1 NSC/6/1 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER (No 2) 2014 EXCHANGE LAND CERTIFICATES IN RESPECT OF SPECIAL CATEGORY LAND Proof of Evidence of Matthew Bowell On behalf of North Somerset Council I n respect of Ecology Atkins NSC/6/1 I Version 4.0 I 2 June 2014

2 Table of contents Chapter 1. Qualifications and Experience 2. Introduction and Scope of Evidence 3. Background Ecological Impacts Overview Description of Scheme Legal Context Position of Statutory Consultees Ecological Context Summary of Ecological Assessment Summary of Ecological Impacts and Mitigation Design Development Requirement for Compensation Works 4. Objections Relating to Ecology Overview OBJ/9 (Giannettos); Plot 04/03 & part of 04/01 OBJ/16 (Withers); Plots 03/04,03/14 & 03/43 OBJ/29 (Burnell); Plots 04/08, 04/19, 04/20, 04/21, 04/22 OBJ/30 (Virìdor Waste Exeter Limited): Plot 03/01 OBJ/32: (James) Plot 03/26 5. Conclusion Pages Atkins NSC/6/1 I Version 4.0 I 2 June 2014

3 1. Qualifications and Experience 1.1. My name is Matthew Bowel!. I am a Principal Consultant Ecologist working for Atkins Limited (Atkins), multi-disciplinary engineering and environmental consultants, based in their Bristol office i have a BSc in Zoology from the University of Reading and an MSc in Ecology from the University of Wales, Bangor. I am a Chartered Environmentalist (CEnv), Member of the Chartered Institute of Ecology & Environmental Management (MCIEEM) and a member of the British Ecological Society i have over 15 years experience as an ecological consultant with past positions with EMEC Ecology (Nottingham), Carter Ecological (now RSK) and Ecosulis Ltd. i have been involved with a wide range of projects including ecological survey and assessments, advice on legally protected species, Environmental Impact Assessments and Habitats Regulations Assessment of impacts to internationally designated sites. My project work has included assessment of ecological impacts of roads, rail and other infrastructure projects, residential development, urban regeneration, greenfield development and brownfield/derelict land reclamation The evidence which I have prepared and provide for this Inquiry within this Proof of Evidence is true and I confirm that the opinions expressed are my true and complete professional opinions. Atkins NSC/6/1 I Version 4.0 I 2 June

4 2. Introduction and Scope of Evidence 2.1. This Proof of Evidence has been produced on behalf of North Somerset Council (NSC) in relation to the proposed South Bristol Link (the Scheme). Scope of Evidence 2.2. To address the objections raised to the Orders promoted by NSC, my evidence is organised under the following headings: (a) Section 3 - Background: Summarises the evolution of the Scheme from an ecological context up to and beyond the grant of planning permission; (b) Section 4 - Objections Relating to Ecology: Assessment and response to the objections to the Orders relevant to this Proof of Evidence; (c) Section 5 - Conclusion: Summarises the arguments in support of the Orders in relation to ecology; 2.3. I will confirm that land to be acquired for ecological purposes is needed in order to deliver the Scheme This Proof of Evidence will draw on the information already provided to North Somerset and Bristol City Councils and other publicly available sources where appropriate to respond to the objections For convenience, relevant extracts from key guidance in relation to ecology and correspondence referred to in this Proof of Evidence are provided as Volume 2 of my Proof of Evidence Appendices (NSC/6/2). Atkins NSC/6/1 I Version 4.0 I 2 June

5 3. Background Ecological Impacts Overview 3.1. The Scheme has been subject to a suite of ecological field surveys in order to inform assessment of the potential impacts on ecological receptors. Assessment was undertaken in line with the standard Guidelines on Ecological Impact Assessment in the UK (IEEM 2006) (CD5/23). The results of this assessment are detailed in Chapter 13 of the Environmental Statement (CD4/2). Parts of the Scheme cross undeveloped countryside with an unavoidable loss of habitat and associated severance impacts. The overall conclusion of this assessment was that, with the in-built package of compensation measures, the long-term residual impacts on ecological receptors would not be significant. Description of Scheme 3.2. The Scheme wil! comprise the construction and realignment of a section of highway 4.5 kilometres in length from the A370 Long Ashton bypass within North Somerset to the A38 and onwards to the Cater Road roundabout within the Hartcliffe area of south BristoL. This incorporates the minor realignment of sections of existing highway at Highridge Green, King Georges Road and Whitchurch Lane Full Scheme details are given in the Environmental Statement (CD4/1-4n) and are also provided to the Inquiry more fully in evidence from other witnesses Appendix 1 (contained in NSC/6/2) gives an overview of statutory sites in the broad vicinity of the Scheme Appendix 2 (contained in NSC/6/2) gives an overview of non-statutory sites in the vicinity of the Scheme The Scheme has been designed to incorporate a number of features to support wildlife connectivity and biodiversity. Legal Context Legislation 3.7. Key legislation relevant to ecology in relation to the Scheme is as fol!ows: Atkins NSC/6/1 I Version 4.0 I 2 June

6 i. EC Directive on the conservation of natural habitats and of wild fauna and flora (92/42/EEC); ii. Conservation of Habitats and Species Regulations 2010; iii. EC Directive on the conservation of wild birds (2009/147/EC); iv. Natural Environment & Rural Communities Act 2006; v. Protection of Badgers Act 1992; vi. The Hedgerows Regulations 1997; and vii. Wildlife and Countryside Act 1981 (as amended). Planning Policy and Guidelines of Relevance 3.8. As wel! as national and local guidance and action plans, the policies and guidance are relevant to the determination of the Scheme have included: i. National Planning Policy Framework (2012) (CD2I6); ii. BCC Core Strategy (CD2n); iii. NSC Core Strategy (CD2/6); Planning Determination 3.9. As is described more ful!y in evidence from other witnesses, the Scheme has been subject to a full Environmental Impact Assessment (EIA) in accordance with The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 and was granted full planning permission (subject to conditions) by NSC on 2 December 2013 (Planning Ref: 13/P/1204/F2)(CD2/1) and by Bristol City Council (BCC) on 18 November 2013 (Planning Ref: 13/03108/F) (CD 2/2) The following planning conditions are relevant to my evidence: i. NSC Condition 6: Requirements relating to landscape design including planting commitments made in the ES; ii. NSC Condition 7: Requirements relating landscape maintenance; Atkins NSC/6/1 1 Version June

7 iii. NSC Condition 8: Requirements in relation to tree and hedge protection fencing; iv. NSC Condition 25: Requirement to produce and adhere to a Landscape and Conservation Habitat Management Plan, which includes a requirement to include 'a detailed Scheme of mitigation, compensation and biodiversity enhancement...'; v. NSC Condition 26: Relating to creation of ponds; vi. NSC Condition 27 and BCC Condition 13: Relating to provision of bird and bat boxes; vii. NSC Condition 29 and BCC Condition 12: Mitigation plan for Highridge Common exchange land, which includes a requirement to translocate turf and also to ensure its establishment and long term management; and viii. BCC Condition 15: Landscape management plan. Position of Statutory Consultees Consultation with Natural England, the Environment Agency and BCC and NSC ecologists was undertaken throughout the initial design and planning process The statutory consultees did not object to the Scheme at any stage during the initial design meetings, nor during the planning application process. Discussions were held in relation to survey techniques, assessment of impacts, and proposed mitigation, but these were always constructive and resulted in agreement. Ecological Context The northern part of the Scheme lies within a largely rural area, and crosses farmland consisting of agricultural grasslands, divided by hedges with blocks of woodland and scrub. Two water courses are crossed: Longmoor Brook and Colliter's Brook The southern half of the Scheme is on the outskirts of Bristol, on the edge of the built environment, where it crosses Highridge Common which contains a mosaic of unimproved and semi-improved grassland habitats and scrub. The Scheme Atkins NSC/6/1 I Version 4.0 I 2 June

8 extends into sub-urban Bristol passing along existing roads. The southern-most part of the Scheme passes through an area of amenity grassland before joining Hengrove Way Appendix 3 (contained in NSC/6/2) shows current habitat and land use for the Scheme and immediate environs. Summary of Ecological Assessment The EIA for the Scheme was undertaken by Atkins on behalf of BCC and NSC. The South Bristol Link Road Environmental Statement July 2013 (the ES) (CD 4/1-4n) included a full assessment of the potential ecological impact of the Scheme undertaken by Atkins; this is reported in Chapter 2.13 of the Environmental Statement (ES) (CD4/2) The scope of the ecological assessment included: i. Data-gathering of existing ecological information within the vicinity of the Scheme from appropriate sources, this included a 'Phase l' habitat survey and protected species scoping report produced for the Scheme in 2010 (Mott MacDonald, 2010). Additional 'Phase 2' ecological survey work was undertaken by Atkins in These were reported in 11 separate survey reports that are appended to the ES document (CD 4/3-4/5); ii. Evaluation of ecological features within and adjacent to the Scheme with regard to their ecological importance; iii. Provision of mitigation measures to minimise negative impacts from the Scheme on those receptors; iv. Assessment of the significance of potential ecological impacts from the proposals, including habitat loss, disturbance to animals and off-site impact from the Scheme; and v. Enhancement measures to increase the biodiversity value of the land within the Scheme. Atkins NSC/6/1 1 Version June

9 Summary of Ecological Impacts and Mitigation Scheme design has been developed with a considered and proportionate schedule of mitigation elements. This includes planting of trees and scrub, translocation of turf and soil and management of habitats for biodiversity enhancement. These elements have been designed to be sympathetic with the design and the existing and retained habitats Table in Appendix 7 (NSC/6/2) summarises the principal impacts on ecological receptors relevant to the Inquiry One European site designated for nature conservation importance was identified within 2 km of the Scheme: Avon Gorge Woodlands Special Area of Conservation (SAC). The Severn Estuary SAC, Special Protection Area (SPA) and Wetland of International Importance (Ramsar site) is linked to the Scheme via a hydrological pathway and lies approximately 10 km downstream from the centreline of the Scheme. Five Special Areas of Conservation (SACs) with bats as qualifying features have been identified within 30 km of the Scheme. Two nationally designated sites lie within 2 km of the Scheme: Avon Gorge Site of Special Scientific Interest (SSSI) and Ashton Court SSSI. Statutory nature conservation designations are shown in Appendix 1 (NSC/6/2). No significant effects as a result of the Scheme are predicted on any of these European or nationally important sites Of the eight non-statutory designated sites within 1 km of the Scheme, three are directly affected by the Scheme: Highridge Common Site of Nature Conservation Interest (SNCI), Colliter's Brook SNCI, and Hanging Hill Wood Wildlife Site (WS1). These designations are shown in Appendix 2 (NSC/6/2). Habitat loss and fragmentation at Highridge Common SNCI is regarded as an impact with the potential to be significant at a county/regional scale (IEEM 2006) (CD5/23) and a programme of habitat translocation is proposed. With appropriate monitoring and management the level of impact on the integrity of the SNCI will be reduced to a level where impacts will not be significant. Impacts on the other two nonstatutory designated sites are regarded as minor and not significant. Impacts on Hanging Hill Wood will be compensated by woodland planting and translocation of top soil and elements such as coppice stools where possible. 1 WS and SNCI are equivalent designations used by NSC and BCC respectively Atkins NSC/6/1 I Version June

10 3.22. Habitats within the Scheme corridor include broadleaved woodland, mature and veteran trees, hedgerows, unimproved and semi-improved grassland, and open water. The Scheme will result in the loss of some of these habitats but with habitat translocation and creation as part of the overall landscape proposals, including woodland and hedgerow planting, and surface water attenuation ponds to be created as part of the drainage management, the impact of any loss will be minimised and the impacts on the conservation status of the habitats are not significant The Scheme corridor provides habitat for bats including use for foraging and commuting and at least one location used as a roost by common pipistrelle bats Delivery of the Scheme would require a licence from Natural England to relocate the common pipistrelle roost and any others which might be found in pre-works surveys. There is no reason why a licence for these should not be forthcoming The Environmental Statement concluded that due to mitigation and compensation built into the design, there will be no long term significant impact on bats. There will be a short term impact on lesser horseshoe bats using the area for foraging and commuting. However, within 10 years mitigation and compensation planting will have matured and this impact will no longer be significant Habitats within the Scheme corridor also provide food and nesting opportunities for badgers, birds, reptiles, otters, hedgehogs and terrestrial invertebrates. However, the implementation of mitigation measures means that, impacts will not be significant in relation to the conservation status of these species. Design Development As is the expectation of any EIA scheme, the design has been developed to take into account requirements of policy and guidance. With highways schemes, this means finding a balance which minimises negative impacts on various receptors whilst delivering the essential elements of the scheme and seeking to maximise any positive opportunities. In this case, ecological design involved influencing the highway alignment to avoid particular receptors, influencing works extent to minimise impacts on certain receptors and providing designs to reduce severance impacts caused by the Scheme (in particular culvert and bridge Atkins NSC/6/1 1 Version June

11 design). This process also involved recommendations for habitat creation as compensation for certain impacts. The Scheme minimises impacts on Highridge Common SNCI by largely following the edge of the grassland, impacts the narrowest part of the Hanging Hill Wood WS and requires no loss of Colliter's Brook SNCI or its adjoining wildlife network sites. Requirement for Compensation Works One of the areas of objection to the CPO for the Scheme in relation to nature conservation relates to the land required for ecological compensation works in the form of tree planting or other habitat creation and works to increase the biodiversity of existing habitats and the rationale for the extent and the location of these compensation works. In this Scheme, compensation has been used because despite the use of 'mitigation by design' to reduce ecological impacts, some habitat loss and severance has been unavoidable Compensation is defined in the ecological impact assessment guidelines (IEEM 2006) (CD5/23) as: 'Measures taken to make up for the loss of, or permanent damage to, biological resources through the provision of replacement areas. Any replacement area should be similar to or, with appropriate management, have the ability to reproduce the ecological functions and conditions of those biological resources that have been lost or damaged. ' As summarised in Chapter 5 of the ecological impact assessment guidelines (IEEM 2006) (CD 5/23) there is an expectation that compensation measures including habitat creation will be undertaken where impacts are unavoidable. Relevant planning policy documents also place a strong emphasis on this as detailed below: (a) National Planning Policy Framework (NPPF) (CD2I6) Paragraph 109: 'minimising impacts on biodiversity and providing net gains in biodiversity where possible, contributing to the Government's commitment to halt the overall decline in biodiversity, including by establishing coherent ecological networks that are more resilient to current and future pressures'; Atkins NSC/6/1 1 Version June

12 (b) Bristol Core Strategy (CD2n) Policy BSC9: '...Development should incorporate new and/or enhanced green infrastructure or an appropriate type, standard and size. Where on-site provision of green infrastructure is not possible, contributions will be sought to make appropriate provision for green infrastructure off site; (c) North Somerset Core Strategy (CD2/8) Policy CS4, items 2 and 5: '2) seeking to ensure that new development is designed to maximise benefits to biodiversity, incorporating, safeguarding and enhancing natural habitats and features and adding to them where. possible, particularly network habitats. A net loss of biodiversity interest should be avoided, and a net gain achieved where possible;' '5) promoting native tree planting and well targeted woodland creation, and encouraging retention of trees with a view to enhancing biodive rsity.' In addition to the above, as detailed in Natural England's statutory consultation response letter dated 6th August 2013 (Appendix 9; NSC/6/2): The authority should consider securing measures to enhance the biodiversity of the site if it is minded to grant permission for this application. This is in accordance with Paragraph 118 of the National Planning Policy Framework. Additionally, we would draw your attention to Section 40 of the Natural Environment and Rural Communities Act (2006) which states that 'Every public authority must, in exercising its functions, have regard, so far as is consistent with the proper exercise of those functions, to the purpose of conserving biodiversity'. Section 40(3) of the same Act also states that 'conserving biodiversity includes, in relation to a living organism or type of habitat, restoring or enhancing a population or habitat' I consider that the inclusion of ecological compensation works are a necessary component of the Scheme. Atkins NSC/6/1 1 Version June

13 4. Objections Relating to Ecology Overview 4.1. Those elements of objections to the CPO submissions which concern ecological matters and are responded to in this proof of evidence are as follows; 4.2. OBJ/9 (Giannetto), Plots 04/03 & part of 04/01: Objector argues that land required for tree planting is not necessary to mitigate the Scheme OBJ/16 (Withers), Plots 03/04, 03/14 and 03/43: Objector comments about general ecological impacts OBJ/29 (Burnell), Plots 04/08, 04/19, 04/20, 04/21 & 04/22: Various objections relating to the size of plot required as exchange land, choice of Option 1 over Option 2, and access agreements regarding survey work OBJ/30 (Viridor Waste Exeter Ltd.), Plot 03/01: Objector comments about impact on Hanging Hill Wood and measures to protect wildlife along Colliters Brook and Hanging Hill Wood OBJ/32 (James), Plot 03/26: Objector argues that land is not required for compensatory tree planting In the remainder of this section I will address each of these objections in the context of the evidence I have set out in previous sections and any other information specifically relevant to that objection Appendix 4 (NSC/6/2) shows these above plots on a 'Phase 1 habitat' map of the Scheme. OBJ/9 (Giannettos); Plot 04/03 & part of 04/ Sub-section 5 ('Ground 2') of this objection relates to plot 04/01 and part of 04/03, land to be acquired for tree planting. The objectors argue that this tree planting is not necessary to mitigate the Scheme. The second sentence of OBJ/9 para 5.2 appears to refer to an alternative parcel of land for this tree planting, does not indicate exactly where this in relation to Plots 04/03 and 04/01. Atkins NSC/6/1 1 Version June

14 Response Plots 04/01 and 04/03 form a parcel of land formed by division of an existing field by the Scheme, it is proposed for tree planting in the form of a proposed native tree and scrub belt As stated in Section 3 of my evidence, the Scheme will result in permanent loss of habitats including ancient woodland at Hanging Hill Wood, broadleaved plantation woodland, trees, scrub and hedgerows. Whilst it is preferable to avoid impacts on important habitats such as woodland and trees, where this is unavoidable compensation planting is an accepted and appropriate mechanism to reduce the overall impacts at a scheme level. The tree planting referenced by OBJ/9 is part of the compensation works for the Scheme. I will assess this in terms of the footprint area and location of the proposed planting. Area As indicated in sub-sections to of the ES (CD4/2), the Scheme will involve a loss of 0.1 ha of ancient woodland, two plots of 0.2 ha of broadleaved plantation woodland, 161 trees and 1.5 ha of scrub (including some broadleaved trees) Proposed planting on the Scheme includes broad leaved woodland planting adjacent to Hanging Hill Wood and blocks scattered along the Scheme Appendix 8 (NSC/6/2) summarises the woodland and scrub planting compensation ratios for the Scheme overall and this is broken down to describe the rationale for each planting element The overall ratio of woodland and scrub planted to woodland and Scheme is approximately 5 planted: 1 lost. A large proportion of this is a large block of planting providing specific compensation relating to Hanging Hill Wood. The remaining element of planting comprises native tree and scrub belts in small blocks throughout the Scheme at a ratio of approximately 1.05 planted: 1 lost (see Appendix 8; NSC/6/2) The planting referred to in OBJ/9 is not associated with the ancient woodland planting and therefore is a component of the native tree and scrub belt element with a planting ratio of 1.05: 1. Atkins NSC/6/1 1 Version 4.0 I 2 June

15 4.17. Where planting of new habitats is used as a means of compensating for loss of existing habitat, a compensation ratio of 1: 1 would normally be considered as an absolute minimum. Planning policy as outlined in paragraph 3.27 of my evidence enforces this expectation, in particular: i. The aspiration for '...net gain...' in NPPF (CD2/6) paragraph 109; ii. Bristol Core Strategy (COW) Policy BSC9; '...Development should incorporate new and/or enhanced green infrastructure'. iii. NSC Core Strategy Policy CS4 (CD2I8) '...A net loss of biodiversity interest should be avoided, and a net gain achieved where possible.' Compensation ratios of 1: 1 or greater are expected because new habitat will take time to establish and may never achieve the ecological value of the lost habitat. In this case, establishment includes growth and development of trees, development of habitat structure elements and colonisation by other plants and animals. In 2013, the UK government undertook a consultation on the use of 'metric' for the purposes of calculating 'biodiversity offsetting'. A technical paper produced in 2012 as part of this consultation includes suggestions of multiplying factors to be applied in habitat restoration and re-creation (relevant extracts of this technical paper are given in Appendix 11; NSS/6/2). Multipliers include: risks to success; time for complete establishment; location of receptor in relation to the impacted habitats and wider spatial aspirations. These multipliers do not provide a fixed ratio for compensation or replacement, but do serve to illustrate why a ratio of above 1:1 is required I consider that the compensation planting ratio of 1.05: 1 of which this is part is appropriate and not excessive. Location In identifying locations for compensation planting, it is necessary to take account of existing retained vegetation and attempt to try and recreate the habitat distribution which has been lost. The Scheme will result in the loss of woodland blocks, trees and patches of scrub. It is therefore appropriate to recreate this with a series of native tree and shrub planting blocks throughout the Scheme. Atkins NSC/6/1 1 Version June

16 4.21. Planning policy as outlined in Section 3 of my evidence enforces this expectation, in particular: i. The aspiration for '...establishing coherent ecological networks...' in NPPF (CD2/6) paragraph 109; ii. Bristol Core Strategy (CD2n) Policy BSC9; '...Development should incorporate new and/or enhanced green infrastructure or an appropriate type, standard and size. iii. NSC Core Strategy Policy CS4 (CD2I8) '...enhancing natural habitats and features and adding to them where possible.' This is also expressed in the ecological impact assessment guidelines (IEEM 2006) (CD5/23): 'Any replacement area should be similar to or, with appropriate management, have the ability to reproduce the ecological functions... ' This is a more appropriate mechanism to minimise loss of biodiversity than simply putting the woodland in one convenient location irrespective of context I consider it appropriate that there are blocks of native tree and shrub planting along the Scheme The proposed planting on land parcels 04/03 and part of 04/01 form part of Scheme wide compensation works. The proposed planting is situated in a small portion of a field severed by the main Scheme alignment. This proposed planting is adjacent to existing hedgerow and scrub and is therefore in an ecologically appropriate location I conclude that scrub and tree planting within land parcels 04/01 and 04/03 comprises part of a necessary package of compensation planting. Atkins NSC/6/1 1 Version June

17 OBJ/16 (Withers); Plots 03/04, 03/14 & 03/ OBJ/16 contains a generic objection to the CPO and Scheme, although there is one reference which is specific to nature conservation which states: 'There will be much removal of very established native tree and wildlife which even with a replanting plan will be lost forever, some of the trees and fauna are ancient'. Response As stated in Section 3 of my evidence, the ES recognises that the Scheme will result in permanent loss of habitats including ancient woodland at Hanging Hill Wood, broadleaved plantation woodland, trees, scrub and hedgerows as well as impacts on fauna. There is no suggestion either in the objection from the Withers (nor from any other party that I am aware of) that there has been any under estimation of the potential ecological impacts of the Scheme. The information regarding the impacts of the Scheme was presented to both NSC and BCC planning authorities in order to inform the planning application. In determining to grant planning permission for the Scheme, it was the considered opinion of both authorities that any potential residual negative impacts (ecological or otherwise) were outweighed by the benefits of the Scheme Subject to the implementation of ecological compensation and mitigation measures, the Scheme will have no significant long term adverse ecological effects. Atkins NSC/6/1 I Version June

18 OBJ/29 (Burnell); Plots 04/08, 04/19, 04/20, 04/21, 04/ Elements of OBJ/9 relevant to this proof of evidence are subsections 2.1 to 2.11 which deal with the above plots required for the exchange land ('Option 1 '). The key objections relevant to the ecological case in these paragraphs are as follows: i. Land required is too large and therefore not justified (ss ); ii. Lack of justification due to uncertainty of translocation success (ss ); iii. No access has been provided for intrusive surveys (ss 2.7); iv. Lack of potential benefit due to low quality donor habitat (also in ss 2.7); and v. Alternative land (Option 2) also meets requirements and is preferable Response General context to the objector (ss ) Land parcels referred to in OBJ/29 form part of the compensation package for impacts on Highridge Common. It is proposed that the land will form an area of open grassland which will fulfil two separate purposes, firstly compensation for loss of common land, secondly compensation for loss of species rich grassland My evidence deals with the ecological reasons for requiring this land. Justification of need in relation to common land is given in evidence provided by Nicholas Rowson (NSC/5/1) It is important to note that the extent of the SNCI designation for Highridge Common is not the same as the extent of the common land as well as the open area designated as common land, the designation also includes a small field immediately north of Highridge House. This field is crossed by the Scheme. Extents of common land and the SNCI designation are both are shown in Appendix 6; NSC/6/2. As indicated in the ES, the Scheme will result in direct impacts to approximately 0.75 ha of Highridge Common SNCI, as well as additional impacts through severance and disturbance. Atkins NSC/6/1 1 Version June

19 4.34. Ecological mitigation within the exchange land area will comprise management of the existing grassland to increase species diversity and translocation of between 0.3 and 0.5 ha of species diverse turf from directly impacted areas of the Common. The exact extent will depend on the construction works foot required by the contractor. Commitment to undertake turf translocation was made in the ES and has also been taken into account in NSC Planning Condition 29 and BCC Planning Condition 12 (CD2/1 and 2/2). Land required is too large and therefore not justified The objection suggests that the ratio of land to be acquired to that impacted by the Scheme is in the order of 2.3:1 or 2.6:1. The total area of permanent habitat loss from the SNCI under the footprint of the works is 5,240 m2. As stated in the ES, the total area of permanent and temporary impacts is approximately 0.75ha (7,500 m2). As is shown in Appendix 6 (NSC/6/2) plots 04/08, 04/21 and 04/22 are already designated as part of Highridge Common SNCI. The principal ecological gain is in respect to Plots 04/19 and 04/20. The total area of these plots 21,245 m2 (20,822 m2 and 423 m2 respectively - CD1/1). Overall, the ratio of land to be acquired in plots 04/19 and 04/20 (21,245 m2) to that permanently lost (5,240 m2) is approximately 4: 1. Whereas, the ratio of land to be acquired in plots 04/19 and 04/20 (21,245 m2) to that subject to temporary and permanent impacts (7,500 m2) is approximately 2.8: As detailed previously in my evidence there is an expectation that ecological compensation ratio of 1: 1 as an absolute minimum which should be bettered where possible because factors including the time taken for establishment and the ecological value of the lost habitat. In 2013, the UK government undertook a consultation on the use of 'metric' for the purposes of calculating 'biodiversity offsetting'. A technical paper produced in 2012 as part of this consultation includes suggestions of multiplying factors to be applied in habitat restoration and re-creation (relevant extracts of this technical paper are given in Appendix 11; NSS/6/2). Multipliers include: risks to success; time for complete establishment; location of receptor in relation to the impacted habitats and wider spatial aspirations. These multipliers do not provide a fixed ratio for compensation or replacement, but do serve to illustrate why a ratio in excess of 1: 1 is expected. Atkins NSC/6/1 1 Version June

20 4.37. This is reiterated in relevant planning policy as set out in paragraph 3.27 and 4.17 above As well as complying with requirements to provide a compensation ratio greater that 1: 1, the current habitat status of the land to be acquired also influences the land which is offered as compensation. The proposed exchange land already has a gradation of grassland quality from species poor semi-improved grassland in the west relative to species rich unimproved grassland in the east. The species poor western portion of this field is an ideal location for the receptor site, as the translocated turf will complement the existing species rich turf in the east of the field. There would be significantly less ecological gain in translocating turf onto the species rich turf in the east of the field. It is therefore appropriate for translocated turf to be located in the west of the field. This is illustrated in Appendix 5 (NSC/6/2) One additional point regarding the size of the land required relates to the need for an establishment period. This will require the translocated turf to be left fenced off to ensure that it is undisturbed for a period of time to allow it to establish. During this time, establishing turf cannot be accessed by the public and commoners. To ensure this the area will be temporarily fenced for up to six months in accordance with Schedule 1 of the Works on Common Land (Exemptions)(England) Order 2007 (or any amended version in force at the time) (Extracts in Appendix 13; NSC/6/2). Lack of justification due to uncertainty of translocation success There is a very good prospect that translocated turf will be successful. There are established principles for successful relocation of turf (in particular in: Habitat Translocation, A best practice guide. CIRA Guidance C600, Anderson, P. 2003) Extracts in Appendix 12 (NSC/6/2). The 'biodiversity offsetting' technical paper (Appendix 11; NSS/6/2) lists recreation of lowland meadow as being of Medium technical difficulty A commitment was made in the ES to develop a management plan for the purpose of assisting this habitat to establish. This has also been accounted for in NSC Planning Condition 29 and BCC Planning Condition 12 (CD2/1 and 2/2). On-going monitoring will be undertaken to maximise this success. In the unlikely Atkins NSC/6/1 1 Version June

21 event that turf translocation fails, introduction of soil and seed bank material and long-term management will allow the habitat to establish. No access has been provided for intrusive surveys Access was provided to NSC's then land agents Persona Associates in August A copy of the agreement to access the site is contained in Appendix 10 (NSC/6/2). Lack of potential benefit due to low quality donor habitat Habitat under the road footprint is a mosaic of unimproved neutral grassland; species rich semi-improved neutral grassland; marshy grassland and scrub. Appendix 5 (NSC/6/2) shows that the donor habitat forms only part of the area of permanent grassland loss. Other areas are turf of lower ecological botanical diversity or scrub, these areas are not proposed for translocation. Areas of damp grassland and rush pasture are of ecological value diverse and will be translocated. It is proposed that the receptor site will be prepared to include locations which allow damper habitats establish. Alternative land (Option 2) also meets requirements and is preferable to the objector ( ) Two options were available for the compensation/exchange land. The approximate location and extent of these options are shown in Appendix 5 (NSC/6/2). A variety of ecological and non-ecological factors were used to choose the preferred option. An ecological appraisal of the two options is given below Both options are contiguous with the grassland of the Common. Option 1 is closer to the more species rich habitats in the northern half of the Highridge Common and therefore provides opportunities for the retained and new common areas to function as a single habitat area allowing flow of species and genetic material over the medium to long term. Option 2 is adjacent to less species diverse grassland in the southern half of the common. Proximity to the more diverse grassland gives a better opportunity to create a continuous parcel of diverse grassland and makes Option 1 preferable in this respect. Atkins NSC/6/1 1 Version June

22 4.46. In order to provide open access between the retained and exchange common land, Option 1 would require the removal of a small section of species rich hedgerow between plots 04/19 and 04/21. This hedgerow is already severed by the Scheme itself. Option 2 would be likely to require the removal of a longer section of hedge (curving diagonally across the hedge). A greater loss of hedgerow makes Option 2 less preferable in this respect The Option 1 land has a gradation of grassland quality from relatively species poor in the west side to relatively species rich in the east. Translocation of turf to the species poor west side will complement the existing grassland habitat and with sensitive management, there is the opportunity for a large area of species rich grassland to be created. Option 2 is poorer quality grassland habitat, so there is less certainty of successfully establishing an area of species rich grassland and this is likely to take significantly longer than on Option Overall, Option 1 clearly gives the best possibility of providing an area of grassland which will adequately compensate impacts on HighridgeCommon SNCI in an acceptable timeframe As explained in the evidence of Nicholas Rowson (NSC/5/1) the ecological attributes of the common are an important component of its amenity value and thus relevant in considering the appropriateness of the land provided in Exchange. Atkins NSC/6/1 1 Version June

23 OBJ/30 (Viridor Waste Exeter Limited): Plot 03/ Paragraphs 5 and 6 of OBJ/30 relate to measures to prevent potential impacts on wildlife and habitats in Hanging Hill Wood and Colliter's Brook during construction. There is also a comment relating to ancient woodland status and Tree Protection Orders within Hanging Hill Wood. Response As stated in Section 3 of my evidence, the ES recognises that the Scheme will result in permanent loss of habitats including ancient woodland at Hanging Hill Wood, broadleaved plantation woodland, trees, scrub and hedgerows as well as impacts on fauna. In the mitigation section of the ecology chapter, paragraph states: 'During the construction phase, woodland in the vicinity of the construction zone will be fenced and protected from damage and disturbance from construction traffic in line with BS5837:20 12 Trees in Relation to Design, Demolition Construction - Recommendations'. The same paragraph is repeated at in relation to Colliter's Brook SNCI (CD4/2) This commitment is also reinforced in NSC planning Condition 8 (CD2/1) which relates to requirements to provide and adhere to plans in relation to construction phase tree and hedge protection fencing. The Viridor land is only within the North Somerset part of the Scheme Impacts in relation to any TPOs are covered by the granting of planning permission I conclude that the potential impacts mentioned in the objection are adequately addressed and provided for in the Scheme and carried into conditions of the planning permission. Atkins NSC/6/1 1 Version 4.0 I 2 June

24 OBJ/32: (James) Plot 03/ An objection in relation to plot 03/26 was received and relates to land required for planting as partial mitigation of impacts on Hanging Hill Wood. Objectors question the extent of the land required and also offer alternative locations for this planting. Response In Section 3 of my evidence and in my response to the Gianetto objection (above), I have established that there is a need for compensation planting as part of the Scheme The Scheme results in the loss of approximately 0.1 ha of Hanging Hill Wood WS, as well as additional impacts through disturbance. Compensation for the loss of ancient woodland and other impacts is provided through measures including planting on an area of land adjacent to WS. The 1 ha of planted woodland to the 0.1 ha lost gives a ratio of 10: Natural England recently published standing advice on ancient woodland Natural English Nature and Forestry Commission England 2014 Standing Advice for Ancient Woodland and Veteran Trees (Extracts in Appendix 14; NSC/6/2). Although this document was not available in this form at the time of the ES or planning determinations, the Scheme is in line with the recommendations therein. Paragraph 1.1 of the standing advice states that ancient woodland is an irreplaceable resource. In relation to creating new native woodland as a compensation measure the document states in paragraph 6.5.2: 'Creating new woodland cannot provide a direct replacement for ancient woodland - the habitat is irreplaceable. However, if an area of ancient woodland is lost to development native woodland habitat creation at a large scale, could be considered as part of a compensation package. ' To ensure the compensatory woodland planting provides the best ecological function, it is proposed in a location which is contiguous with the existing area of Hanging Hill Wood and an area of more recent planted broadleaved woodland. This location is poor semi-improved grassland of low botanical diversity so of relatively low ecological value, thereby increasing the potential for biodiversity gain. Atkins NSC/6/1 1 Version June

25 4.60. Natural England and Forestry Commission do not quantify the 'large scale' quoted in the reference above (Appendix 14; NSC/6/2) but I the planting ratio of 10: 1 adequately fulfils this. I am not aware of any authoritative guidance on what would be an appropriate ratio of compensation planting for ancient woodland As stated earlier in my evidence, a technical paper produced in 2012 as part of a UK government consultation into biodiversity offsetting included suggestions of multiplying factors to be applied in habitat restoration and re-creation (relevant extracts of this technical paper are given in Appendix 11; NSS/6/2). Multipliers include: risks to success; time for complete establishment; location of receptor in relation to the impacted habitats and wider spatial aspirations. These multipliers do not provide a fixed ratio for compensation or replacement, but values relating to establishment time do back up the assertion of a large compensation ratio (see extracted para 67 and Appendix 2 in my Appendix 11) Other non-ecological factors were also used to determine its location and extent; these are covered by other witnesses. Alternatives proposed by objector The objectors propose two alternative locations. My interpretation of these locations is shown in Appendix 6 (NSC/6/2) The objection suggests previously capped landfill land to the north of Colliter's Brook as a potential alternative (my understanding of this is shown as Alternative 1 on Figure 6, Volume 2). This is within CPO Plot 02/26. Habitats are relatively species poor so there is an opportunity for biodiversity gain, it is also relatively contiguous with Hanging Hill Wood. However, it is somewhat isolated from other habitats by the existing landfill site, railway and the Scheme itself. i also understand that this land is already intended to be planted with trees as part of remediation works included in the quarry/landfill planning consent. This means it is not possible to use this land for compensation planting as part of the Scheme Overall I conclude that from an ecological perspective, Alternative 1 is a potentially suitable alternative, not as preferable as the proposed location 1. However, this land is already committed for tree planting under an existing planning consent relating to the Yanley Quarry site (NSC Planning reference Atkins NSC/6/1 1 Version 4.0 I 2 June

26 08/P/1374/F (Amendments to conditions): Proposed Restoration Masterplan: Reference: Plan , determined 11 th August Shown as Plot PW3) A copy is given in Appendix 15 (NSC/6/2). This makes it unavailable for tree planting by the Scheme The objectors also propose a second location which they describe as 'north of the SBL'. My understanding of this is shown as Alternative 2 in Appendix 6; NSC/6/2). I believe that this would be in the land adjacent and to the east of the Scheme in the vicinity of Hanging Hill Wood. This habitat is within close proximity to the existing wood, improved and semi-improved grassland so there is an opportunity for biodiversity gain. However, it would be isolated from the existing Hanging Hill Wood by the Scheme. There is considerable advantage in a new habitat being adjacent to the new habitat as it will enables colonisation and quicker establishment. Whilst Alternative 2 is potentially suitable for tree planting, lack of contiguity with Hanging Hill Wood would considerably reduce its suitability The proposed option (Plot 03/26) is considerably more ecologically appropriate and preferable than Alternative 1 and Alternative 2. Alternative 1 is unavailable due to existing planning commitments and Alternative 2 is unsuitable due to severance from the existing Hanging Hill Wood. Atkins NSC/6/1 I Version June

27 5. Conclusion 5.1. The Scheme comprises construction of a road on the south west fringe of Bristol City. It has been subjected to a statutory Environmental Impact Assessment which has been submitted with a planning application to Bristol City and North Somerset Council planning departments. The Environmental Statement concluded that there would be no significant long term impacts on ecological receptors. There were no statutory environmental objections to the proposal and both authorities have awarded planning permission The Scheme is compliant with national and local planning policy in respect of ecology and there are no foreseen impediments to obtaining licences for any anticipated protected species issues The proposed design includes some elements of ecological compensation works including habitat creation outside the footprint of the road itself in some instances at a ratio greater than 1: 1. This approach is an expectation of the planning process and national policy Several objections relating to ecology relate to this land to be acquired for habitat compensation. In my evidence, I demonstrate that this is a necessary requirement of the Scheme design Other objections relate to generic comments about ecological impacts. The Scheme has been subject a full EIA which concluded that it will have no significant long term adverse ecological effects and this conclusion was accepted by the NSC and BCC planning authorities Therefore, i conclude that objections relating to ecological impact should not be given any substantial weight. Atkins NSC/6/1 1 Version June

Policy DM19: Development and Nature Conservation

Policy DM19: Development and Nature Conservation Avonmouth Wetland Habitat Project October 2010 and December 2011 (the Cresswell study). Policy Links Bristol Local Plan Core Strategy Lead Policy BCS4: Avonmouth and Bristol Port BCS9: Green Infrastructure

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments Watford Local Plan Part 2 Publication Stage Environmental Report Appendix 3: Consultation Comments August 2016 Appendix 3 - Responses to Consultation of the Local Plan Part 2 As required by the SEA Directive,

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

HRA PLANNING Chartered Town Planning and Environmental Consultants

HRA PLANNING Chartered Town Planning and Environmental Consultants HRA PLANNING Chartered Town Planning and Environmental Consultants Screening Statement for the Purposes of Determining the need for Appropriate Assessment Proposed development of 74 no. residential units

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

Planning Application 13/00952/FULLS at Ampfield Hill, Romsey, Test Valley: Great Crested Newt Survey Following on From Ecological Assessment

Planning Application 13/00952/FULLS at Ampfield Hill, Romsey, Test Valley: Great Crested Newt Survey Following on From Ecological Assessment 10 June 2014 Mr Allan Clark esq Ampfield Parish Council Blue Haze Ampfield Hill Ampfield Romsey SO51 9BD By email only Our Ref: P13/46 Dear Mr Clark Planning Application 13/00952/FULLS at Ampfield Hill,

More information

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey PLANNING I DESIGN I ENVIRONMENT 1.0 INTRODUCTION TEP conducted Site

More information

ECOLOGICAL ADVICE SERVICE

ECOLOGICAL ADVICE SERVICE ECOLOGICAL ADVICE SERVICE TO: FROM: Guy Wilson Marie Thibault DATE: 11 th August 2016 SUBJECT: CA/16/01502/FUL / Land adjoining Goose Farm, Canterbury Thank you for requesting advice on this application

More information

Statutory and Non-Statutory Designated Sites and Ecology

Statutory and Non-Statutory Designated Sites and Ecology Statutory and Non-Statutory Designated Sites and Ecology The National Planning Policy Framework considers the conservation and enhancement of the natural environment in chapter 11 paragraphs 109-119, where

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

Land at Whiteditch Lane, Newport, Essex

Land at Whiteditch Lane, Newport, Essex Land at Whiteditch Lane, Newport, Essex Ecology Report Produced for Sworders Agricultural By March 2013 Document Control: Version Date Version Details Prepared by Checked by Approved by 0.1 01.03.2013

More information

2014/0590 Reg Date 26/06/2014 Chobham

2014/0590 Reg Date 26/06/2014 Chobham 2014/0590 Reg Date 26/06/2014 Chobham LOCATION: PROPOSAL: TYPE: APPLICANT: OFFICER: ASCOT PARK POLO CLUB, WESTCROFT PARK FARM, WINDLESHAM ROAD, CHOBHAM, WOKING, GU24 8SN Erection of a two storey detached

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

Dormouse Method Statement

Dormouse Method Statement , Northamptonshire A Report on behalf of April 2013 CONTENTS 1.0 Introduction 1.1 Purpose of this Method Statement 1.2 Site Background 1.3 Dormouse Ecology & Legal Protection 2.0 Methodology 2.1 Tool Box

More information

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) 345786 Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 APPROVAL OF RESERVED MATTERS FROM APPLICATION CHE/12/00234/OUT (1) LAYOUT,

More information

Wildlife and Planning Guidance: Local Plans

Wildlife and Planning Guidance: Local Plans Wildlife and Planning Guidance: Local Plans This Leaflet is one of a series of 4 Wildlife and Planning Guidance Leaflets and is intended to provide useful information to assist you to campaign effectively

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

A16 Ecology: Application 2 - LBHF

A16 Ecology: Application 2 - LBHF A16 Ecology: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A16.1 This Chapter of the Addendum to the June 2011 Environmental Statement (ES) (hereafter

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009 DESIGN MANUAL FOR ROADS AND BRIDGES CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009 SUMMARY OF CORRECTION HA 200/08 VOLUME 11, SECTION 1, PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL

More information

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

SPG 1. * the northern and western sections which are open fields used for pasture and grazing; SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended

More information

Habitat Regulations Assessment (HRA) Screening Determination. May 2017

Habitat Regulations Assessment (HRA) Screening Determination. May 2017 Cholsey Parish Council Cholsey Neighbourhood Plan Habitat Regulations Assessment (HRA) Screening Determination May 2017 Cholsey Neighbourhood Plan Page! 1 of! 10 SASR - HRA v1.1 Page Left Intentionally

More information

Legend. Pennsylvania Fields, Sedbury. River Wye. Aust Cliff. Severn Estuary. Cattybrook Brickpit Three Brooks. Severn Estuary

Legend. Pennsylvania Fields, Sedbury. River Wye. Aust Cliff. Severn Estuary. Cattybrook Brickpit Three Brooks. Severn Estuary Pennsylvania Fields, Sedbury River Wye Legend Other DCO Land Cooling Water Pipeline Corridor Electrical Connection & Utilities Corridor 10km buffer of Ramsar Severn Estuary Aust Cliff Local Nature Reserve

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

OVERVIEW OF PLANNING POLICY AND PROCEDURE RELATING TO BIODIVERSITY IN ENGLAND

OVERVIEW OF PLANNING POLICY AND PROCEDURE RELATING TO BIODIVERSITY IN ENGLAND OVERVIEW OF PLANNING POLICY AND PROCEDURE RELATING TO BIODIVERSITY IN ENGLAND Disclaimer: This document is a guide to legislation and procedure relating to biodiversity in England. It is offered to readers

More information

HS2 Environment. Protecting the environment

HS2 Environment. Protecting the environment HS2 Environment Protecting the environment Approach to mitigation EIA Regulations require an ES to include a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant

More information

Non-technical summary

Non-technical summary Non-technical summary Introduction NTS.1 is applying for outline planning permission for a residential development of up to 80 dwellings on land at Hambrook, on the northern fringe of Bristol. NTS.2 An

More information

49 Broughton Avenue London N3 3EN

49 Broughton Avenue London N3 3EN Location 49 Broughton Avenue London N3 3EN Reference: 17/3448/RCU Received: 30th May 2017 Accepted: 1st June 2017 Ward: Finchley Church End Expiry 27th July 2017 Applicant: Mr P Atwal Proposal: Erection

More information

STATEMENT OF COMMON GROUND (CD/H01) LAND ADJ A385 TOTNES ROAD COLLATON ST MARY APPEAL REFERENCE: APP/X1165/A/14/

STATEMENT OF COMMON GROUND (CD/H01) LAND ADJ A385 TOTNES ROAD COLLATON ST MARY APPEAL REFERENCE: APP/X1165/A/14/ STATEMENT OF COMMON GROUND (CD/H01) LAND ADJ A385 TOTNES ROAD COLLATON ST MARY APPEAL REFERENCE: APP/X1165/A/14/2214154 APPEAL BY TAYLOR WIMPEY (EXETER) LIMITED LOCAL PLANNING AUTHORITY TORBAY COUNCIL

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Rannoch 132 / 33 kv Substation Extension

Rannoch 132 / 33 kv Substation Extension Who we are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the networks in the north of Scotland the electricity transmission network

More information

Neighbourhood Planning Guidance Local Green Spaces

Neighbourhood Planning Guidance Local Green Spaces Neighbourhood Planning Guidance Local Green Spaces Introduction This guidance note has been produced for communities preparing neighbourhood plans in North Dorset to help them to identify, assess and designate

More information

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral

More information

South Bristol Link Environmental Statement Non-Technical Summary. July 2013

South Bristol Link Environmental Statement Non-Technical Summary. July 2013 South Bristol Link Environmental Statement Non-Technical Summary July 2013 Notice This document and its contents have been prepared and are intended solely for Bristol City Council and North Somerset Council

More information

ECOLOGY DUE DILIGENCE REPORT

ECOLOGY DUE DILIGENCE REPORT ECOLOGY DUE DILIGENCE REPORT Saunderton Data Centre GP Limited, Haw Lane, Saunderton November 2010 Our Ref: JSL1776-R-003 RPS Lakesbury House Hiltingbury Road Chandlers Ford Hampshire SO53 5SS Tel: 0238

More information

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) PROPOSAL: LOCATION: APPLICANT: Amendments to the design of a scheme for a 49.99MW battery

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Cotswolds AONB Landscape Strategy and Guidelines. June 2016 Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction

More information

South West Nature Map - A Planners Guide

South West Nature Map - A Planners Guide South West Nature Map - A Planners Guide Helping to Shape Spatial Planning for Biodiversity in Local Development Frameworks Working together for wildlife CONTENTS Foreword 1.0 Introduction 1.1 Purpose

More information

17 NOVEMBER 2015 PLANNING COMMITTEE. on Cttee Day: 73/73. Land To The Rear Of Brook Farm Rickford Worplesdon, Bagshot Road, Woking, Surrey

17 NOVEMBER 2015 PLANNING COMMITTEE. on Cttee Day: 73/73. Land To The Rear Of Brook Farm Rickford Worplesdon, Bagshot Road, Woking, Surrey 5l 14/0218 Reg d: 27.06.14 Expires:20.11.15 Ward: BR Nei. 17.07.14 BVPI Con. Target: 18 Exp: Number of Weeks On Target? on Cttee Day: 73/73 Y LOCATION: PROPOSAL: TYPE: Land To The Rear Of Brook Farm Rickford

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Land at Porch Farm, Kingsclere Ecology Briefing Paper, April 2016 C_EDP3343_01a

Land at Porch Farm, Kingsclere Ecology Briefing Paper, April 2016 C_EDP3343_01a C_EDP3343_01a Introduction 1.1 This Ecology Briefing Paper has been prepared by The Environmental Dimension Partnership Ltd (EDP) on behalf of Linden Homes. This briefing paper considers the ecological

More information

Everton s Neighbourhood Plan. Site Allocation - Assessment Criteria

Everton s Neighbourhood Plan. Site Allocation - Assessment Criteria Everton s Neighbourhood Plan Site llocation - ssessment Criteria Introduction 1.1 This report assesses all the sites identified through the emerging Neighbourhood Plan for Everton and their potential for

More information

Draft Hailey Neighbourhood Plan

Draft Hailey Neighbourhood Plan Persimmon Homes (Wessex) Draft Hailey Neighbourhood Plan Representations to West Oxfordshire District Council s Regulation 16 Consultation December 2018 2 Copyright 2018 Persimmon Homes Ltd. All rights

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4 Number: 4 Application Number: C15/0034/37/LL Date Registered: 21/05/2015 Application Type: Full - Planning Community: Llanaelhaearn Ward: Llanaelhaearn Proposal: Location: Summary of the Recommendation:

More information

HS2 EIA Scope and Methodology Consultation

HS2 EIA Scope and Methodology Consultation HS2 EIA Scope and Methodology Consultation Response from The Wildlife Trusts (England) May 2012 ENGLAND The Wildlife Trusts The Kiln, Waterside, Mather Road, Newark, NG24 1WT Registered Charity No. 207238

More information

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Departure from the Development Plan. Town Council objection to a major application. DETERMINE Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

Chapter 3: Natural Environment. Proposed Waikato District Plan Stage 1. (Notified version)

Chapter 3: Natural Environment. Proposed Waikato District Plan Stage 1. (Notified version) Chapter 3: Natural Environment Proposed Waikato District Plan Stage 1 Page 2 of 7 Contents Chapter 3: Natural Environment... 3 3.1 Indigenous Vegetation and Habitats... 3 3.1.1 Objective Biodiversity and

More information

Ref: A073350/SM/sm Date: 13 September 2013

Ref: A073350/SM/sm Date: 13 September 2013 Ref: A073350/SM/sm Date: 13 September 2013 Ian Parkinson Development Control Team Leader Planning Portsmouth City Council Civic Offices Guildhall Square Portsmouth PO1 2AY Dear Ian LIGHT & GLEAVE VILLA

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text Chapter 1: Introduction Draft - March 2017 Prepared by: Address: Email: Website: Mott McDonald, The Urbanists and HLM

More information

Ward: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works.

Ward: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works. Parish: Southbourne Ward: Southbourne SB/16/00205/OUT Proposal Site Outline application with all matters reserved. Erection of 5 no. dwellings and associated works. Dunkirk South Lane Southbourne Emsworth

More information

Planning and Regulatory Committee 20 May Applicant Local Councillor Purpose of Report

Planning and Regulatory Committee 20 May Applicant Local Councillor Purpose of Report Planning and Regulatory Committee 20 May 2014 7. APPLICATION FOR PLANNING PERMISSION FOR THE CARRYING-OUT OF DEVELOPMENT PURSUANT TO PLANNING PERMISSION REFERENCE NUMBER 603451 DATED 28 FEBRUARY 2007 WITHOUT

More information

Peter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).

Peter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site). Our ref: 30062 2 nd August 2017 Kettering Borough Council Planning Department Municipal Offices Bowling Green Rd Kettering NN15 7QX 61 Oxford Street Manchester M1 6EQ T: +44 (0)161 245 8900 E: manchester@peterbrett.com

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

Balcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report

Balcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report Balcombe Neighbourhood Plan Habitats Regulations Assessment Screening Report Produced for Regulation 14 of the Neighbourhood Planning (General) Regulations 2012 17 th July 2015 1.0 Introduction 1.1 This

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT Land to the South East of the A495, Bronington Erection of 31 Dwellings (27 dwellings and 4 bungalows including 4 Affordable Dwellings), Realignment and Improvements to A495 (including

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008

PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008 PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008 Extraction of minerals, including building and roofing stone, from the land requires planning permission under the

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

Linden Homes Proposals for land off Ringwood Road, Verwood

Linden Homes Proposals for land off Ringwood Road, Verwood Welcome Welcome to Linden Homes first public exhibition displaying proposals for new homes on land off Ringwood Road in Verwood. Award-winning house builder Linden Homes, part of the Galliford Try Group,

More information

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).

TOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED). FAO: D. Williams Isle of Anglesey County Council Council Offices Llangefni Anglesey LL77 7TW 16 November 2017 DCRM Ref. No: WN0904-QUD-OS-LET-00002_English Dear Mr Williams TOWN AND COUNTRY PLANNING ACT

More information

Review of the Environmental Impact Assessment (Agriculture) (Wales) Regulations 2007

Review of the Environmental Impact Assessment (Agriculture) (Wales) Regulations 2007 Review of the Environmental Impact Assessment (Agriculture) (Wales) Regulations 2007 Consultation response form Q1. Do you agree with the proposal to add a definition of semi-natural land to the EIA regulations?

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY

GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY Volume II - Addendum On behalf of Guildford Borough Council PPG Ref : BNL.0287 April 2014 COPYRIGHT The conents of this document must not be copied or

More information

Response by The Dartington Hall Trust

Response by The Dartington Hall Trust Consultation Response by The Dartington Hall Trust Site Reference: (T6 in DPD) 14_56/2246/13/f Contents Introduction 1 Site Description 2 Development Proposal and Context 3 Site Technical Assessment 4

More information

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request TAYSIDE & CLACKMANNANSHIRE Tel: 01738 458582(direct line) Fax: 01738 458616 e-mail addresses: denise.reed@snh.gov.uk Niall Urquhart Team Leader Sustainability Clackmannanshire Council Kilncraigs Greenside

More information

Preliminary Ecological Appraisal

Preliminary Ecological Appraisal Preliminary Ecological Appraisal Seminar Outline What is Preliminary Ecological Appraisal (PEA)? What are the main objectives of PEA? Methods of PEA Wildlife legislation and planning policy Examples of

More information

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN BASIC CONDITIONS STATEMENT December 2018 CEF 4 Legal Requirements This statement has been produced by the NDP Working Group on behalf of Repton Parish Council

More information

Assessing the impact of smallscale wind energy proposals on the natural heritage

Assessing the impact of smallscale wind energy proposals on the natural heritage Scottish Natural Heritage Assessing the impact of smallscale wind energy proposals on the natural heritage Guidance March 2016 Version 3 1 Contents 1. Introduction. 3 2. Encouraging a spatial approach

More information

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:-

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:- 8. THE DISTRICT VILLAGES 8.1 Population About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:- Village No. of Persons Cottingham

More information

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015 Oxford Green Belt Study Summary of Final Report Prepared by LUC October 2015 Project Title: Oxford Green Belt Study Client: Oxfordshire County Council Version Date Version Details Prepared by Checked by

More information

Effingham Neighbourhood Plan 1. Basic Conditions Statement

Effingham Neighbourhood Plan 1. Basic Conditions Statement Effingham Neighbourhood Plan 1 Basic Conditions Statement Effingham Neighbourhood Plan 2016: Basic Conditions Statement 2 Contents This statement has been prepared by Effingham Parish Council to accompany

More information

3.1 This evidence is based on the landscape and visual impact assessment included in Chapter 10 and Appendix I of the EIS.

3.1 This evidence is based on the landscape and visual impact assessment included in Chapter 10 and Appendix I of the EIS. LANDSCAPE & VISUAL 1 QUALIFICATIONS AND EXPERIENCE 1.1 My name is Raymond Holbeach and I am a Regional Director for RPS Planning & Environment with full responsibility for management of the RPS Belfast

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background Summary of SMBC Asks 23/09/13 Background The Council has a developed a significant number of asks and propositions for consideration by HS2 Ltd and Government throughout further development of the HS2

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(iii) 13/81 Erection of sports hall, associated changing facilities, offices

More information

Introduction. Grounds of Objection

Introduction. Grounds of Objection Planning application ref. number 18/04496/APP Planning application to Aylesbury Vale District Council for the erection of 17 dwellings and associated works to the South of Hogshaw Road Granborough. Granborough

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

Toddington Central Bedfordshire Stage 3 Green Belt Study December 2017

Toddington Central Bedfordshire Stage 3 Green Belt Study December 2017 Toddington Central Bedfordshire Stage 3 Green Belt Study December 2017 Site: ALP086 - Middle Lakes, Toddington Site size (ha): 2.83 Site: ALP086 - Middle Lakes, Toddington Site size (ha): 2.83 Site description

More information