1 nts Dollis Valley regeneration Environmental statement Non-technical summary Terence O Rourke Planning Design Environment

2 Dollis Valley Regeneration Countryside Properties and L&Q Introduction NTS.1 NTS.2 NTS.3 NTS.4 The 10.8-hectare application site consists of Dollis Valley Estate (largely low-rise residential buildings (up to five storeys) currently providing 436 residential units), the former Barnet Hill Junior Mixed Infant and Nursery School, associated playing field and caretakerʼs house, and existing community facilities. The site also includes three properties on Mays Lane and a section of the Mays Lane highway and pavement. Countryside Properties UK Ltd (Countryside Properties) is applying for a hybrid planning permission for the comprehensive redevelopment of the Dollis Valley Estate. This comprises full detailed information for the first phase of development (phase 1), with the remainder of the site covered in outline (phases 2-5), requiring the subsequent submission of reserved matters. The proposals, which have been evolved in association with Countryside Properties development partner London and Quadrant Housing Trust (L&Q), will provide up to 631 dwellings, which represents a net gain of 191 dwellings. Figure NTS 1 shows the application boundary and figure NTS 2 shows the location of the site in relation to Barnet. An environmental impact assessment (EIA) was required for the application, in accordance with schedule 2 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2011, due to the potential for significant environmental effects. An environmental statement (ES) has been prepared to report the findings and its key elements are summarised in this non-technical summary. Site description NTS.5 NTS.6 NTS.7 The Dollis Valley Housing Estate consists of low-rise blocks of flats and maisonettes providing 436 residential units. Of these, 34 are owner occupied, 43 are private rentals, and the remaining 363 units comprise secure and non-secure social rents (affordable) and some empty properties. The majority of the buildings are of pre-fabricated concrete construction. Although technically also comprising part of the existing Dollis Valley Estate, the housing area to the south of Dollis Valley Drive accessed off Crocus Fields and Meadow Close is not within the redevelopment site. The western part of the site is the former Barnet Hill School, which was closed in 2009 following the rationalisation of London Borough of Barnet (LBB) education resources. The school site is being used temporarily to accommodate the Torah Vodaas Independent Orthodox Jewish School for Boys (approximately 260 pupils). This is a temporary arrangement until 1 April 2013, whilst the Torah Vodaas School finds a permanent location. The site also accommodates three community facilities that are used by a range of local groups, including exercise classes, religious and ethnic groups, adult education classes and childrenʼs activities, in addition to privately rentable space. Terence OʼRourke Ltd B January 2013

3 Dollis Valley Regeneration Countryside Properties and L&Q NTS.8 NTS.9 There are two day nurseries on the site. The Valley Pre-school is a nonprofit based organisation accommodating 20 children based at the BSCA premises and the Pine Trees Nursery is a commercial operation that occupies part of the school site. Several small retail units occupy the ground floor of the Homefield residential block, located on the north west part of the estate. However, these are unoccupied with the exception of a small convenience store. The wider environment NTS.10 NTS.11 NTS.12 The surrounding area is mostly residential in character, with a small parade of local shops including a small Co-op nearby to the west on Mays Lane. Chipping Barnet High Street is located approximately 800m to the north, offering a wide range of retail facilities. There is a purpose built healthcare facility approximately 350m to the north east of the site (in Vale Drive) and Barnet General Hospital is approximately 1km to the north west. High Barnet underground station is approximately 500m to the north of the site. This is the terminus of the High Barnet branch of the Northern Line, with trains running to central London (a 40 minute journey) every three to seven minutes. To the south of the site, Crocus Fields and Meadow Close is Dollis Brook. Beyond the brook are open fields with mature hedgerows, and playing fields, which form part of the green belt, and the secondary school of Totteridge Academy. The Barnet section of the long distance footpath of the London outer orbital path (LOOP) follows the course of Dollis Brook as it passes to the south of the site. The Dollis Valley Greenwalk (a 10 mile walk from Mill Hill to the north of Hampstead Heath) also follows the route of Dollis Brook. Future of the site in the absence of the proposals NTS.13 In the absence of the proposed redevelopment, it is likely that the Dollis Valley Estate will remain in its current condition. LBB is not proposing to re-open the former school, as additional pupil spaces and playing fields have been created in nearby schools. The proposed development NTS.14 Redevelopment of Dollis Valley estate will accommodate up to 631 residential units, replacement community space, new open space and infrastructure. NTS.15 NTS.16 The outline element of the application is for the demolition of existing residential buildings and the construction of up to 523 new residential units, together with new public open spaces, junction improvements to existing access onto Mays Lane, enhanced pedestrian, cycle and public transport facilities, car parking, infrastructure and other ancillary works. The detailed element (Phase 1) of the application is for the demolition of existing residential and community buildings (including the former Barnet Hill school), and construction of 108 new residential units and 417sqm of non-residential floorspace (new community and nursery space) together Terence OʼRourke Ltd B January 2013

4 Dollis Valley Regeneration Countryside Properties and L&Q with public open space, creation of a new vehicular access to Mays Lane, new car parking, bike storage, infrastructure and other ancillary works NTS.17 NTS.18 NTS.19 NTS.20 NTS.21 NTS.22 NTS.23 NTS.24 The proposed new residential development includes the construction of residential apartment blocks and terraces of town houses (figure NTS 3 shows the development zones). It is anticipated that across the whole site 40% of dwellings will be affordable properties. The houses will be a mixture of two and three storeys 1 with low-rise apartments and maisonettes (mainly three and four storey), but with two ʻlandmarkʼ buildings in the south of the site that will be up to five storeys (maximum height of 18m). The proposed building heights are set out in figure NTS 4. There will be a mixed use block on the corner of Mays Lane and Hammond Close in the north west of the site (figure NTS5), which on the ground floor will provide community facilities consisting of three key rooms: a community café, a large hall and a small hall; with office space, toilet facilities and storage space. Also within the ground floor accommodation of this building will be facilities for The Valley Pre-school. There will be three vehicular access points for the development site onto Mays Lane (figure NTS 6). This includes the provision of a new main access point that will incorporate a ghost right turn lane (a dedicated right turn lane denoted with markings on the carriageway without any form of physical barrier) for both the new access and the adjacent opposing junction of Bedford Road. The new avenues will provide the main access for Dollis Valley from Mays Lane. A series of residential streets (secondary roads), running mainly in an east west orientation, will provide vehicular access to individual dwellings. Vehicular access to the adjacent residential areas will be maintained during construction and once the development is completed. Dollis Valley will be served by a bus route (following the primary roads from the east to the west of the site), running from the site to Barnet railway station and town centre. There will be three bus stops within the development located adjacent to the new public open spaces. The proposal includes a total of 788 car parking spaces, with most houses provided with at least one allocated on-plot parking space (with the exception of a small number of houses that will have courtyard parking). Apartments will share on-plot (including undercroft) / on-street parking. Some of the houses will include driveways of 3.3m in width to enable disabled parking access. Within the communal parking courts, 10% of overall spaces will be spaces for the disabled. A number of unallocated parking bays will be provided across the site as visitor parking spaces and parking for the non-residential elements in phase 1 will be provided through the unallocated bays in Hammond Close. 1 Each storey in the residential buildings is considered to be 3m, although overall heights may be increased by an additional 3m to allow for roof structures and roof mounted photovoltaic panels (note: two storey buildings have a roof allowance of 5m to accommodate the proposed roof style). Terence OʼRourke Ltd B January 2013

5 Dollis Valley Regeneration Countryside Properties and L&Q NTS.25 NTS.26 NTS.27 NTS.28 NTS.29 In accordance with the London Plan, at least 20% of the parking spaces provided on-site will have electrical car charging facilities, with a further 20% enabled for future conversion. Bicycle storage will be provided for all residential dwellings. Apartment blocks will have shared bicycle storage and all houses will be provided with a bicycle store within their rear gardens. Additional on-street bicycle spaces will be provided for visitor use. There will be pedestrian access from the site to Brent Place, Barnet Lane and Dollis Brook. The new avenues and residential streets will include footways on both sides of the roads and have appropriate tree planting. The proposal includes public open space in the form of three parks (totalling approximately 3485m 2 ), as shown on figure NTS 5. In addition, the proposal will provide approximately 1,200 m 2 of semi-private open space and 21,680 m 2 of private gardens. Figure NTS 7 also shows the proposed landscaping of the site, setting out areas of new planting. It is anticipated that the construction will be undertaken in five phases (figure NTS 8), with the first phase commencing in October 2013 and completed in September 2015 and with phase 5 being completed in December Phasing has been developed to ensure that existing tenants are found alternative accommodation within a building completed as part of an earlier phase of the works (this process is termed ʻdecantʼ), thereby ensuring that no off-site decant will be required. Each household will be assessed with regard to housing need and support provided for the moving house where appropriate. Phase 1 detail NTS.30 NTS.31 NTS.32 NTS.33 Phase 1 will accommodate 108 dwellings (81 houses and 27 apartments), of which 37% will be affordable rented units (33% of which will be houses), 5% for shared ownership and 58% private ownership. Figure NTS 9 shows the phase 1 layout. The new community facilities will, in addition to the halls and café areas, provide purpose built nursery space (117m 2 ) for the Valley Pre-school, which is the existing nursery provision on the site providing affordable child care services to residents living predominantly on the Dollis Valley Estate (layout shown in figure NTS 10). The new facility will be co-located with the community centre, although for security, teaching and practical reasons the nursery will have a completely separate welfare facilities, outside space and a dedicated secure entrance. The nursery will provide space for up to 25 children. During the construction of the new nursery facility a temporary facility will be established in the south of the school playing fields utilising the existing terrapin buildings. This phase includes the construction of a new vehicular access from Mays Lane, which requires the removal of three existing properties on Mays Lane. The majority of the buildings in phase 1 will be up to three storeys high, although the row of houses adjacent to Eastham Close will be up to two storeys and the building containing the community facilities will be three to Terence OʼRourke Ltd B January 2013

6 Dollis Valley Regeneration Countryside Properties and L&Q four storeys, with the community facilities on the ground floor and apartments above. Figure NTS 11 shows a cross section of the phase 1 site from Rossiter Fields to Mays Lane, while figure NTS 12 shows a cross section from house number 127 to 187 / Co-op Mays Lane. NTS.34 NTS.35 The building materials selected are reminiscent of those used across London housing stock and will include light buff bricks, slate grey roof tiles and limited use of timber cladding. Where possible, residential property windows will be tall (to maximise natural daylight) and include patio doors and Juliet balconies. The community facility will have full height glazing and the nursery will have large picture windows. Elevations illustrating the apartment blocks proposed in the northern part of phase 1 are shown in figures NTS 13a-d and NTS 14a-d. The detailed landscape proposals for phase 1 are shown in figure NTS 15. The parking strategy for phase 1 follows the principles set out in the wider master plan. Parking for individual houses will be predominantly on-plot or within garages. Parking for the apartment blocks will be in a shared and enclosed parking area. Phase 1 will provide 155 parking spaces for the 108 dwellings, of which 129 will be allocated and 26 not allocated. Alternatives NTS.36 NTS.37 NTS.38 Countryside Properties and L&Q did not consider alternative sites, as the purpose of the proposed development is to regenerate the Dollis Valley Estate. The proposed scheme has evolved over the life of the project, with a total of 36 master plan iterations that are set out in detail in the design and access statements. A number of design iterations occurred during the procurement process to select LBBʼs development partner, which primarily saw the general layout of the scheme established in response to the general site conditions and constraints (including links to the wider area) and principles of urban design (green spaces, street arrangements and housing typology). Following the procurement process, Countryside and L&Q undertook a series of consultations with local residents, LBB and other stakeholders. These led to changes to the road dimensions, adjustments to retain as many trees as possible and alterations to housing types and the layout of the community facilities. Concerns regarding potential overlooking of adjacent houses and gardens led to alterations to the massing of the proposed apartments, which was reduced by stepping the blocks in line with the sloping terrain. Alterations around the access roads included the removal of a property from the new main access road to avoid degrading the amenity of the adjacent existing property and the introduction of more tree planting along the central access road. The EIA process and assessment methodology NTS.39 In February 2012, LBB was asked to provide a screening opinion to confirm if the proposed redevelopment required an EIA to be undertaken. The councilʼs response was that an EIA would be required. A copy of the screening request and opinion can be found in technical appendix A of this ES. Terence OʼRourke Ltd B January 2013

7 Dollis Valley Regeneration Countryside Properties and L&Q NTS.40 NTS.41 NTS.42 NTS.43 A scoping exercise was undertaken to identify the range of significant issues likely to arise as result of the proposed redevelopment. The scoping report submitted to LBB in May 2012 identified the potential main environmental effects to be addressed within the EIA and scoped out issues that did not require consideration. This was issued (via LBB) to a range of consultees for comment and a number of additional issues were identified. Further details of the scoping process can be found in chapter 3 of the ES and technical appendix A. The various specialist assessments, discussed in more detail below, followed generally similar methodologies. Baseline desk and / or field studies were undertaken to establish the existing situation. For the majority of topics, the effects of the proposed development were evaluated using a method that compares the sensitivity and importance of receptors with the likely magnitude of change to establish the degree of the effects using the matrix (developed by Terence O'Rourke Ltd) shown in figure NTS 16. Unless otherwise stated, if the degree of effect is moderate or above then the effect is considered to be significant. Slight or negligible effects are not considered to be significant. The degree of an effect determines the resources that should be put in place to avoid or reduce (mitigate) an adverse effect and identifies the actual value of a positive effect. Where appropriate, assessments also gave consideration to the potential for cumulative effects of the proposed redevelopment in association with the following four developments in the local area, as required by LBB in its scoping response: 90 Mays Lane (demolition of a builders yard and construction of seven self contained flats) Meadow Works, Pricklers Hill (retaining employment and café/restaurant uses, erection of nine three bedroom houses and creating a new access) Barnet Trading Estate (99 residential units) Barnet gas works site on Albert Road (retail and residential) Environmental effects Air quality NTS.44 NTS.45 The traffic-related pollutants nitrogen dioxide and fine particulate matter were the main focus of the air quality assessment, although construction dust was also addressed. Current air quality around the estate was established from measurements made by LBB and modelled data provided by DEFRA. LBB has declared the whole borough an air quality management area for both nitrogen dioxide and fine particulate matter because air quality objectives for these pollutants are not being met. During the construction process, there is the potential for increased dust generation from activities such as demolition, site preparation, earthworks and transport and storage of materials. Best practice construction techniques will be put in place during construction to minimise this potential. A full list of mitigation is included in chapter 4 and chapter 14 of Terence OʼRourke Ltd B January 2013

8 Dollis Valley Regeneration Countryside Properties and L&Q the ES, but measures include (where appropriate) the covering of delivery vehicles, re-vegetating of earthworks, inspections of highways for dust, the appropriate location and management of stockpiled material, well maintained construction plant and no burning of materials on site. NTS.46 NTS.47 NTS.48 NTS.49 With the mitigation measures proposed in place, the temporary effects from dust generation during construction will be reduced to slight and will not be significant in EIA terms. The implementation of construction traffic controls will ensure that emissions arising from construction vehicles will also not be significant. The modelling undertaken to predict emissions related to post-construction traffic activities showed that there will be no significant increases in concentrations of nitrogen dioxide and fine particulate matter as a result of the proposed development, so there will be no significant effects on air quality post-construction. Of the four developments identified for consideration in the cumulative assessment, only the site at 90 Mays Lane is considered to be close enough to give rise to potential for cumulative effects as a result of construction dust. It is considered that, as both this site and Dollis Valley will be subject to best practice mitigation measures, there will be a short term slight cumulative effect, which will not be significant in EIA terms. In terms of cumulative construction traffic emissions, the relatively small volumes of traffic means that adverse effects are likely to be slight to negligible and not significant in EIA terms. Post-construction traffic flows from developments within the borough were included within the factors used for predicting the future baseline traffic flows. Given the scale and location of the schemes, the cumulative effects of post-construction road traffic emissions are considered to be negligible. Community, economic and social effects NTS.50 NTS.51 The proposed development has the potential to have effects on the existing local community, economy and services in the surrounding area. In order to assess these effects, current conditions on the estate, in Underhill ward (in which the estate lies) and Barnet borough as a whole have been analysed. Underhill wardʼs demography differs from the borough and regional averages, with higher proportions of pensioner households and households with children. There is an existing shortage of affordable housing in the borough as a whole, but Dollis Valley estate has a much higher percentage of socially rented housing than the ward, borough or London averages. Unemployment rates on the estate are above the borough and London averages. NTS.52 There are two pre-schools on the estate and 17 other pre-schools / nurseries in the High Barnet area, although overall demand for pre-school provision in the area exceeds the supply of places. The estate falls within the High Barnet and Underhill primary school planning area, which contains nine primary schools. Five of these schools currently have spare capacity, although council projections indicate a shortfall of primary school places across the borough by There are 13 secondary schools Terence OʼRourke Ltd B January 2013

9 Dollis Valley Regeneration Countryside Properties and L&Q within 5 km of the estate, six of which currently have spare capacity. All the GP surgeries in the vicinity of the estate are currently open to new patients and seven dental practices near the estate are currently registering new NHS patients. NTS.53 NTS.54 NTS.55 NTS.56 NTS.57 NTS.58 NTS.59 There is a newsagent and convenience store within the estate, although the three other retail units in the estate are vacant. There is a small Co-op supermarket and a parade of local shops on Mays Lane, to the north west of the estate. Existing community facilities on the estate include the Valley Centre and Rainbow Centre, both of which have capacity for more intensive use. The BSCA, which has approximately 300 members, rents a building in the north west corner of the estate. There is no formal play or sports provision on the estate, although these facilities are available at the King George V Playing Fields to the south. Open space at the estate is dominated by hard paved surfaces and mowed lawns, and the landscape is generally of poor quality and minimally maintained. Overall quality of life on the estate is generally below average. It is anticipated that up to 180 people will be employed on site during the construction phase. This will be a temporary, moderate, beneficial, significant effect. There will not be any significant changes to employment rates post-construction. It is likely that there will be temporary reductions in the amenity of surrounding parts of the estate during construction due to increased levels of noise and the generation of dust. It is considered that there will be a substantial, adverse, significant effect on the amenity of areas closest to construction works. However, this change will be temporary and will move across the estate as construction progresses, so each individual area of the estate will only experience the effect for a limited time. The proposed community building will be provided prior to the demolition of the Valley Centre and the Rainbow Centre, so there will be no significant adverse effects on community facilities during construction. The new building will have sufficient capacity to accommodate demand from both existing users and new residents. It is not proposed to reprovide the BSCA facilities on site, as the requirement for a private membersʼ licensed bar is considered to conflict with the need for a new community facility on the estate that is available to all residents. The council is committed to assisting the BSCA to relocate to alternative premises in the local area, so the facility will still be available to the local community. The Valley pre-school will be moved to existing terrapin buildings elsewhere on site prior to demolition of their buildings. The proposed replacement building with increased capacity for the Valley Pre-school will then be constructed in phase 1 and the pre-school will move into its new building, while The Pine Trees Nursery will move off site. Barnet Council is committed to assisting the nursery in relocating to alternative premises in the local area, so the nursery provision will not be lost to the local community. Overall, no significant effects are predicted on pre-school provision. There will be a long term increase in the estateʼs population when the redevelopment is complete, which will lead to a moderate change in the Terence OʼRourke Ltd B January 2013

10 Dollis Valley Regeneration Countryside Properties and L&Q demography of the area. The proposals will lead to an increase in housing provision in the area, which will be a moderate, significant beneficial effect. There will be an overall reduction in the number of affordable dwellings on the estate, which will be a moderate to substantial, significant adverse effect. However, it should be noted that the estate is within an area with high levels of affordable housing and the development mix has been designed to accommodate all existing secure tenants, ensure the economic viability of the scheme and contribute towards providing a balanced and mixed community. The council is committed to ensuring that suitable alternative accommodation would be made available elsewhere in the borough to tenants on non-secure leases. NTS.60 NTS.61 NTS.62 NTS.63 NTS.64 The increase in population will increase demand for local services, including schools, healthcare and libraries. Financial contributions will be made through a legal agreement with Barnet Council towards these facilities and no significant adverse effects are predicted on local services as a result of the proposed development. No replacement retail units are proposed on the estate. The vacancy of three of the existing units suggests there is currently limited demand for retail units on the estate. It may be possible for the existing newsagent and convenience store, which has a business lease with the council, to relocate to an alternative council property elsewhere in the area. The increase in the estateʼs population is predicted to lead to a slight to moderate, significant beneficial effect on demand for the shops on Mays Lane and a slight, beneficial effect that will not be significant on shops in the town centre. The proposed redevelopment includes three new areas of public open space, which will provide play and picnic areas in addition to community and wildlife gardens. In addition, semi-private open space will be provided for flats and private open space will be provided for houses. This will be a moderate to substantial, significant beneficial effect on open space provision on the estate. The provision of new higher quality buildings and public open space will lead to a substantial, beneficial significant effect on the estateʼs amenity. There is also potential for improvement to residentsʼ quality of life through reduced barriers to housing and services and the improved living environment. This will be a moderate, beneficial significant effect. The cumulative community, economic and social effects of the proposals with the other developments in the area include a temporary increase in employment during construction that will be a moderate, significant beneficial effect, and slight beneficial effects on housing provision in the borough and demand for local businesses in Chipping Barnet and New Barnet that will not be significant. There will also be moderate, significant beneficial cumulative effects on the overall amenity of Chipping Barnet and New Barnet as a result of regeneration and on the quality of life of local residents. There is the potential for cumulative increases in demand for pre-schools, schools, healthcare and library services in the area. However, it is likely that the other developments will also need to make financial contributions towards a range of community facilities and services through a legal Terence OʼRourke Ltd B January 2013

11 Dollis Valley Regeneration Countryside Properties and L&Q agreement with the council, so no significant cumulative effects are predicted on these facilities. Cultural heritage NTS.65 NTS.66 NTS.67 NTS.68 NTS.69 NTS.70 This assessment examined the impacts of the proposed development on the historic environment, including designated and undesignated heritage assets such as archaeological remains, historic buildings and areas and designed landscapes. The study area comprised the site and surrounding area within 500m of the site boundary for the archaeological resource and 2km for the heritage assets. All heritage assets (designated and undesignated) with the study area were considered within the desk-based assessment. The desk-based report formed part of the consultation process with the Greater London Archaeology Advisory Services and English Heritage. There are no nationally designated scheduled monuments on the site or in the surrounding study area and there are no archaeological finds within the site boundary. The majority of the site is developed with the existing estate buildings, with the western part of the site being previously used as a sewage farm until the late 1950s. It is considered that, should there be any remaining archaeological resources on the site, it will be of low importance. It is considered that the site offers limited potential for undisturbed archaeology in the open areas (the school playing field and green space along the northern site boundary). Mitigation in the form of a scheme of geophysical survey can be undertaken on those areas known or suspected to be previously undeveloped if deemed necessary. Alternatively, a qualified archaeologist could be present during the intrusive construction activities in these open areas. It is considered unlikely that any features of archaeological interest will be uncovered outside of these open areas, but if this situation arises further appropriate surveys will be undertaken. The implementation of the mitigation measures will ensure that no significant residual effects will arise. There are no designated heritage assets within the application boundary, although there are conservation areas covering the historic centre of Chipping Barnet and a large area of Totteridge. The majority of listed structures fall within the conservation areas. These heritage assets are of medium to high importance. The distance and intervening development between the site and these assets, and the fact that the landscape and visual assessment concluded that all visual change from the redevelopment will be beneficial, mean that no significant effects on these built heritage assets are predicted. As no significant residual effects are predicted for cultural heritage, there will be no cumulative effects in relation to archaeology or built heritage. Ground conditions and water environment NTS.71 Desk-top studies and intrusive investigations were undertaken to establish the potential for existing contamination at the estate. The site was in agricultural use on the earliest map from 1877, but by 1896 a sewage farm Terence OʼRourke Ltd B January 2013

12 Dollis Valley Regeneration Countryside Properties and L&Q had been developed. Several tanks were built on site between 1896 and 1914 and by 1935 there were several sludge beds on the site. Between 1967 and 1973 the site was redeveloped as the existing Dollis Valley Estate and has since remained essentially unchanged to the present day. NTS.72 NTS.73 NTS.74 NTS.75 NTS.76 NTS.77 NTS.78 A number of soil samples from across the site were analysed for a range of commonly occurring contaminants, including heavy metals, organic compounds and hydrocarbons. Overall, the analysis revealed limited evidence of contamination, with hotspots of lead and petroleum hydrocarbons and wider evidence of polycyclic aromatic hydrocarbons found to pose a potential risk. Several samples were tested for ammonia because of the siteʼs historic use as a sewage farm, but this was not found to pose a contamination risk. Remediation measures will be put in place to ensure that the identified contamination will not pose a risk to human health. The isolated hydrocarbon contamination hotspots will be excavated and removed off site to a licensed disposal facility. To protect residents and visitors from the elevated concentrations of lead and polycyclic aromatic hydrocarbons, specified depths of clean topsoil will be used to cover all gardens and landscaped areas. Construction workers will be provided with personal protective equipment, such as gloves and masks, and precautions will be adopted to prevent direct contact with soil and limit the production of dust. The existing buildings on the estate are likely to contain asbestos, which was still in common use when the estate was constructed. An asbestos survey will be carried out prior to works starting on site. Any identified asbestos-containing materials will be removed by a suitably licensed specialist contractor prior to any disturbance of the buildings. A programme of ground gas monitoring identified that there is a very low risk of ground gas generation at the site and no precautionary measures are required to protect future residents. Japanese knotweed, an invasive species that can damage buildings and outcompete native plant species, was identified along the northern site boundary. This will be removed by a specialist contractor prior to any groundworks commencing on site, to ensure that there is no risk to the proposed buildings and landscape planting. Given that the other developments in the area would be required to mitigate any significant contamination risks identified, and ensure construction works are undertaken in accordance with health and safety legal requirements, it is considered that there is no potential for significant adverse cumulative ground conditions effects. The water environment assessment focused on the quality and hydrology of surface water and groundwater bodies and the potential flood risk at the site. The issues addressed included potential contamination from surface water run-off from areas of hardstanding, pollution of surface water and groundwater during construction, and the need for a drainage system that will ensure there will be no increase in flood risk as a result of the proposed development. The assessment also considered the potential for effects on the foul water drainage and drinking water supply networks. Terence OʼRourke Ltd B January 2013

13 Dollis Valley Regeneration Countryside Properties and L&Q NTS.79 NTS.80 NTS.81 NTS.82 NTS.83 NTS.84 The principal surface water body in the area is the Dollis Brook, approximately 140 m to the south of the estate. The estate is in flood zone 1, an area of little or no risk of flooding. It is underlain by impermeable London Clay, which does not contain groundwater. Site investigations encountered isolated areas of groundwater within made ground above the London Clay. At present, surface water run-off from the site drains into two surface water sewers that discharge into the Dollis Brook. Foul water drains into the Thames Water sewer network, while existing drinking water supplies to the estate are provided by Affinity Water. A range of mitigation measures will be put in place to ensure that there will be no significant adverse effects on water quality as a result of construction activities. These will include storage of fuel, oils and chemicals on an impervious base within a bund, refuelling mobile plant in a designated area on an impermeable surface, the use of bunds to prevent uncontrolled runoff, and wheel-washing. The proposed drainage system will be designed to reduce the surface water discharge rate from the estate by 76% compared to current rates, which will ensure there will be no increase in flood risk as a result of the proposed development. A range of measures will be incorporated into the drainage strategy to store run-off, including green roofs on some apartment blocks, permeable paving of private parking areas and shared surface roads, and over-sized pipes and modular storage tanks. Flow control devices will be used to limit the discharge rate. The drainage system will incorporate measures such as oil interceptors to prevent pollution of Dollis Brook and no significant effects are predicted on surface water quality post-construction. The low permeability of the London Clay beneath the site will prevent infiltration of run-off and there will be no significant effects on groundwater post-construction. The proposed development will represent a very small increase in foul water discharge rates to the existing sewer network. This will be managed in consultation with Thames Water and no significant effects are predicted on the foul water drainage network. Affinity Water has confirmed that there is sufficient capacity in the water supply network to service the proposed development. All properties will have water meters to encourage reduced consumption, and no significant effects are predicted on water supply. Given that the other developments in the area are likely to be required to follow similar standard construction practice measures and accord with adopted policy requirements on drainage and flood risk, it is considered that there is no potential for significant cumulative effects on the water environment. Landscape and visual effects NTS.85 NTS.86 Desk and field studies were undertaken to evaluate the landscape in and around the estate, and to identify potential views and visual receptors. Several were selected to provide representative viewpoints from various locations, which were agreed with LBB. The estate and surrounding area fall within the Barnet Plateau landscape character area. The developed parts of this area are characterised by Terence OʼRourke Ltd B January 2013

14 Dollis Valley Regeneration Countryside Properties and L&Q suburban terraces, rural linear developments and low density development with gardens and tree lined streets. The rural parts are characterised by farmed countryside, remnant heathland, floodplain meadows along narrow streams and ancient hedgerows. The estate itself is characterised by predominantly five storey slab residential blocks cutting across the natural contours of the site, a lack of clear public realm, a car-dominated street scene, limited tree planting and unattractive single storey community buildings. There are views from limited areas of the estate across the green belt and open countryside to the south. NTS.87 NTS.88 NTS.89 NTS.90 NTS.91 NTS.92 There will be a moderate, significant adverse effect on the landscape resources of the site during construction, as a result of the presence of cranes and other construction activity, but this will be temporary. The proposed development will lead to a moderate, significant beneficial effect on the siteʼs landscape resources as a result of the removal of the negative elements discussed above and the introduction of development of a scale and form that will be more in keeping with the characteristics of the surrounding houses and landscape. These changes will also lead to a moderate, significant beneficial effect on the landscape resources of the Barnet Plateau area. The potential for effects on landscape resources and visual receptors was a key consideration in the design of the proposed development. The design of the proposed dwellings has taken account of key features of the neighbouring residential areas and the master plan has incorporated characteristics of local suburban streets. Buffer planting is proposed along the site boundary at key sensitive locations and there will be new tree planting lining the streets and within the new public open spaces. Moderate, significant adverse effects on views from Bedford Avenue and the LOOP / Dollis Valley Greenwalk are predicted during construction works, as a result of the visibility of cranes and construction activities on site. However, these effects will be temporary. No other significant visual effects are predicted during construction. The redevelopment of the estate will change views of the site from the surrounding area, although the significant effects will be limited to the areas closest to the site. The reduction in visible development and the replacement of negative elements with an architectural style and layout that is more in keeping with the surrounding streets will lead to a substantial, significant beneficial effect on views from Bedford Avenue and moderate, significant beneficial effects on views from the LOOP / Dollis Valley Greenwalk and the King George V Playing Fields. Intervening screening provided by vegetation and the areaʼs topography means that the effects on views from the other viewpoints will not be significant. Slight beneficial effects are predicted on views from Barnet Lane and Barnet football and cricket club, while negligible effects are predicted on views from the Whitings Hill Open Space, the Horseshoe Lane footpath and the footpath to the west of the Totteridge Academy. There is no potential for significant cumulative effects with the other schemes in the vicinity because the other developments are not visible from the viewpoints discussed above. Terence OʼRourke Ltd B January 2013

15 Dollis Valley Regeneration Countryside Properties and L&Q Natural heritage NTS.93 NTS.94 NTS.95 NTS.96 NTS.97 NTS.98 NTS.99 A combination of a desk-top study and information from field surveys has been used to inform this chapter. The desk-top study included a search of records held by Greenspace Information for Greater London within 1km of the site and the websites of the National Biodiversity Network and the Multi Agency Geographical Information for the Countryside within 10km of the site. A standard phase 1 habitat survey was undertaken in June 2012, which directly searched for legally protected, notable and invasive species of plant and categorised any habitats of ecological value that were encountered. During this survey, the habitats on site were also evaluated for their potential to support protected species. Those considered to be potentially present within an urban setting were bats, common reptiles, badgers and great crested newts. The phase 1 habitat survey identified a need for further bat and reptile surveys, which were undertaken between June and September No other protected species were identified as potentially using the site. Due to the urban nature of the site, a limited number of habitats were identified, including the amenity grassland, small sections of hedgerows and scattered trees. The school playing field in the west of the site has been relatively un-managed in recent years and has become semiimproved grassland. However, since the phase 1 survey was undertaken, this area has been mown to accommodate the independent school temporarily using the area and is therefore reclassified as amenity grassland. The buildings on the site are considered to offer limited potential for roosting bats and during the survey no bats were recorded emerging or reentering any buildings or trees on the site. Some bat foraging activity of common bat species was recorded over the amenity grassland areas of the site and along the tree line on the northern boundary. No reptiles were found on site. Bird species breeding on site include blue tit, wren, song thrush, house sparrow and common starling. The latter three are UK Biodiversity Action Plan species. There are no nationally or internationally designated nature conservation sites within 5 km of the site. The nearest locally designated sites are the Totteridge Fields Local Nature Reserve (LNR), 2.4km to the south west of the site, and Dollis Brook Site of Importance for Nature Conservation (SINC), 150m south of the site. Dust generation during the construction phase could potentially affect vegetation. A code of construction practice (CoCP) will be prepared to control dust during construction and no significant effects are predicted. NTS.100 There is the potential for disturbance of breeding birds and roosting bats during construction. Buildings and trees with the potential to support bat roosts will be re-checked for signs of roosting bats at least six months before felling or demolition. Should evidence of roosting bats be discovered, a Natural England licence will be required to allow works to continue. Demolition of buildings will be undertaken outside the bird Terence OʼRourke Ltd B January 2013

16 Dollis Valley Regeneration Countryside Properties and L&Q breeding season. If it is not possible to undertake all tree and hedgerow removal works outside the bird breeding season, affected trees will be checked by a suitably qualified ecologist prior to works. If nests are found, works will be suspended or modified until all nesting activity has ceased. With these measures in place, there will be no significant adverse effects on birds or bats during construction. NTS.101 The phased loss of the buildings, trees, hedgerow and amenity grassland on site during construction will affect nesting habitat used by breeding birds and foraging habitat used by bats. However, the proposed development will lead to the creation of new areas of amenity grassland and semiimproved grassland margins in the parks and the trees to be lost will be replaced with 386 new trees (332 trees within the site and 54 in nearby offsite locations). Some of the replacement trees will be planted in corridors along streets and will become foraging and commuting areas for the local bat population. Bat and bird boxes will be installed where appropriate and no significant adverse effects are predicted on bird and bat populations post-construction. NTS.102 The provision of new areas of amenity grassland and semi-improved grassland will be a slight beneficial effect that will not be significant. The loss of the trees on site will be a slight to moderate, significant adverse effect in the short term, but the replacement with increased numbers of trees will lead to a long term slight to moderate, significant beneficial effect. NTS.103 Post-construction, the proposal may lead to a small increase in recreational use of Totteridge Fields LNR and Dollis Brook SINC, which could place additional pressure on these areas. However, it is considered likely that only a small proportion of new residents will use these areas on a regular basis. It is considered that this may be a moderate, significant adverse effect, but use of these areas is unlikely to be continuous. NTS.104 The majority of the other sites considered in the cumulative assessment are some distance from the estate, so there is no potential for these sites to have a significant cumulative natural heritage effect. The site at 90 Mays Lane is relatively close to the estate, but its former use as a buildersʼ yard means it is likely to have very limited ecological interest and no cumulative effects are predicted with this development. Noise and vibration NTS.105 A baseline noise measurement survey was undertaken in August 2012 at five locations around the site. This found that road traffic noise was the only significant noise source in the vicinity of the site. NTS.106 It is inevitable that there will be some disturbance to nearby residential receptors during the site clearance and construction; however, this will be localised and temporary in nature. A construction vibration assessment was not considered necessary, as vibration producing equipment will not be utilised in close proximity to the existing receptors. NTS.107 In terms of construction noise, generally only people living within approximately 100m of the construction activities are likely to be affected. General best practice mitigation measures are proposed across the whole site, including set working hours, properly maintained and silenced plant, Terence OʼRourke Ltd B January 2013

17 Dollis Valley Regeneration Countryside Properties and L&Q preference for hydraulic demolition and construction over percussive, temporary hoardings, a programme for noise and vibration monitoring, and the use of construction method statements, which will be set out as part of the final CoCP. Any noise complaints will be investigated. NTS.108 With these best practice mitigation measures in place, construction noise at the majority of receptors will result in a temporary, slight adverse effect, which is not significant in EIA terms. The main exceptions to this are the houses immediately next to the northern boundary of the site where the new access is to be formed, and during activities adjacent to 8 Eastham Close. At these locations, for the few days that construction takes place at 6 to 12m from the properties, a short term, substantial adverse significant effect is predicted. Further mitigation is unlikely to be practicable given the proximity of the source to the receptor. Close liaison with these residents will be necessary to minimise disruption. NTS.109 The change in road traffic flows post-construction in comparison with the baseline flows is predicted to lead to an increase in traffic noise of a maximum of 0.1 decibels. It is generally accepted that a change in noise levels of less than 1 decibel is imperceptible, so no significant effects are predicted. NTS.110 There may be some post-construction noise generated by the ventilation associated with the community café. The extractor fan of the café will be domestic in nature and will be selected and installed to ensure that any associated noise is negligible and does not give rise to a significant effect on nearby residential receptors. NTS.111 The majority of the other sites considered in the cumulative assessment are sufficiently far from the estate that there is no potential for these sites to have a significant cumulative noise and vibration effect during construction. Should the development at Mays Lane be constructed at the same time as the proposed redevelopment of the estate, there is the potential for a temporary cumulative effect. NTS.112 Post-construction traffic flows from developments within the borough were included within the factors used for predicting the future baseline traffic flows. Given the scale and location of the schemes, the cumulative effects of post-construction road traffic noise are considered to be negligible. Traffic and transport NTS.113 The traffic and transport assessment examined the effect of the increased traffic associated with the proposed development on traffic flows and sensitive receptors in the vicinity of the site. NTS.114 A desk-top study of information relating to existing bus and rail services, and accident records from the local area was undertaken. The highway conditions (speed limits and nature of the roads) and pedestrian and cycle provision on the site and in the surrounding area were also recorded. Traffic survey data collected in 2009 and 2010, together with automatic traffic count data from September 2012, were used to establish the 2012 baseline traffic flows for the study area (Mays Lane, Barnet Lane and the A1000 Barnet Hill). Traffic flows for the future baseline years of 2015 and 2019 were also modelled. Terence OʼRourke Ltd B January 2013

18 Dollis Valley Regeneration Countryside Properties and L&Q NTS.115 In terms of traffic generated during the construction phase, it is estimated that 10 heavy good vehicles (HGVs) and 46 worker vehicles will access the site daily. The construction traffic does not represent a permanent change to traffic flows in the local area and no significant effect is predicted as flows will represent less than a 0.3% increase on current traffic levels. A construction logistics plan, HGV routing strategy and managed delivery times will further minimise any potential for disruption to local traffic flows. NTS.116 The assessment focused on the community as sensitive receptors and addressed the traffic and transport effects in terms of the severance (for example, being unable to cross the road), driver delay and pedestrian and cyclist amenity that may result from an increase in traffic volumes in close proximity to sensitive receptors, such as residences, post-construction. The assessment found that the increase in traffic flows on the local road network will be negligible and there will be no significant adverse effects on sensitive receptors. NTS.117 The regeneration of the Dollis Valley Estate will provide a number of opportunities to improve the existing traffic and transport situation of the site and surrounding area, including re-routing the existing bus service, implementation of a residential travel plan and the introduction of pedestrian refuge islands as crossing points on Mays Lane. NTS.118 As the post-construction traffic flows from other developments within the borough were included within the factors used for predicting the future baseline traffic flows, and have therefore already been considered in the main assessment, there will be no significant cumulative traffic and transport effects. Conclusion NTS.119 This non-technical summary has outlined the findings of the EIA of the proposed redevelopment the Dollis Valley estate. The proposed development will result in a number of changes to the local environment, but a range of measures will be put in place to minimise potential significant adverse effects and enhance beneficial effects. The proposed mitigation measures and the residual effects of the proposals that are predicted to remain after mitigation are summarised in chapter 12 of the ES. NTS.120 Copies of the full ES and its technical appendices have been distributed to LBB and the statutory consultees. The full documents are available for public inspection during the consultation period at LBBʼs offices at the address below: Environment, Planning and Regeneration The London Borough of Barnet North London Business Park Oakleigh Road South London N11 1NP Terence OʼRourke Ltd B January 2013

19 Dollis Valley Regeneration Countryside Properties and L&Q NTS.121 Copies of the ES on CD can be purchased from Terence OʼRourke Ltd at a cost of 20, which reflects the time and production costs. Paper copies may also be available (at printing cost) from Terence OʼRourke Ltd at the following address: Terence OʼRourke Ltd 3 Whitcomb Street London WC2H 7HA Tel: maildesk@torltd.co.uk Terence OʼRourke Ltd B January 2013

20 Copyright Based upon here??????????????? the 2012 Ordnance Survey 1:10,000/1: colour raster map with the permission of the Ordnance Survey on behalf of Her Majesty s Stationery Office, Crown copyright. Terence O Rourke Ltd. Licence No. AL & Copyright Terence O Rourke Ltd, 2013 Legend Site boundary m Dollis Valley regeneration Environmental statement Figure NTS1 Application boundary

21 Based upon the 2012 Ordnance Survey 1:10,000 colour raster map with the permission of the Ordnance Survey on behalf of Her Majesty s Stationery Office, Crown copyright. Terence O Rourke Ltd. Licence No. AL & Copyright Terence O Rourke Ltd, 2013 A1081 A1000 Main commercial area High Barnet underground station Barnet General Hospital Barnet South Community Association Vale Drive Primary Care Centre New Barnet railway station Co-op Local shops Dollis Brook Legend London outer orbit loop national trail Barnet Hill School Conservation areas Site boundary m Dollis Valley regeneration Environmental statement Figure NTS2 Site location and surrounding area

22 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS3 Development zones

23 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS4 Building heights

24 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS5 Land uses

25 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS6 Access and circulation

26 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS7 Strategic landscape

27 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS8 Phasing

28 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS9 Phase 1 detailed layout

29 refer to scale bar OS licence no: Dollis Valley regeneration Environmental statement Figure NTS10 Floor plan of the community facilities

30 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS11 Cross section (from Rossiter Fields to Mays Lane, looking west)

31 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS12 Cross section (along Mays Lane from house number 127 to 187 / Co-op, looking south)

32 NTS13a North elevation OS licence no: refer to scale bar NTS13b East elevation Dollis Valley regeneration Environmental statement Figure NTS13a-b Elevations of block 12

33 NTS13c South elevation OS licence no: refer to scale bar NTS13d West elevation Dollis Valley regeneration Environmental statement Figure NTS13c-d Elevations of block 12

34 NTS14a North elevation OS licence no: NTS14b South elevation refer to scale bar NTS14c East elevation NTS14d West elevation Dollis Valley regeneration Environmental statement Figure NTS14a-d Elevations of block 13

35 refer to scale bar Dollis Valley regeneration Environmental statement Figure NTS15 Detailed landscape proposals

36 Determination of significance matrix Sensitivity of receptor High Medium Low Negligible Large Very substantial Magnitude / scale of change Medium Small Substantial Moderate Slight Negligible Negligible Significance If the degree of effect is moderate or above, then the effect is considered to be significant. Dollis Valley regeneration Environmental statement Figure NTS16 Significance matrix

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Proposed Land Use: Total Site Area (Ha): Housing 1.85 Ha Description: It is understood that the owner has no plans to dispose of the site

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

Ashtead Neighbourhood Forum Site Assessment AS07 Old Chalk Pit, Pleasure Pit Road. Site ref: AS07 Site address: Old Chalk Pit, Pleasure Pit Road

Ashtead Neighbourhood Forum Site Assessment AS07 Old Chalk Pit, Pleasure Pit Road. Site ref: AS07 Site address: Old Chalk Pit, Pleasure Pit Road Site ref: AS07 Site address: Old Chalk Pit, Pleasure Pit Road Proposed Land Use: Total Site Area (Ha): Housing 0.7ha Description: The site was formally an old chalk pit that has been partially filled and

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton. Introduction Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton. We are currently considering options for the mixed-use redevelopment

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This public exhibition gives you the opportunity to view and comment on our proposals to create a new residential development on land adjacent to

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Maidstone Medical Campus Ltd is applying to Maidstone Borough Council for

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral

More information

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1 The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1. Introduction This report summarises the results of an assessment that has been undertaken to determine how a proposed

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2)

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) Central Chelmsford Development Agency / Genesis 27/08/2014 Central Chelmsford Development Agency: Environmental Statement Quality Management

More information

Welcome to our public consultation

Welcome to our public consultation About our development Welcome to our public consultation This exhibition gives you the chance to view and comment on our proposals for a residential development of up to 187 high-quality homes, along with

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Land at Weymouth Gateway Proposed hotel and pub / restaurant Non-technical summary. Premier Inns Ltd February 2011

Land at Weymouth Gateway Proposed hotel and pub / restaurant Non-technical summary. Premier Inns Ltd February 2011 February 2011 Introduction NTS.1 In April 2007, New Look Retailers Ltd submitted an outline planning application to Weymouth and Portland Borough Council to redevelop the Mount Pleasant Business Park

More information

Ashtead Neighbourhood Forum Site Assessment AS03 Lime Tree Lodge, Farm Lane. Site address: Lime Tree Lodge, Farm Lane. Proposed Land Use:

Ashtead Neighbourhood Forum Site Assessment AS03 Lime Tree Lodge, Farm Lane. Site address: Lime Tree Lodge, Farm Lane. Proposed Land Use: Site ref: AS03 Site address: Lime Tree Lodge, Farm Lane Proposed Land Use: Total Site Area (Ha): Housing 1.25ha Description The site is located off Farm Lane at the junction with Park Lane. To the north

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD Proposals for land at Smug Oak Lane BRICKET WOOD Previous Linden Homes and Wates Developments scheme Welcome Welcome to Linden Homes and Wates Developments public exhibition. Working together as joint

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY INTRODUCTION NTS.1 CEMEX UK Properties Limited is applying for planning permission to South Cambridgeshire District Council (SCDC) for the redevelopment of the former CEMEX cement

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

DESIGN & ACCESS STATEMENT. REVISION A Residential Development, Neon Social Club, Nairn Street, Jarrow.

DESIGN & ACCESS STATEMENT. REVISION A Residential Development, Neon Social Club, Nairn Street, Jarrow. DESIGN & ACCESS STATEMENT. REVISION A Residential Development, Neon Social Club, Nairn Street, Jarrow. The following Design & Access Statement is in support of a Full Planning Application for a residential

More information

Non-technical summary

Non-technical summary Non-technical summary Introduction NTS.1 is applying for outline planning permission for a residential development of up to 80 dwellings on land at Hambrook, on the northern fringe of Bristol. NTS.2 An

More information

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Departure from the Development Plan. Town Council objection to a major application. DETERMINE Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95

More information

SITE ASSESSMENT CHECKLIST

SITE ASSESSMENT CHECKLIST 1. Site Details a. What is the site s name/reference? CR3 FORUM NEIGHBOURHOOD PLAN SITE ASSESSMENT CHECKLIST CR3NPCOH3016 Douglas Brunton Centre Park Rd b. Where is the site located? Caterham Hill urban

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

WELCOME TO THE NEW WILTON PARK

WELCOME TO THE NEW WILTON PARK WELCOME TO THE NEW WILTON PARK VISION HISTORY OF WILTON PARK TOWARDS A PLANNING APPLICATION Our objective is to create a truly outstanding environment at Wilton Park. At the heart of our proposals is a

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

ABOUT CALA HOMES CALA HOMES

ABOUT CALA HOMES CALA HOMES WELCOME Welcome to this public consultation event for our proposed development on land to the east of Salisbury Road, in Hungerford. Thank you for taking the time to come along today. Homes and Wates Developments

More information

1 INTRODUCTION 1.1 INTRODUCTION

1 INTRODUCTION 1.1 INTRODUCTION 1 INTRODUCTION 1.1 INTRODUCTION RREEF (UK) Ltd in partnership with Sheffield City Council (SCC) is applying for planning permission for the construction of: a new indoor city centre market hall and indoor

More information

LAND NORTH OF NETHERHOUSE COPSE, FLEET

LAND NORTH OF NETHERHOUSE COPSE, FLEET REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

CALA HO ME S WELCOME

CALA HO ME S WELCOME WELCOME Welcome to this public consultation event for our proposed residential development of 56 high quality homes on land to the north east of Station Road in Earls Colne. Thank you for taking the time

More information

26 September 2014 CONSULTATION EXPIRY : APPLICATION EXPIRY : 22 July 2014 SUMMARY RECOMMENDATION: PERMISSION

26 September 2014 CONSULTATION EXPIRY : APPLICATION EXPIRY : 22 July 2014 SUMMARY RECOMMENDATION: PERMISSION Item No.: 5 The information, recommendations and advice contained in this report are correct as at the date of preparation, which is more than one week in advance of the Committee meeting. Because of the

More information

and Netherhall Road and Camp Farm EIA

and Netherhall Road and Camp Farm EIA and Netherhall Road and Camp Farm EIA Environmental Statement - Non Technical Summary December 2012 in association with 1. Introduction Story Homes applied to Allerdale Borough Council (ABC) in May 2011

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom Elvetham Chase, Fleet Environmental Statement: Non-Technical Summary November 2016 A Ne w F e tte r P lace 8-10 New Fetter Lane London EC4A 1AZ United Kingdom T +44 (0) 20 7467 1470 F +44 (0) 20 7467 1471

More information

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS SCHEME EVOLUTION STARBUCKS The proposed Starbucks Drive Thru alongside the proposed food store provides an appropriate mix of uses, suitable for this location. The proposed store is bespoke, designed specifically

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION)

Harrow Lane, St Leonards-on-Sea, East Sussex, TN37 7JZ ERECTION OF 113 DWELLINGS TOGETHER WITH ESTATE ROADS (DETAILED SUBMISSION) AGENDA ITEM NO: Report to: PLANNING BOARD Date: 10 September, 2003 Report from: Borough Planning Officer Application Address: Proposal: Application No: Recommendation: Ward: File No: Applicant: Interest:

More information

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand. WELCOME Welcome to this public consultation event for our proposed development on land to the south of Twelve Leys in Wingrave. Thank you for taking the time to come along today. Homes is preparing a planning

More information

NRP North Environmental Statement Non Technical Summary. Norwich Research Park North Environmental Statement Non Technical Summary.

NRP North Environmental Statement Non Technical Summary. Norwich Research Park North Environmental Statement Non Technical Summary. Norwich Research Park North Environmental Statement Non Technical Summary Non Technical Summary Introduction The Norwich Research Park (NRP) is an important component of the East of England life sciences

More information

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT January 2016 Contents Introduction section 1 Section 1 - Introduction Section 2 - Assessment Section 3 - Involvement Section 4 - Evaluation Section 5 - Design Section 6 - Layout

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Application Recommended for Approval Hapton with Park Ward

Application Recommended for Approval Hapton with Park Ward Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for

More information

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham 1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN NON-TECHNICAL SUMMARY October 2017 CLARENDON GAS WORKS WOOD GREEN CLARENDON GAS WORKS, HARINGEY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY October 2017 Our Ref: Q70251 Contents 1 INTRODUCTION... 2 2

More information

10. East Dulwich East Dulwich Area Vision

10. East Dulwich East Dulwich Area Vision 10. 10.1. Area Vision 10.1.1. is: A predominantly residential area characterised by mostly medium density housing, including many family homes. Many parts of have retained historic character and it includes

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Site ref: AS05 Site address: Ashtead Park Garden Centre, Pleasure Pit Road

Site ref: AS05 Site address: Ashtead Park Garden Centre, Pleasure Pit Road Site ref: AS05 Site address: Ashtead Park Garden Centre, Pleasure Pit Road Proposed Land Use: Total Site Area (Ha): Housing 1.25ha Description: The site is located off Pleasure Pit Road near the junction

More information

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY May 2016 CONTENTS CONTENTS... i 1 Introduction... 1 2 The Proposed Development... 3 3 Need and Alternatives

More information

The Fairfield Partnership Vision for North-East Elsenham

The Fairfield Partnership Vision for North-East Elsenham The Fairfield Partnership Vision for North-East Elsenham August 2009 Frequently Asked Questions Who is The Fairfield Partnership? The Fairfield Partnership is a joint venture between Marchfield Developments

More information

1. Objectives of this consultation

1. Objectives of this consultation 1. Objectives of this consultation Provide an update on the results of the December 2014 consultation Provide a summary of the Pre-Submission Plan which is now out for formal consultation To ask for your

More information

4 RESIDENTIAL ZONE. 4.1 Background

4 RESIDENTIAL ZONE. 4.1 Background 4 RESIDENTIAL ZONE 4.1 Background The residential areas within the City are characterised by mainly lowrise dwellings sited on individual allotments. Past architectural styles, settlement patterns and

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION PLANNING & BUILDING CONTROL Tracy Harvey Head of Planning & Building Control Rob Wells Savills Innovation Court 121 Edmund Street Birmingham B3 2HJ Our Ref: 5/16/3441 E-mail: Date: planning@stalbans.gov.uk

More information

Blackley Mere Developments Limited Blackley Mere Redevelopment

Blackley Mere Developments Limited Blackley Mere Redevelopment Blackley Mere Developments Limited Blackley Mere Redevelopment Environmental Statement Non-Technical Summary Hyder Consulting (UK) Limited 2212959 Firecrest Court Centre Park Warrington WA1 1RG United

More information

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon. 138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1

More information

Environmental Statement

Environmental Statement Non-technical summary (NTS) Introduction Site description and development proposals Environmental issues and methodology Air quality Community and social effects Cultural heritage: designated heritage

More information