Meridian Gate. Non Technical Summary. Submitted by Meridian Property Holdings Ltd.

Size: px
Start display at page:

Download "Meridian Gate. Non Technical Summary. Submitted by Meridian Property Holdings Ltd."

Transcription

1 Meridian Gate Non Technical Summary Submitted by Meridian Property Holdings Ltd.

2 Meridian Gate May 2014 Waterman Energy, Environment & Design Limited Pickfords Wharf, Clink Street, London SE1 9DG,

3

4 Meridian Gate Client Name: Document Reference: Project Number: Meridian Property Holdings Ltd EED R VW. EED14005 Quality Assurance - Approval Status This document has been prepared and checked in accordance with Waterman Group s IMS (BS EN ISO 9001: 2008 and BS EN ISO 14001: 2004) Issue Date Prepared by Checked by Approved by First Second Third Victoria Webb Senior Consultant Victoria Webb Senior Consultant Victoria Webb Senior Consultant Hannah Fiszpan Technical Director Hannah Fiszpan Technical Director Hannah Fiszpan Technical Director Hannah Fiszpan Technical Director Hannah Fiszpan Technical Director Hannah Fiszpan Technical Director Comments Comments Our Markets Property & Buildings Transport & Infrastructure Energy & Utilities Environment

5 Disclaimer This report has been prepared by Waterman Energy, Environment & Design Limited, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporation of our General Terms and Condition of Business and taking account of the resources devoted to us by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at its own risk.

6 Contents 1. Introduction The Existing Site and Its Surrounding Context What are the Proposals? Approach and Environmental Impact Assessment Methodology What are the Likely Environmental Effects and How Will They be Minimised? Socio Economics Transportation and Access Air Quality Noise and Vibration Archaeology (Buried Heritage Assets) Ground Conditions and Contamination Water Resources and Flood Risk Daylight, Sunlight, Overshadowing and Solar Glare Wind Microclimate Townscape, Heritage and Visual Effects Cumulative Effects What Will Happen Next? Appendices Appendix A Figures Contents Z:\Projects\EED14005\100\Reports\Working Drafts\005. NTS\EED R HF Non Technical Summary (290514).docx

7 1. Introduction Waterman Energy, Environment & Design Ltd (Waterman EED), on behalf of Meridian Property Holdings Ltd (the Applicant ), has prepared this Non-Technical Summary (NTS) of the Environmental Statement (ES). A detailed planning application has been submitted for the redevelopment of land off Marsh Wall, within the northern part of the Isle of Dogs (the Site ). The Applicant is seeking to obtain detailed planning permission for the residential-led mixed-use development of the Site, covering an area of 0.38 hectares (ha), and is located within the administrative boundary of London Borough of Tower Hamlets (LBTH). The proposed development (the Development ) would provide 423 residential units and office space, together with the provision of retail space, a residential gym and associated health facilities, new public realm open space (including pedestrian linkages and children s playspace), a new UK Power Networks (UKPN) substation, car and cycle parking. As part of the detailed planning application, an Environmental Impact Assessment (EIA) has been undertaken by Waterman EED. EIA is a formal procedure that must be followed for certain types and scales of development projects, where the likely significant environmental effects of a project are systematically assessed and reported. The purpose is to ensure that appropriate information about the likely environmental effects of a project is available for consideration by the relevant Local Planning Authority (LPA), consultees and the public, and that the LPA has this information before it can determine a planning application. The EIA process can also identify ways in which the project can be modified, or likely significant adverse effects mitigated, so as to reduce or avoid potentially significant adverse effects and to create and enhance beneficial effects. The legislation relevant to EIA is the Town and Country Planning (Environmental Impact Assessment) Regulations, 2011 (the EIA Regulations). From an early stage, the Applicant recognised that the detailed planning application would require an EIA and hence instructed Waterman EED to undertake the EIA for the Development. To ensure that all potential likely significant effects were considered in the EIA, LBTH were consulted in a process known as Scoping. The findings of the EIA are reported in the ES, which has been prepared to accompany the detailed planning application. The likely significant environmental effects of the Development, both during the demolition and construction stage, and once completed and operational have been considered. This document provides a summary of the findings of the EIA in non-technical language. Page 1

8 2. The Existing Site and Its Surrounding Context The Site is bound by the Meridian Place residential-led complex to the north, 225 Marsh Wall (Angel House) to the east, Marsh Wall to the south and the University of Sunderland London Campus, which forms part of the Thames Quay complex, to the west. The location of the Site and planning application boundary are shown in Figure 1 and Figure 2 respectively. The Site is currently occupied by: five medium-rise commercial / office blocks (Polden, Malvern, Cairngorm, Grampian and Brecon); a small retail unit; areas of a hard-standing surface car park; part of the roadway of Meridian Place; and part of the roadway of Lord Amory Way. Land uses surrounding the Site include commercial, residential, shops and offices together with open space and significant transport infrastructure. Land uses in the immediate vicinity of the Site include: residential dwellings at Meridian Place, Antilles Bay and Antilles Bay on Lawn House Close, and Walker s Lodge, located north, north-east and east of the Site respectively; the Docklands Light Railway (DLR) stations of South Quay and Crossharbour, located west and south of the Site respectively; Canary Wharf London Underground Limited (LUL) Station, located north-west of the Site, providing access to the Jubilee Line; and education facilities for The University of Sunderland (London Campus), South Quay College, and the Magic Roundabout Nursery (Dockland Branch), located west, south and east of the Site respectively. The Site is located within Marsh Wall East, which is identified within local and regional planning policy, and the LBTH Managing Development Document (MDD) and the Isle of Dogs Opportunity Area (OA), as one of 20 development sites that have been safeguarded for a specific use. Marsh Wall East has been identified as an area suitable for high-density, mixed use development. In addition, local and regional planning policy identified that in order to meet the housing needs of the local community within the Isle of Dogs, at least 10,000 new homes need to be provided between 2006 and Page 2

9 3. What are the Proposals? The detailed planning application seeks planning approval for the demolition of all existing built structures on the Site, together with the construction of a predominantly residential-led tower (the Residential Tower ) within the west of the Site and the construction of a separate Pavilion Building in the east of the Site. Between the Residential Tower and the Pavilion Building would be an area of new public realm (refer to Figure 3). The Residential Tower and Pavilion Building would be linked below ground by a single basement ( basement level B1 ) across much of the Site. A second basement level ( basement level B2 ) would extend beneath the footprint of the Pavilion Building. The Residential Tower would be lozenge shaped in plan form, rising to ground plus 53 storeys (a maximum height of m Above Ordnance Datum (AOD) (refer to Figure 4). The Residential Tower would be a tall, slender building which would be angled at the top. The angle would gesture slightly towards One Canada Square, located north-west within the centre of the existing Canary Wharf tower cluster. The Residential Tower would comprise: 423 residential units and associated residents gym, lounge and games room (a total of 49,910m 2 Gross External Area (GEA)), and 425m 2 GEA of office space, providing up to 5 office units catering to small and medium sized businesses. A total of 46 intermediate and 58 social rented residential units would be provided on Level 1 up to and including Level 15 of the Residential Tower. A total of 319 private residential units would be provided on Levels of the Residential Tower. Level 16 of the Residential Tower would also accommodate amenity space for residents, a gym for residents and building plant. The elevations of the Residential Tower would be articulated using five different fin types that would be fixed in terms of height and width, but would vary in depth. The fins would be constructed of glass reinforced plastic (GRP) or extruded aluminium which would create texture to the Residential Tower s elevations. The Pavilion Building would be rectilinear in form, providing a single-storey building (a maximum height of 13.90m AOD) (refer to Figure 5). The Pavilion Building would comprise: a new UK Power Networks (UKPN) substation; 105m 2 GEA of retail (café) space; two car lifts; and access to basement facilities. The exterior of the Pavilion Building would feature timber fins and both plain and back-painted glazing. The basement levels would provide the following: Basement level B1, which extends across the majority of the Site, would provide space for servicing and plant (including heating plant), resident s cycle (481 spaces) and car parking (30 spaces, of which four would be suitable for disabled use), car lifts, store rooms and water storage tanks. Basement level B2, which extends beneath the Pavilion Building, would provide residents leisure facilities (i.e. swimming pool, steam room, sauna and changing rooms), store room and plant. The main vehicular access into and out of the Site would be located at ground floor level in the north-east of the Site off Meridian Place. Private cars, entering and leaving the residential parking area, located Page 3

10 within basement level B1, would use this access point. Cars would enter and exit basement B1 via two car lifts located at ground level within the north of the Pavilion Building. Two drop off areas are provided, one to the north-east of the Residential Tower on Meridian Place; and another to the east of the Pavilion Building on Lord Amory Way. These areas would be used as disabled and visitor drop-off points and would also function as servicing areas. At the external ground floor level, 14 cycle spaces would be provided at a dedicated cycle parking station, to the east of the Pavilion Building. Visitors would be allocated 12 cycle parking spaces. Two cycle spaces would be allocated for use by users of the office units within the Residential Tower. The entrances of the Residential Tower have been arranged so that residents, office users and visitors would enter either from the direction of Marsh Wall or Meridian Place. Entrances to the Pavilion Building would be from Marsh Wall and Lord Amory Way. The Residential Tower and Pavilion Building are set back from Marsh Wall to allow pedestrian circulation around the Site. A significant area of public realm would be created between the Residential Tower and the Pavilion Building. This would provide accessible pedestrian access through the Site, connecting Marsh Wall and Meridian Place. An indicative landscaping strategy has been developed which breaks the public realm down into three distinct spaces. Features within these individual spaces would include soft and hard landscaping, a public square, 185m 2 of children s playspace (0-5 year olds) and outdoor seating areas associated with the café use of the Pavilion Building. All residential units would have individual private amenity space either as internalised amenity space, balconies, winter gardens or private terraces. A detailed surface water drainage strategy has been developed which includes measures to store rainfall and control the rate of discharge of this water to the local sewer network. The demolition and construction programme for the Development is assumed to take around 36 months to complete. It is anticipated that demolition works would commence in May For the purposes of the EIA, the completion and operation of the Development is considered to be May Once a contractor has been instructed and the details and methods of the demolition and construction works agreed, it is proposed that a Construction Environmental Management plan (CEMP) would be prepared for the Development. The CEMP would include all details of relevant environmental management controls necessary for environmental protection during the demolition and construction works. Page 4

11 4. Approach and Environmental Impact Assessment Methodology The EIA has been undertaken in accordance with the EIA Regulations and best practice guidance using established methods such as site surveys, reviews of available reports and data, computer modelling, consultations with relevant organisations and specialist assessments. The first stage of the EIA process involved undertaking a Scoping Study. The purpose of the Scoping Study was to identify the likely significant environmental effects that could arise from the Development, and therefore provide the focus of the EIA. The findings of the scoping exercise, along with details of the proposed methods for the specialist assessments, were presented in a Scoping Study report and were submitted to LBTH on 6 January The Scoping Study confirmed that the Development would likely give rise to a number of issues that need to be considered as part of the EIA process. These comprise: socio-economics; transportation and access; air quality; noise and vibration; archaeology; ground conditions and contamination; water resources and flood risk; daylight, sunlight, overshadowing and solar glare; wind microclimate; townscape, heritage and visual effects; and cumulative effects. The scope of the EIA was formally agreed with LBTH via their formal Scoping Opinion (dated 19 February 2014) and subsequent EIA scoping negotiations between 7 and 25 March Each of the above issues have been addressed in the ES, with a Chapter dedicated to each. The Townscape, Heritage and Visual Assessment is presented in a separate volume (Volume 3) of the ES. In each Chapter (and Volume 3 of the ES), a description of the assessment methodology is given, together with a description of the relevant environmental aspects of the Site and surrounding area. This is followed by an assessment of the likely significant effects of the Development (both beneficial and adverse) and any measures that should be adopted to reduce or offset any significant adverse effects identified during the assessment. The ES also provides an assessment of the likely residual effects that would remain after mitigation measures have been implemented, as well as the likely significant cumulative effects of the Development in combination with other reasonably foreseeable redevelopment proposals, Page 5

12 5. What are the Likely Environmental Effects and How Will They be Minimised? 5.1 Socio Economics The demolition of the existing buildings on the Site would give rise to the displacement of a small number of existing commercial occupiers, all of whom are on short-term leases. Current information provided by the Applicant indicates that the existing commercial floorspace on the Site is approximately two-thirds vacant. In addition, a survey of the existing commercial floorspace highlights that deficiencies in the quality of the existing provision would be very costly to remedy. All such factors together with the fact that there is superior quality commercial accommodation near to the Site leads to the conclusion that the displacement of existing commercial occupiers would not give rise to significant issues. It is estimated that the Development would generate approximately 130 full-time equivalent (FTE) construction jobs during the 36-month demolition and construction programme. An increase in construction workforce would give rise to additional expenditure in the local economy. The provision of 423 private, intermediate and social rented residential units would positively contribute to the housing targets for LBTH and London and contribute to addressing the overall housing shortfall within LBTH. It is estimated that Development would accommodate a new resident population of approximately 777 people, 37 of which would be of primary school age and 17 of which would be of secondary school age. With appropriate Community Infrastructure Levy (CIL) contributions in relation to school facilities, it has been assessed that the additional population demand of the Development would not place significant pressure on local schools. Similarly, with appropriate CIL contributions in relation to healthcare facilities, the Development would have an insignificant effect upon the capacity, supply and demand for healthcare facilities. The Development includes the provision of a small amount of office and retail floorspace. It is estimated that approximately 41 FTE jobs would be created. However, this is a net loss of 61 FTE jobs. As the Site is allocated by LBTH for residential development, the principle of redevelopment of existing employment floorspace for housing at the Site has already been established. The new residential population and new employees of the Development have the potential to contribute 5,674,968 and 46,000 annually to the local area respectively. The design of the Development has ensured that each residential unit within the Development has access to private amenity space. In addition, the Development includes a significant level of ground floor open space for residents of the Development, the wider community and visitors. The Development provides an adequate quantum of children s playspace for 0-5 year olds. The Site is within walking distance of existing parks which contain facilities suitable for older children s play and recreation. The proposed mix and layout of land uses and publically accessible spaces would provide active frontages at ground floor level and encourage activity throughout the day. This would maximise natural surveillance, thereby reducing the opportunity for crime and improving perceptions of safety and wellbeing. The Development would include pedestrian routes through the Site which would open up the Site improving access and permeability. This would help to ensure a safe environment for pedestrians and visitors to the Site. Page 6

13 5.2 Transportation and Access During the demolition and construction works there would be a short-term increase in traffic flow, particularly heavy goods vehicles (HGVs), associated with general plant and materials deliveries and the removal of waste from the Site. To effectively manage this, in addition to traffic management measures set out within a CEMP, a Construction Logistics Plan (CLP) would be developed and implemented. This would be agreed with LBTH and Transport for London (TfL), and would include measures such as the use of agreed appropriate routes to and from the Site for construction vehicles and restricting the largest vehicles to arriving and departing from the Site during off-peak times of the day. Appropriate signage would be implemented around the Site as well as communication methods for keeping local residents informed of activities. Overall, once the Development is completed and occupied, it is predicted to result in insignificant increases in traffic flows on the local road network. All proposed parking for residents would be provided within the Development. The 30 car parking spaces (of which four would be suitable for disabled use) is in line with relevant policy guidelines and has been agreed in consultation with LBTH and TfL. A Travel Plan has also been developed in support of the detailed planning application. This sets out a framework for the delivery of new transport initiatives and measures for residents that would travel to and from the Development on a regular basis. The aim of the Travel Plan is to reduce reliance on private car use and to encourage travel by more sustainable modes of transport. Serving of the Development would be undertaken via dedicated drop-off areas along the northern perimeter of the Site (for the Residential Tower) and the eastern perimeter of the Site (for the Pavilion Building). Additional servicing and refuse servicing would also occur along the western perimeter of the Site (for the Residential Tower). Access would be controlled by bollards and there would be no need for any servicing vehicles to undertake any turning manoeuvres. A Delivery and Servicing Plan (DSP) would be prepared, which aims to ensure that servicing and deliveries to the residential, office and retail uses within the Development can take place efficiently without significant effects upon the local road network. The Development is predicted to generate additional walking and cycle trips on the local network surrounding the Site. However, the Development provides new pedestrian routes through the Site and enhances the Site s permeability and connectivity for pedestrians and cyclists. The pedestrian environment within the Site would be of high quality with the provision of an attractive open space, wellmaintained and legible pathways, lighting and animated ground floor uses, thus providing natural surveillance. Cycling would be encouraged via the provision of 481 cycle parking spaces for residents of the Development, 12 cycle parking spaces for visitors of the Development and two cycle parking spaces for the users of the office accommodation provided by the Development. With regard to the increased use of public transport in the area, the predicted net increase in passengers using the South Quay DLR Station, Crossharbour DLR Station, LUL Jubilee line and local buses is predicted to be low and would not give rise to any significant capacity issues. Page 7

14 5.3 Air Quality The main likely effects on local air quality during the demolition and construction works would relate to dust. However, nuisance caused from dust, is only likely to be experienced by those living closest to the Site and on a temporary short-term basis. A range of measures to minimise or prevent dust would be implemented through the CEMP. Any emissions from equipment and machinery operating on the Site during demolition and construction would be small and would not significantly affect air quality. It is anticipated that the effect of demolition and construction vehicles entering and leaving the Site during the period of greatest vehicle movements would be moderate in the context of local background pollutant concentrations and existing local road traffic emissions. During all other periods, the effects would be minimal. To address this, the CEMP would include measures such as the use of agreed appropriate routes to and from Site for demolition and construction vehicles and restricting the largest vehicles to arriving and departing from Site during offpeak periods. Computer modelling has been carried out to predict the likely effect of future traffic-related exhaust emissions and heating plant emissions from the operation of the completed Development and the likely changes that this would bring about to local air quality. The effect of the Development on local air quality has been predicted for a number of existing sensitive locations surrounding the Site and for future sensitive locations within the Site. Accounting for the traffic that could be generated by the Development and emissions from the operation of the Development s heating plant, it is predicted that the Development would result in an imperceptible change to local air quality at all of the existing and future sensitive locations. Accordingly, the operation of the completed Development would not have any significant detrimental effect upon local air quality. 5.4 Noise and Vibration The demolition and construction works would include activities likely to increase noise levels and potentially cause vibration within and immediately adjacent to the Site. In particular, when activities are undertaken closest to the Site boundary. This may result in temporary, short-term effects to occupants on surrounding streets. Despite the above, the implementation of noise and vibration control and management measures through a CEMP for the demolition and construction works would help to reduce noise disturbance to occupants of existing properties. The CEMP would include measures such as the use of modern, quiet and wellmaintained machinery and noise and vibration monitoring to assist in controlling level at nearby receptors to reasonable levels. In addition, all demolition and construction traffic is predicted to result in insignificant noise increases on local roads. An assessment of residential amenity for future residents of the Development has been undertaken. The assessment results indicate that with mitigation measures in place, internal noise levels would meet acceptable standards. Noise levels within outdoor amenity spaces of the Development are anticipated to be in line with the expectations of future residents of the Development in this urban location. Any items of fixed building services plant installed, as part of the Development would have the potential to generate noise. Suitable noise level limits have therefore been proposed to ensure that noise from plant does not cause disturbance to either future occupants of the Development or occupants of existing properties in the surrounding area. Given the size and likely daytime use of the Development s office and retail units, it is unlikely that there will be noise break-out associated with either use that would give rise to disturbance to either existing or future residents. Furthermore, the servicing of the office and retail units would be limited to a small Page 8

15 number of vehicles during the daytime period. Servicing and delivery noise is not expected to give rise to any significant noise disturbance to existing or future residents. The assessment of the increase in noise levels resulting from additional traffic generated by the completed and operational Development has found that this would be insignificant on all local roads. 5.5 Archaeology (Buried Heritage Assets) An archaeological assessment has identified that the Site lies in an area of archaeological potential for palaeoenvironmental, prehistoric and post-medieval remains. However, previous development on the Site, particularly the past construction of the timber dock and the construction of the existing buildings on the Site would have partially removed archaeological (buried heritage) assets beneath the Site. Notwithstanding the above, it is acknowledged that there is potential for palaeoenvironmental, prehistoric and post medieval archaeological (buried heritage) assets to exist within the Site. In the absence of mitigation, intrusive ground works during the demolition and construction works would likely penetrate deeper and to a greater lateral extent than any structure currently associated with the existing Site buildings and would have the potential to remove archaeological (buried heritage) assets within the footprint of the works. However, as agreed in consultation with the Greater London Archaeological Advisory Service (GLAAS), with the implementation of a targeted programme of archaeological investigation and evaluation (to be undertaken following planning approval but prior to all intrusive ground works), a more detailed mitigation strategy would be devised and implemented (as necessary and appropriate) so that there would be no significant effects upon archaeology (buried heritage assets). There would be no archaeological effects resulting from the completed and operational Development, as there would be no disturbance of the ground. 5.6 Ground Conditions and Contamination A desk-based study of ground contamination at the Site has established that owing to historical activities at the Site and within its surrounding area, there is the potential for localised contamination to exist beneath the Site. Due to the historical development of the Site, the most likely source of contamination is likely to relate to the presence of Made Ground (i.e. material which is not naturally occurring and is present due to past activities on a site). However, the potential for significant contamination to be present on the Site is considered to be generally low. During the demolition and construction works, any existing contamination on the Site could be exposed and disturbed, potentially resulting in harm to human health, the underlying groundwater and nearby surface waters. However, all demolition and construction works would be undertaken in accordance with measures set out in the CEMP and any piling methodologies would be prepared in consultation with the Environment Agency to establish the appropriate methodology and minimise the risk to the deep aquifer from piling works penetrating through potentially contaminated soils. In addition, in line with mandatory legislative requirements and best practice guidance, redevelopment of the Site would take place in a manner that would not cause any unacceptable contamination risk to human health and the wider environment. The completed Development (comprising buildings and areas of hard standing) would not give rise to any sources of pollution, or generate any potential pollution pathways to future occupants, users and visitors to the Site. Page 9

16 5.7 Water Resources and Flood Risk The Site is protected by the Thames Tidal Defences, and as such, tidal and fluvial flood risk at the Site is considered to be low. A surface water drainage strategy has been developed which includes measures to store rainfall and reduce runoff from the Site and control the rate of discharge of this water to the local sewer network. These measures include the use of sustainable drainage methods and the strategy also allows for the likely future increase in rainfall due to climate change. The Development would therefore not increase flood risk on the Site or elsewhere beyond the Site boundary, which is in line with national and local policy as well as Environment Agency guidance. The deepest level of the Development s basement (basement level B2) would lie within groundwater. However, since this element of basement has a relatively small footprint, it is considered that this would not give rise to any significant groundwater flooding issues. In addition, it is anticipated that the basement would be appropriately waterproofed and would remain watertight throughout the lifetime of the Development. There would be no flood risk to the Site posed by artificial sources such as reservoirs and / or the nearby docks. Thames Water have confirmed that the estimated foul water discharges from the Development could be accommodated by the existing sewer network within the vicinity of the Site. Necessary upgrades to the local foul water drainage network would be undertaken by Thames Water as part of planned works to facilitate strategic development in the Isle of Dogs area. There would be an increased demand for water supply resulting from the Development. However, similar to the above, it is expected that the implementation of the Thames Water Resource Management Plan would ensure water demand be met within London. 5.8 Daylight, Sunlight, Overshadowing and Solar Glare During the demolition works, there would be some temporary improvements to levels of daylight and sunlight and overshadowing to properties and areas surrounding the Site. However, owing to the relatively few, medium-rise, existing buildings on the Site to be demolished, the effects would be minimal. As construction of the Development progresses, the daylight, sunlight, overshadowing and solar glare effects to properties and areas surrounding the Site would progress to the conditions predicted for the completed Development. Once completed and operational, the Development would have insignificant effects upon levels of daylight and sunlight within the majority of residential properties closest to the Site. With regard to the Site s nearest neighbour (Meridian Place, located adjacent to the north of the Site), due to the reduced massing within the east of the Site once the Development is completed, there would be some improvements to levels of daylight received at Meridian Place. However, overall, the Development would have insignificant effects upon levels of daylight and sunlight within the majority of this residentialled complex. It has been identified that a very small proportion of rooms and windows would experience daylight and sunlight reductions in excess of the industry standard guidelines with respect to daylight and sunlight availability. Despite this, it is widely accepted that the industry standard guidelines for daylight and sunlight should be applied with flexibility, particularly given their original application was intended for developments within the suburban environment. Accordingly, it is considered that the effects of the Development upon daylight and sunlight availability within Meridian Place are acceptable and appropriate, particularly given the very limited effects, the planning policy context for the Site and the wider area which encourages high-density, mixed use redevelopment. Page 10

17 In terms of overshadowing created by the Development, the likely effects are, once again, considered to be acceptable and appropriate. This is on account of the urban context and planning policy aspirations of the Site and the wider area. The Development would create limited instances of solar glare are just two locations for short periods of time during the day. Daylight and sunlight levels within the proposed residential units of the Residential Tower are proven to be very good. All amenity areas of the Development (balconies, terraces and ground level public realm) would be very well sunlit. 5.9 Wind Microclimate An assessment of the likely wind conditions as a result of the Development and the suitability of these in terms of pedestrian comfort and safety has been undertaken. Owing to the relatively few, medium-rise, existing buildings on the Site which are to be demolished, the demolition works are not expected to have a significant effect on the wind conditions within, and immediately surrounding the Site. As construction progresses the wind conditions would move towards the conditions predicted for the completed Development. Following completion of the Development, and with mitigation measures in place (such as detailed landscaping design and the inclusion of 1.6m balustrades to the west facing Level 16 terrace of the Residential Building) the wind conditions likely to be experienced at all locations within, and immediately surrounding the Site, have been found to be suitable for the intended uses. These locations include entrances to the Residential Tower and Pavilion Building, pedestrian thoroughfares / routes of the Development, the proposed public realm, proposed ground level sitting, seating and play areas of the Development, drop-off locations, balconies and terraces of the Residential Tower and pedestrian thoroughfares / routes adjacent to the Site. It is therefore considered that wind conditions would not significantly affect pedestrian comfort or safety either within the Development or within the public realm surrounding the Site, following completion of the Development Townscape, Heritage and Visual Effects The likely effect of the demolition and construction works upon local townscape character and the setting of above ground built heritage assets would be greatest in areas adjacent to the Site, with the exception of areas to the north of the Site where the existing built form and the presence of South Dock would screen views of demolition and construction at the lower levels. The likely visual effect arising from the demolition and construction works is anticipated to be insignificant for distant views. However, views from positions close to the Site are anticipated to be affected in the short-term, lasting for the anticipated 36 month demolition and construction programme. Such effects would be associated with the visual intrusion of large demolition and construction plant and machinery and the presence of partially completed built form of the Development. Consideration of the townscape, above ground built heritage assets and visual effects of the completed Development have been an integral part of the Applicant s design approach. The design of the Development has been adapted and modified throughout the design process to take account of likely townscape, heritage and visual constraints and opportunities. As such, likely significant effects have been avoided. The likely effects upon the West India Dock conservation area, the Narrow Street conservation area, the Grade I listed warehouses and general office at the western end of North Quay and the Grade I listed quay walls, copings and buttresses to Import and Export Dock would not be significantly affected by the Page 11

18 Development. In many cases, the Development would enhance the setting of many above ground built heritage assets including that of the Coldharbour conservation area. The Development would enhance the setting of the Greenwich Maritime World Heritage Site (WHS). The Development would positively add to the existing pattern of development within the wider setting of the Greenwich Maritime WHS, with the Development providing a new point of interest on the skyline in relation to the existing cluster of tall buildings at Canary Wharf. Overall, the character and quality of the Greenwich Maritime WHS would not be significantly affected by the Development. In the visual assessment, the suitability of the design of the Development in its spatial location has been assessed using 20 viewpoints, which were selected in consultation with LBTH. Within 19 viewpoints assessed, the Development would have a significant beneficial effect. Within just one viewpoint assessed, the Development would have no effect as it would be totally obscured from view by the existing built form Cumulative Effects Two types of cumulative effects have been considered: Type 1 Effects: The combination of individual effects (for example, noise, dust and visual effects) from one development (in this case, the Development) on a particular receptor; and Type 2 Effects: The combination of effects from several developments (in this case, the Development together with other reasonably foreseeable schemes (hereafter referred to as cumulative schemes )), which individually might be insignificant, but when considered together could create a significant cumulative effect. During demolition and construction, a combination of effects arising from the Development in isolation (i.e. Type 1 Effects) would likely arise from dust, emissions from construction related vehicles, noise from demolition and construction plant and machinery and traffic, vibration, and townscape, heritage and visual effects. The implementation of mitigation measures through the CEMP would minimise the effects to existing residents and occupants and users of existing commercial and education uses surrounding the Site. In relation to Type 2 Effects, the combined effects of the Development together with other reasonably foreseeable development proposals ( cumulative schemes ) have been assessed. The cumulative schemes considered in the assessment have been agreed in consultation with LBTH (27 in total). During demolition and construction of the Development, similar works on the sites of the cumulative schemes (assuming there would be some overlap of demolition and construction programmes and durations) would likely result in temporarily increased traffic, emissions from demolition and construction vehicles, noise, and townscape, heritage and visual effects. Again, the implementation of mitigation measures via a CEMP for the Development and the cumulative schemes would minimise such Type 2 cumulative effects. The Type 2 cumulative effects, once the Development and the cumulative schemes are complete, have been generally found to be minimal. Notable exceptions include the beneficial cumulative socioeconomic effects as follows: the generation of at least 6,827 FTE demolition and construction jobs; an overall residential yield of approximately 10,145 residential units which would significantly contribute to the achievement of LBTH housing targets; the generation of in excess of 65,000 FTE jobs; and Page 12

19 the generation of in excess of 200 million annual local spend associated with household and employee spend. Furthermore, the Development together with the cumulative schemes leads to a generally calmer wind microclimate within and around the Site and the Type 2 cumulative townscape, heritage and visual effects are more beneficial for the majority of townscape, heritage and visual assets assessed. Page 13

20 6. What Will Happen Next? Following the submission of the detailed planning application, there will be an opportunity for any interested parties to comment on the Development. The ES and a set of documents supporting the detailed planning application can be viewed on the London Borough of Tower Hamlet s website: A copy will also be available in the Town Hall on Clove Crescent. The address is: London Borough of Tower Hamlets Town Hall Mulberry Place 5 Clove Crescent London E14 2BG Tel: Additional copies of the ES can be purchased from Waterman EED on request (contact details below). Additional copies of the NTS can be obtained free of charge. A CD version of the ES can be purchased at a cost of 20. Waterman Energy, Environment & Design Ltd Pickfords Wharf Clink Street London SE1 9DG Tel: Fax: eed@waterman-group.co.uk Page 14

21 FIGURES Figure 1: Location Plan Figure 2: Planning Application Boundary Figure 3: Ground Floor Plan Figure 4: Cross Section Plan (A-A) Figure 5: Pavilion Building (Elevations) Figures

22 Energy, Environment & Design SITE LOCATION N WATERMAN ENERGY, ENVIRONMENT & DESIGN Reproduced from the Ordnance Survey maps with the permission of the Controller of Her Majesty s Stationery Office, Crown copyright, Waterman Energy, Environment & Design, Pickfords Wharf, Clink Street, London SE1 9DG. Licence number Project Details EED : Meridian Gate Figure Title Figure 1: Site Location Figure Ref EED _GR_NTS_1A Date 2014 File Location \\nt-lncs\weedl\projects\eed14005\100\graphics\nts\issued figures

23 Energy, Environment & Design Planning Application Boundary N Project Details EED : Meridian Gate Figure Title Figure 2: Planning Application Boundary Figure Ref Date File Location EED _GR_NTS_2A 2014 \\nt-lncs\weedl\projects\eed14005\100\graphics\nts\issued figures WATERMAN ENERGY, ENVIRONMENT & DESIGN Reproduced from the Ordnance Survey maps with the permission of the Controller of Her Majesty s Stationery Office, Crown copyright, Waterman Energy, Environment & Design, Pickfords Wharf, Clink Street, London SE1 9DG. Licence number

24 Energy, Environment & Design Planning Application Boundary N WATERMAN ENERGY, ENVIRONMENT & DESIGN Reproduced from the Ordnance Survey maps with the permission of the Controller of Her Majesty s Stationery Office, Crown copyright, Waterman Energy, Environment & Design, Pickfords Wharf, Clink Street, London SE1 9DG. Licence number Project Details EED : Meridian Gate Figure Title Figure 3: Ground Floor Plan Figure Ref EED _GR_NTS_3A Date 2014 File Location \\nt-lncs\weedl\projects\eed14005\100\graphics\nts\issued figures

25 Energy, Environment & Design Project Details EED : Meridian Gate Figure Title Figure 4: Cross Section Plan (A-A) Figure Ref Date File Location EED _GR_NTS_4A 2014 \\nt-lncs\weedl\projects\eed14005\100\graphics\nts\issued figures WATERMAN ENERGY, ENVIRONMENT & DESIGN Reproduced from the Ordnance Survey maps with the permission of the Controller of Her Majesty s Stationery Office, Crown copyright, Waterman Energy, Environment & Design, Pickfords Wharf, Clink Street, London SE1 9DG. Licence number

26 Energy, Environment & Design WATERMAN ENERGY, ENVIRONMENT & DESIGN Reproduced from the Ordnance Survey maps with the permission of the Controller of Her Majesty s Stationery Office, Crown copyright, Waterman Energy, Environment & Design, Pickfords Wharf, Clink Street, London SE1 9DG. Licence number Project Details EED : Meridian Gate Figure Title Figure 5: Pavilion Building (Elevations) Figure Ref EED _GR_NTS_5A Date 2014 File Location \\nt-lncs\weedl\projects\eed14005\100\graphics\nts\issued figures

27

28

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction ASDA Stores Limited and Ashbourne Beech Property Limited (hereafter referred to as the Applicants ) are seeking to obtain planning permission for the redevelopment of the existing supermarket

More information

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction DV4 Properties Park Street Co. Ltd (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of 185 Park Street, situated on land bounded

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

Battersea Park East Environmental Statement

Battersea Park East Environmental Statement Environmental Statement Non-Technical Summary July 2014 , Battersea, London July 2014 Waterman Energy, Environment & Design Limited Pickfords Wharf, Clink Street, London SE1 9DG, www.watermangroup.com

More information

1. Introduction. Site Boundary

1. Introduction. Site Boundary 1. Introduction Workspace Group Plc (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of (hereafter referred to as the Site ), situated to the

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

NON - TECHNICAL SUMMARY

NON - TECHNICAL SUMMARY WATERMAN ENERGY, ENVIRONMENT & DESIGN LTD 60 ludgate hill / 30 old bailey environmental STATEMENT NON - TECHNICAL SUMMARY REV. 01 january 2011 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey 1. Introduction

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY Waterman Energy, Environment & Design

SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY Waterman Energy, Environment & Design SMITHFIELD QUARTER ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY HENDERSON GLOBAL INVESTORS LTD. FEBRUARY 2013 Waterman Energy, Environment & Design 1. Introduction Henderson Global Investors Limited

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction Workspace 14 Limited (hereafter referred to as the Applicant ) has applied for full planning permission for the redevelopment of and 14 Marshgate Lane, situated on land bound by Marshgate

More information

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010 GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY 24 December 2010 Our Ref: DT/JLL0509 Appeal Ref (optional): RPS 1 st Floor West Cottons Centre Cottons Lane London

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

South Quay Plaza Tower Hamlets Community Forum; Record of Discussion

South Quay Plaza Tower Hamlets Community Forum; Record of Discussion South Quay Plaza Tower Hamlets Community Forum; 03.02.14 Record of Discussion Attendees: Jerry Bell - Tower Hamlets Council Nasser Farooq - Tower Hamlets Council Emily Harris - Berkeley Homes (South East

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN NON-TECHNICAL SUMMARY October 2017 CLARENDON GAS WORKS WOOD GREEN CLARENDON GAS WORKS, HARINGEY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY October 2017 Our Ref: Q70251 Contents 1 INTRODUCTION... 2 2

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

Rotherhithe Rotherhithe Area Vision Map

Rotherhithe Rotherhithe Area Vision Map Area Vision Map CWAAP1 Improved pedestrian and cycle links to the wider area Improved link from town centre to River Thames and docks CWAAP2 Brunel Museum NSP79 CWAAP3 Proposed Thames Crossing Station

More information

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey O Scale 1:1,250 Map Dated: 09/05/2016 CA//16/00504/FUL Crown copyright and database rights 2016 Ordnance Survey 100019614 Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 13

More information

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary The Haymarket 189 Morrison Street, Edinburgh Environmental Statement Volume 1 Non Technical Summary 16 August 2010 Tiger Haymarket Limited Partnership Non Technical Summary Contents 1 Introduction 1 2

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2)

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) Central Chelmsford Development Agency / Genesis 27/08/2014 Central Chelmsford Development Agency: Environmental Statement Quality Management

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

75-89 Wallis Road & 59 Berkshire Road, Hackney Wick, London, E9 5LN

75-89 Wallis Road & 59 Berkshire Road, Hackney Wick, London, E9 5LN East London Mixed-Use Development Opportunity CGI of Proposed Scheme Summary A mixed-use development opportunity located in Hackney Wick within the jurisdiction of the London Legacy Development Corporation.

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(iii) 13/81 Erection of sports hall, associated changing facilities, offices

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon. 138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1

More information

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction RT Group Property Investments Limited (the Applicant ) is seeking detailed planning permission for the redevelopment of 1.28 hectares of land off Norton Folgate to the north of Liverpool

More information

Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ

Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ Committee Date: 11/07/2013 Application Number: 2013/03520/PA Accepted: 20/05/2013 Application Type: Full Planning Target Date: 15/07/2013 Ward: Sutton Vesey Land Adj. 63 Sunny Bank Road, Sutton Coldfield,

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part

More information

RE: THE MALL, WALTHAMSTOW PLANNING APPLICATION REF: 17/1355 RESPONSE TO LBWF NEIGHBOUR CONSULTATION

RE: THE MALL, WALTHAMSTOW PLANNING APPLICATION REF: 17/1355 RESPONSE TO LBWF NEIGHBOUR CONSULTATION Gavin Chinniah Planning Manager Majors Team Development Management London Borough of Waltham Forest Sycamore House Town Hall Complex Forest Road London E17 4JF 19278/A3/RM/MJ/sl 4 th October 2017 Dear

More information

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Location 374B Long Lane London N2 8JX Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Applicant: Ms Katrin Hirsig Proposal: Single storey

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

YMCA Erdington (Phase 2), 300 Reservoir Road, Erdington, Birmingham, B23 6DB

YMCA Erdington (Phase 2), 300 Reservoir Road, Erdington, Birmingham, B23 6DB Committee Date: 13/06/2013 Application Number: 2013/03011/PA Accepted: 30/04/2013 Application Type: Full Planning Target Date: 30/07/2013 Ward: Stockland Green YMCA Erdington (Phase 2), 300 Reservoir Road,

More information

on behalf of LS Portland House Developer Ltd Portland House, Bressenden Place, London Environmental Statement - Non-Technical Summary February 2013

on behalf of LS Portland House Developer Ltd Portland House, Bressenden Place, London Environmental Statement - Non-Technical Summary February 2013 on behalf of LS Portland House Developer Ltd Portland House, Bressenden Place, London Environmental Statement - Non-Technical Summary February 2013 1. INTRODUCTION LS Portland House Developer Limited (hereafter

More information

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1 Environmental Statement Non-Techncial Summary 28.06.2017 Anthology Hale Works xx.xx.xx Document title 1 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description...

More information

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157 NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY September 2016 Our Ref: Q60157 Contents 1 INTRODUCTION... 2 2 EIA METHODOLOGY... 5 3 SITE DESCRIPTION AND SETTING... 6 4 ALTERNATIVES...

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Form to Submit Land for Residential Evidence Gathering Shepway Strategic Housing Land Availability Assessment (SHLAA) Partial Review

Form to Submit Land for Residential Evidence Gathering Shepway Strategic Housing Land Availability Assessment (SHLAA) Partial Review Form to Submit Land for Residential Evidence Gathering Shepway Strategic Housing Land Availability Assessment (SHLAA) Partial Review All organisations and individuals who wish to put forward land for consideration

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text Chapter 1: Introduction Draft - March 2017 Prepared by: Address: Email: Website: Mott McDonald, The Urbanists and HLM

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd. Environmental Impact Assessment for Waterway Restoration Projects Chris John, Technical Director Ecus Ltd. Environmental Impact Assessment for Waterway Restoration Projects What is Environmental Impact

More information

intu Bromley Planning Summary Bringing more to Bromley February 2014

intu Bromley Planning Summary Bringing more to Bromley February 2014 intu Bromley Planning Summary February 2014 Bringing more to Bromley Contents Introduction 1 Description of the Proposals 2 Economic Benefits 4 Planning Policy 6 Cinema and Catering Assessment 7 Design

More information

6. Bermondsey 6.1. Bermondsey Area Vision

6. Bermondsey 6.1. Bermondsey Area Vision 6. 6.1. Area Vision 6.1.1. is: An inner-london neighbourhood characterised by modest worker ho associated with the historic Rotherhithe docks and local manufacturing industries such as biscuits, jam, vinegar

More information

DELEGATED DECISION on 1st September 2015

DELEGATED DECISION on 1st September 2015 Application N o : 14/04810/OUT LONDON BOROUGH OF BROMLEY TOWN PLANNING RENEWAL AND RECREATION DEPARTMENT DELEGATED DECISION on 1st September 2015 14/04810/OUT Claire Harris 4 Oaklands Road Bromley BR1

More information

1 INTRODUCTION 1.1 INTRODUCTION

1 INTRODUCTION 1.1 INTRODUCTION 1 INTRODUCTION 1.1 INTRODUCTION RREEF (UK) Ltd in partnership with Sheffield City Council (SCC) is applying for planning permission for the construction of: a new indoor city centre market hall and indoor

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

here today Public exhibition

here today Public exhibition Public exhibition here today Find out more about Central England Co-operative and Hawkstone Vale Developments Ltd s redevelopment proposal to bring new retail and community facilities to Wilnecote. The

More information

Ref: A073350/SM/sm Date: 13 September 2013

Ref: A073350/SM/sm Date: 13 September 2013 Ref: A073350/SM/sm Date: 13 September 2013 Ian Parkinson Development Control Team Leader Planning Portsmouth City Council Civic Offices Guildhall Square Portsmouth PO1 2AY Dear Ian LIGHT & GLEAVE VILLA

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision 5. 5.1. Area Vision 5.1.1. are: A globally significant central London business district which is home to international business headquarters; At the heart of the commercial and cultural life of the capital

More information

Non-technical summary

Non-technical summary Non-technical summary Introduction NTS.1 is applying for outline planning permission for a residential development of up to 80 dwellings on land at Hambrook, on the northern fringe of Bristol. NTS.2 An

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 11 October 2016 by Mike Hayden BSc DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 21 November 2016 Appeal

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

London Bridge London Bridge Area Vision Map

London Bridge London Bridge Area Vision Map Area Vision Map Borough Market Southwark Cathedral NSP54 Hay s Galleria Key: NSP Site Allocations Greenspace Low Line Thames Path Cycle Network Primary Shopping Areas Borough High Street Tube Station NSP51

More information

Peckham Peckham Area Vision Map

Peckham Peckham Area Vision Map Area Vision Map PNAAP13 PNAAP8 Sumner Road Surrey Canal Walk Bird in Bush Park Key: NSP Site Allocations PNAAP Allocations Greenspace Low Line Cycle Network Primary Shopping Areas Square Surrey Canal Walk

More information

13. London Bridge London Bridge Area Vision

13. London Bridge London Bridge Area Vision 13. 13.1. Area Vision 13.1.1. is: A globally significant central London business district which is home to international business headquarters; Internationally renowned for its prominent riverfront location

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

16. Peckham Peckham Area Vision

16. Peckham Peckham Area Vision 16. 16.1. Area Vision 16.1.1. is: A lively town centre providing a range of daytime and night time activities on Rye Lane including a Library, a Leisure Centre and many independent retailers which specialise

More information

Elephant and Castle. Elephant and Castle Area Vision Map. Elephant and Castle. 216 New Southwark Plan Proposed Submission Version NSP42 NSP49 NSP44

Elephant and Castle. Elephant and Castle Area Vision Map. Elephant and Castle. 216 New Southwark Plan Proposed Submission Version NSP42 NSP49 NSP44 Area Vision Map Lamberth North Station Waterloo Road Southwark Station NSP49 NSP43 Blackfriars Rd St George s Road Borough Road NSP48 Great Suffolk Street NSP42 NSP44 NSP45 Borough Station Newington Gardens

More information

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Duddingston House Properties and Urbanist Hotels Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Environmental Statement Non-Technical Summary 3rd September 2015 www.oldroyalhighschool.com

More information

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS PLANNING STATEMENT To support planning and listed building consent applications for change of use from Class A1 shop and Class A3 cafe to Class A3 restaurant at: Market House Market Place Kingston upon

More information

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. ITEM 9 Application Number: 18/00266/DISCON Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. AT The Point, 602 Midsummer Boulevard,

More information

Land at Edmonstone, The Wisp, South East Edinburgh Environmental Statement

Land at Edmonstone, The Wisp, South East Edinburgh Environmental Statement Land at Edmonstone, The Wisp, South East Edinburgh Environmental Statement November 2016 Waterman Energy, Environment & Design Limited Third Floor, South Suite, 8 Nelson Mandela Place, Glasgow, G2 1BT,

More information

LONDON BOROUGH OF WALTHAM FOREST

LONDON BOROUGH OF WALTHAM FOREST LONDON BOROUGH OF WALTHAM FOREST Committee/Date: Planning 5th December 2006 Application reference: Applicant: Location: Proposed development: Wards affected: Appendices: 2006/1330/OUT Mr Z Ahmed Nita Villa

More information

St Michaels C of E Junior & Infant School, Nantmel Grove, Bartley Green, Birmingham, B32 3JS

St Michaels C of E Junior & Infant School, Nantmel Grove, Bartley Green, Birmingham, B32 3JS Committee Date: 06/03/2014 Application Number: 2013/08595/PA Accepted: 19/11/2013 Application Type: Full Planning Target Date: 14/01/2014 Ward: Bartley Green St Michaels C of E Junior & Infant School,

More information

10. East Dulwich East Dulwich Area Vision

10. East Dulwich East Dulwich Area Vision 10. 10.1. Area Vision 10.1.1. is: A predominantly residential area characterised by mostly medium density housing, including many family homes. Many parts of have retained historic character and it includes

More information

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT PENRHYN QUARRY BETHESDA GWYNEDD Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT September 2010 PENRHYN QUARRY, BETHESDA, GWYNEDD Proposed development of an Inert Waste Recycling Facility

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

GREENFORD HALL & ADJOINING LAND

GREENFORD HALL & ADJOINING LAND GREENFORD HALL & ADJOINING LAND CONTENTS 1. Introduction 1. Introduction 2. Urban Context 2.1 The Site and Surroundings 2.2 Urban Context Map 2.3 Access and Movement 3. Planning Context 3.1 Planning History

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff

More information

Proposed Student Accommodation Development

Proposed Student Accommodation Development Statement of Response to the Notice of Pre- Application Consultation Opinion Former "Matts of Cabra" public house and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7 Proposed Student Accommodation

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

HS2 Interchange Station Design

HS2 Interchange Station Design Working on behalf of HS2 Interchange Station Design October 2018 www.hs2.org.uk 1 Interchange Station, Solihull Introduction In February 2018, HS2 Ltd appointed Arup to take forward the design of Interchange

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location The Avenue Tennis Club The Avenue London N3 2LE Reference: 16/6509/FUL Received: 10th October 2016 Accepted: 10th October 2016 Ward: Finchley Church End Expiry 5th December 2016 Applicant: Mrs

More information

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Departure from the Development Plan. Town Council objection to a major application. DETERMINE Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95

More information

Library of Birmingham integrated with The REP

Library of Birmingham integrated with The REP 0123456789 Birmingham City Council Library of Birmingham integrated with The REP Environmental Statement Chapter 9 Shadowing 9 Shadowing Chapter Summary Key features A private amenity garden is located

More information