County of Santa Barbara Department of Public Works. SWCA Environmental Consultants. Prepared for: Prepared by:

Size: px
Start display at page:

Download "County of Santa Barbara Department of Public Works. SWCA Environmental Consultants. Prepared for: Prepared by:"

Transcription

1 for the Goleta Beach Park Bridge Replacement Project, Santa Barbara County, California 05-SB-0-CR Federal Project Number BRLO-5951 (120) Prepared for: County of Santa Barbara Department of Public Works Prepared by: SWCA Environmental Consultants February 2015

2

3 Replacement Project 05-SB-0-CR Federal Project Number BRLO-5951 (120) Prepared for: County of Santa Barbara Department of Public Works 123 East Anapamu Street Santa Barbara, CA Attn: Charlie Elbert, County Project Manager (805) Prepared by: Travis Belt, Senior Biologist SWCA Environmental Consultants 1422 Monterey Street, Suite C200 San Luis Obispo, CA (805) SWCA Project No February 2, 2015

4

5 Contents 1 INTRODUCTION PROJECT AND SITE DESCRIPTION RESPONSIBLE PARTIES AND FINANCIAL ASSURANCES LOCATION OF PROJECT PROJECT SUMMARY JURISDICTIONAL AREAS TO BE IMPACTED BY HABITAT TYPE Sarcocornia Pacifica Herbaceous Alliance (Southern Coastal Salt Marsh) Restored Southern Bluff Scrub GOALS OF THE COMPENSATORY MITIGATION PROJECT SOUTHERN BLUFF SCRUB RESTORATION AND ENHANCEMENT SOUTHERN COASTAL SALT MARSH RESTORATION AND EXPANSION Restore Tidal Flow and Estuarine Functions to Adjacent Wetlands TIME LAPSE BETWEEN JURISDICTIONAL IMPACTS AND EXPECTED COMPENSATORY MITIGATION SUCCESS RESTORATION OF TEMPORARILY IMPACTED AREAS SITE PREPARATION SOUTHERN COASTAL BLUFF SCRUB HYDRAULIC MULCH SEEDING SOUTHERN COASTAL BLUFF SCRUB PLANTING IRRIGATION PLAN SOUTHERN COASTAL SALTMARSH RESTORATION Coastal Salt Marsh Material Salvage Coastal Salt Marsh Seed Collection and Propagation Coastal Salt Marsh Material Planting ENHANCEMENT/EXPANSION OF EXISTING HABITATS SOUTHERN COASTAL BLUFF SCRUB ENHANCEMENT SOUTHERN COASTAL SALT MARSH Tidal Flow Restoration Project MAINTENANCE PLAN WATERING WEED CONTROL AND HERBICIDE USE DEBRIS REMOVAL AND VANDALISM REPLANTING MONITORING PLAN MONITORING SCHEDULE ANNUAL PERFORMANCE STANDARDS AND SUCCESS CRITERIA BIOLOGICAL MONITORING PROGRAM Coastal Bluff Scrub Planting Percent Survival Southern Coastal Salt Marsh Planting Percent Cover SWCA Environmental Consultants i

6 7.3.3 Southern Coastal Salt Marsh and Tidal Flow Restoration in Adjacent Wetland Percent Cover Non-native Species Other Attributes to Monitor REPORTING REQUIREMENTS U.S. Army Corps of Engineers California Department of Fish and Wildlife Regional Water Quality Control Board California Coastal Commission COMPLETION OF MITIGATION NOTIFICATION OF COMPLETION CONTINGENCY MEASURES REFERENCES Figures Figure 1. Project Vicinity Map... 2 Figure 2. Project Location Map... 3 Figure 3. Project Planting Plan... 7 Figure 4. Map of Estimated Tidal Inundation Following Culvert Replacement Tables Table 1. Impact and Mitigation Summary... 5 Table 2. Estimated Mitigation and Monitoring Schedule... 9 Table 3. Southern Coastal Bluff Scrub Container Plant Palette Table 4. Coastal Saltmarsh Salvage and Planting Palette Table 5. Annual Performance Standards Attachments Attachment A. Habitat and Jurisdictional Impacts Maps Attachment B. Tidal Flow Restoration Map and Data Sheet Attachment C. USACE Monitoring Report Guidelines SWCA Environmental Consultants ii

7 1 INTRODUCTION This (HMMP) has been prepared to mitigate project impacts within U.S. Army Corps of Engineers (USACE), California Department of Fish and Wildlife (CDFW), Regional Water Quality Control Board (RWQCB), and California Coastal Commission (CCC) jurisdictions that will result from the Goleta Beach Park Bridge Replacement Project (project). The HMMP structure follows guidelines presented in the Checklist for Compensatory Mitigation Proposals, dated June 10, 2008, and the Final Rule for Compensatory Mitigation for Losses of Aquatic Resources, dated April 10, PROJECT AND SITE DESCRIPTION 2.1 Responsible Parties and Financial Assurances As the project applicant, the party responsible for meeting the mitigation obligation pursuant to the special conditions of the Clean Water Act and State agency permitting is: County of Santa Barbara Department of Public Works 123 Anapamu Street Santa Barbara, CA The County of Santa Barbara Department of Public Works (County) will conduct the project with financial assistance from the Federal Highway Administration (FHWA) Highway Bridge Program (HBP). Through FHWA programs and internal funds, the County has the financial and technical means to implement this HMMP and any required contingency actions. The need to establish a performance bond for the actions outlined in this HMMP or any subsequent contingency measure is not anticipated at this time. The site is located within a County-owned right-of-way; therefore, a third-party conservation easement or other site protection measures are not necessary. 2.2 Location of Project The proposed project is located in coastal Santa Barbara County, immediately east of the Santa Barbara Airport, and at the entrance to Goleta Beach Park (refer to Figures 1 and 2). Specifically, the project site is located at and adjacent to the Sandspit Road crossing over Goleta Slough. Sandspit Road is a two-lane road that provides access to Goleta Beach Park from State Route (SR) Project Summary The County proposes to replace the existing Bridge 51C-0158 over the Goleta Slough. Bridge 51C-0158 is eligible for replacement under the FHWA HBP in cooperation with the California Department of Transportation (Caltrans) and the County. The existing bridge is a total of 34 feet wide and consists of two 12-foot lanes with two 2-foot shoulders and two 3-foot sidewalks. The existing piles that support the bridge are in a degrading condition due to reactive aggregate, which has reduced the load capacity of the bridge. The proposed project will replace the existing bridge on a new alignment, west of the existing crossing. The bridge replacement on a new alignment will allow the existing bridge to remain in service during the construction of the new bridge. The new bridge and roadway approaches will provide two traffic lanes, shoulders, a sidewalk, and a bike lane for a total width of 53.5 feet. The realignment of the park access will require modifications to the Coastal Route bike path, relocation of utilities, and changes to the landscaping. SWCA Environmental Consultants 1

8 Figure 1. Project Vicinity Map SWCA Environmental Consultants 2

9 Figure 2. Project Location Map SWCA Environmental Consultants 3

10 The vertical profile along Sandspit Road is fixed due to the SR 217 overcrossing to the west and the northbound on- and off-ramps to the east. In addition, only minor vertical increases are desirable on the Goleta Beach Park side of the proposed bridge due to heavy pedestrian use. As a result of these vertical restrictions, the new bridge profile will need to conform closely to existing grades on each approach. Therefore, the new bridge will not be able to clear span the slough. A multi-span bridge with intermediate supports will be constructed within the banks of the slough in order to provide an at-grade bridge crossing. Permanent fills would be required within the slough banks behind the abutments in order to construct the new bridge approach. The new bridge will be placed on cast-in-drill-hole (CIDH) concrete piles. CIDH installation would utilize crane and wet construction methods with slurry to keep the hole open until the concrete is poured. If the hole collapses while drilling, the contractor may install temporary or permanent casings. If a permanent casing is used, the contractor may grout the bottom of the casing in place. If used, the permanent casing would not extend above the scour line so it would not be visible after construction. After the casing is set, the contractor would drill material out through the middle of the casing. Drilling slurry would be added to the hole as the drilling occurs. This viscous fluid stabilizes the hole and reduces caving. Drilled soil material saturated with slurry will be collected and disposed of off-site. After the hole is completely drilled and filled with slurry, the contractor would place a steel reinforcing cage in the hole. The contractor would then insert a tremie pipe to the pile tip and start pumping concrete into the bottom of the pile. As the concrete displaces the slurry, the slurry will be pumped out of the top of the hole into a baker tank and contained. Water in the baker tank will be treated and used as dust control or disposed of off-site. The contractor will need access into the slough to install new CIDH piles and remove the existing bridge. Access may be achieved by temporarily diverting water through or around the work area and constructing a temporary access path into the slough channel. Water diversion may use a combination of cofferdams, pipes, sand bags, and temporary fill. Driven sheet piling with impact hammers for cofferdam construction will not be allowed; however, sheet piles may be vibrated into place while constructing the cofferdams. The new CIDH piles, would be located just inside the wetted channel (depending on tidal influence), necessitating the installation of a temporary access path. The temporary access path would be located adjacent to the proposed bridge, traverse the slough bank, enter the slough channel, and extend under the proposed and existing bridges. The contractor may place clean crushed rock into the slough in order to create the temporary path and construct the CIDH piles that are just inside the wetted channel. All temporary fill associated with the creek diversion and the access path would be removed after construction is complete. Equipment anticipated to be used in the construction of the new bridge includes excavators, dozers, cranes, dump trucks, concrete trucks, concrete pumps, and potentially vibrating or oscillating hammers. Removal of the existing bridge will require excavators, hoe rams, cranes, and dump trucks. Construction of the new bridge and demolition of the existing bridge is anticipated to be completed within one construction season spanning from May 1 to December Jurisdictional Areas to be Impacted by Habitat Type SWCA Environmental Consultants (SWCA) prepared a Jurisdictional Waters Assessment (SWCA 2013) and a Natural Environmental Study (SWCA 2014) for the project. The findings of these reports concluded that the jurisdictional areas to be impacted largely consist of open water, southern coastal salt marsh, and restored southern coastal bluff scrub habitats. As proposed, the project would result in 1.11 acres of temporary and permanent impacts to waters of the U.S. and the state. SWCA Environmental Consultants 4

11 Impact calculations are based on project plans provided by Quincy Engineering dated July 10, All jurisdictional areas that would be filled or otherwise replaced with a structure, or permanently altered from its current condition, were considered to be subject to permanent impacts. Permanent impacts were applied to the proposed bridge approaches, CIDH concrete piles, and abutments. Temporary impacts include all jurisdictional areas that are subject to temporary disturbance, but are expected to be returned to their current condition following project completion. Temporary impact areas include but are not limited to the estimated dewatering area, the estimated temporary access road, areas located under the proposed bridge but not subject to permanent impacts, and the bore pads for the culvert replacement. Temporary impact estimations were based on the following impact buffers: 1) 20 feet in all areas surrounding the proposed bridge, 2) 50 feet from the proposed bridge for dewatering and temporary access, 3) 40 feet surrounding existing bridge for bridge removal. Two maps showing the impact areas to habitats and jurisdictional areas are provided in Attachment A. Discussions of the existing habitats to be impacted are included below. Table 1 provides a summary of impacts and proposed mitigation. Table 1. Impact and Mitigation Summary Jurisdiction Permanent Impacts Temporary Impacts Area Needed for Mitigation Proposed Mitigation Strategy USACE Wetland 35.2 ft 2 / ac USACE Other Waters 0.0 ft 2 / 0.0 ac CDFW/RWQCB/CCC Waters of the State 6,773.6 ft 2 / 0.16 ac Total 6,808.8 ft 2 / 0.16 ac 5,510.1 ft 2 / 0.13 ac 9,336.6 ft 2 / 0.23 ac 25,573.3 ft 2 / 0.59 ac 41,381.7 ft 2 / 0.95 ac 17,423.9 ft 2 / 0.40 ac. 30,056.2 ft 2 / 0.69 ac 111,948.3 ft 2 / 2.57 ac 159,428.4 ft 2 / 3.66 ac Restore ac of coastal bluff scrub Restore ac of coastal salt marsh Enhance ac of coastal bluff scrub Enhance ac of coastal salt marsh ac of tidal flow restoration and estuarine enhancement Note: ft 2 = square feet, ac = acres Sarcocornia Pacifica Herbaceous Alliance (Southern Coastal Salt Marsh) This salt marsh vegetative cover is often seen along the intertidal shores of bays and estuaries. This habitat is characterized by highly productive, herbaceous, salt-tolerant hydrophytes, in hydric soils subject to regular tidal inundation by salt water for at least part of each year (Holland 1986). The salt marsh vegetation within the project area occurs in the slough channel, in patches between the various roadways, and in patches in an adjacent wetland that is enclosed by the cloverleaf interchange parcel. Associates of this community observed in the project study area include Pacific swampfire (Sarcocornia pacifica), western marsh rosemary (Limonium californicum), alkali heath (Frankenia salina), and marsh jaumea (Jaumea carnosa). The proposed project is anticipated to result in 35.2 square feet of permanent impacts and 0.13 acres of temporary impacts to salt marsh vegetation, which constitutes USACE jurisdictional wetlands and waters of the state Restored Southern Bluff Scrub Due to past disturbances and restoration of the slough banks, the vegetation on the slough banks does not fit the description of any vegetation alliances as described in A Manual of California Vegetation (Sawyer, SWCA Environmental Consultants 5

12 et al. 2009). However, it does support associates of the Encelia californica Shrubland Alliance. For the purposes of this HMMP, the vegetation cover on the slough banks has been labeled Restored Southern Coastal Bluff Scrub. This is largely due to its similarities with Southern Coastal Bluff Scrub as defined in Preliminary Descriptions of the Terrestrial Natural Communities of California (Holland 1986). This cover type consists of low scrubs (less than 2 meters tall) in areas exposed to winds with high salt content (Holland 1986). Shrub species observed in the study area include quail bush (Atriplex lentiformis var. breweri), California encelia (Encelia californica), California sagebrush (Artemisia californica), coastal golden yarrow (Eriophyllum staechadifolium), coast morning glory (Calystegia macrostegia), lemonade berry (Rhus integrifolia), and coyote brush (Baccharis pilularis). Due to the close proximity to the slough, hydrophytic species such as alkali heath and mugwort (Artemisia douglasiana) are intermixed among the scrub associates. The project is anticipated to result in 0.15 acres of permanent impacts and 0.23 acres of temporary impacts to restored southern bluff scrub. These impacts are largely outside of USACE jurisdiction but within state regulated waters. 3 GOALS OF THE COMPENSATORY MITIGATION PROJECT The goals of this mitigation project include: 1) to ensure that permanent impacts do not result in a net loss of wetlands; 2) to replace southern coastal bluff scrub and salt marsh vegetation that is temporarily impacted; 3) to enhance and expand existing southern coastal bluff scrub and salt marsh vegetation in the project area; and 4) restore tidal ebb and flow in the adjacent wetland. This HMMP provides for on-site and in-kind mitigation for temporary impacts at a 3:1 ratio; and on-site and in-kind habitat enhancement/expansion for permanent impacts at a 5:1 ratio. Restoration of temporarily impacted areas will focus on restoring disturbed areas with the appropriate vegetation (refer to Figure 3). Mitigation for permanent impacts will include habitat enhancement and expansion of southern coastal salt marsh and southern coastal bluff scrub vegetation. Mitigation activities will be conducted in the Goleta Slough channel, on the slough banks, and in an adjacent but hydrologically connected wetland. The County will retain a qualified habitat restoration specialist to oversee the implementation of this HMMP and monitor the efficacy of the mitigation efforts. The habitat restoration specialist and landscape contractor may or may not be from the same firm. The County s restoration specialist will utilize the project site plan (refer to Figure 3) and appropriate project plans when staking the mitigation areas and detailing plant locations. The restoration specialist will oversee all site preparations, plant salvage, and plant installation, and will ensure conformity with this HMMP. 3.1 Southern Bluff Scrub Restoration and Enhancement Southern bluff scrub occurs on the banks of the Goleta Slough and will be subject to 0.15 acres of permanent impacts and 0.23 acres of temporary impacts. To mitigate these impacts, the County will restore acres of temporarily impacted southern bluff scrub and enhance acres of existing southern coastal bluff scrub. Southern coastal bluff scrub restoration activities will focus on replacing existing southern coastal bluff scrub vegetation that is impacted by project activities. The temporary impact areas will be stabilized, seeded, and replanted with southern coastal bluff scrub associates. Southern coastal bluff scrub enhancement will occur in areas within the BSA that are not impacted by project activities. Habitat enhancement will focus on removing non-native species from existing southern bluff scrub habitat and reintroducing southern bluff scrub associates in areas supporting non-native vegetation. Figure 3 identifies the coastal bluff scrub restoration and enhancement areas. SWCA Environmental Consultants 6

13 Goleta Beach Park Bridge Figure 3. Project Planting Plan SWCA Environmental Consultants 7

14 This page intentionally left blank. SWCA Environmental Consultants 8

15 3.2 Southern Coastal Salt Marsh Restoration and Expansion Southern coastal salt marsh occurs on the margins of the Goleta Slough channel and in an adjacent wetland located in a parcel immediately north of the bridge. Project activities are expected to result in 35.2 square feet of permanent impacts and 0.13 acres of temporary impacts to southern coastal salt marsh vegetation. To mitigate these impacts, the County will restore acres of temporarily impacted salt marsh vegetation and enhance acres of existing southern coastal salt marsh. Salt marsh restoration will be accomplished by salvaging and propagating salt marsh plant species from the work area. Following construction completion the salvaged materials will be reintroduced into the temporary impact areas. Coastal salt marsh habitat will be enhanced by conducting exotic species and urban debris control in existing salt marsh habitat Restore Tidal Flow and Estuarine Functions to Adjacent Wetlands The County proposes to restore the tidal flow to the adjacent wetland which will enhance estuarine functions and promote the expansion of southern coastal salt marsh vegetation in the biological study area. The County will restore the tidal flow into and out of the adjacent wetland by replacing a broken and slopping existing 24-inch culvert that connects the slough channel to the wetland and grading a low tide channel at the culvert opening (refer to Figure 3). The goal of the culvert replacement is to allow a sufficient amount of tidal ebb and flow in the parcel to improve estuarine functions and promote the expansion of salt marsh vegetation Time Lapse between Jurisdictional Impacts and Expected Compensatory Mitigation Success Project construction is proposed to begin in May and is expected to be completed by fall of the year after the project is approved. Implementation of this HMMP will begin upon completion of all grading within the mitigation and restoration areas. Plant salvage activities are anticipated to occur in the fall and early winter the year prior to construction activities. The mitigation project is expected to attain the described success criteria within 5 years of project completion. Table 2 provides the projected schedule for project activities. Table 2. Estimated Mitigation and Monitoring Schedule IMPLEMENTATION TASKS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Collect California saltbush, matscale, and western marsh rosemary seed. Salvage coastal salt marsh material prior to site disturbance. X X X X Propagate plant materials X X X X X X X X X X X X Construction activities X X X X X X Prepare planting areas Apply seed, install plantings X X X Construction completion report X X SWCA Environmental Consultants 9

16 Table 2. Estimated Mitigation and Monitoring Schedule FIRST YEAR TASKS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Watering (as necessary) X X X X X X X X X X Weed control and debris removal X X X X X Collect tidal data in adjacent wetland X X X General site monitoring X X X X X X Biological monitoring data collection X Annual report X SECOND YEAR TASKS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Watering (as necessary) X X X X X X X Weed control and debris removal X X X X X Collect tidal data in adjacent wetland X X X General site monitoring X X X X Biological monitoring data collection X Annual report X THIRD YEAR TASKS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Watering (as necessary) X X X X X X Weed control and debris removal X X X X X Collect tidal data in adjacent wetland X X X General site monitoring X X X X Aerial image of adjacent wetland X Biological monitoring data collection X Annual report X FOURTH YEAR TASKS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Weed control and debris removal X X X Collect tidal data in adjacent wetland X X X General site monitoring X X X X Biological monitoring data collection X Annual report X FIFTH YEAR TASKS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Weed control and debris removal X X X Collect tidal data in adjacent wetland X X X General site monitoring X X Aerial image of adjacent wetland X Biological monitoring data collection X Mitigation completion report X SWCA Environmental Consultants 10

17 4 RESTORATION OF TEMPORARILY IMPACTED AREAS Temporarily impacted areas include those areas that will be physically disturbed by project activities, but can be revegetated (refer to Figure 3). It is anticipated that these areas will be cleared of all existing vegetation resulting in a bare substrate. The following discussions include the methods proposed for restoring the southern coastal bluff scrub and the southern coastal saltmarsh vegetation in the areas that will be temporarily impacted. Southern coastal bluff scrub and southern coastal salt marsh are two very different habitat types; therefore, methods that are specific to each habitat are discussed separately. 4.1 Site Preparation Preparation of temporarily impacted areas will consist of a mixed effort that utilizes both on-site construction equipment and small hand tools. Construction equipment will be used to mechanically shape temporarily impacted areas to achieve the desired topography. After the desired topography is achieved, the soil surface will be track-walked horizontal to the slope surface. Small hand tools will be used to facilitate installation of erosion control devices and restoration plantings. 4.2 Southern Coastal Bluff Scrub Hydraulic Mulch Seeding Once the desired topography is achieved and appropriate erosion control measures are installed, the County s restoration contractor will utilize hydraulic seeding methods to apply a compost blanket with an erosion control seed mix consisting of the following species: bush sunflower (Encelia californica) California sagebrush (Artemisia californica) mugwort (Artemisia douglasiana) California brome (Bromus carinatus) coast goldenbush (Isocoma menziesii) coastal morning glory (Calystegia macrostegia) giant wild rye (Leymus condensatus) small fescue (Vulpia microstachys) The seed mix will be applied to all temporarily disturbed areas that are above the mean high tide line of the Goleta Slough and the banks of the adjacent wetland. The identified seed mix will be purchased from a reputable seed supplier and should be applied at the suppliers recommended rates. For soil stabilization, a hydraulically applied mulch will be included with the seed mix. 4.3 Southern Coastal Bluff Scrub Planting Upon completion of the site preparation and seeding, the County s contractors will install southern coastal bluff scrub container plants. The container plants will be purchased from a local nursery that grows from locally collected seed. Table 3 provides the species palette to be used in the restoration project. Horticultural cultivars of these species are not acceptable for the restoration project. The identified native plant species were chosen because they are known to occur in or near the project area, they are common associates of southern bluff scrub communities, they are commercially available, and they provide an aesthetically pleasing landscape. SWCA Environmental Consultants 11

18 Table 3. Southern Coastal Bluff Scrub Container Plant Palette Common Name Scientific Name Material / Spacing lemonade berry Rhus integrifolia 1 gallon / 8 feet on-center Number to be Planted 45 Comment seacliff buckwheat Eriogonum parvifolium 1 gallon / 4 feet on-center 50 quail bush Atriplex lentiformis 1 gallon / 8 feet on-center bush sunflower Encelia californica 1 gallon / 4 feet on-center California sagebrush mugwort Artemisia californica 1 gallon / 4 feet on-center Artemisia douglasiana 1 gallon / 4 feet on-center creek clematis Clematis ligusticifolia 1 gallon / grouped with other shrubs coast morning glory Calystegia macrostegia 1 gallon / grouped with other shrubs Horticultural cultivars of these species are not acceptable for the restoration project. Planted in random distribution (not rows). These species should be distributed in a patchy mosaic that emulates natural distribution. Spacing is provided to assist in developing a materials inventory. giant wild rye Leymus condensatus 1 gallon / grouped in few groupings 20 The following guidelines will be considered during the container plant installation: The County s restoration specialist will ensure that the container plants are placed in a mosaic that emulates natural patterns. All planting holes should be equal the depth and 0.5 times the width of the plant rootball. The soil in each planting hole should be saturated prior to planting. The planting should be installed so that the backfill can be pressed firm around the rootball and watered; the crown of the rootball should be at or above the surrounding finish grade. A watering basin should be created around the plant rootball. 4.4 Irrigation Plan The natural water source for the project site is the Goleta Slough and ambient rainfall. These natural sources will be insufficient to establish the coastal bluff scrub plantings during the first 3 years of the project. Therefore, a drip irrigation system will supply supplemental water to the planted coastal bluff scrub materials on the slough banks during the 3-year maintenance period. The drip irrigation system will be installed as part of the bridge project. Water supply for the irrigation system will be delivered via an existing water source at the adjacent park. SWCA Environmental Consultants 12

19 4.5 Southern Coastal Saltmarsh Restoration The coastal saltmarsh habitat in the project area is an important wetland resource. The saltmarsh vegetation constitutes USACE jurisdictional wetlands and supports several Local Plant Species of Concern. The Goleta Slough Management Committee considers California saltbush (Atriplex californica), matscale (Atriplex watsonii), western marsh rosemary (Limonium californicum), and three square (Schoenoplectus pungens) to be Local Plant Species of Concern. To preserve the genetic diversity of these species, this HMMP includes a plant salvage, propagation, and reintroduction program Coastal Salt Marsh Material Salvage The coastal saltwater marsh species to be used for the restoration project currently occupy the site, are locally adapted to the site conditions, and respond well when divided. The species favorable response to division and local adaptations will help provide for an increased success rate among the restoration plantings. These plant materials will be salvaged from the anticipated impact areas (including tidal flow culvert replacement area) prior to initial disturbances. Prior to site grading or bridge demolition activities, the County s contractor and restoration biologist will salvage the plant species listed in Table 4 from the immediate work area. The plant materials will be salvaged from the construction site, kept moist, transferred to an off-site nursery, divided and potted, and maintained until they are ready for reintroduction into the restoration areas. Plant salvage activities will be conducted with consideration to the following guidelines: Salt marsh plant materials, including cuttings, divisions, plugs, and/or sod must be collected from the work area and temporary impact areas within and the identified biological study area (refer to Figure 3). Plant material may not be collected from areas outside of the disturbance area. If a species is not located in the actual disturbance area, it will not be included in the salvage efforts and will be omitted from success criteria requirements. All reasonable efforts will be made to collect at least 75% of the saltmarsh vegetation from the impact area. If preferred, the County s contractor may harvest sod from the wetland areas rather than cuttings, divisions, or plugs. Collection will occur from healthy populations, and no more than 20% of a plant grouping will be removed from any area located outside of the impact area. Material should be excavated by hand using small hand tools. All planting/collecting efforts will be overseen in the field by the County s restoration specialist. The restoration specialist will attempt to salvage and divide enough plantings to implement the restoration program; however, if salvaging sufficient amounts of saltmarsh materials to fulfill all planting requirements is not feasible, the County may purchase additional materials from a local nursery. SWCA Environmental Consultants 13

20 Table 4. Coastal Saltmarsh Salvage and Planting Palette Common Name Scientific Name Material / Spacing Comment three square Schoenoplectus pungens Tree band / grouped at 1-2 feet on-center fleshy jaumea Jaumea carnosa Tree band / grouped at 1-2 feet on-center pickleweed Salicornia pacifica Tree band / grouped at 1-2 feet on-center alkali heath Frankenia salina Tree band / grouped at 1-2 feet on-center shoregrass Monanthochloe littoralis Tree band / grouped at 1-2 feet on-center saltgrass Distichlis spicata Tree band / grouped at 1-2 feet on-center Horticultural cultivars of these species are not acceptable for the restoration project. Plantings should be placed in intraspecific groupings. Groupings should be placed in a patchy mosaic. Saltmarsh plants should not be installed in areas where they will be frequently submerged. The contractor may substitute sod for tree band materials Coastal Salt Marsh Seed Collection and Propagation California saltbush, matscale, and western marsh rosemary are best cultivated by seed. The County s contractor will collect seed of these species from the biological study area approximately 6 months prior to the start of construction. The seed will be processed, germinated, and grown in an off-site nursery until the plants are ready for installation. Seed of California saltbush and matscale should be collected between September and October. Seed of western marsh rosemary should be collected between September and November Coastal Salt Marsh Material Planting Upon completion of the final site grading, hydraulic seeding, and installation of the appropriate erosion control measures the County s contractors will install the salvaged coastal saltmarsh materials in the temporary impact areas. The County s restoration specialist will ensure that the saltmarsh materials are installed in the high marsh zone. They should not be installed in areas where they will be frequently submerged. The anticipated saltmarsh planting areas are shown in Figure 3. 5 ENHANCEMENT/EXPANSION OF EXISTING HABITATS Portions of the biological study area contain degraded southern coastal bluff scrub and southern coastal salt marsh vegetation. Implementation of this HMMP will enhance these habitats via exotic species removal, urban debris removal, and restoring tidal flow to the adjacent wetland. 5.1 Southern Coastal Bluff Scrub Enhancement Southern coastal bluff scrub habitat in the area will be enhanced via exotic species removal, urban debris removal, and supplemental planting (as necessary). Exotic species and urban debris removal will be conducted in accordance with Sections 6.2 and 6.3 of this HMMP. Once exotic species are removed from the enhancement area, portions of the area will have small openings in the vegetation. Absence of supplemental planting would allow the exotic species to recolonize the openings. To reduce the potential for exotic species recolonization, the County will install coastal bluff scrub plantings in the openings that provide sufficient space. The species to be installed are SWCA Environmental Consultants 14

21 listed in Table 3. Depending on the conditions in the planting area, the restoration specialist may choose to water the plantings or to rely on natural water sources. 5.2 Southern Coastal Salt Marsh Existing southern coastal salt marsh habitat in the study area but outside of the disturbance areas will be enhanced via exotic species and urban debris removal. Exotic species and debris removal will be conducted in accordance with Sections 6.2 and 6.3 of this HMMP. The southern coastal salt marsh vegetation in the adjacent wetland will be expanded by restoring tidal ebb and flow to the adjacent wetland, as discussed below Tidal Flow Restoration Project The County will partially mitigate impacts resulting from the bridge replacement project by restoring tidal flow to the parcel located just north of the bridge. This parcel is connected to the slough through a poorly functioning 24-inch diameter concrete culvert. The culvert runs parallel to the existing bridge and crosses under Sandspit Road just east of the bridge. During high tide, slough water flows through the culvert to the parcel; however, flows that reach the parcel are reduced due to the slope of the culvert towards the slough. As the tide retreats, the slope of the culvert traps water in the parcel to an elevation just below the bottom of the culvert. This results in salt water being trapped in the parcel and evaporating, leaving high concentrations of salt. The County proposes to install a new 48-inch culvert adjacent to the existing culvert and grading a graduated channel at the culvert openings. The existing culvert would be abandoned but left in place. The new culvert would have a level slope to allow for tidal inundation of the trench at a 2.1-foot tide, inundation of the remaining portions of the parcel at tides greater than 5.5 feet, and for water to leave the parcel when the tide drops below 2 feet. Figure 4 shows the extent of tidal flow that is expected to be realized by installing a new culvert. Jack-and-bore methods would be used to install the culvert; standard grading equipment would be used to create the tidal flow channel. A jack-and-bore entry pit would be excavated in the northern parcel; a receiving pit would be excavated on the slough side of Sandspit Road. A bore machine, welding machine, and carrier stock pipe would be assembled in the northern parcel. The bore machine equipped with an auger would then jack and bore a level hole parallel and adjacent to the existing culvert. Carrier pipe would be installed just behind the auger in order to keep the hole stable. Additional carrier pipe segments (typically in 10-foot increments) will be welded on and advanced as the auger travels through the existing roadway fill material. Fill generated by the operation would be removed from the site or incorporated with native fill material for the bridge replacement project. After the borehole is complete, the carrier pipe would stay in place and the remaining equipment would be removed. The site would then be graded to provide tidal flow channels at the culvert openings (both sides of culvert) and revegetated with appropriate species. All impacts associated with the bore pads would be temporary. The restored tidal flow would improve estuarine functions in the parcel and promote the growth of southern coastal salt marsh vegetation in the area. 6 MAINTENANCE PLAN Maintenance during plant establishment is necessary to ensure success of the mitigation effort. The maintenance period will begin immediately upon completion of the mitigation planting. With exception to the coastal bluff scrub watering, the maintenance activities will continue through the 5-year program (refer to Table 2). Coastal bluff scrub watering will only be conducted for the first 3 years of the mitigation program, or until the restoration specialist determines the plantings to be self-sustaining. SWCA Environmental Consultants 15

22 The maintenance program will ensure that watering of installed plants, weed control, debris removal, vandalism control, replanting, and plant and site protection are performed adequately. The County s contractors will be responsible for site maintenance. 6.1 Watering Supplemental water will be supplied to the coastal bluff scrub plantings via a drip irrigation system (refer to Section 4.4). This HMMP provides for a monthly watering schedule for the first year after planting; the plantings maybe watered monthly in the summer months for the second and third years of the program. Supplemental watering may cease during the winter months. The actual watering regime will be adjusted by the County restoration specialist based on the planting s vigor and needs. All supplemental watering will be performed in a manner that ensures deep penetration of water to the soil around the plant roots. At the end of 3 years, the County s restoration specialist will evaluate the coastal bluff scrub plantings and determine if the supplemental watering will need to be continued. Since the southern coastal salt marsh species will be installed in locations that are subject to soil saturation from tidal influence, these species will not receive supplemental water on a regular basis. If during the course of the establishment period the County restoration specialist determines that the coastal salt marsh plantings need supplemental water, the County s maintenance contractors will water the individuals with a hose that is fed by the irrigation system. If repeated watering is determined necessary, the County s restoration specialist must assess whether or not the plantings were installed in the proper location and if they need to be relocated. 6.2 Weed Control and Herbicide Use Weed control will be conducted to minimize competition from exotic plants. Exotic species will be removed during grading activities; however, additional weed abatement will be required during the 5-year mitigation program. The weed control program will emphasize manual removal of exotic species. However, manual removal may be augmented with herbicide applications. If herbicide applications are necessary, they will be conducted by an individual holding a valid Qualified Applicators License. The Qualified Applicator must use herbicides that are approved for use in and adjacent to aquatic areas (i.e., Rodeo or similar). Exotic plant species to be targeted for removal include, but are not limited to, myoporum (Myoporum laetum), Russian thistle (Kali tragus), onionweed (Asphodelus fistulosus), bristly ox-tongue (Picris echioides), Italian thistle (Carduus pycnocephalus), sweet fennel (Foeniculum vulgare), poison hemlock (Conium maculatum), bull thistle (Cirsium vulgare), castor bean (Ricinus communis), and cape ivy (Delairea odorata). 6.3 Debris Removal and Vandalism Removal of trash and litter will occur on a regular basis. Non-fruiting organic debris created from hand removal of weeds may be left on-site if it will not significantly impact the establishment of the mitigation plantings. Noxious weed debris will be disposed of off-site to avoid further invasions of the exotic species. The slough channel tends to accumulate urban debris from the surrounding park and roads. The County s maintenance contractor will remove the debris with a handheld net during routine maintenance activities. All urban debris will be removed from the site and properly disposed of at a local landfill. Due to the sites proximity to public areas, vandalism may be a problem. If vandalism occurs and plants are removed or trampled, the County will replace the vandalized plants and take appropriate actions to prohibit further vandalism. As such, incidents shall be recorded and reported to regulatory agencies within the annual reports to be produced per this HMMP. SWCA Environmental Consultants 16

23 Goleta Beach Park Bridge Figure 4. Map of Estimated Tidal Inundation Following Culvert Replacement SWCA Environmental Consultants 17

24 This page intentionally left blank. SWCA Environmental Consultants 18

25 6.4 Replanting The County s restoration specialist will adjust specific replanting requirements if needed, including species, quantities, and schedules. Species selection will be consistent with those currently occupying the immediate area and at the direction of the County and their restoration specialist. Any replanted vegetation will be monitored and maintained until the restoration specialist determines that the plantings are self-sustaining. 7 MONITORING PLAN In order to accomplish project goals, a monitoring program will provide both quantitative and qualitative data to be used to determine the success of the mitigation project. The restoration biologist will collect and evaluate data indicating the relationship between actual site conditions and established performance criteria (refer to Table 5). The data will be presented in annual reports that include photo-documentation and evaluate whether or not the annual performance goals for the year were met. All monitoring shall be conducted by a restoration specialist with documented experience preparing mitigation restoration monitoring reports. 7.1 Monitoring Schedule The 5-year monitoring program will consist of general monitoring visits and annual biological data collection. The County s restoration specialist will perform general monitoring site visits every other month during the first year of the program; quarterly for the second, third, and fourth years of the program; and semi-annually in the fifth year (refer to Table 2). General monitoring visits can be conducted concurrently with maintenance visits. The focus of general monitoring visits is to assess the plantings need for water, or other maintenance related issues. General monitoring visits should be conducted directly following storm events to determine if the plantings were damaged by the event. The restoration specialist will perform biological monitoring data collection annually throughout the 5-year monitoring program. The focus of the biological monitoring visits is to collect quantitative data that will provide an assessment of the site s vegetative cover, success rates, and overall vigor. 7.2 Annual Performance Standards and Success Criteria According to the USACE Final Rule for Compensatory Mitigation for Losses of Aquatic Resources (April 10, 2008), HMMPs must include ecologically based success criteria. This HMMP includes annual performance standards that are based on the vegetative structure observed on-site prior to construction related disturbances and the type of vegetation to be replanted. The Performance Standards and Success Criteria will document the status of the following attributes: Percent survival of southern coastal bluff scrub plantings; Percent cover of southern coastal salt marsh plantings; Percent increase of southern coastal salt marsh vegetation in the adjacent wetland; Percent tidal inundation in the adjacent wetland; and, Percent cover of exotic (non-native) species in restored temporary impact areas (southern coastal bluff scrub and southern coastal salt marsh). The mitigation areas will be monitored for 5 years or until the final success criteria are met. It is anticipated that by the fifth year, the site will be self-sustaining for the long-term. At the end of the 5-year monitoring period, the restoration specialist will evaluate the site to determine if the success criteria are satisfied. If the program is determined to be unsuccessful, the restoration specialist in consultation with SWCA Environmental Consultants 19

26 the County and the USACE will recommend appropriate contingency measures. The mitigation site will not be considered successful until USACE has provided written verification that the final success criteria have been met. Table 5. Annual Performance Standards Performance Standards Year 1 Year 2 Year 3 Year 4 Year 5 Percent survival of planted southern coastal bluff scrub plantings 1. 80% 100% 100% 100% 100% Percent cover of southern coastal salt marsh plantings 20% 30% 45% 60% 75% Documented tidal ebb and flow in adjacent parcel Yes Yes Yes Yes Yes Percent of non-native cover (in temporary impact area; excludes annual grasses) <35% <30% <25% <20% <15% Notes: 1. If stated plant survivorship is not attainable the plantings must attain 75% cover after 3 years and 90% cover after 5 years for the life of the project. 2. The mitigation site must be self-sustaining (i.e., no irrigation) for a minimum of 2 years to be considered successful. 3. Nursery stock plant survivorship may include original plantings, remedial plantings, or volunteers. 4. Any remedial plantings will be monitored until the restoration specialist determines that they are self-sustaining. 5. Percent non-native cover calculations exclude non-native annual grasses; however, includes non-native perennial grasses. The final goal for percent non-native cover is less than 15% (excluding annual grasses). If achieving 15% non-native cover in the restoration areas is not feasible, the restoration specialist can adjust the final success criteria to be at least 5% less than the non-native vegetation percent cover found in undisturbed areas immediately adjacent to the site. 7.3 Biological Monitoring Program Biological attributes of the mitigation areas will be monitored annually for 5 years following plant installation or until the USACE agrees that mitigation is complete. Annual quantitative monitoring visits will be conducted in the late fall or winter of each year. The objective of the monitoring program is to ensure that the mitigation efforts achieve the established performance standards Coastal Bluff Scrub Planting Percent Survival Plant survival calculations will be based on the number of individual plants installed. Percent survival will be obtained by counting the number of surviving plants and dividing the result by the number of plants installed (initial and remedial installations). Volunteer plants will be counted if they are the same species as the planted vegetation. Consequently, this calculation method can result in a survival rate greater than 100%. A plant is considered surviving if at least half of the foliage (or stem if deciduous) is green and flexible Southern Coastal Salt Marsh Planting Percent Cover Percent cover of the installed salt marsh species will be obtained annually throughout the 5-year monitoring program. Percent cover calculations must be determined by a documented vegetation monitoring method such as Daubenmire, point intercept, or similar. The restoration specialist may choose the method to be implemented, but must use the same method for the entire duration of the program. Individual transects must be monitored in the bridge replacement restoration area and the tidal flow channel restoration area. For the southern coastal salt marsh plantings to be considered successful, at the end of 5 years, salt marsh plant species should provide at least 75% cover in the temporary impact restoration areas (inclusive of the tidal flow project restoration area). SWCA Environmental Consultants 20

27 7.3.3 Southern Coastal Salt Marsh and Tidal Flow Restoration in Adjacent Wetland Monitoring the tidal flow restoration project will include vegetation and tidal flow monitoring. The percent cover of salt marsh vegetation in the tidal flow restoration area will be collected utilizing the same methods discussed in Section In addition, the monitor will note on the provided data sheet whether or not the planted salt marsh vegetation is growing beyond the County right-of-way. The vegetation monitoring will be conducted during low tide to ensure the restoration plantings are accessible. The goal of the salt marsh restoration in the northern parcel is to achieve 75% cover of salt marsh vegetation in the restoration area at the end of Year 5. Tidal flow in and out of the parcel will be monitored and documented three times per year during the mitigation program. Monitoring efforts will utilize a fixed observation and photo point to document ebb and flow in/out of the parcel at various tides and months. Based on elevation data and project plans, the following levels of inundation in the adjacent wetland are expected: At tides ranging from 0.0 feet to 2.1 feet, the low tide flow channel should have 1.0 to 1.5 feet of water in its thalweg. At tides ranging from 2.2 feet to 5.49 feet, the low tide flow channel should be approaching bank full depth. At 5.5 feet or greater tides, flows should exceed bank full of the low tide flow channel and be inundating the remainder of the adjacent wetland. The County s restoration biologist will visually inspect and photo document the percent of tidal inundation during low and high tides in the months identified in the monitoring schedule (refer to Table 2). Estimates of percent inundation will be based on the provided map; tidal inundation will be documented on the provided datasheet (refer to Attachment B). Photo documentation and graphs plotting the percent inundation against recorded tides will be included in the annual reports. The tidal restoration project will be considered successful if tidal ebb and flow to/from the parcel is documented. Since the slough mouth is closed during portions of the year and tidal influence is variable, it is expected that tidal flow will not be observed during every monitoring visit Percent Cover Non-native Species The County s restoration specialist will utilize a documented method, such as line intercept or similar, to measure the percent cover of non-native species (excluding annual grasses) in the temporary impact restoration areas. At no time during the monitoring program should the restoration areas contain more than 35% cover by non-native species. For the mitigation project to be considered successful, non-native species (excluding annual grasses) should not exceed 15% cover in the temporary impact restoration areas at the end of Year 5. Areas directly adjacent to the proposed restoration area support non-native species. These areas are a source of non-native seed dispersal that will likely be deposited in the restoration area. If at the end of the 5-year program, it is evident that the non-native cover cannot be kept below 15%, the success criteria can be adjusted to be at least 5% less than the percent cover of non-native species found in natural areas directly adjacent to restoration area. For example, if the percent cover of non-native vegetation adjacent to the restoration area is 25% (excluding annual grasses) then the final success criteria for the restoration areas can be adjusted to be less than 20%. The restoration program will not be considered successful if the non-native percent cover in the restoration area exceeds or equals that of the adjacent areas. SWCA Environmental Consultants 21

28 7.3.5 Other Attributes to Monitor Another important monitoring activity is to detect the presence and advance of invasive plant species, such as introduced whitetop (Lepidium draba), pampas grass (Cortaderia sp.), or English ivy (Hedera helix). Monitoring activities will identify the establishment of invasive species and identify the appropriate action to control their advance. All wildlife observed in and around the mitigation areas will be documented as to species and functional use of habitat (e.g., feeding, nesting, roosting, etc.). Observations of the general habitat quality will be documented in the annual report. Permanent photo points will be established throughout the mitigation site to assist in tracking the success of the mitigation program. Permanent photo points will be established during the preparation of the asbuilt planting plan, and ground view photos will be taken during each monitoring year from the same vantage point. 7.4 Reporting Requirements The various regulatory agencies having discretionary approval over the bridge project have different reporting requirements for the revegetation efforts. The County will ensure that the appropriate agencies receive the required reports on a timely basis. Although permits have yet to be obtained for the project, the following reporting requirements are anticipated U.S. Army Corps of Engineers Monitoring reports will be prepared annually during the 5-year monitoring period. The County will be responsible for ensuring that monitoring reports are submitted to the USACE on the required basis. Annual reports must be prepared by the restoration specialist, and be submitted to the USACE by December 31st of each year. The annual reports shall be written pursuant to the USACE Mitigation Monitoring Guidelines requirements (refer to Attachment C) AS-BUILT CONDITIONS An as-built planting plan will be prepared and submitted to the USACE in the first annual report. The plan will illustrate the final construction of the restoration areas, showing planting locations and any modifications to this HMMP. Other than remedial plantings, there will be no deviation from the as-built planting plan without USACE coordination California Department of Fish and Wildlife The County is responsible for preparing and submitting annual reports to CDFW within 30 days of the end of each calendar year for 5 years. The reports must include photo documentation and detail the progression of the revegetation efforts Regional Water Quality Control Board Typically, RWQCB water quality certifications require submittal of three reports pertaining to a project. The first report would document the completion of the construction efforts including revegetation activities. This report must be submitted within 30 days of project completion and include a summary of daily activities, monitoring observations, problems incurred, and actions taken. The second and third reports must be submitted annually by December 31st of the second and third monitoring years. The annual reports must quantify growth and progress of the restoration plantings to determine if the SWCA Environmental Consultants 22

29 performance criteria have been met. All three of the required reports must include photographs that document the revegetation progress over time California Coastal Commission The County anticipates preparing and submitting annual reports to the Executive Director of the CCC within 30 days of the end of each calendar year for 5 years. The annual reports will document the implementation and effectiveness of the mitigation program. Each report shall include all monitoring data, shall describe the progress towards achieving the success criteria of the HMMP, and shall make recommendations, if any, on changes necessary to better meet the HMMP s objectives. 8 COMPLETION OF MITIGATION 8.1 Notification of Completion The County will notify the USACE, CDFW, RWQCB, and CCC in writing upon completion of the monitoring period and attainment of the success criteria. At the end of the 5-year monitoring period, the restoration specialist will submit a final monitoring report requesting agency verification that the final success criteria have been met. Following receipt of the final monitoring report, the County understands that the agencies may request a site visit to confirm the completion of the mitigation effort. The mitigation will not be considered complete without an on-site inspection by an agency representative or written confirmation that approved success criteria have been achieved. 9 CONTINGENCY MEASURES If it becomes apparent that the on-site mitigation will not attain the final success criteria within the 5-year timeframe, the County will begin an assessment of reasons for failure, and will work with the USACE to determine an acceptable solution. If the site trends indicate that the success criteria will eventually be met in a longer timeframe than anticipated, maintenance and monitoring will continue until the criteria have been satisfied. If replanting is determined to be necessary, the replanted areas will be monitored and maintained until the restoration specialist determines that they are self-sustaining, or for a period agreeable to the USACE. Any species substitutions proposed for contingency planting due to low survival of originally planted species must be coordinated with the USACE. The mitigation site should be selfsustaining (i.e., no artificial irrigation) for a period of 2 years to be considered successful. If a total site failure is evident, the County will consult with the USACE to determine what alternative compensatory mitigation will be required. Should this occur, identification of an alternative mitigation site may be necessary. No alternative locations for contingency mitigation are identified at this time. SWCA Environmental Consultants 23

30 10 REFERENCES Emery, Dara Seed Propagation of Native California Plants. Santa Barbara Botanic Garden. Baldwin, et al The Jepson Manual: Higher Plants of California. University of California Press. Berkeley, California. January Goleta Slough Management Committee (GSMC) Goleta Slough Ecosystem Management Plan. Prepared by the City of Santa Barbara. December Holland, Robert F., Ph.D Preliminary Descriptions of the Terrestrial Natural Communities of California. Prepared for State of California, The Resources Agency, Department of Fish and Game. October Sawyer, J., T. Keeler-Wolf, and J. Evens A Manual of California Vegetation. 2nd ed. California Native Plant Society. SWCA Environmental Consultants (SWCA) Goleta Park Bridge Replacement Project Jurisdictional Waters Assessment. Prepared for the County of Santa Barbara Department of Public Works. August Goleta Park Bridge Replacement Project Natural Environmental Study. Prepared for the County of Santa Barbara Department of Public Works. March U.S. Department of Agriculture Natural Resource Conservation Service (NRCS) Sampling Vegetation Attributes, Interagency Technical Reference. Published by the Cooperative Extension Service: U.S. Department of Agriculture, Forest Service; Natural Resource Conservation Service, Grazing Land Technology Institute; and U.S. Department of the Interior, Bureau of Land Management. 1996, revised in 1997 and SWCA Environmental Consultants 24

31 Attachment A. Habitat and Jurisdictional Impacts Maps SWCA Environmental Consultants

32 SWCA Environmental Consultants

33 Goleta Beach Park Bridge SWCA Environmental Consultants A-1

34 This page intentionally left blank. SWCA Environmental Consultants A-2

35 Goleta Beach Park Bridge SWCA Environmental Consultants A-3

36 This page intentionally left blank. SWCA Environmental Consultants A-4

37 Attachment B. Tidal Flow Restoration Map and Data Sheet SWCA Environmental Consultants

38 SWCA Environmental Consultants

39 Goleta Beach Park Bridge SWCA Environmental Consultants B-1

MITIGATION MANAGEMENT AND MONITORING PLAN BAYFRONT PARK WETLAND RESTORATION MILL VALLEY, CA

MITIGATION MANAGEMENT AND MONITORING PLAN BAYFRONT PARK WETLAND RESTORATION MILL VALLEY, CA MITIGATION MANAGEMENT AND MONITORING PLAN BAYFRONT PARK WETLAND RESTORATION MILL VALLEY, CA PREPARED FOR: THE CITY OF MILL VALLEY PARKS AND RECREATION DEPARTMENT 180 CAMINO ALTO AVENUE MILL VALLEY, CA

More information

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers Stormwater Standards Clackamas County Service District No. 1 APPENDIX B Planting Guide for Buffers Table of Contents Appendix B - Planting Guide for Buffers... Page B.1 General... 1 B.1.1 Introduction...

More information

HABITAT RESTORATION PLAN FOR WHITE POINT LANDSLIDE REPAIR

HABITAT RESTORATION PLAN FOR WHITE POINT LANDSLIDE REPAIR HABITAT RESTORATION PLAN FOR WHITE POINT LANDSLIDE REPAIR MITIGATION OCTOBER 30, 2014 1 INTRODUCTION This habitat restoration plan was prepared for the White Point Nature Preserve, for 1.5 acres that were

More information

Morro Shoulderband Snail Protocol Survey Report for the Parcel at 3093 Beachcomber Drive, Morro Bay, San Luis Obispo County, California

Morro Shoulderband Snail Protocol Survey Report for the Parcel at 3093 Beachcomber Drive, Morro Bay, San Luis Obispo County, California Morro Shoulderband Snail Protocol Survey Report for the Parcel at 3093 Beachcomber Drive, Morro Bay, San Luis Obispo County, California Prepared for: John K. Construction Inc. Prepared by: SWCA Environmental

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

Information for File # JTF

Information for File # JTF Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil

More information

SECTION TURF AND GRASSES

SECTION TURF AND GRASSES SECTION 32 92 00 TURF AND GRASSES PART 1: GENERAL 1.01 DESCRIPTION Restore all disturbed grass and landscaped areas to conditions equal to or better than before the work began and to the satisfaction of

More information

Restoring Soil Ecology and Native Plant Communities in an Altered Salt Pond Ecotone

Restoring Soil Ecology and Native Plant Communities in an Altered Salt Pond Ecotone Restoring Soil Ecology and Native Plant Communities in an Altered Salt Pond Ecotone Dylan Chapple Save The Bay/UC Berkeley dylanchapple@berkeley.edu 10/24/2012 Overview Eden Landing Ecological Reserve

More information

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline Agricultural Impact Minimization Plan Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline operation. PennEast

More information

SECTION 6. Routine Maintenance Activity Details

SECTION 6. Routine Maintenance Activity Details SECTION 6 Routine Maintenance Activity Details 80. DEBRIS REMOVAL When Deadfall, and other objects, such as shopping carts, tires, appliances, and mattresses have accumulated in the drain. Why To prevent

More information

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary Commercial Launch Site Addendum to Wetland Mitigation Plan Revision 2 April 25, 2017 SpaceX Proprietary Contents 1.0 Project Information... 1 1.1 Background... 1 2.0 Compensatory Mitigation... 2 2.1 Goals

More information

STREAM ALTERATION PRACTICES

STREAM ALTERATION PRACTICES STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow

More information

Appendix 5 Vegetation Management of Tidal Marsh Edges, San Francisco Estuary

Appendix 5 Vegetation Management of Tidal Marsh Edges, San Francisco Estuary Vegetation Management of Tidal Marsh Edges, San Francisco Estuary Working examples of vegetation management strategies for tidal marsh terrestrial edges 5.1. Sonoma Baylands, Sonoma County. Shoreline type:

More information

Section 3 Non-Structural BMPs

Section 3 Non-Structural BMPs 3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide

More information

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed

More information

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001 STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP 2014-0030 FEBRUARY 26, 2015 CPA - 1 OWNER/APPLICANT: AGENT: REQUEST: HANS HEIM PO BOX 238 APTOS, CA 94001 JAMES HAY PO BOX 762 MENDOCINO, CA 95460

More information

Volume 2, Chapter 12 - Revegetation

Volume 2, Chapter 12 - Revegetation Volume 2, Chapter 12 - Revegetation Users Guidance: If a UDFCD Section number in this chapter is skipped: It was adopted as is; please refer to that Section in the corresponding UDFCD Manual, Volume, Chapter

More information

Appendix E Preliminary Location Hydraulic Study

Appendix E Preliminary Location Hydraulic Study Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally

More information

Trestles Wetlands Natural Preserve Plant Communities. Plant Community Site Map from Feldmeth (1987):

Trestles Wetlands Natural Preserve Plant Communities. Plant Community Site Map from Feldmeth (1987): Trestles Wetlands Natural Preserve Plant Communities Plant Community Site Map from Feldmeth (1987): In the definitive study Biological Resources of the San Mateo Creek Area (Feldmeth, 1987), the primary

More information

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004)

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363 4210 Fax: (916) 363 4230 M e m o r a n d u m To: Julie Myrah, Branch Chief Date: May 5, 2017 California Department of Transportation

More information

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION Project Background November 19, 2007 Executive Summary The Grand Canal is an important tidal waterway in the Venice community of Los Angeles, California,

More information

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline Agricultural Impact Minimization Plan Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline operation. PennEast

More information

Guidelines for planting within the 100 Ft. Buffer

Guidelines for planting within the 100 Ft. Buffer CAPE COD COOPERATIVE EXTENSION PO Box 367 Barnstable, MA 02630 508 375-6690 (www.capecodextension.org) Guidelines for planting within the 100 Ft. Buffer Introduction: The Barnstable County Extension Service

More information

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018 Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3. September 18, 2018 Agenda Welcome Introductions Rules of the Ad-Hoc Presentation Background Vulnerability Assessment Results Non-Agenda

More information

Point-No-Point Tide-Gate & Outfall Replacement Project. Briefing Memo 2013

Point-No-Point Tide-Gate & Outfall Replacement Project. Briefing Memo 2013 Point-No-Point Tide-Gate & Outfall Replacement Project Briefing Memo 2013 This memo provides an initial outline of the proposed Point-No-Point (PNP) Tide-Gate and Outfall replacement project. The current

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

7.5 Impacts on the Section 4(f) Properties

7.5 Impacts on the Section 4(f) Properties constructive use, such as noise, air quality and visual impacts were also assessed. It was determined that this project would not introduce changes of an external nature that would affect the recreational

More information

Understanding Drainage Options What s Feasible and Legal. February 2019

Understanding Drainage Options What s Feasible and Legal. February 2019 Understanding Drainage Options What s Feasible and Legal February 2019 Outline for the Presentation Do you need a permit? Does common law apply? Does local government approve it? Will my neighbor allow

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual. 4.4. Filter Strips Filter Strips are densely vegetated lands that treat sheet flow storm water from adjacent pervious and impervious areas. They function by slowing runoff, trapping sediment and pollutants,

More information

Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR

Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR Submitted CONTENTS 1. PLAN SUMMARY II. INTRODUCTION IX. SPECIFIC PLAN RELATIONSHIPS X. XI. List of Figures 1. Regional Location 2. Point Richmond Area 3. Planning

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

BEST MANAGEMENT PRACTICES Herb Robert (Geranium robertianum) (Family Geraniaceae Geranium Family)

BEST MANAGEMENT PRACTICES Herb Robert (Geranium robertianum) (Family Geraniaceae Geranium Family) JEFFERSON COUNTY NOXIOUS WEED CONTROL BOARD 380 Jefferson Street Port Townsend WA 98368 360 379-5610 Ext. 205 noxiousweeds@co.jefferson.wa.us BEST MANAGEMENT PRACTICES Herb Robert (Geranium robertianum)

More information

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I SBCAG STAFF REPORT SUBJECT: Cabrillo-UPRR Bridge Project MEETING DATE: March 17, 2016 AGENDA ITEM: 5I STAFF CONTACT: Fred Luna RECOMMENDATION: Authorize the chair to sign a Memorandum of Understanding

More information

MPDP VEGETATION ADVISORY WORKGROUP WORKSHOP #5

MPDP VEGETATION ADVISORY WORKGROUP WORKSHOP #5 MPDP VEGETATION ADVISORY WORKGROUP WORKSHOP #5 DATE: TO: LOCATION: April 21, 215 MPDP Vegetation Advisory Workgroup SWA Group Office, 1245 West 18 th Street Meeting Purpose: Review Workgroup Activities

More information

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time. AGENDA ITEM H-7 continued from 4/18 Public Works STAFF REPORT City Council Meeting Date: 4/18/2017 Staff Report Number: 17-081-CC Informational Item: Update on the Bayfront Canal Bypass Project Recommendation

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Table 4.7.1: Swales Potential Application and Storm Water Regulation 4.7. Swales A swale is a vegetated open channel, planted with a combination of grasses and other herbaceous plants, shrubs, or trees. A traditional swale reduces peak flow at the discharge point by increasing

More information

Reclamation Success Best Management Practices. Pinedale Field Office. Joseph Debebe PhD. Natural Resource Specialist PFO 04/30/2014

Reclamation Success Best Management Practices. Pinedale Field Office. Joseph Debebe PhD. Natural Resource Specialist PFO 04/30/2014 Reclamation Success Best Management Practices Pinedale Field Office Joseph Debebe PhD. Natural Resource Specialist PFO 04/30/2014 Objective Identifying factors necessary for reclamation success at different

More information

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan Prepared for City of Oceanside Planning Department 300 N. Coast Highway Oceanside, CA 92054 Prepared by Ogden Environmental

More information

PLANTING OF LARGE SCALE MARSH PROJECTS. Eddie Seidensticker, biologist, Natural Resources Conservation Service

PLANTING OF LARGE SCALE MARSH PROJECTS. Eddie Seidensticker, biologist, Natural Resources Conservation Service PLANTING OF LARGE SCALE MARSH PROJECTS Eddie Seidensticker, biologist, Natural Resources Conservation Service As the Houston-Galveston Navigation Channel is expanded, the Beneficial Uses Group (BUG), the

More information

Asparagus Response to Water and Nitrogen

Asparagus Response to Water and Nitrogen Asparagus Response to Water and Nitrogen Item Type text; Article Authors Roth, Robert L.; Gardner, Byrant R. Publisher College of Agriculture, University of Arizona (Tucson, AZ) Journal Vegetable Report

More information

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY A. Purpose: 1. Regulatory Requirement and Use Mitigation: The purpose of this appendix is to provide a regulatory context (standards)

More information

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES CHAPTER 4: GENERAL LANDSCAPING STANDARDS This chapter describes plant material minimum standards that apply to landscaping both on private property (on-site) and within the public right-of-way (off-site).

More information

Juneau Watershed Partnership

Juneau Watershed Partnership Juneau Watershed Partnership Native Plant Resource Center Final Report A Partners for Fish and Wildlife Project Prepared for: U.S. Fish and Wildlife Service For Grant #F11C00552 Prepared by: The Juneau

More information

4.6. Low Impact and Retentive Grading

4.6. Low Impact and Retentive Grading 4.6. Low Impact and Retentive Grading Low Impact Grading techniques focus on utilizing existing topography during Site layout to minimize cost. Proposing structures, roads, and other impervious surfaces

More information

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

WET PONDS INSPECTION & MAINTENANCE CHECKLIST WET PONDS INSPECTION & MAINTENANCE CHECKLIST INTRODUCTION Once construction is completed, periodic site inspections are essential in order to monitor the effectiveness and to anticipate the maintenance

More information

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS ARTICLE 3 CHAPTER 4 LANDSCAPING AND SCREENING REQUIREMENTS SEC 3.401 SEC 3.402 (D) (E) PURPOSE: The purpose of this Chapter is to establish minimum standards for the design, installation, and maintenance

More information

Creating Biodiversity on your Farm

Creating Biodiversity on your Farm Creating Biodiversity on your Farm Sam Earnshaw Hedgerows Unlimited California Small Farm Conference (831) 722-5556 October 2017 hedgerows@baymoon.com www.hedgerowsunlimited.com Conservation Practices:

More information

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project

More information

The Napa River Flood Protection Project

The Napa River Flood Protection Project The Napa River Flood Protection Project Creating Flood Protection and Restoring Geomorphic and Biological Processes Jeremy Sarrow, Napa County Flood Control & Water Conservation District June 2, 2014.

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

POST-FIRE RESTORATION Dos and Don ts

POST-FIRE RESTORATION Dos and Don ts POST-FIRE RESTORATION Dos and Don ts USDA Natural Resources Conservation Service The NRCS/RCD office is located at: 744 LA GUARDIA ST BLDG A SALINAS, CA 93905-3354 (831) 424-1036 (NRCS) (831) 424-1036

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION County: Linn County, IA GREEN SHEET Location: IA 100, from its terminus at Edgewood Rd. to US 30 southwest of Cedar Rapids Route: IA 100 Extension Project No.: NHS-100-1(36) 19-57 OLE Project Managers:

More information

Squaw Mountain Road Bridge Repair Project

Squaw Mountain Road Bridge Repair Project Squaw Mountain Road Bridge Repair Project Wetland Mitigation Plan July 24, 2013 Prepared for: KB Home Coastal, Inc. 36310 Inland Valley Dr. Wildomar, CA 92595 Prepared by: HELIX Environmental Planning,

More information

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following: SECTION 320190.13 LANDSCAPE MAINTENANCE FOR 90 DAYS PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for 90 day landscape maintenance for the following: 1. Watering trees and grass. 2. Monitoring

More information

Tips for Maintaining and Enhancing Stormwater Management Areas

Tips for Maintaining and Enhancing Stormwater Management Areas 4 4 N. Second Street, Denton, Md. 21629 (410) 479-3625 (410) 479-3534 fax www.dentonmaryland.com Tips for Maintaining and Enhancing Stormwater Management Areas Information provided by the Town of Denton

More information

CHECKLIST BMPs for FIELD NURSERIES REGULATIONS, SITE SELECTION, WATER MANAGEMENT

CHECKLIST BMPs for FIELD NURSERIES REGULATIONS, SITE SELECTION, WATER MANAGEMENT CHECKLIST BMPs for FIELD NURSERIES REGULATIONS, SITE SELECTION, WATER MANAGEMENT Regulations For information on the Wetlands Protection Act or the Water Management Act, contact the Massachusetts Department

More information

Palmdale Municipal Code (Excerpts) Title 14: ENVIRONMENTAL MANAGEMENT Chapter 14.04: JOSHUA TREE AND NATIVE DESERT VEGETATION PRESERVATION

Palmdale Municipal Code (Excerpts) Title 14: ENVIRONMENTAL MANAGEMENT Chapter 14.04: JOSHUA TREE AND NATIVE DESERT VEGETATION PRESERVATION Palmdale Municipal Code (Excerpts) Title 14: ENVIRONMENTAL MANAGEMENT Chapter 14.04: JOSHUA TREE AND NATIVE DESERT VEGETATION PRESERVATION 14.04.010 Purpose and intent. It is determined by the City Council

More information

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 September 14, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

Veranda Park Planting Plan Draft 10/08/10

Veranda Park Planting Plan Draft 10/08/10 Planting Plan Native Plant Selection Trees and Shrubs Plants were selected based on what species were indentified onsite, information from the Medford Riparian Ordinance, and typical native riparian species

More information

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility. SUMMARY THE I-69 LOCATION STUDY The proposed I-69 Location Study from El Dorado to McGehee, Arkansas, represents one section (Section of Independent Utility No. 13) of the nationally designated I-69 Corridor

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS 808.1 Description. This work shall consist of furnishing and planting material in the locations designated on the plans or established by the engineer.

More information

Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives

Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives Project Sponsor/Partners The Nature Conservancy Dike District #3

More information

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL Effective July 1, 2007 HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL EFFECTIVE JULY 1, 2007 FIFTH EDITION Lower Colorado River Authority TABLE OF CONTENTS DESIGN SPREADHEET

More information

Natural Areas Certification Program Guidelines

Natural Areas Certification Program Guidelines Natural Areas Certification Program Guidelines Purpose of the Program The City of Fort Collins Natural Areas Department encourages site management practices that focus on protecting, restoring, and enhancing

More information

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting Rio De Flag Existing Conditions. Ephemeral stream; Limited riparian plants, habitats.. & Opportunities Water (effluent) available Restore

More information

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads; Bedford Township, MI (Monroe Co.) 2012 http://library.municode.com/index.aspx?clientid=02123 400.1907 - Landscaping and screening. Se 1907. 1. Intent. Landscaping, greenbelts, and screening are necessary

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar

More information

Our Wetland Restoration Plan

Our Wetland Restoration Plan Our Wetland Restoration Plan Name/Property name Date Wetland Restoration/Management Template SITE DETAILS Owner Occupier (if different to owner) Location (e.g. access/street address, topographic grid reference

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL Surface Water Protection During Well Site Construction Kelly Kees, PE WVDEP, Office of Oil and Gas SEDIMENT & EROSION CONTROL PLANS Per West Virginia State Code 22-6-6(d) 22-6A-7(c),

More information

Plant Selection: Principles

Plant Selection: Principles Plant Selection, Forms & Sources Warren Gold REN capstone November 7, 2008 This presentation will focus on principles For specific information on species see resources on handout, books, instructors Plant

More information

4. Contractor (and subcontractors if applicable) certification statement(s)

4. Contractor (and subcontractors if applicable) certification statement(s) CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 4 To conserve, manage, appropriately use and protect the natural resources of the City ensuring continued resource availability and environmental

More information

Appendix E Section 4(f) Evaluation

Appendix E Section 4(f) Evaluation Appendix E Section 4(f) Evaluation Appendix E Draft Section 4(f) Evaluation E.1 Introduction This appendix addresses a federal regulation known as Section 4(f), which protects parks, recreation areas,

More information

Lake Nokomis Shoreline Enhancement Project

Lake Nokomis Shoreline Enhancement Project Lake Nokomis Shoreline Enhancement Project Community Meeting 2 February 13, 2018 Agenda Current Problems Project Goals Project Status Existing Conditions Community Input Draft Schematic Design Long-term

More information

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent. ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,

More information

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures MARBLE RIVER WIND POWER PROJECT Siting Considerations 1. Locate access roads and, to the extent allowed by local laws, wetlands and topography, individual wind turbines and other structures along field

More information

ITEM 164 SEEDING AND EROSION CONTROL BLANKET

ITEM 164 SEEDING AND EROSION CONTROL BLANKET AFTER NOVEMBER 1, 2008 ITEM 164 SEEDING AND EROSION CONTROL BLANKET 164.1 Description. This Item shall govern for preparing the ground, sowing of seeds, application of a fertilizer, and stabilization with

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN 01/17/2003 VERSION UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN TABLE OF CONTENTS I. APPLICABILITY... 1 II. SUPERVISION AND INSPECTION...

More information

River Corridor Overlay Zone (RCOZ) Article 5

River Corridor Overlay Zone (RCOZ) Article 5 River Corridor Overlay Zone (RCOZ) Article 5 The site is in one of two designated districts. The first is the CBD (central business district) River District, which recognizes the urban character and unique

More information

Rule D Wetland and Creek Buffers

Rule D Wetland and Creek Buffers Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions

More information

DIVISION II PLANTING SECTION 02950

DIVISION II PLANTING SECTION 02950 Subdivision Requirements Manual Page 1 of 9 PART I - GENERAL 1.1 Related Work.1 Topsoil and Finish Grade : Section 02212.2 Seeding : Section 02933.3 Hydraulic Seeding : Section 02934.4 Sodding : Section

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

BIORETENTION FACILITY

BIORETENTION FACILITY ILLINOIS URBAN MANUAL PRACTICE STANDARD BIORETENTION FACILITY (feet) CODE 800 Source: Jessica Cocroft, Winnebago Soil and Water Conservation District DEFINITION Facility that utilizes a soil media, mulch,

More information

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

PROJECT BACKGROUND. Preliminary Design Scope and Tasks PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of

More information

Information for File MMJ Main Stem Bassett Creek Restoration Project

Information for File MMJ Main Stem Bassett Creek Restoration Project Information for File 2013-03866-MMJ Main Stem Bassett Creek Restoration Project Applicant: Minneapolis Park and Recreation Board (MPRB) Corps Contact: Melissa Jenny Address: Corps of Engineers, St. Paul

More information

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of

More information

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY Mobile Bay National Estuary Program 4172 Commanders Drive Mobile, AL 36615 Phone: 251-431-6409 Fax: 251-431-6450 Contact: Tom Herder, Watershed Protection Coordinator Email: therder@mobilebaynep.com July

More information

Visual and Aesthetics

Visual and Aesthetics Such a connection could accommodate timed transfers and improve connections between local transit service and Presidio Shuttle service. Level of Service The results of the analysis are provided on a route-by-route

More information

Illinois Urban Manual

Illinois Urban Manual Illinois Urban Manual Jim Nelson: Association of Illinois Soil and Water Conservation Districts (AISWCD) Funding for this project provided, in part, by the Grand Victoria Foundation of Elgin IL, the Governor

More information

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.

More information

Your town s subdivision or land use ordinance standards should reference the following street standards, for example:

Your town s subdivision or land use ordinance standards should reference the following street standards, for example: Your town s subdivision or land use ordinance standards should reference the following street standards, for example: Streets shall be designed to move traffic safely and in a way that minimizes environmental

More information

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015 Guiding Landowners in Stream Restoration The Science, Practice & Art of Restoring Native Ecosystems 2015 January 24, 2015 Guiding Landowners in Stream Restoration January 24, 2015 Agenda 1Watershed Planning

More information