MANUAL OF INSTALLATION AND EXPLOITATION

Size: px
Start display at page:

Download "MANUAL OF INSTALLATION AND EXPLOITATION"

Transcription

1 MACHINERY FACTORY ASTRA LT Alytus, Ulonų 33 Lithuania tel fax HEATING BOILERS Astra G-18MES Astra G-25MES Astra G-31,5MES Astra G-40MES Astra G-50MES Astra G-80MES Astra G-100ES MANUAL OF INSTALLATION AND EXPLOITATION 2011

2 Heating boilers are transported packed under the manufacturer s documentation, protected from atmospheric precipitation and dust. The transporter should ensure the quality of product transportation and protect from damages. The vendor (manufacturer) does not accept claims for production damaged during transportation. The BUYER should lay claims to the transporter for the product damaged during transportation. The BUYER (user) should follow all requirements of this guidebook during transportation, storage and exploitation, otherwise he loses the vendor s (manufacturer s) guarantees. 1. SAFETY REQUIREMENTS 1.1. The room where the boiler is to be installed should be ventilated The air should freely access the room The boiler flue connection with the chimney should be tight. Don t heat up the boiler with leaking flue connections! 1.4. The boiler should be installed in a closed heating system with a closed (membranous) expansion vessel, the volume of which should be no less than 10% of the total volume of a heating system (including the boiler) (the volume of the expansion vessel can be calculated according to the standard EN annex D) Safety valve for no more than 2 bar response pressure should be installed at the boiler in the heating system for the boilers (Astra G-18 and Astra G-25) and maximal 3 bar response pressure for the boilers Astra G-31,5, Astra G-40, Astra G-50, Astra G-80 and Astra G-100. Please consult the chapter Clean boiler flues from smoke and pitch scurf, as indicated in this passport. The chimney should be cleaned as required by fire prevention regulations The room where the boiler is installed should have fire-extinguishing tools: fireextinguishers, sand box, shovel and other tools Don t put flammable materials on or near the boiler Connect the boiler to the electric system only by a three-pole plug plugged into an adequate three-pole socket with earthling. Protect connection cable from damages Monitor operation of temperature regulation devices and manometer readings. If notice an abnormal boiler operation, stop heating and eliminate damages Kindle the boiler and put the firewood into the boiler only as indicated in section 6 of this passport Keep children away from the boiler! Only adults can serve the boiler Before kindling the boiler, check, if the heating system is filled up with water and aired Operating pressure in the heating system should not exceed: - 0, 2 MPa (2.0 kg/cm 2 ) for the boilers Astra G-18, Astra G-25; - 0, 3 MPa (3.0 kg/cm 2 ) for the boilers Astra G-31,5, Astra G-40, Astra G-50, Astra G-80, Astra G The electrical connections of the boiler are tested: - evenness of the protective chain electric resistance of the protective chain does not exceed 0, Ω, - the minimal resistance of the electric insulation is 1.0 MΩ, - the resistance of the electric insulation is checked using 50 Hz, 1000V. 2. PURPOSE OF THE PRODUCT Heating boilers are designed for heating of dwelling houses, public, industrial and similar purpose buildings where water-heating systems are installed. Boilers are fired only with wood (firewood) or (saw dust, peat, chaff, etc.) briquettes. It is recommended to fire dry (20% moisture content) wood. It is possible to fire fine wood waste and saw dust in small quantities (to 10%), mixing them with firewood. Control and regulation equipment installed in the boilers automatically maintains the set heat carrier (water) temperature, ensures cost-efficient operation of the boilers, and safe exploitation. The boilers of this type are constructed for wood firing with a partial gas generation. In the upper combustion chamber of the boiler, gas is extricated (generated) from the burning firewood and burned in the lower chamber. Intensity of gas generation and its combustion is regulated by the frequency and duration of air inlet into combustion chambers. Advantages of the boilers: Gas generation from firewood ensures a high effective operation coefficient. Boiler is equipped with the excess heat distribution system (serpentine of the emergency cooling).

3 Power of the boiler (temperature of a heat carrier) is controlled automatically by a thermo-regulator, by turning on or off a ventilator (ventilators) of the air inlet into combustion chambers; and by a traction regulator, by closing or opening air supply opening cap of the ventilator. Long load combustion period. Complete fuel combustion ensures cost-efficient fuel exploitation. Ashes might be removed only 1-2 times per week. 3. TRANSPORTATION, STORAGE, UNPACKING, PREPARATION TO EXPLOITATION Heating boiler should be carefully loaded, unloaded and transported, suffering no big impacts. The boiler can be transported only in a vertical position, fastened in order to avoid sliding and falling. If the boiler is transported in other than vertical position, decorative surfaces may be damaged, tins battered, control and regulation equipment broken, built-in ceramic kindling details may fall down and splinter. The boiler should be stored also in a vertical position. It is not allowed to put one boiler on another, as a safety-packaging frame is not designed for this purpose. The boiler should be stored in closed space protected from atmospheric precipitations. Air humidity of the room should not exceed 80% in order to avoid condensate (dew) forming on the surfaces of the boiler. Storage temperature may vary from -40 ºC to +60 ºC. If the boiler was transported or stored in minus temperatures, then before it is kindled, it should be kept in plus temperature no less than for 2 hours (for the order and requirements of the first kindling see section 6 of this passport). After the heating boiler is delivered to the site, take off the packing frame and polyethylene film and unscrew bolts of boiler fastening to the packaging base. Take off the boiler from the packaging base. WARNING! Opening the doors of the boiler, check, if all tools listed in the section THE BOILER KIT are there. Check, if painted surfaces haven t been damaged, components not battered, control and regulation equipment not broken during transportation. If notice any inadequacies of the listed above, lay your claims to the transportation or vendor company. The kit consists of: 1. Boiler 1 unit 2. Poker 1 unit 3. Scraper 1 unit 4. Guidebook for exploitation 1 unit 6. Leg 4 units 7. Fan/ventilator 1 unit 4. INSTALLATION These boilers of solid fuel are boilers of complete loading. For this reason they reach the highest effectiveness when they are working at the nominal power and due to this the boilers must be equipped with the accumulation tank of sufficient size which could accumulate the excessive heat volume. Recommended capacity of the accumulation tank is about 50 liters for 1 kw of nominal power of boiler: Model of boiler G-18 G-25 G- 31,5 G- 40 G- 50 G- 80 G- 100 Required volume of accumulation tank, liters The boiler has to be exploited only with the installed emergency cooling system. Description of the connection scheme of the emergency cooling serpentine. Thermostatic safety valve protects the boiler form the overheating. If the water temperature in the boiler exceeds 95 0 C the valve automatically opens the flow of water from the water supply system through the cooling serpentine. This water absorbs the excessive heat energy and flows out. Sensor of valve with the external thread ½ is screwed in the socket on the rear wall of the boiler. Technical data of the thermostatic safety valve : Opening temperature 95 0 C Highest working temperature C

4 Working pressure 10 bar Pipe of sensor L=142 mm, external thread ½ ATTENTION! The system of the emergency cooling of the boiler can not be used for the heating of water. Description of the principal scheme of the boiler room. When the water temperature in the boiler reaches 60 0 C there is launched circulation pump connected with the boiler. Water circulates through the thermostatic mixing valve in the cycle boiler thermostatic mixing valve boiler. Heating system is equipped with the programmed automatic control processor and 3-way mixing valve with electric drive (if the heating system is not equiped with the programmed automatic control processor and 3-way mixing valve with electric drive there can be installed manual operation 3-way mixing valve and to perform the regulation of heating system in manual way). When the water temperature rises further the programmed processor control and regulate the temperature of the water supplied from the accumulation tank to the heating system. This temperature depends very much on the outside and ambient temperatures measured with the sensor. In order to avoid the corrosion of boiler caused by the water condensate in the temperatures below 55 0 C thermostatic mixing valve automatically ensures that the minimal temperature of water returning to the heating boiler is 60 0 C. Installing the boiler, the following requirements should be fulfilled: The boiler should be installed in a closed heating system with a closed (membranous) expansion vessel, the volume of which should be no less than 10% of the total volume of a heating system (including the boiler). The closed heating system is the system with no free access to atmospheric air, which actuates corrosion. Due to this, it is restricted to drain water from the system without a particular reason (e.g. in summer, etc.). It is also necessary to ensure tightness of the system in order to need fewer refills with fresh water having free oxygen. Quantity of the additional water should not exceed 5% of water volume of the system per year. If an open expansion vessel is installed at the highest point of the heating system, it should be disconnected from the system and an automatic air escaper installed instead as well as a closed expansion vessel at the boiler (see fig. 4). There must be no shut-off valves between the boiler and safety valve. The technical characteristics of the safety valve: Instrument Technical characteristics Type of boiler Safety valve Connection diameter does Astra G-18, Astra G-25, not exceed ½, opening pressure 2 bar Safety valve Temperature pressure gauge Connection diameter does not exceed 3/4, opening pressure 3 bar Range of pressure 0-4 bar Temperature C Astra G-31,5, Astra G-40, Astra G-50, Astra G-80, Astra G-100, All the boilers Water from the safety valve should be conducted via an offtake duct. It should be conducted in the way that the water let by the valve would safely flow, avoiding exposure with people and electrical parts of the boiler. The diameter of the offtake duct should be no less than the diameter of the offtake opening connection branch of the safety valve. Total length of the offtake duct should not exceed 2 metres. Installing this duct, no more than 2 elbow joints at 90 0 angles should be used. No closed, adjustable or other reinforcements should be installed in the valve water offtake duct. This duct should be installed in the way to see the offtake flow of the water. If the end of the duct is to be hidden (e.g. in the sewerage pipe), then this duct should have a special funnel enabling to see the offtake flow of the water. WARNING! Operation of the safety valve should be checked at least once per month. The valve is opened for a while by turning its head to see a small quantity of the offtake water. Avoiding this, due to a high temperature impact, the components of the valve may stick together and serious damages of the boiler and the heating system may occur as well as danger arise for human health and life. The temperature of the returning water from the heating system to the boiler should be no less than 60 C. This is the only way to prevent the walls of the boiler combustion chambers from weeping, and the boiler will be protected from corrosion. To ensure the temperature of the returning water to the boiler and to regulate water temperature of

5 the heating system, it is necessary to install a four-way mixing valve between the boiler and the heating system. Water temperature supplied from the boiler during exploitation should be no less than 70 C. WARNING! In order to guarantee a natural water circulation in the boiler, the pipeline between the boiler and the four-way mixing valve (boiler four-way mixing valve boiler) should be of the same diameter and meet the diameter of the boiler connection branches (see fig. 4, I - boiler ring). Four-way mixing valve should be installed above the boiler. The boiler will operate in the most effective and economic way, if a circulating pump is installed in the system. It should be installed behind the water supplied by the four-way mixing valve in the pipe. This guarantees a constant water flow in the heating system. The boiler may also operate in a natural circulation (gravitational, without a pump) system, however in this case, it won t be totally used and its operation conditions won t be optimal. In case when reconstruction of natural (gravitational) circulation systems is performed by installing the pump, in order to avoid emergencies, when the pump is broken, it should be installed on the edging line together with reverse valves, as shown in fig. 4 and 5. The pump is controlled with the electronic controller of boiler and is connected to the electric socket on the rear wall of the boiler. Dirt collector should be installed in the returning water pipe of the heating system. Boiler room should be ventilated. The required airflow necessary for combustion and ventilation should be also guaranteed. For this purpose, boiler room doors should have grille or there should be a gap between the doors and the floor. If there is no possibility to bring air in from another rooms or the house is very tight, it will be necessary to make an opening in the exterior wall. Air quantity should be no less than 1, 6 m 3 /kw per hour. Cross-section area of the opening should be no less than 0,001 m 2 /kw. The required air quantities and areas of the opening are presented in the table below. Boiler type G-18 G-25 G- 31,5 G- 40 G- 50 G- 80 G- 100 Required air quantity per hour, m 3 /h Area of airflow opening, m 2 0,018 0,025 0,025 0,03 0,05 0,08 0,1 For example: the area of airflow opening should be 0,025 m 2 or 250 cm 2, i.e. 16x16 cm; or the height of the gap under the door - about 4 cm when door width is 60 cm. Put the boiler on the hard (e.g. concrete) and even ground, closer to the chimney pot. Leave at least 600 mm gap between the back wall of the boiler and building structure for boiler servicing and cleaning. The smallest distance between a lateral wall of the boiler and building structure is 400 mm. If building structure is of the flammable materials, this distance should be doubled. At least 800 mm gap should be left from the other side of the boiler to have an access to the backside of the boiler, its servicing and cleaning. From three sides of the boiler the floor of 300 mm and from the front of the boiler the floor of 500 mm should be of inflammable materials. Screw supporting legs in to the base of the boiler and level the boiler with screw nuts using a level. Smoke exhaust opening of the boiler should be connected with the chimney by a metal pipe. Internal diameter of the metal connecting pipe should be at least of the external diameter of the smoke exhaust opening of the boiler. To improve the traction, a connecting pipe between the boiler and the chimney should be installed with an inline towards the boiler. All junctions should be carefully tightened by a heat-resistant material. If the boiler is installed higher than the heating equipment, the water level measuring instrument must be installed in the heating system. When the boiler is installed in the open heating system, on the highest point of the heating system there has to be mounted the open expansion vessel. The volume of expansion vessel has to be about 10 % of the total volume of water in the heating system (including the volume of the boiler). The diameter of the overflow pipe of the expansion vessel has to exceed the diameter of the safety inlet pipe by one unit. Safety return pipe has to be connected to the return pipe of the heating system and to the bottom of the expansion vessel. It is forbidden to install any fittings in the safety inlet and return pipes between the boiler and expansion pipe. Chimney requirements. It is recommended to install acid-resistant stainless steel shell into the stone chimney. It improves traction of the chimney and protects the stone chimney from destruction due to the condensate (moisture) impact. Internal diameter of the shell should be no less than the external diameter of the smoke exhaust opening of the boiler. Chimney shell may be round or

6 oval. It is not recommended to use rectangular shell, as due to the temperature fluctuations, its walls deform, gaps appear at the element junction points, through which the condensate falls on the walls of the stone chimney, and an additional air is sucked in, which reduces traction of the chimney. Traction of smoke should correspond to the calculated value of traction (see the table of technical data). The shell should be constructed by the factory and certified. Minimum permissible height of the chimney should be at least 6 m. The top of the chimney should be above the top roof at least by 0, 5 m. If the chimney is in bigger distance than 1 m from the top roof, the top of the chimney should level with the line going down from the top roof with no bigger than 10 angle from the horizon. You should also evaluate the influence of different obstacles present around the building (trees, other buildings, etc.) (see fig. 3). There can not be connected any other equipment to the chimney connected with the boiler. Electrical installation with earthing should be installed for connection of the electrical part of the boiler pursuant to electrical safety requirements (see a principal electricity scheme, fig. 4). PROTECT isolation of the connection cable from damages! 5. FUEL The boiler is fired only by firewood and different briquettes. It is prohibited to fire by coal. It is recommended to fire dry firewood (15-20% moisture content). The drier is the firewood, the bigger its caloric content. When a moisture content of the firewood is 20%, thermal value of 1 kg is approximately 4 kwh; when the moisture content is 50%, its thermal value reduces in half. The length of the firewood should be at least 5 cm shorter than the length of the boiler combustion chamber, i.e.: Boiler type G-18 G- 25 G- 31,5 G- 40 G- 50 G- 80 G- 100 The maximal length of the firewood in mm The recommended thickness of the firewood is mm. Larger firewood should be split at least once. WARNING! Don t fire newly prepared and too damp firewood! Recommendations for firewood preparation: - Put split firewood into well ventilated and, if possible, well sun lightened place. Firewood should be well protected from rain and snow; - stow the split firewood with sufficient gaps in between in order for a freely circulating air to withdraw the moisture evaporated from the firewood; - there should be a sufficient space atop of the firewood up to the roof and such ventilation that wet air could drift away; - it is not recommended to store freshly cut (undried) firewood in the cellar, as its drying requires sun and free air circulation. Dry firewood could be stored in the cellar where sufficient ventilation is guaranteed; - It is recommended to dry split firewood under above described conditions in dependence with the type of the wood: soft wood (alder, asp, fir, willow etc.) no shorter than 8 months, hard wood (oak, ash, birch, etc.) no shorter than 20 months. 6. EXPLOITATION Preparation for heating Before kindling the boiler, check the edge (5) position at the lower combustion chamber (see fig. 2): the edges should be pressed to the rear wall of the boiler; ~ 100 mm gap should be between the wall and the edge in the front. At the rear part of the boiler at the air inlet above the ventilator there is a damper to regulate the air inlet to the upper burning chamber and heater (fig. 12). Operation of the damper: after loosening the screw push the damper until the support and then pull by 15 mm (till the marking on the damper plate) and then tighten it with screw. This damper has to be adjusted during the preparation for handling. It is recommended to check the position of this damper at the beginning of the heating season. During heating season don t put firewood and other flammable materials on the boiler (or at unsafe distance). You can cause a fire! Fill the heating system with water. The filling pressure has to exceed the hydrostatic pressure by 0, 2 bars but no exceeding the working pressure of the boiler. When the system is filled up with water, check tightness of the whole system before kindling the boiler and afterwards when the operation reaches its standard mode. Check if the air is sufficiently drained from the heating system.

7 Kindling order of the boiler Before kindling the boiler, check whether all requirements indicated in the section 1 are executed. Open the damper of the upper flue (C) by pushing the handle (12) towards yourself (see fig. 2). Open the door (9) of the upper combustion chamber (2) and put dry kindling wood on the heatresistant shell (3) to form 2-3 cm gap between the opening of the shell and kindling wood. Put some of the easy flammable materials and bigger kindling wood and firewood atop. Fire the kindling wood, wait till the firewood combusts, close the door and turn the handle (12) of the flue damper from yourself to the end. Load the wood without any bigger spaces until the top of combustion chamber. Bigger pieces of firewood should be loaded in the middle and smaller prices at the sides, because the walls of the combustion chamber due to their lower temperature slows down the combustion of the bigger pieces of wood. Do not cover with the wood the hole of the smoke extraction valve C. With the boiler control panel switch the tension of the electronic controller with the button 0 - I ( see the technical description of the electronic controller). There will be switched on the lights and temperature indicator. Using the buttons of the temperature regulation set required temperature of the water flowing of the boiler it is recommended to set on the 70 0 C. Close the upper door of the combustion chamber, open the lower door, burn the wood pieces., Leave the lower door open until the water temperature in the boiler reaches 40 0 C. Close the lower door, close the valve of the upper smoke traction by pushing the handle of valve (12) to the end. Switch-on the ventilator with the control panel. Afterwards the boiler will work on the automatic range and will maintain the set temperature of the water from the boiler. WARNING! The door of the boiler combustion chambers should be tightly closed, there should be no flammable products accessing the exterior. Door tightness is regulated by screwing or unscrewing hinge and lock screws of the door. Regulation of the boiler temperature see the technical description of the electronic regulator. Emergency thermostat of the water temperature (safety switch! 95 o C ). If the water temperature due to the unforeseen reasons exceeds the maximal allowable limit, safety thermostat (emergency switch), switches off the ventilator of the air supply. Combustion intensity will decrease and the temperature of water will drop. When the emergency thermostat comes into action (switches off) the light of the ventilator switch and electronic controller is off, it is necessary to detect the reasons and to remove them. Emergency thermostat is turned on by taking off the cover of thermostat! 108 o C and pressing the red button.. The attempts of purchaser to repair the thermostat and to recover its functions on his own without removal of reasons which caused the over-heating of boiler can result not only serious damages of boiler, but also the danger for the health and life. If the reasons of the switch of the emergency thermostat can not be detected and removed, it is necessary to call the servicing company! Addition of the firewood While putting firewood into the combustion chamber (during boiler operation or after load burning off), keep strictly to the set order: 1) Open the damper of the upper flue by pulling the handle (12) (see fig. No. 2). 2) Switch off the ventilator. 3) Wait at least 20 s, open the upper door. 4) Put the firewood in and close the door tightly. 5) Switch on the ventilator. 6) Close the damper. If operated following this order, smoke and carbon won t enter the room. Combustion control The combustion control of boiler is described in the chapter COMBUSTION CIONTROL of the technical description of regulator KR-4. The flame in the boiler can be checked by opening the lower door of the combustion chamber when the ventilator is on. Temperature regulation of the heating system See the description of the scheme of boiler room ( beginning of the chapter 4). Cleaning of the boiler Aches are removed from the boiler each 4-7 days. Open the door of the upper combustion chamber and shovel aches down to the lower chamber. Open the door of the lower chamber, take out the ceramic inserts and shovel ashes to the metal box. WARNING! In any case keep strictly to the determined order: open the damper of the upper flue, then after 20 s open the boiler door.

8 Clean boiler chambers from smoke-black and pitch scurf once or twice a month. Clean the boiler when the fuel is completely burned and the boiler is cooled down to at least +40 C. Clean smoke-black and scurf from combustion chambers and flue walls using a scraper and metal hog. Clean after the doors of the combustion chambers are open and caps of flue upper openings unscrewed. When finished, check, whether no ashes or smoke-black fell into the ventilator opening and tightly screw the caps of the flue openings. Control water pressure in the heating system at least every two weeks. If necessary, fill it up. If the boiler is not being heated, drain the water off the system when air temperature is below 0 C! Emergency extinction of the boiler If due to any reasons you must immediately extinct the heated boiler, by any means don t pour water on the kindling wood! The boiler can burst. It is very convenient to use dry sand for emergency extinction. There should be ~50 kg of dry sand in the boiler room. Sand not only well isolates burning firewood from the air oxygen but also cools down the burning zone. Then, when the boiler cools down, sand can be easily cleaned and removed. 7. POSSIBLE DAMAGES Damage Cause Ways of elimination 1. The set temperature (power) cannot be reached 2. Smoke breaks through the doors 3. Ventilator isn t operating - Not enough water in the heating system; - Thermo regulator or ventilator is broken; - Bad quality fuel (high moisture content, very large firewood); - Heating surfaces of the boiler are very impure; - No traction in the chimney (impure) the upper ignition is congested; - Ceramic burner is foul. - Tightening rope is damaged; - Doors are leaky along the whole perimeter. - No traction in the chimney - Emergency thermostat went off (switch light of ventilator is off); - Thermo regulator or ventilator is broken; - Disconnection of electricity supply. Fill up Replace Use dry fuel, split firewood Clean Clean Clean Clean Replace with a new one Adjust hinge supports and door lock (regulated screwing or unscrewing door hinge or lock screws) Clean. Call representatives of the service company; turn on after indication of the causes (see section 5) Replace Check electric fuses of the building, call the electrician

9 Indicators 8. TECHNICAL DATA Nominal heating power -tire wood kw - wooden briquets, kw Class of boiler according to EN Meanings of the indicators G-18 G-25 G-31,5 G-40 G-50 G-80 G-100 Class of protection against electric impact Usage coefficient,% Area of the internal heated surface of boiler, m 2, 1,92 2,08 2,08 2,2 3,39 3,8 6,45 Power of the cooling serpentine, kw Water volume in the boiler, litres Setting range of the temperature regulator O C Max working smoke traction, mbar 0,25 0,25 0,30 0,30 0,32 0,35 0,38 Working pressure of water in the system, bar, max 2,0 2,0 3,0 3,0 3,0 3,0 3,0 Testing pressure of boiler, bar 4,0 4,0 4,5 4,5 4,5 4,5 4,5 Max. allowable water temperature in the boiler, O C, Max. allowable working water temperature in the boiler, O C, Electric characteristics - voltage, V/ frequency, Hz 220/50 220/50 220/50 220/50 220/50 220/50 220/50 - used power, W Level of electric protection of boiler Dimensions - height, mm width, mm depth, mm Weight of boiler, kg, Diameter of the connection nozzles 1 1 / / / / / Volume of combustion, l Dimensions of the loading hole, mm 350x x x x x x x285 Al diameter of the smoke extraction, mm Length of wood pieces, mm Temperature of the outlet gases at the nominal heating power, 0 C ,

10 9. GUARANTEE AND ITS VALIDATION CONDITIONS 1. The manufacturer gives 2 year guarantee*, if the installation, start-up and regulation (the first kindling and adjustment) and maintenance are performed by the certified company and the 6 months guarantee if the mentioned works are executed by the non certified company : - the guarantee repairs are performed, if the faults occur due to the manufacturer s fault or used bad quality materials; - guarantee period is not extended after boiler faults have been eliminated during the guarantee period; - boiler cleaning as well as boiler and heating system regulation are not included into the list of guarantee repair works; - guarantee doesn t mean that losses suffered due to the boiler fault occurred during the guarantee period will be compensated; - guarantee repair works and replacements of the parts are free of charge during the guarantee period; - the client pays for boiler installation and the first kindling and regulation works. * One year guarantee is given to the boiler ventilator, thermo regulators and door stuffing (tightening ropes). 2. Guarantee validation conditions: - guarantee is valid from the boiler selling date; - guarantee is valid, if the boiler is installed, connected to the heating system and exploited under the requirements of this passport. 3. Guarantee is not applied in the following cases: - when heat exchanger is limed; - in case the heat transmitter is frozen; - when the boiler is broken due to improper exploitation; - when the boiler is broken due to improper connection of the electric input; - when the boiler parts are mechanically damaged; - if the boiler is connected to the heating system not under the schemes and requirements of this passport. 4. The owner of the boiler pays himself for repair works performed after the guarantee period. 10. ACCEPTANCE CERTIFICATE The heating boiler Astra G serial No. meets the standard (EN 303-5) requirements and is accepted suitable for exploitation. Manufacturing date Head of Quality Service

11 BOILER GUARANTEE CARD Boiler Astra G... Boiler serial No. Selling date, place, seal Seller s name, surname, signature BOILER START-UP AND ADJUSTMENT CARD Start-up, adjustment date Start-up and adjustment performing company Certificate No. Employee s name, surname, signature Employee s qualification certificate No.

12

13 L k a b h H Rear viev Supplied Trap regulator b 1 Trap regulator 17 a 1 80 B d o152 Returning 7 Cross-section C A B Boiler type Boiler typeb L B H L h H k h a 1 k b 1 a1 a b1 b a D b d d G-31, ASTRA G-18 MS/MES G ASTRA G-25 MS/MES Frame Damper hendte of upper combustion chamber ASTRA G-31,5 MS/MES 2. Combustion 615 chambers oppening to the flue G1 ½ 3. Ceramic shel 13. Control panel ASTRA G-40 MS/MES 4. Air path with ventiliators Flue cheaning caps Ceramic edge 17. Adjustable legs ASTRA G-50 MES 6. Flue Connection 170 of the --- cooling serpentine /2" Sensors of the termregulators 1210 and 19.Nozzle of the sensor of the safety valve 1/2" ASTRA G-80 MES emergency thermostat Tekeoff cap A-air inlet opening 180 G2 ASTRA G-100 MES 9. Combustion 810 chamber 1230 doors B-opening 185 to the flue ,11. Connecting braches C-upper combustion chamber opening to the flue 1. Frame Fig.2. General 12. Damper picture of hinge the boiler of upper combustion chamber 2. Combustion chambers opening the flue 3. Ceramic shell 13. Control panel 4. Air path with ventilator 14. Outlet of water 5. Ceramic edge 16. Flue cleaning cap 6. Flue 17. Adjustable legs 7. Sensors of the thermoregultors and 18. Connection of the cooling serpentinre ½" emergency thermostate 19. Nozzle of the cooling serpentine ½" 8. Take off cap 9. Combustion chamber doors 10, 11. Connection branches А Air inlet opening В Opening to the flue С Upper combustion chamber to the flue Fig. 2. General picture of the boiler

14 Fig. 3. Zones of wind influence Bigger angles form an increased resistance of the chimney traction Sensor of Thermostatic Safety valve Thermical sofety valve Filter Water from the watersupply sistem pressure is 2-6 bar. Temperature C Astra G-31,5 To sewage Water from the watersupply sistem pressure is 2-6 bar. Temperature C Filter Thermical sofety valve Astra G-40 To sewage Fig.4Heating energy distribution scheme (Scheme for the wunection of serpertine of emergency cooling)

15 PE N L 220 V PE M PE N L N L KM PE N L L1 L1 L14 N L3 N L4 4 F L1 L L13 L14 L13 L2 N L N L1 N1 L2 L3 L4 P SK S2 S1 KR 5. pic. Electric scheme ( electronic control) S1 lilet switch (R595KMET2F) S2 ventiliator switch (R392KYFT2C) SK emergency thermostat ( LA ) F safety plug 2A M1 ventiliator (GR03710/L25X0E12/03 KM syocket connection KR controller (KR-4) PE

16 Ceramic inserts and their position in heat boiler No Ceramic Type of heat boiler insert G-31,5 G Burner ŠK ŠK Chopper ŠK ŠK Segments 3 G G

17 Declaration of Confirmity Manufacturer: Machinery plant Astra AB Address: Ulonu st. 33, Alytus, Lithuania Product designation: Heating boiler Heating boiler Power, kw Waking pressure, bar Astra G-31,5 31,5 2,0 Astra G ,0 GB We confirm, thwart this product designated comply with the conditions of the following: 1. Requirements of the directives : 97/23 EC, p /95 EC These standards were applied for the above mentioned products: EN EN EN EN Procedure of conformity evaluation according to regalement 97/23 EC 2.3 is executed by TÜV Thüringen. Certification No 0662/0373/05 No 0662/0528/06 Alytus (date) Vaidas Liesionis, marketing director

18 Technical description of the control device KR-4 Designation: Control device is designed for the control of the solid fuel boiler. Fan is controlled according to the law of proportional integral- differential regulation (PID) and the pump, air valve or electric heating device are regulated positionaly. Connection: Control device is connected according to the scheme designed on the fig, No. 1: L1, N supply of electricty to the control device; L2 supply of electricity to the fan; L3 voltage to the fan; L4 voltage to the pump; P voltage to the programmed output. Fig. 1. Scheme of the connection of control device Temperature sensor RK (PT-100) is installed in the water tight capsule which is immerged into the water of boiler. Voltage of the fan L2 is connected from the control pannel of the boiler to the control device when the boiler works in the heating regime (the fuel is loaded and the limit thermical relay is not in action). Impulse commutator of the fan connects L3 to L2. The relay of control of pump connects L4 to L1. It connects P with L1. The power of the fan is VA. The maximal power of the controlled pump is 250 VA. Maximal controlled power of the relays of programmed output is 250 VA. Exploitation After the loading of fuel the fan is put into operation with the swith on the control panel. There appears green signal light "Heating" 3 (Fig. 2.) and the process of the fan control begins. The fan is working only when the green signal light No. 3 is on. The desired water temperature of the boiler is set with the keys 2 (2 pav.). By short pressing of + or -, digital indicator 1 starts to indicate the temperature of the water in the boiler. For the change of the temperature it is necessary to press and to keep the related key (for the increasing +, for decreasing - ). After the few seconds after the last press of the key the set temperature is saved and the indicator starts to show the measured temperature of the water (when indicator shows the set temperature, there is a point lighting near the digits ; when indicator shows the real measured temperature there is no point lighting near the digits). 1 digital temperature indicator; 2 temperature setting keys; 3-6,8 signal lights: 3 "heating", 4 "heating off", 5 "pump", 6 fan, 8 programmed output. 7 programmed output control key Fig. 2. Front pannel of the regulating device The speed of the fan is proportional to the deviation of the temperature, to its duration and to the rate of the increase/decrease of the water temperature in the boiler. Each time at the start there is launched the electric magnet, which opens air valve and there appears light 8. Control of the pump The pump of the heating system can be switched on for the continuing operation or it can be switched on and off depending on the water temperature. The operation of the pump and the temperatures for the switch on / off are defined by the servicing staff, referring to the characteristics of the heating system. When the pump is on there is a signal light 5 on the front pannel of the control device (fig 2.). Burning control The state of work heating off is indicated in the following cases: - if the temperature after two hours from the beginning of heating is T 45 o C; - if the temperature drops below 45 o C and does not increases within the period of 30 min.; - if during the operation of boiler the pump is switched off for longer than 1 hour. (it is not applied when the pump is put on the constant operation ).

19 The state of operation heating off switches off the fan and switches on the corresponding light signal. This state can be left by switching off the voltage L2 or the supply of the electricity to the control device. Programmed output Depending on the design of the boiler the programmed output can control air valve or electric heating. If there is installed electric heating it can be swicthed off automaticaly when the boiler is on the mode heating off. In order to activate or desactivate this control it is necessary to keep pressed the key P 7. There will apear On at the indicator (activated) ir OF (switched off). The servicing personnel set the temperatures of switching on/off for the electric heating referring to the characteristics of rthe heating system. Control device No.: Date of installation: * - depending on the design of th

HEATING BOILERS Astra G-18 E Astra G-25 E Astra G-32 E Astra G-40 E

HEATING BOILERS Astra G-18 E Astra G-25 E Astra G-32 E Astra G-40 E ASTRA MACHINERY PLANT AB ANNO 1929 HEATING BOILERS Astra G-18 E Astra G-25 E Astra G-32 E Astra G-40 E INSTALLATION AND OPERATION MANUAL CONTACT INFORMATION OF THE FACTORY: MACHINERY PLANT ASTRA AB ULONŲ

More information

HEATING BOILERS Astra H-25 E Astra H-32 E Astra H-45 E

HEATING BOILERS Astra H-25 E Astra H-32 E Astra H-45 E ASTRA MACHINERY PLANT AB ANNO 1929 HEATING BOILERS Astra H-25 E Astra H-32 E Astra H-45 E CONTACT INFORMATION OF THE FACTORY: MACHINERY PLANT ASTRA AB ULONŲ G. 33, LT-62161 ALYTUS, LITHUANIA TEL.: +370

More information

KALVIS-2-20, 2-25, 2-30, 2-40

KALVIS-2-20, 2-25, 2-30, 2-40 - 2 - Attention! Get acquainted with this technical certificate before installing the boiler.it will allow you to install the boiler correctly and to run it as efficiently as possible. 1. Technical data.

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service

More information

Technical certificate, instruction for installation and use. Sauna heater VIENYBĖ- P K6M ĮST :2003 ГОСТ

Technical certificate, instruction for installation and use. Sauna heater VIENYBĖ- P K6M ĮST :2003 ГОСТ EN Technical certificate, instruction for installation and use Sauna heater VIENYBĖ- P K6M ĮST 8271432-33:2003 ГОСТ 9817-95 Certificate of acceptance Sauna heater Vienybė - PK6M Prior to installing and

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL INSTALLATION AND OPERATION MANUAL PRESSURISED STEEL BOILERS AR 30 AR 1000 RADIALAND - BOILER's INSTALLATION MANUAL version 1.0 / 15-02-2008 The company E. is outstanding in the field of central heating

More information

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17 MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17 CE Tested by the DIN EN 13240 15a B-VG Austria Type 1 Color Emajl d.o.o. Alaginci 87 a 34000 Požega Croatia www.color.hr team@color.hr 1 Attention!

More information

SAFETY OF USE INSTALLATION RECOMMENDATIONS

SAFETY OF USE INSTALLATION RECOMMENDATIONS CONTENT SAFETY OF USE...3 INSTALLATION RECOMMENDATIONS...3 TECHNICAL DATA...4 PURPOSE...5 OPERATING PRINCIPLE...5 CONNECTION SCHEME...6 CONSTRUCTION OF ELECTRONIC CONTROLLER...7 CONTROL PANEL...8 INSTALLATION...9

More information

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+ INSTALLATION AND OPERATING INSTRUCTIONS Ariterm 60+ CONTENTS General.... 2 Installation.... 4-5 Installation of temperature limit valve... 6 Measurements and connections... 7 Technical specifications and

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20 INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8

More information

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 EN OPERATING MANUAL OIL HEATER TRT-BA-IDE20-30-50-60-80-TC-001-EN Table of contents Information on the use of this manual... 1 Scope of delivery... 1 General safety...

More information

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN To respected customer, We are very pleased for your trust and your decision to buy our product. You made a good choice,

More information

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL Heating, Air Conditioning, Ventilation Отопление-Кондиционеры-Вентиляция MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL 1. Usage MTM 8-30 universal oil heater is designed for heating commercial rooms

More information

MANUAL. Page 1/44

MANUAL.     Page 1/44 MANUAL FOR INSTALLATION AND OPERATION OF A HEATING SYSTEM, CONSISTING OF HOT WATER WOOD PELLET BOILER FROM SERIES PELLETHERM V4 AND AUTOMATED WOOD PELLET BURNER FROM SERIES GP IV http:// www.greenecotherm.eu

More information

OPERATION AND MONTAGE MANUAL ROOF FANS

OPERATION AND MONTAGE MANUAL ROOF FANS NO RFEC/U/2017-1 (EN) (valid since 18.08.2017) ROOF FANS RF/EC...-... / RFV/EC...-... Venture Industries Sp. z o.o. is not responsible for any damage caused by improper use of the fan and reserves the

More information

INSTRUCTIONS FOR INSTALLATION, SETTING AND USE

INSTRUCTIONS FOR INSTALLATION, SETTING AND USE BUILT-IN FIREPLACE INSTRUCTIONS FOR INSTALLATION, SETTING AND USE 1. BUILT-IN FIREPLACE SPECIFICATION - WIDE 730 mm - DEPTH 426 mm - HEIGHT 543 mm - NOMINAL POWER 11 KW - CHIMNEY POT DIAMETER Ø 180 mm

More information

INSTRUCTION MANUAL. for installation and operation of solid fuel cookers. Victoria and Victoria Lux

INSTRUCTION MANUAL. for installation and operation of solid fuel cookers. Victoria and Victoria Lux INSTRUCTION MANUAL for installation and operation of solid fuel cookers Victoria and Victoria Lux VICTORIA-05 Ltd. CONTENTS 1. Introduction... 3 2. Technical specifications and description... 3 3. Cooker

More information

Instructions for Operation and Maintenance of Containers

Instructions for Operation and Maintenance of Containers Instructions for Operation and Maintenance of Containers Container Handling 1. Containers are designed for transport on a flat loading area that is 2.5 m wide, which enables support of the load-bearing

More information

SAUNA HEATER INSTALLATION AND OPERATING MANUAL

SAUNA HEATER INSTALLATION AND OPERATING MANUAL SAUNA HEATER INSTALLATION AND OPERATING MANUAL Type Stoveman 13 Models 13R; 13R-M; 13; 13-M; 13R-LS; 13R-M-LS; 13-M-LS; 13-LS Heating output in the sauna room 15.4 kw Sauna room cubage 6-13 m³ Fuel Wood

More information

VENTING CLEARANCES. BBT NORTH AMERICA Bosch Group. Bosch Water Heating 340 Mad River Park, Waitsfield, VT TWH-V-26 page 1 of 6 rev 01/06

VENTING CLEARANCES. BBT NORTH AMERICA Bosch Group. Bosch Water Heating 340 Mad River Park, Waitsfield, VT TWH-V-26 page 1 of 6 rev 01/06 page 1 of 6 VENTING CLEARANCES The vents should not be obstructed and all joints properly fitted. Floors, ceilings and walls must be cut or framed to provide necessary clearance to vents. Metal strippings

More information

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4 Wood gasification process... Wood as a fuel... Boiler construction - its elements...4 Boiler construction - materials...4 EKO advantages...4 Boiler construction - schematics... Boiler dimensions... Boiler

More information

1. The structure and its description

1. The structure and its description Thank you for using our KYUNG-DONG NAVIEN. To use this boiler in the proper way, be sure to read this manual fully before using it, and keep this manual with the warranty of the quality in a safe place.

More information

ISO 9001 TUV CERT CE

ISO 9001 TUV CERT CE ISO 9001 TUV CERT CE INSTRUCTION MANUAL CONTENT 2 1. Boiler application 2. Principle of work 3. Description of the controller 3.1. Front panel of EKOSTER 2 3.2. Main functions of EKOSTER 2 4. Gasification

More information

INSTALLATION AND MANINTENANCE INSTRUCTIONS

INSTALLATION AND MANINTENANCE INSTRUCTIONS INSTALLATION AND MANINTENANCE INSTRUCTIONS Appr. Nr. A 9503 T - 0085 AQ 0765 PEGASUS F2 T HIGH EFFICIENCY GAS-FIRED CAST-IRON BOILERS Models 51-68 - 85-102 2 Contents 1. General technical data 2. Dimensional

More information

TECHNOSKLO Ltd. Držkov

TECHNOSKLO Ltd. Držkov TECHNOSKLO Ltd. Držkov Distillation apparatus for producing of distilled water TYPE DP 4000 Operating manual TECHNOSKLO Ltd. 468 24 Držkov 135 Czech Republic tel.: 00420 483 346 403 fax: 00420 483 385

More information

PER-EKO type KSW & KSW PLUS Instruction Manual

PER-EKO type KSW & KSW PLUS Instruction Manual TABLE OF CONTENTS INTRODUCTION..... 3 1. GENERAL INFORMATION..... 3 1.1. Application.. 3 1.2. Fuel..... 3 1.3. Dimensions & technical parameters........ 4 2. BOILER TECHNICAL SPECIFICATION...... 4 2.1.

More information

Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1

Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1 Gasification boiler PYROLYT INSTRUCTION MANUAL ver. 1.1 THERMOSTAHL would like to thank and congratulate you on your purchasing this boiler device and ensure that you have made a good choice. PYROLYT boiler

More information

PELLET BURNER PV 350

PELLET BURNER PV 350 PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION

More information

Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. CENTRIFUGAL PUMP Instruction Manual ACm60 / ACm75 / ACm150 / ACm150B2

Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. CENTRIFUGAL PUMP Instruction Manual ACm60 / ACm75 / ACm150 / ACm150B2 CENTRIFUGAL PUMP Instruction Manual ACm60 / ACm75 / ACm150 / ACm150B2 Congratulations on your purchase of a LEO Centrifugal Pump It is important that you read, fully understand and observe the following

More information

Installation & Manual. Model T-25

Installation & Manual. Model T-25 Installation & Manual TR Central Heating Stove With Solid Fuel Model T-25 Tested according to DIN EN 13240 For product efficiency and emission values, see the declaration of conformity! TABLE OF CONTENTS

More information

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200 INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200 CE INSTRUCTION MANUAL Content 1. Boiler application...3 2. Principle of work...3 3. Description of the controller...4 3.1. Front panel of EKOSTER 2...4 3.2.

More information

SINGLE-ROOM REVERSIBLE UNIT WITH HEAT AND HUMIDITY RECOVERY VENTO V50-1 OPERATION MANUAL

SINGLE-ROOM REVERSIBLE UNIT WITH HEAT AND HUMIDITY RECOVERY VENTO V50-1 OPERATION MANUAL SINGLE-ROOM REVERSIBLE UNIT WITH HEAT AND HUMIDITY RECOVERY VENTO V50-1 EN OPERATION MANUAL CONTENTS Introduction 3 General 3 Safety rules 3 Transportation and storage rules 3 Manufacturer's warranty 3

More information

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL CONTENT 3 Introduction 3 General 3 Safety rules 3 Storage and transportation rules 3 Manufacturer s warranty 4 Fan design 4 Delivery set 5 Technical data

More information

GFT-060/40/H2. Designed and built According AD-2000 regulation Homologation and branded CE According to the European Directive CE

GFT-060/40/H2. Designed and built According AD-2000 regulation Homologation and branded CE According to the European Directive CE Item 1) TWO THERMAL OIL HEATERS OF 1200 kw EACH 1.1) THERMAL OIL HEATER BODY Brand PIROBLOC Model GFT-060/40/H2 Power 1200 kw Delta Temperature 40 ºC Execution Horizontal Designed and built According AD-2000

More information

MTP (MTPAL) AIR HEATERS TECHNICAL DOCUMENTATION

MTP (MTPAL) AIR HEATERS TECHNICAL DOCUMENTATION Do Žlábku 733, 514 01 Jilemnice Subject: MTP (MTPAL) Technical Documentation Page 1 of 13 MTP (MTPAL) AIR HEATERS TECHNICAL DOCUMENTATION Table of Contents: Page: 2 Warranty Certificate 3 Quality and Completeness

More information

qüé=`üáãåéó An effective chimney is an important part of any successful wood-burning system.

qüé=`üáãåéó An effective chimney is an important part of any successful wood-burning system. 8. qüé=`üáãåéó An effective chimney is an important part of any successful wood-burning system. How Chimneys Work An effective chimney is an important part of any successful wood-burning system. Many of

More information

Synergy Grill User & Engineer Installation & Conversion Guide

Synergy Grill User & Engineer Installation & Conversion Guide Synergy Grill 1300 User & Engineer Installation & Conversion Guide 1 Index: Description Page Number/Section Important Information 3 Installation 4-6 / Section 1 Commissioning 6 / Section 2 Converting Gas

More information

INSTRUCTION. for installation and operation of solid fuel fireplace

INSTRUCTION. for installation and operation of solid fuel fireplace INSTRUCTION for installation and operation of solid fuel fireplace SKLADOVA TEHNIKA Division Bitova tehnika 2 Ivan Momchilov St. 5100 Gorna Oryahovitsa CONTENTS 1.Introduction...3 2.Assembling of the fireplace...3

More information

Installation, operation and care Firewood boiler Vedolux 40 UB

Installation, operation and care Firewood boiler Vedolux 40 UB Installation, operation and care Firewood boiler Vedolux 40 UB 2008-09-23 Ver 2 Replaces: 05-11 VEDOLUX 40 UB Notes 0809 To be completed when the Vedolux 40 UB is installed Serial number:... Installation

More information

model No: ir20.v2 FUSE

model No: ir20.v2 FUSE InstructioNS for: model No: ir20.v2 INFRARED PARAFfIN / KEROSENE / diesel HEATER 70000Btu 230V Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according

More information

CONTENTS

CONTENTS GENERAL USER MANUAL CONTENTS GENERAL USER MANUAL 1 INSTRUCTION OF USING A WOODEN HOT TUB 3 INSTRUCTION OF USING A FIBERGLASS HOT TUB 4 A GUIDE TO USING YOUR HEATER 5 HOT TUB ACCESSORIES 6 SAND FILTRATION

More information

INLINE CENTRIFUGAL FAN. Centro-M OPERATION MANUAL

INLINE CENTRIFUGAL FAN. Centro-M OPERATION MANUAL INLINE CENTRIFUGAL FAN OPERATION MANUAL www.blaubergventilatoren.de CONTENT 3 Introduction 3 General 3 Safety rules 3 Transport and storage requirements 3 Manufacturer's warranty 4 Fan design 4 Delivery

More information

Rocket heater GAMERA

Rocket heater GAMERA Rocket heater GAMERA High efficiency heater on hard fuel Manufacturer: AGNON Ltd., Bulgaria Hissarya, 4 Han Kubrat STR. +359 885 525 464 WWW.GAMERA.EU ROCKETGAMERA@GMAIL.COM ATTENTION! Read the following

More information

User s Information Manual

User s Information Manual Gas-fired Water boiler Series 2 NOTICE: Series 1/Series 2 identification Read the boiler rating plate to determine the series number. The rating plate is located on the right side of the boiler. User s

More information

Merloni Elettrodomestici. Technical Fitting Manual OVENS. Language Issue/Edition Page GB /

Merloni Elettrodomestici. Technical Fitting Manual OVENS. Language Issue/Edition Page GB / GB 99-11-03/01 1-18 Index 1 WORKING AND FITTED DIMENSIONS 3 1.1 Oven size 60 cm 3 1.2 Maxioven 4 2 INSTALLING THE FITTED OVEN 5 3 FITTED GAS - INSTALLATION REQUIREMENTS 5 4 FIXING THE OVEN TO THE UNIT

More information

Index I. INSTALLATION DIAGRAM... WIRING DIAGRAMS...

Index I. INSTALLATION DIAGRAM... WIRING DIAGRAMS... Index I. INSTALLATION DIAGRAM... 4 II. III. WIRING DIAGRAMS...... 1. Wiring diagram AC 3-N-400 50/60 Hz... 2. Wiring diagram AC 3-230 50/60 Hz...... 3. Wiring diagram AC 230 50/60 Hz... 4. Series 30 electrical

More information

Cooker Hood LA-72-CAN.

Cooker Hood LA-72-CAN. Cooker Hood LA-72-CAN EN www.luxairhoods.com WARNINGS Safety This equipment can be used by children aged 8 or more, people with physical, mental and sensory disabilities or inexperienced users it they

More information

INSTALLATION AND USER S MANUAL COOKER HOOD RS-600/A-S

INSTALLATION AND USER S MANUAL COOKER HOOD RS-600/A-S INSTALLATION AND USER S MANUAL COOKER HOOD RS-600/A-S RS-600 (CHS60SS)-GB-05.indd 1 6/8/2010 9:30:59 AM TABLE OF CONTENTS 1. Introduction 2 2. Safety precaution 2 3. Intended use 3 4. Parts supplied 3

More information

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS Before using the heater, read and understand all instructions and follow them carefully. The manufacturer is not responsible for damages to goods

More information

OPERATION AND MONTAGE MANUAL ROOF FANS

OPERATION AND MONTAGE MANUAL ROOF FANS NO RF/U/2017 (ENGLISH) (valid since 13.10.2017) ROOF FANS RF / RFV Venture Industries Sp. z o.o. is not responsible for any damage caused by improper use of the fan and reserves the right to modify this

More information

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59 SOUND-INSULATED FAN OPERATION MANUAL _v.1(2)-en.indd 1 10.08.2015 15:20:59 CONTENT Introduction 3 General 3 Safety rules 3 Transport and storage requirements 3 Manufacturer's warranty 3 Fan design 4 Delivery

More information

WARNING! For your safety

WARNING! For your safety Manual GB WARNING! For your safety PLEASE READ THIS MANUAL CAREFULLY BEFORE USING THIS FIREPLACE! Warning: The appliance couldn't been ignite at hot state. Miscellaneous Congratulations! You purchased

More information

REV.01 /

REV.01 / REV.01 / 2012 123794 CAUTION! Observe the safety instructions of this installation and maintenance manual before placing the boiler in operation. If an unqualified person carries out installation, adjustment,

More information

Installation of a Brunner fireplace. General Indications

Installation of a Brunner fireplace. General Indications Installation of a Brunner fireplace General Indications CONTENTS 1 Basic informations...3 2 Safety precautions...4 3 Combustion air...5 4 Requirements for location... 6 5 Overview of fire safety and heat

More information

Operation regulations must be strictly obeyed.

Operation regulations must be strictly obeyed. General This manual will help the user to operate this equipment safely and correctly. Correct operation of this air drier will reduce maintenance costs and extend the working life of all systems and parts

More information

HOT AIR GENERATOR WITH GAS BURNER NA11.45 A GGS. Installation Operation Commissioning Maintenance

HOT AIR GENERATOR WITH GAS BURNER NA11.45 A GGS. Installation Operation Commissioning Maintenance Installation Operation Commissioning Maintenance HOT AIR GENERATOR WITH GAS BURNER GGS NA11.45 A 06-2011 04-2011 CONTENTS 1. DESCRIPTION OF THE UNIT 2. INSTALLATION & CONNECTION 3. COMMISSIONING 4. CARE

More information

Maintenance 50 Serie CAUTION. Before resetting your electronic card that displays an error code. OVERHEAT MESSAGE

Maintenance 50 Serie CAUTION. Before resetting your electronic card that displays an error code. OVERHEAT MESSAGE 29-10-2013 CAUTION Before resetting your electronic card that displays an error code. OVERHEAT MESSAGE Service the stove COMPLETELY as described in this manual. Check the chimney pipe. BLOCKED FLUE MESSAGE

More information

HEAT RECOVERY AIR HANDLING UNIT

HEAT RECOVERY AIR HANDLING UNIT HEAT RECOVERY AIR HANDLING UNIT OPERATION MANUAL KOMFORT_L v2(2)_en.indd 1 07.08.2015 15:0:44 CONTENTS Introduction General Safety regulations Transportation and storage regulations Manufacturer's warranty

More information

Propane Flame Projector Safety instructions and operating manual

Propane Flame Projector Safety instructions and operating manual Bigflame Propane Flame Projector Safety instructions and operating manual 1 Flame projector Bigflame Safety instructions Caution The directions in this manual must be followed strictly. It is imperative

More information

Instruction manual for installation, operation and maintenance of automatic pellet burner of series GP on solid fuel hot water boiler VIADRUS U26

Instruction manual for installation, operation and maintenance of automatic pellet burner of series GP on solid fuel hot water boiler VIADRUS U26 Instruction manual for installation, operation and maintenance of automatic pellet burner of series GP on solid fuel hot water boiler VIADRUS U26 www.greenecotherm.eu Producer Address Thank You for buying

More information

Heating with log wood

Heating with log wood English Heating with log wood De Luxe 18-40 Lambda 18-40 1 Competence is our success... HERZ FACTS: 60 subsidiaries Group headquarter in Austria Research & development in Austria Austrian owner 2.600 employees

More information

BIX B-One 100 kw INSTALLATION GUIDE

BIX B-One 100 kw INSTALLATION GUIDE BIX B-One 100 kw INSTALLATION GUIDE Dear Customer, We thank you for choosing our product. The Bix B-One 100 Kw is a burner of advanced concept and technology, with a high reliability and construction quality.

More information

COOKER HOOD INSTRUCTIONS MANUAL MODEL

COOKER HOOD INSTRUCTIONS MANUAL MODEL 390 3300 COOKER HOOD INSTRUCTIONS MANUAL MODEL INTRODUCTION OF DEVICE 3 4 5 390 390 0 3 Min 80/Max 060 6 5 3300 ) Chimney ) Body 3) Control Panel 4)Aluminum Cassette Filter 5) Lighting 6) Split Extraction

More information

DH-Direct Fired Poultry Farm Diesel Heater

DH-Direct Fired Poultry Farm Diesel Heater DH-Direct Fired Poultry Farm Diesel Heater Comparison of Diesel Heater to Gas Heater Diesel LPG Gas LPG Gas KW 43 70 120 Fuel consumption/hr 3 5.1 8.8 Heat output 37000 60000 100000 Cost of fuel/lit or

More information

VETO CLEANER 500 FLUE GAS CLEANER

VETO CLEANER 500 FLUE GAS CLEANER As of serial number 3100 0001 VETO CLEANER 500 FLUE GAS CLEANER USER MANUAL SPARE PARTS LIST Manufacturer: ALA TALKKARI Veljekset Ala-Talkkari Oy FI-62130 HELLANMAA TEL. +358 6 433 6333 FAX +358 6 437

More information

INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER

INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER INSTRUCTION MANUAL Content 1. Boiler application...3 2. Principle of work...3 3. Description of the controller...4 3.1. Front panel of

More information

Introduction. General requirements when using the heat pump

Introduction. General requirements when using the heat pump USER MANUAL Introduction Read the manual before actuating your heat pump! NB! Changing any properties entered either by the manufacturer or the installer is strictly forbidden! - Prior to actuating the

More information

ACN SMOKE INSTALLATION AND MAINTENANCE

ACN SMOKE INSTALLATION AND MAINTENANCE NovAx ACN SMOKE INSTALLATION AND MAINTENANCE 918149-0 English 918149-0 GB Installation and maintenance NovAx smoke exhaust fan type ACN smoke 1. Application 2. Handling 2.1 Marking 2.2 Weight 2.3 Transport

More information

USER S MANUAL NKP. Duct heater for supply air pre-heating with external control

USER S MANUAL NKP. Duct heater for supply air pre-heating with external control USER S MANUAL Duct heater for supply air pre-heating with external control CONTENTS Contents... 2 Safety requirements... 2 Purpose... 4 Delivery set... 4 Designation key... 4 Technical data... 5 Design

More information

Installation and Maintenance Novax Smoke Exhaust Fan Type ACN Smoke

Installation and Maintenance Novax Smoke Exhaust Fan Type ACN Smoke 918149-0 GB Installation and Maintenance Novax Smoke Exhaust Fan Type ACN Smoke 1. Application 2. Handling 2.1 Marking 2.2 Weight 2.3 Transport 3. Storage 4. Installation 4.1 Prior to attachment 4.2 Attachment

More information

USER S MANUAL. Centrifugal inline fan. VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125. VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315

USER S MANUAL. Centrifugal inline fan. VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125. VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315 USER S MANUAL VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125 VKMz 150 VKMz 160 VKMz 200 Q VKMz 200 VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315 Centrifugal inline fan VKMz CONTENTS Contents... 2 Safety requirements...

More information

Kyung Dong Oil Boiler. Contents. 1. General Warnings Safety Warnings

Kyung Dong Oil Boiler. Contents. 1. General Warnings Safety Warnings Contents 1. General Warnings --------------------- 1 2. Safety Warnings ----------------------- 2 3. Parts and structure --------------------- 7 4. Safety Device ------------------------- 9 5. Checkups

More information

TermEfekt USER S MANUAL AIR HEATER. Model PGA 14

TermEfekt USER S MANUAL AIR HEATER. Model PGA 14 Przedsiębiorstwo Produkcyjno-Wdrożeniowe ARAJ sp. z o.o. 55-080 Kąty Wrocławskie, ul. Mireckiego 30 POLAND USER S MANUAL AIR HEATER TermEfekt Model PGA 14 Kąty Wrocławskie, 2004 Product identification

More information

INSTALLATION AND OPERATION MANUAL FOR HUUM DROP ELECTRIC SAUNA HEATER

INSTALLATION AND OPERATION MANUAL FOR HUUM DROP ELECTRIC SAUNA HEATER INSTALLATION AND OPERATION MANUAL FOR HUUM DROP ELECTRIC SAUNA HEATER 2 Table of Contents 1. THINGS TO CHECK BEFORE INSTALLATION... 2 2. INSTALLATION... 2 3. CONTROLLING THE HEATER... 5 4. GUARD RAILS...

More information

Specifications 3. Bladder 5. Chimney 12. Air Supply 12. Anti-Rollout Device and Ash Auger Tube 14. Timer 15

Specifications 3. Bladder 5. Chimney 12. Air Supply 12. Anti-Rollout Device and Ash Auger Tube 14. Timer 15 TABLE OF CONTENTS Page No. Specifications 3 Bladder 5 Fire Door 7 Chimney 12 Air Supply 12 Anti-Rollout Device and Ash Auger Tube 14 Timer 15 Supply Line and Return Line Threaded Connectors 15 Low Water

More information

PowerVent. Installation manual (GB) English. Store this document in a safe place UK

PowerVent. Installation manual (GB) English. Store this document in a safe place UK PowerVent Installation manual (GB) Store this document in a safe place 959.034.03.UK GB Contents Blz Foreword 3 1. Introduction 3 2. CE declaration 4 3. SAFETY 4 3.1 General 4 3.2 Regulations 4 3.3 Precautions

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL STREBEL GENEVA CE ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL INDEX TABLE 1 TECHNICAL DATA SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION

More information

1. GENERAL SAFETY RULES

1. GENERAL SAFETY RULES ID180 & ID290 Indirect-Fired Diesel/Oil Construction Heaters Sure Flame Products Lethbridge, Alberta, Canada Telephone: (403)328-5353 Fax: (403)328-9956 www.sureflame.ca July 12, 2006 Service and Maintenance

More information

Logic+ Combi

Logic+ Combi USER GUIDE Logic+ Combi 24 30 35 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use

More information

User and maintenance manual

User and maintenance manual GB User and maintenance manual IMPORTANT SAFETY INSTRUCTIONS These instructions shall also be available on website: docs.whirlpool.eu. YOUR SAFETY AND THAT OF OTHERS IS HIGHLY IMPORTANT. This manual and

More information

Operation Manual R205BV, R209BV

Operation Manual R205BV, R209BV Operation Manual R205BV, R209BV 1 Safety Instruction The rotary evaporator is manufactured according to current methods and accepted safety regulations. However, risks still exist during the installation,

More information

Installation and maintenance manual

Installation and maintenance manual Installation and maintenance manual Warm air heater WS/WO (Copy of the original version) Wolf GmbH D-84048 Mainburg Postfach 1380 Telefon +498751/74-0 Telefax +498751/741600 Internet: www.wolf-heiztechnik.de

More information

BENSON LINEAR RADIANT TUBE

BENSON LINEAR RADIANT TUBE BENSON LINEAR RADIANT TUBE Natural or Propane (Gas fired) I N S T A L L A T I O N C O M M I S S I O N I N G S E R V I C I N G U S E R I N S T R U C T I O N S September 2001 CONTENTS Page Compliance Notices

More information

VH60SS 60CM VISOR HOOD STAINLESS STEEL

VH60SS 60CM VISOR HOOD STAINLESS STEEL VH60SS 60CM VISOR HOOD STAINLESS STEEL INSTRUCTION MANUAL Thank you for purchasing our product. We hope you enjoy using the many features and benefits it provides. Before using this product please study

More information

Parts Available from

Parts Available from Montage und Bedienungsanleitung Manuel d entretien Installation, use and maintenance instructions Installatie-, gebruiks- en onderhoudsvoorschriften Oδηγίες εγκατάστασης, χρήσης και συντήρησης D F GB NL

More information

Installation Instructions

Installation Instructions Instructions for Dryers Original Instructions Keep These Instructions for Future Reference. (If this machine changes ownership, this manual must accompany machine.) Part No. 514446ENR2 February 2015 Front

More information

User s Information Manual

User s Information Manual 48AJ,AK,AW,AY020-060 Single-Package Rooftop Gas Heating Units with COMFORTLINK Controls and Scroll Compressors User s Information Manual NOTE TO INSTALLER This manual should be left with the equipment

More information

TABLE OF CONTENTS. Site preparation 2 Placement. 2 Chimney and stove pipe connections. 2

TABLE OF CONTENTS. Site preparation 2 Placement. 2 Chimney and stove pipe connections. 2 TABLE OF CONTENTS SECTION TITLE PAGE 1. SITE PREPARATION AND INSTALLATION Site preparation 2 Placement. 2 Chimney and stove pipe connections. 2 Installation. 3 Water supply and return.. 3 Pressure/relief

More information

Installation Instructions Remote Blowers

Installation Instructions Remote Blowers Installation Instructions Remote Blowers Models: REMP3, REMP16 Suitable for use in a household cooking area. Suitable for use with solid state controls. To complete this blower, a Dacor hood assembly or

More information

Light oil / kerosene burner

Light oil / kerosene burner Installation, use and maintenance instructions Light oil / kerosene burner One stage operation CODE MODEL TYPE 374445 G5 444T50 290238 (5) - 05/20 TECHNICAL DATA Thermal power output 28 60 kw 2.3 5 kg/h

More information

PELLETS BURNER 15-60kW MOC

PELLETS BURNER 15-60kW MOC PELLETS BURNER 15-60kW MOC. Please read those documentation before first start up the unit. Improper burner start may lead to its damage and may create a danger for end user! Table of Contents: 1. Admission

More information

OSC... INSTRUCTION MANUAL - KITCHEN EXTRACTOR HOOD

OSC... INSTRUCTION MANUAL - KITCHEN EXTRACTOR HOOD OSC... INSTRUCTION MANUAL - KITCHEN EXTRACTOR HOOD EN min 450mm Electrical cookers min 650mm Gas cookers min 650mm Gas cookers 1a 1b 1c 2a 2b ELECTRICAL / GAS - 650mm 3a 3b 2 2 x 8 3c 3d 3e 3 0 1 2 3 L

More information

Operation and maintenance manual for the boilers with feeder. Q-Per

Operation and maintenance manual for the boilers with feeder. Q-Per Operation and maintenance manual for the boilers with feeder Q-Per Thank you for purchasing PEREKO boiler. This technical documentation applies to feeder boilers from the Q-PER series and contains all

More information

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY Bousquet Technologies Inc. 2121, Nobel, Ste Julie, Quebec, Canada, J3E1Z9 SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL Oil-Fired air heater for industrial and commercial use. FOR YOUR SAFETY Do not

More information

Stainless Steel Chimney Extractor

Stainless Steel Chimney Extractor Stainless Steel Chimney Extractor User & Installation Guide LAM2404 LAMONA Appliances Dear Customer, Congratulations on your choice of a LAMONA domestic appliance which has been designed to give you excellent

More information

MJC Cartridge Filter Unit Operation & Maintenance

MJC Cartridge Filter Unit Operation & Maintenance 1 of 19 Hodge Clemco Ltd MJC Cartridge Filter Unit Operation & Maintenance Owner s Manual Date of Issue: 19.07.04 TSSM536.1a Hodge Clemco Ltd Orgreave Drive Sheffield S13 9NR Tel: 0114 254 8811 Fax: 0114

More information

KKKKKKKCOOKER HOOD INSTRUCTION MANUAL

KKKKKKKCOOKER HOOD INSTRUCTION MANUAL KKKKKKKCOOKER HOOD INSTRUCTION MANUAL Read this manual carefully before operation Pictures in this manual are for reference only, the product in kind prevail. E60MEW2M19 Contents 01 02 03 04 05 06 07 08

More information

Light oil - kerosene burner

Light oil - kerosene burner Installation, use and maintenance instructions Light oil - kerosene burner One stage operation CODE MODEL TYPE 374374 G3B 437T 90 (4) - 05/0 TECHNICAL FEATURES TYPE 437T Thermal power output 9 35 kw.6

More information

GB User and maintenance manual

GB User and maintenance manual GB User and maintenance manual IMPORTANT SAFETY INSTRUCTIONS These instructions shall also be available on website: docs.whirlpool.eu. YOUR SAFETY AND THAT OF OTHERS IS VERY IMPORTANT This manual and

More information