Environmental Statement Volume 3: Non-Technical Summary November 2010

Size: px
Start display at page:

Download "Environmental Statement Volume 3: Non-Technical Summary November 2010"

Transcription

1 Volume 3: November 2010

2 Newlands Environmental Impact Assessment Environmental Statement Volume 3

3 NON TECHNICAL SUMMARY Introduction Background Grainger plc (hereafter referred to as Grainger ) proposes the development of land to the west of Waterlooville. They have commissioned Savills to co-ordinate a formal Environmental Impact Assessment (EIA) including the preparation of an Environmental Statement (ES) and Non-Technical Summary (NTS) to support their planning application, part of which is submitted with full details and part is in outline only. The planning application proposes the development of a new neighbourhood of 2,550 dwellings, land for employment uses, and a mix of other community uses including land for two primary schools, land for allotments, land for a cemetery, open space, associated infrastructure and access arrangements. The application site is referred to as Newlands. This application supersedes a previous application in outline only for a smaller area of land within the current Newlands site. That application was known as Newlands Common. In conjunction with a further development to the north by Taylor Wimpey, which is currently under construction, these schemes of Newlands and the Taylor Wimpey site make up what is known as the West of Waterlooville Major Development Area (MDA). Purpose and Structure of the Environmental Statement EIA is a process through which the likely significant environmental effects of a development proposal can be identified, assessed and, wherever possible, avoided or mitigated (reduced). This process and its outcomes are then reported in the ES to decision makers, the Council and its advisors, and the public. The NTS is provided to allow a wider public understanding of the environmental effects of the project. The ES is set out in a structured manner to allow easier navigation: Volume 1 comprises the Main Environmental Statement Volume 2 comprises the Appendices, including technical supporting reports Volume 3 (this volume) comprises the (NTS) Opportunity for Public Consultation Should interested parties wish to make comment on the content of this ES, they should be made in writing to the application co-ordinator, Jacky Wilson at Winchester City Council, Development Control, City Offices, Colebrook Street, Winchester, Hampshire, SO23 9LJ. The ES is available for purchase from Savills (L&P) Limited, Brunswick House, Brunswick Place, Southampton SO15 2AP. Table 1 sets out the costs related to the various volumes of the ES available. NTS - 1

4 Table 1: Environmental Statement Costs Volume Hard Copy CD-Rom Volume 1 Main ES Statement 250 Volume 2 Appendices Please enquire at above address 5 Volume 3 20 Requests should be made in writing to the above address. Cheques should be made payable to Savills (L&P) Limited. The Assessment Team The assessment team comprises the following organisations: Savills has managed the EIA process and team, and has undertaken the socio-economic and community impact assessment and landscape and visual impact assessment. Savills is also the master planner and has produced the overall design and urban design approach. ADAM Architecture is the architect who has produced the full detailed plans for Phase 1. Fabrik Landscape Architects have provided the detailed landscape strategy and works. Mayer Brown has provided technical assessment of baseline conditions and environmental effects with regard to ground conditions, hydrology and hydrogeology, traffic and transport, air quality, noise and vibration, waste disposal and recycling, and service supplies. Biodiversity by Design has undertaken the impact assessments with regard to biodiversity. They have also informed the design with regard to landscape. CgMs Consulting has provided impact assessments with regard to archaeology and cultural heritage. Inbuilt has provided advice on sustainability including Code for Sustainable Homes, BREEAM, energy and allotments. NEP Lighting Consultancy has undertaken a lighting assessment. Green Issues has provided community relations advice and led the organisation and review of public consultation events. Two Blue Communications has provided public relations advice. Capita Symonds has undertaken the project management work for the application preparation. What is Environmental Assessment? EIA is a statutory process that is governed by UK and European law. On 3 March 1997 the Council of the European Union amended Directive 85/337/EEC through Council Directive 97/11/EC, which was given legal effect in England and Wales through the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999 insofar as it relates to development under the Town and Country Planning Act These Regulations came into effect on 14 March NTS - 2

5 EIA follows an iterative process in the following stages: Screening is the first stage of the EIA process where the relevant authorities (local authorities or the Secretary of State) decide if EIA is required. Once it has been agreed that EIA is required, scoping is undertaken to define what should be assessed as part of the EIA and reported in the ES. This is done in partnership between the applicant and the local authority. With the scope set, relevant information on the environmental baseline conditions is collected. This information is then used initially to understand the potential environmental effects and inform the design of the proposed development to minimise the potential for significant adverse impacts. The formal assessment process is then undertaken of the proposed scheme parameters to define the significant impacts of the proposed development. Any significant adverse impacts that are identified during the formal assessment process are then reviewed against the design to consider whether alterations could be made to minimise the impact. Should this occur the formal assessment process is run again. Where significant adverse impacts cannot be minimised through alterations to the design itself, mitigation or reduction measures are considered. Monitoring may also be considered to measure the actual significance of the impact during and post-construction to allow management of mitigation where appropriate. Once the EIA is completed, the ES is submitted to the local planning authority for consideration with the planning application. NTS - 3

6 The Proposed Development The Site and Surroundings The proposal covers an area of about 209 hectares to the west of Waterlooville, situated 13 kilometres to the north of Portsmouth in Hampshire. The site is predominantly located within the administrative area of Winchester City Council with eastern parts located within the administrative area of Havant Borough Council. For the purposes of the application process, the site is referred to as Newlands. The site is currently arable farmland and woodland. Fields within the site are medium and large in scale with some hedgerows and trees. There are five Sites of Importance for Nature Conservation (SINCs) within or abutting the site and five areas of woodland within the central and southern parts of the site, some with protected trees. Two watercourses cross the northern part of the site. The St John s Conservation Area at Purbrook adjoins the southeastern boundary of the site with a Grade II Listed farmhouse situated in the central eastern part of the site. Vehicular access to the site is through Milk Lane off London Road which runs along the eastern boundary of the site. The Proposed Development The proposed development will create a new neighbourhood on the western edge of Waterlooville, comprising a mix of uses incorporating: 2,550 dwellings (2,650 assessed in the EIA to ensure a maximum figure is tested) Mix of dwelling tenure, type and height, with up to 40% affordable housing Access and infrastructure including two new junctions from the eastern boundary of the site (Milk Lane and Ladybridge roundabout) along with the completion of access off Maurepas Way roundabout A local centre and mixed use areas comprising a convenience store, residential, a restaurant/ takeaway, a public house, community uses and land for healthcare uses Leisure and residential uses at Plant Farm, potentially including a public house Integration and links with Waterlooville town centre and to other surrounding areas including the countryside to the west Approximately 30ha of employment land including a mix of uses that generate jobs Land for two primary schools Land for allotments Other infrastructure including public open space and landscaping Land for a cemetery NTS - 4

7 The development has been designed strategically in order to design out crime, anti-social behaviour and achieve community safety. Infrastructure, such as electricity, gas and water will be installed as required to serve the proposed development. Surface water and flood risk will be managed through sustainable drainage techniques such as open water features to control and manage surface water run-off, as well as the restoration of the River Wallington to a natural state, which currently runs within a man-made channel. The development will be phased over a period commencing in 2011/12, with first completions in 2012 and final completion by 2021/2022 resulting in a 10 year build programme. Main Alternatives Throughout the design of the scheme, many different alternatives have been examined. These have included reviewing the need for the residential and employment development and other locations for the development. In addition to these alternatives, the layout of the scheme and the detailed design have undergone revisions, which have been through various forms of consultation. The consideration of environmental issues has also informed the proposed layout. The main elements that have been reviewed include the location of the school, the local centre, cemetery and the main routes through the site as well as the proposed built form. Preparing the Green Infrastructure Strategy and Biodiversity Strategy has been an iterative process with all consultants and the wider stakeholders involved. NTS - 5

8 Summary of Impacts Socio-Economic and Community Impacts The 2,650 households assessed for the proposed development will result in an increase in population for the area of approximately 6,360 people when completed. As a result of these dwellings the population of Winchester District will increase by around 4% and approximately 0.9% for Havant Borough. The tenure and size of dwellings proposed is reflective of both market demand and affordable housing need in both Winchester District and Havant Borough. The increase in population would likely have a substantial impact on local services and facilities in the surrounding area if appropriate mitigation was not provided as part of the development. The Newlands development therefore proposes to provide a range of social infrastructure that will not only ensure the emerging population will have appropriate access to services and facilities, but will also likely improve overall provision for the local neighbourhood. Land for two new primary schools will be provided on-site, alongside land for a new health centre, a community building within a local centre and an employment hub that will provide jobs for the new and existing community. The development will promote employment in the area through the provision of a mix of offices, warehouses and general industrial use, storage provision, retail, cafés, restaurants and drinking establishments, along with other employment generating uses. An extensive range of formal and informal open space features will be provided on-site to meet need. This provision will be in accordance with the standards set by both local authorities. A Biodiversity and Green Infrastructure Strategy also form a substantial part of the application, which all contributes to the overall sustainability of the site. Green links will be created across the site east-west that will enhance existing biodiversity and connect the site to the countryside. In terms of secondary school provision, the development will not generate enough pupils to require a new secondary school. Using Hampshire County Council s methodology, there is sufficient forecasted capacity at nearby secondary schools to accommodate children generated from the proposal and therefore no contributions will be required for secondary school provision. This strategy has been discussed with Hampshire County Council. The overall strategy for Newlands will ensure that the development will assist with having a positive impact on the local neighbourhood and will not result in an adverse effect on local facilities and services. The development offers the chance to enhance the character of the area, whilst the increase in open space, community facilities and leisure activities will help create a sustainable community for the long term. Ground Conditions, Hydrology and Hydrogeology There is no evidence of existing contamination on the site and as such it is concluded that with no mitigation the overall impacts of the development are likely to be negligible, based on available data. The site has however been the subject of several studies and investigations, which have identified the following issues that require mitigation to provide further enhancement and protection as part of the site development strategy: Restoration of a section of the River Wallington to the south of Brambles Business Park including softening the channel by removing the concrete and creating a more natural form. Incorporation of Sustainable Drainage Systems (SuDS) to enhance water quality by removing pollutants associated with urban development and slow down rainfall run-off and assist in soaking back into the ground. NTS - 6

9 There is a potential risk of discovering unexploded bombs due to the use of the area for training prior to D-Day in 1944 which must be addressed. Potential for contamination of land and controlled waters from site plant and activities during the works need to be minimised and will be addressed through the Construction Environmental Management Plan (CEMP) Archaeology and Cultural Heritage Plant Farm, a Grade II Listed farmhouse, lies within the site. The farmhouse and associated farm buildings at Plant Farm have been the subject of a programme of building recording. As part of the proposed development, the farmhouse and the Tithe barn will be retained, repaired and re-used. There are no other designated Heritage Assets within the site. As a result of detailed desk and field studies, it is known that parts of the site contain sub-surface features evidencing localised Mesolithic, Neolithic and Bronze Age activity and more extensive Iron Age and Romano-British settlement. Mitigation measures in the form of archaeological excavation and recording have already taken place on six areas containing archaeological remains within the site. Given the nature, condition, character and significance of the remaining assets involved, it is proposed that where any potential adverse impacts are identified, these will be mitigated by archaeological investigation and recording ahead of development. Following the implementation of the proposed mitigation measures, there will be no significant residual or cumulative adverse effects on heritage assets. The excavation, analysis and recording of archaeological remains within the site will enhance the regional understanding of the prehistoric and Roman evolution of the landscape. Following the repair and restoration of Plant Farm, a moderate beneficial impact is identified both from the repair of an unused listed building and for the focus and sense of place that this historic building can create within the development. Biodiversity The site has been subject to detailed ecological surveys which have identified a range of species and habitats. The habitats identified are typically known to support a number of protected species, identified through field surveys, including badgers, reptiles, Barn Owl, Otter and roosting bat species. The habitat of greatest ecological interest within the site is the woodland which covers over 6% of the Site. Most of this woodland is Ancient in origin and is SINC designated, though nearly all is below favourable conservation status due to lack of suitable management for many years. Much of the rest of the site is intensively farmed and of limited ecological interest, although the network of ditches and hedgerows that bound these fields are of ecological value. Two streams traverse the site - the River Wallington and Old Park Farm Stream. Ten ponds are distributed across the Site with two field ponds being of greatest interest in terms of amphibians and aquatic invertebrates. Portsmouth Harbour and Chichester and Langstone Harbours Special Protection Areas (SPA) are within 4km of the site. These harbours also include components of Solent Maritime Special Area of Conservation (SAC) and Solent and Isle of Wight Lagoons SAC. The key interests of these sites are the Brent Geese and wider assemblage of waterfowl, and the various inter-tidal and other wetland habitat types. Although small numbers of Brent Geese from the SPAs have been recorded intermittently grazing at Newlands, none have been recorded in the last four years despite intensive monitoring. NTS - 7

10 The development has been carefully designed to minimise loss of important wildlife habitat and maximise biodiversity gain wherever feasible. There will be a loss of woodland and hedgerow habitat, existing ditches and open arable habitat, which has the potential to lead to habitat fragmentation. Contextual change may also occur to the remaining habitats. The creation of a rich array of locally appropriate habitats is proposed, less by way of mitigation and enhancement for the sake of species and habitats in their own right, but rather as integral to wider scheme aims of societal benefit and enhancement of the urban setting. Key in provision of green infrastructure that is both biodiverse and multifunctional will be the creation of two substantial nonstatutory Community Nature Reserves, as well as the retention and restoration of the site s five SINCs, all of which will be interconnected by various biodiverse green corridors. The two new reserves will be: Newlands Farm Community Nature Reserve encompassing the newly created zone of green infrastructure, including woodland copses, wildflower meadows, and various water features, positioned adjacent to the western fringe of the built development. River Wallington Community Nature Reserve encompassing the new alignment of the ecologically/morphologically restored River Wallington and adjoining habitat. This reserve would also include the Old Park Farm Stream corridor and a newly created wet woodland - Wallington Wood. The creation of these large attractive biodiverse reserves will also play a significant role in linking the site s various habitats to the wider countryside, and in deflecting recreational pressure away from local ecologically sensitive habitats such the site s Ancient Woodland and the local coastline. The creation of an extensive SuDS network would perform both pollution and flood prevention functions and create a new wetland resource of notable ecological and amenity value. Additional mitigation is proposed to ensure the integrity and conservation status of habitats and species are not adversely affected. Measures will include: Establishing works exclusion zones in sensitive areas. Installing habitat protection and species exclusion fencing. Installing wildlife tunnels beneath new roads. Timing of works to avoid sensitive life stages of protected species. Species displacement from working zones via vegetative management. Provision of alternative refugia where necessary for displaced species. Undertaking repeat survey checks for species prior to works commencing. Wildlife-friendly lighting design. Production of a Land Management Plan setting out the current status of the natural resources in the area to be managed, the desired future conditions and the management practices to achieve those conditions. The preparation and implementation of an effective and systematic monitoring programme to serve as an early warning system to detect man-induced threats to biodiversity and natural processes and NTS - 8

11 inform necessary changes in management. The monitoring programme will be clearly set out in the Land Management Plan. The proposed development will protect and enhance the site s ecological resources and provide longer term benefits for residents and wildlife alike. Landscape and Visual Impact The potential landscape and visual impacts from the proposed development for the new neighbourhood have been assessed. The assessments have concluded that the site does not have any adverse landscape or visual effects on any Sites of Importance for Nature Conservation, the Denmead-Waterlooville Gap or the South Downs National Park. Whilst the development would result in a change in the character of the landscape, from rural to urban, this would be focussed on the eastern side, which is already influenced by urban built form. The proposed development provides the opportunity to create a high quality extension to Waterlooville. In particular this could enhance the townscape of the A3 corridor as well as providing large areas of public open space and new pedestrian/cycle routes between Waterlooville and the countryside to the west. The scheme will retain the existing farm ponds as well as introducing new ponds and the restoration of the corridor of the River Wallington. As such, the scheme will have a beneficial effect on water bodies. The majority of trees on the site are protected by Tree Preservation Orders. Whilst the scheme will result in the loss of some hedgerows, it has been designed to retain as many as possible and respect the structure of the existing field pattern and landform. All important areas of woodland such as Plant Row will be retained and managed more positively and large areas of new trees and shrub planting will be planted throughout the site. Whilst a small number of trees would be lost to facilitate the improvements to the London Road junction and Purbrook Heath Road junction, these would be more than compensated for by a comprehensive planting programme throughout the proposed open spaces and streets. As such, the scheme will have a beneficial effect on vegetation and neutral effect on landform. The agricultural land on the site is classified by the government as Grade 4 (poor) and is therefore not considered to be of high value. Movement and access to the site is currently via a number of public rights of way. The new scheme will amend these paths, introducing a balanced network of footpaths, cycle routes and bridleways. These will benefit from street lighting and will therefore improve access within the area both geographically and after dark. Given the location of the site on the edge of Waterlooville, the scheme will also have the benefit of enhancing access to the countryside to the west for existing residents in the area. Visually, the site is relatively well concealed, both by existing mature vegetation to the south and west and within the site, the existing buildings of Waterlooville and Purbrook to the east and the general rolling landform of the area. There are no viewpoints which show the site in its entirety. To the west and east, there are very limited views of the site, with glimpses generally restricted to the Newlands Lane area to the west and London Road corridor to the east. To the north, views extend to the Closewood Road area, whilst to the south there are some distant views of small parts of the site from Portsdown Hill and a short stretch of the Purbrook Heath Road. Some of the current visual receptors that would be most affected by the proposals will be users of the public rights of way that cross the site. The paths that will remain will see a change in the character of their views, from rural, to more urban. In general then, this network will be amended though the new footpaths which will be created will have new views. NTS - 9

12 A lighting assessment of the site shows that the main effects will be on those directly adjacent to the site boundary as its topography and existing vegetation will screen most if not all of its lighting from further away. Due to the existing lighting on the A3 corridor, effects on most residents in Waterlooville and Purbrook will be limited. The main effects would be on those working on the edges of the business parks in Waterlooville. There would be a negligible impact on views from Denmead, or on sky glow generally. Traffic and Transport A Transport Assessment has been prepared and included with the application. A review and assessment of the current and proposed transport arrangements for cars, public transport, pedestrians, equestrians and cyclists, as well as car parking and servicing has been completed. It is proposed that the development will take vehicular access from four junctions the main Maurepas Way access, the southern access at Ladybridge Roundabout, the Milk Lane access and a northern access via Old Park Farm. Primary routes accommodating bus services and cyclists would connect each element of the site to the local centres at Hambledon Parade and Purbrook Village, Waterlooville town centre and beyond. Strategic links for pedestrians and cyclists offer the potential to integrate the development with the existing urban environment and provide a connection to the South Hampshire Rapid Transit (SHRT) route. The link between the existing town centre and the main access corridor is of strategic importance as is the link that heads north towards Old Park Farm, providing access to the proposed employment areas. A comprehensive bus strategy for Newlands is proposed. A contribution towards subsidising the proposed bus services in the early years of the development will be provided. Measures to encourage bus use would include high quality bus shelters with real time information, discounted bus fares for new residents, a package of public transport information for Newlands residents and employees and touch screen information systems fitted at local facilities. A network of pedestrian and cycle routes is proposed and would be made up of new infrastructure supplemented by existing rights of way routes that would either be retained or improved to provide comprehensive connectivity between development plots. The scheme would incorporate a multi-function greenway running along the western side of the development, connecting Purbrook in the south to Hambledon Parade in the north and linking into Newlands at various points. Pedestrian and cycle linkages along the A3 corridor would also be provided. Further offsite improvements are proposed as part of a Safer Routes to Schools scheme between the site, Crookhorn College of Technology and South Downs College. Marketing measures will be implemented to encourage residents and employees to travel by non-car means, including information on discount travel, community website, travel plan, travel posters, car club and access to secure cycle parking. The consented scheme included improvements to the Hulbert Road/Tempest Avenue roundabout and the A3(M) Junction 3 roundabout as part of the mitigation strategy for the 2,000 dwelling scheme. This strategy also included converting the Purbrook Way/ Stakes Hill Road roundabout and the Purbrook Way/ College Road priority junction to signal controlled junctions to deliver improved facilities for pedestrians and cyclists on the Safer Routes to Schools route, whilst not encouraging car use through demand management along the corridor between the southern access and the A3(M) Junction 4. Traffic impact assessment of the enlarged scheme indicates that the junction improvements proposed for the consented scheme are sufficient to accommodate the traffic impact of the larger Newlands scheme as well. In conclusion the promotion and implementation of comprehensive sustainable transport measures aim to reduce the impact of increased vehicular activity, which would be demand managed through the NTS - 10

13 introduction of off-site junction improvements that would assist to accommodate this traffic and ensure that road safety is not compromised. Air Quality The potential air quality impacts of the Newlands development during construction and operation have been assessed. The traffic assessment collated the proposed traffic modelling data for the existing without development and proposed with development scenarios and modelled worst case scenarios, in order to establish the likely traffic related air quality levels of pollutants. The findings were that development related traffic posed no significant impacts in relation to pollutants. A number of potential climatic influences were assessed. These were the impact of the climate on the development, the impact of the development on climate change and the impact of the development on the local climate. Baseline climatic conditions were assessed in a report produced by the MET office and this found that whilst there may be a higher incidence of fog and frost in the employment area, this was typical for low lying areas at this location and was not considered significant. It was also concluded that the Newlands development was not of a size or nature that could influence global or local climate. The northwest corner of the site is traversed by 132kv pylon lines. An assessment was, therefore, undertaken to establish if these could potentially affect receptors on the site. Baseline readings were taken from directly beneath the pylons at a number of locations to establish the strength of the magnetic fields. These readings were compared to both international guidelines and the most recent UK independent guidance and were found to be well within advised levels. Odour was investigated in relation to the potential for odours associated with the proposed new pumping station, which is to be sited to the west of the proposed employment area and the two temporary pumping stations near the main access and local centre, respectively. The initial study undertaken did not identify any significant odour issues associated with the existing gas valve compound pressure reducing station. However, further studies will seek to confirm this finding. Finally, in relation to construction, all potential construction air quality impacts will be controlled within the Construction Environmental Management Plan, which will specify working procedures to minimise air quality impacts, including dust. Noise and Vibration A noise and vibration assessment of the proposed development has been undertaken comparing it to the existing environment. Due to construction activities there is the potential for elevated noise levels and vibration. All potential construction noise and vibration impact will be controlled within the Construction Environmental Management Plan, which will set out noise and vibration limits and specify working procedures to minimise impacts. Traffic data for the existing without development and proposed with development scenarios was then collated and modelled in worst case scenarios, in order to establish the traffic related noise levels that existing and proposed receptors were likely to be exposed to. NTS - 11

14 Overall it was found that the development posed no significant impact on existing or proposed receptors. However, it was found that in the south of the development, the provision of the southern access road could bring traffic noise to some areas, which previously were subject to very low background noise. Where potential for impacts may occur at existing boundary locations, appropriate boundary treatment will be an issue for the detailed design progression and noise attenuation features will be designed at the appropriate stage, to reduce the impacts at these properties to acceptable levels. Any other potential impacts from the operational phase of the development will be minimised by the selection of plant in accordance with the appropriate guidelines, with the design criteria that noise levels from building services will not exceed the baseline background night time noise level at any residential receptor. The assessment found that significant vibration impacts were not anticipated from the operational phase of development. Waste Disposal and Recycling The construction and demolition process has the potential to generate large quantities of waste, the disposal of which should be considered in the environmental context. Removal of unsuitable or excess earthworks material has the potential to become a large waste disposal issue. Mitigation is proposed to reduce the off-site disposal of earthworks to zero. Methods used will include chemically improving the strength of the subsoil, reducing the foundation depth of roads and hardstanding and raising some landscaped areas to dispose of the reminder. Existing farm building will be re-used where practical to minimise demolition. Designs of new buildings will aim to minimise wastage by incorporating construction elements of standard dimensions, to reduce cutting in situ. A site waste management plan will detail how the contractors will deal with waste, including segregation of materials for recycling. Measures will be introduced to minimise the effect of littering, including the provision of temporary litter and recycling bins for the workforce and covering skips and lorries in transit. With the proposed mitigation, the construction and demolition operations will have no significant environmental impacts outside the development site, and on-site earthworks and soil stabilisation impacts will be of medium impact and temporary in nature. The assessment made a subjective appraisal of the impact made by additional household waste generation. Impacts considered included those on the proposed residents, existing facilities and the surrounding area. The existing arrangements of Winchester City Council, Havant Borough Council (as Waste Collection Authorities) and Hampshire County Council (as Waste Disposal Authority) were appraised. Measures will be introduced into the design of the buildings to ensure that two full sized wheelie bins, plus additional space for green waste can be accommodated in suitable areas. In addition the buildings will be designed to accommodate segregated bins at the point of use to further aid recycling. In addition education of the residents will be via the welcome pack and through information on the community website. Although not located within the site, the proposed relocation of the Hambledon Road HWRC will benefit the new residents, providing a very local facility to recycle materials not collected by the Authorities, and dispose of bulky items. In addition the Waste Collection Authority will be consulted on whether they would wish to manage additional bin sites at strategic locations, such as the proposed Local Centre. NTS - 12

15 Using existing waste generation figures, the proposed development is anticipated to increase waste generation in Hampshire by 0.3%, and require an additional 3 to 4 vehicle days per week for collections. These increases will be over a number of years, and the minor increases in service capacity can be planned for and implemented. With the proposed mitigation, the municipal waste (and recycling) operations will have no significant environmental impacts associated with collection or disposal. The assessment made a subjective appraisal of the impact made by additional sewage sludge. Impacts considered included those on the proposed residents, existing facilities and the surrounding area. The sewage from the development will be collected in an adopted foul sewer system and conveyed to Budds Farm Sewage Treatment Works for processing. A new on-site pumping station will be required due to the topography. If sewage is allowed to reside at the pumping station, or in the outgoing rising main for too long, there is a risk of it becoming septic. This is the term used to describe the multiplication of odour generating bacteria. To reduce the likelihood of this it is proposed to serve initial development phases via a smaller temporary pumping station, discharging via controlled storage, to the Hambledon Road sewer. Budds Farm is a relatively modern facility, and is large enough to accommodate the full development. The sludge component of the sewage is dewatered, dried to 90% dry solids (extracting methane used to run the plant), granulated and sold to the farming industry as a low odour fertiliser. This process is acknowledged by UK Government to be the most sustainable disposal route for treated biosolids. With the proposed mitigation, the transport and disposal of sewage sludge will have no significant associated environmental impacts. Service supplies There is a well developed existing water network of trunk and distribution mains in and around the proposed development site. No off-site reinforcement is considered necessary. The water for Waterlooville is sourced primarily from the River Itchen at Gater s Mill. There is a system of link mains and boosters linking the various water sources to maintain security of supply. The proposed dwellings on the development will be designed to consume water at a much lower rate than the average existing dwelling. Portsmouth Water has a large reserve in their supply ( headroom ) and has proposed a number of initiatives to reduce existing waste to make more efficient use of the existing supply and increase overall capacity to accommodate development forecasts (which include Newlands). With the proposed mitigation, the developments impact on security of water supply and peak daily abstractions will be negligible. With some minor upgrades to an existing pumping station, Southern Water has confirmed that there is sufficient sewerage capacity in its existing infrastructure from a connection point at the southern end of the site. Due to the topography of the site, this will require a new on-site pumping station to make the connection. For the initial phases of housing of approximately 400 dwellings, temporary connection to sewers in Hambledon Road will be made. This will incorporate some storage prior to discharge to ensure that the sewer capacity is not exceeded. When sufficient housing is completed to provide a sufficient flow rate, the proposed permanent pumping station will be constructed. This approach will reduce the residency time of the sewage in the pumping station and pipework, and reduce the potential for septicity (bad smells) to occur. The sewage is treated at the Budds Farm works near Portsmouth. These works were refurbished several years ago and have adequate capacity to serve the proposed development. The 2009 figures supplied NTS - 13

16 by Southern Water suggested a 12% reserve capacity of dry weather flow in relation to the Environment Agency discharge consent. In addition, the Integrated Water Management Strategy prepared by PUSH suggested that with the total predicted regional growth, including the Newlands development, Budds Farm would have spare capacity up to and beyond The discharge of partially treated sewage into Langstone Harbour during heavy rainfall is a particular issue of environmental concern. The proposed development will not discharge any surface water to the foul water sewers, and although unrelated to the development, Southern Water has plans to reduce the total volume of these discharges by disconnecting surface water in the Portsmouth catchment. With the proposed mitigation, the impacts of bad smells local to the site from the pumping station and of the increase in dry weather flows at the treatment works are of overall negligible significance. There is a well developed existing network of medium and low pressure gas mains in and around the proposed development site, in addition to large diameter high pressure mains serving a gas valve compound within the site. No off-site reinforcement is considered necessary. Sourcing of natural gas is considered on a national basis, with distribution via a national grid. The development is calculated to represent % of the UK annual consumption (2008 figures) before mitigation, based on existing local consumption. The proposed development will incorporate highly efficient boilers and high levels of insulation to meet the relevant requirements of the Code For Sustainable Homes. Compared with existing local housing stock, an average dwelling constructed to Level 4 of this code would be expected to consume 65% less gas. With the proposed mitigation, the generation of additional CO 2 associated with burning natural gas will be of overall negligible significance. Reinforcement of the existing high voltage network will be required to serve electricity to the proposed development. This will require the provision of an additional 33kV service from Fort Widley to Waterlooville. The upgrades at either end have already been carried out. This will result in some disruption during cable laying, which will be reduced by routing the cable though the development site for some of its length rather than along existing roads. This reinforcement will provide additional electricity capacity to the wider Waterlooville area. Sourcing of electricity is considered on a national basis, with distribution via a national grid. The development is calculated to represent % of the UK annual consumption (2008 figures) before mitigation, based on existing local consumption. The proposed development will use electricity efficiently. Electricity will not be used as a direct source of space heating, or as the primary source of water heating. Compared with existing local housing stock, an average dwelling constructed to Level 4 of the Code for Sustainable Homes would be expected to consume 50% less electricity. With the proposed mitigation, the generation of additional CO 2 associated with burning natural gas will be of overall negligible significance. There is a well developed network of underground telecommunications plant in close proximity to the site. No significant off-site improvements are foreseen. Similarly, all the mobile telecommunications networks have adequate coverage of the site, and additional masts to serve the development are not anticipated. There are no adverse residual effects relating to telecommunications. NTS - 14

17 Cumulative Impacts The Environmental Impact Assessment has also considered the impacts that the proposed development might have on the environment alongside other developments proposed. This has been undertaken throughout the EIA process by considering other developments that are likely to be constructed and/or become operational during the same period as the proposals. It has been concluded that there are no significant adverse cumulative impacts expected, although it is recommended that required tree loss along Purbrook Heath Road is minimised wherever possible in the cumulative schemes. There would, however, be some beneficial cumulative impacts, in particular related to transport and waste as a result of the proposed development in association with the cumulative schemes. NTS - 15

18

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

Applicant: Mr C Fletcher Agent: Ms B Stala Case Officer: Sally Smith (HBC) Jill Lee (WCC) Ward: Stakes Parish Southwick and Widley

Applicant: Mr C Fletcher Agent: Ms B Stala Case Officer: Sally Smith (HBC) Jill Lee (WCC) Ward: Stakes Parish Southwick and Widley Site Address: Berewood Phase 2 Development Site, London Road, Purbrook, Waterlooville Proposal: Reserved Matters Application for landscaping of Phase A of the Town Park (under Condition 6(i)d)), together

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

3. Neighbourhood Plans and Strategic Environmental Assessment

3. Neighbourhood Plans and Strategic Environmental Assessment 1. Introduction This report sets out a draft Screening Determination for the Preston Parish Council s Neighbourhood Plan and has been prepared by rth Hertfordshire District Council. The purpose of the

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality

More information

LAND NORTH OF NETHERHOUSE COPSE, FLEET

LAND NORTH OF NETHERHOUSE COPSE, FLEET REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Proposed Land Use: Total Site Area (Ha): Housing 1.85 Ha Description: It is understood that the owner has no plans to dispose of the site

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

A VISION FOR BLAIRGOWRIE

A VISION FOR BLAIRGOWRIE Welcome to the Westpark Partnership and Lidl UK GmbH Community Presentation. The purpose of this presentation is for you to view and comment upon the revised and updated proposals for the allocated development

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

Dunsbury Hill Farm. Environmental Statement - Non Technical Summary. Portsmouth City Council

Dunsbury Hill Farm. Environmental Statement - Non Technical Summary. Portsmouth City Council Dunsbury Hill Farm Environmental Statement - Non Technical Summary Portsmouth City Council March 2012 1 2 Environmental Statement: Non Technical Summary March 2012 3 4 Introduction A planning application

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

WELCOME. North East Haverhill. The Planning Process

WELCOME. North East Haverhill. The Planning Process WELCOME North East The site to the North East of, known as Great Wilsey Park, is identified by St Edmundsbury Borough Council in its Core Strategy as capable of delivering a Sustainable Urban Extension.

More information

INTRODUCTION. Land south of Bishopswood Lane, Tadley

INTRODUCTION. Land south of Bishopswood Lane, Tadley 0 INTRODUCTION THE SITE Introduction Gladman Developments Ltd. has successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial

More information

and Netherhall Road and Camp Farm EIA

and Netherhall Road and Camp Farm EIA and Netherhall Road and Camp Farm EIA Environmental Statement - Non Technical Summary December 2012 in association with 1. Introduction Story Homes applied to Allerdale Borough Council (ABC) in May 2011

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

SPG 1. * the northern and western sections which are open fields used for pasture and grazing; SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended

More information

Ʊ ± ªº Œª ºª ø ª ª ± ª

Ʊ ± ªº Œª ºª ø ª ª ± ª Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham 1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Welcome to the Public Consultation Exhibition

Welcome to the Public Consultation Exhibition Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised

More information

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015 Causeway Farm, Petersfield Environmental Statement October 2015 2 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals... 6 2.1

More information

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows:

The proposals presented in September drew a large number of comments and feedback and have been grouped together as follows: Appendix A Stakeholder presentation + powerpoint slides Planning Context and Emerging Proposals presentation Nick Tyrrell, Alder King, Planning Consultants Alder King began by setting the site context

More information

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole B2. Tāhuhu whakaruruhau ā-taone - Urban growth and form B2.1. Issues Tāhuhu whakaruruhau ā-taone The sheltering ridge pole Auckland s growing population increases demand for housing, employment, business,

More information

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies Environment and Landscape Policy 1 - Landscape Setting Development should respect and wherever possible enhance the landscape setting of Cuddington

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

WELCOME TO THE NEW WILTON PARK

WELCOME TO THE NEW WILTON PARK WELCOME TO THE NEW WILTON PARK VISION HISTORY OF WILTON PARK TOWARDS A PLANNING APPLICATION Our objective is to create a truly outstanding environment at Wilton Park. At the heart of our proposals is a

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY APRIL 2010 INTRODUCTION This document is the Non-Technical Summary (NTS) of an Environmental Statement

More information

Rannoch 132 / 33 kv Substation Extension

Rannoch 132 / 33 kv Substation Extension Who we are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the networks in the north of Scotland the electricity transmission network

More information

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M)

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M) 1. Welcome Bloor Homes welcomes you to today s Public Exhibition relating to development proposals for Land to the East of Horndean. Idsworth Close Rowlands Castle Road Roa d Dell Piece East J2 Pyle Farm

More information

CAERNARFON DEPENDENCY CATCHMENT AREA

CAERNARFON DEPENDENCY CATCHMENT AREA CAERNARFON DEPENDENCY CATCHMENT AREA GWYNEDD UNITARY DEVELOPMENT PLAN - HOUSING Map not to scale Dependency Catchment Area Location 2 Caernarfon Topic Housing To the rear of Bro Eglwys, Bethel. Grid Ref.

More information

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016) Introduction This background paper sets out a methodology for the definition of settlement boundaries in the North Northumberland Coast Neighbourhood Plan. The neighbourhood plan is planning positively

More information

PERRYFIELDS BROMSGROVE. ENVIRONMENTAL STATEMENT - NON-TECHNICAL SUMMARY December 2015

PERRYFIELDS BROMSGROVE. ENVIRONMENTAL STATEMENT - NON-TECHNICAL SUMMARY December 2015 PERRYFIELDS BROMSGROVE ENVIRONMENTAL STATEMENT - NON-TECHNICAL SUMMARY December 2015 Environmental Statement Non-technical summary CONTENTS 1 Introduction 2 The Site and local context 3 Description of

More information

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) PROPOSAL: LOCATION: APPLICANT: Amendments to the design of a scheme for a 49.99MW battery

More information

Frequently Asked Questions

Frequently Asked Questions 1. Where is Aylesbury Woodlands? Frequently Asked Questions Aylesbury Woodlands lies to the east of Aylesbury. It is bounded to the south by the A41. To the north is the Aylesbury Arm of the Grand Union

More information

Hunts Grove, Gloucestershire

Hunts Grove, Gloucestershire Hunts Grove, Gloucestershire Environmental Statement Non Technical Summary February 2007 ISSUING OFFICE OXFORD T: 01865 887050 F: 01865 887055 E: info@lda-design.co.uk HUNTS GROVE, GLOUCESTERSHIRE ENVIRONMENTAL

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

Ebbsfleet Development Corporation

Ebbsfleet Development Corporation Title of Paper Planning and Housing Delivery Report September 2018 Presented by Sub-Committee Mark Pullin, Chief Planning Officer Planning Committee Purpose of Paper and Executive Summary This paper provides

More information

Strategic Employment Site, on land to the East of the M5, south of Junction 6, west of Pershore Lane. Environmental Statement. Non Technical Summary

Strategic Employment Site, on land to the East of the M5, south of Junction 6, west of Pershore Lane. Environmental Statement. Non Technical Summary Strategic Employment Site, on land to the East of the M5, south of Junction 6, west of Pershore Lane Environmental Statement Non Technical Summary March 2010 Strategic Employment Site, on Land to the East

More information

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site

More information

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4 Number: 4 Application Number: C15/0034/37/LL Date Registered: 21/05/2015 Application Type: Full - Planning Community: Llanaelhaearn Ward: Llanaelhaearn Proposal: Location: Summary of the Recommendation:

More information

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016)

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016) UNITARY PLAN UPDATE REQUEST MEMORANDUM TO FROM Phill Reid Linley Wilkinson DATE 25 September 2018 SUBJECT Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

Hampton Park North Littlehampton West Sussex

Hampton Park North Littlehampton West Sussex North Littlehampton West Sussex SUMMARY Summary An opportunity to create a new community in West Sussex on the northern outskirts of Littlehampton with outstanding views across open countryside towards

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history... Board 1 A message from Satnam... Thank you for attending today s public consultation about proposals to develop a new residential neighbourhood at. The display boards show why the development is needed

More information

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand. WELCOME Welcome to this public consultation event for our proposed development on land to the south of Twelve Leys in Wingrave. Thank you for taking the time to come along today. Homes is preparing a planning