1 TENTATIVE TRACT MAP NO (stamped map dated June 11, 2014.) HEARING DATE: Wednesday, July 2, 2014 PLANNING DEPARTMENT STAFF REPORT PURSUANT TO ORDINANCE NO. 164,845, IF A CERTIFICATE OF POSTING HAS NOT BEEN SUBMITTED BEFORE THE DATE OF THE PUBLIC HEARING, IT MUST BE PRESENTED AT THE HEARING, OR THE CASE MUST BE CONTINUED. REQUEST Pursuant to Los Angeles Municipal Code Sections 17.03, 17.06, and 18.04, Tentative Tract Map No to permit the merger and re-subdivision of 4 lots into 21 lots, including Private Streets, for implementation of the previously approved NBC Universal Evolution Plan that includes studio, studio office, entertainment, entertainment retail, hotel, and office uses, and located on an approximately 48.8 net acre site located at 3848 Lankershim Boulevard in the RE15-1-H, [Q]C2-1-SN, C2-1, and PB Zones. The applicant is also requesting to be able to record the map in multiple phases/unit maps. Find under the California Public Resources Code Section and the State s Environmental Quality Act (CEQA) Guidelines Section 15162, on the basis of substantial evidence contained in the whole record, that since certification of EIR No. ENV EIR (SCH ), on November 14, 2012, there have been no changes to the project, changes with respect to the circumstances under which the project is being undertaken, or new information of substantial importance concerning the project, which cause new significant environmental effects or a substantial increase in the severity of previously identified significant effects, and therefore no additional environmental review is required for the project. RELEVANT CASES ON-SITE: Case No. ENV EIR: On November 14, 2012, the City of Los Angeles certified an Environmental Impact Report (State Clearing House No ) and adopted a Mitigation Monitoring and Reporting Program for the NBC Universal Evolution Plan project at 100 Universal City Plaza. Case No. CPC GPA-ZC-SP: On November 14, 2012, a General Plan Amendment and Zone Change was approved for the NBC Universal Evolution Plan project at 100 Universal City Plaza. The General Plan Amendment changed the land use designation from Open Space, Minimum Density Residential, Very Low Density Residential, Medium Density Residential, Limited Commercial, Community Commercial, and Regional Center Commercial to Regional Commercial. The Zone Change changed the zoning from OS-1XL, RE40-1, RE20-1, RE20-1-H, RE15-1-H, R1-1, P-1, PB-1, (Q)C1-1L, and C2-1 to [Q]C2-1-SN (Ordinance No. 182,321). On February 5, 2013, the Universal City Sign District was established by Ordinance No. 182,436.

2 TENTATIVE TRACT MAP NO PAGE 2 Case No. CPC AD: Approval of the initiation of jurisdictional annexation and detachment process (LAFCO annexation). Case No. CPC DA: On February 5, 2013, a development agreement by and between the City of Los Angeles and Universal Studios LLC was established by Ordinance No. 182,437. Case Nos. Tentative Tract and 69527, and Vesting Tentative Tract 70481: The Tentative Tract Maps were previously filed with the Department of City Planning for various subdivision configurations associated with the NBC Universal Evolution Plan project. The Applicant submitted a request to withdraw these cases on July 16, 2012, and the City terminated all proceedings relative to such cases on July 26, Case No. AA PMEX: July 25, 2002, approval of a parcel map exemption to adjust the boundaries between Parcels 1 and 4. Case No. ZA : A deemed approved Conditional Use for alcohol sales for the remodel of an existing restaurant (Saddle Ranch Shop House). Case No. Plot Plan : May 2000 approval of remodeled freestanding sign and acknowledgement of freestanding sign total entitlement. CF No : May 2000 approval of street name change. Case Nos. CPC DA, CPC ZC-MPR, and CPC SP: A Development Agreement, Zone Change, General Plan Amendment, and Specific Plan that was approved by the City Planning Commission, but not completed/withdrawn. Case No. ZA : April 27, 1993 approval of a Variance within RE-15-1 and RE40-1-H Zones to construct a parking structure along Coral Drive adjacent to the Hollywood Freeway. Case No. ZA ZV: May 1993 approval of Variance to permit the sale of beer and wine in conjunction with a restaurant (Wolfgang Puck) in the P-1 Zone. Case No. ZA ZV: December 13, 1990 approval of a Variance to permit construction of 38,000-sf of retail and entertainment uses in the P Zone. Ordinance 164,959: January 11, 1989 approval of Zone Change established by AB283 from R4-1 to RE-40-1 in Subarea 980 and from C2-1 to CR-1-VL in Subarea Ordinance 164,341: June 16, 1989 approval of Zone Change established by AB283.

3 TENTATIVE TRACT MAP NO PAGE 3 OFF-SITE Case No. PMLA No PS: July 6, 1984 approval of a Parcel Map that established two parcels, which included the 10 Universal City Plaza office building, Sheraton Hotel, and Hilton Hotel. It also established a private street and community driveway (now known as Universal Hollywood Drive). Case No. CPC-27558: January 3, 1979 approval of a Zone Change to P-1 on an interior area of City property adjacent to the County boundary and the Hollywood Freeway (Ordinance No. 151,855). Case No. ZV : December 29, 1978 approval of a Variance to permit the construction of a 450-seat restaurant within the RE-15 Zone (Saddle Ranch Chop House). Case No. ZA : March 23, 1977 approval of a Variance to permit the construction of a 4-story office building and 3-story parking garage of which 2,000 square feet is located in the City on land zoned RE-15. Case No : December 18, 1972 approval of a Variance to permit a second film processing laboratory and pedestrian bridge at Lankershim Boulevard. Case No. ZA-19572: December 20, 1968 approval of a Variance at 3900 Lankershim Boulevard to permit the construction of a two-story L-shaped addition of office uses to the existing office building located in the RE-15 Zone. Case Nos. CPC and CPC-20040: December 1, 1996 approval of adjusted zoning between the C2-1 and PB-1 Zones in order to create a building site for the Sheraton Universal Hotel. A series of Zone Boundary Adjustment approvals followed to establish zoning for the 10 Universal Street Parkway Building and the Hilton Hotel (Sheraton 2). Ordinance No. 133,289: October 13, 1966 approval of C2-1 zoning on a portion of property located near the Hollywood Freeway. Ordinance No. 132,416: May 18, 1966 approval of RE15-1-H zoning on a portion of property located near the Hollywood Freeway. Case No. CPC-4224: 1952 approval of the original Conditional Use Permit for the site to be used as a motion picture studio. Case No. TT-72692: Pursuant to Los Angeles Municipal Code Sections 17.03, 17.06, and 18.04, Tentative Tract Map No for a subdivision consisting of 13 lots for implementation of the previously approved NBC Universal Evolution Plan that includes studio, studio office, office, entertainment, and entertainment retail uses, and located on an approximately 40.4 net acre site located at 3737 Barham Boulevard in the [Q]C2-1-SN Zone. The Advisory Agency will conduct a

4 TENTATIVE TRACT MAP NO PAGE 4 concurrent public hearing on the application at Los Angeles City Hall on July 2, 2014, 10:30 A.M. PUBLIC RESPONSES No letters have been received from the public. GENERAL COMMENTS The Applicants, Universal Studios LLC and Tyjade Ranch LLC, seek approval of Tentative Tract Map No to permit the merger and re-subdivision of 4 lots into 21 lots on an approximately 48.8 net acre site (approximately 49.1 gross acres) at 3848 Lankershim Boulevard for implementation of the previously approved NBC Universal Evolution Plan that includes studio, studio office, entertainment, entertainment retail, hotel, and office uses. The applicant is also requesting approval to record the map in multiple phases/unit maps, consolidate lots, and allow private street design to deviate from conformance with public street design standards and Bureau of Engineering Standard S Conditions pursuant to Sections 17.05D and of the Municipal Code. The subject property is generally located east of Lankershim Boulevard, north of the 101 Hollywood Freeway, and west of Universal Studios Boulevard. It is part of the Universal Studios property. The site is currently developed with studio, studio office, office, entertainment, and entertainment retail uses. The proposed project site is located within the Sherman Oaks Studio City Toluca Lake Cahuenga Pass Community Plan Area and designated for Regional Center Commercial and Regional Commercial land uses. The site is zoned [Q] C2-1-SN, C2-1, PB-1, and RE15-1-H. No changes in the land use designations or zoning classifications are proposed. The project site is included in the adopted NBCUniversal Evolution Plan, which involves additions to the existing studio, studio office, office, entertainment, and entertainment retail uses at Universal Studios and introduces the hotel use. In 2012, the City Council adopted Ordinance No. 182,321, which approved a zone change for the NBC Universal Evolution Plan. The City Council also certified the Environmental Impact Report (EIR) No. ENV EIR (SCH ) for the NBC Universal Evolution Plan, which includes the project site. Ordinance No. 182,321 permits a total development of 330,000 square feet of Floor Area for new studio office, a 500-room hotel, 50,000 square feet of Floor Area for studio use, and 50,000 square feet of Floor Area for entertainment retail use. These development square footages are included in Table No. 1-A of the ordinance. New parking structures on the project site are permitted to accommodate the new uses. In 2012, the City also adopted a Mitigation Monitoring and Reporting Program for the NBC Universal Evolution Plan project. On May 23, 2014, the Applicant recorded a Covenant and Agreement, Document No , binding the property owner and successors to the [Q] Qualified Conditions of Zone Change Ordinance No , of which [Q] Condition No. 15 requires compliance with the project design features and mitigation measures contained in the adopted Mitigation

5 TENTATIVE TRACT MAP NO PAGE 5 Monitoring and Reporting Program for the NBC Universal Evolution Plan (Environmental Impact Report No. ENV EIR; SCH ). REPORTS RECEIVED BUREAU OF ENGINEERING: Recommends that the project be subject to the conditions stated in the memo dated June 25, See recommended conditions in Draft Tentative Tract Report with Conditions under department. DEPARTMENT OF BUILDING AND SAFETY, GRADING DIVISION: Recommends that the project be subject to the conditions stated in the memo dated June 25, See recommended conditions in Draft Tentative Tract Report with Conditions under department. DEPARTMENT OF BUILDING AND SAFETY, ZONING DIVISION: Recommends that the project be subject to the conditions stated in the memo dated April 30, See recommended conditions in Draft Tentative Tract Report with Conditions under department. DEPARTMENT OF TRANSPORTATION: Recommends that the project be subject to conditions stated in the memo dated May 23, As noted by the Department, the recommended conditions are consistent with the adopted Mitigation Monitoring and Reporting Program for the NBC Universal Evolution Plan, and the Department of Transportation assessment report attached to the MMRP. See proposed conditions in Draft Tentative Tract Report with Conditions under department. FIRE DEPARTMENT: Recommends that the project be subject to conditions stated in the memo dated April 29, Recommended conditions are consistent with the adopted Mitigation Monitoring and Reporting Program for the NBC Universal Evolution Plan. See proposed conditions in Draft Tentative Tract Report with Conditions under department. LOS ANGELES UNIFIED SCHOOL DISTRICT: No comments were available at the writing of the staff report. DEPARTMENT OF WATER AND POWER: Reports that this tract can be supplied with water from the municipal system subject to LADWP s Water Services Organization s rules and requirements in a memo dated June 10, BUREAU OF STREET LIGHTING: Recommends that the project be subject to conditions stated in the memo dated April 30, See recommended conditions in Draft Tentative Tract Report with Conditions under department. BUREAU OF SANITATION: No comments were available at the writing of the staff report.

6 TENTATIVE TRACT MAP NO PAGE 6 ENVIRONMENTAL CLEARANCE On November 14, 2012, the City of Los Angeles certified Environmental Impact Report No. ENV EIR (SCH ) and adopted a Mitigation Monitoring and Reporting Program for the NBC Universal Evolution Plan. The Environmental Impact Report reflects the independent judgment of the lead agency (the City of Los Angeles). The information contained in Environmental Impact Report No. ENV EIR has been previously reviewed and considered by the Director. Pursuant to California Public Resources Code Section and CEQA Guidelines Section 15162, on the basis of substantial evidence contained in the whole record, since certification of the Environmental Impact Report, there have been no changes to the Project, changes with respect to the circumstances under which the Project is being undertaken, or new information of substantial importance concerning the Project, which cause new significant environmental effects or a substantial increase in the severity of previously identified significant effects, and therefore no additional environmental review is required for the Project. STAFF RECOMMENDATIONS The Planning Department staff recommends approval of Tentative Tract Map No subject to the standard conditions and the additional conditions in the Draft Tentative Tract Report with Conditions. Prepared by: Christina Toy-Lee City Planning Associate (213) Note: Recommendation does not constitute a decision. Changes may be made by the Advisory Agency at the time of the public hearing.

7 TENTATIVE TRACT MAP NO PAGE 7 DRAFT TENTATIVE TRACT REPORT WITH CONDITIONS In accordance with provisions of Los Angeles Municipal Code (LAMC) Section of the LAMC, the Advisory Agency approved Tentative Tract Map No for a maximum of 21 lots, located at 3848 Lankershim Boulevard as shown on map stampdated June 11, 2014 in the Sherman Oaks-Studio City-Toluca Lake-Cahuenga Pass Community Plan. For an appointment with the Development Services Center call (213) The Advisory Agency s approval is subject to the following conditions: NOTE on clearing conditions: When two or more agencies must clear a condition, subdivider should follow the sequence indicated in the condition. For the benefit of the applicant, subdivider shall maintain record of all conditions cleared, including all material supporting clearances and be prepared to present copies of the clearances to each reviewing agency as may be required by its staff at the time of its review. 1. That the tract be permitted to record with final map units in a number and sequence satisfactory to the Advisory Agency. The subdivider shall submit the Unit Map Fee, a Unit Map showing the boundaries of all units, the Unit Number(s) of each Unit Map(s), and all applicable tract conditions in a matrix for each Unit Map(s). Should particular master tract condition(s) not apply to a Unit Map, the subdivider shall submit all evidences or documentation to prove so. All above required items shall be submitted satisfactory to the Advisory Agency prior to the clearance of all other conditions of approval. (Note: All conditions and requirements of the City Engineer for each unit map and the approved tract as whole shall be satisfactory to the City Engineer.) BUREAU OF ENGINEERING - SPECIFIC CONDITIONS 2. That a 12-foot wide strip of land be dedicated along Lankershim Boulevard adjoining the tract to complete together with 20-foot radius property line returns at the intersections with Universal Hollywood Drive and the 101-Freeway offramp to complete a 12-foot wide concrete sidewalk. 3. That a minimum 106-foot and variable widths private street easements be provided as shown on the tentative map stamp dated June 11, 2014 for proposed Universal Hollywood Drive (Lot 4) and as shown on the tentative map stamp dated June 11, That a minimum 91-foot and variable widths private street easements be provided as shown on the tentative map stamp dated June 11, 2014 for proposed Universal Hollywood Drive (Lot 5) including if necessary a 39.5-foot radius property easement cul-de-sac and as shown on the tentative map stamp dated June 11, That a minimum 44-foot and variable widths private street easements be provided for Hotel Drive (Lot 14) as shown on the tentative map stamp dated April 11, 2014 for proposed Universal Hollywood Drive and as shown on the tentative map stamp dated June 11, 2014.

8 TENTATIVE TRACT MAP NO PAGE 8 6. That a minimum 46-foot and variable widths private street easements be provided for proposed WC Filed Drive (Lot No.12)Together with a 39.5-foot radius easement line cul-de-sac at the street terminus and as shown on the tentative map stamp dated June 11, That a minimum 30-foot and variable width private street easement be provided for the portion of the private street shown as Sheraton Driveway on the tentative map stamp dated June 11, That a minimum 40-foot wide and variable width private street easement be provided for the portion of the private street shown as Hilton Driveway on the tentative map stamped dated June 11, That portion of the proposed private street shown as Lot No.4 on the tentative tract and within the County of Los Angeles jurisdiction (Universal Hollywood Drive) be designated as a separate lot and be reviewed and approved by the Los Angeles County. 10. That portion of the proposed private street shown as Lot No.4 on the tentative map and within the Los Angeles County jurisdiction be correctly shown on the final map. 11. That the necessary evidence be submitted satisfactory to the City Engineer showing right of ingress, egress from this tract area through the private street area within said Los Angeles County jurisdiction to Lankershim Boulevard. 12. That sanitary sewer easement be dedicated full-width of the proposed private streets if deemed necessary satisfactory to the Valley District Engineering Office. 13. That a Covenant and Agreement be recorded stating that the property owner will create a mechanism to make sure that the private street lots will never be in a tax default situation and ownership of said lot will not be conveyed to the City of Los Angeles ownership. 14. That the owners of the property record an agreement satisfactory to the City Engineer stating that they will grant the necessary easements for ingress, egress and public facilities over the private street areas upon the creation of the respective lots and they will maintain the private street, free and clear of obstructions and in a safe condition for vehicular use at all times. 15. That a Covenant and Agreement be recorded stating that private streets will be posted in a manner prescribed in Section of the Los Angeles Municipal Code Private Street Regulations. 16. That the private streets be named and the proposed name for private street shall be approved by the City Engineer. Any street name that would create confusion, be misleading, be unduly long or carry connotations offensive to good taste and decency shall be disapproved.

9 TENTATIVE TRACT MAP NO PAGE That the subdivider make a request to the Valley District Office of the Bureau of Engineering to determine the capacity of the existing sewer in the area. 18. That all the proposed tract map boundary lines be properly established in accordance with Section D of the Los Angeles Municipal Code prior to the recordation of the final map satisfactory to the City Engineer. 19. That the final map be approved by the State Department of Transportation with respect to the alignment of the Hollywood Freeway. Four copies of the final map shall be submitted to the City Engineer s Office for the State s approval prior to recordation of the final map. 20. That necessary arrangements be made with the State Department of Transportation prior to recordation of the final map for any necessary permits with respect to any construction and drainage discharge within or adjacent to the Hollywood Freeway right-of-way. 21. That any fee deficit under Work Order Nos. EXT00557 and E for this project be paid. 22. All existing public easements including the utilities easements for Los Angeles County and City of Los Angeles be shown on the final map. 23. That all the existing City Of Los Angeles Boundary Lines be shown correctly on the final map. 24. Prior to recordation of final map of Tract Map No , the subdivider shall provide a report defining, locating and addressing the geologic deficiencies and hazards identified in the Bureau of Engineering Geotechnical Review, dated May 23, 2014, under Geo File No , within and adjacent to the Tract Map area, including, but not limited to, fill soils, seismic, cut slopes, settlement and liquefaction, and recommends conceptual mitigation for such hazards and method to document such mitigations to the satisfaction and approval of the Department of Public Works, Bureau of Engineering, Geotechnical Engineering Group with site/building specific measures not required until a permit is requested. The recommended mitigation shall be consistent with the Mitigation Monitoring and Reporting Program (MMRP) for the NBC Universal Evolution Plan (Env EIR) adopted by the City of Los Angeles on November 14, In addition, a covenant and agreement shall be recorded stating that prior to the issuance of a building permit, grading permit, B-permit, or other permit for roadway construction or modification, provide a sitespecific/building specific geotechnical report to the satisfaction of the Department of Public Works, Bureau of Engineering, consistent with Mitigation Measure F-1 of the MMRP. DEPARTMENT OF BUILDING AND SAFETY, GRADING DIVISION 25. That prior to issuance of a grading or building permit, or prior to recordation of the final map, the subdivider shall make suitable arrangements to assure compliance, satisfactory to the Department of Building and Safety, Grading

10 TENTATIVE TRACT MAP NO PAGE 10 Division, with all the requirements and conditions contained in Inter-Departmental Letter dated June 25, 2014 Log No and attached to the case file for Tract No. TT DEPARTMENT OF BUILDING AND SAFETY, ZONING DIVISION 26. Prior to recordation of the final map, the Department of Building and Safety, Zoning Division shall certify that no Building or Zoning Code violations exist on the subject site. In addition, the following items shall be satisfied: a. Provide copy of building records, plot plan, and certificate of occupancy of all existing structures to verify the last legal use and the number of parking spaces required and provided on each site. Provide a list which indicates the following items in each proposed lots: building permit number, approved use, required parking spaces, and provide parking spaces, consistent with the existing [Q]C2-1-SN Zone established by Ordinance No. 182,321. b. Provide a copy of [Q] conditions. Show compliance with the [Q] conditions as applicable or Department of City Planning approval is required. c. Provide a copy of affidavit AF , AFF-50385, PKG-3235-A, AFF CD, AFF-35063, AFF-56075, AFF-61165, and AFF Show compliance with the conditions/requirements of the affidavits as applicable. d. Show all street dedication as required by Bureau of Engineering and provide net lot area after all dedication. Area requirements shall be rechecked as per net lot area after street dedication. Front yard requirements shall be consistent with the existing [Q]C2-1-SN Zone established by Ordinance No. 182,321. e. Comply with the parking requirements established by Ordinance No Notes: The existing or proposed building plans have not been checked for and shall comply with Building and Zoning Code requirements. With the exception of revised health or safety standards, the subdivider shall have a vested right to proceed with the proposed development in substantial compliance with the ordinances, policies, and standards in effect at the time of the effective date of the Development Agreement by and between Universal Studios LLC and the City of Los Angeles established by Ordinance No. 182,437. Plan check will be required before any construction, occupancy or change of use.

11 TENTATIVE TRACT MAP NO PAGE 11 If the proposed development does not comply with the current Zoning Code as applicable and Ordinance No. 182,321, all zoning violations shall be indicated on the Map. An appointment is required for the issuance of a clearance letter from the Department of Building and Safety. The applicant is asked to contact Laura Duong at (213) to schedule an appointment. DEPARTMENT OF TRANSPORTATION 27. Prior to recordation of the final map, satisfactory arrangements shall be made with the Department of Transportation to assure that the project is in compliance with the Project Design Features and Mitigation Measures in Section B of the adopted Mitigation Monitoring and Reporting Program for the NBC Universal Evolution Plan and the Department of Transportation assessment report attached to the Mitigation Monitoring and Reporting Program. FIRE DEPARTMENT 28. Prior to the recordation of the final map, a suitable arrangement shall be made satisfactory to the Fire Department, binding the subdivider and all successors to the following: a. Compliance with all Fire Department project features and mitigation measures applicable to development of the project in the City of Los Angeles under the adopted Mitigation Monitoring and Reporting Program for the NBC Universal Evolution Plan, including but not limited to: Project Design Features, K.1-1, K.1-2, and K.1-3. b. Access for Fire Department apparatus and personnel to and into all structures shall be required. c. Entrance to the main lobby shall be located off the address side of the building. d. Any required Fire Annunciator panel or Fire Control Room shall be located within 50ft visual line of site of the main entrance stairwell or to the satisfaction of the Fire Department. e. Where rescue access window is required, provide conditions and improvements necessary to meet accessibility standards as determined by the Los Angeles Fire Department. f. No building or portion of a building shall be constructed more than 150 feet from the edge of a roadway of an improved street, access road, or designated fire lane.

12 TENTATIVE TRACT MAP NO PAGE 12 g. Where fire apparatus will be driven onto the road level surface of the subterranean parking structure, that structure shall be engineered to withstand a bearing pressure of 8,600 pounds per square foot. h. All parking restrictions for fire lanes shall be posted and/or painted prior to any Temporary Certificate of Occupancy being issued. i. Electric Gates approved by the Fire Department shall be tested by the Fire Department prior to Building and Safety granting a Certificate of Occupancy. j. Where access for a given development requires accommodation of Fire Department apparatus, overhead clearance shall not be less than 14 feet. k. That in order to provide assurance that the proposed common fire land and fire protection facilities, for the project, not maintained by the City, are properly and adequately maintained, the sub-divider shall record with the County Recorder, prior to the recordation of the final map, a covenant and agreement (Planning Department General Form CP-6770) to assure the following: 1. The owner shall cause a yearly inspection to be made by a registered civil engineer of all common fire lanes and fire protection facilities. The owner will undertake any necessary maintenance and corrective measures. 2. The future owner of affected lots with common fire lanes and fire protection facilities shall be informed of the owner s responsibility for the maintenance of the devices on their lots. The future owner and all successors will be presented with a copy of the maintenance program for their lot. Any amendment or modification that would defeat the obligation of said owner the Advisory Agency must approve required hereinabove in writing after consultation with the Fire Department. 3. Prior to any building permits being issued, the applicant shall improve, to the satisfaction of the Fire Department, all common fire lanes and install all private fire hydrants to be required. 4. That the Common Fire Lanes and Fire Protection facilities be shown on the Final Map. l. No framing shall be allowed until the roadway is installed to the satisfaction of the Fire Department. m. Any required fire hydrants to be installed shall be fully operational and accepted by the Fire Department prior to any building construction. n. Site plans shall include all overhead utility lines adjacent to the site.

13 TENTATIVE TRACT MAP NO PAGE 13 o. Any roof elevation changes in excess of 3 feet may require the installation of ships ladders. p. Construction of public or private roadway in the proposed development shall not exceed 15 percent in grade. q. Standard cut-corners will be used on all turns. r. Where access for a given development requires accommodation of Fire Department apparatus, minimum outside radius of the paved surface shall be 35 feet. An additional six feet of clear space must be maintained beyond the outside radius to a vertical point 13 feet 6 inches above the paved surface of the roadway. s. The proposed project shall comply with all applicable State and local codes and ordinances, and the guidelines found in the Safety Plan, which is an element of the General Plan of the City of Los Angeles. t. The Fire Department may require additional vehicular access where buildings exceed 28 feet in height. DEPARTMENT OF WATER AND POWER 29. Satisfactory arrangements shall be made with the Los Angeles Department of Water and Power (LADWP) for compliance with LADWP s Water System Rules and Requirements for Tentative Tract Map No Upon compliance with these conditions and requirements, LADWP s Water Services Organization (WSO) will forward the necessary clearances to the Bureau of Engineering. (This condition shall be deemed cleared at the time the City Engineer clears Condition No. S-1.(c).) BUREAU OF STREET LIGHTING 30. If new street light(s) are required, then prior to the recordation of the final map or issuance of the Certificate of Occupancy (C of O), street lighting improvement plans shall be submitted for review and the owner shall provide a good faith effort via a ballot process for the formation or annexation of the property within the boundary of the development into a Street Lighting Maintenance Assessment District. BUREAU OF SANITATION 31. Satisfactory arrangements shall be made with the Bureau of Sanitation, Wastewater Collection Systems Division for compliance with its sewer system review and requirements. Upon compliance with its conditions and requirements, the Bureau of Sanitation, Wastewater Collection Systems Division will forward the necessary clearances to the Bureau of Engineering. (This condition shall be deemed cleared at the time the City Engineer clears Condition No. S-1. (d).)

14 TENTATIVE TRACT MAP NO PAGE 14 URBAN FORESTRY DIVISION AND THE DEPARTMENT OF CITY PLANNING 32. Prior to the issuance of a grading permit, an updated plot plan prepared by a reputable tree expert, indicating the location, size, type, and condition of all existing trees on the site shall be submitted for review by the Department of City Planning. All trees in the public right-of-way shall be provided per the current Urban Forestry Division standards. Replacement by a minimum of two 15-gallon trees of a protected tree species on- or off- the site for each protected tree to be removed, shall be required for the unavoidable loss of protected trees on the site. Note: Removal of all trees in the public right-of-way shall require approval of the Board of Public Works. Contact: Urban Forestry Division at: (213) Failure to comply with this condition as written shall require the filing of a modification to this tract map in order to clear the condition. DEPARTMENT OF CITY PLANNING-SITE SPECIFIC CONDITIONS 33. Prior to the recordation of the final map, the subdivider shall prepare and execute a Covenant and Agreement (Planning Department General Form CP-6770) in a manner satisfactory to the Planning Department, binding the subdivider and all successors to the following: a. Limit the proposed development to a maximum of 21 lots. b. That the subdivider considers the use of natural gas and/or solar energy and consults with the Department of Water and Power and Southern California Gas Company regarding feasible energy conservation measures. 34. That a revised map be submitted, satisfactory to the Advisory Agency and the City Engineer, substantially in conformance with this Tentative Tract Report with Conditions indicating the rights of way and improvements of the private streets, as well as other necessary adjustments. 35. That the subdivider shall record and execute a Covenant and Agreement to comply with [Q] Condition(s) per Ordinance No. 182,321 (Case No. CPC GPA-ZC-SP-SPA-CA/CPC AD). 36. That the subdivider shall record and execute a Covenant and Agreement to comply with Ordinance No. 182,437 (Development Agreement between Universal Studios LLC and the City of Los Angeles). 37. That the subdivider shall record and execute a Covenant and Agreement to comply with Ordinance No. 182,436 (Universal City Sign District).

15 TENTATIVE TRACT MAP NO PAGE Prior to the clearance of any tract map conditions, the applicant shall show proof that all fees have been paid to the Department of City Planning, Expedited Processing Section. 39. Indemnification. The applicant shall defend, indemnify and hold harmless the City, its agents, officers, or employees from any claim, action, or proceeding against the City or its agents, officers, or employees to attack, set aside, void or annul this approval which action is brought within the applicable limitation period. The City shall promptly notify the applicant of any claim, action, or proceeding and the City shall cooperate fully in the defense. If the City fails to promptly notify the applicant of any claim action or proceeding, or if the City fails to cooperate fully in the defense, the applicant shall not thereafter be responsible to defend, indemnify, or hold harmless the City. DEPARTMENT OF CITY PLANNING-ENVIRONMENTAL MITIGATION MEASURES 40. That prior to recordation of the final map, the subdivider shall prepare and execute a Covenant and Agreement (Planning Department General Form CP- 6770) in a manner satisfactory to the Planning Department requiring the subdivider to identify mitigation monitors who shall provide periodic status reports on the implementation of project design features and mitigation measures contained in the adopted Mitigation Monitoring and Reporting Program for the NBC Universal Evolution Plan (Environmental Impact Report No. ENV EIR, SCH ) satisfactory to the Advisory Agency. The mitigation monitors shall be identified as to their areas of responsibility, and phase of intervention (pre-construction, construction, postconstruction/maintenance) to ensure continued implementation of the above mentioned mitigation items. 41. Prior to the recordation of the final map, the subdivider shall prepare and execute a Covenant and Agreement (Planning Department General Form CP-6770) in a manner satisfactory to the Planning Department, binding the subdivider and all successors to the following: Project Design Feature B-1 (Ci/Co): The Project Applicant or its successor shall prepare and implement a Transportation Demand Management program to reduce traffic impacts of the Project encouraging Project employees and patrons to reduce vehicular traffic on the street and freeway system during the most congested time periods of the day. The Transportation Demand Management program shall include implementation of several Transportation Demand Management strategies, which may include, but are not limited to the following: Flexible work schedules and telecommuting programs; Alternative work schedules; Bicycle and pedestrian-friendly environment (i.e., established and clear pedestrian networks, intersections, and built environments);

16 TENTATIVE TRACT MAP NO PAGE 16 Bicycle amenities; Rideshare/carpool/vanpool promotion and support; Mixed-use development; Education and information on alternative transportation modes; Transportation Information Center; Guaranteed Ride Home Program; Join an existing or form a new Transportation Management Association; On-site flex cars; Discounted employee and tenant transit passes; and Financial mechanisms and/or programs to provide for the implementation of the Transportation Demand Management program. The Transportation Demand Management program shall be subject to the approval of the applicable jurisdiction. In the City, it shall be subject to the approval of the Los Angeles Department of Transportation. In the County, it shall be subject to the approval of the Director of Regional Planning. Transportation or County of Los Angeles, Department of Public Works, as applicable Monitoring Agency: City of Los Angeles, Department of Transportation or County of Los Angeles, Department of Public Works, as applicable Monitoring Phase: Construction, Post-construction Monitoring Frequency: Preliminary TDM plan prior to issuance of first building permit; Final TDM plan prior to the issuance of the permanent certificate of occupancy. Action Indicating Compliance: Issuance of permanent certificate of occupancy; statement of compliance from the Department of Transportation. Project Design Feature B-2: [DELETED] Project Design Feature B-3 (Ci/Co): Buddy Holly Drive between Barham Boulevard and the US 101 northbound off-ramp shall be widened from its current configuration of two westbound lanes to three westbound lanes. The roadway shall continue to accommodate only westbound traffic on this section. Transportation; City of Los Angeles, Department of Public Works,

17 TENTATIVE TRACT MAP NO PAGE 17 Bureau of Engineering; County of Los Angeles, Department of Public Works, as applicable. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering; County of Los Angeles, Department of Public Works, as applicable. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Action Indicating Compliance: Funding or guarantee provided in accordance with the phasing program of the Transportation Improvement Program, or acceptance of completed roadway improvements by City or County, as applicable (see Attachment B to this MMRP). Project Design Feature B-4 (Ci/Co): Buddy Holly Drive between the US 101 northbound off-ramp to Donald O Connor Drive shall be widened to accommodate between four and five lanes. At the approach to Donald O Connor Drive, a dedicated right-turn lane shall be provided, and a dedicated left-turn lane onto the northbound US-101 Freeway shall be provided. Transportation; City of Los Angeles, Department of Public Works, Bureau of Engineering; County of Los Angeles, Department of Public Works, as applicable. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering; County of Los Angeles, Department of Public Works, as applicable. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Action Indicating Compliance: Funding or guarantee provided in accordance with the phasing program of the Transportation Improvement Program, or acceptance of completed roadway improvements by City or County, as applicable (see Attachment B to this MMRP).

18 TENTATIVE TRACT MAP NO PAGE 18 Project Design Feature B-5 (Ci/Co): The final segment of Buddy Holly Drive between Donald O Connor Drive and Universal Studios Boulevard/Universal Center Drive may be widened to accommodate four westbound travel lanes and two eastbound travel lanes. If this segment of Buddy Holly Drive is widened, the US 101 northbound on-ramp at Universal Studios Boulevard/Buddy Holly Drive shall be relocated maintaining the existing 12-foot travel lane, an 8-foot left shoulder, and a 6-foot right shoulder. Entrance to the on-ramp shall be reconfigured from the existing northbound right-turn lane off of Universal Studios Boulevard to a right-turn off the new westbound lanes on Buddy Holly Drive between Donald O Connor Drive and Universal Studios Boulevard/Universal Center Drive. If operated under twoway flow, the westbound approach on Buddy Holly Drive would include two left-turn lanes, one through lane, and two free-flow right-turn lanes. Also, Universal Studios Boulevard would be restriped to provide a northbound right-turn lane, and the eastbound approach would be restriped to provide one left-turn land and one shared through/right-turn lane. The entire improvement described above would not be needed if Buddy Holly remains a one-way eastbound street. Transportation; City of Los Angeles, Department of Public Works, Bureau of Engineering; County of Los Angeles, Department of Public Works, as applicable. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering; County of Los Angeles, Department of Public Works, as applicable. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Action Indicating Compliance: Funding or guarantee provided in accordance with the phasing program of the Transportation Improvement Program, or acceptance of completed roadway improvements by City or County, as applicable (see Attachment B to this MMRP). Project Design Feature B-6 (Ci): The Project proposes to widen Lakeside Plaza Drive from the intersection with the Studio gate to Forest Lawn Drive in order to provide at least two travel lanes in each direction.

19 TENTATIVE TRACT MAP NO PAGE 19 Transportation; City of Los Angeles, Department of Public Works, Bureau of Engineering. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Action Indicating Compliance: Funding or guarantee provided in accordance with the phasing program of the Transportation Improvement Program, or acceptance of completed roadway improvements by City (see Attachment B to this MMRP). Project Design Feature B-7 (Ci/Co): The new development calls for the realignment and widening of Universal Hollywood Drive, which extends between the Universal Tram stop east of Lankershim Boulevard and Universal Studios Boulevard, providing access to parking structures within Universal Studios Hollywood and the entrance to CityWalk near Universal CityWalk, to improve overall circulation both on-site and off-site. Transportation; City of Los Angeles, Department of Public Works, Bureau of Engineering; County of Los Angeles, Department of Public Works, as applicable. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering; County of Los Angeles, Department of Public Works, as applicable. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Action Indicating Compliance: Funding or guarantee provided in accordance with the phasing program of the Transportation Improvement Program, or acceptance of completed roadway improvements by City or County, as applicable (see Attachment B to this MMRP).

20 TENTATIVE TRACT MAP NO PAGE 20 Project Design Feature B-8 (Ci): The Project Applicant or its successor shall pay for up to five portable or small dynamic changeable message signs as part of the Hollywood Event Management infrastructure. Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Action Indicating Compliance: Funding provided in accordance with the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Project Design Feature B-9 (Ci): Cahuenga Boulevard & Barham Boulevard (Intersection 47): In the event that the assumed base roadway improvement of widening the westbound approach of Cahuenga Boulevard (West) to provide one through lane and one right-turn only lane is not completed by the time required by the Project s transportation improvement subphasing plan, the Project Applicant or its successor shall fund the assumed base improvement of widening the westbound approach of Cahuenga Boulevard (West) to provide two through lanes and one right-turn only. Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP).

21 TENTATIVE TRACT MAP NO PAGE 21 Action Indicating Compliance: Funding provided in accordance with the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Project Design Feature B-10 (Ci): Cahuenga Boulevard & Odin Street (Intersection 67): In the event that the assumed base roadway improvement to provide three northbound through lanes on Cahuenga Boulevard is not completed by the time required by the Project s transportation improvement subphasing plan, the Project Applicant or its successor shall fund the assumed base roadway improvement to provide three northbound through lanes on Cahuenga Boulevard. Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Action Indicating Compliance: Funding provided in accordance with the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Project Design Feature B-11 (Ci): The Project Applicant or its successor shall fund the addition of left turn arrows at the intersections identified in Attachment B. Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP).

22 TENTATIVE TRACT MAP NO PAGE 22 Action Indicating Compliance: Funding provided in accordance with the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Project Design Feature B-12 (Ci): The Project Applicant or its successor shall fund the upgrade of the traffic signal controllers and the installation of CCTV cameras at the intersections listed in Attachment B. Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Agency: City of Los Angeles, Department of Transportation; City of Los Angeles Department of Public Works, Bureau of Engineering. Monitoring Phase: Pre-Construction; Construction Monitoring Frequency: At the implementation of the applicable phase described in the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Action Indicating Compliance: Funding provided in accordance with the phasing program of the Transportation Improvement Program (see Attachment B to this MMRP). Project Design Feature B-13: [DELETED] Mitigation Measure B-1 (Ci): The Project Applicant or its successor shall implement the following: Provide one articulated bus to be operated by Metro to supplement the Metro Rapid 750 service (capacity = 66 seated/ 75 standing); and Pay the net operations and maintenance (O&M) costs for the new bus during peak hours (7:00 A.M. to 10:00 A.M. and 3:00 P.M. to 6:00 P.M.) for the first three years of the bus s operation and shall pay for the unsubsidized portion of these costs for an additional seven years of the bus s operation. Farebox revenues and state/federal transit subsidies shall be credited against operation and maintenance costs for years 1 through 10 of the bus operation. Transportation; Los Angeles County Metropolitan Transit Authority.

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

,4Li/;{ a &a~/,2- 'Randa M. Hanna, Commission Executive Assistant South Valley Area Planning Commission

,4Li/;{ a &a~/,2- 'Randa M. Hanna, Commission Executive Assistant South Valley Area Planning Commission SOUTH VALLEY AREA PLANNING COMMISSION 200 N. Spring Street, Room 272, Los Angeles, California, 90012-4801, (213) 978-1300 www.lacity.org/pln/index.htm Determination Mailing Date: JAN '""::...:._.:...:::...

More information

City of Los Angeles January FIRE PROTECTION

City of Los Angeles January FIRE PROTECTION ENVIRONMENTAL SETTING 2. FIRE PROTECTION Fire Protection Fire prevention, fire suppression, and life safety services are provided throughout the City of Los Angeles by the Los Angeles Fire Department (LAFD),

More information

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11,

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11, TOWN OF EAST GREENBUSH NOTICE OF PUBLIC HEARING PLEASE TAKE NOTICE that the Town Board of the Town of East Greenbush will hold a public hearing on April 11, 2018, at 5:45 p.m. at the East Greenbush Town

More information

Note: Staff reports can be accessed at Zone: I-3. Tier:

Note: Staff reports can be accessed at  Zone: I-3. Tier: The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicant is the J.H. Snyder Company located at 5757 Wilshire Boulevard, Penthouse 20, in Los Angeles, CA 90036. B. PROJECT LOCATION The project

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE 20000 Prairie St. DOT Case No. 41443 Date: November 5, 2014 To: R. Nicolas Brown, Associate Zoning Administrator Department of City Planning From:

More information

Prepared by: Casey Kempenaar, Senior Planner

Prepared by: Casey Kempenaar, Senior Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING September 13, 2017 Prepared by: Casey Kempenaar, Senior Planner REQUEST The applicant requests a Design Review Permit Modification

More information

ANTONIO R. VILLARAIGOSA MAYOR. Transmitted herewith, is the City Engineer's report dated September 28, 2006 for Council review and approval of:

ANTONIO R. VILLARAIGOSA MAYOR. Transmitted herewith, is the City Engineer's report dated September 28, 2006 for Council review and approval of: BOARD OF PUBLIC WORKS MEMBERS CYNTHIA M. RUIZ PRESIDENT VALERIE LYNNE SHAW COMMISSIONER YOLANDA FUENTES COMMISSIONER DAVID SICKLER COMMISSIONER - c.tv OF LOS ANGELt:S CALIFORNIA DEPARTMENT OF PUBLIC WORKS

More information

2 Project Description

2 Project Description Project Description 2 Project Description The proposed project would involve the demolition of the existing church and the construction of 40 twostory single family residences. The residential lots would

More information

ATTACHMENT A PROJECT PERMIT COMPLIANCE REVIEW APPLICATION SITE ADDRESSES: 1200 S. FIGUEROA ST. OWNER/APPLICANT: 1200 S. FIGUEROA DEVELOPMENT, INC.

ATTACHMENT A PROJECT PERMIT COMPLIANCE REVIEW APPLICATION SITE ADDRESSES: 1200 S. FIGUEROA ST. OWNER/APPLICANT: 1200 S. FIGUEROA DEVELOPMENT, INC. SECTION I: LIST OF DISCRETIONARY REQUESTS The Applicant, 1200 S. Figueroa Development, Inc., is seeking the following discretionary approvals: 1. Pursuant to Los Angeles Municipal Code Section 11.5.7 and

More information

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES Established 1949 FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES The following are guidelines for new development. Any submitted plans must comply with these guidelines,

More information

September 20, 2017 ENV EIR

September 20, 2017 ENV EIR September 0, 07 CASE NO.: ENV-07-470-EIR PROJECT NAME: 4 th and Hewitt Project PROJECT APPLICANT: LIG 900, 90 and 96 E. 4th St., 40-4 S. Hewitt St., LLC PROJECT ADDRESS: 900, 90, 904, 906-90, and 96 E.

More information

Notice of Preparation

Notice of Preparation Notice of Preparation OF ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING August 7, 2017 CASE NO.: ENV-2016-3631-EIR PROJECT NAME: 6400 Sunset Boulevard Project PROJECT APPLICANT: 6400 Sunset, LLC

More information

A BILL FOR AN ORDINANCE TO AMEND CHAPTER 9, KAUAI COUNTY CODE 1987, RELATING TO STREET REQUIRE:MENTS FOR SUBDIVISIONS

A BILL FOR AN ORDINANCE TO AMEND CHAPTER 9, KAUAI COUNTY CODE 1987, RELATING TO STREET REQUIRE:MENTS FOR SUBDIVISIONS ORDINANCE NO. BILL NO. { vy"yj1j A BILL FOR AN ORDINANCE TO AMEND CHAPTER 9, KAUAI COUNTY CODE 1987, RELATING TO STREET REQUIRE:MENTS FOR SUBDIVISIONS BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF KAUA'I,

More information

ARTICLE 17 SITE PLAN REVIEW

ARTICLE 17 SITE PLAN REVIEW ARTICLE 17 SITE PLAN REVIEW 17.01 INTENT AND PURPOSE The intent of this section is to provide for consultation and cooperation between the applicant and the township planning commission so that the applicant

More information

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO) TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 260-400 E. COLORADO BOULEVARD (PASEO COLORADO) RECOMMENDATION:

More information

CONSENT CALENDAR CITY PLANNING COMMISSION AGENDA ITEM NO: A.1, A.2 STAFF: LARRY LARSEN

CONSENT CALENDAR CITY PLANNING COMMISSION AGENDA ITEM NO: A.1, A.2 STAFF: LARRY LARSEN Page 8 CONSENT CALENDAR CITY PLANNING COMMISSION AGENDA ITEM NO: A.1, A.2 STAFF: LARRY LARSEN FILE NO: CPC PUZ 14-00013 - QUASI-JUDICIAL FILE NO: CPC PUD 14-00014 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER:

More information

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa To: Planning and Zoning Commission From: City Staff Date: November 15, 2016 Re: Case #16026 Raymore Activity Center Site Plan GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Applicant/ Property Owner:

More information

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units:

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units: The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional) Rezoning Petition 2016-117 Zoning Committee Recommendation January 4, 2017 REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional) LOCATION

More information

Honorable Members: C. D. No. 9

Honorable Members: C. D. No. 9 Office of the City Engineer Los Angeles, California To the Public Works and Gang Reduction Committee Of the Honorable Council Of the City of Los Angeles JUL 0 6 2017 Honorable Members: C. D. No. 9 SUBJECT:

More information

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX City of Reedley SPECIAL PERMIT Submittal Requirements Conditional Use Permit (CUP), Site Plan Review (SPR) & Variance (VAR) Please use this information sheet as a checklist to assemble materials required

More information

PLANNING COMMISSION. Submitted

PLANNING COMMISSION. Submitted PLANNING COMMISSION City Hall 1275 Main Street El Centro, CA 92243 Submitted PLANNING COMMISSION ACTION ITEM (1844) Meeting: 05/10/16 12:00 AM Department: Community Development Category: Public Hearing

More information

February 26, 2018 ENVIRONMENTAL CASE NO.: ENV EIR PROJECT NAME:

February 26, 2018 ENVIRONMENTAL CASE NO.: ENV EIR PROJECT NAME: February 26, 2018 ENVIRONMENTAL CASE NO.: ENV-2017-5091-EIR PROJECT NAME: Sunset Gower Studios Enhancement Plan PROJECT APPLICANT: Hudson Pacific Properties, Inc. PROJECT ADDRESS: 6010, 6050 and 6060 Sunset

More information

Notice of Preparation

Notice of Preparation Notice of Preparation OF ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING August 23, 2017 REVISED AND RECIRCULATED NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING Note:

More information

Glenborough at Easton Land Use Master Plan

Glenborough at Easton Land Use Master Plan Implementation 114 9.0 IMPLEMENTATION 9.1 OVERVIEW This chapter summarizes the administrative procedures necessary to implement the proposed land use plan, infrastructure improvements, development standards,

More information

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, 2015 6:30 P.M. - ARDEN HILLS CITY HALL PLANNING CASES A. Planning Case 15-016; Final Planned Unit Development Arden Plaza;

More information

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.3 STAFF REPORT August 18, 2015 Staff Contact: Peyman Behvand (707)

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.3 STAFF REPORT August 18, 2015 Staff Contact: Peyman Behvand (707) CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.3 STAFF REPORT August 18, 2015 Staff Contact: Peyman Behvand (707) 449-5140 TITLE: REQUEST: VISTA CROSSINGS PLANNED SIGN PROGRAM AMENDMENT PLANNED

More information

Project phasing plan (if applicable) 12 copies of site plan

Project phasing plan (if applicable) 12 copies of site plan SITE PLAN REVIEW PERMIT APPLICATION City of Grand Haven, 11 N. Sixth Street, Grand Haven, MI 49417 Phone: (616) 847-3490 Fax: (616) 844-2051 Website: www.grandhaven.org 1. Project Information Address/location

More information

Planning Commission Staff Report March 15, 2007

Planning Commission Staff Report March 15, 2007 Planning Commission Staff Report Project: Request: Madeira East Tentative Subdivision Map, Design Review for Subdivision Layout & Abandonment of Easements Location: Phase IV of the Laguna Ridge Specific

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS

More information

ENVIRONMENTAL IMPACT ANALYSIS PUBLIC SERVICES: FIRE PROTECTION 1. INTRODUCTION

ENVIRONMENTAL IMPACT ANALYSIS PUBLIC SERVICES: FIRE PROTECTION 1. INTRODUCTION IV. K.1. ENVIRONMENTAL IMPACT ANALYSIS PUBLIC SERVICES: FIRE PROTECTION 1. INTRODUCTION This section discusses the physical setting and provides analysis of fire protection services in the area where the

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

Baumgarten MPUD. Exhibit 3 Evaluation Criteria Pursuant to LDC subsections 10.02.13 B, 10.02.08 F and Chapter 3 G. of the Administrative Code, staff s analysis and recommendation to the Planning Commission, and the Planning Commission s recommendation

More information

PLANNING REPORT CITY OF EAGAN. APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: December 18, 2014

PLANNING REPORT CITY OF EAGAN. APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: December 18, 2014 PLANNING REPORT CITY OF EAGAN REPORT DATE: December 8, 2014 CASE: 19-PA-11-11-14 APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: PROPERTY OWNER: The Flats at Cedar APPLICATION DATE: Nov. 21, 2014

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT

MONTGOMERY COUNTY PLANNING DEPARTMENT MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No.: Date: 5-03-18 Pike and Rose, Phase I: Site Plan Amendment No. 82012002D Rhoda Hersson-Ringskog,

More information

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Table of Contents G.1.a Water Resources - Surface Water - Drainage Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...

More information

RECOMMENDATION REPORT

RECOMMENDATION REPORT DEPARTMENT OF CITY PLANNING RECOMMENDATION REPORT City Planning Commission Date: April 9, 2009 Time: After 8:30 AM Place: City Hall 200 North Spring Street, Room 1010, 10th Fl Los Angeles, CA 90012 Public

More information

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan) STAFF REPORT Town of Clayton Planning Department 111 E. Second Street, Clayton, NC 27520 P.O. Box 879, Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 Planning Board May 22, 2017 Application Number:

More information

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc.

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc. March 30, 08 ENVIRONMENTAL CASE NO.: ENV-07-77-EIR PROJECT NAME: PROJECT APPLICANT: Keyes Van Nuys Honda Dealership Keyes Motor, Inc. PROJECT ADDRESS: 600, 6007, 605, 6053, and 6059 N. Van Nuys Boulevard;

More information

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN November 2010 EXPLANATORY NOTES (Secondary Plan Area 22) General (pertaining to all secondary plan office consolidations)

More information

TETON COUNTY FIRE PROTECTION RESOLUTION FOR NEW SUBDIVISIONS 2008 Edition. Chapter I General Provisions

TETON COUNTY FIRE PROTECTION RESOLUTION FOR NEW SUBDIVISIONS 2008 Edition. Chapter I General Provisions TETON COUNTY FIRE PROTECTION RESOLUTION FOR NEW SUBDIVISIONS 2008 Edition Chapter I General Provisions SECTION 1.1: TITLE. This Resolution shall be known as the Teton County Fire Protection Resolution

More information

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK Page 34 CITY PLANNING COMMISSION AGENDA ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK FILE NOS: CPC ZC 12-00035 QUASI-JUDICIAL CPC NV 12-00036 QUASI-JUDICIAL AR DP 12-00039 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER:

More information

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

Design Review Application *Please call prior to submittal meeting to determine applicable fees* CITY OF EAGLE 660 E. Civic Lane, Eagle, ID 83616 Phone#: (208) 939-0227 Fax: (208) 938-3854 Design Review Application *Please call prior to submittal meeting to determine applicable fees* FILE NO.: CROSS

More information

RRW Stonebrook, LLC Tentative Map Findings

RRW Stonebrook, LLC Tentative Map Findings RRW Stonebrook, LLC Tentative Map Findings FINDING T1: The request conforms to the Master Plan and zoning ordinances. RELATIONSHIP TO THE MASTER PLAN 1. The respective development is located within an

More information

PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016

PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016 PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016 NAME Dennis P. Wilkins LOCATION. CITY COUNCIL DISTRICT District 6 7078 Bruns Drive (Northeast corner of Bruns Drive and Cody Road)

More information

ROSENHEIM & ASSOCIATES, INC OXNARD STREET SUITE 630 WOODLAND HILLS, CA TEL FAX

ROSENHEIM & ASSOCIATES, INC OXNARD STREET SUITE 630 WOODLAND HILLS, CA TEL FAX ROSENHEIM & ASSOCIATES, INC. 21600 OXNARD STREET SUITE 630 WOODLAND HILLS, CA 91367 TEL 818-716-2689 FAX 818-593-6184 May 5, 2016 VIA EMAIL The Honorable Jose Huizar Chair, Los Angeles City Council Planning

More information

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN) Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Business License Building Fire Prevention Planning Public Works 707.648.4310 707.648.4374 707.648.4565 707.648.4326 707.651.7151 PLANNED DEVELOPMENT

More information

EXHIBIT A STEAMBOAT SPRINGS FIRE PREVENTION SERVICES ADMINISTRATIVE POLICY & PROCEDURE MANUAL

EXHIBIT A STEAMBOAT SPRINGS FIRE PREVENTION SERVICES ADMINISTRATIVE POLICY & PROCEDURE MANUAL EXHIBIT A STEAMBOAT SPRINGS FIRE PREVENTION SERVICES ADMINISTRATIVE POLICY & PROCEDURE MANUAL SECTION: 4 POLICY NO.: 1258.1D DATE: September 11, 2006 PAGE: 1 SUBJECT: Fire Apparatus Access Road Standards

More information

SUBMITTAL REQUIREMENTS

SUBMITTAL REQUIREMENTS WHEN PROCESS TYPE III IS USED References to Process Type III applications are found in several places in the Milton Municipal Code (MMC), indicating that the development, activity, or use, is permitted

More information

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION A RESOLUTION OF THE PLANNING BOARD OF THE CITY OF ALAMEDA APPROVING DESIGN REVIEW AND DEVELOPMENT PLAN AMENDMENT APPLICATION PLN13-0157 TO CONSTRUCT ELEVEN

More information

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose UAA School of Engineering Parking Garage Master Plan Amendment 1. Purpose Since the UAA campus master plan was drafted in 2003, adopted in 2004, and amended in 2009 a number of significant changes regarding

More information

COUNTY OF EL DORADO DEVELOPMENT SERVICES PLANNING COMMISSION STAFF REPORT SPECIAL USE PERMIT

COUNTY OF EL DORADO DEVELOPMENT SERVICES PLANNING COMMISSION STAFF REPORT SPECIAL USE PERMIT COUNTY OF EL DORADO DEVELOPMENT SERVICES PLANNING COMMISSION STAFF REPORT Agenda of: November 14, 2013 Item No.: 8.c Staff: Aaron Mount SPECIAL USE PERMIT FILE NUMBER: APPLICANT: REQUEST: LOCATION: Sandra

More information

The subject site plan amendment proposes the following revisions to the approved site plan:

The subject site plan amendment proposes the following revisions to the approved site plan: PROPOSED AMENDMENT The subject site plan amendment proposes the following revisions to the approved site plan: 1. The building footprint was modified to accommodate the revised architectural design. 2.

More information

III. PROJECT DESCRIPTION

III. PROJECT DESCRIPTION III. PROJECT DESCRIPTION LOCATION AND BOUNDARIES The City of Manhattan Beach is located in the South Bay region of Los Angeles County, California, approximately 2 miles south of the Los Angeles International

More information

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church R E S O L U T I O N WHEREAS, the Prince George s County Planning Board is charged with the approval of Detailed Site Plans pursuant to Part 3, Division 9 of the Zoning Ordinance of the Prince George s

More information

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC.

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC. . 8 February 9, 2011 Public Hearing APPLICANT: REQUEST: Conditional Use Permit for an automobile service station with a convenience store ADDRESS / DESCRIPTION: 2448 Nimmo Parkway PROPERTY OWNER: COURTHOUSE

More information

D1 September 11, 2013 Public Hearing APPLICANT:

D1 September 11, 2013 Public Hearing APPLICANT: D1 September 11, 2013 Public Hearing APPLICANT: BEACH MUNICIPAL FEDERAL CREDIT UNION PROPERTY OWNER: SISTERS II, LLC STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-2 Agriculture

More information

1. Request: The subject application is for approval of a gymnasium addition to an existing private school and church.

1. Request: The subject application is for approval of a gymnasium addition to an existing private school and church. R E S O L U T I O N WHEREAS, the Prince George's County Planning Board is charged with the approval of Detailed Site Plans pursuant to Part 3, Division 9 of the Zoning Ordinance of the Prince George's

More information

A. INTRODUCTION B. PROJECT LOCATION

A. INTRODUCTION B. PROJECT LOCATION Chapter 1: Project Description A. INTRODUCTION The Lower Manhattan Development Corporation (LMDC), a subsidiary of the New York State Urban Development Corporation, doing business as the Empire State Development

More information

REPORT TO PLANNING COMMISSION

REPORT TO PLANNING COMMISSION CITY OF Meeting Date: October 25, 2011 Agenda Item: Community Development Department Planning Division P. O. Box 151560, San Rafael, CA 94915-1560 PHONE: (415) 485-3085/FAX: (415) 485-3184 Case Numbers:

More information

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC REQUEST: Conditional Use Permit (car wash) 2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC PROPERTY OWNER: MESSER 1060 INDEPENDENCE BOULEVARD STAFF PLANNER: Carolyn A.K. Smith ADDRESS

More information

CITY OF PERRIS COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION FINAL CONDITIONS OF APPROVAL CITY COUNCIL

CITY OF PERRIS COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION FINAL CONDITIONS OF APPROVAL CITY COUNCIL CITY OF PERRIS COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION FINAL CONDITIONS OF APPROVAL CITY COUNCIL TENTATIVE PARCEL MAP 34199 (05 0378), DEVELOPMENT PLAN REVIEW 05 0379, March 14, 2006 PROJECT:

More information

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013 SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013 APPLICANT NAME SUBDIVISION NAME DEVELOPMENT NAME LOCATION S. E. Cemeteries of AL

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

EXHIBIT "A" PROJECT DESCRIPTION Vibiana Development Project

EXHIBIT A PROJECT DESCRIPTION Vibiana Development Project EXHIBIT "A" PROJECT DESCRIPTION Vibiana Development Project A. PROJECT CHARACTERISTICS 228 S. Main Street, LLC, (the Applicant ) is requesting a Conditional Use Permit ( CUP ) for Floor Area Ratio Averaging

More information

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk

More information

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP #8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP STAFF REPORT To: Planning Commission Meeting Date: June 14, 2017 Item: T-1409 Prepared By: Robert Eastman GENERAL INFORMATION: Applicant: Property Owner(s): Requested

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 1/15/2015 Bethesda North Marriott Hotel and Conference Center: Limited Site Plan Amendment

More information

Rezoning Petition Pre-Hearing Staff Analysis October 15, 2018

Rezoning Petition Pre-Hearing Staff Analysis October 15, 2018 Rezoning Petition 2017-137 Pre-Hearing Staff Analysis October 15, 2018 REQUEST Current Zoning: R-3 (single family residential) Proposed Zoning: B-2(CD) (general business, conditional) LOCATION Approximately

More information

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM

PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM PLANNING AND ZONING COMMISSION AGENDA MEMORANDUM City and County of Broomfield, Colorado To: Planning and Zoning Commission From: John Hilgers, Planning Director Anna Bertanzetti, Principal Planner Meeting

More information

General Location Courtyard at LMH Final Development Plan and Final Plat

General Location Courtyard at LMH Final Development Plan and Final Plat R-1 LEYDEN RIDGE LOMA RIDGE LOBDELL R-3 MILLER PARKWAY LAUSSAC Subject Property R-3 LOCHENSHIRE LESMER R General Location Courtyard at LMH Final Development Plan and Final Plat ¹ 230 115 0 230 Feet Airport

More information

Intentionally Left Blank

Intentionally Left Blank Intentionally Left Blank CITY OF LOS ANGELES LOW IMPACT DVELOPMENT BEST MANAGEMENT PRACTICES HANDBOOK LOW IMPACT DEVELOPMENT (LID) CHECKLIST SMALL SCALE RESIDENTIAL (4 UNITS OR LESS) WPD Project Plan Checker:

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 3.10.2016 Site Plan 820160040 Nora School Parker Smith, Planning Technician, Area 1,

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving the removal of Municipal Railway bus zones at various

More information

CHAPTER 12 IMPLEMENTATION

CHAPTER 12 IMPLEMENTATION CHAPTER 12 IMPLEMENTATION The 2010 Town of Denton Comprehensive Plan is intended to capture a vision of the future of Denton. As such, it provides a basis for a wide variety of public and private actions

More information

BYLAW C A Bylaw of Rocky View County to amend Land Use Bylaw C

BYLAW C A Bylaw of Rocky View County to amend Land Use Bylaw C BYLAW C-7720-2017 A Bylaw of Rocky View County to amend Land Use Bylaw C-4841-97. The Council of Rocky View County enacts as follows: PART 1 TITLE This Bylaw shall be known as Bylaw C-7720-2017. PART 2

More information

Regarding actual construction when development occurs, the following applicable guidelines are provided to address public safety issues:

Regarding actual construction when development occurs, the following applicable guidelines are provided to address public safety issues: MIAMI-DADE COUNTY DEPARTMENT OF PLANNING AND ZONING General Comments 1. COMMENT: A careful review of the application provided shows that there is likely to be an impact on the Miami-Dade Police Department

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

CITY OF WILDOMAR CITY COUNCIL Agenda Item #2.1 PUBLIC HEARING Meeting Date: May 9, 2018

CITY OF WILDOMAR CITY COUNCIL Agenda Item #2.1 PUBLIC HEARING Meeting Date: May 9, 2018 CITY OF WILDOMAR CITY COUNCIL Agenda Item #2.1 PUBLIC HEARING Meeting Date: May 9, 2018 TO: FROM: Mayor and City Council Members Matthew Bassi, Planning Director SUBJECT: Wildomar Crossings Retail Center

More information

Chapter Master Planned Communities (MPC) District

Chapter Master Planned Communities (MPC) District Sections 14.53.010 Purpose and Intent 14.53.020 Applicability 14.53.030 Procedure 14.53.040 MPC Standards 14.53.050 Required Findings 14.53.010 Purpose and Intent Chapter 14.53 Master Planned Communities

More information

Joint Study Session of the Sutter County. March 2, 2009

Joint Study Session of the Sutter County. March 2, 2009 Joint Study Session of the Sutter County Board of Supervisors and Planning Commission March 2, 2009 CURRENT APPLICATION General Plan Amendment Specific Plan Specific Plan Appendices Utility Plans Transit/AQ

More information

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.

The Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows. ORDINANCE DRIVEWAYS AND CULVERTS NO. 6-5-06 ORDINANCE CONCERNING DRIVEWAY AND CULVERT REQUIREMENTS 1-1-1 Driveway Permits; Culvert Requirements 1-1-2 Driveway and Culvert Location, Design and Construction

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I SBCAG STAFF REPORT SUBJECT: Cabrillo-UPRR Bridge Project MEETING DATE: March 17, 2016 AGENDA ITEM: 5I STAFF CONTACT: Fred Luna RECOMMENDATION: Authorize the chair to sign a Memorandum of Understanding

More information

Camden County Development Regulations. Updated February 2017

Camden County Development Regulations. Updated February 2017 Camden County Development Regulations Updated February 2017 GENERAL MEETING SCHEDULE OF THE CAMDEN COUNTY PLANNING BOARD All meetings will convene at 6:00 PM on the 4th Tuesday of each month and will be

More information

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT LOS ANGELES CITY PLANNING COMMISSION CASE NO: CPC 2006-9374 CRA CEQA: Exempt DATE: December 21, 2006 Location: Valley Plaza and Laurel Plaza TIME: after

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS I. PUBLIC SERVICES 1. FIRE PROTECTION

IV. ENVIRONMENTAL IMPACT ANALYSIS I. PUBLIC SERVICES 1. FIRE PROTECTION IV. ENVIRONMENTAL IMPACT ANALYSIS I. PUBLIC SERVICES 1. FIRE PROTECTION ENVIRONMENTAL SETTING Within the City of Los Angeles, fire prevention, fire suppression, and emergency medical services are provided

More information

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

STAFF REPORT. April 30, 2018 May 9, 2018

STAFF REPORT. April 30, 2018 May 9, 2018 PATRICK J. SULLIVAN DIRECTOR City of New Bedford Department of Planning, Housing & Community Development 608 Pleasant St, New Bedford, Massachusetts 02740 Telephone: (508) 979.1500 Facsimile: (508) 979.1575

More information

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT LOCAL AMENDMENTS INTERNATIONAL FIRE CODE 2009 December 5, 2012 1 Chapter 1 Administration Chapter 5 Fire Service Features Chapter 9 Fire Protection Systems Chapter

More information

SPECIFIC PLAN Requirements

SPECIFIC PLAN Requirements CITY OF LANCASTER PLANNING DEPARTMENT 44933 Fern Avenue, Lancaster, California 93534 (661) 723-6100 SPECIFIC PLAN Requirements Purpose The purpose of a specific plan is to provide for the logical development

More information

Neo-Traditional Overlay Application

Neo-Traditional Overlay Application MAYOR AND CITY COUNCIL OF LAUREL DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT 8103 Sandy Spring Road Laurel, Maryland 20707 (301) 725-5300 Internet Address http://www.cityoflaurel.org E-mail: ecd@laurel.md.us

More information

MIDTOWN MIXED-USE VILLAGE. TECHNICAL DATA SHEET COMPONENT C-1 FOR PUBLIC HEARING - PETITION NUMBER Project No RZ1.1. Issued.

MIDTOWN MIXED-USE VILLAGE. TECHNICAL DATA SHEET COMPONENT C-1 FOR PUBLIC HEARING - PETITION NUMBER Project No RZ1.1. Issued. N MIDTOWN MIXED-USE VILLAGE TECHNICAL DATA SHEET COMPONENT C- FOR PUBLIC HEARING - PETITION NUMBER 04-00 Project No. 496 Issued Revised SCALE: " = 0' N 0 0 0 40 RZ. c GENERAL PROVISIONS: a. SITE LOCATION.

More information

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004. CITY CLERK Consolidated Clause in Report 8, which was considered by City Council on October 26, 27 and 28, 2004. 28 Request for Direction Report - Site Plan Approval Application 03 200020 NNY 24 SA - Marek

More information

Project Overview. Get Involved. Public Information Meeting. Contact Information

Project Overview. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information