Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Size: px
Start display at page:

Download "Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures"

Transcription

1 Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures 4.0 EROSION & SEDIMENT CONTROL MEASURES After performing the analysis summarized above, Burns & McDonnell civil engineers, construction personnel, and environmental personnel walked both Newgate/Phelps Road and Hatchett Hill Road areas on July 21 and 22, Another site walk of both areas was conducted on March 30, Prior to both visits to these areas it had rained steadily for 24 to 36 hours. Some surface runoff, primarily channel flow, was observed. Although not analytically confirmed, observations in the field lead Burns & McDonnell to believe the drainage problems in some areas may be partially due to ground water seepage rather than overland flow, particularly in the Newgate/Phelps Road area. 4.1 VEGETATION REMOVAL A dense tree canopy currently exists in both areas, however it would be necessary to remove 80 to 100 feet of this forested area along the east side of the existing transmission lines to construct the Project. Although no impervious surfaces will be created, and only a small percentage of each sub-basin would be impacted, the vegetation removal would result in a small, short-term increase in surface water flow coming from both areas. This increase would be mitigated somewhat because the majority of the stumps from the cut vegetation would be left in place, as would the leaf and duff layer that has accumulated over time. The recommended control measures will ensure that the remainder of the small increase in runoff will be effectively controlled until site stabilization is achieved. The existing root systems, leaf layer, and duff layer would also help minimize the potential for erosion. Additionally, many of the hardwood tree and shrub stumps can be expected to start re-sprouting soon after the cutting, sometimes during the same growing season. Many of the stored seeds of a variety of tree, shrub, and herbaceous species in the leaf and duff layers would also respond vigorously to the increased light and water and quickly germinate. Therefore, these areas would very likely re-vegetate themselves quickly. The areas where hemlock is more prevalent (Hatchett Hill Road Area) would likely take longer to re-vegetate, therefore these areas would be more prone to increased erosion potential. In all areas, the stability of the sites would be closely monitored by environmental inspectors, including the third party inspector that the CSC has ordered CL&P to hire. This third party inspector will perform weekly inspections of all disturbed sites, and on a bi-weekly basis will report directly to the CSC. If conditions warrant additional controls (beyond current recommendations), any of the following measures, at a minimum, could be used to temporarily stabilize the site until natural vegetation, which will be maintained in an early successional state according to NU s vegetation maintenance standards, has successfully re-established itself: installing staked hay bales, silt fences, filter socks/logs, mulch, and erosion control blankets; as well as Northeast Utilities 4-1 Burns & McDonnell GSRP 345-kV Line D&M Plan Appendix E: Page 17 of 36

2 Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures seeding disturbed ground with fast growing herbaceous species. It is not anticipated, nor is it recommended, that planting of native trees and shrubs will be necessary within the cleared areas. As stated above, it is expected that the natural vegetation will quickly reestablish itself within these areas. Supplemental plantings of native trees and shrubs would require regular maintenance (most importantly watering), would likely be impacted by deer and other wildlife browsing, and very likely would quickly be overtopped by the resprouting natural vegetation. As a result mortality of these supplemental plantings would likely be high. 4.2 NEWGATE/PHELPS ROAD AREA EROSION & SEDIMENT CONTROL The long-term quantity of runoff is not expected to increase because pre- and post- runoff coefficients are the same. However control measures are proposed to mitigate the small, short-term increase in runoff and protect against the movement of sediment from disturbed portions of the Project. Due to the linear conditions of the Project Route, the most effective method of erosion and sediment control in the Newgate/Phelps Road area is a combination of rock check dams and silt fence, and quick stabilization of disturbed ground, to re-establish ground cover. Due to the difference between concentrated flow and sheet flow, different erosion control measures are recommended. As shown on the Site Drawings in Appendix A, the majority of the sediment control consists of silt fence on the down slope side of the construction and clearing areas to control and filter sheet flow leaving the site. Because the largest threat of erosive volume and velocity results from the installation of on-site improvements, silt fence or wire-reinforced silt fence should be installed up slope from some of the crane pads. This installation provides two benefits: 1. Protecting the crane pads (required to safely construct the Project) from water gaining enough velocity to cause erosive damage to them and 2. Slowing the water velocity as it moves across the site, providing an additional measure of protection for the residents down slope. Stone check dams will be installed within three areas of concentrated flow identified near Line List 1092 and 1093, and up slope of Line List 1130 and 1144 to control and filter runoff leaving these areas. An area of concentrated flow identified by the owner of Line List 1083 originates from the forested area uphill and to the east of the ROW. In this area several very small, ephemeral streams in moderately-defined channels converge within the ROW to form one, main channel which carries water to Newgate Road in this area. There also appears to have been some grading done within the ROW in the past. A berm was created to intercept water Northeast Utilities 4-2 Burns & McDonnell GSRP 345-kV Line D&M Plan Appendix E: Page 18 of 36

3 Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures flowing down the hill, and direct it to the south. The water flowing south along this berm has created the channelized flow that is now present. A combination of wire reinforced silt fence and stone check dams (not shown on the plans at this time because location of the channels has not been definitively identified with GPS) will likely be used down slope of the disturbed area to control and filter concentrated and sheet flow leaving the site in this location. Another area of concentrated flow was identified up slope of Line List 1151 and In this area there are several well-defined ephemeral stream channels generally flowing from east to west. A man-made feature (origin unknown) does play a part in intercepting some of this flow, but ultimately the confluence of these channels results in one main channel that directs flow to the side of Line List A combination of wire reinforced silt fence and stone check dams (not shown on the plans at this time because location of the channels has not been definitively identified with GPS) will likely be used down slope of the disturbed area to control and filter concentrated and sheet flow leaving the site in this location. The Typical details for both types of control measures are shown in Appendix B Silt Fence During construction, a typical geotextile silt fence (GSF) would be installed on the downhill side of the disturbed areas. The GSF would provide erosion protection along embankment slopes where sheet flow occurs. (Embankments are all areas not defined as concentrated flow path.) It is expected that runoff entering the site is anticipated to be minimal, so erosion and sedimentation control does not appear necessary up slope of the ground disturbing activities associated with the Project. However, silt fence, or in some cases wire-reinforced silt fence is recommended up slope of some of the crane pads to provide an additional layer of protection for these disturbed areas Stone Check Dam In areas where concentrated flows may cause erosion, the use of a typical energy-dissipating stone check dam (SCD) system would be used. A typical, temporary stone check dam would be designed and constructed per section of the 2002 Connecticut Guidelines for Soil Erosion and Sediment Control to safely pass the peak flow expected from a ten-year frequency storm without structural failure and adverse tail water effects. These stone check dams would be particularly effective in protecting water quality at culverts and allowing the culverts to remain operational throughout construction. Northeast Utilities 4-3 Burns & McDonnell GSRP 345-kV Line D&M Plan Appendix E: Page 19 of 36

4 Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures Summary As designed, the control measures would provide sufficient temporary control of sheet flow during a fifty-year storm event and concentrated flow during a ten-year storm event in this area. After a larger storm event the control measures will likely require maintenance. The recommended control measures would only provide temporary control of surface water flow (sheet and concentrated) within this area during construction and until the areas have been stabilized. These measures will not provide ground water control within or outside this area, nor will they permanently reduce the amount of runoff that ultimately leaves the area. As part of the D&M Plan development, the location of additional controls required to protect wetlands and watercourses, prevent sedimentation and erosion issues, and maintain the stability of all improved surfaces (access roads and crane pads) will be determined. The final D&M Plan, which will be submitted to the CSC, would also include all controls identified in this report. 4.3 HATCHETT HILL ROAD AREA EROSION & SEDIMENT CONTROL Long-term the quantity of runoff is not expected to increase because pre- and post- runoff coefficients are the same. However, control measures are proposed to mitigate for the small short-term increase in runoff and protect against the movement of sediment from disturbed portions of the Project. Because there were no point sources (concentrated flow) identified in the Hatchett Hill Road area, the most effective method of erosion and sediment control would be the installation of silt fence in conjunction with quick stabilization of any disturbed ground to reestablish ground cover as quickly as possible. As shown on the Site Drawings in Appendix A, the sediment control consists of silt fence on the down slope side of the construction and clearing areas to control and filter sheet flow leaving the site. Because the largest threat of erosive volume and velocity results from the installation of on-site improvements, silt fence or wire-reinforced silt fence should be installed up slope from some of the crane pads. This installation provides two benefits: 1. Protecting the crane pads (required to safely construct the Project) from water gaining enough velocity to cause erosive damage to them; and 2. Slowing the water velocity as it moves across the site, providing an additional measure of protection for the residents down slope. The typical detail for this type of control measure is shown in Appendix B. Northeast Utilities 4-4 Burns & McDonnell GSRP 345-kV Line D&M Plan Appendix E: Page 20 of 36

5 Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures The resident s concern is that Marsh Pond often exceeds the capacity of its basin and water begins to backup towards his property. This seems unlikely since the pond is approximately 12 feet lower in elevation than the southern edge of his property. Based on GIS analysis and on site observations it is more likely that water moves from north to south, towards Marsh Pond. His property is also clearly lower in elevation than the adjacent scrub/shrub wetland in the ROW to the east, so as water moves from north to south along the ROW and through this wetland it ultimately does reach his property because water naturally flows to the lowest point. The recommended control measures will ensure that the small increase in runoff will be effectively controlled until site stabilization is achieved Silt Fence During construction, a typical geotextile silt fence (GSF) would be installed on the downhill side of the disturbed areas. The GSF would provide erosion protection along embankment slopes where sheet flow occurs. (Embankments are all areas not defined as concentrated flow path.) It is expected that runoff entering the site is anticipated to be minimal, so erosion and sedimentation control does not appear necessary up slope of the ground disturbing activities associated with the Project. However, silt fence, or in some cases wire-reinforced silt fence is recommended up slope of some of the crane pads to provide an additional layer of protection for these disturbed areas Summary As designed, the control measures would provide sufficient temporary control of sheet flow during a fifty-year storm event in this area. After a storm event greater than a fifty-year, the control measures are likely to require maintenance by the contractor. The recommended control measures will provide temporary control of surface water (sheet flow) within this area during construction through stabilization. These measures will not provide control of ground water within or outside this area, nor will they permanently reduce the amount of runoff leaving the area. As part of the development of the D&M Plan, the location of additional controls needed to protect wetlands and watercourses, prevent sedimentation and erosion issues, and maintain the stability of all improved surfaces (access roads and crane pads) will be determined. The final D&M Plan, which will be submitted to the CSC, would also include all controls identified in this report. Northeast Utilities 4-5 Burns & McDonnell GSRP 345-kV Line D&M Plan Appendix E: Page 21 of 36

6 GSRP 345-kV Line D&M Plan Appendix E: Page 22 of 36

7 APPENDIX A S ITE DRAWINGS GSRP 345-kV Line D&M Plan Appendix E: Page 23 of 36

8 GSRP 345-kV Line D&M Plan Appendix E: Page 24 of 36

9 Concord Dr \\Espsrv\data\DATA2\Projects\NUS\SNETR_Projects\45063_Springfield_345kV\Environmental\GIS\ARC\ArcMXD\Network\GreaterSpringfield\Analysis\Sediment_Survey\GSRP_CT_Erosion_Control_200_Scale_FIXED.mxd Date: 07/29/10 COPYRIGHT 2010 BURNS & McDONNELL ENGINEERING COMPANY, INC. W Hatchett Hill Ln 280 Hampden Hartford Litchfield Tolland Legend Hatchett Hill Rd 290 Proposed Structure Existing Structure - Remain Existing Structure - Remove Existing Structure - Reuse Proposed 345kV Route Centerline Vegetation Removal Limit Proposed Pad Location Existing LiDar Access Roads 1001 Line List Number Existing Preferred Route Existing Alternate Route New Preferred Route New Alternate Route NU Owned Property Existing Culvert Proposed Temporary Culvert Proposed Permanent Culvert Replaced Permanent Culvert Watercourse Erosion Control Standard Vernal Pool GSF-3 - Silt Fence Wetlands GSF-3 - Wire Reinforced Silt Fence Wall Town Boundary SCD-2 - Stone Check Dam Contours (2 ft) Metacomet Trail W Feet Source: AECOM, Coler and Colantonio, ESRI and Burns & McDonnell Engineering. Image Source: Optimal Geomatics W Greater Springfield Reliability Project Erosion Control Maps July 29, 2010 Sheet 01 of 07 GSRP 345-kV Line D&M Plan Appendix E: Page 25 of 36

10 Lexington Dr \\Espsrv\data\DATA2\Projects\NUS\SNETR_Projects\45063_Springfield_345kV\Environmental\GIS\ARC\ArcMXD\Network\GreaterSpringfield\Analysis\Sediment_Survey\GSRP_CT_Erosion_Control_200_Scale_FIXED.mxd Date: 07/29/10 COPYRIGHT 2010 BURNS & McDONNELL ENGINEERING COMPANY, INC W Hampden Hartford Litchfield 250 Tolland Legend Proposed Structure Existing Structure - Remain Existing Structure - Remove Existing Structure - Reuse Proposed 345kV Route Centerline Vegetation Removal Limit Proposed Pad Location Existing LiDar Access Roads 1001 Line List Number Concord Dr 1035 Existing Preferred Route Existing Alternate Route New Preferred Route New Alternate Route NU Owned Property Existing Culvert Proposed Temporary Culvert Proposed Permanent Culvert Replaced Permanent Culvert Watercourse Vernal Pool Wetlands Wall Town Boundary Contours (2 ft) Metacomet Trail 280 Adams Dr Erosion Control Standard GSF-3 - Silt Fence GSF-3 - Wire Reinforced Silt Fence SCD-2 - Stone Check Dam W9-227 Culvert 3163 # Holcomb St W Feet Culvert #104 Culvert #103 W W Culvert #1 W Source: AECOM, Coler and Colantonio, ESRI and Burns & McDonnell Engineering. Image Source: Optimal Geomatics W W9-232A 3166 W Greater Springfield Reliability Project Erosion Control Maps July 29, 2010 Sheet 02 of 07 GSRP 345-kV Line D&M Plan Appendix E: Page 26 of 36

11 \\Espsrv\data\DATA2\Projects\NUS\SNETR_Projects\45063_Springfield_345kV\Environmental\GIS\ARC\ArcMXD\Network\GreaterSpringfield\Analysis\Sediment_Survey\GSRP_CT_Erosion_Control_200_Scale_FIXED.mxd Date: 07/29/10 COPYRIGHT 2010 BURNS & McDONNELL ENGINEERING COMPANY, INC Litchfield Hampden Hartford W Tolland Legend W W9-254 Proposed Structure Existing Structure - Remain Existing Structure - Remove Existing Structure - Reuse Proposed 345kV Route Centerline Vegetation Removal Limit Proposed Pad Location Existing LiDar Access Roads 1001 Line List Number Existing Preferred Route Existing Alternate Route New Preferred Route New Alternate Route NU Owned Property Existing Culvert Proposed Temporary Culvert Proposed Permanent Culvert Replaced Permanent Culvert Watercourse Vernal Pool Wetlands Wall Town Boundary Contours (2 ft) Metacomet Trail Erosion Control Standard GSF-3 - Silt Fence GSF-3 - Wire Reinforced Silt Fence SCD-2 - Stone Check Dam Copper Hill Ter Country Club Ln Feet Newgate Rd Woodledge Dr 1076 Source: AECOM, Coler and Colantonio, ESRI and Burns & McDonnell Engineering. Image Source: Optimal Geomatics 2007 Copper Hill Rd Greater Springfield Reliability Project Erosion Control Maps July 29, 2010 Sheet 03 of 07 GSRP 345-kV Line D&M Plan Appendix E: Page 27 of 36

12 W \\Espsrv\data\DATA2\Projects\NUS\SNETR_Projects\45063_Springfield_345kV\Environmental\GIS\ARC\ArcMXD\Network\GreaterSpringfield\Analysis\Sediment_Survey\GSRP_CT_Erosion_Control_200_Scale_FIXED.mxd Date: 07/29/10 COPYRIGHT 2010 BURNS & McDONNELL ENGINEERING COMPANY, INC Litchfield 1085 Hampden Hartford Tolland Legend Proposed Structure Existing Structure - Remain Existing Structure - Remove Existing Structure - Reuse Proposed 345kV Route Centerline Vegetation Removal Limit Proposed Pad Location Existing LiDar Access Roads 1001 Line List Number Existing Preferred Route Existing Alternate Route New Preferred Route New Alternate Route NU Owned Property Existing Culvert Proposed Temporary Culvert Proposed Permanent Culvert Replaced Permanent Culvert Newgate Rd Watercourse Vernal Pool Wetlands Wall Town Boundary Contours (2 ft) Metacomet Trail Erosion Control Standard GSF-3 - Silt Fence GSF-3 - Wire Reinforced Silt Fence SCD-2 - Stone Check Dam Culvert #5 W Feet Source: AECOM, Coler and Colantonio, ESRI and Burns & McDonnell Engineering. Image Source: Optimal Geomatics Wyncairn W Culvert #65 W9-257 W9-257 Greater Springfield Reliability Project Erosion Control Maps July 29, 2010 Sheet 04 of 07 GSRP 345-kV Line D&M Plan Appendix E: Page 28 of 36

13 \\Espsrv\data\DATA2\Projects\NUS\SNETR_Projects\45063_Springfield_345kV\Environmental\GIS\ARC\ArcMXD\Network\GreaterSpringfield\Analysis\Sediment_Survey\GSRP_CT_Erosion_Control_200_Scale_FIXED.mxd Date: 07/29/10 COPYRIGHT 2010 BURNS & McDONNELL ENGINEERING COMPANY, INC. W W Culvert # W Hampden Hartford Litchfield Culvert #66 Tolland Legend Proposed Structure Existing Structure - Remain Existing Structure - Remove Existing Structure - Reuse Proposed 345kV Route Centerline Vegetation Removal Limit Proposed Pad Location Existing LiDar Access Roads 1001 Line List Number Existing Preferred Route Existing Alternate Route New Preferred Route New Alternate Route NU Owned Property Existing Culvert Proposed Temporary Culvert Proposed Permanent Culvert Replaced Permanent Culvert Watercourse Vernal Pool Wetlands Wall Town Boundary Contours (2 ft) Metacomet Trail Erosion Control Standard GSF-3 - Silt Fence GSF-3 - Wire Reinforced Silt Fence SCD-2 - Stone Check Dam Feet Source: AECOM, Coler and Colantonio, ESRI and Burns & McDonnell Engineering. Image Source: Optimal Geomatics W Newgate Rd Greater Springfield Reliability Project Erosion Control Maps July 29, 2010 Sheet 05 of 07 GSRP 345-kV Line D&M Plan Appendix E: Page 29 of 36

14 \\Espsrv\data\DATA2\Projects\NUS\SNETR_Projects\45063_Springfield_345kV\Environmental\GIS\ARC\ArcMXD\Network\GreaterSpringfield\Analysis\Sediment_Survey\GSRP_CT_Erosion_Control_200_Scale_FIXED.mxd Date: 07/29/10 COPYRIGHT 2010 BURNS & McDONNELL ENGINEERING COMPANY, INC Hampden Hartford Litchfield 3208 W W Tolland 380 W9-259 Legend Culvert # Proposed Structure Existing Structure - Remain Existing Structure - Remove Existing Structure - Reuse Proposed 345kV Route Centerline Vegetation Removal Limit Proposed Pad Location Existing LiDar Access Roads 1001 Line List Number 1132 Existing Preferred Route Existing Alternate Route New Preferred Route New Alternate Route NU Owned Property Existing Culvert Proposed Temporary Culvert Proposed Permanent Culvert Replaced Permanent Culvert Watercourse Erosion Control Standard Vernal Pool GSF-3 - Silt Fence Wetlands GSF-3 - Wire Reinforced Silt Fence Wall Town Boundary SCD-2 - Stone Check Dam Contours (2 ft) Metacomet Trail W Feet Source: AECOM, Coler and Colantonio, ESRI and Burns & McDonnell Engineering. Image Source: Optimal Geomatics Newgate Rd Greater Springfield Reliability Project Erosion Control Maps July 29, 2010 Sheet 06 of 07 GSRP 345-kV Line D&M Plan Appendix E: Page 30 of 36

15 1143 \\Espsrv\data\DATA2\Projects\NUS\SNETR_Projects\45063_Springfield_345kV\Environmental\GIS\ARC\ArcMXD\Network\GreaterSpringfield\Analysis\Sediment_Survey\GSRP_CT_Erosion_Control_200_Scale_FIXED.mxd Date: 07/29/10 COPYRIGHT 2010 BURNS & McDONNELL ENGINEERING COMPANY, INC Litchfield Hampden Hartford Culvert # Tolland Legend Proposed Structure Existing Structure - Remain Existing Structure - Remove Existing Structure - Reuse Proposed 345kV Route Centerline Vegetation Removal Limit Proposed Pad Location Existing LiDar Access Roads 1001 Line List Number Existing Preferred Route Existing Alternate Route New Preferred Route New Alternate Route NU Owned Property Existing Culvert Proposed Temporary Culvert Proposed Permanent Culvert Replaced Permanent Culvert 550 Watercourse Vernal Pool Wetlands Wall Town Boundary Contours (2 ft) Metacomet Trail 1148 Erosion Control Standard GSF-3 - Silt Fence GSF-3 - Wire Reinforced Silt Fence SCD-2 - Stone Check Dam Feet Source: AECOM, Coler and Colantonio, ESRI and Burns & McDonnell Engineering. Image Source: Optimal Geomatics METACOMET TRAIL 480 Phelps Rd Greater Springfield Reliability Project Erosion Control Maps July 29, 2010 Sheet 07 of 07 GSRP 345-kV Line D&M Plan Appendix E: Page 31 of 36

16 GSRP 345-kV Line D&M Plan Appendix E: Page 32 of 36

17 APPENDIX B TYPICAL EROSION CONTROL MEASURE DETAILS GSRP 345-kV Line D&M Plan Appendix E: Page 33 of 36

18 GSRP 345-kV Line D&M Plan Appendix E: Page 34 of 36

19 Figure SCD-2 Stone Check Dam Installation in Drainageways Stone Check Dam (SCD) Source: USDA-NRCS Connecticut Guidelines for Soil Erosion and Sediment Control GSRP 345-kV Line D&M Plan Appendix E: Page 35 of 36

20 Figure GSF-3 Toe of Slope Installations with Wings 5' 10' from toe of slope Geotextile Silt Fence (GSF) Detail of Fence Joint (Top View) Section A Section B 6" by 6" backfilled trench Existing subgrade Wing Detail 12" min. Max. fence height 30" Supporting post at least 42" long, 1.5" square hardwood stake or steel post 6" by 6" backfilled trench Wing oriented to intercept flow Posts Position posts to overlap as shown above, making certain that fabric folds around each post one full turn Drive posts tightly together and secure tops of posts by tying off with cord or wire to prevent flow-through of built-up sediment at joint. Direction of flow collecting behind fence Direction of flow from adjacent slope 6" by 6" backfilled trench Connecticut Guidelines for Soil Erosion and Sediment Control GSRP 345-kV Line D&M Plan Appendix E: Page 36 of 36

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL Surface Water Protection During Well Site Construction Kelly Kees, PE WVDEP, Office of Oil and Gas SEDIMENT & EROSION CONTROL PLANS Per West Virginia State Code 22-6-6(d) 22-6A-7(c),

More information

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES 4.1 INFILTRATION BASIN AND TRENCH Figure 4.1. Infiltration basin and trench (Source: Department of Civil, Construction, and Environmental Engineering,

More information

STREAM ALTERATION PRACTICES

STREAM ALTERATION PRACTICES STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow

More information

Section 3 Non-Structural BMPs

Section 3 Non-Structural BMPs 3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide

More information

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16 GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

Information for File # JTF

Information for File # JTF Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil

More information

The Low Risk Site Handbook

The Low Risk Site Handbook The Low Risk Site Handbook for Erosion Prevention and Sediment Control The content of this Handbook is adapted from the New York State Standards and Specifications for Erosion and Sediment Control-August

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer Protect Stormwater Quality Project and Site Management Training for General Contractors Presenter Becky Pearson Professional Civil Engineer Part II Best Management Practices (BMPs) What is a Best Management

More information

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing

More information

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages 4.2-d VEGETATED SLOPE STABILIZATION Alternative Names: Willow Wattles, Live Bundles, Fascines, Live Staking, Joint Planting, Branch Packing, Brush Layering, and Brush Matting DESCRIPTION Vegetated slope

More information

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary 0 25 50 00 Feet Parcel Boundary, Approximate 202 LIDAR 2 FT CONTOURS, VCGI BING AERIAL NRCS SOIL MAPPING MMI FIELD DATA Culvert Pipe Swale 0 Scale: "=40' SOURCE(S): NRCS Soil Area Boundary Overland st

More information

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual. 4.4. Filter Strips Filter Strips are densely vegetated lands that treat sheet flow storm water from adjacent pervious and impervious areas. They function by slowing runoff, trapping sediment and pollutants,

More information

SECTION 6. Routine Maintenance Activity Details

SECTION 6. Routine Maintenance Activity Details SECTION 6 Routine Maintenance Activity Details 80. DEBRIS REMOVAL When Deadfall, and other objects, such as shopping carts, tires, appliances, and mattresses have accumulated in the drain. Why To prevent

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education Wisconsin Contractors Institute Continuing Education Erosion & Sediment Control Course # 12775 2 hours Wisconsin Contractors Institute N27 W23953 Paul Road, Suite 203 Pewaukee, WI 53072 Website: www.wicontractorsinstitute.com

More information

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures MARBLE RIVER WIND POWER PROJECT Siting Considerations 1. Locate access roads and, to the extent allowed by local laws, wetlands and topography, individual wind turbines and other structures along field

More information

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM Reclamation plans for the Wilson Mine Lecroy area were approved by the Arkansas Department of Environmental Quality with a passive barrier

More information

FURNEAUX CREEK 5 CHANNEL

FURNEAUX CREEK 5 CHANNEL FURNEAUX CREEK 5 CHANNEL AND TRAIL IMPROVEMENTS TEXAS CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION PROJECT OF THE YEAR CATEGORY: ENVIRONMENT PROJECT OF $2 MILLION BUT LESS THAN $5 MILLION ENGINEERING DEPARTMENT,

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

POST-FIRE RESTORATION Dos and Don ts

POST-FIRE RESTORATION Dos and Don ts POST-FIRE RESTORATION Dos and Don ts USDA Natural Resources Conservation Service The NRCS/RCD office is located at: 744 LA GUARDIA ST BLDG A SALINAS, CA 93905-3354 (831) 424-1036 (NRCS) (831) 424-1036

More information

PROPOSED DRAINAGE PATTERNS

PROPOSED DRAINAGE PATTERNS 1121 1118.50 Basin Floor 1120 1119 0 N 100 200 PROPOSED DRAINAGE PATTERNS Deroiser Drive Riverwood Drive County 260 0 100 200 Project Name: Riverwood Drive LITTLE FALLS TOWNHOMES Project Location: LITTLE

More information

Structural Storm Water Best Management Practices (BMPs)

Structural Storm Water Best Management Practices (BMPs) Structural Storm Water Best Management Practices (BMPs) Storm Water Permitting: The SWPPP Revealed By Deron Austin, PE January 11, 2006 3:30-5:00 PM Orlando, Florida Presentation Outline Preface About

More information

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General

More information

Adaptive Management of Erosion and Sediment Control Best Management Practices (BMPs) Presenter: Denis Rushton, P. Eng. Date: May 18, 2016

Adaptive Management of Erosion and Sediment Control Best Management Practices (BMPs) Presenter: Denis Rushton, P. Eng. Date: May 18, 2016 Adaptive Management of Erosion and Sediment Control Best Management Practices (BMPs) Presenter: Denis Rushton, P. Eng. Date: May 18, 2016 Adaptive Management (AM) The definition of AM for the purpose of

More information

Stormwater Management Plan Narrative Quality Fleet Services, Inc. SITE RE-DEVELOPMENT 548 New Ludlow Road South Hadley, MA The project proposed by Quality Fleet Services, Inc. consists of the site improvements

More information

Post Construction BMPs

Post Construction BMPs Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases

More information

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

Pollutant Removal Benefits

Pollutant Removal Benefits Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration

More information

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design

More information

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed

More information

4.6. Low Impact and Retentive Grading

4.6. Low Impact and Retentive Grading 4.6. Low Impact and Retentive Grading Low Impact Grading techniques focus on utilizing existing topography during Site layout to minimize cost. Proposing structures, roads, and other impervious surfaces

More information

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

WET PONDS INSPECTION & MAINTENANCE CHECKLIST WET PONDS INSPECTION & MAINTENANCE CHECKLIST INTRODUCTION Once construction is completed, periodic site inspections are essential in order to monitor the effectiveness and to anticipate the maintenance

More information

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Part IV(a): BMPs for Erosion, Sediment, Velocity Control Part IV(a): BMPs for Erosion, Sediment, Velocity Control Find Design Standards and Specifications for Iowa Erosion and Sediment Control Practices at: www.iowasudas.org Erosion Control Keeping the soil

More information

East Coast Erosion Blankets

East Coast Erosion Blankets Protect Your Landscapes with East Coast Erosion Blankets Soil erosion can be a serious problem, resulting in catastrophic damage to water sources, landscaping, and wildlife. Repairing damage caused by

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL 1 EROSION & SEDIMENT CONTROL Effective Soil & Water Protection Whether you want to prevent soil erosion caused by rain, water and wind, or protect waterways from inevitable build

More information

Geosynthetics for Erosion Control and Reinforcement

Geosynthetics for Erosion Control and Reinforcement Geosynthetics for Erosion Control and Reinforcement Stan Boyle, Ph.D., P.E. Shannon & Wilson, Inc. What are Geosynthetics? Geosynthetics are (generally) polymeric products used in civil engineering applications.

More information

Appendix F Construction phase management

Appendix F Construction phase management Appendix F Construction phase management F.1. Introduction... 1 F.2. Core principles of sediment and erosion control... 2 F.3. Planning... 3 F.4. Occupational health and safety... 7 F.5. References / further

More information

STORM TACOMA 02. Potential permitting requirements STANDARD DETAILS FOR RAIN GARDEN CONSTRUCTION. How to use this document

STORM TACOMA 02. Potential permitting requirements STANDARD DETAILS FOR RAIN GARDEN CONSTRUCTION. How to use this document R R G R P 02 STORM TACOMA 02 STANDARD DETAILS FOR RAIN GARDEN CONSTRUCTION Updated October 23, 2013 How to use this document Your rain garden will need to be designed and constructed in accordance with

More information

Plan Review Checklist

Plan Review Checklist Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project

More information

Nevada Contractors Field Guide for Construction Site Best Management Practices (BMPs)

Nevada Contractors Field Guide for Construction Site Best Management Practices (BMPs) June 2008 Nevada Contractors Field Guide for Construction Site Best Management Practices (BMPs) Funding for the development and production of the Nevada BMP Field Guide was provided by the Nevada Division

More information

PLAN SUBMITTER'S CHECKLIST

PLAN SUBMITTER'S CHECKLIST Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write

More information

C-12. Dry Pond. Design Objective

C-12. Dry Pond. Design Objective C-12. Dry Pond Design Objective The primary purpose of dry pond is to attenuate and delay stormwater runoff peaks. Dry ponds hold water immediately after a storm event and drain to be almost complete dry

More information

HYDRAULIC DESIGN involves several basic

HYDRAULIC DESIGN involves several basic Chapter 6 Tools for Hydr draulic and Road Design HYDRAULIC DESIGN involves several basic concepts that must be considered to build successful projects with a minimum risk of failure (Photo 6.1). Use of

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information

a. Site Topography and Relationship to Surrounding Topography

a. Site Topography and Relationship to Surrounding Topography C. Topography and Slopes 1. Existing Conditions a. Site Topography and Relationship to Surrounding Topography The Site is gently rolling, as is the surrounding topography (Figure I.A-8). The Property is

More information

Soil Erosion and Sediment Control

Soil Erosion and Sediment Control PDHonline Course C188 (3 PDH) Soil Erosion and Sediment Control Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86

More information

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) 4.5-s EROSION CONTROL BLANKET SYSTEM Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) DESCRIPTION Erosion control blanket systems are woven or

More information

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1 The ABC s of BMP s Aux Sable Watershed Plan St. Charles, IL Why are BMP s Important Best Management Practices (BMPs) developed as a set of practices which help to achieve goals of the Clean Water Act and

More information

Rule D Wetland and Creek Buffers

Rule D Wetland and Creek Buffers Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions

More information

Chapter 11 Site Rehabilitation and Stabilization

Chapter 11 Site Rehabilitation and Stabilization Chapter 11 Site Rehabilitation and Stabilization Chapter 11 Layout: Part 1 - Page 131 Planning Site Rehab Part 2 - Page 132 Controlling Runoff and Capturing Sediment Part 3 - Page 133 Rehab for Crossings

More information

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management VORS 2018 Stormwater Management Session 2 Stormwater Management, Green Infrastructure,

More information

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting Landfill Closure, Intermediate Cover & Post-Closure Care Municipal League Meeting 9-7-17 Gated and Closed Landfill Gated means no longer accepting waste. Closed means gated and final cover has been installed

More information

Zoning Ordinance Chapter 10

Zoning Ordinance Chapter 10 CHAPTER 10 - WASHES SECTION 10.0 GENERAL: A. The purpose of this Ordinance is to establish standards for development in or near Major and Minor Washes as defined in Appendix A Glossary of Terms and Definitions

More information

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Table 4.7.1: Swales Potential Application and Storm Water Regulation 4.7. Swales A swale is a vegetated open channel, planted with a combination of grasses and other herbaceous plants, shrubs, or trees. A traditional swale reduces peak flow at the discharge point by increasing

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us STORMWATER

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Soil Health Practices in the Landscape

Soil Health Practices in the Landscape Soil Health Practices in the Landscape Salvatore Mangiafico Rutgers Cooperative Extension Environmental and Resource Management Agent In this session... Benefits of healthy soils in the landscape Plant

More information

Stormwater Pollution Prevention Plan Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE

Stormwater Pollution Prevention Plan Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 3 A. Topography/ Drainage... 3 B. Soils... 3 C. Wetlands... 3 D. Floodplain... 3 E. NYSDEC Environmental

More information

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation EnkaTech Note Installation Guide for Enkamat Slopes and Channels Site Preparation For both slope and channel applications, the site must be shaped to the design specifications (grade, geometry, soil compaction,

More information

Chapter Six: Tree Removal and Erosion Control

Chapter Six: Tree Removal and Erosion Control Chapter Six: Tree Removal and Erosion Control Through the combination of canopy and roots, trees help protect and stabilize the land. Their removal requires proper planning and adherence to land-based

More information

6.1 Bioretention Areas

6.1 Bioretention Areas SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.1 Bioretention Areas Figure 6-1. Bioretention Area. Source: City of Brisbane Bioretention areas 1, or rain gardens, are concave landscaped areas

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design 4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design Specification Bioretention O & M Manual Draft Green

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

Zoning Ordinance Article 3

Zoning Ordinance Article 3 Article 3 Natural Resources Protection Section 301 Natural Resources Protection 301.1. Purpose - The following natural resources protection standards are established to protect the public health, safety

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

Tips for Maintaining and Enhancing Stormwater Management Areas

Tips for Maintaining and Enhancing Stormwater Management Areas 4 4 N. Second Street, Denton, Md. 21629 (410) 479-3625 (410) 479-3534 fax www.dentonmaryland.com Tips for Maintaining and Enhancing Stormwater Management Areas Information provided by the Town of Denton

More information

Rain Gardens. A Welcome Addition to Your Landscape

Rain Gardens. A Welcome Addition to Your Landscape Rain Gardens A Welcome Addition to Your Landscape Where Does The Rainwater Go? Naturally, forests provide a way for rainwater to percolate into the soil, filtering pollutants while trees are allowed to

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service POND Construction Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service DdY Did You Know? Alabama is the only state without any safe dams legislation. Alabama has a very

More information

Kickapoo Woods Restoration Plan

Kickapoo Woods Restoration Plan Report Prepared for Friends of the Chicago River Kickapoo Woods Restoration Plan Gully Recommendations 6/30/2014 INTRODUCTION WRD Environmental (WRD) was retained by Friends of the Chicago River to help

More information

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN 01/17/2003 VERSION UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN TABLE OF CONTENTS I. APPLICABILITY... 1 II. SUPERVISION AND INSPECTION...

More information

Plan of Development Mountain Valley Pipeline Project. APPENDIX M Winter Construction Plan

Plan of Development Mountain Valley Pipeline Project. APPENDIX M Winter Construction Plan APPENDIX M October 20, 2017 Appendix M Prepared by: October 20, 2017 TABLE OF CONTENTS 1.0 INTRODUCTION... M-1 2.0 STABILIZATION/WINTERIZATION... M-2 3.0 EROSION AND SEDIMENT CONTROL MEASURES... M-3 4.0

More information

DEALING WITH STORM WATER MANAGEMENT

DEALING WITH STORM WATER MANAGEMENT December 2012 DEALING WITH STORM WATER MANAGEMENT This fact sheet provides information on the guiding principles of storm water management practices, explains the difference between structural and non-structural

More information

Subsurface Infiltration Bed

Subsurface Infiltration Bed Subsurface Infiltration Bed The Subsurface Infiltration Bed BMP consists of a storage bed underlying either a vegetated or hardscaped surface for the purpose of temporary storage and infiltration of stormwater

More information

Illinois Urban Manual

Illinois Urban Manual Illinois Urban Manual Jim Nelson: Association of Illinois Soil and Water Conservation Districts (AISWCD) Funding for this project provided, in part, by the Grand Victoria Foundation of Elgin IL, the Governor

More information

2018 Annual Landfill Inspection Report

2018 Annual Landfill Inspection Report 2018 Annual Landfill Inspection Report Landfill H.W. Pirkey Plant Southwestern Electric Power Company Hallsville, Texas December 17, 2018 Prepared for: Southwestern Electric Power Company H.W. Pirkey Plant

More information

1.6 IMPLEMENTATION GUIDELINES

1.6 IMPLEMENTATION GUIDELINES 1.6 IMPLEMENTATION GUIDELINES Planning Planning is necessary if effective solutions are to be provided for erosion and sediment control on construction sites. Plans can guide development and prevent waste.

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 Using the Updated RI Soil Erosion and Sediment Control Handbook The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 URI Cooperative Extension NEMO URI Cooperative Extension NEMO White Oak,

More information

Information for File # ARC

Information for File # ARC Information for File # 2016-02630-ARC Applicant Corps Contact Will Bomier-Carlton County Transportation Department Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil

More information

Coir Fibers Help Strengthen Environmentally-Friendly Golf Course Stream Restoration Project

Coir Fibers Help Strengthen Environmentally-Friendly Golf Course Stream Restoration Project Coir Fibers Help Strengthen Environmentally-Friendly Golf Course Stream Restoration Project RoLanka International, Inc. 2004 Stabilizing nearly two miles of streambanks and slopes wasn t the only challenge

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS Introduction As required by federal and state law, the Borough of Swarthmore has adopted regulations that affect stormwater runoff and surface

More information

RECOMMENDED BEST MANAGEMENT PRACTICES FOR RESTORATION OF WETLANDS AFTER TEMPORARY IMPACTS

RECOMMENDED BEST MANAGEMENT PRACTICES FOR RESTORATION OF WETLANDS AFTER TEMPORARY IMPACTS RECOMMENDED BEST MANAGEMENT PRACTICES FOR RESTORATION OF WETLANDS AFTER TEMPORARY IMPACTS Prepared in partial fulfillment of a U.S. Environmental Protection Agency State Wetland Program Development Grant

More information

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT FIELD INSPECTION REPORT Date September 19, 2018 Project Northern Natural Gas Company (Northern) Cedar Station Upgrade Project Dakota County, Minnesota Authority: Section 7(c) Personnel FERC Staff: Company

More information