1 Environmental Statement Review for Infrastructure
2 Temple s added value Temple is one of the UK s leading independent infrastructure and property consultancies, specialising in environment, planning and sustainability. We have a proven track record in both undertaking Environmental Impact Assessments (EIA) and reviewing Environmental Statements (ES). Temple has been involved with some of the most significant infrastructure projects in the UK and our track record in rail dates back 20 years to the Channel Tunnel Link (CTRL) and the Thameslink Programme. Our portfolio of projects covers highspeed, inter-urban, commuter and metro services, along with light rail, trams and heritage lines. We adopt a pragmatic approach to ES reviews, working closely with our clients to deliver a level of review to meet their needs, whether this is simply a regulatory compliance check or a more detailed technical review. We are known for our responsive and collaborative approach of working, providing ongoing support to our clients throughout the decision making process and beyond consent. ES reviews and why you need to do them: There are many reasons for arranging an independent review of an ES, these include: ensuring compliance with all the relevant regulations; reducing risk to both planning authorities and the Applicant from third party challenge; to help the case officer in compiling their Committee reports and making their recommendations; assessing whether the information presented in the ES is complete and whether it has been arrived at in the right way; advising on suitable wording for any specific planning conditions needed; and adequate scrutiny of an ES to support the decision making process.
3 Thames Tideway ES review Client: London Borough of Tower Hamlets Date: June 2012 Temple was instructed by the London Borough of Tower Hamlets to undertake a review of Thames Water s proposals for two major worksites within the borough, including a Combined Sewer Overflow connection shaft site at King Edwards Memorial Garden. This proposal forms part of the DCO for the Thames Tideway Tunnel project currently in construction. Temple undertook a review of the site selection process and consultation process used by Thames Water during the preapplication stage, and further reveiws of the s.78 publicity, and the applicants various responses to written representations during the determination period. The commission included for focussed expert techncial reviews of the traffic and transport, local air quality (including odour), noise and vibration, and recreation, open space and visual impact baseline data and assessment findings. Temple also supported LBTH at the Examination in Public. The review addressed both the construction and operation phases. Our value Temple was able to guarantee a consistent team over the whole two and a half year period, ensuring knowledge of the scheme and key issues were carried throughout the project. Helpful, proactive approach to the project, providing flexibility where appropriate. Very satisfied with the service provided Harriet Peacock, London Borough of Tower Hamlets
4 M20 Junction 10A ES Review Client: Ashford Borough Council Date: August 2016 Temple was commissioned by Ashford Borough Council to undertake an independent review of the ES, which was produced by Highways England to support a Development Consent Order (DCO) for the proposed scheme at M20 Junction and A2070 Link. Key issues requiring detailed consideration included: Ensuring compliance with all the relevant regulations; landscape arboricultuire air quality traffic and transportation noise and vibration Temple supported the Council in ensuring the ES was robust by providing highly experienced technical specialists toadvise on the scheme, compliance with legislation, associated impacts and proposed mitigation. Our value Temple has worked with the Council on numerous projects and continue to demonstrate the quality of our work. As demonstrated on this project, Temple is able to prioritise its effort to areas of focus, providing a balanced review along with practical advice.
5 Norton Bridge Client:Network Rail Date: June 2012 On behalf of Network Rail, Temple provided environmental services for this Nationally Significant Infrastructure Project (NSIP) which required a Development Consent Order (DCO). Works comprised a new grade separated railway junction on the West Coast Main Line north of Stafford, with associated highway, major gas and fuel oil pipeline diversions, deep cuttings, multiple bridge construction and watercourse diversions. Temple provided the following services: environmental assessment and EIA co-ordination; production of ES; consultation GIS analysis and constraints mapping; carbon modelling; sustainability appraisal; and Our value Temple ensured value for the client by carrying out hydraulic modelling alongside consultation with local land owners and the Environment Agency. This work enabled the client to agree reduced span watercourse crossings, saving the client 6 million in construction cost. Temple s help and dedication has gone above and beyond and is greatly appreciated Michelle Wishart, Network Rail
6 For further information on these services or how we can help, please contact Peter George or Mark Skelton: E: / T: +44 (0) templegroup.co.uk
Environmental Impact Assessment
Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.
More informationTRANSPORT & INFRASTRUCTURE
Pegasus Group PEGASUS GROUP TRANSPORT & INFRASTRUCTURE OUR SERVICES PLANNING DESIGN ENVIRONMENT ECONOMICS Our specialist team of transport planners, traffic engineers and infrastructure designers provide
More informationEnvironmental Impact Assessment. York Glasgow Edinburgh
Environmental Impact Assessment York Glasgow Edinburgh Our Services Our Approach EIA (Environmental Impact Assessment) ASSESSMENTS Environmental Impact Assessment (EIA) Environmental Statements and Reports
More informationA.3. Preliminary Environmental Information Report. Riverside Energy Park EN STATEMENT OF COMPETENCY. June 2018 Revision 0
Riverside Energy Park Preliminary Environmental Information Report APPENDIX: A.3 PLANNING INSPECTORATE REFERENCE NUMBER: EN010093 STATEMENT OF COMPETENCY June 2018 Revision 0 Planning Act 2008 Infrastructure
More informationInterim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents
Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives
More informationWhy we need the Counters Creek storm relief sewer
Counters Creek storm relief sewer Why we need the Counters Creek storm relief sewer The problem The sewer network we operate today has been much improved and vastly extended over the years and remains
More informationChapter 1. Introduction
Chapter 1 Introduction 2 Crossrail Amendment of Provisions 1 Introduction 1.1.1 The Crossrail Bill was submitted to Parliament together with an Environmental Statement (ES) (hereafter referred to as the
More informationPlumstead Temporary Railway Sidings and Associated Permanent Works
Plumstead Temporary Railway Sidings and Associated Permanent Works Environmental Impact Assessment Non-Technical Summary Document Number: February 2013 Plan Design Enable Page 2 of 20 Contents Contents...
More informationWelcome to the Public Consultation Exhibition
Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised
More information11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2
11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON
More informationWednesbury to Brierley Hill Extension
19 February 2019 Wednesbury to Brierley Hill Extension Evidence Given on Behalf of the Applicant: WMCA Civil Engineering Summary Proof of Evidence Ian Collins Transport and Works Act 1992 The Transport
More informationAppendix A: The EIA Team
Appendix A: The EIA Team Appendix A.1: The EIA Team Appendix A.1 The Environmental Impact Assessment Team 1 Introduction Affric Limited have led the EIAR production, however it has been a team effort.
More informationvolume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08
DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This
More informationPegasus Group PEGASUSGROUP.CO.UK PEGASUS GROUP OUR SERVICES
Pegasus Group PEGASUSGROUP.CO.UK PEGASUS GROUP OUR SERVICES PLANNING DESIGN ENVIRONMENT ECONOMICS PEGASUS GROUP Pegasus Group was established in 2003 and has grown to become a leading independent, national
More informationHS2 Environment. Protecting the environment
HS2 Environment Protecting the environment Approach to mitigation EIA Regulations require an ES to include a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant
More informationDEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental
DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics
More informationWelcome Welcome to this public consultation which outlines our proposals for the redevelopment of the Old Southwark Fire Station located on Southwark Bridge Road. The purpose of this consultation is to
More informationPlanning Statement. Application for Development Consent. Thames Tideway Tunnel Thames Water Utilities Limited. Application Reference Number: WWO10001
Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Planning Statement Doc Ref: 7.01 Appendix Z APFP Regulations 2009: Regulation
More informationEbbsfleet Development Corporation
Title of Paper Planning and Housing Delivery Report September 2018 Presented by Sub-Committee Mark Pullin, Chief Planning Officer Planning Committee Purpose of Paper and Executive Summary This paper provides
More informationArchaeology and Planning in Greater London. A Charter for the Greater London Archaeology Advisory Service
Archaeology and Planning in Greater London A Charter for the Greater London Archaeology Advisory Service THE PURPOSE OF THE CHARTER This Charter sets out how English Heritage will provide archaeological
More informationGarden Bridge Planning Application
Planning Application Additional Verified photomontages and assessment September 2014 Contents Page 1 Visual assessment 2 1.1 Introduction 2 1.2 Baseline 2 1.3 Potential effects and good environmental
More informationWatford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments
Watford Local Plan Part 2 Publication Stage Environmental Report Appendix 3: Consultation Comments August 2016 Appendix 3 - Responses to Consultation of the Local Plan Part 2 As required by the SEA Directive,
More informationNorth Somerset Council Local Development Framework
North Somerset Council Local Development Framework Sites and Policies Development Plan Document Evidence Paper Re-opening Portishead Railway Line and Options for the Location of Portishead Railway Station
More informationEnvironmental Assessments
SERVICE GUIDE 03 Environmental Assessments Making a statement Lichfields is the pre-eminent planning and development consultancy in the UK We ve been helping create great spaces for over 50 years. lichfields.uk
More informationHigh Speed Rail (London- West Midlands)
High Speed Rail (London- West Midlands) Draft Environmental Minimum Requirements Annex 3: Draft Heritage Memorandum November 2013 ESA 4.4 High Speed Rail (London- West Midlands) Draft Environmental Minimum
More informationInfrastructure for London. Perspective
Infrastructure for London Perspective Contents Investing in Infrastructure 3 Project Services 5 Transport 7 Airports 7 Waterways 9 Rail 11 Roads 13 Cycle Routes 15 Water 17 Green Infrastructure 19 Contact
More informationHow we chose our preferred sites
Counters Creek storm relief sewer How we chose our preferred sites The site selection process In order to meet the need to reduce sewer flooding in the Counters Creek catchment area of west London, we
More informationLANDMARK HOUSE SUDS NOT DUDS Image Credit: RSH
LANDMARK HOUSE SUDS NOT DUDS Image Credit: RSH Graduate Engineer Infrastructure and Highways MEng Civil Engineering University of Southampton. Graduate Member of the ICE. 14 months experience working for
More informationWitteveen+Bos. Strategy // Planning // Design for resilient urban places. Rachael Cox April 2017
Healthy Witteveen+Bos: & Resilient Cities: Designing Urban Healthy Planning & and Resilient Engineering Cities 1 Witteveen+Bos Strategy // Planning // Design for resilient urban places Rachael Cox April
More informationvolume 11 environmental assessment section 2 environmental impact assessment Part 2 ha 202/08 environmental impact assessment
DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental section 2 environmental impact Part 2 ha 202/08 environmental impact SUMMARY This Advice Note provides guidance for undertaking statutory and
More informationHydrology, Flood Risk + SuDS. York Glasgow Edinburgh
Hydrology, Flood Risk + SuDS York Glasgow Edinburgh Our services Our Approach Hydrology, Flood Risk + SuDS ASSESSMENTS Flood Risk Assessment Flood Consequence Assessment Drainage Impact Assessment Environmental
More informationBabergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation
Babergh and Mid Suffolk Joint Draft Local Plan Consultation, August 2017, Public Consultation Having reviewed the documents, the Society has made the following response: Housing Delivery Q 7. Do you agree
More informationWelcome to our public exhibition
About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the
More informationEnvironmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.
Environmental Impact Assessment for Waterway Restoration Projects Chris John, Technical Director Ecus Ltd. Environmental Impact Assessment for Waterway Restoration Projects What is Environmental Impact
More informationDan Gray, Property Director. Date: November 2017 Review Due Date: November 2020
Policy title: Scope: Policy owner & job title: Approver: Fire Safety Policy Group-wide Dan Gray, Property Director Aspire Housing Board Date: November 2017 Review Due Date: November 2020 POLICY SUMMARY
More informationReplacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary
Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller
More informationPublic Consultation. Land at Monks Farm, North Grove. Welcome
Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open
More informationTRANSPORT. creative minds safe hands
www.wyg.com creative minds safe hands DELIVERING SOLUTIONS Efficient transport links are vital for supporting economic growth. With increasing pressure on existing networks, the need for clear, intelligent
More informationAECOM Wolverhampton City Centre Metro Extension Environmental Impact Assessment Scoping Report 64
AECOM Wolverhampton City Centre Metro Extension Environmental Impact Assessment Scoping Report 64 14 Conclusions It can be concluded from the scoping report that the following topics should be scoped in
More informationCORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009
DESIGN MANUAL FOR ROADS AND BRIDGES CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009 SUMMARY OF CORRECTION HA 200/08 VOLUME 11, SECTION 1, PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL
More informationLAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development
LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION Proposed Residential Development YOUR VIEW MATTERS TO US PROPOSED RESIDENTIAL DEVELOPMENT AREA Thank you for taking the time to read this information
More informationSlough International Freight Exchange Proposals, Colnbrook+
Welcome Welcome to this exhibition, which is being held in connection with our proposals for a new freight exchange facility on land to the north of the A4. Please take this opportunity to look at the
More informationRetrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.
Retrofitting SuDS Virginia Stovin Department of Civil and Structural Engineering Pennine Water Group University of Sheffield Outline Urban stormwater management Conventional approach, problems and costs
More informationNewcourt Masterplan. November Exeter Local Development Framework
Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up
More informationThe Hadean-Creation studio.
Residential Designing Spring 2016 The Hadean-Creation studio. We provide sustainable and ethical responses to the client s brief by adding value and empowering a sense of pride and ownership. Hadean-Creation
More information17A. Wind Microclimate
17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate
More informationStart of works exhibition
Start of works exhibition Find out about the work that Highways England are undertaking to create a new interchange junction 700 metres east of junction 10 over the M20, a dual carriageway link road to
More informationTOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).
FAO: D. Williams Isle of Anglesey County Council Council Offices Llangefni Anglesey LL77 7TW 16 November 2017 DCRM Ref. No: WN0904-QUD-OS-LET-00002_English Dear Mr Williams TOWN AND COUNTRY PLANNING ACT
More informationShaping Quality Development & The Mitigation Maze Alister Kratt Board Director
Shaping Quality Development & The Mitigation Maze Alister Kratt Board Director June 2017 Shaping Quality Development Guide Establishes the principles and framework for maximising the integration between
More informationPublished in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.
Action Pack Published in March 2005 by the Ministry for the Environment Manatū Mō Te Taiao PO Box 10-362, Wellington, New Zealand ISBN: 0-478-18994-X ME number: 580 This document is available on the Ministry
More informationMy role and specialisms. Worked at spawforths for nearly 13 years. Worked on EIA projects for approx. 10 years and had co-ordinator role for approx.
My role and specialisms. Worked at spawforths for nearly 13 years. Worked on EIA projects for approx. 10 years and had co-ordinator role for approx. 9 years. Lead EIA activities in the company. The majority
More informationENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development
ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development TEN-T Project Management Workshop 2010 George Kremlis DG ENV B4, European Commission 13 January 2010 Environmental
More informationOUR AREA SECTION 02 I NEXT PAGE. 2.1 This section sets the scene in regard to the role of the Legacy Corporation and the baseline
7 ADOPTED LOCAL PLAN SECTION 02 2.1 This section sets the scene in regard to the role of the Legacy Corporation and the baseline position of the Local Plan. It sets out the historical context and current
More informationPeter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).
Our ref: 30062 2 nd August 2017 Kettering Borough Council Planning Department Municipal Offices Bowling Green Rd Kettering NN15 7QX 61 Oxford Street Manchester M1 6EQ T: +44 (0)161 245 8900 E: manchester@peterbrett.com
More informationROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document
ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL
More informationCotswolds AONB Landscape Strategy and Guidelines. June 2016
Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction
More informationHeritage Action Zone. Explanatory Notes and Guidance
Heritage Action Zone Explanatory Notes and Guidance Contents What is a Heritage Action Zone?...2 What support can Historic England offer to a Heritage Action Zone?...2 What could a Heritage Action Zone
More informationLondon Road, Derker. Non Technical Summary. Introduction
London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for
More informationSpecial Landscape Area (Great Orme and Creuddyn Peninsular). Agricultural land (grade 3a). TPO A14 (1982) - group of trees (G4) on east boundary.
TAN 24 and TAN 5: Technical Advice Note (TAN) 24: The Historic Environment (2017) Guidance on how the planning system considers the historic environment during development plan preparation and decision
More informationPegasus Group PEGASUS GROUP PLANNING OUR SERVICES
Pegasus Group PEGASUS GROUP PLANNING OUR SERVICES PLANNING DESIGN ENVIRONMENT ECONOMICS ABOUT US Pegasus Group was established in 2003 and has grown to become a leading independent national planning consultancy,
More informationGreen Roofs and Stormwater Management Virginia Stovin
Green Roofs and Stormwater Management Virginia Stovin Department of Civil and Structural Engineering Pennine Water Group University of Sheffield Outline Urban stormwater management Conventional solutions,
More informationLONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY
LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2
More informationCreating thriving and sustainable places
Creating thriving and sustainable places Highways, property and planning and building control services Delivering excellence in the built environment Contents Creating thriving and sustainable places 3
More informationOlympic Park, London. SuDS used. 1. Location. 2. Description. Case study
Olympic Park, London SuDS used Porous asphalt strips Wetlands Swales Filter strips Filter drains Balancing ponds Rainwater harvesting 1. Location Olympic Park, Stratford, East London, E20 2ST. 2. Description
More informationBrookside Walk Children's Play Area, London, NW4
LOCATION: Brookside Walk Children's Play Area, London, NW4 REFERENCE: H/05584/13 Received: 26 November 2013 Accepted: 11 December 2013 WARD(S): Hendon Expiry: 05 February 2014 Final Revisions: APPLICANT:
More informationChapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts
Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor
More informationGreening the Thameslink Route
Greening the Thameslink Route Amelia Woodley Network Rail Thameslink Environment Manager 29-Sep-15 / 1 Thameslink Programme / 2 Our approach to sustainability Recruit, retain and grow People Diversity
More informationAn introduction. An introduction to HOW Planning
An introduction An introduction to HOW Planning Property sectors Our expertise spans all major property sectors and we have a proven track record. Retail Residential Mixed Use Energy Conservation Business
More informationLandscape Architecture & Urban Design
Landscape Architecture & Urban Design Delivering excellence in the built environment What we do Landscape architecture Urban design Masterplanning Public consultation Design briefs Design codes Conservation
More informationRoute Window Environmental Topic Summary of Significant Residual Impacts
Table 1.3: Summary of Eliminated Significant Residual Impacts Route Window Environmental Topic Summary of Significant Residual Impacts C6 and C7: Farringdon Station and Liverpool Street Station Townscape
More informationLAND OFF TOLLBAR WAY, HEDGE END PUBLIC CONSULTATION. Proposed Residential Development
LAND OFF TOLLBAR WAY, HEDGE END PUBLC CONSULTATON Proposed Residential Development YOUR VEW MATTERS TO US PROPOSED STE AREA Thank you for taking the time to read this information leaflet regarding a proposed
More informationPaddington House. 164 Bloomfield Road, Bath
Paddington House 164 Bloomfield Road, Bath Paddington House 164 Bloomfield Road, Bath, BA2 2AT A substantial Edwardian semi-detached family house with views over the city Accommodation: Lower Ground Floor:
More informationPlanning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator
Department Director of Manager of Policy Planner Planner II (2) Planner II/ Heritage Coordinator Technician/ Sustainability Coordinator Technician Administrative Clerk March 2017 Department 2018 Business
More informationWOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD)
Agenda Item No. 5 EECUTIVE - 15 JANUARY 2015 Executive Summary WOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD) The report outlines the various responses to the consultation on the Design Supplementary
More information20. NEWHAM ROUTE SECTION - ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2
20. NEWHAM ROUTE SECTION - ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 20.1 OVERVIEW OF NEWHAM ROUTE SECTION... 2 20.2 POLICIES RELEVANT TO ALL WORKSITES IN NEWHAM... 3 20.3 POLICIES RELEVANT
More informationTRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006
TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006 THE MIDLAND METRO (BIRMINGHAM CITY CENTRE EXTENSION LAND ACQUISITION AND VARIATION)
More informationResponse to the London Bridge Area Vision and Site Allocations within the New Southwark Plan
1 Melior Place London SE1 3SZ 020 7407 4701 teamlondonbridge.co.uk info@teamlondonbridge.co.uk 28 April 2017 Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan
More informationCrossrail Environmental Statement
Crossrail Environmental Statement Volume 5 Appendices A1: Requirements of the EIA regulations A2: Scope and methodology A3: Consultation 5 If you would like information about Crossrail in your language,
More informationTo evaluate the magnitude and significance of likely impacts and to propose appropriate measures to mitigate potential adverse impacts.
.0 INTRODUCTION. PURPOSE OF REPORT This Environmental Impact Statement (EIS) has been prepared as part of an application for a railway order for Luas Line A, a proposed 4.2km spur from the existing Luas
More informationmode transport planning
Ben Fairgrieve, Principal mode transport planning Professional Qualifications BA (Hons) Geography University of Wales: Swansea Summary Ben is a traffic and transportation planner with eight years experience
More informationFixing the Foundations Statement
Fixing the Foundations Statement 13 th August 2015 The Heritage Alliance is the largest coalition of non-government heritage interests in England, bringing together 98 national organisations which are
More informationThe Villages. Cliffe Cottage Port Lympne
Cliffe Cottage Port Lympne #TheGardenOfEngland Cliffe Cottage Port Lympne Aldington Road, Lympne, Kent CT21 4LN A charming detached character farmhouse with 2 double bedrooms, 2 reception rooms and lovely
More informationThe Train Now Arriving At... Harmonised Fire Safety For European Rolling Stock
The Train Now Arriving At... Harmonised Fire Safety For European Rolling Stock Beth Dean beth.dean@exova.com : The Role of Accredited Laboratories in Regulation and Market Surveillance 10 th October 2012
More informationWhat now for home building?
Successful Partners DELIVERING QUALITY 2017 Residential Seminar What now for home building? The post Brexit world May 2017 Successful Partners DELIVERING QUALITY 2017 Residential Seminar 30 March 2017
More information21. GREENWICH ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2
21. GREENWICH ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 21.1 OVERVIEW OF GREENWICH ROUTE SECTION... 2 21.2 POLICIES RELEVANT TO ALL WORKSITES IN GREENWICH... 3 21.3 WARREN LANE
More informationHaydock Point. Welcome
Welcome Peel Logistics Property, alongside Peel Land and Property, is preparing a planning application for Haydock Point, a high-quality logistics park east of Haydock. The purpose of this exhibition is
More informationChapter 27 Route Window SE7 Church Manorway Bridge. Transport for London
Chapter 27 Route Window SE7 Church Manorway Bridge Transport for London CHURCH MANORWAY BRIDGE 27 Route Window SE7 Church Manorway bridge Introduction 27.1 The North Kent Line will be converted to four
More informationHS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background
Summary of SMBC Asks 23/09/13 Background The Council has a developed a significant number of asks and propositions for consideration by HS2 Ltd and Government throughout further development of the HS2
More informationHighways England Environment Fund. Graeme Hull Tyne Tees Catchment Coordinator
Highways England Environment Fund Graeme Hull Tyne Tees Catchment Coordinator 2 3 Strategic Road Network HE Road Investment Strategy 2015/16 to 2019/20 Part 1: Strategic Vision Part 2: Investment Plan
More informationInfrastructure and the environment
INFRASTRUCTURE MATTERS Infrastructure and the environment December 2016 In this edition: Infrastructure and the environment: maximising environmental benefits Ancient woodland: a case study Image: Helix
More informationPlanning Statement. Application for Development Consent. Thames Tideway Tunnel Thames Water Utilities Limited. Application Reference Number: WWO10001
Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Planning Statement Doc Ref: 7.01 Appendix Q APFP Regulations 2009: Regulation
More informationTRANSPORT ARCHITECTURE. JOHN McASLAN + PARTNERS
TRANSPORT ARCHITECTURE JOHN McASLAN + PARTNERS The practice has, from the outset, been involved in significant infrastructure projects. Its first rail scheme, the redevelopment of Redhill Station in Surrey,
More informationPPS5: Planning for the Historic Environment
Heritage at the Heart of the Planning System Heritage Protection Reform Newsletter SPRING 2010 PPS5: Planning for the Historic Environment >> English Heritage welcomes the new Planning Policy Statement
More informationSouth Worcestershire Development Plan. South Worcestershire Design Guide Supplementary Planning Document
South Worcestershire Development Plan South Worcestershire Design Guide Supplementary Planning Document Statement of Consultation: Early Engagement Scoping Paper February 2017 1. Introduction 1.1 This
More informationSustainability Statement. Whitby Business Park Area Action Plan
Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan
More informationRE: QUEENSLAND GOVERNMENT PLANNING POLICY REVIEW
Planning Group Department of Infrastructure, Local Government and Planning PO Box 15009 CITY EAST QLD 4002 Via email: planningpolicy@dilgp.qld.gov.au 9 February 2017 Dear Sir/ Madam, RE: QUEENSLAND GOVERNMENT
More informationCrossrail. Supplementary Environmental Statement 3. Mapping
Crossrail Supplementary Environmental Statement 3 Mapping Supplementary Environmental Statement 3 SES3a 3 Contents 1. Introduction 2. Definitions and Sources: 2.1 Revised Scheme and Impacts 2.2 Transport
More informationSt. Clair Avenue West Area Transportation Master Plan
1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present
More informationHS2 Interchange Station Design
Working on behalf of HS2 Interchange Station Design October 2018 www.hs2.org.uk 1 Interchange Station, Solihull Introduction In February 2018, HS2 Ltd appointed Arup to take forward the design of Interchange
More informationTHE DEVELOPMENT SPECIALISTS
THE DEVELOPMENT SPECIALISTS SITE SOURCING DEVELOPMENT, DELIVERY AND GUIDANCE Development is a difficult process. It is both an art and a science and advising on development can only be done after years
More information