems (e.g. buses). Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 8 of 29

9 2. Test specification for the functional proof of detector positioning and detector selection This test specification focuses exclusively on positioning and selection of the fire detectors in relation to the potential fire starting points. To meet the requirement of early fire detection, the following test criteria have been defined: A) Detection of fire smoke as parameter: 1. The simulation of smoke release in passenger areas (these are: passenger areas, lobbies, WCs, etc.) is based on the test fire "burning of a travelling bag ignited by an UIC paper cushion /P-1/. Note: In EN 50553, the test fire for areas accessible to persons is defined as ignition model 5 from EN 45545, Appendix A. However, ignition model 5 does in this case not represent the real / increasing fire development during the development phase. 2. The simulation of smoke release in electrical / technical cabinets follows the example of the test fire for "Cables with thermal overload". /P-1/. Note: In EN 50553, the test fire for electrical / technical areas is defined as a test with an alternative burner, according to ISO/TR :2001, Fire behavior of construction materials. This test does not comprehensively base upon real fire scenarios inside technical areas; here particularly at electrical devices in rolling stock. 3. For the simulation of smoke release, thermally driven cold smoke or fog generated from a fluid is used. Over the test period, the smoke release is increased in accordance with the defined test fire criteria. Note: EN relates to EN Measurement of smoke density of cables burning under defined conditions for the proof of smoke detection. The requirements for measuring the smoke density described there, in this case based upon cable fires, might be insufficient for proofing the position and selection of fire detectors e.g. in passenger areas. In addition, it would result in an unreasonable effort in the real vehicle. o The detection system in passenger and staff areas must respond within 1 minute after the beginning of smoke release under all possible operational conditions. Note: For areas accessible to persons, EN prescribes a maximum detection time of 2 minutes. With regard to the safety objective Safety of persons in relation to the reaction and evacuation time of passengers, the ARGE experts evaluate this as too long. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 9 of 29

10 o In electrical / technical areas, the detection system must under all possible operational conditions respond within 2 minutes from the beginning of the cold smoke release (external influences when vehicle is running have to be taken into account). Deviating from this, in technical areas with combustion, the maximum allowed time until response is 1 minute; due to the risk of huge damage. Note: In technical areas with combustion, smoke should generally NOT be used as parameter for fire detection; due to the risk of contamination by dirt and thus low system availability. o The specified time period also includes the alarm transmission from detector to persons (passengers and/ or train staff). B) Detection of fire temperature as parameter: 1. The simulation of temperature development in installation areas using technical testing equipment is impracticable as it is too complex and partially hazardous. 2. The installation of heat detectors was specified on the basis of 1:1 fire tests in electrical cabinets [see appendix 7]. The correct geometrical arrangement of the detectors, also taking into account the aerodynamics in the monitored area, is thus visually verifiable. 3. In large techical areas with forced ventilation (e.g. engine rooms) and in machine systems installed outside of the vehicle body (e.g. underfloor areas), the correct spatial arrangement of the detectors must be demonstrated in terms of the aerodynamic conditions in the monitored space or area by numerical fire simulations or equivalent methods (e. g. fire test). The simulations are subject to determined inputs and / or simulation boundary conditions. [see appendix 8] Note: EN also refers to CFD simulations for technical / electrical areas. However, for such simulations, no input criteria or boundary conditions are defined. Concerning the ignition source, reference is made to the ignition model as in 5 from EN 45545, Appendix A. 4. In case of the installation of linear heat detectors in underfloor risk areas, a proof can be omitted, if the risk areas determined by the fire hazard analysis are monitored completely and directly. Operational influences (e.g. aerodynamics) have to be taken into account. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 10 of 29

11 Note: In passenger areas, temperature should generally NOT be used as parameter for fire detection. The system functionality including, fault simulations, and the related reactions of the fire detection system and/or the signals released are not part of this test specification. These topics are considered in ARGE Guideline- Part 3. The system functionality has to be specified by the vehicle operator or the operating railway company, as here, the focus lies on reliability and availability of the system. For the system design, this is an important design basis. 3. Performing the assessment for detector position and selection The assessment procedure verifies that the installed fire detection equipment can detect a fire event in accordance with the specification. The procedure of type testing should already be applied during the system design. This ensures a high probability of success for the type testing. This ensures a high probability of success for type testing. EN does not define any parameters related to performing an assessment. 3.1 Requirements for system validation At least those parts of the documentation are required in advance to the test, which describe the general system function. A successfully type testing can only be certified, if proof is available that the system's general function was tested with regard to rail suitability, liability and environmental conditions. Proof of certified testing labs or inspection authorities will be accepted. The requirements according to /R-21/ and 30 seconds with totally 6 ml +/- 0.5 ml /R-27/ shall be respected and proven by the submission of a test certificate according to DIN EN Vehicle parameters For planning and performing the tests, the following information related to the test object (passenger or staff area, equipment area) shall be available: Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 11 of 29

12 o Description of the individual rail vehicle or non-separable train set, with regard to operational use and the related environmental conditions (e.g. tunnel operation) o Control and regulation concept for the air treatment units (for ventilation, heating, cooling) in the rail vehicle or the train set and air routing concept (layout of air ducts and air inlet and air outlet situations, dynamic or static exhaust air routes) o Information on door and window openings and their possible handling (e.g. open in normal service or open only if ventilation equipment fails) o Information on ventilation concepts of control cabinets and machine rooms (e.g. static or dynamic ventilation) o Information on zones or assemblies with a fire risk in equipment areas; refers mainly to staff areas and control cabinets as well as to machine rooms for which the detection concept is designed - reference to fire risk assessment e.g. on the basis of /R-22/ and /R-23/. The vehicle state at the time of testing has to be documented. Deviations to the possible operating states have to be identified and evaluated in terms of their impact (note the situation in pre-series vehicles, prototypes or future conversion vehicles). In case of not-acceptable deviations, verification tests can be required. This situation shall also be considered in terms of preconditions for system specification tests, e.g. at older type of rolling stock System parameters For planning and performing the tests, the following information relating to the fire detector(s) connected within the system must be available: o Description of the fire detection system concerning the fire detectors' function within the system (e.g. single function, collective function, redundant function) o Description of the fire detector types and their positions (including variations, if available) in the vehicle or the monitored area o Proof of compliance with requirements necessary for use in rail vehicles [see Appendix 4], possible requirements deviating from standards have to be regarded (e.g. corresponding conditions concerning operating and storage temperature) If certificates based on other standards are submitted, proof of equivalence shall also be submitted. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 12 of 29

13 3.1.3 Test equipment parameters The requirements on the simulation of the "fire parameter smoke" and on the thermal lift characteristics are defined in Appendix 5 and 6. This concerns the requirements on the fog generator, as e.g. fog intensity and controllability (e.g. Viper NT from Look Solutions), on the fog fluid in terms of stability and dwell time of the fog (e.g. "Regular-Fog" from Look Solutions) and the requirements on the thermal lift (hot gas generation). As different fog generators might be used, they must meet certain minimum requirements [see Appendix 6]. The equipment for generating thermal lift (fire pan) has to be realized and operated according to the requirements [see Appendix 5]. The specification of the thermal lift determines the maximum allowed size of the fire pan. Smaller dimensions are to be considered as conservative. This is shown by the test report [P-5]. Appropriate proofs have to be made and to be confirmed in the template according to Appendix 2 (focused on the characteristics and proofs of the test equipment) with a reference to the calibration document. After successful validation according to /P-1/, alternative simulations concerning the "fire parameter smoke" can be permitted. 3.2 Preparing and performing the tests The performing of the tests is determined by the potential fire risks Passenger and staff areas In areas designated for passengers, fire risks are defined by possible vandalism. For this reason, the positioning of a UIC paper cushion at any point of the vehicle interior is required according to the codes of practice mentioned as examples in the following. /R-25/: CEN TS Railway applications - Fire prevention on railway vehicles, Part 1 "General" or EN (expected in February 2013) /R-26/: UIC (January 1991), Regulations relating to fire protection and firefighting measures in passenger carrying railway vehicles or assimilated vehicles used on international services (see Appendix 14 of UIC) Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 13 of 29

14 Therefore the positioning of the test equipment and the realization of the test smoke's thermal lift should be focused at areas which a) are most unfavorable for quick detection of the fire, b) permit hidden ignition, c) can be used for storage of larger items of travel luggage. The tests have to be performed with all possible air circulation situations in service (e.g. ventilation ON, OFF, heating, cooling). Thereby individual tests can be omitted if the related situations are covered by other similar air circulation situations Technical areas Tests in technical vehicle areas such as control cabinets require information on potential fire risks. This concerns, among other things, switching components for higher electrical power or components with hot surfaces in cases of failure. Here, the blow-out point of the test smoke should be located where a) the risk-bearing component's location is most unfavorable for quick detection of the fire, b) the air volume flow for heat removal at the risk-bearing component is the lowest, c) in cases of failure permanently hot surfaces can occur by liquid fire loads (e.g. diesel engine rooms). The tests have to be performed using all possible air circulation situations in service (e.g. ventilation ON, OFF). Thereby individual tests can be omitted if the related situations are covered by other similar air circulation situations. The thermal lift of the test smoke can be omitted for situation assessment tests in areas with high air change rate. If the proof cannot be provided within the test (e.g. at not ventilated equipment enclosures or containers of low construction height), the deviation has to be assessed by an authorized expert Test Report The test report about proofing the fire detectors' functionality shall be written based on the respective templates [see Appendix 2 and Appendix 3]. Picture documentaries illustrating the test results have to be included. This concerns, among other things, the test layout (hot gas thermal lift and fog generator) and the position of the fire detectors. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 14 of 29

15 4. Revisions of the Guideline The content of the Guideline and its revision is the editorial responsibility of TÜV SÜD Rail GmbH and the ARGE consortium. Annual meetings of the ARGE consortium are planned for updating the Guideline. Editorial work: TÜV SÜD Rail GmbH TÜV NORD Systems GmbH & Co.KG Ridlerstraße 57 Große Bahnstraße 31 D Munich D Hamburg 5. Literature References The reports listed below can be viewed at TÜV NORD or TÜV SÜD Rail, if necessary. /P-1/: Report about determining the simulation basic conditions for cold smoke tests for fire detection by smoke detectors. /P-2/: Report about performed fire tests for estimating the temperature development in installation spaces for fire detection by heat detectors. (e.g. control cabinet) /P-3/: Test Report - Fire tests of ARGE consortium for validating the fire simulation programs FDS and Kobra 3D for proving the correct detector positioning (temperature sensing) in large installation spaces (e.g. engine rooms) and at machines installed outside installation spaces (e.g. underfloor areas) /P-4/: Test proof for identifying fog generation characteristics calibration of fog generators (TÜV Rail test equipment) /P-5/: Test proof for fire pan layout concerning thermal lift Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 15 of 29

16 List of appendixes Appendix 1 Abbreviations, definitions and terms Appendix 2 Template F-1 "Result documentation of Detection test" Appendix 3 Template F -2 "Documentation of the detection test" Appendix 4 Minimum requirements or prerequisites for performing the function proof of fire detectors Appendix 5 Specification of test equipment for function tests of fire detectors Appendix 6 Test fog generation for performing the function test on fire detectors (smoke detection) Appendix 7 - Specification of the detector positioning in small installation spaces / control cabinets (temperature sensing) Appendix 8 Specification for the proof of the detector positioning (temperature sensing) in large installation compartments (e.g. engine rooms) and at equipment installed outside (e.g. underfloor areas) by numerical fire simulation Appendix 9 Participants of the consortium (ARGE) Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 16 of 29

17 Appendix 1 Abbreviations, definitions and terms A Abbreviations ARGE Consortium TSI Technical Specification for Interoperability UIC UNION INTERNATIONALE DES CHEMINS DE FER International Union of Railways B Definitions and terms Reference is made to DIN ISO Fire Safety Vocabulary (October 2000) and series of standards DIN EN 54. Fire detection system Total of all devices and components matched for functional interaction. Fog generator Rail vehicles Installation space Device producing an aerosol from a fluid for test purposes. These include in this Guideline all track-guided vehicles, such as railways, tramways, overhead railways, cable railways, mine railways and magnetic railways. Room or enclosure to house technical equipment such as electric cabinets, equipment containers, roof interior. Machine system, machinerytechnical or drive system installed in, under or on rolling stock. Cross acceptance Flow conditions Rail suitability Mutual acceptance of different proof documents or certificates with the same intention. Operation-related air flow situation in a separated area (e.g. static or dynamic ventilation), or an outside area. Characteristic of a technical system, which is proven applicable in rolling stock. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 17 of 29

18 Equipment area Thermal lift Certificate/ statement Equipment areas are installation areas separated from passenger and staff areas for electrical installations or machinery, which are not intended to be accessible to passengers. These rooms or containers house electrical or electronic components or equipment requiring monitoring such as batteries, fire load carrying systems or. Convection flow generated by a heat source. Document based on tests of the components' functionality under defined basic conditions. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 18 of 29

19 Appendix 2 Template F-1 "Result documentation of Detection test" Order No.: Document No.: Number of Appendixes: (depending on number of performed tests) Parameters Vehicle type Specifications e.g. electric locomotive Vehicle type for example RE 484 Vehicle No.: Type of fire detection system Designation of fire detection system Protection objective Direct safety of persons Confirmation of test equipment characteristics (calibration protocol, among other things) see Appendix 6 Test fog generation for performing the function test on fire detectors (smoke detection) e.g. smoke detectors Indirect safety of persons Asset protection Defects found yes partially no Requirement met Further inspection required Test date: Rolling stock equipment expert: Name / signature: Responsible system engineer for fire detection technology: Technical expert / Consultant: Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 19 of 29

20 Appendix 3 Template F -2 "Documentation of the detection test" Order No.: Document No.: Test No. xy Point of time of test 0:00 Test object: Pre-series vehicle for system specification Boundary test conditions static conditions dynamic conditions Position marking in the vehicle's layout drawing Example illustration Test objective Smoke detection: - Detector type: Hot gas detection: - Detector type: Position of the detector(s) Position of the fog generator Position marked in the sketch (number) and - if applicable - height information Explanation: Detectors (1, 2, 3) in luminous band, mounted during the tests Position marked in the sketch Explanation: Fog's thermal lift in large luggage areas and folding seats Thermal lift of fog Thermal lift (stack) on off Thermal lift (pan) on off Reheater on off Air circulation object or operating state of air treatment technology Monitoring area ventilation on off Event area ventilation on off other influences: Window open closed Test duration (s) Comment / test result Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 20 of 29

21 Appendix 4 Minimum requirements or prerequisites for performing the function proof of fire detectors 1. Concept description with respect to safety and functional requirements to be fulfilled (detection technology and information transmission, communication and associated control systems, if applicable control function for fire fighting system), based, among other things on purchase requisitions (e.g. specifications) 2. Hardware description, wiring diagrams, system layout and information on the components and materials used; in terms of a project description 3. Certificates from other accredited testing and certification bodies (if applicable, conformity declarations / certificates), while for all indicated standards a document or a statement on the basis of test reports must be available. This concerns: /R-27/: DIN EN 54 Fire alarm systems - Part 1: Introduction , Part 5: Heat detectors - Point detectors , Part 7: Smoke detectors - Point detectors using scattered light, transmitted light or ionization , Part 10: Flame detectors - Point detectors , Part 12: Smoke detectors - Line detectors using transmitted light , Part 15: Point Multi-Detectors pre2006-8, Part 20: Aspirating smoke detectors , Part 22: Resettable line type heat detectors (draft), Part 27: Smoke detectors for monitoring of ventilation ducts (draft) 4. Rail suitability proof according to: /R-28/: DIN EN Part 3-2 Railway applications Electromagnetic compatibility (July 2007) /R-29/: DIN EN Railway applications Rolling stock, protective provisions relating to electrical hazards (December 2003) /R-30/: DIN EN Railway applications Electronic equipment used on rail rolling stock (January 2004) /R-31/ DIN EN Railway applications Rolling stock equipment, shock and vibration tests (November 1999) /R-32/: DIN EN part 1 (March 1995), 2-1 (March 1995), 2-2 (August 1994), 2-27 (March 1995), 2-30 (February 2000), 2-47 (August 2000), 2-64 (August 1995), Environmental testing Test methods 5. Safety relevant User Manual or Operating Instructions 6. Installation guidelines for the professional installation of equipment and for performing acceptance and quality tests (instructions) of series rolling stock Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 21 of 29

22 Appendix 5 Specification of test equipment for function tests of fire detectors Thermal lift Test in electrical / technical compartments For testing smoke detectors in electrical / technical areas, a thermal lift of the fog is needed. This can be achieved by a fog heater at the tube exit. It consists for example of a copper sheet of about 10 x 10 cm which is twisted into a tube shape. Glued onto this is a heating foil of 10 x 10 cm size, 12 W, 10 V. This foil is powered by an AC adapter, and reaches a temperature of 80 to 90 C. A pre-warming period of about 5 min has to be taken into account. The through-streaming fog is heated and thus rises as it leaves the tube. Figure 2: Test layout for technical compartment test / fog heater for hose Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 22 of 29

23 Thermal lift Test in areas accessible for persons Figure: 3: Test layout with methanol container Technical specification of the methanol container for the passenger area fire test: Square shaped metal container of maximum 500 cm 2 base area Container height should be up to 10 cm to ensure that the flames do not extend beyond the edge 2 to 5 cm high legs (to reduce heat transfer to the floor), but also other measures possible (e.g. heat-insulated support); observing the vertical stability particularly at tests while train is moving The container should be filled between 0.5 and 1 cm (this corresponds to a minimum fire duration of 1 minute) When the test is finished or interrupted, the container should be closed with a non-flammable plate to extinguish the flame by displacing oxygen Figure 4: Test layout with methanol container and stack Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 23 of 29

24 Appendix 6 Test fog generation for performing the function test on fire detectors (smoke detection) With a fog generator, the below described volume of test fog is generated. This requires to know the fog generator's consumption of fluid to produce the required volumes of fog. This is done by a protocolled measuring equipment calibration (consumption measurement). If different intensity levels cannot be set, the required fog volume is produced by setting intervals (blow-out and pause times). It is recommended to use a fog fluid with medium half-life (e.g. Regular-Fog - Distributor: Look-Solution). Example of fog volume generation with fog generators Viper NT and Viper 2.6 from OTTEC Technology GmbH: - Fog volumes can be set in 1 % increments up to 100 %. - Switching levels / percentage of maximum possible conversion: Level 1 or 1% with about 7.5 ml / min (Viper NT) and 10.0 ml / min (Viper 2.6) Level 5 or 5%, with about 8.5 ml / min (Viper NT) and 15.0 ml / min (Viper 2.6) Smaller fog volumes should be assessed as conservative, however, the prescribed maximum response times must be observed here as well. Fog volume/ fog duration Passenger and staff areas (Release time max 1 minute): Fog duration: Of this 60 seconds with totally 10 ml +/- 1 ml) 30 seconds with totally 4 ml +/- 0.5 ml 30 seconds with totally 6 ml +/- 0.5 ml Equipment area (Release time max 2 minutes): In non-ventilated equipment areas or equipment areas with passive ventilation (e.g. control cabinets or machine rooms), a fog heater [see Appendix 5] is necessary. Test duration: 120 seconds with totally 15 ml +/- 1 ml Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 24 of 29

25 Measuring instrument calibration (fog generator) measuring methods of fluid consumption: One of the following measuring methods must be applied for the relevant level settings (if available) of the fog generator. Example log Parameters Fog generator Model No. Level setting option Fluid designation Measuring method Specifications Method a) 1. Fluid aspiration from a measuring cup during a selected time, e.g. 2 min 2. Operation of the machine with a fluid volume of 20 ml with time measurement From time and fluid volume, the fluid consumption in ml/min is calculated. From this, the necessary level setting for the simulation during 1 minute in passenger areas or more than 2 minutes in equipment areas is determined. Deviating from this, in technical areas with combustion, the maximum allowed time until response is 1 minute; due to the risk of huge damage. Note: A possibly differing quality of the main energy supply might influence the generator function. Example log Level setting Measuring time [s] Fluid volume [ml] Consumption [ml/min] Date: Test performer: Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 25 of 29

26 Signature: Method b) The below table lists the density values for the fluid (e.g. Regular-Fog by Look Solutions) in milliliters and grams. The table values were determined by practical tests and are therefore verifiable. The measurements have determined how many grams of the fluid equal to which amount in milliliters. For different fluids new measurements must be made. Density table Weight [g] Fluid volume [ml] Fluid volume [ml] Weight [g] Procedure of this method: For this method, a measuring cup is placed on a balance and the scale then set to zero. Then 200 g (equivalent to 188 ml) is weighed and filled into the cup. Subsequently, the mist generator is set at any level (e.g. stage 15 Viper NT) and, in order to reduce measuring errors, fog is generated for 120 seconds. Via the above density table, the exact "consumption" of fog fluid in milliliters can be calculated. This value has to be compared with those given in this appendix. If a predetermined value is not reached, a different level has to be selected at the fog generator and then the procedure has to be repeated. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 26 of 29

27 Appendix 7 - Specification of the detector positioning in small installation spaces / control cabinets (temperature sensing) 1. Combustion will be limited in enclosed and non-ventilated installation spaces. Installation requirement above potential ignition sources up to approx. 0.5 m. 2. Combustion with normal thermal lift occurs in installation spaces with static ventilation. Installation requirement above potential sources of ignition until approximately 2 m and in the ceiling area of the room. 3. Combustion with deflected thermal lift occurs in strongly ventilated installation spaces. Installation requirement at the bottom flow-off edge of the air-outlet of the installation area. 4. If the installation spaces include extensive obstructions or separating elements, the detectors for fire risk areas have to be positioned below these obstructions. In case of a forced ventilation a separate positioning can possibly be omitted. The installation requirement additionally depends on required maintaining of functionalities of the components installed in the installation space. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 27 of 29

28 Appendix 8 Specification for the proof of the detector positioning (temperature sensing) in large installation compartments (e.g. engine rooms) and at equipment installed outside (e.g. underfloor areas) by numerical fire simulation 1. The numerical fire simulations have to be carried out with a field model (e.g. Kobra 3D or FDS). Full fire models or zone models are not suitable for assessment. For the model definition, it is referred to the "Technical Report TB 04/01 of vfdb, as of May 2009 Guide to fire prevention engineering methods". /R20/ 2. For the assessment, the FDS and Kobra 3D programs have been validated using real fire tests /P-3/. The use of different programs requires validation by an independent authorized evaluator with expert knowledge in vehicle fire prevention. 3. For the fire simulation, the basic conditions for the particular application have to be determined and described exactly. In particular, the heat release rate (HRR), the heat transfer to the components enclosing the installation space and to the installed components as well as the ventilation conditions in the room/ area have to be taken into account. 4. At least two fire scenarios have to be calculated for installation compartments of combustion : 1. Spray fire by rupture of an injection line with a heat release rate which corresponds to the released fuel volume per time of the respective engine. Example underfloor engine leak in an injection line: l/s 2. Pool fire with an area of 0.25 m 2 underneath the engine (heat release rate of 347 kw for diesel fuel). For other installation areas, the fire scenarios must be discussed and agreed upon with the authorized expert. 5. When interpreting the results of the simulation, the following should be considered concerning the spatial arrangement of the detectors: For the assessment, the temperature distribution 2 min after start of the simulation is determining. Deviating from this, in equipment areas with combustion, the maximum allowed time until response is 1 minute; due to the risk of huge damage. The release temperature of the sensor should be 80% of the calculated temperature at the detector position. Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 28 of 29

29 Appendix 9 Participants of the consortium (ARGE) Company AOA Apparatebau Gauting GmbH AQUASYS Technik GmbH DETECTOMAT GmbH FOGTEC Brandschutz GmbH & Co. KG HEKATRON Vertriebs GmbH IME Elektrotechnik GmbH KIDDE-DEUGRA Brandschutzsysteme GmbH MARIOFF Corporation Oy RWS Railway Service GmbH WAGNER Bayern GmbH TÜV NORD Systems GmbH & Co.KG TÜV SÜD Rail GmbH Domain Expert Mr. Weber Mr. Biberauer Mr. Müller Mr. Dirksmeier Mr. Behrens Mr. Langbein Mr. Kacar Mr. Valkohaapa Mr. Fenske Mr. Kainz Mr. Thiel Dr. Heyn Consortium meetings Time Place First consultation - Kick Off 16/07/2004 Munich Second consultation - Project alignment 23/09/2004 Berlin Third consultation - Project alignment Munich 4th consultation - Result presentation (smoke) 26 to 27/01/2006 Munich 5th consultation - Detailed discussion of Guideline (smoke) 22 to 23/05/2006 Hamburg 6th consultation - Planning 1:1 fire tests (thermal) 22/09/2006 Berlin 7th consultation - Fire simulations (thermal) 02 to 03/11/2006 Rostock 8th consultation - Discussion of results (thermal) 22/11/2006 Hamburg 9th consultation - Adoption of the Guideline 02/02/2007 Berlin 10th consultation - Exchange of experiences 24/09/2008 Berlin 11th consultation - Revision 03 19/11/2009 Ahrensburg 12th consultation - Revision 04 19/06/2012 Berlin Document: ARGE-Guideline_Part-1_Fire_Detection_Rollig_Stock_V-4.doc Page 29 of 29

ARGE Guideline - Part 3 "System functionality fire detection and fire fighting systems in rolling stock"

ARGE Guideline - Part 3 System functionality fire detection and fire fighting systems in rolling stock "System functionality fire detection and fire fighting systems in rolling stock" Functional proof for detection and control of system Rev. No. Date Responsible Comment 1.0 19/11/2009 ARGE Adoption 2.0

More information

Fire Detection and Fire Fighting Testing and Approval on Railway Vehicles

Fire Detection and Fire Fighting Testing and Approval on Railway Vehicles Fire Detection and Fire Fighting Testing and Approval on Railway Vehicles Peter Stahl Wagner Schweiz AG, Wallisellen, Switzerland Abstract Fire detection system and firefighting solutions are getting a

More information

ARGE Directive Fire Detection in Rolling Stock

ARGE Directive Fire Detection in Rolling Stock Fire Detection in Rolling Stock Procedure for the proof of function concerning the placement of fire detectors in rooms accessible to people, electric control cabinets and areas of Guideline / Inspection

More information

Recent European and national German regulations for. measures

Recent European and national German regulations for. measures Fire safety concepts and risk analysis in rolling stock Recent European and national German regulations for railway vehicles and the acceptance of compensation measures IFAB 4 Different Business Units

More information

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005 Deutsche Akkreditierungsstelle GmbH Annex to the Accreditation Certificate D-PL-11035-03-00 according to DIN EN ISO/IEC 17025:2005 Period of validity: 25.10.2017 to 24.10.2022 Holder of certificate: DMT

More information

Procedure for the Approval of New Fire Detection and Alarm Technologies

Procedure for the Approval of New Fire Detection and Alarm Technologies VdS Guidelines for Automatic Fire Detection and Fire Alarm Systems VdS 3469en Procedure for the Approval of New Fire Detection and Alarm Technologies VdS 3469en : 2016-01 (01) Publisher and publishing

More information

A Study into the Standardization of Using Fire Detectors in Rail Vehicles for China

A Study into the Standardization of Using Fire Detectors in Rail Vehicles for China Available online at www.sciencedirect.com Procedia Engineering 52 ( 2013 ) 240 244 A Study into the Standardization of Using Fire Detectors in Rail Vehicles for China LIU Xiao-lu *, WANG Wen-qing Shenyang

More information

FIRE CONTAINMENT AND CONTROL SYSTEMS

FIRE CONTAINMENT AND CONTROL SYSTEMS FIRE CONTAINMENT AND CONTROL SYSTEMS III INTERNATIONAL CONFERENCE MODERN TRENDS OF FIRE PROTECTION IN ROLLING STOCK WARSAW 2016-05-18 AUTHORS: SERGE MÉTRAL (SNCF) CONVENOR OF CEN TC256 WG1 GUILLAUME CRAVEUR

More information

Increasing Fire Safety of Cologne Main Station by High Pressure Water Mist

Increasing Fire Safety of Cologne Main Station by High Pressure Water Mist Increasing Fire Safety of Cologne Main Station by High Pressure Water Mist Dipl.-Ing. Rüdiger Kopp FOGTEC Fire Protection ruediger.kopp@fogtec.com 1 Background of this Presentation In recent years the

More information

FINDINGS FROM FIRE TESTS IN TUNNEL CONSTRUCTIONS WITH VENTILATION SYSTEMS AND FIXED FIRE SUPPRESSION SYSTEMS

FINDINGS FROM FIRE TESTS IN TUNNEL CONSTRUCTIONS WITH VENTILATION SYSTEMS AND FIXED FIRE SUPPRESSION SYSTEMS - 203 - FINDINGS FROM FIRE TESTS IN TUNNEL CONSTRUCTIONS WITH VENTILATION SYSTEMS AND FIXED FIRE SUPPRESSION SYSTEMS Hofer R., IBS Institute for Technical Fire Protection and Safety Research, Linz / Austria

More information

FOGTEC Rail Systems. Rolling Stock Applications. Fire Protection Solutions from one source. Leading in Fire Protection

FOGTEC Rail Systems. Rolling Stock Applications. Fire Protection Solutions from one source. Leading in Fire Protection Fire Protection Solutions from one source FOGTEC Rail Systems Rolling Stock Applications The Smarter Way of Fire Fighting 1 TUNNEL FIRE PROTECTION Tel Aviv, 4th April 2016 Michele Barbagli Area Sales Manager

More information

Jonathan Redding Area Sales Manager FOGTEC Fire Protection Cologne, Germany

Jonathan Redding Area Sales Manager FOGTEC Fire Protection Cologne, Germany Making rail systems more efficient by using on-board Fire Protection Systems Jonathan Redding Area Sales Manager FOGTEC Fire Protection Cologne, Germany Key Presentation Take-Aways Holistic approach to

More information

GUIDELINES FOR THE APPROVAL OF EQUIVALENT FIXED GAS FIRE-EXTINGUISHING SYSTEMS, AS REFERRED TO IN SOLAS 74, FOR MACHINERY SPACES AND CARGO PUMP-ROOMS

GUIDELINES FOR THE APPROVAL OF EQUIVALENT FIXED GAS FIRE-EXTINGUISHING SYSTEMS, AS REFERRED TO IN SOLAS 74, FOR MACHINERY SPACES AND CARGO PUMP-ROOMS 12 December 1996 Ref. T4/4.01 GUIDELINES FOR THE APPROVAL OF EQUIVALENT FIXED GAS FIRE-EXTINGUISHING SYSTEMS, AS REFERRED TO IN SOLAS 74, FOR MACHINERY SPACES AND CARGO PUMP-ROOMS 1 The Maritime Safety

More information

Shipboard incinerators with capacities up to 4000 kw

Shipboard incinerators with capacities up to 4000 kw STANDARD FOR CERTIFICATION No. 2.9 Approval Programmes Type Approval Programmes for Marine Equipment Directive (MED) No. 431.90 - MED A.1/2.7 Shipboard incinerators with capacities up to 4000 kw JANUARY

More information

International Water Mist Conference, Istanbul October 22-23, 2014 The background and development of the guidelines in IMO Resolution A.

International Water Mist Conference, Istanbul October 22-23, 2014 The background and development of the guidelines in IMO Resolution A. International Water Mist Conference, Istanbul October 22-23, 2014 The background and development of the guidelines in IMO Resolution A.800(19) Magnus Arvidson SP Fire Research SP Technical Research Institute

More information

designed for rail 5000 Series

designed for rail 5000 Series designed for rail 5000 Series 5000 Series The only complete SIL system 20 years of experience in the field. More than 15.000 systems supplied worldwide. A team devoted to rolling stock projects with specialized

More information

ITALIAN STANDARD UNI 11565

ITALIAN STANDARD UNI 11565 ITALIAN STANDARD UNI 11565 Consequences on Designing, Testing and Maintaining of Fire Protection Systems in Italy Dr. Markus Mueller WAGNER Bayern GmbH railsystems@wagner.de Agenda 1. Introduction About

More information

The Protection of Machinery Spaces by means of the Local Application of Water Mist. Dr. Tim R. Nichols CPhys FIFireE

The Protection of Machinery Spaces by means of the Local Application of Water Mist. Dr. Tim R. Nichols CPhys FIFireE The Protection of Machinery Spaces by means of the Local Application of Water Mist Dr. Tim R. Nichols CPhys FIFireE 2017 Johnson Controls. All rights reserved. Tyco Fire Products LP is a subsidiary of

More information

Fire Protection for Printing Machines with High Pressure Water Mist

Fire Protection for Printing Machines with High Pressure Water Mist Fire Protection for Printing Machines with High Pressure Water Mist Dipl.-Ing. Rüdiger Kopp FOGTEC Fire Protection ruediger.kopp@fogtec.com 1 Case Study PRINOVIS Printing Company - PRINOVIS is Europe s

More information

AUTOMATIC FIRE EXTINGUISHING and VISUAL GUIDE SYSTEMS for TUNNEL PROTECTION

AUTOMATIC FIRE EXTINGUISHING and VISUAL GUIDE SYSTEMS for TUNNEL PROTECTION AUTOMATIC FIRE EXTINGUISHING and VISUAL GUIDE SYSTEMS for TUNNEL PROTECTION Generals Caccialanza & C. developed in the last years some technologically very innovative products, aimed to provide a very

More information

FOGTEC Rail Systems. Rolling Stock Applications. Fire Protection Solutions from one source. Experts in Fire Protection

FOGTEC Rail Systems. Rolling Stock Applications. Fire Protection Solutions from one source. Experts in Fire Protection Fire Protection Solutions from one source FOGTEC Rail Systems Rolling Stock Applications Modern Trends of Fire Protection in Rolling Stock 2014 designed for rail Warsaw, 25 1 Smart Concepts using innovative

More information

C-NRPP Quality Assurance Guidance for Radon Test Devices

C-NRPP Quality Assurance Guidance for Radon Test Devices C-NRPP Quality Assurance Guidance for Radon Test Devices Table of Contents: 1. Purpose 2. Definitions 3. Quality Assurance Plan 4. Calibration 5. Spikes/Performance Tests 6. Duplicates 7. Blanks 8. Cross-Checks

More information

Gerd Koffmane, Henrik Hoff, AP Sensing GmbH, Böblingen

Gerd Koffmane, Henrik Hoff, AP Sensing GmbH, Böblingen Linear Heat Series Under Test: Extensive fire tests prove Distributed Temperature Sensing (DTS) enables fast and reliable control of fire protection systems in road and rail tunnels Gerd Koffmane, Henrik

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60079-29-2 Edition 2.0 2015-03 Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen INTERNATIONAL

More information

ISO/TR TECHNICAL REPORT. Fire-safety engineering Technical information on methods for evaluating behaviour and movement of people

ISO/TR TECHNICAL REPORT. Fire-safety engineering Technical information on methods for evaluating behaviour and movement of people TECHNICAL REPORT ISO/TR 16738 First edition 2009-08-01 Fire-safety engineering Technical information on methods for evaluating behaviour and movement of people Ingénierie de la sécurité incendie Informations

More information

M-20 Oil Mist Concentration Detection and Alarm Device

M-20 Oil Mist Concentration Detection and Alarm Device Guideline No.M-20 (201510) M-20 Oil Mist Concentration Detection and Alarm Device Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

Fire protection of emergency electrical devices: effect on the level of risk a case study of a rail tunnel

Fire protection of emergency electrical devices: effect on the level of risk a case study of a rail tunnel Safety and Security Engineering VI 73 Fire protection of emergency electrical devices: effect on the level of risk a case study of a rail tunnel M. Lombardi & G. Rossi Dipartimento di Ingegneria Chimica

More information

COMITÉ EUROPÉEN DES ASSURANCES

COMITÉ EUROPÉEN DES ASSURANCES COMITÉ EUROPÉEN DES ASSURANCES SECRETARIAT GENERAL 3bis, rue de la Chaussée d'antin F 75009 Paris Tél. : +33 1 44 83 11 73 Fax : +33 1 44 83 11 85 Web : cea.assur.org DELEGATION A BRUXELLES Square de Meeûs,

More information

Overview of Standards for CO Detection Products

Overview of Standards for CO Detection Products Overview of Standards for CO Detection Products Rev 1.1 1 General Overview... 3 2 Application and Installation Codes & Standards... 3 3 Product Standards... 4 4 Certified and Listed Products (Conforms

More information

Innovative Solutions for Active Fire Protection in Road/Rail Tunnels and Underground Facilities

Innovative Solutions for Active Fire Protection in Road/Rail Tunnels and Underground Facilities Innovative Solutions for Active Fire Protection in Road/Rail Tunnels and Underground Facilities Roger A. Dirksmeier, FOGTEC Fire Protection, Germany Fire Protection Conference Tel Aviv, 4 th of April 2016

More information

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 16: Sound system control and indicating equipment

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 16: Sound system control and indicating equipment INTERNATIONAL STANDARD ISO 7240-16 First edition 2007-07-01 Fire detection and alarm systems Part 16: Sound system control and indicating equipment Systèmes de détection et d'alarme d'incendie Partie 16:

More information

Spark Extinguishing Systems

Spark Extinguishing Systems VdS Guidelines for VdS 2518en Requirements and Test Methods VdS 2518en : 2008-08 (01) Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln, Germany Phone: +49 221 77 66 0; Fax:

More information

WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS

WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS Jukka Vaari 1, Amit Lior 2 1 2 VTT Technical Research Centre of Finland, Espoo, Finland Marioff Corporation Oy, Vantaa,

More information

26 June 2001 *** I:\CIRC\MSC\1007.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

26 June 2001 *** I:\CIRC\MSC\1007.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 Telex: 23588 IMOLDN G IMO E Ref. T4/4.01 MSC/Circ.1007 26 June 2001 GUIDELINES FOR THE

More information

FOGTEC Rail Systems. Rolling Stock Applications. Fire Protection Solutions from one source. Leading in Fire Protection. designed for rail 1

FOGTEC Rail Systems. Rolling Stock Applications. Fire Protection Solutions from one source. Leading in Fire Protection. designed for rail 1 Fire Protection Solutions from one source FOGTEC Rail Systems Rolling Stock Applications designed for rail 1 Trends and Developments in Fire Experts in Water Mist Protection for Rolling stock a global

More information

Availability, Reliability, False Alarm Resistance Best Practice in Fire Alarm Systems. FIRE PROTECTION OF ROLLING STOCK 2 rd March 2017

Availability, Reliability, False Alarm Resistance Best Practice in Fire Alarm Systems. FIRE PROTECTION OF ROLLING STOCK 2 rd March 2017 Availability, Reliability, False Alarm Resistance Best Practice in Fire Alarm Systems FIRE PROTECTION OF ROLLING STOCK 2 rd March 2017 1. Introduction 1905 Compagnie des Wagons-Lits 2000 Rail Services

More information

SP METHOD 5320 Issue No: Test method for fire detection systems installed in engine compartments of heavy vehicles

SP METHOD 5320 Issue No: Test method for fire detection systems installed in engine compartments of heavy vehicles SP METHOD 5320 Test method for fire detection systems installed in engine compartments of heavy vehicles Page 1(17) Copyright This test method is copyrighted by SP. Neither a printed nor electronic copy

More information

The development of seat fire testing for EN Richard Nowell

The development of seat fire testing for EN Richard Nowell The development of seat fire 2017 Introduction Introduction This presentation will examine the development of a new standard for complete seat fire testing that will plug into EN 45545-2 to replace Annexes

More information

Proven Fire Fighting Efficiency for Large Transformers with High Pressure Water Mist

Proven Fire Fighting Efficiency for Large Transformers with High Pressure Water Mist Proven Fire Fighting Efficiency for Large Transformers with High Pressure Water Mist Dipl.-Ing. Rüdiger Kopp FOGTEC Fire Protection ruediger.kopp@fogtec.com 1 Water Mist for Transformer Fire Protection

More information

FOGTEC Rail Systems. Rolling Stock Applications. Fire Protection Solutions from one source. Experts in Fire Protection

FOGTEC Rail Systems. Rolling Stock Applications. Fire Protection Solutions from one source. Experts in Fire Protection Fire Protection Solutions from one source FOGTEC Rail Systems Rolling Stock Applications Warszawa, 25.06.2014 1 Warszawa, 25.06.2014 From concept design to validation and verification: case study of a

More information

Certificate: / 9 February 2011

Certificate: / 9 February 2011 Test report: 936/21212470/A of 1 October 2010 First certification: 26 January 2011 Run of validity until: 25 January 2016 Publication BAnz. 26 January 2011, No. 14, p. 294, Chapter I No. 1.1 Approved application

More information

Fire Protection Scover

Fire Protection Scover November 2nd, 2011 2e version Fire Protection Scover Testing Fire Protection of a small storage facility for vehicles for handicapped transport based on certification scheme BRL-K23003. Fire Protection

More information

Annex to the Accreditation Certificate D PL according to DIN EN ISO/IEC 17025:2005

Annex to the Accreditation Certificate D PL according to DIN EN ISO/IEC 17025:2005 Deutsche Akkreditierungsstelle GmbH Annex to the Accreditation Certificate D PL 17819 01 00 according to DIN EN ISO/IEC 17025:2005 Period of validity: 29.06.2017 to 10.08.2019 Holder of certificate: MPA

More information

Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen

Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen IEC 60079-29-2 Edition 2.0 2015-03 REDLINE VERSION colour inside Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen

More information

IE Code IE Competency Title Credit OAC Ref.

IE Code IE Competency Title Credit OAC Ref. Compulsory Workplace Competency Standards Level Four IE Code IE Competency Title Credit OAC Ref. IE119-4WC Design and draw electrical and electronic drawings including schematics, 4 F5 maintain documentation

More information

MINISTERIO DE FOMENTO

MINISTERIO DE FOMENTO Dirección General de Servicios de Alta Velocidad - Larga Distancia Real Scale Fire Tests in High-Speed Trains Convocatoria de Concesión de Ayudas a Agrupaciones o Consorcios de Investigación para la realización

More information

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 ) ATÜVRheinland'ä ' Prcciscly Ftight. CERTIFICATE of Product Conformity (QAL1 ) Certificate No.: 0000056508_01 AMs designation: Manufacturer: Test Laboratory: LDS 6 7M86121 with cd 6 7M86122 sensorfor NH3

More information

FIRE RESISTANCE OF ROLLING STOCK ELEMENTS STANDARD AND SPECIAL CASE OF TUNNELS

FIRE RESISTANCE OF ROLLING STOCK ELEMENTS STANDARD AND SPECIAL CASE OF TUNNELS FIRE RESISTANCE OF ROLLING STOCK ELEMENTS 45545-3 STANDARD AND SPECIAL CASE OF TUNNELS www.efectis.com May 2016 1 SUMMARY EN 45545-3 What is a fire barrier? Requirements regarding fire resistance Tests

More information

Control and Indicating Equipment

Control and Indicating Equipment VdS Guidelines for Fire Detection and Fire Alarm Systems VdS 2540en Requirements and Test Methods VdS 2450en : 2018-12 (03) Publisher and publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174

More information

7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.

7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3. Rev. 1 03/05/2015 ANNEX A to the Yokogawa Corporation of America Quality Assurance Manual For Additional Requirements selectively applied to ATEX and IECEx certified products CONTENTS 1. Scope 2. Purpose

More information

CHOOSING A FIRE VENTILATION STRATEGY FOR AN UNDERGROUND METRO STATION

CHOOSING A FIRE VENTILATION STRATEGY FOR AN UNDERGROUND METRO STATION - 165 - CHOOSING A FIRE VENTILATION STRATEGY FOR AN UNDERGROUND METRO STATION Wojciech Węgrzyński, Grzegorz Krajewski, Paweł Sulik Fire Research Department, Building Research Institute (ITB), Poland ABSTRACT

More information

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 20: Aspirating smoke detectors

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 20: Aspirating smoke detectors INTERNATIONAL STANDARD ISO 7240-20 First edition 2010-05-15 Fire detection and alarm systems Part 20: Aspirating smoke detectors Systèmes de détection et d'alarme d'incendie Partie 20: Détecteurs de fumée

More information

Certificate: / 29 April 2014

Certificate: / 29 April 2014 Test report: 936/21217455/A of 10 September 2013 Initial certification: 01 April 2014 Expiry date: 31 March 2019 Publication: BAnz AT 01 April 2014 B12, chapter I, No. 1.1 Approved application The tested

More information

BUSINESS PLAN CEN/TC 305 POTENTIALLY EXPLOSIVE ATMOSPHERES EXPLOSION PREVENTION AND PROTECTION EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 305 POTENTIALLY EXPLOSIVE ATMOSPHERES EXPLOSION PREVENTION AND PROTECTION EXECUTIVE SUMMARY BUSINESS PLAN CEN/TC 305 POTENTIALLY EXPLOSIVE ATMOSPHERES EXPLOSION PREVENTION AND PROTECTION CEN/TC 305 Business Plan Page: 1 Business environment, benefits and priorities EXECUTIVE SUMMARY CEN/TC 305

More information

The European Radio Equipment Directive 2014/53/EU

The European Radio Equipment Directive 2014/53/EU TÜV SÜD Slide 1 The European Radio Equipment Directive 2014/53/EU 28 March 2017 Meet the speaker behind the voice Jon Lea Senior Engineer (Product Certification), TÜV SÜD 30 years experience in the testing

More information

ISO Acceptance tests for Nd:YAG laser beam welding machines Machines with optical fibre delivery Laser assembly

ISO Acceptance tests for Nd:YAG laser beam welding machines Machines with optical fibre delivery Laser assembly INTERNATIONAL STANDARD ISO 22827-1 First edition 2005-10-15 Acceptance tests for Nd:YAG laser beam welding machines Machines with optical fibre delivery Part 1: Laser assembly Essais de réception pour

More information

Notice. Approval number: Z Scope of validity By: 08 January 2013 to: 01 November 2017

Notice. Approval number: Z Scope of validity By: 08 January 2013 to: 01 November 2017 Notice of the amendment and supplementation to the general building inspectorate approval dated 25 October 2012 Approval body for building products and types of building Civil Engineering Test Agency An

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 7240-27 First edition 2009-04-01 Fire detection and alarm systems Part 27: Point-type fire detectors using a scattered-light, transmitted-light or ionization smoke sensor, an

More information

CERTIFICATE. EN tested QAL 1 certified TUV approved Annual inspection. The certificate is valid until: 19July2017. Köln, 17 August2012

CERTIFICATE. EN tested QAL 1 certified TUV approved Annual inspection. The certificate is valid until: 19July2017. Köln, 17 August2012 Umwelt Bundes Amt For our Environment A TÜVRheinland Precisely Right. CERTIFICATE on Product Conformity (QAL 1} Number of Certificate: 0000036942 Certified AMS: Manufacturer: Test Institute: Dusthunter

More information

Certificate: _01 / 22 March 2013

Certificate: _01 / 22 March 2013 Test report: 936/21219384/A of 27 September 2012 Initial certification: 20 July 2012 Expiry date: 19 July 2017 Publication: BAnz AT 05 March 2013 B10, chapter I, No. 1.6 Approved application The tested

More information

CERTIFICATE of Product Conformity (QAL1)

CERTIFICATE of Product Conformity (QAL1) ATÜVRheinland Precisely F=ight. CERTIFICATE of Product Conformity (QAL1) Certificate No.: 0000036943 02 Certified AMS: Manufacturer: Test lnstitute: DUSTHUNTER SB100 for dust SICK Engineering GmbH Bergener

More information

Australian Standard. Fire detection and alarm systems. Part 6: Carbon monoxide fire detectors using electro-chemical cells

Australian Standard. Fire detection and alarm systems. Part 6: Carbon monoxide fire detectors using electro-chemical cells AS 7240.6 2006 ISO 7240-6:2004 AS 7240.6 2006 Australian Standard Fire detection and alarm systems Part 6: Carbon monoxide fire detectors using electro-chemical cells This Australian Standard was prepared

More information

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 3: Audible alarm devices

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 3: Audible alarm devices INTERNATIONAL STANDARD ISO 7240-3 First edition 2010-12-15 Fire detection and alarm systems Part 3: Audible alarm devices Systèmes de détection et d'alarme d'incendie Partie 3: Dispositifs d'alarme sonores

More information

AUTOMATIC FIRE EXTINGUISHING SYSTEM for TUNNEL PROTECTION with SPREAD REMOTE CONTROLLED MONITORS (TUDEM-LEGIO)

AUTOMATIC FIRE EXTINGUISHING SYSTEM for TUNNEL PROTECTION with SPREAD REMOTE CONTROLLED MONITORS (TUDEM-LEGIO) AUTOMATIC FIRE EXTINGUISHING SYSTEM for TUNNEL PROTECTION with SPREAD REMOTE CONTROLLED MONITORS (TUDEM-LEGIO) Generals Innovating fire extinguishing system for tunnel fires, for fully automatic intervention

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN/TS 14972 May 2008 ICS 13.220.20 English Version Fixed firefighting systems - Watermist systems - Design and installation Installations

More information

AS/NZS 4745:2012. Code of practice for handling combustible dusts AS/NZS 4745:2012. Australian/New Zealand Standard. Superseding AS/NZS 4745:2004

AS/NZS 4745:2012. Code of practice for handling combustible dusts AS/NZS 4745:2012. Australian/New Zealand Standard. Superseding AS/NZS 4745:2004 AS/NZS 4745:2012 (Incorporating Amendment No. 1) Australian/New Zealand Standard Code of practice for handling combustible dusts Superseding AS/NZS 4745:2004 AS/NZS 4745:2012 AS/NZS 4745:2012 This Joint

More information

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 ) ATÜVRheinland Precisely F}ight. CERTIFICATE of Product Conformity (QAL1 ) Certificate No.: 0000053803 Certified AMS: Manufacturer: Test lnstitute: D-R 808 for dust DURAG GmbH Kollaustr.105 Hamburg German

More information

TECHNICAL AND USER REQUIREMENTS FOR PERSONAL ALERT SAFETY SYSTEMS

TECHNICAL AND USER REQUIREMENTS FOR PERSONAL ALERT SAFETY SYSTEMS Centrum Naukowo Badawcze Ochrony PrzeciwpoŜarowej (Scientific and Research Centre for Fire Protection) Nadwiślańska 213, 05-420 Józefów, Poland Telephone (+48) 22 789 11 11 Fax.: (+48) 22 769 33 45 e-mail:

More information

Performance Specifications LSF LIFT-SMOKE-FREE

Performance Specifications LSF LIFT-SMOKE-FREE Performance Specifications LSF LIFT-SMOKE-FREE Lift shafts and machinery rooms must be ventilated and equipped with a smoke and heat exhaust ventilation (SHEV) system in accordance with the currently valid

More information

AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment

AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment AS/NZS 3820:2009 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee

More information

Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS)

Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS) Fire Protection Leaflet Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS) 0 General Regulations and recommendations missing from this leaflet do not entitle

More information

(Publication of titles and references of harmonised standards under Union harmonisation legislation) (Text with EEA relevance) (2016/C 054/02)

(Publication of titles and references of harmonised standards under Union harmonisation legislation) (Text with EEA relevance) (2016/C 054/02) 12.2.2016 EN Official Journal of the European Union C 54/9 Commission communication in the framework of the implementation of Regulation (EC) No 765/ 2008 of the European Parliament and of the Council

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL REPORT ISO/TR 15657 First edition 2013-06-15 Fire resistance tests Guidelines for computational structural fire design Essais de résistance au feu Lignes directrices sur la conception statistique

More information

ICS ; Supersedes CEN ISO/TS :2005. English Version

ICS ; Supersedes CEN ISO/TS :2005. English Version TECHNICAL SPECIFICATION SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN ISO/TS 14907-1 June 2010 ICS 43.040.15; 35.240.60 Supersedes CEN ISO/TS 14907-1:2005 English Version Electronic fee collection

More information

Official Journal of the European Union C 97/11

Official Journal of the European Union C 97/11 16.4.2010 Official Journal of the European Union C 97/11 Commission communication in the framework of the implementation of the Council Directive 96/48/EC of 23 July 1996 on the interoperability of the

More information

Underground fires in metro systems failures, accidents and terrorism

Underground fires in metro systems failures, accidents and terrorism Underground fires in metro systems failures, accidents and terrorism Dr Fathi Tarada Mosen Ltd RIFA Seminar 22-03-2018 Issues Higher threat of fire & explosions in congested underground metro stations?

More information

BUS ENGINE COMPARTMENT FIRE PROTECTION SYSTEM FIREPRO TEST REPORT PEER REVIEW

BUS ENGINE COMPARTMENT FIRE PROTECTION SYSTEM FIREPRO TEST REPORT PEER REVIEW & e. INDUSTRIAL LOSS CONTROL & eng Analisi e Controllo dei Rischi Industriali HUGHES ASSOCIATES EUROPE, srl FIRE SCIENCE & ENGINEERING BUS ENGINE COMPARTMENT FIRE PROTECTION SYSTEM FIREPRO TEST REPORT

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

WATER MIST CONVENTION AND EXHIBITION

WATER MIST CONVENTION AND EXHIBITION INTERNATIONAL WATER MIST ASSOCIATION IWMA SEMINARS S ON WATER MIST TECHNOLOGY DUBAI INTERNATIONAL CONVENTION AND EXHIBITION CENTRE Water mist fire protection: The most innovative fire fighting technology

More information

Document No

Document No CO Guardian LLC 1951 E. Airport Dr. Tucson, AZ 85706 CARBON MONOXIDE DETECTOR MODEL 452 INSTALLATION AND OPERATIONAL MANUAL Document No. 01-2510-02 MODEL 452 INSTALLATION AND OPERATIONAL MANUAL Page 1

More information

Fire protection documentation. CFPA-E Guideline No 13:2015 F

Fire protection documentation. CFPA-E Guideline No 13:2015 F Fire protection documentation CFPA-E Guideline No 13:2015 F FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation in the

More information

MD and Its Impact on Lab Facilities

MD and Its Impact on Lab Facilities MD 15128 and Its Impact on Lab Facilities RPIC / SLCan Sustainable Laboratories Regional Workshop September 5, 2013 Timothy Ma, P. Eng., M. Eng., PMP Senior Mechanical Engineer Mechanical and Laboratory

More information

Certificate: _01 / 22 March 2013

Certificate: _01 / 22 March 2013 Test report: 936/21219384/B of 27 September 2012 Initial certification: 20 July 2012 Expiry date: 19 July 2017 Publication: BAnz AT 05 March 2013 B10, chapter I, No. 1.5 Approved application The tested

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL Annex 2, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL Section 1 Application 1 The following new sentence is added to the end of paragraph 1.2:

More information

Changes in NFPA

Changes in NFPA Changes in NFPA 72-2002 2002 Oregon Fire Code Committee November 25, 2003 Michael B. Baker, SET Automatic Fire Alarm Association MikeBaker@afaa.org 2003 Michael B. Baker 1 Table of Contents 1. Administration

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61514-2 First edition 2004-01 Industrial process control systems Part 2: Methods of evaluating the performance of intelligent valve positioners with pneumatic outputs IEC 2004

More information

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 ) ATÜVRheinland Precisely Right. CERTIFICATE of Product Conformity (QAL1 ) Certificate No.: 0000028731 01 Certified AMS: Manufacturer: Test lnstitute: D-R 800 for dust DUFUG GmbH Kollaustraße 105 22453 Hamburg

More information

Australian Standard. Fire detection, warning, control and intercom systems System design, installation and commissioning. Part 1: Fire AS 1670.

Australian Standard. Fire detection, warning, control and intercom systems System design, installation and commissioning. Part 1: Fire AS 1670. AS 1670.1 2004 (Incorporating Amendment No. 1) AS 1670.1 2004 Australian Standard Fire detection, warning, control and intercom systems System design, installation and commissioning Part 1: Fire This Australian

More information

Japanese Case Study: How to maintain the fire safety in subway station and tunnel

Japanese Case Study: How to maintain the fire safety in subway station and tunnel Japanese Case Study: How to maintain the fire safety in subway station and tunnel Takashi Kusa Railway International Standards Center 12 October 2011 Contents About Railway International Standards Center

More information

ISO/TS TECHNICAL SPECIFICATION. Fire detection and alarm systems Part 9: Test fires for fire detectors

ISO/TS TECHNICAL SPECIFICATION. Fire detection and alarm systems Part 9: Test fires for fire detectors TECHNICAL SPECIFICATION ISO/TS 7240-9 First edition 2006-01-01 Fire detection and alarm systems Part 9: Test fires for fire detectors Systèmes de détection et d'alarme d'incendie Partie 9: Essais sur foyers

More information

An experimental study of the impact of tunnel suppression on tunnel ventilation

An experimental study of the impact of tunnel suppression on tunnel ventilation An experimental study of the impact of tunnel suppression on tunnel ventilation Yoon J. Ko and George Hadjisophocleous Civil and Environmental Engineering, Carleton University 1125 Colonel By Drive, Ottawa,

More information

Certification of Thermographers

Certification of Thermographers CFPA-E No 3:2011 F Certification of Thermographers CFPA-E -GUIDELINES FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation

More information

BUILDING INDUSTRY TUNNEL RAIL TUNNEL FIRE FIGHTING WITH HIGH PRESSURE WATER MIST

BUILDING INDUSTRY TUNNEL RAIL TUNNEL FIRE FIGHTING WITH HIGH PRESSURE WATER MIST BUILDING INDUSTRY TUNNEL RAIL TUNNEL FIRE FIGHTING WITH HIGH PRESSURE WATER MIST FIRE FIGHTING IS RESPONSIBILITY Fire monitoring Fire detection Fire suppression We are a leading international supplier

More information

Fire protection for railway vehicles

Fire protection for railway vehicles Fire protection for railway vehicles DB Systemtechnik Our products Fire protection and fire testing of railway vehicles We offer our customers inside and outside the DB Group extensive railway vehicle

More information

Acoustical Test Methods and Sound Power Rating Procedures for Transport Refrigeration Equipment

Acoustical Test Methods and Sound Power Rating Procedures for Transport Refrigeration Equipment AHRI Standard 1120 (formerly ARI Standard 1120) 2007 Standard for Acoustical Test Methods and Sound Power Rating Procedures for Transport Refrigeration Equipment IMPORTANT SAFETY RECOMMENDATIONS It is

More information

AUGUST 2016 CONTENTS:

AUGUST 2016 CONTENTS: EMC SERVICES NEWSLETTER AUGUST 2016 CONTENTS: RECENT STANDARD CHANGES NEW FCC REGULATIONS IEC 60601-1-2 4TH EDITION LOW VOLTAGE DIRECTIVE EU DIRECTIVES EMC DIRECTIVE 2014/30/EU KOREA UPDATE: KN32/35 1.

More information

NCEHSA Conference. Carbon Monoxide Detector Regulations for Lodging Establishments (S.L )

NCEHSA Conference. Carbon Monoxide Detector Regulations for Lodging Establishments (S.L ) NCEHSA Conference Carbon Monoxide Detector Regulations for Lodging Establishments (S.L. 2013-413) 1 Purpose of this session The purpose of this session is to review the provisions of Session Law 2013-413

More information

Method for testing the suppression performance of fire suppression systems installed in engine compartments of buses and coaches

Method for testing the suppression performance of fire suppression systems installed in engine compartments of buses and coaches 2014-09-19 SP Method 4912 Method for testing the suppression performance of fire suppression systems installed in engine compartments of buses and coaches 2014-09-19 page 2 (17) Copyright This test method

More information

J. R. Qualey III, L. Desmarais, J. Pratt Simplex Time Recorder Co., 100 Simplex Drive, Westminster, MA 01441

J. R. Qualey III, L. Desmarais, J. Pratt Simplex Time Recorder Co., 100 Simplex Drive, Westminster, MA 01441 J. R. Qualey III, L. Desmarais, J. Pratt Simplex Time Recorder Co., 100 Simplex Drive, Westminster, MA 01441 Response-Time Comparisons of Ionization and Photoelectric/Heat Detectors 1. Introduction Despite

More information

EUROPEAN COMMITTEE FOR ELECTROTECHNICAL STANDARDIZATION (CENELEC) TECHNICAL COMMITTEE No. 62: ELECTRICALEQUIPMENT IN MEDICAL PRACTICE

EUROPEAN COMMITTEE FOR ELECTROTECHNICAL STANDARDIZATION (CENELEC) TECHNICAL COMMITTEE No. 62: ELECTRICALEQUIPMENT IN MEDICAL PRACTICE TC62/SEC1015/INF October 2009 EUROPEAN COMMITTEE FOR ELECTROTECHNICAL STANDARDIZATION (CENELEC) TECHNICAL COMMITTEE No. 62: ELECTRICALEQUIPMENT IN MEDICAL PRACTICE SOFTWARE AND MEDICAL DEVICES WORKING

More information