1 Date: 30 January 07 To: ll Plan Holders Subject: DDENDUM NO. 3 Project: PULIC SFETY & SECURITY UILDING UILDING RENOVTION & EPNSION - UURN, LM Job #: C# U# 6-9 SSL# 606 From: Raleigh Price The plans and Specifications of the subject project, dated December 4, 06 are amended as follows: (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern) Item No. : Item No. : The bid date has been rescheduled for February 4, 07 at UFM uilding in Training Room at 3:00pm CST Refer to drawing sheet M0. and replace with the attached M0.. Item No. 3: Refer to drawing sheet P0. and replace with the attached P0. Item No. 4: Refer to drawing sheet E8. and replace with the attached E8. Item No. 5: Item No. 6: Item No. 7: Refer to specifications. dd the attached section Raceways and Wiring. Refer to specifications section rea of Refuge Communication System and replace with the attached section Refer to specifications section Security Camera System and replace with the attached section ttachments: M0. P0. E Raceways and Wiring rea of Refuge Communications System Security Camera System End of ddendum #3

2 Facilities Management 6 West Samford venue uburn University, L Phone: (334) Fax: (344) Safety is our first priority. Think Safety. ct Safely No. Revision Date ddendum No. ddendum No. 3 Project Number#606 Public Safety uilding U 6-9 LEGEND & SCHEDULES - MECHNICL DRWN Y: MJL CHECKED Y: JTS DTE: 0/30/07 FILE NUMER: SS&L 606 PROJECT NUMER: U 6-9 SHEET NUMER: M0. 65 of 94

3 Facilities Management 6 West Samford venue uburn University, L Phone: (334) Fax: (344) Safety is our first priority. Think Safety. ct Safely No. Revision Date ddendum No. ddendum No. 3 ddendum No. 3 Project Number#606 Public Safety uilding U 6-9 LEGEND, SCHEDULES, & DETILS - PLUMING DRWN Y: MJL CHECKED Y: JTS DTE: 0/30/07 FILE NUMER: SS&L 606 PROJECT NUMER: U 6-9 SHEET NUMER: P0. 7 of 94

4 C D E G LIGHTING PLN GENERL NOTES (apply to this sheet only):. FOR EISTING LIGHT FITURES TO E REMOVED, CONTTOR SHLL COORDINTE IN DVNCE THE PROPER MNGEMENT OF LIGHT FITURES WITH TOM HODGES, UURN UNIVERSITY RISK MNGEMENT ND SFETY.. REFER TO HITECTURL CEILING PLN FOR ECT CEILING TYPE ND HEIGHT. UURN 3 4 FUTURE 3 DMIN SERGENT 5 PTROL LIEUTENNT 7 DETECTIVE SUITE E PTROL SUITE INTERVIEW 09 E WOMENS LOCKER 34 MEN'S LOCKER 33 PP E JNITOR 3 E L-4 E J WOMEN'S RESTROOM 34 J DMINISTRTIVE LIEUTENNT 7 PTROL SERGENT 05 J E CE 4 OR E E E PP PP E E CC D EE FF NORTH E-9 (PRTIL) 3 CE PTROL SERGENT 03 MEN'S RESTROOM 33 OFFICE HOTEL 3 SSOCITE DIRECTOR 3 C C 3 L-3 CIULTION CE C C OR 4 E SECURITY SUPERVISOR 5 SSISTNT CHIEF 39 VESTIULE 0 DISPTCHER 54 CE 3 E-9 (PRTIL) LOY 0 RECEPTION 58 E CMPUS SFETY OFFICER 6 DMINISTRTION SSISTNT 46 E CLERY 43 First Floor Plan - Lighting /8" = '-0" 3 L-37 VICTIM ROOM 53 CMPUS SFETY OFFICER 60 E L-39 E FMILY RESTROOM 55 HOUSEKEEPING 5 REK ROOM 63 J FUTURE SHRED 3&4 6 L-35 J L-9 3 E E DIRECTOR/CLERY COMPLINCE 45 EMERGENCY OPERTIONS CENTER/ TRINING ROOM 8 EECUTIVE SSISTNT 66 EECUTIVE DIRECTOR 68 E IT OFFICE 69 4 OR z TRINING EM MNGER & TECH 6 EMERGENCY MNGER 76 EMERGENCY PLNNER FUTURE 7 E-5 L E E E E 9 z E E E E-7 CONFERENCE ROOM 73 G CMER STTION 84 STORGE 85 E- E G G G G SPRINKLER/ WTER RISER ROOM 89 8 UNISE RESTROOM 8 COMMUNICTIONS 8 MECHNICL 90 4 OR 3 E 7 W 7 W 7 W 7 3. ELECTRICL CONTTOR SHLL PROVIDE ND INSTLL TRIM ND MOUNTING HRDWRE FOR ECH LIGHTING FITURE TO MTCH CEILING IN OR ON WHICH IT IS INSTLLED. 4. ELECTRICL CONTTOR SHLL MTCH VOLTGE OF LL FITURES TO THE CIUIT WHICH THEY RE CIUITED. 5. LL SURFCE MOUNTED CONDUIT INSTLLED ON CEILING SHLL E RUN PERPENDICULR ND PRLLEL TO STRUCTURE ND IN MNNER THT IS NET ND SECURE. 6. SITE MEETING SHLL E CONDUCTED ETWEEN THE ELECTRICL CONTTOR, ELECTRICL ENGINEER ND THE HITECT TO DISCUSS ND PPROVE LL EPED CONDUIT RUNS PRIOR TO INSTLLTION OF EPED CONDUITS. 7. LL EPED CONDUIT RUNS SHLL E PINTED S DIRECTED Y HITECT. 8. LL LIGHTING FITURE HEIGHTS LISTED RE MESURED TO THE OTTOM OF THE FITURE FROM FINISHED FLOOR UNLESS OTHERWISE NOTED. 9. PROVIDE ND INSTLL LL CONTROL WIRING ND POWER PCKS S REQUIRED TO OPERTE OCCUPNCY SENSORS. 0. LL EIT SIGNS RE TYPE "" ND "" UNLESS NOTED OTHERWISE.. ROUTE UNSWITCHED HOT CONDUCTORS FEEDING EMERGENCY TTERY PCKS, EMERGENCY EGRESS FITURES ND EIT SIGNS ROUND LIGHTING CONTROL RELYS ND SWITCHES.. ROUTE #6WG MINIMUM LOW VOLTGE CONDUCTORS FROM FITURES WITH 0-0V DIMMING DRIVERS INDICTED IN LIGHTING FITURE SCHEDULE. CONNECT 0-0V CONTROL WIRING TO ECH LIGHT IN CIUIT INDICTED ND CONNECT TO DRIVER. 3. UNLESS OTHERWISE NOTED, LL SINGLE-POLE SWITCHES INDICTED TO INTERFCE WITH ROOM CONTROLLER SHLL E LOW VOLTGE SWITCH, 4-UTTON (LL ON, RISE, LOWER, LL OFF). LIGHTING PLN keynotes (apply to this sheet only): night light FITURE TO REMIN ON 4/7, CONTTOR SHLL CONNECT TO UN-SWITCHED 'HOT' IN LIGHTING CIUIT. EMERGENCY EGRESS LIGHTING FITURE, CONTTOR SHLL CONNECT SWITCHED 'HOT' TO NORML LLST ND UN-SWTICHED 'HOT' TO EMERGENCY TTERY PCK FOR CHRGING ND CONTROL SO THT IN THE EVENT POWER IS LT FITURE WILL TURN ON FOR EMERGENCY EGRESS LIGHTING. ROUTE CIUIT THROUGH LIGHTING CONTROL PNEL. CONTTOR SHLL ROUTE UN-SWITCHED 'HOT' ROUND LIGHTING CONTROL PNEL FOR NIGHT LIGHTING CONTROL. CONTTOR SHLL PROVIDE OVERRIDE SWITCH FOR LIGHTING CONTROL SYSTEM, SWITCH SHLL TURN LIGHTS ON/OFF DURING NORML USINESS HOURS ND OPERTE S ND OVERRIDE SWITCH FTER USINESS HOURS. REFER TO LIGHTING CONTROL PNEL FOR DDITIONL CONTROL REQUIREMENTS. CIUIT TO E ROUTED TO TTERY INVERTER FOR -HOUR OPERTION IN THE EVENT OF LS OF NORML POWER ND GENERTOR CKUP. FITURE TO E NORMLLY CONTROLLED WITH THE OTHER FITURES IN THE ROOM. PROVIDE ND INSTLL ODINE D TRNSFER SWITCH FOR TRNSFER OF LIGHTING DURING EMERGENCY LS OF POWER. PROVIDE SENSING CIUIT TO D. CONNECT LL TYPE 'W' ETERIOR EGRESS WLL PCKS TO CIUIT 'E- 9' FOR ETERIOR LIGHTING. PROVIDE ND INSTLL NEW LIGHTING CONTROL RELY PNEL "LCP". SEE SHEET E. FOR DDITIONL INFORMTION. two-zone room controller to control lighting in training room. zone (z) to be controlled separately from zone (z). provide and install 6-button wallstation to function as follows: - all on - Zone On/off - zone on/off - raise all - lower all - all off UNIVERSITY Facilities Management 6 West Samford venue uburn University, L Phone: (334) Fax: (344) Safety is our first priority. Think Safety. ct Safely No. Revision Date 3 ddendum 3 /30/07 0/8/07 Project Number#606 Public Safety and Security uilding - uilding Renovation & Expansion U 6-9 LINE VOLTGE ND 0-0V 4 OR W 7 inv- S S S 5 ELECTRICL 9 E-3 G 3 E-5 W FIRST FLOOR PLN - LIGHTING DRWN Y: TS LINE VOLTGE ND 0-0V line voltage power source S 0-0V TYPICL ROOM CONTROLLER WIRING DETIL NOT TO SCLE S S S CHECKED Y: KL DTE: 0/4/07 FILE NUMER: SS&L 606 PROJECT NUMER: U 6-9 SHEET NUMER: E8. 89 of 94

5

6 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set SECTION EWYS ND WIRING 600 VOLT PRT - GENERL. SUMMRY. Provide all raceways and wiring specified herein and as required to provide a complete system throughout the project as indicated on the Drawings. PRT - PRODUCTS. CONDUIT. Galvanized Rigid Steel Conduit (G): Rigid steel conduit shall be galvanized, constructed of high-grade raw steel piping, galvanized inside and outside with threaded joints.. Intermediate Metal Conduit (IMC): IMC shall be constructed of high-grade steel tubing, galvanized inside and outside with threaded joints. Zinc coating shall be applied by the hot-dip, galvanized process. C. Electrical Metallic Tubing (EMT): EMT shall be constructed of high-grade steel, zinc coated and galvanized inside and outside. D. Rigid Plastic Conduit (PVC): PVC conduit shall be polyvinyl chloride rigid scheduled to heavy wall type. PVC conduit shall be joined with PVC couplings of the solvent cement type to provide complete watertight joints. Conduit systems shall be UL listed for direct burial and exposed use. E. Flexible Metal Conduit: Shall be flexible steel conduit tubing spirally wound having a hot-dip galvanized coating and meeting requirements of UL for flexible metal conduit. F. Liquid tight Flexible Metal Conduit: Shall be flexible steel conduit spirally wound and shall have a copper grounding strand and factory-applied neoprene jacket. Liquid tight flexible conduit shall meet the requirements of UL. G. PVC coated galvanized rigid conduit: Shall be UL listed. The PVC coating must have been approved by UL as providing the primary corrosion protection for the rigid conduit. The PVC coated conduit must be ETL Verified to the Intertek ETL SEMKO High Temperature HO PVC Coating dhesion Test Procedure for 00 hours. The PVC coated conduit must bare the ETL Verified PVC-00 label to signify compliance to the adhesion performance standard. Ferrous fittings for general service locations must be UL Listed with PVC as the primary corrosion protection. Hazardous location fittings, prior to the plastic coating must be UL Listed. ll conduit and fittings must be new, and unused material. pplicable UL standards may include: UL6 Standard for Safety. Rigid Metal Conduit, UL54 Standard for Safety, Fittings for Conduit and Outlet oxes. Conduit and Fittings shall be evaluated for reliability and performance. Certified test results and the respective test data that have been witnessed and certified to be accurate by an independent, recognized third party. Public Safety & Security ldg EWYS ND WIRING uilding Renovation & Expansion 600 VOLT

7 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set. CONDUIT FITTINGS. G and IMC: shall be factory-made taper threaded and of the same material as the conduit. Provide with molded nylon insulating bushing or throat at all boxes and cabinets with locknuts inside and outside. Provide watertight hubs in wet locations for terminations into enclosures. Provide insulated grounding bushing where required.. EMT: shall be of the same material as the conduit and shall be hexnut compression or steel setscrew. Provide with molded nylon insulating bushing or throat at all boxes and cabinets. Provided insulated grounding bushing where required. C. PVC: shall be Schedule 40 and of the same manufacturer as the conduit. D. Flexible Metal Conduit and Liquidtight Flexible Metal Conduit: Provide couplings at connections between flexible and rigid conduit suitable for that application. Provide with nylon-insulated busing or throat at all boxes and cabinets with locknuts. E. Expansion Joints: Provide O.Z./Gedney, Type expansion joint fittings for all conduit which crosses an expansion joint. Provide with internal ground and external bonding jumper. F. Wire Support ushings: Provide for vertical runs as required by the NEC..3 JUNCTION OES ND PULL OES. Junction boxes and Pull boxes shall be galvanized steel with mode size and gauge as required by the NEC in accordance with voltage parameters. Covers shall be of the same gauge as the box as shall be screw fastened. oxes shall be sized as required but no smaller than 4 inches square and -/ inches deep.. Covers shall be accessible. C. Provide galvanized cast iron or aluminum with threaded hubs and gaskets for outdoor and damp locations. D. oxes in grade or underwater shall be cast brass or bronze..4 OUTLET OES. Outlet boxes shall be UL listed, and of sizes and types required for the application.. oxes Recessed in Construction: Sheet steel boxes, unless noted or required otherwise. oxes shall be no lighter than 4 gauge and shall be galvanized after fabrication. Set so face of box will finish flush with building surface.. For Lighting Fixture Outlets: 4-inch square with raided fixture ring.. For Wall Switches, Receptacles, and Communication Use: 4 inch square, onepiece; no sectional boxes permitted. Use boxes with plaster rings in all plastered walls where wall thickness permits. Use boxes less than -/ inch deep only in locations where deep boxes cannot be accommodated by construction. Public Safety & Security ldg EWYS ND WIRING uilding Renovation & Expansion 600 VOLT

8 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set C. oxes Used Outdoors or in Damp/Wet Locations: Cast metal boxes (iron and alloy) with gasketed covers and threaded hubs. D. oxes in Hazardous reas: pproved cast metal boxes with appropriate sealing fittings. E. Provide blank cover for boxes without fixture or device. F. oxes in grade or underwater shall be cast brass or bronze. G. Cycolac: Per code for pools and fountains only..5 WIREWYS ND UILLRY GUTTERS. Wireways shall be constructed in accordance with UL 870. Every component including lengths, connectors, and fittings shall be UL listed and labeled. Provision shall be included in the construction to allow screwing the hinged cover closed without the use of parts other than the standard lengths, fittings, and connectors. It shall also be possible to seal the cover in the closed position with a sealing wire.. Wireways shall be constructed with/without knockouts, as required. Enclosure type shall be as required by conditions encountered. C. Gutters and Wireways shall be suitable for lay-in conductors. Connector covers shall be permanently attached so that removal is not necessary to utilize the lay-in feature. D. ll sheet metal parts shall be provided with a rust-inhibiting phosphatizing coating and gray baked enamel finish. ll hardware shall be plated to prevent corrosion. ll screws installed toward the inside shall be protected by spring nuts or otherwise guarded to prevent wire insulation damage. E. ll connectors shall be slip-in type with self-retaining mounting screws. ll hangers shall be two-piece with hook-together feature to permit pre-assembly of wireway and hanger bottom plate before hanging on pre-installed upper bracket..6 SURFCE METL EWY. Surface metal raceway shall be UL listed and labeled; shall be used together with couplings, clips, bushings, straps, connectors, connection covers, elbows, extension boxes, fixture boxes, extension adapters, blank covers and all other required fittings; shall be of the proper size to accommodate the conductors to be installed therein in each case..7 CONDUCTORS 600 VOLTS OR LESS. Provide conductors of stranded copper, 98% conductivity, new building wire, insulated in accordance with the requirements of the NEC. Insulation shall be rated no less than 600- volt. Conductors shall be Type THHN, THHW or HHW. Conductors for service and distribution feeders shall be HHW. Solid conductors terminating in a breaker or device shall be utilized for wire size No. and No. 0. Sizes specified are WG gauge for No. 4/0 and smaller and circular mils (kcmil) for sizes larger than No. 4/0. Minimum wire size shall be No.. Public Safety & Security ldg EWYS ND WIRING uilding Renovation & Expansion 600 VOLT

9 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set. Connectors: Make spices and connections in conductors using UL connectors.. Stranded Conductors: UL listed, solderless, bolted pressure or compression connectors. Connectors shall be of proper sizes to match conductor sizes.. Solid Conductors: UL listed, bolted pressure or spring connectors. Connectors shall be of proper sizes to match conductor sizes. 3. Motor Lead Pigtails: UL listed, crimp lugs with through-bolt fasteners between lugs. Lugs shall be of proper sizes to match conductors. Proper sized dies and tools shall be provided to apply connectors. 4. Lighting Fixture Taps: Electrical spring connectors as specified for solid conductors. 5. Ground connections: urndy ground clamps or connectors of a type suitable for and having a UL listing for grounding applications. C. ll conductor sizes shown on the Drawings are copper unless specifically noted otherwise. ll ground conductors shall be copper..8 MNUFCTURERS. Conduit (G, IMC, EMT). llied. Republic 3. Triangle 4. Wheatland. Conduit Fittings (G, IMC, EMT). ppleton. O.Z. Gedney 3. Steel City 4. Thomas and etts 5. Raco C. Flexible Metal Conduit. FC. lflex 3. naconda 4. International Metal Hose D. Liquidtight Flexible Metal Conduit. merican rass Company. naconda 3. Electri-Flex Company E. PVC Conduit and Fittings. Thomas & etts. Prime Conduit 3. Cantex 4. Certainteed 5. Triangle Public Safety & Security ldg EWYS ND WIRING uilding Renovation & Expansion 600 VOLT

10 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set F. Conductors, Copper, 600 Volts or less. merican Insulated Wire. Cablec 3. General Cable 4. Pirelli 5. Southwire 6. Triangle 7. Drakar (Fire Resitive Cables) or UL approved equal G. Conductors, luminum, 600 volt or less (where specified). lcan Cable. Cablec 3. Southwire H. Outlets and oxes. ppleton. Raco 3. Steel City 4. Midland PRT 3 - EECUTION 3. CONDUIT. PVC (encased in 4 concrete on all sides) or Galvanized Rigid Steel (G) meeting corrosion resistant protection of NEC shall be used for underground service entrance and underground feeders. When PVC is used, a transition to metal conduit shall be made below grade using G 90 degree fitting such that only metal conduit exits concrete or ground.. G or Intermediate Metal Conduit (IMC) shall be used where exposed and subject to physical damage, or installed in damp or wet locations. C. Rigid Plastic Conduit (PVC) shall be used for underground branch circuits, underground feeders where run below the slab on grade, maximum in the slab on grade, maximum in the slabs above grade, in concrete columns and concrete wall and in masonry walls. D. PVC Schedule 80 (or G meeting corrosion resistant protection of NEC 300.6) may be used for direct burial for branch circuits only. When PVC is used, a transition to metal conduit shall be made below grade using G 90 degree fitting such that only metal conduit exits concrete or ground. E. Electrical Metalic Tubing (EMT) shall be used for branch circuits concealed in walls and ceilings. EMT may be used for feeders where not exposed to damage and/or not installed in wet or damp locations. F. Flexible Metal Conduit shall be used for connections to rotating or vibrating equipment. The lengths shall be as short as possible, in no case longer than 6 or shorter than. Public Safety & Security ldg EWYS ND WIRING uilding Renovation & Expansion 600 VOLT

11 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set G. Liquidtight Flexible Metal Conduit shall be used for connections to rotating or vibrating equipment where located outdoors or in damp or wet locations. The lengths shall be as short as possible but in no case longer than 6 or shorter than. Liquidtight Flexible Metal Conduit shall NOT be located above a ceiling, in an air shaft or in a mechanical room utilized as a return air plenum. H. Raceways shall be installed as a complete and total wiring enclosure system from outlet to outlet, to junction box, pull box, panel or cabinet prior to the installation of the conductors. I. ll conduit shall be run concealed (except in electrical, mechanical and similar area) unless shown otherwise. Where conduit is run exposed it shall be run in a neat and orderly manner. ll conduit shall be run parallel and perpendicular to the building structure. J. Conduits shall be secured to all boxes, cabinets, panels and equipment with locknuts and bushings and shall be securely fastened in place on intervals required by the Code and local codes; hangers, supports or fastenings shall be provided at each elbow and at the end of each straight run within 3 of a termination to a box or cabinet. ll supports shall be independent and shall not use ceiling supporting system wires. K. Use threaded rods and hangers for supporting single conduit. Multiple conduits shall be supported using a trapeze of Unistrut (or Kindorf) channels and threaded rods with double nut/washer. L. Provide pullboxes as shown and/or as required by Code and where necessary in the raceway system to avoid excessive runs or too many bends. oxes shall have removable hinged or screw covers and shall be accessible. M. The minimum size conduit shall be ¾ diameter. N. Provide non-hardening elastic type duct seal compound for each conduit entering the building from the outside and from one space to another having a normal operating temperature differential greater or less than 0 degrees F. O. Provide seals around all conduit and sleeves penetrating through walls, partition or ceilings. Provide UL approved fire resistant seal around all penetrations through fire rated barriers to maintain the barrier rating. P. Provide pull wire or nylon rope in all empty conduits. Q. ll fire alarm cables shall be run in conduit. Conduit shall be painted red every 0 o.c. (at couplings), at elbows and all backboxes. R. Sleeves shall be rigid G with bushings. S. ll wiring shall be in conduit except telecommunications where cable trays or hooks/rings are provided above suspended accessible ceilings. Public Safety & Security ldg EWYS ND WIRING uilding Renovation & Expansion 600 VOLT

12 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set 3. CONDUIT PROTECTION. Provide underground conduit with a top cover at least 30 below finished grade and no more than CONDUCTORS 600 VOLTS OR LESS. No conductor shall be smaller than No. except for signal or control circuits.. ll conductors shall be installed in conduit. C. Where feeders or circuits are required to be fire protected by NEC rticles 57, 695, 700, 708 and 760 as well as NFP 7, NFP 0, NFP 30 ND NFP 50 they shall be installed either: ) Outside the building and protected as defined by Code; ) Encased in a minimum in of concrete; 3) e protected by a fire-rated assembly to achieve a minimum fire rating of hours and dedicated to the equipment served; 4) e a listed electrical circuit protective system with a minimum -hour fire rating. Feeders for life safety distribution systems under NEC rticle 700 where routed in sprinkler protected spaces are considered to be protected. D. Where a connection is made to any terminal of 40 amperes or more and/or conductors No. 8 or larger, copper terminal lugs shall be bolted to the conductors. Where multiple terminal lugs are made, individual lugs for each conductor shall be used. Where aluminum conductors are accepted in this Section or noted on the drawings, the terminations shall be made with high compression lugs as manufactured by Ideal or MC. E. maximum of six (6) current carrying conductors shall be run in a conduit. The neutral shall be considered a current carrying conductor. F. For homeruns of 0 Volt, 0 amp circuits, where the length of run from the panelboard to the center of the load exceeds 00-0 the conductors shall be No. 0 minimum. If that length exceeds 00-0 the conductors shall be No. 8 minimum. G. For homeruns of 77 Volt, 0 amp circuits where the length of run from the panelboard to the center of the load exceeds 00-0 the conductors shall be No. 0 minimum. H. Multiple branch circuits homeruns serving computer loads, electronic lighting ballasts and/or H.I.D. lighting ballasts shall utilize a neutral conductor one trade size larger than the phase conductors or use separate neutrals for each circuit. Neutral conductors for individual branch circuits may be the same size as the phase conductor but not less. I. Provide an equipment grounding conductor in all feeder and branch circuit conduits. Size per code unless shown otherwise. J. Conductors shall have color coded jackets the entire length. Colors shall be as follows: Public Safety & Security ldg EWYS ND WIRING uilding Renovation & Expansion 600 VOLT

13 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set 0/08 Volt System 77/480 Volt System Phase lack Phase rown Phase Red Phase Orange Phase C lue Phase C Yellow Feeder or Shared Neutral Feeder or Shared Neutral- White Gray ranch Phase Neutral ranch Phase Neutral White w/ lack Stripe White w/ rown Stripe ranch Phase Neutral ranch Phase Neutral White w/ Red Stripe White w/ Orange Stripe ranch Phase C Neutral ranch Phase C Neutral White w/ lue Stripe White w/ Yellow Stripe Ground - Green Ground - Green K. efore pulling any wire into conduit, thoroughly swab the conduit and clean the boxes of debris. L. Run feeders in continuous lengths, without joints or splices. Joints shall occur in branch circuits only in locations where they divide. M. Run conductors for emergency power in conduits separate from all other wiring. N. undle conductors in switchboards and panelboard cabinets and similar using nylon straps made for the purpose. Conductors No. 8 and larger shall be bundled in individual circuits. 3.4 JUNCTION OES, PULL OES, ND OUTLET OES. ll junction boxes and pullboxes shall be sized in accordance with the Code.. ll boxes shall be rigidly secured in position to building structure. oxes larger than 4 shall be secured at two points. C. Outlet boxes shall be flush with the finished wall or ceiling, or not more than ¼ back, unless specifically shown as surface mounted or its purpose is to be above the ceiling. D. Provide galvanized steel or cast type outlet boxes. Where exposed G or IMC terminates in a box, provide cast box with threaded hubs. E. ll boxes shall be provided with a cover plate. F. ll outlet boxes shall be mounted vertically unless noted otherwise. G. Where outlets are shown at the same location but at different heights, they shall be mounted one above the other along the same centerline. H. The exact mounting height of an outlet may be adjusted slightly to align with masonry joint where approved by the rchitect. I. Verify outlet locations in finished spaces with Drawings of interior details and finishes. Public Safety & Security ldg EWYS ND WIRING uilding Renovation & Expansion 600 VOLT

14 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set J. Outlets shall NOT be located back to back. Where outlets are shown on opposite sides of a wall, they shall be located in separate stud spaces. K. Protect floor boxes from entering debris during construction using temporary covers approved by the floor box manufacturer. L. Provide barriers in outlet boxes for switches separating different phases for voltages exceeding 50 volts to ground. M. oxes shall not be supported from a suspended ceiling. N. ll fire alarm back boxes shall be painted red. O. Electrical boxes (stainless-steel/outdoor rated) for irrigation control to be mounted on the building (3-ft FG) with power outlet and control; all holes to be in the bottom of the box. END OF SECTION Public Safety & Security ldg EWYS ND WIRING uilding Renovation & Expansion 600 VOLT

15

16 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set.3 Processors. Processors shall have the following features:.4 Manufacturer. 0 V C system controller.. 0 min. UPS back-up.. Talk--Phone, Command Station CU-8R, or Remote Station ETP-00. PRT 3 - EECUTION 3. Command Stations. Coordinate the location with the rchitect. Install command station in a flush-mounted box, at the location indicated on the Drawings.. Program the system at the command station to indicate the remote stations as alphanumeric description of their location, i.e. Third Floor East Stairwell. C. Program the system at the command station to forward unanswered calls to the telephone number provided by the owner. D. Install a ¾ homerun conduit from command station to each remote station. E. Install one shielded twisted pair copper circuit (not to exceed 5 ohms resistance) from command station to each remote station via the homerun conduit. 3. Remote Stations. Install remote station in surface-mounted boxes at location where the device is indicated on the Drawings to be installed in a -hour or greater fire wall.. Install remote stations in flush-mounted boxes at locations where the device is indicated on the Drawings to be installed in a wall of less than -hour construction. END OF SECTION Public Safety & Security ldg RE OF REFUGE uilding Renovation & Expansion COMMUNICTIONS SYSTEM

17

18 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set G. Refer to the design drawings for camera locations. The existence of drawings does not relieve the contractor of the responsibility of a site survey to confirm the accuracy of the drawings. Specific mounting locations, exact wire and cable runs, and conduit routing have not been specified or delineated on the security device drawings. Coordinate all aspects of the work with the University. I. The contractor shall visit the site and fully investigate all conditions affecting the scope of the work. Failure to visit the site shall not relieve the contractor from any responsibility in the performance of this scope of work..3 SYSTEM DESCRIPTION. The basis of design is the Genetec OmniCast Enterprise software, xis cameras and all related infrastructure and hardware as indicated herein and on the supplied drawings. ll equipment must be 00% compatible with the existing uburn University security system network.. The contractor shall verify all requirements of the existing switch and power locations to assist in the installation and programming of the specified camera and its location..4 CODES ND STNDRDS. The camera shall be installed in accordance with all applicable national, state and local codes including, but not limited to, the most recent editions (as adopted) of the following:. ICSI 569 standard wiring practices. National Electrical Code rticles 300, 700, and National Fire Protection ssociation Life Safety Code (NFP 0) 4. uilding Officials & Code dministrators International, Inc. (OC) 5. Underwriters Laboratories (UL 94, 076, 037) 6. International uilding Code (IC) PRT - PRODUCTS. CMER SECURITY SYSTEM. The closed-circuit television (CCTV) camera system be an extension of the existing Genetec OmniCast Enterprise version Video Management system.. Cameras shall be used to view specific areas inside and outside the premises. The cameras to be utilized shall be an integrated color camera, lens, and mini-dome enclosure system approved for indoor or outdoor applications. The device will operate on VDC or 4VC, utilize NTSCPL or EICCIR camera formats. The unit can be installed on a wall or ceiling, surface-mounted or pendant-style.. CCTV CMERS. ll CCTV cameras furnished on this project shall be of one manufacturer from the approved list as follows: Public Safety & Security ldg SECURITY CMER uilding Renovation & Expansion SYSTEM

19 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set xis, Pelco, or osch.. Fixed dome cameras shall be equal to IS P33 Series with SVG resolution up to 5 megapixel, and including support for SMPTE standard-compliant HDTV 70p and 080p video. The 5 megapixel models shall be able to cover a large area with exceptional detail and light sensitivity. PRT 3 - EECUTION 3. GENERL INSTLLTION. Install systems in accordance with UL, NEC and all other applicable codes. Install system to comply with drawings and final shop drawings in compliance with manufacturer instructions. Provide all required hardware and labor for rack mounting of head-end system components.. Refer to plans for locations and quantities of equipment. Equipment locations shown on plans will be required to be field coordinated to ensure proper system operation. C. No items of equipment shall be installed in such a manner as to void or reduce the proper operating characteristics of individual components or of the system. D. Perform all work under the onsite supervision of a factory authorized trained technician. E. It shall be the responsibility of the technician to check, inspect and adjust this installation to the University approval. trained representative of the installing contractor or manufacturer shall train the University's personnel on the proper operation and maintenance of the equipment. Perform all work in conjunction with this installation in accordance with good engineering practices as established by NEC. 3.0 WIRING INSTLLTION. ll wiring shall be run per University standards. Where existing cable management systems are in place and there is adequate capacity to install the wiring, the contractor may utilize these pathways providing they have coordinated with all other wiring contractor on site.. Where pathways do not exist for wiring, the contractor shall be responsible for providing all required cable management systems such as J-hooks to support communications cabling to meet building codes and manufacturer's recommendations. C. ll cabling installed in ceiling spaces that are used for air distribution plenums shall be UL plenum rated. D. This contract shall be responsible for furnishing and installing all required cabling between components to form a complete and operational system meeting all the requirements of this specifications. 3.3 GROUNDING Public Safety & Security ldg SECURITY CMER uilding Renovation & Expansion SYSTEM

20 Public Safety & Security ldg SS&L Project No.: 606 December 4, 06 uilding Renovation & Expansion U No.:6-9 id Set. The installing contractor shall be responsible for ensuring the grounding integrity of all installed equipment to eliminate the potential for equipment or personnel hazards due to improperly or inadequately grounded systems.. ll grounding and bonding shall be in conformance with the National Electric Code, article 50 and as recommended by EI TI IDENTIFICTION/LELING 3.5 TESTING. Contractor shall identify all major items of equipment and tag all cables with permanent type markers to denote equipment served. Cables shall be tagged at both ends and at each point where the cable is administered. ll labeling shall be approved by the University prior to application.. The University will test each camera. The contractor shall coordinate with the University to provide personnel, equipment, instrumentation, and supplies necessary to troubleshoot any issues that arise with the camera connectivity (cabling) or the cameras, including aiming cameras or adjusting varifocal lenses to achieve the coverage desired by the University. 3.6 WRRNTY. Warranty all cameras and materials for a period of year from the date of Final acceptance from the University. If any defects in materials, workmanship or operational failures under NORML" conditions are experienced within the warranty period, promptly correct at no expense to the University. Provide statement of warranty with operations and maintenance manuals. 3.7 OPERTIONS ND MINTENNCE MNULS. Provide maintenance manuals for every item of equipment when available from the manufacturer. These shall be the technical manuals provided by the manufacturer and shall not consist of generic sales brochures. Technical manuals shall provide complete specifications for the equipment as well as complete operating, maintenance, troubleshooting and product repair replacement information. Where available only in electronic format, the contractor may provide a CD with electronic versions of the manuals.. s uilt drawings updated shall be provided to the university with final as-built information. This shall be in the form of a complete set of Technology drawings with as-built information indicated in colored pen based upon actual field conditions. C. Rack elevations for all systems with rack mounted equipment. G. Warranty: provide statement of warranty with operation and maintenance manuals. END OF SECTION Public Safety & Security ldg SECURITY CMER uilding Renovation & Expansion SYSTEM

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

SECTION ELECTRICAL GENERAL PROVISIONS

SECTION ELECTRICAL GENERAL PROVISIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. General provisions for Electrical Systems B. Wire and cable for 600 volts and less. C. Wiring connectors. D. Electrical tape. E. Heat shrink tubing. F. Wire pulling

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW) SECTION 26 05 21 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the low voltage power and lighting wiring. 1.2 RELATED WORK A. Excavation and backfill

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

occurs and be cause for termination of the contract.

occurs and be cause for termination of the contract. 1.02 SUBMITTALS occurs and be cause for termination of the contract. CITY OF MIAMI CAPITAL IMPROVEMENTS PROGRAM A. Manufacturer s Data: 1. Complete list of materials to be furnished under this section.

More information

DIVISION 16 ELECTRICAL

DIVISION 16 ELECTRICAL DIVISION 16 ELECTRICAL Saratoga Springs / standards / 02-2004 Page - 0 ELECTRICAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.01 SECTION INCLUDES A. Grounding electrodes and conductors, equipment

More information

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices. SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance

More information

MEDIUM, LOW AND CONTROL VOLTAGE CABLES

MEDIUM, LOW AND CONTROL VOLTAGE CABLES Related Sections U-M Design Guideline Sections: 260800 - Electrical Acceptance Tests Products Medium Voltage Primary Cables Primary power distribution cable shall be single conductor stranded copper, with

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings. DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS

More information

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod Journeyman and Master Common Exam 2 1 The grounding terminal of a grounding-type receptacle installed in a metal box shall be? A. Connected to the equipment ground B. Bonded to the box C. Connected to

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with

More information

SECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA

SECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low voltage power panelboards 1.02 RELATED SECTIONS 1.03 REFERENCES

More information

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3 HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California 95833 September 15, 2016 Woodland Joint Unified School District Spring Lake Area Elementary School HMC No. 3535003.000 DSA Appl.

More information

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems. SECTION 26 0553 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electrical identification requirements. B. Identification nameplates and labels. C. Wire and cable markers. D. Voltage markers. E. Underground warning

More information

SECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35

SECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35 SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1 Overview of Low-Voltage and Power-Limited Systems...3 Chapter 4 Equipment for General Use...3 Chapter 5 Special Occupancies...3 Chapter 6 Special Equipment...4

More information

SECTION (16140) - WIRING DEVICES

SECTION (16140) - WIRING DEVICES SECTION 26 27 26 (16140) - WIRING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Receptacles, Connectors, Switches, and Finish Plates. B. Related Sections: 1. Section 00 31 13.43 (00370) -

More information

Undercarpet Cabling Products Undercarpet Power, Voice and Data Distribution

Undercarpet Cabling Products Undercarpet Power, Voice and Data Distribution Undercarpet Cabling Products TE Connectivity Enterprise Networks Warranty Power Distribution Product Coverage* TE Connectivity warrants that all Undercarpet cabling system products within this catalog

More information

PART GENERAL 1.01 SECTION INCLUDES

PART GENERAL 1.01 SECTION INCLUDES Specification Number: 26 24 16.06 Product Name: Emergency Lighting Control NQ Circuit Panelboards: 240 Vac, 48 Vdc Maximum SECTION 26 24 16.06 Emergency Lighting Control NQ Circuit Panelboards: 240 Vac,

More information

135'c " Conduit, 6-#3, 12-#4 Wires Rated-50% 45'c 345'w. 1" Conduit, 3-#4 3.43%VD. 66'c 411'w 4.08%VD. Wires Rated-50% 77'c. 421'w 14 4.

135'c  Conduit, 6-#3, 12-#4 Wires Rated-50% 45'c 345'w. 1 Conduit, 3-#4 3.43%VD. 66'c 411'w 4.08%VD. Wires Rated-50% 77'c. 421'w 14 4. ,, Panelboard NEM R enclosure. 90 positions 18K breakers Extend existing concrete base per base details. Paint panel very dark green which is close to the panel across the street. Use existing meter. 58'

More information

Corra/Clad MC Cable The contractors cable of choice in place of conduit and wire.

Corra/Clad MC Cable The contractors cable of choice in place of conduit and wire. Corra/Clad MC Cable The contractors cable of choice in place of conduit and wire. Installs fast and easy Lowers labor costs Replaces conduit and wire Provides superior grounding UL Listed Corra/Clad MC

More information

Installation Instructions

Installation Instructions Installation Instructions Free-Standing Electric Ranges Questions? Call 800.GE.CRES (800.432.2737) or Visit our Website at: ge.com EFORE YOU EGIN Read these instructions completely and carefully. IMPORTNT

More information

SECTION DUCTWORK. A. Section Painting: Weld priming, weather resistant, paint or coating.

SECTION DUCTWORK. A. Section Painting: Weld priming, weather resistant, paint or coating. SECTION 15890 DUCTWORK PART 1 - GENERAL 1.1 SECTION INCLUDES A. Metal ductwork. B. Duct cleaning. 1.2 RELATED SECTIONS A. Section 09900 - Painting: Weld priming, weather resistant, paint or coating. B.

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

SECTION SPECIAL PROVISIONS FOR ELECTRICAL WORK

SECTION SPECIAL PROVISIONS FOR ELECTRICAL WORK SECTION 26 00 10 SPECIAL PROVISIONS FOR ELECTRICAL WORK PART 1 GENERAL 1.1 WORK INCLUDED: A. Furnish all labor, materials, equipment, tools and services in connection with, or properly incidental to the

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

A. Shop Drawing submittals shall include, but not be limited to, the following:

A. Shop Drawing submittals shall include, but not be limited to, the following: SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical

More information

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 211313 WET-PIPE SPRINKLER SYSTEMS PRT 1 GENERL 1.01 RELTED DOCUMENTS. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PANELBOARDS & BUILDING DISTRIBUTION

PANELBOARDS & BUILDING DISTRIBUTION 262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic

More information

1. Building wires and cables rated 600 V and less. 2. Connectors, splices, and terminations rated 600 V and less.

1. Building wires and cables rated 600 V and less. 2. Connectors, splices, and terminations rated 600 V and less. Copyright 2010 AlA MasterSpec Full Length 09/10 SECTION 260519- LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART I-GENERAL 1.1 SUMMARY A. Section Includes: 1. Building wires and cables rated 600

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Section Electical General Provision

Section Electical General Provision Section 26 05 00 Electical General Provision 26 05 00-1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Except as modified in this Section, General Conditions, Supplementary Conditions, applicable provisions

More information

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM SECTION 213100 WET PIPE FIRE PROTECTION SPRINKLER SYSTEM PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. The requirements of the General Conditions and Supplementary Conditions apply to all work herein.

More information

Oberon s National Electric Code (NEC)Compliance Statement and Underwriters Laboratories (UL ) Considerations for Oberon Products

Oberon s National Electric Code (NEC)Compliance Statement and Underwriters Laboratories (UL ) Considerations for Oberon Products Oberon s National Electric Code (NEC)Compliance Statement and Underwriters Laboratories (UL ) Considerations for Oberon Products Manufacturers Statement of Compliance with NFPA 70, National Electric Code,

More information

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5 DOC Cremer Heating and Hot Water Plant Project Number: M 1411-04 TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION 21 30 00- WATER BASED FIRE PROTECTION SYSTEMS... 5 SECTION 22 40 00 -PLUMBING

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers. September 2012, rev. 00 26 2416 Panelboards PART 1. GENERAL 1.01 Summary A. Section includes: 1.02 Definitions 1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is low voltage cable allowed to be run through drilled

More information

Town of Cicero Local Code Amendments

Town of Cicero Local Code Amendments Town of Cicero Local Code Amendments 2009 International Residential Code Local Amendments: DELETE Table R302.1 (Exterior Walls), see Attachment A. DELETE Exception for Subsection R313.2 (One and Two-Family

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Chapter 1 General... 5

Chapter 1 General... 5 About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Incorporate as part of the Contract Documents, the following:

Incorporate as part of the Contract Documents, the following: March 21, 2014 SAS Job No. 1207R Addendum Number 3 to the Contract Documents for the Construction of: Bevill Biomedical Research Building Shared Equipment Room Package University of Alabama at Birmingham

More information

SECTION (16075) - IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION (16075) - IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 26 05 53 (16075) - IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Electrical identification materials and devices required to comply with ANSI C2, NFPA

More information

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51 TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

DIVISION 16 BASIC MATERIALS, METHODS, AND REQUIREMENTS SECTION 16A-1

DIVISION 16 BASIC MATERIALS, METHODS, AND REQUIREMENTS SECTION 16A-1 DIVISION 16 BASIC MATERIALS, METHODS, AND REQUIREMENTS SECTION 16A-1 PART 1: GENERAL 1.1 SUMMARY.1 This section covers materials, methods, and requirements common to all electrical work..2 When it becomes

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 260500 - BASIC ELECTRICAL MATERIALS AND METHODS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION AIR DUCT ACCESSORIES

SECTION AIR DUCT ACCESSORIES SECTION 23 33 00 AIR DUCT ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes back-draft dampers, combination fire-and-smoke dampers, duct access doors, fire dampers, smoke dampers, volume control

More information

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International

More information

Section COMMUNICATION EQUIPMENT ROOM FITTINGS. Section Communications Cabinets, Racks, Frames and Enclosures

Section COMMUNICATION EQUIPMENT ROOM FITTINGS. Section Communications Cabinets, Racks, Frames and Enclosures PART 1 GENERAL 1.1 WORK INCLUDED Section 27 11 00 COMMUNICATION EQUIPMENT ROOM FITTINGS Section 27 11 16 Communications Cabinets, Racks, Frames and Enclosures A. Provide all labor, materials, and equipment

More information

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS. A. This Section includes basic electrical materials and methods including:

SECTION BASIC ELECTRICAL MATERIALS AND METHODS. A. This Section includes basic electrical materials and methods including: SECTION 16050 BASIC ELECTRICAL MATERIALS AND METHODS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes basic electrical materials and methods including: 1. Conduit, fittings and accessories. 2. Wire,

More information

Related Sections: TBD. Effective Date: January 1, 2016

Related Sections: TBD. Effective Date: January 1, 2016 Description: The purpose of the section is to highlight the current applicable UMCP Design Standards for the design, selection and, installation of lighting fixtures within buildings. Related Sections:

More information

2. Welding Materials and Procedures shall conform to the ASME Code.

2. Welding Materials and Procedures shall conform to the ASME Code. PART 1 GENERAL 1.01 Scope of Standard A. The design guidelines contained herein include the requirements for systems, materials, fittings and valves utilized for fire protection systems at Sam Houston

More information

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer --------------------------------------------------------------------------------------------------------------------------------------------

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 27 COMMUNICATIONS SECTION PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 27 COMMUNICATIONS SECTION PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS SECTION 275116 - PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Preamplifiers. 2. Power amplifiers. 3. Microphones. 4. Control console. 5. Loudspeakers.

More information

ALL ENGINEER NOTES SHALL BE DELETED FROM THE FILE OR MARKED AS HIDDEN. DIVISION 16 ELECTRICAL SECTION 16010

ALL ENGINEER NOTES SHALL BE DELETED FROM THE FILE OR MARKED AS HIDDEN. DIVISION 16 ELECTRICAL SECTION 16010 SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS CONTRACT NO. CE 05031 ALL ENGINEER NOTES SHALL BE DELETED FROM THE FILE OR MARKED AS HIDDEN. DIVISION 16 ELECTRICAL SECTION 16010 BASIC ELECTRICAL REQUIREMENTS

More information

INSTALLATION INSTRUCTIONS FOR 6797A737 HEAT PUMP FLUSH MOUNT CEILING PLENUM

INSTALLATION INSTRUCTIONS FOR 6797A737 HEAT PUMP FLUSH MOUNT CEILING PLENUM INSTALLATION INSTRUCTIONS FOR 6797A737 HEAT PUMP FLUSH MOUNT CEILING PLENUM TABLE OF CONTENTS Warnings............................................................................... 2 Package Contents........................................................................

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

All surfaces shall be restored where surface finish damage is evident. Physical material damage will require replacement of part.

All surfaces shall be restored where surface finish damage is evident. Physical material damage will require replacement of part. General This standard sets forth the minimum requirements for basic electrical materials and methods used in construction on University projects. It is not intended to be used as a complete specification

More information

PHILADELPHIA REGIONAL PORT AUTHORITY VOLUME 2 SPECIFICATIONS FOR VEHICLE PROCESSING FACILITY NAVAL BUSINESS CENTER PHILADELPHIA PA.

PHILADELPHIA REGIONAL PORT AUTHORITY VOLUME 2 SPECIFICATIONS FOR VEHICLE PROCESSING FACILITY NAVAL BUSINESS CENTER PHILADELPHIA PA. PHILADELPHIA REGIONAL PORT AUTHORITY VOLUME 2 SPECIFICATIONS FOR VEHICLE PROCESSING FACILITY NAVAL BUSINESS CENTER PHILADELPHIA PA Prepared By STV Incorporated 205 West Welsh Drive Douglassville, PA 19518

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions: SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint. (816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the

More information

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Lighting and appliance panelboards 1.02 RELATED SECTIONS A. 16475,

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

LEGACY AUTHENTICITY CONTENTS

LEGACY AUTHENTICITY CONTENTS I N S T L L T I O N M N U L CONTENTS! EFORE YOU EGIN SFETY & PRECUTIONS 2-3 FN PLCEMENT 4 MINTENNCE 5 IN THE OX 6 TOOLS NEEDED 7 INSTLLTION STEP 1: MOUNTING 8 STEP 2: MOTOR SSEMLY 9 STEP 3: RETENTION SYSTEM

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Updated section on Manufacturers 3 1. 6/15/16 Updated division section from 16120 to 26 05 00, - mgl44

More information

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ). SECTION 28 13 00 - ACCESS CONTROL PART I - GENERAL 1.1 SUMMARY A. This specification section describes the furnishing, installation, commissioning, and programming of a complete, turnkey, hardwired Andover

More information

ELECTRICAL-GENERAL PROVISIONS SECTION A. The accompanying General Conditions shall apply to and form a part of this Section.

ELECTRICAL-GENERAL PROVISIONS SECTION A. The accompanying General Conditions shall apply to and form a part of this Section. ELECTRICAL-GENERAL PROVISIONS SECTION 16010-1 1.00 GENERAL: 1.01 GENERAL CONDITIONS: A. The accompanying General Conditions shall apply to and form a part of this Section. 1.02 GENERAL REQUIREMENTS: A.

More information

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM SECTION 21 0000 AUTOMATIC FIRE SPRINKLER SYSTEM PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Codes and Standards: 1. FBC (Florida Building Code 2015) 2. FBC (Florida Fire Code 2015) 3. NFPA #13R (Standard for

More information

INSTALLATION INSTRUCTIONS FOR MOUNTING KIT

INSTALLATION INSTRUCTIONS FOR MOUNTING KIT RV Products Division INSTALLATION INSTRUCTIONS FOR 8330-5501 MOUNTING KIT 8330-752 CONTROL BOX KIT (12 VDC COOL ONLY) 9330B755 CONTROL BOX KIT (12 VDC HEAT/COOL) 8530-750 CONTROL BOX KIT (24 VAC COOL ONLY)

More information

SECTION EXTERIOR LIGHTING

SECTION EXTERIOR LIGHTING SECTION 26 56 00 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of exterior luminaries, controls, poles and supports. 1.2 RELATED WORK A. Section 26

More information

INSTALLATION INSTRUCTIONS FOR 8330*5511 MOUNTING KIT

INSTALLATION INSTRUCTIONS FOR 8330*5511 MOUNTING KIT RV Products Division INSTALLATION INSTRUCTIONS FOR 8330*5511 MOUNTING KIT 8330-752 CONTROL BOX KIT (12 VDC COOL ONLY) 9330A755 CONTROL BOX KIT (12 VDC HEAT/COOL) 8530-750 CONTROL BOX KIT (24 VAC COOL ONLY)

More information

SECTION LIGHTING

SECTION LIGHTING SECTION 26 50 00 LIGHTING PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to furnish and install

More information

S U B S T I T U T E O R D I N A N C E BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHICAGO: ARTICLE I ELECTRICAL CODE

S U B S T I T U T E O R D I N A N C E BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHICAGO: ARTICLE I ELECTRICAL CODE S U B S T I T U T E O R D I N A N C E BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHICAGO: This ordinance is organized into eight Articles, as follows: Article I. Article II. Article III. Article

More information

Permit Fairview Municipal Building 55 Anderson Ave. Fairview NJ Issue December 31, 2015

Permit Fairview Municipal Building 55 Anderson Ave. Fairview NJ Issue December 31, 2015 SECTION 26 05 00 - BASIC ELECTRICAL MATERIALS AND METHODS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

You work hard on your panel. we work hard in your panel. PRODUCTS FOR

You work hard on your panel. we work hard in your panel. PRODUCTS FOR You work hard on your panel we work hard in your panel. PRODUCTS FOR 2 PRODUCTS FOR You simply won t find better panel components. Thomas & Betts has everything you need to make your panel better than

More information

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. DIVISION 26 ELECTRICAL SECTION 26 27 26 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. B. Specialty switches and outlets

More information

UNIVERSITY OF SOUTH FLORIDA POLYTECHNIC SCIENCE AND TECHNOLOGY BUILDING LAKELAND, FLORIDA DIVISION 27 - COMMUNICATIONS SPECIFICATION INDEX

UNIVERSITY OF SOUTH FLORIDA POLYTECHNIC SCIENCE AND TECHNOLOGY BUILDING LAKELAND, FLORIDA DIVISION 27 - COMMUNICATIONS SPECIFICATION INDEX UNIVERSITY OF SOUTH FLORIDA POLYTECHNIC LAKELAND, FLORIDA DIVISION 27 - COMMUNICATIONS SPECIFICATION INDEX SECTION NO. SECTION TITLE 27 00 00 COMMUNICATIONS 27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS

More information

ESTIMATE SET-UP PACKAGE BID SCHEDULE ENTRY AND MAINTENANCE

ESTIMATE SET-UP PACKAGE BID SCHEDULE ENTRY AND MAINTENANCE BIDDING INFORMATION BID DATE: PROJECT NAME: ADDRESS: ESTIMATE SET-UP PACKAGE BID SCHEDULE ENTRY AND MAINTENANCE ESTIMATE NO.: CITY: STATE: ZIP: PRIME: PROJECT MANAGER: PROJECT TYPE: SUB: $ SIZE: BID TIME:

More information

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements. FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment

More information

INTERNAL FRAMING PROFILES

INTERNAL FRAMING PROFILES INTERNAL FRAMING PROFILES Ceiling Furring Sections Dry-Wall Partitioning Sections Angle Beads And Accessories About the Hadley Group Hadley Industries is one of Europe s leading manufacturers of cold rollformed

More information

Oberon s NEC Compliance Statement and Underwriters Laboratories (UL ) Considerations for Oberon Products

Oberon s NEC Compliance Statement and Underwriters Laboratories (UL ) Considerations for Oberon Products Oberon s NEC Compliance Statement and Underwriters Laboratories (UL ) Considerations for Oberon Products Manufacturers Statement of Compliance with NFPA 70, National Electric Code Oberon s suspended ceiling

More information

Gas Station & C Store SECTION CWM Job No

Gas Station & C Store SECTION CWM Job No SECTION 21 1300 - PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract

More information

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR September 2012, rev. 00 26 0553 Identification for Electrical Systems PART 1. GENERAL 1.01 Summary A. Section Includes: 1.02 Submittals 1. Identification for raceways. 2. Identification of power and control

More information

Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013

Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013 Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013 1. Is a standard wire-nut approved for a wet location as in an outside j-box? Is there a listed

More information

DIVISION SECTION ELECTRICAL. A. Provisions of General Requirements, Division 1, are a part of this section.

DIVISION SECTION ELECTRICAL. A. Provisions of General Requirements, Division 1, are a part of this section. DIVISION 16000 SECTION 16100 ELECTRICAL PART I - GENERAL 1.01 Related Documents A. Provisions of General Requirements, Division 1, are a part of this section. 1.02 This work shall include, but not necessarily

More information

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work.

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work. PART 1 GNRAL 1.1. APPLICABL PROVISIONS A. The General, Supplementary and other Conditions of the Contract, modifications to the General Conditions, the Drawings, and the applicable provisions of the other

More information

Division 26 ELECTRICAL TABLE OF CONTENTS

Division 26 ELECTRICAL TABLE OF CONTENTS Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND

More information

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July

More information

15900 HVAC INSTRUMENTATION AND CONTROLS

15900 HVAC INSTRUMENTATION AND CONTROLS 15900 HVAC INSTRUMENTATION AND CONTROLS PART 1 GENERAL - Andover Controls BAS system is the standard for the University, and may be specified as a proprietary item. 1.0 RELATED DOCUMENTS A. Drawings and

More information

INSTALLATION INSTRUCTIONS FOR 7370A736 FLUSH MOUNT CEILING PLENUM

INSTALLATION INSTRUCTIONS FOR 7370A736 FLUSH MOUNT CEILING PLENUM INSTALLATION INSTRUCTIONS FOR 7370A736 FLUSH MOUNT CEILING PLENUM TABLE OF CONTENTS Warnings...2 Package Contents...2 General Information...3 Ceiling Plenum Installation Requirement...3 Supply Ducting

More information

INSTALLATION INSTRUCTIONS FOR 8330*633* COOL ONLY A/C 8330*635* HEAT READY A/C 8530*63** HEAT PUMP CHILLGRILLE FLUSH MOUNT CEILING ASSEMBLY

INSTALLATION INSTRUCTIONS FOR 8330*633* COOL ONLY A/C 8330*635* HEAT READY A/C 8530*63** HEAT PUMP CHILLGRILLE FLUSH MOUNT CEILING ASSEMBLY RV Products Division INSTALLATION INSTRUCTIONS FOR 8330*633* COOL ONLY A/C 8330*635* HEAT READY A/C 8530*63** HEAT PUMP CHILLGRILLE FLUSH MOUNT CEILING ASSEMBLY DESIGNED AND MANUFACTURED BY THE MAKERS

More information