STRATEGIC MASTERPLAN FOR THROCKLEY NORTH

Size: px
Start display at page:

Download "STRATEGIC MASTERPLAN FOR THROCKLEY NORTH"

Transcription

1 STRATEGIC MASTERPLAN FOR THROCKLEY Supporting Information for E.I.P Core Strategy and Urban Core Plan NewcastleGateshead Project No Rev.06 May 2014 Prepared for Greenwich Hospital by SmithsGore and +Plus Urban Design 1

2 CONTENTS PAGE Section.1 The Allocation Page Introduction 6 Strategic Masterplan 7 Planning Context 8 Assessment against Green Belt Purposes 8 Scale of Proposed Development 9 Accessibility and impact on local services and facilities 9 Timescale 10 Housing Mix 10 Viability 10 Technical Assessments 11 Urban Design Approach 12 Section.2 Access Options Appraisal Strategic Option Testing 28 Masterplan Aims 29 Option.1 Western Gateway 30 Option.2 Central Gateway 34 Option.3 Eastern Gateway 38 Delivering the development 42 Preferred Option 44 Section.3 Wider Masterplan Safeguarded Land 48 Wider Masterplan 49 Prepared for Greenwich Hospital by SmithsGore and +Plus Urban Design 2 3

3 1 SECTION.1 THE ALLOCATION The following section puts forward our technical background work to help provide the evidence base and policy justification for a deliverable and well designed strategic masterplan for Throckley North. 4 5

4 Introduction The two main areas examined in this masterplan are: Greenwich Hospital is an ancient Crown charity founded in 1694 and provides charitable support (including annuities, sheltered housing and education) to serving and retired personnel of the Royal Navy and Royal Marines and their dependants. [Site A] Allocation site: 25.9 hectares and identified by Newcastle City Council as a Village Growth Area in the Core Strategy; and Currently GH supports 26,000 people through 20 charities; has 3 sheltered housing schemes with a total of 124 beds; supports a Naval Care Home; and - through educational grants and bursaries - supports a faculty at Greenwich University (Maritime Institute) and other students at Trinity Laban, together with bursaries for children of the Royal Hospital School whose parents are serving or family have served in the Navy. The Hospital is also currently looking into providing apprenticeships to retrain injured service men and women and business start-ups. There is no public money involved in GH s investments which are in Greenwich, rural estates, properties in central London and equities. Greenwich Hospital aspires to work collaboratively with Newcastle City Council and other stakeholders to undertake a long term strategic investment programme that will enhance Throckley s village centre and its overall contribution to the local economy. Throckley [Site.B] Safeguarded Land: Extending to 29.9 hectares and immediately west of Site A; identified by Newcastle City Council as Green Belt. Strategic Masterplan This masterplan document provides a strategic framework for a sustainable urban extension to North Throckley, in the outer west of Newcastle to demonstrate that, in line with the requirements contained within the National Planning Policy Framework and the emerging Core Strategy for Newcastle and Gateshead, Site A is available, suitable and fully deliverable within the early part of the plan period. Safeguarded Land [Site.B] Allocation [] Greenwich Hospital commisioned +Plus Urban Design Ltd and Smiths Gore to prepare a planning case and a strategic masterplan to justify the release of Green Belt land at North Throckley to deliver new housing to help meet the needs of the City over the forthcoming plan period. Greenwich Hospital is a major landowner in the area and is keen to work in partnership with the Local Planning Authority to ensure deliverability of sites for housing. The masterplan presents a series of options to demonstrate the deliverability of a sustainable north-western extension to the settlement of Throckley and is to be considered alongside the Core Strategy for Gateshead and Newcastle. This supportive piece of work also examines the land further to the west of the proposed Council s proposed housing allocation; also in the ownership of Greenwich Hospital. The document presents an additional strategic masterplan option to demonstrate how the two sites can collectively work together in the future to meet additional housing needs either beyond the plan period or to ensure housing delivery within this plan period, should other sites fail to come forward within the requisite timeframe. Key The following masterplan looks at a range of strategic options building upon the original work undertaken at previous stages in the plan preparation and Newcastle City Council s proposed allocation in the Publication Draft of the Core Strategy (Throckley North NV3A). Collectively, the masterplan illustrates how a logical and sustainable residential extension of Throckley village could be arranged to integrate with the wider context, respond to local distinctiveness and character and be fully accessible whilst having an overall positive impact on the wellbeing and long term sustainability of the settlement of Throckley. This work has been supported by detailed and specialist transport advice to help assess a number of the access options and explore the wider effects on the local highway network to minimise impact. However, this document is not a detailed masterplan and it is hoped that an appropriate design will evolve through future partnership working with Newcastle City Council and key stakeholders. Throckley (Exisiting Settlement Edge) Newburn Ward Boundary 6 7 Key Masterplan Area Site.B NCC

5 Planning Context Throckley is a large village in the outer west of Newcastle, approximately 11km from the City Centre. The site, identified as Throckley North, is positioned directly to the south of the main A69 and to the north of the existing houses along Hexham Road. The existing brickworks and other large employers are located to the east. The land at north Throckley (Site A) is proposed by Newcastle City Council to be allocated for new housing over the plan period. Site B is proposed to remain in the Green Belt. Newcastle City Council has robustly demonstrated a shortage of available land within the city to meet its objectively assessed housing needs. Existing Green Belt boundaries are drawn tight around the city and, on this basis, a review is necessary to ensure that the city can meet both its 5 year housing land supply requirement and the requirements of the Core Strategy to identify housing land over the plan period. SHLAA SITES IN NEWCASTLE UPON TYNE Scale of proposed development The Core Strategy must provide sufficient homes and Policy CS1 sets out the need to provide 30,000 new homes by It goes on to suggest that around 4,300 of these new homes will need to be accommodated within the villages around Newcastle and Gateshead s urban areas. Part of the rationale behind this is the need to ensure the long term sustainability of key local services and facilities and to provide a more diverse range of type of housing within the areas, complementing the existing provision. This will, in turn, create a larger and more diverse local neighbourhood and a more attractive residential area and local service centre. The allocation of Site A (and B) for housing sits at the heart of the Core Strategy s spatial strategy to promote sustainable neighbourhoods and give everyone the opportunity to live in a high quality, well designed home within inclusive and mixed communities that they can afford. The village of Throckley has been identified by Newcastle City Council (Strategic Land Review (SLR) 2012) as being one of the most sustainable locations for growth and having the potential to be able to accommodate new housing development. Site A is identified as being able to accommodate around 550 new homes. Site B could potentially provide a further 550 dwellings. While it is recognised that the Council have sought to allocate only the land it needs to meet their objectively assessed needs and to support the longer term sustainability of the settlements beyond the Urban Core, a far longer term view is crucial to ensuring housing development on deliverable sites beyond the plan period or to trigger the release of alternative deliverable and sustainable housing sites (via an appropriate mechanism) should other housing allocations fail to come forward within the plan period. The masterplan provides a further option for consideration on this basis, to include Site B as, in essence, a Safeguarded site. Accessibility and impact on local services and facilities The sites are in close proximity to Local Schools, with the primary school being within 5 minutes walking distance from the south eastern corner of the site and 15 minutes from the north westernmost parts of the site. Accessibility could be potentially be enhanced through the creation of a footpath link to the south-east of the site. This is shown on the preliminary masterplan drawings. Paragraph 83 of the National Planning Policy Framework advises that, at the time of review of the Green Belt boundaries, the Local Planning Authority should consider the boundaries having regard to their intended permanence in the long term, so that they should be capable of enduring beyond the plan period. The Council s housing projections are ONS based, sub national population projections to 2021 and extended by Durham Business School/St Chads College to cover the whole of the plan period to Beyond this time, recognition must be given to future housing requirements in the city. It is important to do so at this stage to ensure that permanent and realistic Green Belt boundaries can be drawn, to reduce the likelihood of having to revisit the Green Belt boundaries again in KEY Approaches to City In addition, the majority of the new homes would be within 2 kilometres (20 minutes walk or 5minute cycle) of the nearest secondary school (Walbottle Campus). The Council s SLR identifies that there is sufficient capacity in local schools to meet the resultant demand for school places. Overall, the development of 550 dwellings is likely to require around primary school places and 110 secondary school places. The SLR notes that Assessment against Green Belt purposes Newcastle City Council assessed Site A (in combination with the Throckley South allocation) against the purposes of being included within the Green Belt. Both scored 23 out of a possible 25, indicating a limited contribution towards meeting the Green Belt purposes. The site is therefore considered suitable for removal from the Green Belt to meet the identified housing requirements over the plan period. The site is well contained with clear delineation of the boundaries and would not result in the coalescence of settlements or urban sprawl. NEWCASTLE UPON TYNE Approaches to City Centre Major movement corridors Newcastle Boundary Throckley Primary School can accommodate up to 315 pupils and currently has enough capacity to accommodate this number of additional pupils. It was built as a middle school in 2003 through the Private Finance Initiative but became redundant in 2005 (following the decision to move to two-tier education in the outer-west of the City) before providing for the relocation of Throckley Primary School (which does not currently require premises of this size). The development of this site would make a substantial contribution to making best use of a recently-constructed but under-utilised asset. In 2011/12, Walbottle Campus also had significant surplus capacity. It is understood that the level of capacity is forecast to rise without any additional local housing development to increase its pupil numbers. The case is clear that there is more than adequate capacity in the nearby local primary and secondary schools to serve the requirements of the proposed development of the site at North Throckley. An essential consideration is also the recognition that significant new housing development is required to maintain and enhance the viability of the local schools. In addition, Site B is also very clearly defined and when weighed against the purposes of being within the Green Belt, does not fully meet the criterion. Site B should also be considered to be suitable for removal from the Green Belt and allocated for housing in this plan period. Any additional housing development at Throckley, over and above the proposed allocation at Site A may also serve to help meet the capacity issues at the local schools. Access to local convenience shopping is also readily available with the entrance to the site being within 800 metres of the local centre, which includes a Sainsbury s supermarket. A high number of the existing local shops are closed or significantly run down, particularly along the Hexham Road. An increased local population, with pedestrian access immediately into the local centre will help ensure the long term sustainability and health of the local centre at Throckley. The site scored significantly high in the SLR for accessibility to local services and facilities, transport networks and employment opportunities. 8 NEWCASTLE UPON TYNE BOUNDARY 9 9

6 Timescale The housing backlog and the short term spike in population growth, identified in the Council s Evidence Base, could be met through the early release of all strategic Green Belt sites supported in the Plan (and then additional safeguarded land if necessary) as soon as possible with a phased mechanism to ensure sustainable growth across all of the settlements. This would help to ensure choice and competition in the market (NPPF para 47) and the early delivery of housing to meet the needs arising from the backlog and population swell. Should the Local Plan allocate Site A for housing and planning permission is subsequently sought for the development, construction could begin around On the basis of a realistic build programme of between 100 and 150 per annum (with up to three outlets on site), it should be possible to complete the development of Site A within the early part of the Plan period (i.e. by 2020) to meet the housing backlog and the short term population spike (the SHMA (2013) notes that, whilst there is a significant growth in population over the longer term, a significant amount of this growth is about to take place over the next 5 years ). An opportunity then exists for delivery of Site B as a follow-on to the completion of Site A, with commencement of development around Site B is put forward as potential safeguarded land. It also has a vital role to play in ensuring delivery of housing requirements should some of the low value sites fail to be delivered in the short-medium term and would be a logical and deliverable follow-on site from Site A. Housing mix The site is proposed to be developed for medium and lower density family homes to meet any unmet needs for family houses, at least 60% of the development will be for family housing. A suitable mix could include a larger, upper to mid-market homes (typically larger 3 bed and 4+ bed homes) and mid-market homes (typically smaller and medium sized 3-bed homes), alongside a minority element (20-30%) of smaller homes (houses and, if viable, apartments). Both sites are not of sufficient size to create self-contained neighbourhoods but rather development would complement existing provision in Throckley. Site A, in particular, is well-related to the village, particularly if a pedestrian link is provided through the existing open space to the south of the site. Viability The sites lie in a mid value area where housing development of this site is expected to be economically viable with the Western Gateway as the main point of access into the site. Alternative access options may present challenges to viability but discussions are ongoing. There are no known constraints to provision of service utilities to the sites and we are not aware of any adverse ground constraints, or the potential for any significant archaeological remains within the site to preclude development as proposed. As such, for the purposes of this preliminary assessment of viability, development costs are based on the land being greenfield, accessed without third party ransom and without significant abnormal cost of deliverability. Whilst values appear to be strong enough to support a development with no significant abnormal costs as outlined above, the key factors in the viability assessment are the affordable housing requirements and S106 obligations which the scheme may be required to support. We would expect both of these items to be discussed and agreed with Council Officers later in the process. TECHNICAL ASSESSMENT Flood Risk and Drainage A comprehensive flood risk and drainage assessment has been completed. Northumbrian Water Limited (NWL) have confirmed that a new water supply can be made available for the proposed development from the existing network and there is capacity in both the combined sewer network and at the sewage treatment works to accept new foul flows. As the site is currently greenfield, there will be a requirement to ensure that there is no increase in flood risk. Discharge of surface water will be restricted to ensure that existing rates are not exceeded. Sustainable Drainage Systems (SuDS) will be utilised to attenuate surface water runoff, along with providing amenity, biodiversity and water quality benefits. Flood risk from all sources has also been considered for the site. The site is located in Flood Zone 1 (Low Probability of flooding) and therefore passes the Sequential Test of the NPPF. Further investigations will be carried out prior to the detailed design of the development to quantify flood risks relating to the existing ditch in the middle of the site; the results of these investigations will be used to inform a risk avoidance approach to the layout and design of the development. Utilities Assessment Newcastle City Council has undertaken a utilities assessment concluding that all utilities have sufficient capacity (primary infrastructure) within Newcastle. There may be a need for some additional localised infrastructure, the cost of which is likely to be met by the developer. Further discussions will be ongoing as part of a future planning application. Archaeology and Heritage assets An assessment of the heritage assets relative to the site has been undertaken. There are no historic or statutorily protected buildings in the vicinity of the site. Scheduled Ancient Monuments associated with Hadrian s Wall lie approximately 250m to the south. The Hadrian s Wall corridor is a World Heritage Site and the development site is within the World Heritage Site Frontiers of Empire buffer zone. None of these are likely to be affected by the proposed development. There is no direct evidence of prehistoric or Roman activity in the proposed development area. The area lies to the north of the medieval village of Throckley, and was used in the medieval and post-medieval periods as agricultural land. Evidence relating to this, in the form of ridge and furrow cultivation and field boundaries, may survive, and is likely to be regarded as of limited archaeological significance. Coal mining was carried on in the area from the 17th century and a number of pits and wagonways were located within and adjacent to the development site from the 18th century onwards. Remains of elements of these, particularly the wagonway dividing the southern fields of the site, may survive. Open cast mining in the northern and central parts of the site is likely to have removed any archaeological resource that may have been present in these areas. In the event that the wagonway routes through the site are not retained as rights of way, archaeological evaluation and recording of these is recommended. It is recommended that a geomagnetic survey of the southern two fields is conducted to ascertain if later prehistoric remains are present, the results of which may need to be supplemented by trial trenching. Further work will be undertaken as part of the planning application process. Noise A road traffic noise impact assessment in connection with the proposal for the strategic housing allocation has been undertaken. The area immediately adjacent to the A69 is subject to elevated road traffic noise levels. However, subject to incorporation of appropriate noise mitigation measures into the design of the site, it will be straight-forward to adequately control the impact of road traffic noise. Road traffic noise from the A69 does not place any significant constraints on residential development of the site. Highways The highway and accessibility implications are set out in the Transport Appraisal Report which estimates the traffic likely to be generated and its distribution on to the road network, the range of local facilities within suitable walking and cycling distances and what measures are needed to provide access to public transport services. It concludes that the network has adequate capacity to accommodate the additional development on the scale proposed. Landscape The outline landscape character and visual amenity appraisal together with the outline landscape strategy (see accompanying report) demonstrate that development of Site A together with access over the future set aside Site B development land will not harm the existing wider landscape setting. The landscape report highlights recommendations by way of landscape principles to be applied to the strategic development of these 10 sites to ensure that both are integrated with the existing Throckley settlement whilst providing an appropriate landscape edge relationship with the retained green belt status land to the north and west of the [View of Throckley site looking north towards A69] strategic masterplan site. 11

7 URBAN DESIGN APPROACH MACRO ANALYSIS [Diagram highlighting a wider understanding of Throckley and its surounding settlements] NPPF states that Good design is indivisible from good planning. Open space, public realm, access, movement, safe and inclusive environments will all be important urban design issues to ensure a successful masterplan is achieved for this site. MACRO ANALYSIS A thorough analysis has been undertaken to fully understand the site and its surroundings. The analysis was undertaken in 2 parts: Throckley School Chapel Park 1) At a macro level to appreciate the strategic context of the site. 2) At a micro level to understand the constraints and opportunities of the site. The urban design analysis has been structured to take a more in-depth look at the site and the surrounding area to understand the physical structure of the place, how it currently works and the challenges its faces. The urban design analysis examined the following areas: Evidence Baseline River Tyne Walbottle Newburn a. Urban Structure and distribution of uses; b. Culture and heritage opportunities c. An explanation of how the site has evolved from the middle of the 19th C to the present day. d. Movement Analysis - key connections and quality of routes (not just within the red line boundary); e. Scale and massing local character; f. Buildings of architectural merit; g. Exploring the local vernacular and looking at the typical townscape qualities synonymous with the area h. Areas of opportunity (including potential redevelopment areas) i. Barriers; j. Thresholds and transitions between the various surrounding centres and beyond (residential areas); k. Natural and topographical features; l. Quality and connectivity of open spaces within and around the study area Highlighting both the strategic and detailed landscape elements which contribute towards the quality of amenity, open space and ecological value of the site. Design Process micro ANALYSIS ideas options Site Analysis and Opportunities Our analysis has identified a number of opportunities for the site: Connecting to well established bus links in a close proximity. Retaining and enhancing existing public right of way. Respect Hadrian s Wall buffer zone and mining heritage legacy Potential to deliver much needed high quality family housing Opportunity to support local shops, services and schools. Creation of unique ecological amenity space and community garden for all residents to enjoy. High quality residential design for families that ensure streets are created rather than roads. Promoting pedestrian and cycle links above vehicular movement. Prepare a strong landscape structure connecting to key routes respecting existing features. Connect with existing national cycle route. Legible design to assist with wayfinding. Opportunity to work with the topography and create a sense of place with dramatic street scenes. Exploit change in levels to assist with surface water run-off, to reduce and delay water run-off from the hard surfaces of a housing development to public sewers and watercourses, thus reducing the risk of localised flooding, pollution, and other environmental damage. Create a setting for residents to enjoy a healthy lifestyle as development responds to the enhanced high quality landscape setting

8 CONNECTING TO THE HEART OF THROCKLEY 400m 800m 1200m The following diagram illustrates 5minute (400m) and 10minute (800m) walking distances. This diagram highlights the close proximity of the site to key facilities and also the close proximity of the site in relation to the heart of the village. Bank 10 Lloyds TSB Bank PLC, Newburn Education Throckley Primary School, Throckley Trinity School, Throckley Newburn Manor Primary School Walbottle Village Primary School & Nursery Walbottle High school, Walbottle Barclays Bank PLC, Newburn Post Office Throckley Post Office, Throckley Walbottle Post Office, Walbottle Newburn Post Office, Newburn 15 4 Health 1200m Library Newburn Library, Newburn Throckley Primary Care centre, Throckley Dr A B Mattinson, Newburn Surgery, Newburn Scott Dr M E, Newburn Supermarket SUSTAINABLE CONNECTIONS ANALYSIS River Tyne Sainsbury s, Throckley Local shop Throckley Mini market, Throckley Nisa Local, Walbottle Church St Cuthbert s Catholic Church, Throckley Saint Mary the Virgin, Throckley Newburn Parish Chuch, Newburn Walbottle Methodist Church, Walbottle

9 TRANSPORTATION LINKS Vehicular A69 Primary vehicular movement in Throckley runs east and west along Hexham Road(B6528) along Hawthorn Terrace towards Walbottle. Historically this was the main spine of the village and evolved to become the A69 which has now moved to the north of Throckley village. Ponteland Road Ponteland Road(A6085)connects from the A69 running north/south into Newburn on towards Lemington and the outer west of Newcastle along the A695 into the centre of Newcastle. Chapel Park Bus In terms of public transport Throckley is well served with a dedicated bus service including: Service No.22,71,684,685/85/X85,888 and X82 connecting to the neighbouring villages and the city centre. Bus stops are located along the major movement corridors of the B6528 and the A6085. Cycle A Sustran national cycle route exists to the east of the site along the Dene. Hexham Road Throckley Walbottle Newburn Road Newburn STRATEGIC MOVEMENT BETWEEN SETTLEMENTS Lemington 16 River Tyne 17

10 The Vision Establishing a strong, strategic vision is crucial to creating a successful residential masterplan for Throckley. To help formulate a vision a holistic understanding of context needs to be demonstrated as the first stage of the design process. Key A credible vision for the future for Throckley will need to consider a number of important factors: A comprehensive appreciation of context. A wider understanding of the area particularly in terms of movement and accessibility. The relationship with neighbouring town centres, villages and the role these areas play now and in the future. Establish how the surrounding existing residential community can be integrated into a sustainable community. Creating a vision to compliment the surrounding area rather than compete with it Incorporating policy and best practice from a national and local level. [New development along Hexham Road next to School entrance] Site X X84, 85/685 The overall design approach will need to encompass a long term strategic vision for potential development and improvements to all 3 areas highlighted in the study area. The approach needs to be set out in the delivery of a masterplan which will be in accordance with CABE s Creating Successful Masterplans (2004) in addition to best practice and national policy. The vision will need to allow for coherent improvements to be made to the environment, accessibility and place making to ultimately help push towards central governments target for creating sustainable communities. Bus stop Pedestrian Cycle River Tyne [Historic properties along Hexham Road next to School entrance] PUBLIC TRANSPORT ANALYSIS 18 19

11 TESTING NEW ACCESS OPTIONS POTENTIAL NEW ACCESS POINTS Comprehensive analysis of the access options for the site is examined in detail at Section 2 of this report and further considered as part of the Transport Appraisal. 3 Eastern Safeguarded Land [Site.B] Allocation Site [] Potential entrance from Hexham Road to site.a 2 Central SITE.A Allocation Site Measures 25.9 Ha SITE.B Safeguarded Land Measures 29.9 Ha 1 Western 20 Detail of potential access from Hexham Road to site.a 21

12 SITE ANALYSIS AND OPPORTUNITIES The masterplanning team began the design process with an analysis of the existing opportunities offered by the site and its surroundings. Inspiration has therefore been taken from an assessment of the character surrounding the area, as well as successful residential case studies that have promoted a more sustainable way of living. A69 NCC Land New gateway opportunity and option for access Hexham Road Line of Hadrian s Wall New gateway opportunity and option for access Our analysis has identified a number of opportunities for the site: 3 Change in levels Mature Landscape Connecting to well established bus links in a close proximity. Retaining and enhancing existing public right of way. Noise Buffer Public Right of Way Potential to provide alternative area for school sports facilities. Creation of unique ecological amenity space and community garden for all residents to enjoy. High quality residential design for families that ensure GH Land Existing trees and hedgerow streets are created rather than roads. Promoting pedestrian and cycle links above vehicular movement. Privacy Buffer from existing residential Prepare a strong landscape structure connecting to key routes. Connect with existing national cycle route. NCC Land Legible design to assist with wayfinding. Opportunity to work with the topography and create a sense of place with dramatic streetscenes. Exploit change in levels to assist with surface water run-off, is to reduce and delay water run-off from the hard surfaces of a housing development to public sewers and 1 2 Hexham Road A69 Potential opportunity for alternative points of emergency access Noise Buffer watercourses, thus reducing the risk of localised flooding, pollution, and other environmental damage. Key Create a setting for residents to enjoy a healthy lifestyle as development responds to the high quality landscape setting Potential access points to site P.R.O.W Hexham Road 22 Vehicular Access 23 SITE ANALYSIS AND OPPORTUNITIES

13 Key Aims of Masterplan Building Height and important edges The overall key aims of the masterplan to date can be summarised as follows: Density and mix reflecting local community needs and aspirations in Throckley Sustainability features reducing environmental impact Character designed to feel it is part of Throckley working with existing landscape and topography Legibility designed with well structured building layout not dominated by roads Ease of movement and layout easy to find your way around Travel choices good access to public transport Connections integrate with existing streets, paths and neighbouring development Streets and spaces pedestrian, cycle and vehicle friendly Continuity and enclosure linked development groups with defined identity Parking well integrated and located within street scene Safety public spaces and pedestrian routes feel overlooked and safe Disabled access complying with and exceeding statutory minima regulations Maintenance well designed streets, spaces and buildings with future management in place Buildings adaptable, architecturally well designed utilising the latest in technology and construction Community facilities provided or close to schools, parks, shops, pub/cafes etc A69 Noise Buffer The following diagrams start to look at how working with the topography and street hierarchy of our initial layout edges and variations in building heights can assist with sense of enclosure and wayfinding. These diagrams work in tandem with gateways and help to create structure and legibility whilst ensuring the site is permeable and easy to navigate. Increase in building height Parameter Blocks Important Active Edge Key Movement Gateways Sense of arrival plays an important part in the perception of a place. The following diagram highlights 7 gateway points across the site which will require careful design consideration to ensure the gateway positively promotes the overall feeling of a safe and attractive residential environment. Working in collaboration with the local authority it is hoped that these special areas can be developed together in order to ensure well informed designed. Existing School Hexham Road [Examples of residential development shaping gateways and arrival points] [Concept diagram highlighting structure and strategic connections east/west and north/south] [Diagrams highlighting important edges and key movement within the masterplan site] 24 25

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies The criteria for assessing sites for future housing and business development in Dunsfold are set out below. (Development criteria, covering what it is

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016) Introduction This background paper sets out a methodology for the definition of settlement boundaries in the North Northumberland Coast Neighbourhood Plan. The neighbourhood plan is planning positively

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff

More information

Great Easton Neighbourhood Plan Statement of Basic Conditions

Great Easton Neighbourhood Plan Statement of Basic Conditions Great Easton Neighbourhood Plan 2017-2031 Statement of Basic Conditions OCTOBER 2016 GREAT EASTON PARISH COUNCIL Contents 1.0 Introduction....Page 2 2.0 Summary of Submission Documents and Supporting Evidence..

More information

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015 Oxford Green Belt Study Summary of Final Report Prepared by LUC October 2015 Project Title: Oxford Green Belt Study Client: Oxfordshire County Council Version Date Version Details Prepared by Checked by

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Wallingford Neighbourhood Plan

Wallingford Neighbourhood Plan Wallingford Neighbourhood Plan Introduction What is neighbourhood planning? Neighbourhood planning was introduced by the Localism Act 2011 to give local people more influence over how development comes

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

Land at Fiddington Hill Nursery, Market Lavington

Land at Fiddington Hill Nursery, Market Lavington Land at Fiddington Hill Nursery, Market Lavington Briefing Report for Market Lavington Parish Council Persimmon Homes (Wessex) April 2016 Background This brief report has been prepared following the Market

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT January 2016 Contents Introduction section 1 Section 1 - Introduction Section 2 - Assessment Section 3 - Involvement Section 4 - Evaluation Section 5 - Design Section 6 - Layout

More information

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Proposed Land Use: Total Site Area (Ha): Housing 1.85 Ha Description: It is understood that the owner has no plans to dispose of the site

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD 1.0 Introduction: The relocation of the City Council stores and depot from Bolton Street creates an exciting opportunity for development

More information

Joint Core Strategy Rushden Sustainable Urban Extension

Joint Core Strategy Rushden Sustainable Urban Extension Date Page 1 of 18 Report Originator Title Planning Manager Joint Core Strategy Rushden Sustainable Urban Extension 1. PURPOSE OF REPORT 1.1 To consider representations received on the emerging Joint Core

More information

A VISION FOR BLAIRGOWRIE

A VISION FOR BLAIRGOWRIE Welcome to the Westpark Partnership and Lidl UK GmbH Community Presentation. The purpose of this presentation is for you to view and comment upon the revised and updated proposals for the allocated development

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

Response by The Dartington Hall Trust

Response by The Dartington Hall Trust Consultation Response by The Dartington Hall Trust Site Reference: SH_39_02_08/13 Contents Introduction 1 Site Description 2 Development Proposal and Context 3 Site Technical Assessment 4 Planning Policy

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017

LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017 LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017 Smith Limited Suite 9C Joseph s Well Hanover Walk Leeds LS3 1AB T: 0113 2431919 F: 0113 2422198 E: planning@peacockandsmith.co.uk

More information

Introduction. Grounds of Objection

Introduction. Grounds of Objection Planning application ref. number 18/04496/APP Planning application to Aylesbury Vale District Council for the erection of 17 dwellings and associated works to the South of Hogshaw Road Granborough. Granborough

More information

Linby Neighbourhood Plan Masterplan Safeguarded Land Top Wighay Farm March Linby Neighbourhood Development Plan Masterplan 1

Linby Neighbourhood Plan Masterplan Safeguarded Land Top Wighay Farm March Linby Neighbourhood Development Plan Masterplan 1 Linby Neighbourhood Plan Masterplan Safeguarded Land Top Wighay Farm March 2017 Linby Neighbourhood Development Plan Masterplan 1 Linby Neighbourhood Development Plan Masterplan 2 Contents: Section 1:

More information

Appendix 1 Structure plan guidelines

Appendix 1 Structure plan guidelines Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use

More information

Plumpton Neighbourhood Plan Site Assessment Report

Plumpton Neighbourhood Plan Site Assessment Report Plumpton Neighbourhood Plan Site Assessment Report May 2016 1 Contents 1. Introduction 3 2. Methodology 4 2.1 Identification of Potential Sites 4 2.2 Assessment Process 5 2.3 Assessment Criteria 6 2.4

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

Planning and Sustainability Statement

Planning and Sustainability Statement Land adjacent to Manor Farm, Catterick Village Pallett Hill Sand and Gravel Co Ltd Proposed 10 new dwellings, (6 No market dwellings and 4 No affordable dwellings) with access, associated car parking and

More information

6 Growth Management Challenges and Opportunities

6 Growth Management Challenges and Opportunities 6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s

More information

INTRODUCTION. Land south of Bishopswood Lane, Tadley

INTRODUCTION. Land south of Bishopswood Lane, Tadley 0 INTRODUCTION THE SITE Introduction Gladman Developments Ltd. has successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

Droitwich Spa 6. Reasoned Justification

Droitwich Spa 6. Reasoned Justification 87 Droitwich Spa 6 Reasoned Justification 6.1 Droitwich Spa is identified in the settlement hierarchy (Policy SWDP1) as a main town being the largest settlement in Wychavon District with an estimated population

More information

BLACKHEATH SQUASH CLUB Blackheath Sports Club, Rectory Field, Charlton Road, London, SE7 7EY. Planning, Design and Access Statement

BLACKHEATH SQUASH CLUB Blackheath Sports Club, Rectory Field, Charlton Road, London, SE7 7EY. Planning, Design and Access Statement Planning, Design and Access Statement Revised: 28 th Jan 2016 Peter Pendleton & Associates Ltd Introduction Planning permission will be sought for a refurbishment of existing courts and extension to provide

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

WELCOME. North East Haverhill. The Planning Process

WELCOME. North East Haverhill. The Planning Process WELCOME North East The site to the North East of, known as Great Wilsey Park, is identified by St Edmundsbury Borough Council in its Core Strategy as capable of delivering a Sustainable Urban Extension.

More information

PUBLIC REALM STRATEGY

PUBLIC REALM STRATEGY CONSULTATION DRAFT PUBLIC REALM STRATEGY Trenchard Street & Frogmore Street City Design Group Place Directorate Public Realm Strategy Trenchard Street & Frogmore Street Contents 1. Introduction 2. Understanding

More information

A. The sites in Table 16 below, as identified on the Policies Map, are allocated for retail-led development:

A. The sites in Table 16 below, as identified on the Policies Map, are allocated for retail-led development: SWDP 44: Worcester City Centre A. The sites in Table 16 below, as identified on the Policies Map, are allocated for retail-led development: Table 16: Sites Allocated for Retail-Led Development Policy Reference

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan

Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan 1 Melior Place London SE1 3SZ 020 7407 4701 teamlondonbridge.co.uk info@teamlondonbridge.co.uk 28 April 2017 Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan

More information

March General enquiries: Web site:

March General enquiries: Web site: REDEVELOPMENT OF WILSON HOSPITAL FOR MITCHAM LOCAL CARE CENTRE Community Planning & Design Brief for Merton Clinical Commissioning Group and London Borough of Merton March 2016 1. Mitcham Cricket Green

More information

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation. Story Homes An Introduction to Story Homes Founded by Fred Story in 1987, Story Homes has a long and successful reputation of building high quality and high specification homes. The family owned business

More information

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS PLANNING STATEMENT To support planning and listed building consent applications for change of use from Class A1 shop and Class A3 cafe to Class A3 restaurant at: Market House Market Place Kingston upon

More information

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence 1 Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence Prepared by the Neighbourhood Plan Steering Group on behalf of Garway Parish Council with assistance from 2 Table of

More information

Committee Report. Case Officer: Gemma Walker. Ward: Bacton & Old Newton. Ward Member/s: Cllr Jill Wilshaw.

Committee Report. Case Officer: Gemma Walker. Ward: Bacton & Old Newton. Ward Member/s: Cllr Jill Wilshaw. Committee Report Item No: 1 Ward: Bacton & Old Newton. Ward Member/s: Cllr Jill Wilshaw. Reference: DC/17/05423 Case Officer: Gemma Walker Description of Development Outline planning application (all matters

More information

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES WELCOME Thank you for coming to our consultation event to find out more about our emerging proposals for Hayfield Park, a residential development jointly promoted by the Hayfield Consortium: Martin Grant

More information

Newcastle upon Tyne. Ub Urban development perspectives: Innovative strategies for sustainable planning

Newcastle upon Tyne. Ub Urban development perspectives: Innovative strategies for sustainable planning Newcastle upon Tyne Ub Urban development perspectives: Innovative strategies for sustainable planning Nicola Woodward Head of Planning and Housing Strategy, Newcastle City Council UK Planning Policy Context

More information

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision 5. 5.1. Area Vision 5.1.1. are: A globally significant central London business district which is home to international business headquarters; At the heart of the commercial and cultural life of the capital

More information

PHASE III: Reserved Matters Submission

PHASE III: Reserved Matters Submission Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement

More information

Briefing Document of CNP. June 2017

Briefing Document of CNP. June 2017 Cholsey Parish Council Cholsey Neighbourhood Plan Briefing Document of CNP June 2017 Cholsey Neighbourhood Plan Page! 1 of! 8 Cholsey Plan Briefing v1.4 Page Left Intentionally Blank Cholsey Neighbourhood

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Variation No 1: Dundalk & Environs Development Plan Core Strategy

Variation No 1: Dundalk & Environs Development Plan Core Strategy Variation No 1: Dundalk & Environs Development Plan 2009-2015 Core Strategy Adopted on 29 th August 2011 CONTENTS Page Section 1 1.0 Synopsis 1 1.1 Background Document 1 1.2 Variation of Dundalk and Environs

More information

Alder View. Introduction. Alder View. Harwell. The Vision. The Team. Taylor Wimpey

Alder View. Introduction. Alder View. Harwell. The Vision. The Team. Taylor Wimpey Introduction Welcome to the public exhibition for, a development by Taylor Wimpey on the land south of Grove Road,. This exhibition will provide an overview of the development proposals for the site and

More information

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT. OPEN SPACE TEMPLE COWLEY LIBRARY library beyond Proposed apartments Proposed apartments Proposed houses Temple Road * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT. * Welcome

More information

Plaistow and Ifold Neighbourhood Plan Pre-Submission Consultation Draft

Plaistow and Ifold Neighbourhood Plan Pre-Submission Consultation Draft Mrs Beverley Weddell Clerk to Plaistow And Ifold Parish Council Lock House Lodge Knightons Lane Dunsfold, GU8 4NU. Dear Mrs Weddell, Our ref: Your ref: Telephone Fax HD/P5402/ 01483 252040 18 th October

More information

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole B2. Tāhuhu whakaruruhau ā-taone - Urban growth and form B2.1. Issues Tāhuhu whakaruruhau ā-taone The sheltering ridge pole Auckland s growing population increases demand for housing, employment, business,

More information

3. Neighbourhood Plans and Strategic Environmental Assessment

3. Neighbourhood Plans and Strategic Environmental Assessment 1. Introduction This report sets out a draft Screening Determination for the Preston Parish Council s Neighbourhood Plan and has been prepared by rth Hertfordshire District Council. The purpose of the

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

CAERNARFON DEPENDENCY CATCHMENT AREA

CAERNARFON DEPENDENCY CATCHMENT AREA CAERNARFON DEPENDENCY CATCHMENT AREA GWYNEDD UNITARY DEVELOPMENT PLAN - HOUSING Map not to scale Dependency Catchment Area Location 2 Caernarfon Topic Housing To the rear of Bro Eglwys, Bethel. Grid Ref.

More information

Welcome to our public exhibition

Welcome to our public exhibition About our scheme Welcome to our public exhibition Taylor Wimpey East Anglia intends to submit a detailed planning application for a new residential development of 39 high-quality homes at the B&M Concrete

More information

PDP DESIGN & ACCESS STATEMENT

PDP DESIGN & ACCESS STATEMENT PDP The Planning & Design Partnership Planning.. Architecture.. Interiors.. Landscape The Chicory Barn Studio, The Old Brickyards, Moor Lane, Stamford Bridge York, The East Riding Of Yorkshire, YO41 1HU.

More information

Key Principles. 290 Phasing Principles and Programme

Key Principles. 290 Phasing Principles and Programme 4 Phasing principles and programme 4c The aims of the phasing strategy are to satisfy planning policy requirements and create a sustainable, strong and healthy new community where, from the outset, people

More information

Land East of Cromwell Lane

Land East of Cromwell Lane Land East of Cromwell Lane VISION DOCUMENT AUGUST 2016 The proposals for Land East of Cromwell Lane will be defined by existing landscape features, ensuring that the development offers a quality place

More information

CHRISTOPHER WICKHAM ASSOCIATES Town Planning Consultancy

CHRISTOPHER WICKHAM ASSOCIATES Town Planning Consultancy ROCHFORD CORE STRATEGY EXAMINATION STATEMENT BY CHRISTOPHER WICKHAM ASSOCIATES (4961) ON BEHALF OF INNER LONDON GROUP (9917) POLICY H1 THE EFFICIENT USE OF LAND FOR HOUSING REPRESENTATION ID: 16190 CHRISTOPHER

More information

SITE ASSESSMENT CHECKLIST

SITE ASSESSMENT CHECKLIST 1. Site Details a. What is the site s name/reference? SITE ASSESSMENT CHECKLIST CR3NPWHY 3007 Gasometer Site Godstone Road CR3 0EG b. Where is the site located? Wyhteleafe; Godstone Road. Urban category1

More information

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING 3.1.1 The area referred to by the City Council, as Winchester Town, consists of the Winchester Wards plus the adjoining built up areas of Badger

More information

Basic Conditions Statement Exmouth Neighbourhood Plan

Basic Conditions Statement Exmouth Neighbourhood Plan Exmouth Neighbourhood Plan 2018-2031. On behalf Exmouth Neighbourhood Plan Steering Group July 2018 Table of Contents 1. Introduction... 4 2. Legal Requirements... 5 3. Why there is a need for a Neighbourhood

More information

Lower Hollow Copse. Questions and Answers on Proposals for Permanent Gypsy and Traveller Accommodation

Lower Hollow Copse. Questions and Answers on Proposals for Permanent Gypsy and Traveller Accommodation Lower Hollow Copse Questions and Answers on Proposals for Permanent Gypsy and Traveller Accommodation 0 Why does Mid Sussex District Council need to provide permanent gypsy and traveller accommodation?

More information

Northern Territory Compact Urban Growth Policy

Northern Territory Compact Urban Growth Policy Northern Territory Compact Urban Growth Policy A Reference Policy Document to clause 2.7 (Reference to Policy) of the NT Planning Scheme May 2015 Table of Contents 1 Policy Setting... 3 1.1 Context for

More information

Design Guidance. Introduction, Approach and Design Principles. Mauritius. November Ministry of Housing and Lands. .. a

Design Guidance. Introduction, Approach and Design Principles. Mauritius. November Ministry of Housing and Lands. .. a sig evelo r D Mauritius s. Utilities.. Individu a s. er itects.to ls chpers.po e Public. T. h rban D Sc U e me Promot e h ners. A Design Guidance o.h Planne rs n w iticians r l useholde National Development

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

building with nature - a new benchmark for green infrastructure

building with nature - a new benchmark for green infrastructure building with nature - a new benchmark for green infrastructure Danielle Sinnett, Gemma Jerome, Sarah Burgess, Nick Smith and Roger Mortlock outline the aims, development and proposed operation of Building

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

LAND EAST OF MILL LANE, SHERBURN VILLAGE PLANNING STATEMENT

LAND EAST OF MILL LANE, SHERBURN VILLAGE PLANNING STATEMENT LAND EAST OF MILL LANE, SHERBURN VILLAGE PLANNING STATEMENT On behalf of The Church Commissioners for England Land East of Mill Lane, Sherburn Village Planning Statement On Behalf of The Church Commissioners

More information

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies Environment and Landscape Policy 1 - Landscape Setting Development should respect and wherever possible enhance the landscape setting of Cuddington

More information

2.4 Site Photographs. 4 View of Listed Building looking East. 3 View looking north west of the field adjacent to the site from existing hard standing

2.4 Site Photographs. 4 View of Listed Building looking East. 3 View looking north west of the field adjacent to the site from existing hard standing Looking north on to from the junction to 2 View towards the entrance of from 3 View of southern access to site from Riddles Road 4 3 2 4 Looking west on to from southern access to site View of Grade II

More information

Hodgson s Gate. Welcome. Who we are. Hodgson s Gate Developments. Thank you for taking time to attend today s event.

Hodgson s Gate. Welcome. Who we are. Hodgson s Gate Developments. Thank you for taking time to attend today s event. Welcome Thank you for taking time to attend today s event. is promoting land off Hodgson s Lane at, Sherburn-in-Elmet for a sustainable and high quality development. We are currently preparing an application

More information

Everton s Neighbourhood Plan. Site Allocation - Assessment Criteria

Everton s Neighbourhood Plan. Site Allocation - Assessment Criteria Everton s Neighbourhood Plan Site llocation - ssessment Criteria Introduction 1.1 This report assesses all the sites identified through the emerging Neighbourhood Plan for Everton and their potential for

More information

WELCOME. Welcome and thank you for visiting today.

WELCOME.   Welcome and thank you for visiting today. WELCOME Welcome and thank you for visiting today. Bellway Homes Ltd (Yorkshire) are preparing a reserved matters planning application for a residential development of 293 homes at land North of Yew Tree

More information

Linden Homes Proposals for land off Ringwood Road, Verwood

Linden Homes Proposals for land off Ringwood Road, Verwood Welcome Welcome to Linden Homes first public exhibition displaying proposals for new homes on land off Ringwood Road in Verwood. Award-winning house builder Linden Homes, part of the Galliford Try Group,

More information

Longhorsley Neighbourhood Plan

Longhorsley Neighbourhood Plan Site Assessment 1. The availability of the site 1.1 Is the land owner willing for their site to be made available for development? 1.2 If yes, do you have any written evidence to back this up? Planning

More information

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN OKEFORD FITZPAINE NEIGHBOURHOOD PLAN Dear Parishioner, The Neighbourhood Plan Project Team have prepared this leaflet to summarise the full Neighbourhood Plan document. It provides a summary of the Vision,

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Bradleys Both Parish Council

Bradleys Both Parish Council Bradleys Both Parish Council Bradleys Both Housing Site Assessments April 2015 Contents 1.0 Introduction... 2 2.0 BR001 Health Lea and Land to Rear, Skipton Road... 2 3.0 BR002 Holly Tree House and Land

More information

DHT 750_EDR_00 Ecological Deliverability Appraisal DHT Access Appraisal C DHT Heritage Overview

DHT 750_EDR_00 Ecological Deliverability Appraisal DHT Access Appraisal C DHT Heritage Overview Consultee ID:1020173 April 2017 Rep Summary TTV29 (7) Broom Park Field Legal, Compliant and Sound Hearing: DHT wish to participate in the examination hearings to further develop our comments, to enable

More information