ATTACHMENT 2 DEVELOPER'S NAME: PRINTED COMPANY NAME THIS PLAN IS FOR TREE PROTECTION/ FOREST CONSERVATION PLAN PURPOSES ONLY

Size: px
Start display at page:

Download "ATTACHMENT 2 DEVELOPER'S NAME: PRINTED COMPANY NAME THIS PLAN IS FOR TREE PROTECTION/ FOREST CONSERVATION PLAN PURPOSES ONLY"

Transcription

1 ATTACHMENT 2 Kim ing SCALE: 1"=2000' PROPERTY INFORMATION: (FOR SUBJECT PARCELS) FCP NUMBERS SPECIMAN (30" & GRATER) TREE REPLACEMENT MITIGATION REQUIREMENTS LEGEND DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND SIGNATURE: Expiration NRI/FSD NUMBER FC1.1 GENERAL NOTES

2 LEGEND Rockville, MD Norfolk Avenue, Suite 200, Bethesda, MD Kim ing Pine & Swallow DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND SIGNATURE: Expiration FC1.2

3 Kim ing LEGEND MATCH LINE - SEE FC1.4 DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND SIGNATURE: Expiration MATCH LINE - SEE FC1. 5 MATERIALS LEGEND FC1.3

4 7939 Norfolk Avenue, Suite 200, Bethesda, MD Kim ing Pine & Swallow LEGEND Rockville, MD DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND SIGNATURE: Expiration FC1.4

5 LEGEND Rockville, MD Kim ing 7939 Norfolk Avenue, Suite 200, Bethesda, MD Pine & Swallow MATERIALS LEGEND DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND SIGNATURE: Expiration 3/19/2015 FC1.5

6 SEQUENCE OF CONSTRUCTION TRUNK 2" MIN. CLOSED CELL FOAM ROPE OR STAP MAIN TRUNK OF TREE INSTALL A 2"x4" MIN. BOARD WITH FOAM TIED ON WORK SIDE OF TREE MACHINERY AND STOCKPILING PROHIBITED EXTEND STONE 6" BEYOND PAVING NATURAL GROUND 6" KBI FLEXI-PAVE HD2000 FLEXIBLE POROUS PAVING OR APPROVED EQUAL SEE SITE PLAN FOR WIDTH Kim ing MIN. 12 FIBER/NYLON ROPE OR STAPS. MIN. 3 PLACES OR AS DIRECTED BY THE ARBORIST 2" NOMINAL PAVING THICKNESS 6" COMPACTED #57 STONE BACKFILLED PLANTING SOIL GEOGRID GEOTEXTILE FABRIC EXISTING UNDISTURBED SOIL STEEL "T" BAR OR "U" CHANNEL POST 6" ATTACH THE SIGN TO POST WITH HEAVY-DUTY ZIPTIES TYP. 3 PLACES EXTEND GEOTEXTILE FABRIC 6" PAST THE TOP OF THE WOOD MULCH AND ATTACH TO THE WELDED WIRE MESH FENCE EVERY 24" O.C. TYP. 14 GAUGE 2" X 4" WELDED WIRE FENCE 1/3 HEIGHT OF STAKE ROOT PROTECTION ZONE AS SHOWN ON PLANS MIN. 15" Machinery, dumping or storage any materials prohibited. Violators are subject to fines as imposed by the Maryland Forest Conservation Act 1991 INSTALL ANCHOR POSTS TO A DEPTH OF NO LESS THAN 1/3 OF THE TOTAL HEIGHT OF POST UNDISTURBED GROUND 8 mm GEOTEXTILE INSTALLED BETWEEN THE UNDISTURBED GROUND AND MULCH 5' TALL HARD WOOD STAKE Do not work or place materials beyond this tree protection fence 12" MIN. THICK LAYER OF WOOD CHIP MULCH REPLENISHED AS NEEDED DURING THE CONSTRUCTION PERIOD 20 " MIN. SECURE GEOTEXTILE FABRIC WITH LANDSCAPE STAPLES EVERY 12-24" O.C. TYP. MIN. 11" METAL T-STAKES LOCATED 8-10' O.C. ADJACENT WORK AREA HIGHLY VISIBLE FLAGGING MAX. 10 FEET WELDED WIRE MESH FENCE FLEXI-PAVE ABOVE GRADE NOTES: 1. ATTACHMENT OF SIGNS TO TREES IS PROHIBITED. 2. SIGNS SHOULD BE PROPERLY MAINTAINED. 3. AVOID INJURY TO ROOTS WHEN PLACING POSTS FOR THE SIGNS. NOT TO SCALE DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND SIGNATURE: Expiration HEIGHT AS DIRECTED BY THE ARBORIST Do Not Disturb Seedlings, Shrubs or Trees FOREST CONSERVATION DETAILS 2"x4" MIN. BOARD FC5.1

7 Kim ing DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND SIGNATURE: 03/19/15 Expiration FOREST CONSERVATION DETAILS FC5.2

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP

More information

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT 8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE

More information

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION NO CONSTRUCTION OR EXCAVATION IS TO OCCUR ON LOTS THAT REQUIRE TREE PRESERVATION UNTIL PROPER APPROVALS HAVE BEEN GIVEN BY A CITY ARBORIST 1. When trees

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

Tree Pits Construction Guide

Tree Pits Construction Guide Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Silva Cell 2 Installation Guidelines

Silva Cell 2 Installation Guidelines Silva Cell 2 Installation Guidelines Silva Cell 2 components Deck 1X post 3X post 2X post Base 1 Base (bottom piece) 2 Posts 1X 2X 3X (1x + 2X) 3 1X assembled 16.7 (424 mm) 4 2X assembled 30.9 (784 mm)

More information

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE

More information

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014 CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEME PROJECT LOCATION JUNE 2014 PREPARED BY:. 125 COLLEGE STREET - 4TH FLOOR BURLINGTON, VERMONT 05401 GENERAL NOTES: LEGEND:

More information

Reevesland (ca.1900) 400 N. Manchester Street, Arlington, VA Clarendon Blvd., Suite 400, Arlington, VA See below

Reevesland (ca.1900) 400 N. Manchester Street, Arlington, VA Clarendon Blvd., Suite 400, Arlington, VA See below COUNTY, HISTORICAL AFFAIRS AND LANDMARK REVIEW BOARD APPLICATION FOR CERTIFICATE OF APPROPRIATENESS DATE March 9, 2018 Z- - -HD RPC# (TO BE COMPLETED BY STAFF) DESIGNATED PROPERTY: Name of Historic District

More information

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 329000 PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply

More information

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805)

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805) PROJECT CODE: 1446 FILENAME: 1446 A0.1 Cover.dwg KKC APPROVALS: DATE: NO: DATE: Mar 31, 2016, 12:21pm COMMENTS: A0.1 TITLE SHEET MECH. ROOM DOOR VICINITY MAP N NORTH - PARKING SPACE STATISTICS SOUTH -

More information

Information for File # ARC

Information for File # ARC Information for File # 2015-02781-ARC Applicant Corps Contact Enbridge Energy, Limited Partnership Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil

More information

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK 13440 DELTA PROJECT NO. 2017.226.001 SEPTEMBER 2017 ISSUED FOR BID INDEX OF DRAWINGS GENERAL CIVIL ARCHITECT/ENGINEER PROJECT

More information

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing

More information

39 N. B Street San Mateo, California Construction Tree Protection Plan

39 N. B Street San Mateo, California Construction Tree Protection Plan 39 N. B Street San Mateo, California Construction Tree Protection Plan Summary was retained by HMCA Inc. to prepare a Construction Tree Protection Plan for the 39 North B Street property in San Mateo,

More information

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM Name: CCW Development Associates, L.L.C. Street Address: Telephone Number(s): 1209 Laskin Road, Virginia Beach, VA 23451 (757) 491-1996 Email: chris@vbhomesliving.com

More information

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work. PART 1 - GENERAL PLANT MATERIAL AND PLANTING 1.01 SECTION INCLUDES A. Plant Material and Planting B. Tree Drainage Wells C. Warranty for Plant Material 1.02 DESCRIPTION OF WORK A. Furnishing and installing

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures MARBLE RIVER WIND POWER PROJECT Siting Considerations 1. Locate access roads and, to the extent allowed by local laws, wetlands and topography, individual wind turbines and other structures along field

More information

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES PART 1 DESIGN DIRECTIVES 1.1 GENERAL SECTION 02951 PLANTING DETAILS A. This section consists of AutoCad drawings depicting typical landscape details governing the installation of plant materials on the

More information

Town of Fuquay-Varina

Town of Fuquay-Varina 170 LANDSCAPING 170.01 GENERAL 170.01.01 Street trees shall be provided in accordance with the Land Development Ordinance for site plans and subdivisions 170.01.02 Street trees, landscape areas, landscape

More information

Analyzing the Bioretention Construction Sequence

Analyzing the Bioretention Construction Sequence Analyzing the Bioretention Construction Sequence Avoiding future problems through careful installation procedures, construction inspection and first year maintenance 20 Steps to Better Bioretention Step

More information

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.

More information

Guidelines for planting within the 100 Ft. Buffer

Guidelines for planting within the 100 Ft. Buffer CAPE COD COOPERATIVE EXTENSION PO Box 367 Barnstable, MA 02630 508 375-6690 (www.capecodextension.org) Guidelines for planting within the 100 Ft. Buffer Introduction: The Barnstable County Extension Service

More information

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date. C7.1 www.resourceinternational.com 6350 PRESIDENTIAL GATEWAY COLUMBUS, OHIO 43231 PHONE: (614) 823-4949 FAX: (614) 823-4990 RESOURCE INTERNATIONAL INC. OUTLOT "A" OUTLOT "B" WINCHESTER PIKE WATER LINE

More information

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011 Local Stormwater Retrofit Case Studies Westmoreland County Conservation District Updated 11/2011 WCD 2010 Why we do Sustainable Stormwater Management Retrofits To reduce flooding events and combined sewer

More information

STREAM ALTERATION PRACTICES

STREAM ALTERATION PRACTICES STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education Wisconsin Contractors Institute Continuing Education Erosion & Sediment Control Course # 12775 2 hours Wisconsin Contractors Institute N27 W23953 Paul Road, Suite 203 Pewaukee, WI 53072 Website: www.wicontractorsinstitute.com

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

Installation Manual May 9/14 No revision

Installation Manual May 9/14 No revision 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Manual May 9/14 No revision Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles

More information

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary 0 25 50 00 Feet Parcel Boundary, Approximate 202 LIDAR 2 FT CONTOURS, VCGI BING AERIAL NRCS SOIL MAPPING MMI FIELD DATA Culvert Pipe Swale 0 Scale: "=40' SOURCE(S): NRCS Soil Area Boundary Overland st

More information

TREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service

TREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service TREE PLANTING AND ESTABLISHMENT Keith Wood Colorado State Forest Service Select the Right Tree for the Right Place Match the Tree to the Site: Growth Habit, Water Needs, Durability (Hardiness) Insect and

More information

ACTIVITY: Tree Preservation & Maintenance TP 01

ACTIVITY: Tree Preservation & Maintenance TP 01 ACTIVITY: Tree Preservation & Maintenance TP 01 Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients

More information

WMU Tree Care Plan and Policies

WMU Tree Care Plan and Policies WMU Tree Care Plan and Policies PURPOSE The purpose of the Western Michigan University Tree Care Plan and Policies is to define protocols and give guidance and direction as to the best practices for any

More information

Preventing Storm Water Pollution: What We Can Do

Preventing Storm Water Pollution: What We Can Do Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL PROTECTION

More information

G-2 SOUTHWEST WATER RECLAMATION FACILITY 15 MGAL REJECT STORAGE TANK APRIL 23, 2014 GENERAL NOTES ST. PETERSBURG PROJECT NO.

G-2 SOUTHWEST WATER RECLAMATION FACILITY 15 MGAL REJECT STORAGE TANK APRIL 23, 2014 GENERAL NOTES ST. PETERSBURG PROJECT NO. GENERAL NOTES 10955-2 G-2 FLORIDA P.E. 34942 1 A 1 DETAIL A SECTION SYMBOLS AND ABBREVIATIONS 10955-3 G-3 FLORIDA P.E. 34942 PROCESS SCHEMATIC PROCESS SCHEMATIC AND NOTES 10955-4 G-4 FLORIDA P.E. 34942

More information

V-5 TREE PROTECTION AND LANDSCAPING REQUIREMENTS

V-5 TREE PROTECTION AND LANDSCAPING REQUIREMENTS V-5 TREE PROTECTION AND LANDSCAPING REQUIREMENTS V-5.1 General A. Intent: It is the intent of this section to establish protective regulations for trees within the City of Milton, in order to better control

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

PR 2 PM 3 PR 2 PR 2 BIORETENTION AND FOREBAY PLANTINGS (IN HATCHED AREA) TO INCLUDE: NORTHERN BAYBERRY (MORELLA PENSYLVANICA) VIRGINIA ROSE (ROSA VIRGINIANA) SWITCH GRASS (PANICUM VIRGATUM) DWARF HUCKLEBERRY

More information

ISSUANCES FINAL 4.1 SITE PLAN SUBMISSION

ISSUANCES FINAL 4.1 SITE PLAN SUBMISSION CHAISE LOUNGES, TYP. LOUNGE FURNITURE POOL LOUNGE TABLE RAISED MODULAR PLANTER PEDESTAL PAVERS RAISED MODULAR PLANTER LOUNGE FURNITURE RAISED MASONRY PLANTER PLANTING FLUSH WER FEURE FLUSH LOUNGING PLFORM

More information

A. Contractor shall provide product data for each type of product indicated.

A. Contractor shall provide product data for each type of product indicated. 31 13 00 SELECTIVE TREE AND SHRUB REMOVAL AND TRIMMING SECTION 1 GENERAL 1.1 SUMMARY A. This section includes general protection and pruning of existing trees and plants that are affected by execution

More information

BUSINESS PARK TOWN OF OKOTOKS

BUSINESS PARK TOWN OF OKOTOKS @ TOWN OF OKOTOKS LANDSCAPE TENDER DRAWINGS - 31 JANUARY 2016 L1. DEMOLITION PLAN L2. LAYOUT PLAN L3. GRADING PLAN L4. PLANTING PLAN. SECTIONS AND DETAILS File Location: N:\Projects\. Business Park MR

More information

ACADEMY OF MONTESSORI EXPANSION CONSTRUCTION PLANS

ACADEMY OF MONTESSORI EXPANSION CONSTRUCTION PLANS CONSTRUCTION PLANS COUNTY RESUBMITTAL 2 October 26, 2018 15421 Thonotosassa, FL 33592 DRAWING INDEX (TOTAL NUMBER OF SHEETS = 11) LEGAL DESCRIPTION (PER OR Book 20115, PG 644) Tract B: The south 210 feet

More information

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers FHWA 534_J31 TEA-5A1(833), P1,M51 See Tabulation Below for Section Numbers ALL CONSTRUCTION IS TO BE PERFORMED WITHIN EXISTING RIGHT OF WAY STP-5A1(611) M51 TEA-5A1(833) RECOMMENDED FOR CONSTRUCTION 12/28/216

More information

815 NE 172 nd Avenue Vancouver, WA Installation Manual

815 NE 172 nd Avenue Vancouver, WA Installation Manual 815 NE 172 nd Avenue Vancouver, WA 98684 800-377-3877 www.xeripave.com info@xeripave.com Installation Manual Installation steps include job planning, layout, excavating and preparing the soil sub grade,

More information

VICINITY MAP 1" = 1000'

VICINITY MAP 1 = 1000' SITE PLAN - MINI U STORAGE LOCATED IN A PORTION OF THE SOUTHWEST QUARTER OF SECTION 15, TOWNSHIP 6 SOUTH, RANGE 66 WEST OF THE 6th P.M. 18901 LONGS WAY, PARKER, CO 80134 SITE DEVELOPMENT DATA: SITE ACREAGE:

More information

5000 Acres Initiative at PCC Sylvania in Portland OR

5000 Acres Initiative at PCC Sylvania in Portland OR Project Contacts PROJECT ORIGINATOR AND FISCAL SPONSOR Brian Wegener, Advocacy & Communications Manager Tualatin Riverkeepers 675 SW Hazelbrook Rd, Tualatin, OR 97062 brian@tualatinriverkeepers.com (503)

More information

Milpitas College Extension Milpitas Dry Landscape

Milpitas College Extension Milpitas Dry Landscape SAN JOSÉ / EVERGREEN COMMUNITY COLLEGE DISTRICT Milpitas College Extension Milpitas Dry Landscape PROJECT MANUAL VOLUME II TABLE OF CONTENTS DIVISION 02 through 30 Not Used DIVISION 31 - EARTHWORK Document

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

Request for Approval of Design Modification

Request for Approval of Design Modification March 7, 2017 Piper Peterson U. S. Environmental Protection Agency 1200 Sixth Avenue, ECL-122, Suite 900 Seattle, Washington 98101 Subject: Request for Approval of Design Modification T-117 Early Action

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL Surface Water Protection During Well Site Construction Kelly Kees, PE WVDEP, Office of Oil and Gas SEDIMENT & EROSION CONTROL PLANS Per West Virginia State Code 22-6-6(d) 22-6A-7(c),

More information

APPLICATION FOR A TREE REMOVAL PERMIT. (Please print clearly) Signature of property owner or provide letter of authorization:

APPLICATION FOR A TREE REMOVAL PERMIT. (Please print clearly) Signature of property owner or provide letter of authorization: APPLICATION FOR A TREE REMOVAL PERMIT (Please print clearly) City of Colleyville 100 Main Street Colleyville, TX 76034 Phone 817.503.1030 Fax 817.503.1039 Part 1. Property information Street Address: Legal

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation 1.0 Purpose These guidelines are for the use of all Campus landscaping. 2.0 General Requirements 1. Native trees and shrubs appropriate for this region are strongly preferred. The university has a do not

More information

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent. ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,

More information

Case Study Bioretention Installation and Maintenance

Case Study Bioretention Installation and Maintenance Case Study Bioretention Installation and Maintenance Bioretention Crime Scene Investigation A reality TV series where you get to watch disturbing bioretention crimes and use advanced forensics to solve

More information

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Key Topics Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Bioretention Crime Scenes Investigation A 9 part reality TV series where you get to watch disturbing

More information

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE AFTER FEBRUARY 1, 2010 ITEM 709 TRIANGULAR FILTER FABRIC FENCE 709.1 Description. This work shall consist of furnishing, installing, and removing temporary erosion protection and sediment control triangular

More information

USE THREE LODGE POLES FOR ADDED STABILITY POLYPROPYLENE OR CINCH TIES, TYP. STAKE -2" DIA. PRESSURE TREATED LODGE POLE or 2" x 4" P.T. WD HT AS SPECIFIED. (NOTE: TOP OF STAKES SHALL BE BELOW CANOPY, TYP.)

More information

Austin, Texas GENERAL LEGEND SYMBOL ABBREVIATIONS DESCRIPTION DETAIL REFERENCE MATERIAL OR FINISH REFERENCE SYMBOL SECTION CUT REFERENCE

Austin, Texas GENERAL LEGEND SYMBOL ABBREVIATIONS DESCRIPTION DETAIL REFERENCE MATERIAL OR FINISH REFERENCE SYMBOL SECTION CUT REFERENCE CITY OF AUSTIN LANDSCAPE NOTES: 1. ALL PROPOSED LANDSCAPE AREAS WITHIN PROPERTY LINE TO RECEIVE 100% HEAD TO HEAD IRRIGATION COVERAGE. 2. ALL LANDSCAPE AREAS ADJACENT TO VEHICULAR USE SHALL BE PROTECTED

More information

ABBREVIATIONS. Dwg LID of 1. Abbreviations

ABBREVIATIONS. Dwg LID of 1. Abbreviations ABBREVIATIONS DIA DIAMETER EL ELEVATION FT2 SQUARE FOOT GAL/MIN GALLONS PER MINUTE H HORIZONTAL HDPE HIGH DENSITY POLYETHYLENE HMAC HOT MIX ASPHALT CONCRETE IE INVERT ELEVATION MAX MAXIMUM NO. NUMBER ODEQ

More information

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN 01/17/2003 VERSION UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN TABLE OF CONTENTS I. APPLICABILITY... 1 II. SUPERVISION AND INSPECTION...

More information

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer. Authorised by : Parks & Gardens Manager Section 5 Page 1 of 6 SECTION 5: STREET TREE PLANTING 1.0 GENERAL This section describes the work to be carried out to prepare planting sites and complete planting

More information

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree! SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree! Craig R. Miller Parks & Open Space Manager www.cpnmd.org Environmental Factors to Consider: Minimum temperature the

More information

Legend 22'-2" Sta 10+43 Bark mulch (Typ) 4 R20'-6" Landscape Edging Schedule A Seed Mix - Mowable Schedule B Seed Mix (Typ) Schedule A Seed Mix (Typ) 3' width, 4" depth rock mulch (Typ) 5'-0" Schedule

More information

LOT 66 VACANT Ca (4) 3 BICYCLE PARKING SPACES. REFER ARCH. CANOPY ABOVE (SHOWN DASHED) REFER ARCH.

LOT 66 VACANT Ca (4) 3 BICYCLE PARKING SPACES. REFER ARCH. CANOPY ABOVE (SHOWN DASHED) REFER ARCH. LEGEND L O G I S B O U L E V A R D PROPOSED TREE PROPOSED SHRUB PROPOSED GROUNDCOVERS LlT (49) Ll (26) MINIMUM 10000 LITRE UNDER GROUND RAINWATER TANK FOR THE PURPOSE OF LANDSCAPE IRRIGATION & TOILET FLUSHING.

More information

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General

More information

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE CITY OF FONTANA Engineering Department 8353 Sierra Avenue, Fontana CA 92335 (909) 350-7610 CHECKLIST FOR LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE SECTION 1: GENERAL REQUIREMENTS

More information

Appendix E Preliminary Design

Appendix E Preliminary Design Appendix E Preliminary Design 1 1 0+080 0+100 0+200 0+240 LEGEND PROPOSED POOL PROPOSED RIFFLE PROPOSED COIR CLOTH BANK TREATMENT PROPOSED VEGETATED STONE BANK TREATMENT PROPOSED VEGETATED BLOCK BANK TREATMENT

More information

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON OKANOGAN RIVER PROJECT LOCATION SR53 COLUMBIA RIVER SR73 METHOW RIVER PATEROS SR7 SR7 BRIDGEPORT VICINITY MAP NEAR: VICINITY 2 GEBBERS FARMS INC APN 302570024 STATE HWY 7 DOUGLAS CO. PUD NO. APN 302570037

More information

Applicant Submittal HWANG HOSPITALITY, LLC ARCHITECTS OVERLAND PARK, KANSAS 6470 W. 151ST STREET FIRST FLOOR PLAN A NEW MULTIFAMILY DEVELOPMENT FOR:

Applicant Submittal HWANG HOSPITALITY, LLC ARCHITECTS OVERLAND PARK, KANSAS 6470 W. 151ST STREET FIRST FLOOR PLAN A NEW MULTIFAMILY DEVELOPMENT FOR: 1 LOUNGE 11'-6" 23'-0" ENTRY RECEPTION 8'-0" 11'-0" OFFICE 7'-2" 11'-0"+ GAME ROOM 7'-2" 11'-0"+ DINING/ GATHERING ROOM 7'-2" 11'-0"+ CATERING KITCHEN PANTRY L T ELEVATOR TRELLISED PATIO A1.01 FIRST FLOOR

More information

Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils

Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils Filter Ponds DE-WATERING SEDIMENT CONTROL TECHNIQUE Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils [1] Capture

More information

University of Delaware

University of Delaware SECTION 01 56 18 _ Tree Protection University Contact: UD Assistant Director of Grounds: Office (302) 831 2797 UD Landscape Planner: Office (302) 831 1817 PART 1 GENERAL 1.1 SUMMARY Information in this

More information

Appendix N. Preliminary Design

Appendix N. Preliminary Design Appendix N Preliminary Design Belfountain Dam and Headpond Class EA Preferred Alternative D4H5: Lower the spillway & backfill headpond & construct channel Preliminary Cost Estimate ITEM ITEM UNIT EST.

More information

EZ Base is a high-density panel base system that replaces traditional compacted aggregate-base installations.

EZ Base is a high-density panel base system that replaces traditional compacted aggregate-base installations. UPDATE May 16, 2017 Make sure that you have an up-to-date technical data sheet in hand by consulting our website: techniseal.com U.S.A. and Canada: dial 1 800 465-7325 Others: dial (514) 523-8324 (Canada)

More information

City of Sheridan Landscape Plan Checklist

City of Sheridan Landscape Plan Checklist Included? Section 1. Exemptions - Landscape Plan not Applicable (Sec. 56-512) 1. Single family dwellings, attached and detached, are exempt from landscape regulations and from providing landscape plans.

More information

N 2x ball dia. min. Rubber hoses Guy wires Leave minimal slack/ play, do not tighten () Hardwood stakes, 2"x2"x8' ht. () Set rootflare " higher than surrounding grade. Remove excess soil to expose trunk

More information

Sec Development Standards in the Environmental Overlay (EO) District

Sec Development Standards in the Environmental Overlay (EO) District Sec. 4-12 Development Standards in the Environmental Overlay (EO) District a. Applicability. The Environmental Overlay District applies to areas identified on the official Zoning Map. Environmental Overlay

More information

DISCOUNT TIRE - IAD 10739

DISCOUNT TIRE - IAD 10739 1229 NW 86TH STREET CLIVE, IOWA 50325 PRELIMINARY ENGINEERING PLANS PLAN INDEX SITE LOCATION TITLE SHEET PLAN DATE: 07/13/2015 Beyond Surveying and Engineering NW 86th STREET 0 20 40 EXISTING CONDITIONS

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL 1 EROSION & SEDIMENT CONTROL Effective Soil & Water Protection Whether you want to prevent soil erosion caused by rain, water and wind, or protect waterways from inevitable build

More information

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures 4.0 EROSION & SEDIMENT CONTROL MEASURES After performing the analysis summarized above, Burns & McDonnell

More information

FIRST SISTER LAKE STORMWATER RETROFIT

FIRST SISTER LAKE STORMWATER RETROFIT LE PARKLE AVENUE JUNE 07 DRAWING INDE PREPARED BY: 00 Commonwealth Boulevard, Suite 300 Ann Arbor, Michigan 80 Phone: 73.769.300 Fax: 73.769.366 TOPOGRAPHICAL SURVEY BY: Midwestern Consulting 38 Plaza

More information

BIOBARRIER. Geosynthetics you can trust

BIOBARRIER. Geosynthetics you can trust BIOBARRIER (317)346-4110 www.drainagesolutionsinc.com Geosynthetics you can trust We Look Different. We Are Different. Hardscapes and landscapes are a big investment, and traditional methods of protecting

More information

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS Van Buren Bridge Project IFB #0721-17-VBB GENERAL TREE & LANDSCAPE PROVISIONS CONSTRUCTION SPECIFICATIONS PROJECTS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS DEPARTMENT OF PUBLIC

More information

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

TOWN OF HILLSBOROUGH SAN MATEO COUNTY TOWN OF HILLSBOROUGH SAN MATEO COUNTY Planning Office 650/375-7422 Fax 650/375-7415 1600 Floribunda Avenue Hillsborough California 94010 Architecture and Design Review Board LANDSCAPING APPLICATION PACKET

More information

Dan, this is a list of the items included in the submittal package for the Plan Commission Public Hearing on May 24, 2018:

Dan, this is a list of the items included in the submittal package for the Plan Commission Public Hearing on May 24, 2018: To: Dan Nakahara, Senior Planner Village of Deerfield From: Mary M. Bak, Development Services Advisor Kinzie Real Estate Services Subject: 702 Elm Street Townhomes, 1219 Partners Submittal for Plan Commission

More information

Celebration Residential Owners Association, Inc. Celebration Non-Residential Owners Association, Inc. 851 Celebration Avenue, Celebration, Florida 34747 Phone 407-566-1200 Fax 407-566-1210 ARC@celebrationtownhall.com

More information

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01 ROADWAY SECTION PRINCIPAL ARTERIAL 2-01 ROADWAY SECTION MINOR ARTERIAL COMMERCIAL/MIXED USE 2-02 ROADWAY SECTION MINOR ARTERIAL REDISENTIAL 2-03 ROADWAY SECTION COLLECTOR COMMERCIAL MIXED USE 2-04 ROADWAY

More information

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET SUPPTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WKSHEET For Department of Ecology Stormwater BMP T5.13 This submittal worksheet will help determine what soil amendments are needed to meet the

More information

Section 815. LANDSCAPING

Section 815. LANDSCAPING 815.01 Section 815. LANDSCAPING 815.01. Description. This work consists of providing and planting trees, shrubs, and other plants, including replacements, classified as nursery stock. The Engineer may

More information

THE GUTHRIE TRACT 2 - PROGRESS SET

THE GUTHRIE TRACT 2 - PROGRESS SET CONSTRUCTION DRAWINGS FOR: - PROGRESS SET Sitework/Planting/Irrigation VICINITY MAP A PROJECT BY INDEX OF SHEETS OWNER: ARGYLE RESIDENTIAL LANDSCAPE ARCHITECT: TBG Partners Reference CONTACT: John Burnham

More information

2-B-18-UR. Revised: 3/27/2018

2-B-18-UR. Revised: 3/27/2018 Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard

More information

Sanitation District No. 1 Stormwater Best Management Practices (BMPs) Good Housekeeping Practices (GHPs)

Sanitation District No. 1 Stormwater Best Management Practices (BMPs) Good Housekeeping Practices (GHPs) Sanitation District No. 1 Stormwater Best Management Practices (BMPs) Good Housekeeping Practices (GHPs) Activity: Preservation and Maintenance of Existing (PMV) PLANNING CONSIDERATIONS: Training: No Inspection

More information

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS 808.1 Description. This work shall consist of furnishing and planting material in the locations designated on the plans or established by the engineer.

More information

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents. SECTION 32 9300 PLANTS PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents. B. Related Sections: 1. Section 32 9001:

More information

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing

More information

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation EnkaTech Note Installation Guide for Enkamat Slopes and Channels Site Preparation For both slope and channel applications, the site must be shaped to the design specifications (grade, geometry, soil compaction,

More information