- Howard Darrell Webb
- 5 years ago
- Views:
Transcription
1 Invercauld Estate Braemar Master Plan : A Sustainable Future Consultation Report, 4 September 2018
2 1 Invercauld Estate Braemar Master Plan : A Sustainable Future Consultation Report, 4 September Introduction 2. Purpose of Event 3. Event Format 4. Attendance and Response 5. Key Messages 6. Display Material and Comments Received 7. Site Visit Comments 8. Other Comments 9. Master Planning Responses 10. Next Steps Appendix 1 : List of Detailed Comments Appendix 2 : Event Poster 1. Introduction This Report summarises feedback received during a public consultation event hosted by Invercauld Estate. 2. Purpose of Event The event was designed to provide residents and businesses in Braemar with an opportunity to contribute views to the Estate s preliminary master planning of a proposed development site at the north east of Braemar. The Cairngorms National Park Authority (CNPA) has suggested that some land should be released for development here and will include this proposal in its Proposed LDP, to be issued for public consultation later this year. CNPA suggests a first phase of 20 houses would be appropriate but has requested that this site should be considered within a wider master plan area, as shown below. The Estate organised the event as a means of gathering local views on both the principle of development on this land and the design and layout of this expansion of the village. The Estate Office 4 The Keiloch Braemar Ballater AB35 5TW t angus@invercauld.estate
3 2 3. Event Format The event was held at the Castleton Hall in Braemar. Two public drop-in sessions were arranged, from ,30pm and pm. A site visit followed from pm. Display material was provided, explaining the background to the project. A number of matters were raised for consideration by local people, including the rate at which development should proceed, how it should be laid out and what buildings and streets should look like. No firm proposals were provided at the event, as the Estate wished to understand local opinion and ideas more clearly at the outset of the design process. A model was provided, indicating the existing pattern of streets and buildings. Wooden blocks were available to allow people to suggest how buildings might best be positioned on the site and to understand the capacity of the site for housing and other uses. Comments sheets were made available and attendees were encouraged to use sticky notes to record views on the display boards. Further information on display material and feedback is set out below. An open invitation was issued through social media networks, the Braemar Community Council and event posters. Representatives of the CNPA s Planning Department were invited to attend, as was Highlands Hospitality, which owns the adjacent Invercauld Arms Hotel. The event was staffed by Invercauld Estate s master plan design team: Angus McNicol, Estate Manager, Invercauld Estate Calum Innes, CKD Galbraith Richard Heggie, Urban Animation Liz Roxburgh, Roxburgh McEwan Architects Nick O Neill, Roxburgh McEwan Architects 4. Attendance and Response The drop-in events were attended by people. The site visit was attended by 10 people. Staff from the CNPA Planning Department attended, as did representative from Highlands Hospitality, Braemar Community Ltd and the Princes Foundation. There was a mix of people who had attended previous Estate-led consultation events regarding land in and around the Village and those who were new faces. Most people lived in the village year round but some were regular visitors who return each year. Of these, some are seeking to relocate to Braemar on a full time basis. Many attendees spent significant time viewing the information and discussing it with the Estate design team. There was also much useful discussion between attendees, a good number of whom knew one another. Numerous comments were provided on sticky notes and two comments sheets were returned. Other responses were recorded in writing by the design team, in discussion with attendees. The comments received are summarised below. 5. Key Messages A number of key messages emerged from the event. There were broadly consistent with the findings of previous consultation work undertaken by the Estate, the Community Council through it s Community Action Plan and the CNPA through its LDP process: Braemar s role as an important tourist destination is widely recognised The role of the village as a living, working community is also extremely important New development should be of high quality respecting Braemar s historic character There is a pressing local need for all types of homes, including affordable housing New development must protect the quality of the arrival experience from the east The setting of the Invercauld Arms must be fully considered Any impacts on local services (eg school, health provision) must be fully considered
4 3 6. Display Material and Comments Received Board 1 : Introduction - This board explained the purpose of the event and included a welcome message from Invercauld Estate. No comment notes were attached by attendees. Board 2 : CNPA local Development Plan Review - This board explained CNPA s views on the site and how the master plan work fits into the LDP review process. Attendees had variable understanding of the CNPA s LDP process and how the master plan work fits in to this. There were a small number of comments suggesting no development should take place here. However, there was a wider recognition that Braemar has a significant housing need and there are few viable options for new housing land elsewhere in and around the village. The board was helpful in orientating people and many people noted the need to protect the setting of the Invercauld Arms and ensure that the arrival experience at the village is as attractive as possible. The CNPA will undertake its own public consultation on its Proposed LDP towards the end of 2018.
5 4 Board 3 : What Does Braemar Need? - This board highlighted needs which have been identified for Braemar through the Community Council s Housing Needs and Demand Assessment, the Braemar Community Action Plan and a tourism study commissioned by Invercauld Estate. Many people were aware of the Community Action Plan. Fewer were familiar with the Housing Needs and Demand Assessment. A general need for new housing opportunities of all types was widely recognised. Many people wanted to ensure that housing which is affordable in the broader sense to young people, workers and families should primarily be made available to local people first, where that is possible. Several local businesses and service providers noted difficulties in recruiting staff due to a lack of suitable housing in the village. A number of people questioned whether or not the allocated EP2 and EP3 housing sites in the village can be developed, with recent flooding of the site being noted. CNPA have noted that these sites have secured planning permission but deliverability of housing is being monitored. There were a few comments suggesting no new housing should be built in the village and a preference from a small number of people to locate any new housing elsewhere, tempered by an awareness that there are few viable options for other sites. There was some discussion of non-housing uses which might be provided. Some people suggested a new village hall should be built, meeting modern needs. Ongoing or new uses for the two existing village halls would need to be considered but some people felt these are no longer fit for purpose. A need for new business space was noted by some people and the opportunity to mix uses in the development was raised a number of times. Some people noted a preference for any new development to be more than simply a housing estate. The Invercauld Estate tourism study identified a number of needs and opportunities for Braemar. There was some discussion of options such as visitor accommodation or new facilities such as heritage, retail or visitor services, including a mountain activities centre. There were some suggestions of an art gallery space.
6 5 Board 4 : Analysis - This board highlighted important features surrounding the site, such as buildings, paths, woodland areas and views. It also noted physical features of the site such as the sloping ground, the drainage ditch and fence lines. This board was helpful in providing context for the site in terms of its relationship with the village, the Invercauld Arms, Braemar Castle and the arrival route into the village from the east. Opportunities to enhance path connections towards the Castle were widely discussed. A number of people suggested the area between the Castle and the Invercauld Arms appears unplanned and could provide a more attractive arrival experience for the village. The landscape setting was also raised as an important matter, highlighting some concerns over development on the higher parts of the master plan area. The need to ensure that any new edge to the developed part of the village is sensitively designed also featured in conversations. The need to protect the setting of the Invercauld Arms was noted by numerous people. This prominent Category C Listed building is recognised as an important village landmark, located at the entrance to Braemar and its Conservation Area. There was discussion of options to create green space along the A93 route, improving the path connections and amenity of the route towards the Castle. Several people noted that a green space here might also protect the setting of the Invercauld Arms. Representatives from Highlands Hospitality who attended the event repeated concerns raised through the LDP consultation process. These relate to the setting of the Invercauld Arms and the northern arrival to the village. Their preference has been for no development beyond the hotel. In particular, they have stated that poorly designed housing would not be appropriate.
7 6 Board 5 : Village Character - This board showed streets, spaces and buildings in Braemar s Conservation Area, characterising its historic qualities, including a rich variety of buildings, materials and colours. Many people noted the quality of Braemar s historic Conservation Area and there was a good understanding of many of its key characteristics. This board was presented as a reference point for the design of new development and many people suggested that using the historic character as a starting point is the best way forward. There was much discussion of the village character, including some key features such as : Open views from within the village to the surrounding landscape Large specimen trees in the Conservation Area and beyond A mix of streets arranged formally and informally, often with level changes A network of green spaces, running south from the Invercauld Arms A mix of building sizes and groups, with numerous small timber buildings A mix of materials with stone, timber and rendered walls, slate and metal roofing A range of colours and building details A variety of boundary enclosures with walls, hedges and fencing
8 7 Boards 6 and 7 : Density Study - These boards indicated how much of the CNPA s proposed phase 1 site might be required for 20 houses, showing that there is scope for further development. Examples of streets within Braemar were used for comparison. In conjunction with the model, many people noted that these boards were helpful in illustrating the scale of potential development and how it might be integrated into the existing village. There was broad discussion over how much development might be needed over the next 5-10 years and how much land is needed to accommodate this. Further master planning work will help to clarify this point. The importance of enabling the village to grow organically was noted by numerous people, with appropriate design again being noted as crucial. There mixed views on the type of streets illustrated. Some people suggested the grid layout found in parts of Castleton would make good use of land. Others preferred the lower density informal character found in the village centre. A number of people suggested the street layout should not follow the suburban character found at the recent Springfield housing development at Canmore Road. Others, including some residents of this street, said they liked the development. Many people stated again that the design of the development must ensure that it respects the historic character of Braemar and achieves good quality.
9 8 Board 8 : Building Examples - This sheet provided examples of old and newer buildings from Braemar and north eastern Scotland. Attendees were invited to place sticky dots on their favourite buildings as an indication of the design approach they would like to see in a new development. This board generated significant discussion and some interesting results. The images included existing buildings from the Conservation Area and these were preferred by some people. There were also a number of images showing wholly contemporary buildings. Some of these buildings were appreciated by some people but others were considered inappropriate for Braemar. Those buildings which received most votes were in traditional form (full gables, double pitched roofs, single or one and a half storey), typically with some contemporary features or materials. Four buildings emerged as clear favourites, gaining votes each. These are shown below. No other building gained more than 6 votes. Whilst the result of the voting on these boards is not scientific, it provides an indication that building design and materials should respect the historic Conservation Area. However, there is clearly an appetite for elements of contemporary design and materials, subject to good quality solutions. These was broad recognition that constructing all new buildings with granite is unlikely to be possible but a desire to see some stone used in new development, whether as a main finish on some of the properties as detailing or for boundary walls. 17 votes 14 votes 12 votes 12 votes
10 9 7. Site Visit Comments A number of people commented that the master plan should not propose development on the higher ground east of the village shown on the CNPA site. An opportunity to make good use of views out to the surrounding landscape was noted. Views back into the site from the surrounding landscape would also be important. Path connections could be extended to enable wider enjoyment of the landscape surrounding Braemar by its residents and visitors. The need to protect the setting of the Invercauld Arms was again mentioned, with the view from the dining room noted as of importance by one attendee. The precise location of the raising of the Standard in 1715 was discussed but it was apparent that of the numerous locations which are suggested, none appears to be on the master plan site. 8. Other Comments A number of useful discussions and comments were offered during the site visit. A range of detailed comments were received and these are listed as an Appendix to this report. Other specific issues raised by a number of people include: A general preference to restrict second home ownership A desire to see housing provided for all age groups A need to design streets and buildings for the harsh climate A need to ensure that drainage and services capacity exists for the development A recognition that the site is free from known flood risk Desire to see better car and coach parking arrangements for the village
11 10 9. Review of Findings The responses to the consultation span a range of views. Some people strongly support the proposal to expand the village to the north. Others feel equally strongly that there should be no development here. It is unlikely that a proposal of this type would ever gain universal support. However, the consultation and engagement process is designed to record a full range of views and to set out how the master plan might address concerns as fully as possible. On balance there appears to be conditional support for development - it must be of a high quality and respect the character of the village and the surrounding landscape. Many people acknowledge the local housing need. They generally recognise that Braemar has few viable options for a supply of land to meet current and future needs for housing and other uses. Concerns expressed relate mainly to the need to avoid poor quality development and to protect the arrival experience at the east of the village. There is a clear desire to see new development meet local requirements, supporting the visitor economy but primarily meeting the every day needs of residents and businesses. Further consideration will be given to the extent of development which may be required within the next 5-10 years: the period covered by the CNPA s emerging LDP. This will address the CNPA s initial suggestion of 20 houses as a first phase. This work will take into account views expressed in the consultation suggesting development should not take place on the higher ground at the east of the master plan area at this time. Invercauld Estate is in discussion with Highlands Hospitality regarding the emerging master plan. Highlands Hospitality will be considering its plans for the Invercauld Arms and adjacent land and buildings over the coming months. As well as seeking to ensure their concerns are considered, Invercauld Estate will promote an integrated approach to the design and master planning of development at the north of Braemar. The extent of support and objection to the allocation of land at the master plan site will be tested in due course through the CNPA s public consultation on its Proposed LDP. This is expected to begin late in Key considerations for the next stage of master planning work will include: An essential requirement for a high standard of design and layout The historic character of village must be respected Ensure the development is a proper part of the village The quality of the arrival at the eastern approach to Braemar is important The setting of the Invercauld Arms must be taken into account Better connections should be made to the Castle and surrounding landscape Ensure local services and facilities have sufficient capacity for the development 10. Next Steps Invercauld Estate will now move forward with preliminary master planning proposals for the site. The findings set out above will be reflected as fully as possible. Emerging proposals will be discussed with CNPA and other stakeholders before the Proposed LDP is issued. As part of the master planning process, further technical studies will be undertaken to test matters such as drainage capacity and servicing for the development. A detailed assessment of site capacity and potential site uses will also be carried out. Building and street design will be considered and options for external materials investigated. An initial assessment of development viability will also be undertaken - it is important that any proposals are realistic. The Estate will arrange further community consultation when the preliminary master plan is available. This will enable local people and business to continue helping to shape the layout and design of new development and ensure the proposals are addressing local needs and aspirations. Meantime, Invercauld Estate will welcome any further comments from interested parties and will consider these fully in its master planning design work. Comments can be submitted to : Angus McNicol, Estate Manager, Invercauld Estate, 4 The Keiloch, Braemar, AB35 5TW t angus@invercauld.estate
12 11 Appendix 1 : List of Detailed Comments Community profile Attain a good balance across age profile Design facilities to attract & retain people of all ages Community Concerns Knock-on effects of increased houses on existing village facilities; - Shops - One Dentist - Public Transport - Parking Difficulties recruiting staff due to lack of suitable housing Will Gordon Land houses ever be built? Community Health - one GP currently working to capacity and due for retiral - will service be continued or will residents have to travel to Ballater? Facilities New Village Hall or Community Facility Consider whether new uses could be found for the existing Village Hall and Castleton Hall with a new purpose built community facility on the new site replacing both Possible alternative uses for Castleton Hall - Art/Community gallery, performance venue, boutique hotel, residential accommodation Bigger capacity grocery shopping Mini-supermarkets Incorporate Space for Business Units Housing choice Can people have a stake in design of homes? Look at models for buying off plan e.g. Springfield development in Canmore Road Scope for personalisation and choice? This option extended to Housing Association houses as well? Housing Models Affordable Housing Association Equity Stake Private for Sale - concerns over sale on for 2nd homes/holiday lets Shared Lifestyles - Communal living with studio space Seasonal workers accommodation Retirement Homes Summer Lets What percentage of Affordable Housing is more or less appropriate? 1.5 storey pitched roof with dormers Some single storey (less obtrusive with views into/across site) Traditional cottages Provide plenty of storage to new dwellings storey traditional 2 up - 2 down has little storage and reduced space available at 1st floor due to Coombe ceiling Open plan living with family room Energy & environment Consider alternative means of heating / Braemar does not have a Gas line - Solar Hot water - Ground source heat pumps - District Heating - Air source heat pumps (as used at Canmore Road - be aware of spec/performance in relation to freezing air temperatures) Electricity - Photovoltaic panels Building envelope: - Buildings should be designed for the harsh Braemar climate - Insulated buildings beyond Scottish Building Regulations minimum requirements? - Modern Construction Methods
13 12 Energy and Environment (Continued) Car ports or garages - protect vehicles from snow and rain Concern over possible pressure on public utilities and services, in particular sewage capacity, transport, healthcare, shopping provision Design Ideas & reactions to site Soft edges - earth berm parallel to A93 to lessen views of new development Earth berm could also run perpendicular to A93 to lessen impact of development Use the Chapelton of Elsick development by Aberdeen as inspiration Site is favourable as it does not lie in flood plain Site is a good choice - can t think of a better one Other Stakeholders Braemar Gathering coach & car parking facilities - be aware of possible new walking routes/connections back into centre Rural tourism - grant assistance available? Sticky Notes General: Scope to incorporate contemporary design as well as traditional architecture - don t try to copy the older buildings as this won t work Modern Construction Insulation Levels Economically viable development Car ports and garages Preserve a good age profile What % of affordable housing Deliver complex Eco System Summer Lets are part of culture of village No housing in front of Invercauld Arms Hotel Board 2 If properly landscaped may be ok. Preference would be Glenshee Road but idea OK (Comment in relation to choice of site as per CNPA 1st phase allocation AB022) Board 3 Main need is local housing for local people Provide service area for camper vans - waste, laundry etc Also Hutting? Maybe Shepherds Hut. Maybe like Glenshee Does this village need this development on entrance Do not over build!! We need affordable houses. The people we need here now are workers not retirees Development must not spoil village entrance - should be further back than shown Board 4 Not Springfield Infrastructure - What are ripple effects for facilities, services, transport etc Lowrise Impact on look and feel of village Deer fences make the path to the castle unattractive Need Deer fences Soft Edges landscaped - NSA to consider. This will be first impression of Braemar Concealed (development). Soft Edge with building set back. Landscaped scheme. Housing with recreation Board 5 Retirement Homes needed - income to village but no workforce Affordable Housing for local people No more holiday homes Local business property Mix to traditional styles for the properties Ban on Holiday Homes/Lets/Air B+B Roads incapable of coping with current traffic - parking totally inadequate Aspiration for local homes for local people is laudable but is it achievable? (buy to let, 2nd homes etc) No such thing as affordable housing Jobs scope in Braemar is very limited to be able to sustain mortgage, therefore any housing would be more liable to attract second home owners Need for business space to be incorporated Infrastructure in Braemar is non-existent to cope with expansion - 1 Doctor, 1 Dentist, very limited public transport etc
14 13 Comments given verbally: There should be housing, it s desperately needed, and business use We re concerned about what it looks like A Boris Bikes type scheme Landscaping very important Is the site in the plan yet? How long till it s adopted? The drainage ditch is essential - leads from the top of the village to the river My mother needs a small house and there are none available in the village Prince s foundation are designing a new visitor centre for the castle Houses could be dotted on the hillside spread out with a mix of sizes The ditch should be thought about Like the idea some steading type development. Retired and would like an affordable house but with 3 bedrooms for grandchildren It's cold in Braemar - there s no mains gas, fuel is expensive, so use solar panels Good site as not in the flood plain Small scale, traditional but with large windows to rear for light and views Castle representative would like a pathway to the castle Could be a disaster Supportive of green corridor Worried about a developer buying the site and just sitting on it for years I d like a crescent shape so that everyone has a view Should be single storey Don t ruin the whole entrance into Braemar. Nowhere else to put houses There is a need for business units to diversify the village. Support for community-owned affordable housing with local letting policy It needs variety in terms of development, not just crammed in boxes; think about character, quality,space, environmental considerations, and affordable is a real requirement.
15 Appendix 2 : Event Poster 14
16
Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE
LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback
More informationWELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.
WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on
More information1. Local Plan Context
1. Local Plan Context WHY ARE YOU HERE? ABOUT US PLANNING APPLICATION CONSULTATION Stewart Milne Homes are in the process of preparing a detailed planning application for a development of approximately
More informationStratford Neighbourhood Plan Questionnaire
Stratford Neighbourhood Plan Questionnaire Please tick the appropriate box or answer in the space provided. If you require further copies of the questionnaire, as more than one person in the household
More informationPerth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager
Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West
More informationNew Homes at Winton East
View toward Winton East from Caerketton Hill Aerial photograph of South Edinburgh: Winton East Site Location Indicative proposal Welcome Thank you for coming to the Winton East public exhibition. We would
More informationSTATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY
STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff
More informationLand at Rampton Road. Cottenham
Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire
More informationThe Gwennap Parish Vision Statement
QUICK GUIDE What is a Neighbourhood Development Plan? Ultimately it is a document used by developers or anyone wishing to submit a planning application that describes the vision, strategy, plans, regeneration,
More information3(iv)(b) TCP/11/16(29)
3(iv)(b) TCP/11/16(29) TCP/11/16(29) Planning Application 09/02229/AML Erection of a dwellinghouse, garage with upper floor accommodation and stables (Approval of Matters Specified by Conditions) at land
More informationCAIRNGORMS NATIONAL PARK AUTHORITY
CAIRNGORMS NATIONAL PARK AUTHORITY OUTCOME OF CALL-IN Call-in period: 4 April 2016 2016/0079/DET to 2016/0091/DET 1. The CNPA has delegated responsibility to the CNPA Head Planner, to make Call-in decisions.
More informationWelcome to our exhibition
Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes
More informationStory Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.
Story Homes An Introduction to Story Homes Founded by Fred Story in 1987, Story Homes has a long and successful reputation of building high quality and high specification homes. The family owned business
More informationReporter: Section 3 Place, Drymen, pp reference: Body or person(s) submitting a representation raising the issue (including reference number):
Issue 10 Drymen Development plan Reporter: Section 3 Place, Drymen, pp.66-69 reference: Body or person(s) submitting a representation raising the issue (including reference number): Nadja Ray (85) Stuart
More informationWelcome to our public exhibition
About our scheme Welcome to our public exhibition Taylor Wimpey East Anglia intends to submit a detailed planning application for a new residential development of 39 high-quality homes at the B&M Concrete
More informationWelcome to our public exhibition
About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with
More informationWelcome to our public exhibition
About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the
More informationWelcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE
Land adjacent Sandy Lane WALTHAM CHASE Existing Linden Homes developments Welcome Welcome to Linden Homes Southern s ( Linden ) public exhibition about its proposals for a range of high-quality homes for
More informationWHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014
WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to
More informationCAIRNGORMS NATIONAL PARK AUTHORITY
Title: REPORT ON CALLED-IN PLANNING APPLICATION Prepared by: KATHERINE DONNACHIE (SENIOR PLANNING OFFICER, DEVELOPMENT MANAGEMENT) DEVELOPMENT PROPOSED: FULL PLANNING PERMISSION FOR REPLACEMENT BRIDGE
More informationSOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services)/ Corporate Manager (Planning and New Communities)
SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 6 July 2011 AUTHOR/S: Executive Director (Operational Services)/ Corporate Manager (Planning and New Communities) S/0226/11 - TOFT Erection
More informationCopyright Nigel Deeley and licensed for reuse under this Creative Commons Licence
1 Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence Prepared by the Neighbourhood Plan Steering Group on behalf of Garway Parish Council with assistance from 2 Table of
More informationWELCOME. Welcome to our second public exhibition on proposals for the redevelopment of the Paddington Central Management Office.
WELCOME Management Office Paddington Central Welcome to our second public exhibition on proposals for the redevelopment of the Paddington Central Management Office. Following feedback from meetings with
More informationLongbridge Town Centre Phase 2 Planning Application
Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham
More informationLinden Homes Proposals for land off Ringwood Road, Verwood
Welcome Welcome to Linden Homes first public exhibition displaying proposals for new homes on land off Ringwood Road in Verwood. Award-winning house builder Linden Homes, part of the Galliford Try Group,
More informationDevelopment of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site
Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality
More informationDraft Masterplan Consultation Report Summer 2015 Spring (Updated following community review)
Draft Masterplan Consultation Report Summer 2015 Spring 2016 (Updated following community review) CONTENTS FOREWORD FROM BRITISH LAND 04 CHAPTER 1 EXECUTIVE SUMMARY 07 CHAPTER 2 CONTEXT 15 CHAPTER 3 CONSULTATION
More informationDerry City and Strabane District Council Planning Committee Report
Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development
More informationDEVELOPMENT MANAGEMENT REPORT
ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing
More informationPublic Consultation. Land at Monks Farm, North Grove. Welcome
Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open
More informationLand at Fiddington Hill Nursery, Market Lavington
Land at Fiddington Hill Nursery, Market Lavington Briefing Report for Market Lavington Parish Council Persimmon Homes (Wessex) April 2016 Background This brief report has been prepared following the Market
More informationDerry City and Strabane District Council Planning Committee Report
Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 20.12.2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: A/2014/0495/F Full Construction of
More informationWELCOME. Welcome and thank you for visiting today.
WELCOME Welcome and thank you for visiting today. Bellway Homes Ltd (Yorkshire) are preparing a reserved matters planning application for a residential development of 293 homes at land North of Yew Tree
More informationWELCOME TO THE NEW WILTON PARK
WELCOME TO THE NEW WILTON PARK VISION HISTORY OF WILTON PARK TOWARDS A PLANNING APPLICATION Our objective is to create a truly outstanding environment at Wilton Park. At the heart of our proposals is a
More informationOKEFORD FITZPAINE NEIGHBOURHOOD PLAN
OKEFORD FITZPAINE NEIGHBOURHOOD PLAN Dear Parishioner, The Neighbourhood Plan Project Team have prepared this leaflet to summarise the full Neighbourhood Plan document. It provides a summary of the Vision,
More informationA VISION FOR BLAIRGOWRIE
Welcome to the Westpark Partnership and Lidl UK GmbH Community Presentation. The purpose of this presentation is for you to view and comment upon the revised and updated proposals for the allocated development
More informationThe second application granted full planning permission for the development of a new sports centre facility.
Meadowbank Masterplanning Consultation Autumn 2018 Frequently Asked Questions & Answers Background On 29 June 2018, the City of Edinburgh Council Planning Committee approved two planning applications.
More informationStantonbury Neighbourhood Plan
Stantonbury Neighbourhood Plan 2018-2031 Basic Conditions Statement October 2018 Intentionally blank 1.0 Basic Conditions Statement Introduction 1.1 This statement has been prepared by Stantonbury Parish
More informationNorthfield and Willowbrae Community Council
Northfield and Willowbrae Community Council Head of Planning and Building Standards, Services for Communities, Waverley Court, 4 East Market Street, Edinburgh, EH8 8BG 30 Piershill Terrace, Edinburgh,
More information30. Riverstown Mini-Plan
County Development Plan 2017-2023 Consolidated Draft + Adopted Amendments August 2017 Volume 2, Chapter 30 Riverstown Mini-Plan 30. Riverstown Mini-Plan Village profile Riverstown is located approximately
More informationLinden Homes Proposals for the Ridgewood Centre, Old Bisley Road, Frimley
Linden Homes Welcome Welcome to our public exhibition. Today we are displaying draft proposals for a high quality residential redevelopment of land off Old Bisley Road, currently known as the Ridgewood
More informationSustainable South Warrington s Thoughts on the Preferred Development Option put forward by Warrington Borough Council
s Thoughts on the Preferred Development Option put forward by Warrington Borough Council Context for these thoughts was originally formed by a group of local residents and local councillors to object to
More informationCALA HO ME S WELCOME
WELCOME Welcome to this public consultation event for our proposed residential development of 56 high quality homes on land to the north east of Station Road in Earls Colne. Thank you for taking the time
More informationWelcome. Proposals for land at Smug Oak Lane BRICKET WOOD
Proposals for land at Smug Oak Lane BRICKET WOOD Previous Linden Homes and Wates Developments scheme Welcome Welcome to Linden Homes and Wates Developments public exhibition. Working together as joint
More informationUrban Growth Boundaries
Urban Growth Boundaries Discussion Document July 2008 Contents page Introduction... 3 What are urban growth boundaries?... 3 The need to manage growth... 3 Purpose of urban growth boundaries... 4 How will
More informationPublic Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...
Board 1 A message from Satnam... Thank you for attending today s public consultation about proposals to develop a new residential neighbourhood at. The display boards show why the development is needed
More informationPROPOSED CARE HOME & ASSISTED LIVING DEVELOPMENT (C2), PYRTON LANE, WATLINGTON
Welcome - Meet the Team ABOUT BEECHCROFT Beechcroft has over 30 years experience of assisted living and retirement development and is one of the few house builders that specialise in this type of accommodation.
More informationWallingford Neighbourhood Plan
Wallingford Neighbourhood Plan Introduction What is neighbourhood planning? Neighbourhood planning was introduced by the Localism Act 2011 to give local people more influence over how development comes
More informationCAIRNGORMS NATIONAL PARK AUTHORITY
Title: REPORT ON CALLED-IN PLANNING APPLICATION Prepared by: ANDREW TAIT, PLANNING OFFICER (DEVELOPMENT MANAGEMENT) DEVELOPMENT PROPOSED: ERECTION OF A CAMERA OBSCURA WITHIN MOUNTAIN GARDEN AREA, CAIRNGORM
More informationReplacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary
Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller
More informationHousing development on the edge of Forres
Project Reference Dallas Dhu Details Housing development on the edge of Forres Location Forres, Moray Use Type Housing / Masterplan Client/Developer Sir Alastair Gordon-Cumming, Altyre Estate Lead Designers
More informationWorkshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership
Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic
More informationSummary of Public Consultation
Calder Valley Community Land Trust Summary of Public Consultation held at Hebden Bridge Town Hall, Saturday 27 th Feb 2016 Summary Following presentations from CLT trustees and Bauman Lyons architects
More informationPlanning Permission. Change of use on upper floor from bunkhouse to 2 no. flats 99
Planning Permission Change of use on upper floor from bunkhouse to 2 no. flats 99 Upper floor accommodation 100 Existing bunkhouse layout 101 Proposed upper floor layout (2 no. flats) Key points : The
More information1 The development hereby permitted shall be carried out in accordance with the following approved plans:
Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part
More informationENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF APPLICATION FOR AMENDMENT OF AN ENVIRONMENTAL AUTHORISATION FOR THE HAASENDAL DEVELOPMENT ON PORTIONS 1, 11, 26, 30, 34, 58, AND 87 OF FARM HAASENDAL NO. 222,
More informationCITY OF EDMONTON FIRST PLACE PROGRAM
CITY OF EDMONTON FIRST PLACE PROGRAM Kirkness (3015 151 Ave NW) Consultation Meeting #2 June 23, 2015 Clareview Community Rec Centre (Rm MP #2) 3804 139 Ave NW AGENDA 1. Opening comments. 2. Firm Up Site
More informationWelcome! Joyce Avenue & Snell s Park Estate Regeneration. Please make sure that you fill out our feedback form after you have seen the exhibition!
Welcome! As part of its Housing Development and Estate Renewal Improvement Programme, the Council is currently consulting with you on the long term future of your estates at Joyce Avenue and Snell s Park.
More informationWelcome. Welcome to our public exhibition to explain the future of Griffin Park.
Welcome Aerial view of griffin park Welcome to our public exhibition to explain the future of Griffin Park. As you may know, Brentford Football Club will be relocating to a new, purpose-built site at Lionel
More informationPUBLIC NOTICE UNDER CLAUSE 5 OF SCHEDULE 1 OF THE RESOURCE MANAGEMENT ACT 1991 PLAN CHANGE 12 TO THE OPERATIVE CITY OF NAPIER DISTRICT PLAN
PUBLIC NOTICE UNDER CLAUSE 5 OF SCHEDULE 1 OF THE RESOURCE MANAGEMENT ACT 1991 PLAN CHANGE 12 TO THE OPERATIVE CITY OF NAPIER DISTRICT PLAN Public notice is given in accordance with Clause 5 of Schedule
More informationWELCOME. This consultation at this early stage is an opportunity to share your comments and suggestions with us.
WELCOME Welcome to our public consultation event. We are looking forward to receiving your views and suggestions for the proposed leisure centre in Spelthorne. This consultation at this early stage is
More informationDESIGN & ACCESS STATEMENT
. DESIGN & ACCESS STATEMENT Site Adjacent to The Manor House, Upper Street,, Kingsdown, Deal, Kent. DESIGNS ARCHITECTURE + PLANNING CONTENTS Design and Access Statement Introduction Site and Location Planning
More informationNeighbourhood Planning Local Green Spaces
Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...
More informationCLEVE PARK, THORNBURY
CLEVE PARK, THORNBURY Community Planning Day Report Back Broadsheet February 206 A VISION FOR CLEVE PARK Over 0 local people attended the Cleve Park Community Planning Day at Armstrong Hall on Saturday
More informationPROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM
PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM PUBLIC CONSULTATION YOUR VIEW MATTERS TO US LOCATION PLAN Thank you for taking the time to read this information leaflet regarding a proposed residential
More informationINTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB
INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive
More informationThank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today.
WELCOME Aerial image of the application site in context Thank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today. Plymouth City
More informationNew Bolton Woods Cricket Club
New Bolton Woods Cricket Club 1 1. New Bolton Woods Partnership Area What IS THIS ALL ABOUT? New Bolton Woods Ltd is a development partnership between regeneration company Urbo and Bradford Council. It
More informationMATURE SUBURBS RESIDENTIAL DEVELOPMENT GUIDELINES
MATURE SUBURBS RESIDENTIAL DEVELOPMENT GUIDELINES DRAFT FEBRUARY 2005 BIRMINGHAM CITY COUNCIL 1 Introduction Mature Suburbs Residential Development Guidelines - Interim Supplementary Planning Advice -
More informationFull Planning Permission. Replacement Windows
Full Planning Permission Replacement Windows 51 KEY POINTS : The existing windows would be replaced with similar green and white timber windows; Category B Listed Building. Please refer to CNPA planning
More informationThe Cambie Corridor 2015 Fall workshop series. What we heard WORKSHOP OUTLINE
The Cambie Corridor 2015 Fall workshop series W 16 AVE Area 5 CAMBIE CORRIDOR Phase 3 What we heard ovember 21, 2015, 9am-noon, 1:30-4:30pm Peretz Centre 89 Participants* WORKSHOP OUTLIE Introductions
More informationDenton. A. Downtown Task Force
2 Public Involvement Early and ongoing public involvement was solicited so that the public had ample opportunity to help direct the DTIP s concepts and implementation strategies. The residents of Denton
More informationSite Assessment Technical Document Appendix A: Glossary
Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB
More information1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham
1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to
More informationSection Three, Appendix 16C Medium Density Housing, Design Assessment Criteria (Residential 8A zone)
APPENDIX 16C MEDIUM DENSITY HOUSING, DESIGN ASSESSMENT CRITERIA (RESIDENTIAL 8A ZONE) PURPOSE OF APPENDIX 16C (RESIDENTIAL 8A ZONE) In the Residential 8A Zone the following are defined as restricted discretionary
More informationChange Paper / Date CAIRNGORMS NATIONAL PARK AUTHORITY
Change Paper / Date CAIRNGORMS NATIONAL PARK AUTHORITY Title: Prepared by: REPORT ON CALLED-IN PLANNING APPLICATION FIONA MURPHY (PLANNING OFFICER DEVELOPMENT MANAGEMENT) DEVELOPMENT PROPOSED: REFERENCE:
More informationWELCOME. Welcome to this public exhibition about the future of the Aylesham Shopping Centre.
WELCOME Welcome to this public exhibition about the future of the Aylesham Shopping Centre. This exhibition has been organised by Tiger Developments Ltd and members of the project team are available today
More informationBRIDGE OF DON MASTERPLAN & PLANNING SUMMARY
BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.
More informationCroftamie has a limited range of services and facilities and has close links with neighbouring Drymen.
CROFTAMIE Croftamie has a limited range of services and facilities and has close links with neighbouring Drymen. Sense of Place Croftamie is a small rural village characterised by a linear low density
More informationPlanning and Public Consultation Process for the Preparation of a General Land Use Plan for South Port Kells TERMS OF REFERENCE
APPENDIX "B" Planning and Public Consultation Process for the Preparation of a General Land Use Plan for South Port Kells TERMS OF REFERENCE PURPOSE South Port Kells is located in the northeastern quadrant
More informationLEWISHAM RETAIL PARK WELCOME
WELCOME Welcome to the public exhibition on the initial proposals for the redevelopment of Lewisham Retail Park in Lewisham Town Centre. Legal & General own Lewisham Retail Park and are in discussions
More informationEFDC Draft Local Plan Consultation Theydon Bois Guidance Notes Extended Version
EFDC Draft Local Plan Consultation Theydon Bois Guidance Notes Extended Version There are nine questions you can respond to in the consultation if you wish. Epping Forest District Council (EFDC) has a
More informationCALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.
WELCOME Welcome to this public consultation event for our proposed development on land to the south of Twelve Leys in Wingrave. Thank you for taking the time to come along today. Homes is preparing a planning
More information04Design. Methodology. Future of Jacksons Hill Identifying Potential Uses Building Typology and Adaptability Community Engagement
Jacksons Hill Adaptive Re-Use Study 25 04Design Methodology Objectives Future of Jacksons Hill Identifying Potential Uses Building Typology and Adaptability Community Engagement Jacksons Hill Adaptive
More informationCarterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.
Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number
More informationABOUT CALA HOMES CALA HOMES
WELCOME Welcome to this public consultation event for our proposed development on land to the east of Salisbury Road, in Hungerford. Thank you for taking the time to come along today. Homes and Wates Developments
More informationWELCOME. ORPINGTON. Welcome to this exhibition of our proposals for the redevelopment of Bassetts Campus.
WELCOME Welcome to this exhibition of our proposals for the redevelopment of Bassetts Campus. The site has been vacant since 2013 and in 2014 NHS Property Services previously brought forward plans for
More informationTHE WHARVES DEPTFORD STATEMENT OF COMMUNITY INVOLVEMENT EXECUTIVE SUMMARY. May 2015 MOVING FORWARD
THE WHARVES DEPTFORD MOVING FORWARD THE WHARVES DEPTFORD STATEMENT OF COMMUNITY INVOLVEMENT EXECUTIVE SUMMARY May 2015 2 The Wharves Deptford Statement of Community Involvement The Wharves Deptford Statement
More informationADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.
Page 1 of 9 EXECUTIVE SUMMARY This land use amendment proposes to redesignate a parcel from DC Direct Control District to Multi-Residential Contextual Grade-Oriented (M-CG) District to allow for multi-residential
More informationBriefing Document of CNP. June 2017
Cholsey Parish Council Cholsey Neighbourhood Plan Briefing Document of CNP June 2017 Cholsey Neighbourhood Plan Page! 1 of! 8 Cholsey Plan Briefing v1.4 Page Left Intentionally Blank Cholsey Neighbourhood
More informationDesign Review Report Former YMCA Building, Bridgend DCFW Ref: N164 Meeting of 12th April 2018
Design Review Report Former YMCA Building, Bridgend DCFW Ref: N164 Meeting of 12 th April 2018 Review Status PUBLIC Meeting date 12 th April 2018 Issue date 18 th April 2018 Scheme location Bridgend Scheme
More information17. Coolaney-Rockfield Mini-Plan
County Development Plan 2017-2023 Consolidated Draft + Adopted Amendments - August 2017 17. Coolaney-Rockfield Mini-Plan Village profile Coolaney is located approximately 23 km to the south-west of Sligo
More informationCreating Community: Future Models Heads of Planning Conference
Creating Community: Future Models Heads of Planning Conference 23 June 2017 Need and Targets Election, June 2017 (affordable) housing high on the political agenda Scottish Government 50,000 affordable
More informationHS2 Interchange Station Design
Working on behalf of HS2 Interchange Station Design October 2018 www.hs2.org.uk 1 Interchange Station, Solihull Introduction In February 2018, HS2 Ltd appointed Arup to take forward the design of Interchange
More informationQuestions for Carlsbad City Council Members and Candidates (July 1, 2016)
Ponto is Carlsbad s Southern Coastal Gateway Questions for Carlsbad City Council Members and Candidates (July 1, 2016) 1. Are you aware of the 3 proposed developments in Ponto? What are your most important
More informationEnvision Front Royal Workshop 1 of 2
Envision Front Royal Workshop 1 of 2 September 12, 2013 Summary The Envision Front Royal project held the first of two public workshops on September 12, 2013. The purpose of the workshop was to evaluate
More informationRURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8
Rural Zone Policy RU2 RURAL ZONE - POLICY RU2.1 Introduction The natural resources of the rural environment in the Ruapehu District provide the basis for the existing and potential character, intensity
More informationEverton s Neighbourhood Plan. Site Allocation - Assessment Criteria
Everton s Neighbourhood Plan Site llocation - ssessment Criteria Introduction 1.1 This report assesses all the sites identified through the emerging Neighbourhood Plan for Everton and their potential for
More informationEXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies
EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies Environment and Landscape Policy 1 - Landscape Setting Development should respect and wherever possible enhance the landscape setting of Cuddington
More information37 Interlaken A Vision To The Future
37 Interlaken A Vision To The Future The History The Beckwith or Bonnie Briar Estate is one of the original Berkshires Cottages. It was built in 1892 and designed by architect and wealthy owner Leonard
More information