Green Infrastructure Plan Framework

Size: px
Start display at page:

Download "Green Infrastructure Plan Framework"

Transcription

1 Green Infrastructure Plan Framework West Valley Communities: Campbell, Los Gatos, Monte Sereno, and Saratoga City of Campbell 70 N. First Street Campbell, CA The Town of Los Gatos 110 East Main Street Los Gatos, CA City of Monte Sereno Saratoga-Los Gatos Road Monte Sereno, CA City of Saratoga Fruitvale Avenue Saratoga, CA June 30, 2017

2 ACKNOWLEDGEMENTS The West Valley Communities are appreciative of the dedication and hard work of municipal staff, Santa Clara Valley Urban Runoff Pollution Prevention Program (SCVURPPP), West Valley Clean Water Program (WVCWP), and the SCVURPPP C3PO Ad Hoc Task Group, who have all contributed to this document and continue to promote a Green Infrastructure program in the West Valley Communities. West Valley Agency Representatives: David Tucker City of Campbell Jim Harbin Town of Los Gatos Jeannie Hamilton City of Monte Sereno Mainini Cabute City of Saratoga Contributors: City of Campbell Roger Storz, PE, Senior Civil Engineer Todd Capurso, Public Works Director Stephen Rose, Associate Planner Paul Kermoyan, Community Development Director Town of Los Gatos Mike Weisz, PE, Associate Engineer Matt Morley, Director of Parks and Public Works Jocelyn Puga, Associate Planner Joel Paulson, Community Development Director City of Monte Sereno Jeannie Hamilton, Associate Planner Julie Behzad, City Engineer Debra Figone, Interim Planning Director City of Saratoga Poh Yee, Senior Building Inspector John Cherbone, Public Works Director Chris Riordan, Senior Planner Erwin Ordonez, Community Development Director West Valley Clean Water Program Julie Schaer, Program Staff Gabriella Bedrossian, Intern Kelly Carroll, Program Manager

3 Approval: Green Infrastructure Plan Framework Effective Date: June 30, 2017 This Framework is developed and submitted to San Francisco Bay Regional Water Quality Control Board (RWQCB) in compliance with Municipal Regional Stormwater NPDES Permit (MRP) Provision C.3.j.i.(1). West Valley Communities: Campbell, Los Gatos, Monte Sereno and Saratoga The West Valley Community Green Infrastructure Framework is prepared consistent with the SCVURPPP template that was developed to assist Co-permittees comply with the MRP requirement. The Framework is to be approved by June 30, 2017 and submitted to the RWQCB by September 30, Campbell: Brian Loventhal, City Manager Date Los Gatos: Laurel Prevetti, Town Manager Date Monte Sereno: Debra Figone, Interim City Manager Date Saratoga: James Lindsay, City Manager Date i

4 Page intentionally left blank ii

5 Table of Contents 1.0 Introduction What is Green Infrastructure? Stormwater Quality Regulatory Requirements Purpose of Green Infrastructure Plan and Framework West Valley Communities Description and Background City of Campbell Town of Los Gatos City of Monte Sereno City of Saratoga West Valley Communities Goals and Overall Approach Green Infrastructure Plan Elements Summary of Required Elements Approach to Completion of Required Elements Outreach and Education Project Identification and Prioritization Prioritized Project Locations and Timeframes Completed Project Tracking System Guidelines and Specifications Integration with Other Plans Evaluation of Funding Options Adoption of Legal Mechanisms Completion and Adoption of GI Plan Green Infrastructure Development Plan Schedule Resources..30 Appendices Appendix A. Appendix B. Council memos from Campbell, Monte Sereno and Saratoga, Town memo from Los Gatos Stormwater Resource Plan fact sheet iii

6 ABBREVIATIONS ABAG ADA BASMAA Caltrans CASQA CIP DOF EIR FEMA FY GI GIS GSI LID MRP NPDES NRCS O&M PCBs Program RWQCB SCVURPPP SCVWD SJWC SOI SR SWRP SWRCB VTA WVCWP Association of Bay Area Governments Americans with Disabilities Act Bay Area Stormwater Management Agencies Association California Department of Transportation California Stormwater Quality Association Capital Improvement Program California Department of Finance Environmental Impact Report Federal Emergency Management Agency Fiscal Year Green Infrastructure Geographic Information System Green Stormwater Infrastructure Low Impact Development Municipal Regional Stormwater NPDES Permit National Pollutant Discharge Elimination System National Resource Conservation Service Operation and Maintenance Polychlorinated Biphenyls Santa Clara Valley Urban Runoff Pollution Prevention Program San Francisco Bay Regional Water Quality Control Board Santa Clara Valley Urban Runoff Pollution Prevention Program Santa Clara Valley Water District San Jose Water Company Sphere of Influence State Route Storm Water Resource Plan State Water Resource Control Board Santa Clara Valley Transportation Authority West Valley Clean Water Program iv

7 1.0 INTRODUCTION 1.1 What is Green Infrastructure? Green Infrastructure (GI), is infrastructure that uses vegetation, soils, and natural processes to manage stormwater and create healthier urban environments. At the scale of a town, city or county, GI refers to the patchwork of natural areas that provides habitat, flood protection, cleaner air, and cleaner water. At the scale of a neighborhood or project site, GI refers to stormwater management systems that mimic nature by soaking up and storing water. Examples of GI include resilient, sustainable systems that slow, filter, harvest, infiltrate, and/or evapotranspirate stormwater runoff such as: landscape-based stormwater biotreatment using soil and plants ranging in size from grasses to trees; pervious paving systems (e.g., interlocking concrete pavers, porous asphalt, and pervious concrete); rainwater harvesting systems (e.g., cisterns and rain barrels); and other methods to capture and treat stormwater. These practices are also known as Low Impact Development (LID) site design and treatment measures. GI roadway projects are typically called Green Streets. Another term related to street design is Complete Streets. This term comes from the transportation field and deals with the designing of streets that incorporate all modes of travel equally - in particular to increase safety and access for cyclists and pedestrians. The integration of the goals of both Complete Streets and Green Streets recognizes that environmentally and holistically designed streets achieve many benefits: increased multi-modal travel and safety; clean water and air; climate change resilience and mitigation; placemaking and community cohesion; habitat and energy savings; and higher property values. 1.2 Stormwater Quality Regulatory Requirements The City of Campbell, Town of Los Gatos, City of Monte Sereno, and City of Saratoga are subject to the requirements of the recently reissued Municipal Regional Stormwater National Pollutant Discharge Elimination System (NPDES) Permit for Phase I municipalities and agencies in the San Francisco Bay area (Order R ), also known as the Municipal Regional Permit (MRP), which became effective on January 1, The MRP applies to 76 large, medium and small municipalities (cities, towns and counties) and flood control agencies that discharge stormwater to San Francisco Bay, collectively referred to as Permittees. Over the last 13 years, under the MRP and previous permits, new development and redevelopment projects on private and public property that exceed certain size thresholds ( Regulated Projects ) have been required to mitigate impacts on water quality by incorporating site design, pollutant source control, stormwater treatment and flow control measures as appropriate. LID treatment measures, such as rainwater harvesting and use, infiltration, and biotreatment, have been required on most Regulated Projects since December Construction of new roads is covered by these requirements, but projects related to existing roads and adjoining sidewalks and bike lanes are not regulated unless they include creation of an additional travel lane. A new section of the MRP requires Permittees to develop and implement long-term GI Plans for the inclusion of LID measures in storm drain infrastructure on public and private lands, including 1

8 streets, roads, storm drains, parking lots, building roofs, and other elements. The GI Plan will be completed by September 30, As part of the GI planning process, the MRP requires Permittees to adopt a Green Infrastructure Plan Framework (Framework) by June 30, 2017 and submit it to the RWQCB by September 30, The Framework, a work plan for completing the GI Plan, will at a minimum include a statement of purpose, tasks and timeframes to complete the required elements of the GI Plan. Other sections of the MRP include requirements for municipalities to control pollutants of concern to water quality in stormwater discharges, including polychlorinated biphenyls (PCBs), mercury, trash, and pesticides. LID measures incorporated into green infrastructure can help remove these pollutants from stormwater runoff. For this reason, the MRP establishes a new linkage between public infrastructure retrofits and required reductions in discharges of certain pollutants, specifically PCBs and mercury. Over the next few decades, permittees must reduce the loads of PCBs and mercury in stormwater discharges with a portion of these load reductions achieved through the installation of GI systems. Permittees in Santa Clara County, collectively, must implement GI on public and private property to reduce mercury loading by 16 grams/year and PCB loading by 37 grams/year by The load reductions will continue in future permits. Therefore, these efforts will be integrated and coordinated countywide for the most effective program. Other pollutants, including trash and pesticides, should also be coordinated with the GI program since, when properly designed, constructed and maintained, biotreatment systems may also be credited towards trash and pesticide reduction goals. A key part of the GI definition in the MRP is the inclusion of both private and public property locations for GI systems. This has been done in order to plan, analyze, implement and credit GI systems for pollutant load reductions on a watershed scale, as well as recognize all GI accomplishments within a municipality; however, the focus of the GI Plan and Framework is the integration of GI systems into public rights-of-way. The GI Plan is not intended to impose retrofit requirements on private property, outside the standard development application review process for projects already regulated by the MRP, but may provide incentives or opportunities for private property owners to add or contribute towards GI elements. 1.3 Purpose of Green Infrastructure Plan and Framework The purpose of the GI Plan is to describe how an agency will gradually transform its urban landscape and storm drainage systems from gray to green ; that is, shift from traditional storm drain infrastructure, where stormwater runoff flows directly from impervious surfaces into storm drains and receiving waters, to a more resilient, sustainable system that reduces and slows runoff by dispersing it to vegetated areas, promotes infiltration and evapotranspiration, collects runoff for nonpotable uses, and treats runoff using biotreatment and other green infrastructure practices. The GI Plan will also be used to demonstrate an agency s long-term commitment to implementation of green infrastructure to help reduce loads from pollutants of concern, particularly mercury and PCBs, discharged in stormwater to local waterways. The GI Plan will be coordinated with other agency plans, such as land use, transportation, parks, urban forestry, and sustainability plans, to achieve multiple potential benefits to the community, including improved water and air quality, reduced flooding, increased water supply, traffic calming, safer pedestrian and bicycle facilities, climate resiliency, improved wildlife habitat, and a more pleasant urban environment. 2

9 The purposes of this Framework are to: 1. Provide some background on the MRP requirements for GI Planning; 2. Describe the purpose, goals, and tasks to develop the city s GI Plan; and, 3. Outline the time frames for the creation of the GI Plan and other GI tasks required in the MRP. This Framework was reviewed and approved for submittal to the RWQCP by the Saratoga City Council and by the City Managers for Campbell and Monte Sereno, and the Town Manager for Los Gatos. The City and Town Councils were notified about GI and the GI Framework with a staff report or informational memo including the SCVURPPP GI Fact Sheet. The resolution and/or informational memos are attached as Appendix A. 1.4 West Valley Communities Description and Background City of Campbell: The City of Campbell occupies approximately six square miles of relatively flat land located approximately 50 miles south of San Francisco in Santa Clara County. Campbell is bounded on the north, east and west by the City of San Jose and on the south by the Town of Los Gatos. The city was incorporated in 1952, and has a jurisdictional area of 3,772 acres. According to the 2010 Census, Campbell s population was 39,349, with a population density of 6,685 people per square mile and average household size of As of 2016, according to the California Department of Finance (DOF), the estimated population is 42,584. Campbell has a traditional Downtown in the heart of the city, a natural creekside trail used by pedestrians and bicyclists both recreationally and for commuting, a beautiful collection of parks, a community center on a historic campus, a mix of housing types and a variety of shopping facilities that are accessible to neighborhoods and employment centers. Campbell enjoys a nearly perfect balance between the number of jobs and workers within its borders. Campbell s attractive living environment is enhanced by its central location in the Bay Area, and extensive regional transportation network including the Vasona Light Rail corridor. Additional details for Campbell are provided below. Land Use: Campbell is predominantly built-out, with undeveloped properties for new development becoming exceedingly scarce. As a result, the majority of new projects are infill developments where older and less dense uses are being replaced with higher density projects. As a result, the character of some neighborhoods has been affected by this intensification trend, and as a result, the land use category of some neighborhoods has been changed to a lower density to reflect the existing housing types. Conversely, some neighborhoods have been identified as areas where density can increase due to factors such as proximity to light rail. In those areas, the land use category on the General Plan Diagram has intensified. 3

10 Land uses within the City of Campbell are provided in Table 1. The City of Campbell is primary comprised of residential land use. Other land uses include commercial and services, industrial, retail, K-12 schools, and urban parks. Table 1. Percentages of the City of Campbell's jurisdictional area within land use classes identified by ABAG (2005) Land Use Category Population and Households Jurisdictional Area (acres) % of Jurisdictional Area Commercial and Services % Industrial % Residential 2, % Retail % K-12 Schools % Urban Parks % Other % According to US Census data and the DOF, population growth for the City of Campbell increased significantly from 27,067 in 1980 to 36,048 in The growth rate has slowed appreciably since The local population has continued to increase since the 2010 Census (39,349) and has shown continuing population growth through In 2016, the population for the City of Campbell had increased to an estimated 42,584, which is the most significant rate of population increase since the population increases between 1980 and Household growth increased at a much higher rate (110 percent) compared to Campbell s population (45 percent) from 1970 through From 1990 to 2010 both households and population growth slowed and population increases outpaced household increases at 9.2 and 5.6 percent, respectively. As of 2010, Campbell had approximately 16,000 households. Over the years, the average household size has fluctuated slightly with a high of 3.39 in 1970, and a low of 2.31 in In recent years, household size has remained at similar levels with an average of 2.38 persons per household in 2000, 2.42 persons per household in 2010, and an estimated 2.52 persons per household in Growth Projections: The City of Campbell developed growth projections as part of its General Plan Land Use and Transportation Element update, adopted August 19, Tables 2 and 3, below, describe projection scenarios with years and estimated percent growth in population and/or additional square footage of residential and non-residential buildings. Campbell s population has grown steadily over the past three decades. Current 2016 population estimates (42,584) have exceeded the predictions in Table 2. Campbell is currently working on a complete General Plan update, known as Envision Campbell. Envision Campbell will provide more accurate growth projections that will be available and included in the GI Plan. 4

11 The population increases in Table 2 were estimated based on the potential increase of 1,600 housing units, concentrated mainly on mixed-use redevelopment sites along light rail transit corridors and infill development. The time at which full development ( buildout ) will occur was not specified in or anticipated by the current General Plan. Designation of a site for a certain use does not necessarily mean that the site will be built/redeveloped with the designated use over the 20-year horizon of the General Plan. Table 2: Historic and Projected Population Population 26,910 36,048 38,138 41,946 Percent Increase 34% 5.8% 10 % 1. Assuming the development of 1,600 housing units at 2.38 persons per household by The population could vary depending on the actual number of persons per household. Source: City of Campbell s 2020 General Plan, adopted Non-residential building space in Campbell will increase nine percent from an estimated 10.2 million square feet in 2000 to nearly 11.2 million square feet in 2020, as shown in Table 3: General Plan Buildout Projections for Non-Residential Floor Space. This results from application of average assumed densities and floor area ratios to vacant sites and areas with potential redevelopment/intensification opportunities. Table 3: General Plan Buildout Projections for Non-Residential Floor Space Land Use Existing (sq. ft.) Projected Net New Building Area at General Plan Buildout (sq. ft.) Total (sq. ft.) Auto-related 413,011 (115,223) 297,788 Retail/Restaurant/Hotel 2,813, ,392 2,980,920 Industrial 2,529,444 (64,888) 2,464,556 Prof. Office 3,002, ,924 3,989,227 Parking Structures 419, ,500 Quasi-Public 1,058,072 (34,116) 1,023,956 Total 10,235, ,089 11,175,946 Transportation and Street Types: In Campbell, the local street system is organized in a hierarchy of five types of roadways. Arterial streets, collector streets, neighborhood collector streets, local streets, and private streets augment the regional highway system by serving local automobile traffic. Freeways and highways: California Department of Transportation (Caltrans) owns and maintains several freeways serving Campbell for regional mobility including Highway 17 (which is the southern extension of Interstate 880), Highway 85 and Interstate 280. These highways provide excellent north-south and east-west regional automobile access. 5

12 Expressways: These are major divided arterials with access limited primarily to grade separations and at-grade intersections. Expressways are generally designed, operated, and maintained by the County of Santa Clara. San Tomas Expressway is the only expressway in Campbell. Arterials: Campbell has only a few arterials throughout the City to handle peak hour traffic. Arterials are major multi-lane streets that primarily function to serve through traffic for inter-city and intra-city trips. Arterials also provide access to adjacent properties. Both bike routes and bike lanes can be found on arterials along with ADA accessible pedestrian sidewalks for access to commercial services. There are two types of arterials within the city: Class I arterials generally have little on-street parking and serve major bus routes such as Hamilton and Bascom Avenues, Class II arterials generally have on-street parking and serve major bus routes such as Campbell Avenue and Winchester Boulevard. Collector streets: These are low- to medium-speed two-lane or multi-lane streets that serve to collect and channel local traffic to arterials and to distribute arterial traffic onto local streets. Local streets are low-speed two-lane streets that provide direct access to abutting land uses. Local streets: These provide the lowest level of mobility and usually serve no bus routes. Some Campbell neighborhoods maintain a rural character including local streets with no sidewalk, curb or gutter, where runoff from streets has the opportunity to infiltrate into non-pervious dirt and gravel areas located on private residential park strip areas. Private streets: These are low-speed access streets that provide direct access to private properties within a particular subdivision or development. Public Transit: Campbell has three Santa Clara Valley Transportation Authority (VTA) owned and maintained light rail stations along the Vasona Light Rail Corridor, including stations at Hamilton Avenue, Downtown Campbell and Winchester Boulevard. Additionally, the City has extensive bus service and para-transit, all operated by the VTA. Maintenance of Public Streets: The City uses a Pavement Management System to identify and prioritize major preventive and corrective maintenance needs. All city streets are surveyed and rated every five years and arterials and collector streets every two years. Maintenance needs are identified by measuring observed pavement conditions against a city standard for system-wide average pavement surface conditions and standards establishing road repair strategies with the condition rating for individual street segments. Water Resources and Water Supply: Protection of water quality and the provision of adequate water resources is critical for the health and quality of life of Campbell residents and employees. Water quality is a regional issue that is regulated at the county, State and federal levels. San Jose Water Company (SJWC) is the local water supplier in Campbell. The regional wholesale supplier of water to the South Bay Area is the Santa Clara Valley Water District (SCVWD), which derives water from local, recycled and imported supplies. Some of the SCVWD s water is supplied by local rainfall and groundwater. The rainwater is stored in ten local reservoirs and some of it is 6

13 transferred to SCVWD s Groundwater Recharge Facilities. SCVWD owns and operates more than 30 groundwater recharge facilities, six of which are located in Campbell. These facilities percolate both local and imported water into the groundwater aquifer. Four municipal water pollution control plants located in Santa Clara County develop recycled water for outdoor use. Approximately 20,000 acre-feet per year of non-potable recycled water could be developed throughout the County by the year The recycled water is used mainly for landscape irrigation in various parts of the County. Currently, SCVWD does not supply recycled water to retailers in the City or have any projects or plans for supplying water to retailers in the City; however, Campbell has a program to use recycled water (during drought years) for construction site dust control and median landscape watering. Flood potential: Some land within the City of Campbell is located in special flood hazard areas. The land adjacent to the Los Gatos Creek, San Tomas Aquino Creek and Smith Creek may be designated as Areas of 100-year flood by the Federal Emergency Management Agency (FEMA). In areas with flood potential, the City requires that new construction meets State and local standards for construction as mandated by the Uniform Building Code. Stormwater Drainage System: The City operates and maintains a storm water drainage system and coordinates with surrounding jurisdictions and Santa Clara County to provide regional storm drainage for the Santa Clara Valley area. Drainage improvements are planned to enable additional development while preventing flooding. The stormwater drainage system consists of a series of inlets and pipes that channel storm runoff to various percolation ponds and Los Gatos and San Tomas Aquino creeks, which discharge into San Francisco Bay. Nearly all of Campbell s catchment areas drain to hardened channels, therefore, hydromodification management is not applicable. Open Space: Within the City of Campbell, open space land consists primarily of city and Santa Clara County parks and recreation facilities, school recreation facilities (i.e. sports fields), regional groundwater recharge facilities and creek corridors. Given the limitation for acquisition of new parkland, the City places a high importance on the maintenance, modernization and renovation of existing open space, park and recreation facilities to ensure that they are efficiently utilized and keep pace with the evolving recreational demands of the community. The City will focus on improving existing unimproved open space lands within the City, such as SCVWD Groundwater Recharge Facilities. SCVWD owns and maintains acres of groundwater recharge facilities located within the City. If improved and fully accessible, these facilities would complement the City s open space, park and recreation resources by providing unique amenities and special facilities. 7

14 Soil: Based on the BASMAA 2011 Report, titled Harvest and Use, Infiltration and Evapotranspiration Feasibility/Infeasibility Criteria Report, the National Resource Conservation Service (NRCS) offers data on existing soil types mapped in the US. In Santa Clara County, a majority of soil is classified Group D, meaning that it contains soil that is typically clay loam, silty clay loam, or sandy clays. Group D soils have very low infiltration rates; however, studies conducted in the West Valley communities, including, Campbell, Los Gatos, Saratoga, and Monte Sereno, have indicated higher infiltrating soils than other parts of the county. When infiltration is not available then biotreatment measures may be implemented Town of Los Gatos The Town of Los Gatos occupies approximately fourteen square miles located approximately 50 miles south of San Francisco in Santa Clara County. Los Gatos is bounded on the north by the City of Campbell, south by the Santa Cruz Mountains, east by the City of San Jose and west by the cities of Monte Sereno and Saratoga. The Town Incorporated in 1887, and has a jurisdictional area of 7,281 acres. In 2010, the Town had a population of 30,802, with a population density of 2,635 people per square mile and average household size of As of 2016, according to DOF, the estimated population for Los Gatos is 31,376. Los Gatos is characterized by hilly terrain located on the lower slope of the Santa Cruz Mountains at an elevation of 344 feet. Los Gatos is home to Netflix, Roku and over 3,700 businesses, which serve residents and draw visitors to the restaurants, hotels, and shops within a pedestrian-oriented downtown setting. The Town provides excellent schools, a vibrant Downtown, dynamic neighborhood and diverse shopping experiences and also features many parks and greenbelt areas. Downtown Los Gatos is listed on the National Register of Historic Places and is the model of what communities strive to achieve in a downtown. Additional Town characteristics are provided below: Land Use: Los Gatos is predominantly built-out. Land uses within the Town, as defined in the General Plan, are provided in Table 4. The Town is primary comprised of low density residential land uses. Los Gatos has approximately 4,329 acres of woodland/forest communities, including riparian woodlands, oak woodlands, broadleaved upland forest, and non-native ornamental trees, that support a very green environment. Other land uses include commercial, office, light industrial, K-12 schools, open space and urban parks. TABLE 4 EXISTING LAND USES Land Use Category Number of Acres Percent of Town Acreage Percent of SOI Acreage Residential Single 5, % 51.9% Residential Multi % 0% Commercial % 0% 8

15 Office Professional 126 2% 0% Light Industrial % 0% Public/Quasi-Public % 2.8% Public Utilities % 0.1% Agricultural 112 1% 1% Open 3, % 42.2% Vacant % 2% Total 11, % 100% Source: County of Santa Clara, Office of the Assessor, Growth Projections: The Town of Los Gatos is primarily a built-out community with few opportunities for new largescale development to occur. The Town established growth/development forecasts as part of its General Plan Environmental Impact Report (EIR). The population growth of Los Gatos has remained fairly small and stable in the last three decades as depicted in Figure 1. FIGURE 1 TOWN POPULATION BY YEAR, Sources: U.S. Census Population Estimates ; State of California, Department of Finance As shown in Table 5, implementation of the 2020 General Plan could result in the construction of up to 1,600 new residential units within the Town of Los Gatos by The majority of new housing is expected to be developed on the Housing Element sites. Approximately 270 units could be developed in the North Forty Specific Plan area. ABAG also expects that an additional 170 dwelling units will be developed over the next 10 years in Los Gatos. Most of these units will be multi-family residences, such as apartments or condominiums. A limited number of new stand-alone single-family residences will likely occur on vacant parcels in existing single-family neighborhoods. This increase in residential units could increase the population by 3,790 residents, from 28,810 to 32,600 people by

16 TABLE 5 HOUSING, POPULATION AND JOB GROWTH UNDER THE 2020 GENERAL PLAN Existing Conditions in 2008 Estimated New Development Under Draft 2020 General Plan Estimated Total Development in 2020 Housing Units 12,130 ᵃ 1,600 13,730 Population 28,810 ᵃ 3,790 ᶜ 32,600 Jobs 18,820 ᵇ 2,660 21,480 ᵃ Based on Claritas 2008 ᵇ Based on ABAG Projections, 2009 ᶜ Assuming 2.37 persons per household, based on State of California, Department of Finance, E-5 Population and Housing Estimates for Cities, Counties, and the State, Non-residential building space in Los Gatos could result in an increase from an estimated 4,082,050 million square feet in 2008 to nearly 5,025,260 million square feet by 2020, as shown in Table 6: Commercial, Office, and Industrial Growth Under the 2020 General Plan EIR. TABLE 6 COMMERCIAL, OFFICE, AND INDUSTRIAL GROWTH UNDER THE 2020 GENERAL PLAN Estimated Existing Conditions in 2008 ᵃ Estimated New Development Under Draft 2020 General Plan Estimated Total Development in 2020 Retail/Service 1,924, ,210 2,344,080 Square Footage Office Square 1,630, ,000 2,146,480 Footage Industrial Square 526,700 8, ,700 Footage Total 4,082, ,210 5,025,260 ᵃ Based on Santa Clara County Assessor Data, Transportation and Street Types: In Los Gatos, the local street system is organized in a hierarchy of six types of roadways. Arterial streets, collector streets, neighborhood collector streets, hillside collector streets, local streets, and private streets augment the regional highway system by serving local automobile traffic. Freeways and highways: two freeways and one highway serve Los Gatos for regional mobility: Caltrans owned and maintained Highway 17 (which is the southern extension of Interstate 880), Highway 85 and Highway 9. These highways provide north-south and east-west regional automobile access. 10

17 Arterials: Arterial streets are designed to facilitate two or more lanes of traffic in each direction and provide intra-community travel and access to the county-wide highway system. Los Gatos has eight (8) arterials throughout the Town to handle peak hour traffic. Arterials also provide access to adjacent properties. Both bike routes and bike lanes can be found on arterials along with ADA accessible pedestrian sidewalks for access to commercial services. Examples of arterial streets include Los Gatos Boulevard and Blossom Hill Road. Collector streets: These are low- to medium-speed two-lane or multi-lane streets that serve to collect and channel local traffic to arterials and to distribute arterial traffic onto local streets. A hillside collector street serves abutting property in the hillside areas, carrying traffic to arterial streets or other collectors. Local streets: Low-speed two-lane streets provide for neighborhood traffic movement that provide direct access to abutting land uses. Local streets provide the lowest level of mobility and usually serve no bus routes. Some Los Gatos neighborhoods, especially those in unincorporated county pockets, maintain a rural character including local streets with no sidewalk or curb and gutter. These rural style streets drain mostly to vegetated areas on private property. Private streets: Low-speed access streets that provide direct access to private properties within a particular subdivision or development. Public Transit: VTA has one planned light rail station along the Vasona Light Rail Corridor on Winchester Boulevard near Lark Avenue. Additionally, the Town has extensive bus service and para-transit service, all operated by VTA. Maintenance of Public Streets: The Town uses a Pavement Management System to identify and prioritize major preventive and corrective maintenance needs. Town streets are surveyed and rated on a biennial basis. Maintenance needs are identified by measuring observed pavement conditions against a Town standard for system-wide average pavement surface conditions and standards establishing road repair strategies with the condition rating for individual street segments. Water Resources and Water Supply: Protection of water quality and the provision of adequate water resources is critical for the health and quality of life of Los Gatos residents and employees. Water quality is a regional issue that is regulated at the county, State and federal levels. The Town of Los Gatos does not own or operate a water utility. SJWC is the local water supplier in Los Gatos. The regional wholesale supplier of water to the South Bay Area is SCVWD, which derives water from local, recycled, and imported supplies. Some of SCVWD s water is supplied by local rainfall and groundwater. The rainwater is stored in ten local reservoirs and some of it is transferred to SCVWD s Groundwater Recharge Facilities. SCVWD owns more than 30 groundwater recharge facilities. These facilities percolate both local and imported water into the groundwater aquifer. 11

18 Two open water bodies are within the Town: County owned and maintained Vasona Reservoir and the northern tip of SCVWD s Lexington Reservoir (in the Town s SOI). Creeks include perennial and ephemeral creek channels with above ground and underground reaches. Most of these creeks are considered part of the Guadalupe River watershed. Los Gatos Creek is one of the primary creeks in the area, flowing south to north into and out of the Vasona Reservoir. Four municipal water pollution control plants located in Santa Clara County develop recycled water for outdoor irrigation use. Recycled water is currently produced from these plants and used for landscape irrigation in some areas of the County. Approximately 20,000 acre-feet per year of non-potable recycled water could be developed throughout the County by the year Currently, SCVWD does not supply recycled water to retailers in the Town or have any plans for supplying water to retailers in the Town. Flood potential: Some land within the Town of Los Gatos is located in special flood hazard areas. The land adjacent to a number of creeks, such as: Ross Creek, Los Gatos Creek, Smith Creek, and San Tomas Aquino Creek, may be designated as Areas of 100-year flood by FEMA. In areas with flood potential, the Town requires that new construction meets State and local standards for construction as mandated by the Uniform Building Code. Stormwater Drainage System: The Town of Los Gatos is served by an extensive man-made storm drainage system including pipe networks, ditches and culverts. These systems discharge into the natural creeks that cross the Town. The Town operates and maintains a storm water drainage system and coordinates with surrounding jurisdictions and Santa Clara County to provide regional storm drainage for the Santa Clara Valley area. Drainage improvements are planned to enable additional development while preventing flooding. The stormwater drainage system consists of a series of inlets and pipes that channel storm runoff to nearby creeks, including Los Gatos Creek, Ross Creek, San Tomas Aquino Creek, and Smith Creek, which discharge into San Francisco Bay. Open Space, Agriculture and Vacant land: Open Space/Recreation refers to indoor and outdoor recreational facilities, including public open spaces such as regional parks, community centers, playgrounds and neighborhood parks, country clubs, and natural open spaces. After Residential Single-family land use, Open Space/Recreation comprises the second highest percentage of total land in Los Gatos. There are approximately 1,624 acres of open space in the Town. Much of this acreage is contained in four large facilities: St. Joseph s Hill, Sierra Azul Open Space, Vasona Lake County Park and La Rinconada Country Club. According to the Santa Clara County Assessor s Office, about 64 acres of land in Los Gatos, and approximately 48 acres in the SOI, is currently devoted to agricultural uses. Agricultural land is used for raising and harvesting crops, breeding livestock and/or housing equipment used for agricultural purposes. 12

19 Approximately 292 acres within the Town are vacant parcels of varying sizes that are scattered throughout the Town. Most of the vacant acreage in Los Gatos is located in the hillside singlefamily residential area on the eastern side of the Town. Parcels here are generally larger than they are elsewhere in Los Gatos, and a number of significantly sized parcels are vacant. Generally, vacancies are more common in residential areas of Los Gatos than in commercial areas, although a few small, isolated commercial vacancies exist. Soil: Based on the BASMAA 2011 Report, titled Harvest and Use, Infiltration, and Evapotranspiration Feasibility/Infeasibility Criteria Report, NRCS offers data on existing soil types mapped in the US. In Santa Clara County, a majority of soil is classified Group D, meaning that it contains soil that is typically clay loam, silty clay loam, or sandy clays. Group D soils have very low infiltration rates; however, studies conducted in the West Valley communities, including, Campbell, Los Gatos, Saratoga, and Monte Sereno, have indicated higher infiltrating soils than other parts of the county. When infiltration is not available then biotreatment measures may be implemented City of Monte Sereno Incorporated in 1957, the City of Monte Sereno occupies approximately 1.6 square miles of land, located adjacent to the Town of Los Gatos and City of Saratoga and nestled in the hills of western Santa Clara County. According to the 2010 Census, Monte Sereno has a population of 3,475, with a population density of 2,195 per square mile and average household size of Monte Sereno is home to peaceful neighborhoods, abundant open space and a serene lifestyle within close proximity to a variety of high-quality urban amenities. Unlike many other cities in Santa Clara County, Monte Sereno did not form on a crossroads or from an historical village. Consequently, a commercial core never developed in the City, leaving Monte Sereno strictly residential. Additional details for Monte Sereno are provided below. Land Use: The majority of land use in Monte Sereno consists of very low and low-density residential neighborhoods. Monte Sereno does not feature any commercial or industrial land uses. The City of Monte Sereno is divided into eight neighborhoods, distinguished by their location and unique characteristics, such as ambience, physical description, type of roadways and vegetation. Table 7 describes all Land Use categories for Monte Sereno. Table 7. Summary of Designated Land Uses in Monte Sereno, CA Land Use Designation Acreage in City Limits Single-family Residential, 1 DU/Acre 858 Single-family Residential, 2 DU/Acre 55 Single-family Residential, 3-5 DU/Acre

20 Multi-family Residential, 3 DU/Acre 4.5 (in City SOI) Public 9 Open Space and Conservation 38 Growth Projections: Monte Sereno is a largely built-out community with a limited supply of vacant land. Additionally, many of the remaining vacant sites within the City boundary are located on unstable, steep slopes, not ideal for development. The General Plan anticipates limited additional development through New development is expected to consist of redevelopment of single family homes and new secondary dwelling units. No additional nonresidential development is anticipated. Monte Sereno s population has grown slowly over the past three decades. According to DOF, as of 2016, Monte Sereno s estimated population was 3,475. Monte Sereno households are slightly smaller than the average Santa Clara County household. Average household size in was 2.85 persons per household in Monte Sereno and 2.89 persons per household in Santa Clara County. The number of households in the City has remained at approximately 1200 households from ABAG has predicted that the City will have a 3.2% growth rate in the decade between , resulting in a net increase of approximately 38 households. Transportation and Street Types: Monte Sereno has three types of roads serving the City: thoroughfares, collectors, and local streets. Thoroughfares: roadways that accommodate higher volumes of traffic at higher speeds, and connect Monte Sereno with adjacent communities. The three thoroughfares in Monte Sereno are state-owned Highway 9, Winchester Boulevard and Quito Road. Collector and local streets: designed for internal circulation within Monte Sereno and accommodate lower volumes and vehicle speeds. These are all the streets in residential neighborhoods. Maintenance of Public Streets: The City uses a Pavement Management System to identify and prioritize major preventive and corrective maintenance needs. All City streets are surveyed and rated every two years. Maintenance needs are identified by measuring observed pavement conditions against a city standard for system-wide average pavement surface conditions and standards establishing road repair strategies with the condition rating for individual street segments. Water Resources and Water Supply: Protection of water quality and the provision of adequate water resources is critical for the health and quality of life of Monte Sereno residents. Water quality is a regional issue that is 14

21 regulated at the county, State and federal levels. The City of Monte Sereno does not own or operate a water utility. SJWC is the local water supplier in Monte Sereno. The regional wholesale supplier of water to the South Bay Area is SCVWD, which derives water from local, recycled and imported supplies. Some of SCVWD s water is supplied by local rainfall and groundwater. The rainwater is stored in ten local reservoirs and some of it is transferred to SCVWD s Groundwater Recharge Facilities. SCVWD owns more than 30 groundwater recharge facilities. These facilities percolate both local and imported water into the groundwater aquifer. Flood Potential: Large-scale flooding is not a significant hazard in Monte Sereno. Most of the properties in Monte Sereno are built above the base flood elevation; however, both surface and subsurface local drainage problems do exist in some parts of Monte Sereno, and there is currently no drainage plan for Monte Sereno. Due to its minimal danger of flooding, The Federal Emergency Management Agency (FEMA) has withdrawn the City of Monte Sereno from the emergency program list of the National Flood Insurance Program. Stormwater Drainage System: Monte Sereno uses a stormwater collection system, in conjunction with the natural creek drainage system, to manage runoff. Stormwater collected through this system ultimately drains into the San Francisco Bay. A majority of the residential streets drain to swales or private park strip areas of mostly dirt or gravel. Open Space: Within the City of Monte Sereno, there is approximately 70 acres of privately-owned open space land. The City itself, however, does not own or manage public parkland; however, with very large residential lot sizes, the City provides a vast amount of natural green areas to accommodate natural infiltration. Soil: Based on the BASMAA 2011 Report, titled Harvest and Use, Infiltration and Evapotranspiration Feasibility/Infeasibility Criteria Report, NRCS offers data on existing soil types mapped in the US. In Santa Clara County, a majority of soil is classified Group D, meaning that it contains soil that is typically clay loam, silty clay loam, or sandy clays. Group D soils have very low infiltration rates. However, studies conducted in the West Valley communities, including, Campbell, Los Gatos, Saratoga, and Monte Sereno, have indicated higher infiltrating soils than other parts of the county. When infiltration is not available then biotreatment measures may be implemented City of Saratoga Incorporated in 1956, the City of Saratoga has a jurisdictional area of 7,924 acres located approximately 35 miles south of San Francisco in the low-lying foothills of the Santa Cruz 15

22 Mountains. Saratoga is located in the westerly portion of Santa Clara County and surrounded by the cities of Cupertino, San Jose, Campbell, Monte Sereno and unincorporated county. According to the 2010 Census, Saratoga has a population of 30,219, with a population density of 2,561 people per square mile and average household size of 2.8. Saratoga is home to suburban small-town neighborhoods, a pedestrian-oriented downtown, wineries, and many retail and office uses. Other major land uses in the community include the Saratoga Civic Center, the Saratoga Library, and neighborhood parks. Additional details for Saratoga are provided below. Land Use: Saratoga is predominantly built-out with the majority of land use being low density, singlefamily residences on individual lots. Table 8 below indicates the Land Use categories in Saratoga. Other land uses include commercial retail, professional office, community facilities, and open space and urban parks. Due to the city s large percentage of low density residential and open space land use areas, Saratoga has a large amount of woodland/forest communities that support a very green environment. Table 8 Land Use Categories LAND USE MAXIMUM DU/ACRE OR PEOPLE PER ACRE MAXIMUM ALLOWABLE COVERAGE SUMMARY DESCRIPTION OF USE RESIDENTIAL LAND USES Residential Hillside Conservation (RHC) Residential Very Low Density (RVLD) Residential Low Density (RLD) Medium Density M-10 M-12.5 M-15 Residential Multi- Family (RMF) Planned Development Residential (PDR) 0.5 du/ac or 1.55 people/acre 1.09 du/ac or 3.38 people/acre 2.18 du/net acre or 6.76 people/acre 4.35 du/net acre or 13.5 people/acre 3.48 du/net acre or 10.8 people/acre 2.90 du/net acre or 9.0 people/acre 14.5 du/ac or people/acre du/acre or people/acre 25% of site area, or Single-family dwellings 15,000 s.f, whichever is less 35% of site area Single-family dwellings 45% of site area Single-family dwellings. Single-family dwellings. 40% of site area Detached and attached single-family dwellings, condominiums, duplexes and apartments % of site area Mix of single-family and multi-family densities and housing types. COMMERCIAL LAND USES 16

23 Commercial Retail (CR) Professional Office (PO) ** 60% of net site area, except as regulated by an applicable specific plan. Commercial uses/centers serving community and/or neighborhood; not regional in orientation. Refer to Saratoga Village Specific Plan for uses, height and lot coverage permitted in Specific Plan area. ** 30% of site area Professional office uses permitted; serves as transition zone between commercial and residential areas. PUBLIC AND QUASI-PUBLIC FACILITIES LAND USES Community Facilities Sites (CFS) varies varies Public, civic and quasi-public (private institutional uses, including but not limited to, religious uses (churches, synagogues, religious schools and the novitiate), convalescent homes, private schools, the cemetery, the electrical substation, and the Odd Fellows Home. OPEN SPACE LAND USES Open Space Outdoor Recreation (OS- OR) Open Space Private (OS-P) Open Space Managed Resources (OS-MR) Hillside Open Space (HOS) 1 du/ 4 acres N/A City or County parks or lands designated for those uses. Only recreational facilities (i.e. playground equipment, recreational courts, etc.), structures necessary to support the parks or structures of particular historic value are permitted in these areas. These sites are considered to be of particular value for recreational purposes. N/A Consists of open space resources under private ownership (i.e. Saratoga Country Club Golf Course) N/A Consists primarily of orchard lands, water reservoirs and lands that are under Williamson Act Contract. Only single-family dwellings or structures directly associated with agricultural use are permitted. 1 du/20 acres to 1 du/160 acres (based on a slope density formula subject to stringent criteria) 25% or 12,000 square feet whichever is less Covers all areas within Saratoga s Sphere of Influence (SOI) not designated as parks or OS-MR. Uses include agricultural, mineral extraction, parks and low intensity recreational facilities, land in its natural state, wildlife refuges and very low intensity residential development and support uses of those listed above. These criteria apply to the SOI portion of the General Plan Public Use Corridor N/A N/A Applies to the railroad corridor and allows multi-use trails. (PUC) Overall Height Limit No structure permitted over two stories in height except for structures located within the Saratoga Village boundary (as defined by the Saratoga Village Area Plan, (1988) which shall be regulated by the Village Plan ) or for quasi-public uses, a three-story structure is allowed provided the slope underneath the three-story area is 10% or more and a stepped pad is used. Mixed residential/commercial uses are permitted in all commercial lands, with a maximum of 20 dwelling units per acre excluding density bonuses for very low-income, low-income, or senior housing. The residential portion shall not exceed 50% of the total floor area, (850 sq. ft. for a one-bedroom unit-1,250 sq. ft. for a two-bedroom unit), with an increase of 10% of the total floor area permitted for the site, for projects that provide below-market-rate housing. Total site coverage may also be increased by 10% for a project containing below market-rate housing. Growth Projections: The City of Saratoga has developed growth/development forecasts as part of its General Plan Housing Element. Table 9 and Figure 2 below, describe projection scenarios with years and estimated percent growth in population. As stated in Saratoga s General Plan Housing 17

1 North San Antonio Road Los Altos, California MEMORANDUM GREEN INFRASTRUCTURE PLAN FRAMEWORK

1 North San Antonio Road Los Altos, California MEMORANDUM GREEN INFRASTRUCTURE PLAN FRAMEWORK 1 North San Antonio Road Los Altos, California 94022-3087 MEMORANDUM DATE: July 11, 2017 TO: FROM: SUBJECT: City Council Aida Fairman, Associate Civil Engineer GREEN INFRASTRUCTURE PLAN FRAMEWORK The City

More information

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan Date: August 17, 2016 To: From: Subject: Management Committee Dan Cloak, Consultant Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan Recommendation: Receive the

More information

DRAFT Land Use Chapter

DRAFT Land Use Chapter Stevens Creek Urban Village DRAFT 1 18 17 Land Use Chapter INTRODUCTION This Land Use Chapter describes how the Stevens Creek Urban Village will accommodate the growth that is planned for it in the Envision

More information

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development Page 1 of 8 Office of the City Manager CONSENT CALENDAR June 13, 2017 To: From: Honorable Mayor and Members of the City Council Dee Williams-Ridley, City Manager Submitted by: Phillip L. Harrington, Director,

More information

Transportation. Strategies for Action

Transportation. Strategies for Action Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;

More information

Ten Mile Creek Planning Area

Ten Mile Creek Planning Area PLANNING AREA POLICIES TEN MILE CREEK Ten Mile Creek Planning Area Location and Context The Ten Mile Creek Planning Area ( Ten Mile Creek area ) is located south of the current Boise AOCI, generally south

More information

3. Are there any projects exempt from the definition of Regulated Projects?

3. Are there any projects exempt from the definition of Regulated Projects? STORMWATER REQUIREMENTS: OVERVIEW OF PROVISION C.3 Background: On October 14, 2009, the Regional Water Quality Control Board, San Francisco Bay Region, issued a municipal regional stormwater permit (MRP)

More information

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

Annual Reporting for FY Regional Supplement for New Development and Redevelopment Regional Supplement for New Development and Redevelopment San Francisco Bay Area Municipal Regional Stormwater Permit September 2012 Table of Contents Page INTRODUCTION 2 Low Impact Development 2 C.3.c.iii.(1)

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Background and Process Monroe Expressway will be open by the end of 2018 Union County and Indian Trail identified a need to revisit

More information

The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016

The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016 The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016 Connie Goldade Community Design + Architecture Green Infrastructure (GI) Requirements Develop a Green

More information

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016 Background BASMAA Development Committee Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program s May 6, 2016 In the recently reissued Municipal Regional Stormwater

More information

Site Design for Protecting Water Quality 2013 Award Winning Projects

Site Design for Protecting Water Quality 2013 Award Winning Projects C.3. Workshop, May 29, 2013 Site Design for Protecting Water Quality 2013 Award Winning Projects Vishakha Atre Santa Clara Valley Urban Runoff Program Current New Development and Redevelopment Requirements

More information

Green Infrastructure & Low Impact Development

Green Infrastructure & Low Impact Development Green Infrastructure & Low Impact Development CITY OF COVINGTON STORMWATER MANAGEMENT WHAT IS GREEN INFRASTRUCTURE? Green infrastructure uses vegetation, soils and natural processes to manage water and

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

Silverdale Regional Center

Silverdale Regional Center Silverdale Regional Center Vision for Silverdale Regional Center The Silverdale Regional Center Plan (Plan) will guide the evolution of the Silverdale Regional Center from a collection of strip malls and

More information

COLVER ROAD INDUSTRIAL CONCEPT PLAN

COLVER ROAD INDUSTRIAL CONCEPT PLAN COLVER ROAD INDUSTRIAL CONCEPT PLAN A CONCEPTUAL LAND USE AND TRANSPORTATION PLAN FOR TA-4 AN URBAN RESERVE AREA OF THE CITY TALENT City of Talent Adopted by City Council Resolution No., June, 2015 PART

More information

9 th Street Sub Area Plan

9 th Street Sub Area Plan 9 th Street Sub Area Plan In the 1990 s, when the Township prepared the last Master Plan, the 9 th Street corridor was studied as part of a larger 9 th Street Focus Area that included the West Main Street

More information

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT MAY 8, 2014 The Planning and Development Department hereby forwards to the Planning

More information

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA Planned Community Stockton, CA Project Overview March 2007 Summary of Proposed Community is a master-planned community proposed for development on approximately 3,810 acres in southeast Stockton. In 2004,

More information

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN Public Meeting October 2016 1 Plan Summary and Discussion Public Meeting May 4 2017 City of Brockton Bill Carpenter, Mayor Department of Planning

More information

SPRINGHILL LAKE TRANSIT VILLAGE

SPRINGHILL LAKE TRANSIT VILLAGE Greenbelt Metro Area Sector Plan - Subarea Design Policies and Guidelines - Springhill Lake Transit Village 113 SPRINGHILL LAKE TRANSIT VILLAGE Residential Neighborhood and Village Center CONCEPT Springhill

More information

LAND USE MEADOWS PLANNING AREA

LAND USE MEADOWS PLANNING AREA LAND USE MEADOWS PLANNING AREA I. Profile of Meadows Planning Area A. Location Meadows Planning Area is delineated by I-5 on the north, the Nisqually Bluffs representing the growth boundary on the east,

More information

Post - Construction Hydromodification Development Requirements

Post - Construction Hydromodification Development Requirements Condensed Version - Interim Low Impact Development / Hydromodification Guidelines, City of Lompoc 1 Post - Construction Hydromodification Development Requirements I. PURPOSE A. The purpose of these requirements

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING 4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING 4.7.1 INTRODUCTION The following analysis discusses the consistency of the Proposed Project with the corresponding land use and zoning designations

More information

A. WHAT IS A GENERAL PLAN?

A. WHAT IS A GENERAL PLAN? I. Introduction A. WHAT IS A GENERAL PLAN? A general plan is the planning guideline for the future of a city. It contains goals and policies which regulate urban development, the protection of the natural

More information

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan 425 Hillside Avenue Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan I. INTRODUCTION The is seeking the services of a qualified consulting firm to prepare plans

More information

THE PLANNING AREA 2.1 PLANNING AREA LOCATION

THE PLANNING AREA 2.1 PLANNING AREA LOCATION 2. The Planning Area Brisbane Baylands Specific Plan 21 2 THE PLANNING AREA 2.1 PLANNING AREA LOCATION The Baylands is located approximately midway between San Francisco s central business district and

More information

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1 INTRODUCTION CHAPTER 1 Ms. Guajardo s Class - Central Elementary CH 1 1 1.1 SETTING South Centre City is a linear corridor south of Downtown Escondido paralleling Centre City Parkway and South Escondido

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

4.1.3 LAND USE CATEGORIES

4.1.3 LAND USE CATEGORIES 4.1.3 LAND USE CATEGORIES a. City Center District The City Center District incorporates the existing character and mix of uses in downtown Belmont to encourage redevelopment and new development in keeping

More information

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association GREEN ON THE HORIZON Challenges of Integrating LID into New Development Southeast Stormwater Association Annual Seminar, Charleston SC October 9, 2014 JENNIFER A. NUNN, PE THE BALMORAL GROUP Acknowledgments

More information

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations. This section of the Draft EIR addresses the existing land uses on and adjacent to the project site and discusses the potential impacts of the proposed project on existing land uses. Key issues addressed

More information

Chapter 4. Linking Land Use with Transportation. Chapter 4

Chapter 4. Linking Land Use with Transportation. Chapter 4 Chapter 4 Linking Land Use with Transportation Chapter 4 59 Chapter 4 Linking Land Use with Transportation Community Design and Transportation Program Introduction Since the 1950s, the predominant development

More information

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

CHAPTER 8. Mrs. Zimman s Class - Central Elementary SUSTAINABILITY CHAPTER 8 Mrs. Zimman s Class - Central Elementary 8.1 OVERVIEW Green infrastructure also known as low impact development (LID) and environmental or sustainable site design is an environmentally

More information

HAZARD MITIGATION GOALS AND OBJECTIVES

HAZARD MITIGATION GOALS AND OBJECTIVES SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update

More information

City of Hermosa Beach Administrative Policy #

City of Hermosa Beach Administrative Policy # City of Hermosa Beach Administrative Policy # SUBJECT: Living Streets Policy Date: Approved by: City Council Authority: Public Works Department & Community Development Department Mayor, PURPOSE The City

More information

City Of Sparks Planning Commission Item

City Of Sparks Planning Commission Item Page 1 of 12 City Of Sparks Planning Commission Item Meeting Date: May17, 2012 Subject: PCN12009, Public Hearing, Consideration and possible action on a Master Plan Amendment and Rezoning request to change

More information

Getting Started On Your Green Infrastructure (GI) Plan

Getting Started On Your Green Infrastructure (GI) Plan Getting Started On Your Green Infrastructure (GI) Plan Peter Schultze-Allen EOA Inc. Annual SCVURPPP C3 Workshop June 16, 2015 Presentation Outline MRP 2.0 C.3.j (GI) requirements GI Framework elements

More information

Westbound: A One-day Exploration of Growth

Westbound: A One-day Exploration of Growth Westbound: A One-day Exploration of Growth Frog Pond Area 2018 UGB Expansion Proposal June 13, 2018 Growing Out: UGB Asks Four cities submitted proposals to expand greater Portland s urban footprint by

More information

APPENDIX C SPECIAL PLANNING AREAS

APPENDIX C SPECIAL PLANNING AREAS SPECIAL PLANNING AREAS There are five Special Planning Areas (SPAs) on the Land Use Diagram (Figure LU-2). The SPAs are areas with significant new growth potential that require more detailed subsequent

More information

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential 13. OSTEEN LOCAL PLAN Background: The Osteen Local Plan area is located in southwest Volusia County along the SR 415 corridor between Lemon Bluff Road and Acorn Lake Road and includes 3,990 acres. The

More information

North San José Area Development Policy

North San José Area Development Policy North San José Area Development Policy City of San José Table of Contents 1. Background...3 Policy Area Boundaries...4 Participating Agencies...4 2. Vision and Purpose...4 Core Area...5 Transit/Employment

More information

4 LAND USE DESIGNATIONS

4 LAND USE DESIGNATIONS 4 LAND USE DESIGNATIONS Chapter 4 describes the land use designations and densities that will implement the development vision for North Burlingame outlined in Chapter 3. Land use densities are described

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES CHAPTER 1 GENERAL DESIGN GUIDELINES 1.0 INTRODUCTION This Publication has been developed to provide current, uniform procedures and guidelines for the application and design of safe, convenient, efficient

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION DATE: January 6, 2016 TO: LEAD AGENCY: Responsible Agencies, Organizations, and Interested Parties Contact: Tyler Barrington, Principal Planner Planning Department Community Development

More information

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian

More information

III. PROJECT DESCRIPTION

III. PROJECT DESCRIPTION III. PROJECT DESCRIPTION A. PROJECT LOCATION Regional Setting The project site is located in the southeast quadrant of the City of Chico in Butte County, California and is comprised of four parcels totaling

More information

Glenn Highway MP DSR. Landscape Narrative

Glenn Highway MP DSR. Landscape Narrative Glenn Highway MP 34-42 DSR Landscape Narrative Project Landscape Goals The Glenn Highway MP 34-42 Project extends through a variety of landscape types typical to the Matanuska-Susitna Valley. In general,

More information

Yahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA

Yahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA Yahoo! Inc. CO-7 Site Location: 701 First Avenue Sunnyvale, CA Rocky swales Multi-story buildings reduce building footprint Access to the Bay Trail open space area including parking available for visitors

More information

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville URBAN DESIGN BRIEF 2136&2148 Trafalgar Road Town of Oakville Prepared By: METROPOLITAN CONSULTING INC For 2500674 Ontario Inc November 2016 TABLE OF CONTENTS Page No. 1.0 Introduction/Description of Subject

More information

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd. PART A: PREAMBLE 1.0 PURPOSE The purpose of this Secondary Plan is to provide a development framework for intensification of the Yonge/ Steeles corridor including the north side of Steeles Avenue West

More information

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay Green Streets Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay As the Bay Area continues to grow through development of roads, revitalization of neighborhoods, and construction

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

Warren County/Bowling Green Focus 2030 Comprehensive Plan VOLUME 1 INDEX

Warren County/Bowling Green Focus 2030 Comprehensive Plan VOLUME 1 INDEX Appendix 5: Index VOLUME 1 INDEX A Aesthetics ES-6, FLU-15, FLU-17, FLU-24, NCR-7 Agricultural Base FLU-18, FLU-20 Agricultural Centers, Rural FLU-11 Agricultural District NCR-17-NCR-18 Agricultural Economy

More information

include playgrounds, sports fields, community gardens and picnic areas.

include playgrounds, sports fields, community gardens and picnic areas. DEVELOPMENT PLAN OPEN SPACE SYSTEM OPEN SPACE SYSTEM The neighborhood provides for a range of open space types. The Village Square is an important open space in the neighborhood. It serves as a gathering

More information

Neighborhood Districts

Neighborhood Districts NEIGHBORHOOD DISTRICTS SEVEN MAIN DISTRICTS Neighborhood Districts While the Development Plan provides a broad-scale overview of the neighborhood, this section focuses on uses and relationships at the

More information

Section 9 NEIGHBORHOOD DESIGN

Section 9 NEIGHBORHOOD DESIGN Section 9 NEIGHBORHOOD DESIGN City of Lancaster Comprehensive Plan D u n k i n, S e f k o & A s s o c i a t e s, I n c. NEIGHBORHOOD DESIGN INTRODUCTION There are many ways in which a neighborhood can

More information

SCVURPPP Green Infrastructure Handbook. Kristin Kerr, P.E. EOA, Inc. April 19, 2017

SCVURPPP Green Infrastructure Handbook. Kristin Kerr, P.E. EOA, Inc. April 19, 2017 SCVURPPP Green Infrastructure Handbook Kristin Kerr, P.E. EOA, Inc. April 19, 2017 Outline of Presentation Overview Handbook Contents Schedule Overview MRP requires GI Plans to include general guidelines,

More information

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018 Example Stormwater Control Plan For a Residential Subdivision Project Whispering Pines Lane Anytown, USA February 21, 2018 XYZ Corporation Jane Jones, 925-555-1212 This example prepared by Dan Cloak Environmental

More information

Staff Report and Recommendation

Staff Report and Recommendation Community Planning and Development Planning Services 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 p: 720.865.2915 f: 720.865.3052 www.denvergov.org/cpd TO: City Council Neighborhoods and Planning Committee

More information

SANTA CLARA COUNTY FIRE DEPARTMENT CENTRAL FIRE PROTECTION DISTRICT INTRODUCTION

SANTA CLARA COUNTY FIRE DEPARTMENT CENTRAL FIRE PROTECTION DISTRICT INTRODUCTION ANNEX 1. SANTA CLARA COUNTY FIRE DEPARTMENT CENTRAL FIRE PROTECTION DISTRICT INTRODUCTION ORGANIZATION AND JURISDICTION The Santa Clara County Fire Department (SCCFD) (also known as the Santa Clara County

More information

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent COMMUNITY DESIGN Intent An attractive, well-designed County will attract quality development, instill civic pride, improve the visual character of the community, and create a strong, positive image for

More information

Improve Neighborhood Design and Reduce Non Point Source Water Pollution

Improve Neighborhood Design and Reduce Non Point Source Water Pollution HOW TO Planning Guide Improve Neighborhood Design and Reduce Non Point Source Water Pollution This document was funded by a grant from the New Hampshire Coastal Program with funding from the National Oceanic

More information

East Corridor Final Environmental Impact Statement

East Corridor Final Environmental Impact Statement East Corridor Final Environmental Impact Statement Alternatives Considered Operating Plan The requirements for opening day operations versus year 2030 are based on ridership and operations. Opening day

More information

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period. Definitions Access Management: A combination of physical techniques and transportation policies used to control the flow of traffic between roads and the surrounding lands. Alternative City Form Scenarios:

More information

EXISTING COMPREHENSIVE PLAN

EXISTING COMPREHENSIVE PLAN EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an

More information

Joint Meeting City Council and the Plan Commission. September 1st, 2015

Joint Meeting City Council and the Plan Commission. September 1st, 2015 Joint Meeting City Council and the Plan Commission September 1st, 2015 1 The City Plan Commission shall recommend a City Plan for the physical development of the City Article IX Section 2 of the City of

More information

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017 Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017 Land Use Rural Areas Refine the Farm and Forest area (FF) Update FF boundaries to account for existing lots less than five acres

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION 3.0 PROJECT DESCRIPTION 3.1 BACKGROUND Under California law (Government Code Section 65300 et seq.), every city and county is required to have a general plan. The general plan is to be comprehensive and

More information

LAND USE ELEMENT. Purpose. General Goals & Policies

LAND USE ELEMENT. Purpose. General Goals & Policies LAND USE ELEMENT Purpose This Land Use Element contains the goals and policies necessary to support the City s responsibility for managing land resources and guiding development through implementing regulations,

More information

C. Westerly Creek Village & The Montview Corridor

C. Westerly Creek Village & The Montview Corridor C. Westerly Creek Village & The VISION Community Vision When the goals of the city are achieved Westerly Creek Village, a distinctive community defined by Montview Boulevard and Westerly Creek, is a strong

More information

III. Design Principles

III. Design Principles III. Design Principles The design of Bay Meadows Phase II has been guided by a series of Urban Design Principles. These principles, informed by consultant site analysis, City staff recommendations, and

More information

New Tools/Resources for

New Tools/Resources for New Tools/Resources for C.3 Stormwater Compliance Laura Prickett, AICP, EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Outline of Presentation Updated C.3 Handbook Handbook outline

More information

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories: Lakeside Business District Lakeside Business District Land Use Categories: Campus Commercial Campus Commercial means a mixture of uses which includes corporate offices, office parks, hotels, commercial,

More information

4.1 AESTHETICS AND VISUAL QUALITY

4.1 AESTHETICS AND VISUAL QUALITY SCOPE AND METHODOLOGY 4.1 AESTHETICS AND VISUAL QUALITY This section evaluates the potential impacts to aesthetics and visual quality. Aesthetics refers to visual resources and the quality of what can

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

EXECUTIVE SUMMARY. Introduction

EXECUTIVE SUMMARY. Introduction EXECUTIVE SUMMARY Introduction State Route 68 is a designated scenic route that connects the world-renowned Monterey Peninsula to US Highway 101 and the Salinas Valley. SR 68 is a key route for bicycle,

More information

North Oakville East Parks Facilities Distribution Plan. November, 2009

North Oakville East Parks Facilities Distribution Plan. November, 2009 North Oakville East November, 2009 POLICY CONTEXT 1) Purpose a) The purpose of this document is to be a guide for the location, configuration, design and development of the parks system for the North Oakville

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 5H From: Date: Subject: Staff October 17, 2008 Council Meeting Local Government Comprehensive Plan Review Draft

More information

Urban Sustainability Area Designation

Urban Sustainability Area Designation Urban Sustainability Area Designation City of Santa Cruz October 2013 The City of Santa Cruz Urban Sustainability Area (USA) encompasses the City s business centers and primary transportation corridors

More information

Selecting Appropriate Stormwater Control Measures for Your Development Project

Selecting Appropriate Stormwater Control Measures for Your Development Project Phase II Post-Construction Stormwater Requirements Workshop - February 10, 2014 Selecting Appropriate Stormwater Control Measures for Your Development Project Jill Bicknell, P.E., EOA, Inc. Outline of

More information

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES In This Chapter Goals & Strategies 182 Project List 183 Future Land Use 186 11 IMPLEMENTATION STRATEGIES NORTH AUGUSTA, SC 2017 COMPREHENSIVE PLAN 179 Individual commitment to a group effort that is what

More information

Jackson Highway Master Plans

Jackson Highway Master Plans Jackson Highway Master Plans West Jackson Highway Master Plan (PLNP2008-00240) Jackson Township Specific Plan (PLNP2011-00095) NewBridge Specific Plan (PLNP2010-00081) Mather South Community Master Plan

More information

SECTION IV: DEVELOPMENT CONCEPT

SECTION IV: DEVELOPMENT CONCEPT 80 SECTION IV: DEVELOPMENT CONCEPT Section IV: DEVELOPMENT CONEPT This section provides an overall understanding and rationale for what is envisioned in The Preserve, the intended quality and character

More information

To ensure that resources will be available to provide a consistent level of public services to the community.

To ensure that resources will be available to provide a consistent level of public services to the community. Future Land Use Plan The land use plan is one of the most prominent chapters in the Stillwater Comprehensive Plan. It provides a visual representation of what the community is expected to look like in

More information

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three NEWFOUNDLAND I-5 Agricultural District Subject Site SUNDANCE ANDERSON Single Family Residential CHRISTY PUD Agricultural District Highway Business General Location Annex, Rezone & Preliminary Plat Lansdowne

More information

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions.

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions. 6. Land Use 6.0 Preamble A healthy and livable city is one in which people can enjoy a vibrant economy and a sustainable healthy environment in safe, caring and diverse neighbourhoods. In order to ensure

More information

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction 2.1 Introduction 2.1 Introduction This section of the Specific Plan describes and illustrates the desired form, character and uses of the Downtown Addition and explains the underlying design principles.

More information

SQUAMISH 2010 AND BEYOND COMMUNITY VISION

SQUAMISH 2010 AND BEYOND COMMUNITY VISION Our plan has been imagined and created to be both pragmatic and visionary. At the core of the strategy is a consideration of the highway s role and its impact on the community. First and foremost in creating

More information

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY INTRODUCTION Through the joint efforts of the City of Tulsa planning staff and the Land Services division of Indian Nations Council of Governments (INCOG), the Berryhill Land

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Table of Contents G.1.a Water Resources - Surface Water - Drainage Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

GREEN BUILDING PROGRAM. COUNTY OF LOS ANGELES A joint effort by Department of Regional Planning and Department of Public Works

GREEN BUILDING PROGRAM. COUNTY OF LOS ANGELES A joint effort by Department of Regional Planning and Department of Public Works GREEN BUILDING PROGRAM COUNTY OF LOS ANGELES A joint effort by Department of Regional Planning and Department of Public Works Waste Management Board Fire Department Realtors National Park Service Regional

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project of an Environmental Impact Report and Scoping Meeting for the As the Lead Agency, the County of San Mateo (County) will prepare an Environmental Impact Report (EIR) for the (project), and would like your

More information

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc. Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater Laura Prickett, EOA, Inc. November 17, 2011 Outline of Presentation Why prioritize infiltration and harvest/use

More information

1.0 Circulation Element

1.0 Circulation Element 5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and

More information