1 mawss Buyer II Lisa Russell (251) Office TO INVITATION FOR BID NUMBER SEPARATE SEALED BIDS FOR BIDS WILL BE RECEIVED AT Prospective Bidders IFB INVITATION FOR BID May 17, 2018 Purchase Natural Gas Hot Water Boiler MAWSS Purchasing Department 4725A Moffett Road Mobile. AL BID OPENING DATE June BID OPENING TIME AWARD WILL BE MADE BY MATERIAL DELIVERED TO 10:30 a.m. Central Time Total Cost CC Williams Waste Water Treatment Plant 1600 Yeend Street Mobile. AL or Mail to: MAWSS Purchasing Department PO Box Mobile, AL Mobile Area Water and Sewer System 4725A Moffett Road Mobile, AL PO Box Mobile, AL FOR ADDITIONAL INFORMATION, CONTACT Mike Sims (251) or or Jed Barbour (251) or Sealed bids are to be in the Purchasing Department no later than the time specified in order to be considered. Submissions received after the deadline will not be considered. Envelopes shall bear the name of the supplier, company address and the words "IFB Natural Gas Hot Water Boiler" or "IFB NO QUOTE." Facsimile or s will not be accepted. All bids must be submitted on the attached forms or your bid will be disqualified. Bidder shall furnish all the information required by the solicitation. The bidder's name must be typed or printed on the bid sheet, and signed by the owner or appropriate executive officer of the firm. Bidders must initial any changes or erasures. Bidders should retain a copy of bids for their records. Bidders shall acknowledge receipt of any addendum to this solicitation by signing and returning the addendum or by identifying the addendum number and the date on the bid form. Failure to acknowledge receipt of any addendum by a bidder will result in rejection of the bid if the addendum contains information that substantially changes the requirements. All bids shall be quoted F.O.B. Destination, freight prepaid with no additional charges. Unless otherwise specified in the bid, all prices will be on a firm-fixed price basis and are not subject to adjustments based on costs incurred. MAWSS reserves the right to reject any or all bids submitted, to waive any informality in the bid process, or to terminate the bid process at any time, if deemed by MAWSS to be in the best interest of the Board of Water and Sewer Commissioners. A Purchase Order and this "Invitation for Bid" with "Specifications," "Conditions," "Subcontracting Plan," "Insurance Requirements," "Bid Form," signed by the successful bidder's authorized representative, and all attached drawings and other documents furnished by MAWSS to the bidders with the Invitation in order to illustrate the contract requirements, will constitute a contract for the item to be purchased. BOARD OF WATER AND SEWER COMMISSIONERS Lisa Russell, Buyer II IFB Natural Gas Hot Water Boiler Page 1

2 IFB Natural Gas Hot Water Boiler Conditions The Board of Water and Sewer Commissioners of the City of Mobile will accept bids to Purchase a Hot Water Boiler in the Purchasing Department located at 4725A Moffett Road, Mobile, AL at 10:30 a.m. local time, June 5, Award will be by total cost. The bidder offers and agrees, if this bid is accepted, to furnish the items as defined in the specifications for the total price of this repair. Pricing shall be FOB Mobile, Alabama and is to be delivered to CC Williams Waste Water Treatment Plant (WWTP). The expected length of delivery time is to be stated in bid quote. Bidder understands and agrees that MAWSS reserves the right to reject any or all bids and waive any informalities or irregularities in the bid or in the bidding. Bidder understands that his/her bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receiving bids. A bidder may not modify its bid after bid opening. Errors in the extension of unit prices stated in a bid or in multiplication, division, addition or subtraction in a bid may be corrected by the Purchasing Buyer prior to award. In such cases, unit prices shall not be changed. It is the responsibility of the bidder to determine prior to the bid opening whether any amendment, additions, deletions or changes of any type have been made to this Invitation for Bid, Terms and Conditions or any of the specifications or bid documents. Bid documents and any amendments made to this bid will be posted on our website at For a goods or services contract which is subject to Alabama's competitive bids laws, the MAWSS employee or consultant handling the contract may award it to a DBE who is also a responsive and responsible bidder and who submits a bid no more than ten percent (10%) greater than that of an apparent low bidder which does not have a place of business in Alabama. Delivery Time ARO (after receipt of order): Payment Terms: Address: Company: Address : City, St., Zip : Phone: Fax: Submitted by: Print Name Title: Signature: Date: IFB Natural Gas Hot Water Boiler Page 2

3 Natural Gas Hot Water Boiler Scope of Work Natural Gas Hot Water Boiler Williams Wastewater Treatment Plant Part SUMMARY 1. work in section consists of furnishing equipment required to boiler. 1.2 REQUIREMENTS 1.3 test and place into satisfactory operation one hot water 1. boiler is intended to fire on natural gas a. unattended. b. 40 to 110 degrees Fahrenheit. a. 1. Action Submittals i. Content: 1,000 BTU/Cu. Ft. (HHV). Ii. re at Gas Train Inlet: 5.5 minimum a. Shop Drawings i. Make, model, and weight of the boiler and burner. Ii. specifications, detailed dimensional d descriptive literature ofthe boiler, burner, controls, train components, and any exceptions to the submittal shall show that all gas fuel train valves and including the burner area designed and recommended by for natural gas service. showing the fuel firing rate at flow, water flow rate, water temperatures and the total connected electrical load. Equipment manufacturers shall provide complete and detailed the installation of the boiler and all components. Any installation requirements or operating which they feel to be critical to the safe and reliable fuel operation of the boiler shall be identified and described in detail. IFB Natural Boiler 3

4 v. Factory finished system. vi. Maintenance space requirements. vii. Complete wiring diagrams and schematics showing terminal identification and all wiring between the boiler controls and all external and internal devices including those wired before delivery of the boiler. viii. Electric motor nameplate data for all drives. ix. Panel elevation drawings showing construction and placement of operator interface devices and other elements. x. Provide two (2) copies of the O&M manual. 2. Informational Submittals a. Test reports. b. Boiler inspection report. c. Special shipping, storage and protection, and handling instructions. d. Manufacturer installation instructions. e. Suggested spare parts list to maintain the equipment in service for a period of 1 year and 5 years. Include a list of special tools required for checking, testing, parts replacement, and maintenance with current price information. f. List special tools, materials, and supplies furnished with equipment for use prior to and during startup and for future maintenance. g. Operation and Maintenance data. 1.4 SHIPPING/STORAGEIINSTALLATION 1. Shipping: a. Ship equipment, material, and spare parts complete except where partial disassembly is required by transportation regulations or for protection of components. b. Pack spare parts in containers bearing labels clearly designating contents and pieces of equipment for which intended. c. Deliver spare parts at same time as pertaining equipment. Deliver to Owner after completion of work. d. Unit to be delivered such that the Contractor can fit through the existing entrance. Should this result in non-standard installation practices, Manufacturer to provide Contractor with installation instructions needed to successfully install the equipment. e. Storage: Equipment provided under this section shall be stored and protected in accordance with the manufacturer's recommendations. IFB Natural Gas Hot Water Boiler Page 4

5 2. Installation: a. MAWSS will be responsible for the installation. 1.5 QUALITY ASSURANCE 1. Provisions: a. Products manufactured within scope of standards published by Underwriters Laboratories, Inc. shall conform to those standards and shall have an applied UL listing mark. b. Considerations given only to products of manufacturers who demonstrate successful experience in manufacture operation, and servicing equipment oftype, size, performance, and reliability equal to that specified. c. Equipment furnished to fit with the space allocated with adequate clearance for proper operation and maintenance. 2. Workmanship and Design: a. All parts of the equipment provided to be amply proportioned for long, continuous and uninterrupted service. Provision to be made for easy lubrication, adjustment, or replacement of all parts. b. All materials used in construction of equipment to be of best quality and entirely suitable in every respect for service required. c. Boiler to meet requirements of American Society of Mechanical Engineers and shall bear ASME stamp. Boiler to be inspected prior to shipment. Two copies of inspection report to be submitted. d. The hot water boiler shall be completely assembled and fire tested at the factory. The complete packaged boiler-burner unit shall meet the latest Underwriter's Laboratories requirements and shall be UL labeled. e. Installed equipment will comply and be acceptable to all state, local, and federal codes and regulations. PART 2 PRODUCTS 2.1 APPROVED MANUFACTURER 1. Hurst Boiler Inc. 2. Cleaver-Brooks. 3. Superior. 4. Or approved-equal IFB Natural Gas Hot Water Boiler Page 5

6 2.2 GAS FIRE BOILERS l. General Boiler Design: a. The boiler shall be a four-pass horizontal fire tube upd hot water boiler. It shall be mounted on a heave steel frame with integral forced draft burner, burner controls, insulated assembly and water trim. jacket, flue damper b. The boiler shall be completely preassembled and fire tested at the unit shall be ready for immediate mounting on concrete foundation and for attachment of water, blowdown, electrical connections. c. The shall a complete package unit. 2. Boiler Shell: vent, and a. The boiler shell must be constructed and hydrostatically tested in accordance with ASME Boiler Code and pressure vessel Code, Section IV. A copy ofthe inspection report shall be furnished to the purchaser. Two lifting eyes shall be on top of boiler. Front and rear doors on the boiler shall be hinged and davited. Doors are to sealed with fiberglass tadpole gaskets and fastened tightly using heavy cap screws that thread into replaceable the formed nuts. Insulation shall be contained in which must swing open for inspection of brick work. boiler tubes shall not include turbulators, appurtenances. or other b. boiler shall outdoor ready, with NEMA 4 enclosures and stainless jacket. c. and rear tube sheets all flues must be fully for inspection and when the are swung The boiler shall be furnished with adequate hand holes to boiler inspection and cleaning. Observation ports for the inspection of flame conditions provided at each end the boiler. d. boiler insulation shall of a 2-inch blanket under a sectional preformed metal insulation must readily removable and capable of being reinstalled if required. e. Metal surfaces concealed by insulation and jacket shall be painted with the acceptable rust-inhibiting, heat-resistant paint before the insulation is applied. The paint filler and enamel customary with the manufacturer. finished with coats f. The shell (top, bottom, and shall constructed of not less than 1/4-inch thick. tube sheets, the combustion be IFB Natural Hot Water Boiler 6

7 shall of plate at 3/8-inch shall provided throughout to withstand design The unit shall in accordance with ASME Code for Low Pressure Heating Boilers and shall bear the ASME label. g. The heater section shall have a cylindrical, all-welded, steel combustion chamber surrounded with water and lined with the acceptable refractory material. heater shall be furnished with connections for emergency re relief valve. A. Burner: a. Capable of burning natural The burner assembly shall be an integral part of boiler. The burner shall readily removable for maintenance. b. All metal burner components in the combustion zone shall be stainless steel. c. Air force combustion shall supplied by a forced draft blower mounted in the front boiler door, above the burner, to eliminate vibration and reduce level. The impeller shall be cast minum, radial blade, carefully balanced, and directly connected to the blower motor shaft. The fan motor starter shall be connected and interlocked with the burner controls so that the fan starts before ignition takes place and until the is extinguished. d. Combustion damper and cam fuel valves be operated by a damper control motor that regulates the fire according to load demand. Potentiometer type position controls shall be provided to regulate operation of the damper control motor. e. The pilot be a premix type fired on natural gas with automatic ignition. An electronic detector shall monitor the pilot so the primary valve cannot open until pilot flame has been established. The pilot train shall indude two manual shutoff valves, solenoid valve, pressure regulator and re gauge. Manual restart shall required in event boiler shutdown to flame failure. An airflow switch be mounted on burner to prevent the energization of main fuel in the event of insufficient combustion air. f. The boiler shall have an type flue constructed of aluminized The damper be controlled from the boiler central panel with required safety controls and shall be as manufactured by a vendor to be identical by boiler manufacturer Natural Hot Water Boiler 7

8 B. Gas Trains: a. Gas trains shall be designed and furnished by the Boiler Manufacturer. The gas train shall be sized by the manufacturer: they shall each include, but not be limited to, the following: b. Each Natural gas train shall be provided with: i. Type 316 stainless steel manual shutoff cock. ii. Gas pressure regulator. iii. Automatically operated main motorized gas valve with proof of closure switch and plugged leakage test connection. The main gas valve(s)shall be wired to close automatically in the event of power failure, flame failure, lower water or any safety shutdown condition. iv. A lubricating 316 stainless steel plug cock or valve shall be provided as a means for the tightness check of the main shutoff valve. v. An additional V306 isolation ball valve shall be furnished at entrance to gas train. vi. Low gas pressure switch with manual reset. vii. High gas pressure switch with manual reset. viii. Manual leak test cock. ix. Manifold gas pressure gauge and gauge cock c. Pilot gas train consisting of: i. Gas cocks. ii. Pilot regulator. iii. Pilot gauge point. iv. Pilot valve. C. Hot Water Boiler Trim: a. The boiler package shall include the following and will be sized as per manufacturer's recommendation. i. Water relief valve of a type and size to comply wit~ ASME Code requirements, and shall be shipped loose. ii. Pressure and Temperature gauges mounted on the boiler with sensing element located adjacent to the hot water outlet. iii. Flue temperature gauge. iv. Boiler drain valve. v. High-pressure shut-off safety switch (manual reset) mounted adjacent to the hot water outlet. lfb Natural Gas Hot Water Boiler Page 8

9 vi. low water shut-off safety switch (manual reset) to prevent boiler operation if boiler water falls below a D. Boiler manufacturer to damper assembly including switch, arms, linkage and as a preassembled unit to mount on flue of boiler to two (open or closed). The assembly will be bolted to boiler. The assembly will by factory to interlock with Controls 1. Controls to include: control. a. A means to operate the boilers locally and through SCADA. b. Complete safety control shall be provided for the burners. Provision shall be made to shut off natural supply to the unit in the event a flame or ignition failure and simultaneously to sound an alarm on control board and to valves. failure shall close the main c. A dedicated burner control with flame safeguard. The controller shall supplied with an to monitor pilot and flame and to programming natural gas, and shutdown to chamber prior to ignition. gas-electric ignition failure. An approved device shall confirm pilot flame is lit before main ignition is permitted to occur. the burner. Manual restart shall shutdown. Burner shutdown due to safety controls shall combustion chamber. either pilot or main flame shall shut down required after flame failure at the end of a normal firing cycle or followed by a post-purge of the d. Complete purging of shall take place on each 2. Control Panel: change-over. a. control panel shall be on the front door of the boiler in a NEMA 1A convenient to The panel shall be rna control signal. controller, indicating lights removable sub-base for metal cabinet will and a cabinet lock. single phase power and 4-20 the boiler flame safeguard switches. Panel shall have a safeguard controller, and terminal blocks. The system shall consist of a computer based boiler controller and solid-state sensors integrated to provide automatic IFB Natural Gas Hot Water Boiler 9

10 burner sequencing, flame supervision, and indications of system status, faults, and self-diagnostics. b. Provide the following front-mounted indicator lights and switches: i. Natural gas indicating light - White. ii. Low water flow indicating light - Red. iii. Flame failure indicating light - Red. iv. Alarm silence pushbutton. v. Low demand indicating light - White. vi. Manual/Remote selector switch. vii. Start pushbutton. viii. Stop pushbutton. c. The hot water boiler control panel shall be equipped to communicate with SCADA via discrete and analog inputs and outputs in the future. Monitoring and control points shall include, but are not limited to: i. Hot water boiler run indication. ii. Hot water boiler in/remote. iii. Outlet valve fully open. iv. Outlet valve fully closed. v. Loss of return water flow. vi. Low water shutoff. vii. Hot water temperature. viii. Hot water boiler SCADA start/stop command. 3. Instrumentation a. Hot water temperature transmitter. b. Water pressure gauge. c. Water high pressure switch. d. Water temperature gauge. e. Water temperature switch. f. Low water cut off. g. Return water flow switch. h. Flue temperature gauge. 4. The above is not intended to completely depict all of the functional requirements ofthe control system provided under this section. The supplier shall provide any and all additional equipment necessary to produce a safe and operable system. IFB Natural Gas Hot Water Boiler Page 10

11 2.4 EQUIPMENT IDENTIFICATION PLATES 1. A 16-gauge stainless steel identification plate shall be securely mounted on the equipment in a readily visible location. The plate shall bear the 1/4-inch die-stamped equipment identification number indicated in this Specification. 2.5 LIFTING LUGS 1. Individual equipment and-or each field disassembled part over 100 pounds in weight shall be provided with lifting lugs. 2.6 ANCHOR BOLT SIZE AND MA TERlAL 1. Anchor Bolts: Type 316 stainless steel, sized by equipment manufacturer. 2.7 FACTORY TESTfNG 1. Manufacturer standard test and ASME boiler inspection. PART 3 EXECUTION 3.1 INSTALLATION 1. MAWSS will be responsible for the installation. 3.2 INSPECTION AND TESTING 1. Provide functional and operational tests. 2. Provide all materials and equipment required. 3. Heating System: 4. Burners: a. Remove equipment and appurtenances from system that may be damaged from test pressures. b. Apply test pressure for two consecutive hours and inspect for leakage; remedy leaks by replacing defective material; use no caulking or chemicals. c. Continue test until all leaks are remedied. a. Adjust burners for optimum performance: Perform combustion efficiency tests and forward copy to Owner. b. Test results to indicate percent carbon dioxide, percent oxygen, stack temperature, and smoke density. c. Notify Engineer in advance of testing so that s/he may witness the tests. 3.2 MANUFACTURER'S SERVICES 1. Manufacturer's technical representative must have a minimum of 5 years of experience on the type and size of equipment specified. 2. Manufacturer's Representative: Present at site or classroom designated by Owner or Engineer, for minimum person-days listed below, travel time excluded: IFB Natural Gas Hot Water Boiler Page 11

12 a. 2 person-days each for installation assistance, inspection, testing, coordination with controls integrator, and completion of Manufacturer's Certificate of Proper Installation. b. 1 person-day each for startup, and pre-startup training. 3.3 WARRANTY 1. A two (2) year warranty shall be provided for all parts and labor to begin when installation, testing, and training are complete. IFB Natural Gas Hot Water Boiler Page 12

13 IFB Natural Gas Hot Water Boiler Bid Sheet Total Cost $ Delivery (ARO): (after receipt of order) Payment Terms Company By Print Name Address City, Phone Fax 5ignature* Date *Authorized Signature: The signer declares under penalty of perjury that she/he is authorized to document and bind the company or organization to the terms of this agreement. this IFB Natural Gas Hot Water Boiler Page 13

14

HORIZONTAL FIRE TUBE BOILERS Piping (HVAC) Pumping Equipment (HVAC).

HORIZONTAL FIRE TUBE BOILERS Piping (HVAC) Pumping Equipment (HVAC). SECTION 15555 HORIZONTAL FIRE TUBE BOILERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15510 - Piping (HVAC). 2. 15540 - Pumping Equipment (HVAC). 1.02 SUBMITTALS A. Submit properly identified

More information

SECTION HEATING BOILERS

SECTION HEATING BOILERS SECTION 23 52 00 HEATING BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes boilers, controls and boiler trim, steam and condensate connections, hot water connections, fuel burning system and connections,

More information

SECTION WATER-TUBE BOILERS

SECTION WATER-TUBE BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections

More information

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work. Buchtel/Perkins Community Learning Center GPD -2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 SECTION 15513 CONDENSING BOILERS PART I- GENERAL 1.1 RELATED

More information

PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS

PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS A. General: 1. To obtain maintenance and repair standards for boiler burners (Section 15555A) and boiler tubes (Section 15555B), contact the DPS Project

More information

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER PART 1 GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 American National Standard for Gas-Fired Low Pressure Steam and Hot Water Boilers B. ASME Section

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents

A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents Boiler specifications A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents Burner General: Q. Burner and burner safeguards shall comply with the CGA

More information

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. NAME OF TENDER: CONSTRUCT, DELIVER AND COMMISSION 3 (THREE) LIFT STATION ELECTRICAL LOCATION OF WORK: 3 Separate work sites in

More information

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler Suggested Specifications

BURNHAM COMMERCIAL 27 February 2008 MPC Multiple Pass Commercial Boiler Suggested Specifications 2.1 GENERAL A. Reference is made to the clause entitled Buy American Act Balance of Payments Program Construction Materials FAR 52.225-9. Notwithstanding a bidder s right to offer identifiable foreign

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

Power Flame Incorporated

Power Flame Incorporated Power Flame Incorporated SUGGESTED SPECIFICATION FOR MODEL NVC ULTRA LOW NOx GAS BURNERS SUB 9 PPM NOx THE POWER TO MANAGE ENERGY 2001 South 21st Street, Parsons, Kansas 67357 Telephone: 620-421-0480,

More information

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where

More information

DIVISION FINNED WATER-TUBE WATER HEATERS

DIVISION FINNED WATER-TUBE WATER HEATERS DELTA LIMITED, TYPE WH - MODELS 399B-899B SUGGESTED SPECIFICATIONS Catalog No.: 3500.97B Effective: 04-01-17 Replaces: 11-15-08 DIVISION 23 52 33.13 FINNED WATER-TUBE WATER HEATERS - GENERAL 1.1 SUMMARY

More information

DIVISION FINNED WATER-TUBE WATER HEATERS

DIVISION FINNED WATER-TUBE WATER HEATERS HI DELTA, TYPE WH - MODELS 992C-2342C SUGGESTED SPECIFICATIONS Catalog No.: 3500.932A Effective: 04-01-17 Replaces: 10-31-16 DIVISION 23 52 33.13 FINNED WATER-TUBE WATER HEATERS - GENERAL 1.1 SUMMARY A.

More information

.2 Section Waste Management and Disposal..4 Section Vibration Isolation and Seismic Control Measures.

.2 Section Waste Management and Disposal..4 Section Vibration Isolation and Seismic Control Measures. Issued 2005/06/01 Section 15510 Packaged Boilers Page 1 of 13 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3 Section 01780 Closeout

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

WATER-TUBE POOL HEATERS

WATER-TUBE POOL HEATERS XTHERM, TYPE P - MODELS 2505-4005 SUGGESTED SPECIFICATIONS Catalog No.: 6000.70 Effective: 09-15-16 Replaces: NEW WATER-TUBE POOL HEATERS - GENERAL 1.1 SUMMARY A. Section includes condensing, gas-fired

More information

SECTION DOMESTIC WATER HEATERS

SECTION DOMESTIC WATER HEATERS SECTION 223500 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

WATER-TUBE POOL HEATERS

WATER-TUBE POOL HEATERS XTHERM, TYPE P - MODELS 1005A-2005A SUGGESTED SPECIFICATIONS Catalog No.: 6000.63B Effective: 3-01-15 Replaces: 9-01-09 WATER-TUBE POOL HEATERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes condensing,

More information

Power Flame Incorporated

Power Flame Incorporated Power Flame Incorporated SUGGESTED SPECIFICATION FOR MODEL NVC2 THRU NVC6 ULTRA LOW NOx GAS BURNERS SUB 9 PPM NOx WITH CONTROLINKS CONTROLS THE POWER TO MANAGE ENERGY 2001 South 21st Street, Parsons, Kansas

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DOMESTIC WATER HEATERS PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DOMESTIC WATER HEATERS PART 1 - GENERAL SECTION 22 14 00 DOMESTIC WATER HEATERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 00 10,

More information

DIVISION FINNED WATER-TUBE BOILERS

DIVISION FINNED WATER-TUBE BOILERS MVB, TYPE H - MODELS 503A-2003A SUGGESTED SPECIFICATIONS Catalog No.: 2000.932C Effective: 04-01-14 Replaces: 07-15-13 DIVISION 23 52 33.13 FINNED WATER-TUBE BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

SECTION DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS

SECTION DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS SECTION 237339 - DIRECT GAS-FIRED INDUSTRIAL HEATING AND VENTILATING UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

Suggested Specification: Benchmark 1.5 Low NOx Gas-Fired Hydronic Boiler(s)

Suggested Specification: Benchmark 1.5 Low NOx Gas-Fired Hydronic Boiler(s) Furnish and install as shown on AERCO International plans and operation and maintenance manuals, with all applicable codes and authorities having local, state and federal jurisdiction, Benchmark Series

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT

More information

DIVISION FINNED WATER-TUBE BOILERS

DIVISION FINNED WATER-TUBE BOILERS MVB, TYPE H - MODELS 504A-2004A SUGGESTED SPECIFICATIONS Catalog No.: 2000.933C Effective: 06-25-15 Replaces: 12-21-09 DIVISION 23 52 33.13 FINNED WATER-TUBE BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

XTHERM, TYPE WH - MODELS 1005A- 2005A DIVISION COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS

XTHERM, TYPE WH - MODELS 1005A- 2005A DIVISION COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS XTHERM, TYPE WH - MODELS 1005A- 2005A Catalog No.: 3500.801 Effective: 11-15-14 Replaces: NEW PART 1 - GENERAL 1.1 SUMMARY DIVISION 23 34 36.29 COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS

More information

Bryan Flexible Water Tube. Ultra-High Efficiency Condensing Hot Water Boilers. 3,000,000 BTUH Natural Gas Fired

Bryan Flexible Water Tube. Ultra-High Efficiency Condensing Hot Water Boilers. 3,000,000 BTUH Natural Gas Fired Form No. 8700 Bryan Flexible Water Tube TM Triple-Flex Series Ultra-High Efficiency Condensing Hot Water Boilers 3,000,000 BTUH Natural Gas Fired Minimum 90% Thermal Efficiency at 160 F Return with 20

More information

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from

More information

HHA Bellerive Apartments 7225 Bellerive Houston, Texas J. Allen Management Managing Agent

HHA Bellerive Apartments 7225 Bellerive Houston, Texas J. Allen Management Managing Agent HHA Bellerive Apartments 7225 Bellerive Houston, Texas 77036 J. Allen Management Managing Agent Scope of Work: 1.) Water Heater Replacement with Vertical Boiler System 2.) Water Conditioning System (Softener)

More information

HHA Lyerly Apartments 75 Lyerly Houston, Texas J. Allen Management Managing Agent

HHA Lyerly Apartments 75 Lyerly Houston, Texas J. Allen Management Managing Agent HHA Lyerly Apartments 75 Lyerly Houston, Texas 77022 J. Allen Management Managing Agent Scope of Work: 1.) Boiler Replacement with Double Vertical Boiler System (1 Million btu each) 2.) Water Pump Replacement

More information

DIVISION COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS

DIVISION COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS MVB, TYPE WH - MODELS 503A-2003A SUGGESTED SPECIFICATIONS Catalog No.: 3500.952C Effective: 06-25-15 Replaces: 12-22-09 DIVISION 23 34 36.29 COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS

More information

DIVISION FINNED WATER-TUBE BOILERS

DIVISION FINNED WATER-TUBE BOILERS MVB, TYPE H - MODELS 2503-4003 SUGGESTED SPECIFICATIONS Catalog No.: 2000.934A Effective: 04-01-14 Replaces: 06-01-13 DIVISION 23 52 33.13 FINNED WATER-TUBE BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

A. Section Common Motor Requirements for HVAC Equipment: Fan motors.

A. Section Common Motor Requirements for HVAC Equipment: Fan motors. SECTION 235533 - FUEL-FIRED UNIT HEATERS PART 1 GENERAL 1.1 SECTION INCLUDES A. Gas fired unit heaters. B. Oil fired unit heaters. C. Tubular infrared heaters. 1.2 RELATED REQUIREMENTS A. Section 230513

More information

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY) STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC-213-100797 RACCOON CREEK STATE PARK (BEAVER COUNTY) I. SCOPE OF WORK: The Commonwealth of Pennsylvania, Department of Conservation

More information

Design and Construction Standards SECTION PLUMBING EQUIPMENT

Design and Construction Standards SECTION PLUMBING EQUIPMENT SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES: A. Water heaters. B. Packaged water heating systems. C. Water storage tanks. D. Water softeners. E. Pumps. F. Circulators. 1.2 REFERENCES

More information

A. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.

A. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters. SECTION 15622 DIRECT GAS-FIRED BURNER & MANIFOLD SYSTEM PART 1: GENERAL 1.1 Section includes: A. Direct gas-fired heater modules B. Controls C. Equipment schedule 1.2 Related Sections A. Section 01655:

More information

SECTION GAS-FIRED RADIANT HEATERS

SECTION GAS-FIRED RADIANT HEATERS SECTION 23 55 23 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

DIRECTIVE NO: D-B

DIRECTIVE NO: D-B DIRECTIVE NO: D-B6 100604 1 LOW PRESSURE THERMAL FLUID PLANT AUTOMATED CONTROL SYSTEMS Date of Issue: June 4, 2010 General Details This directive is being issued to owners, licensed contractors, consulting

More information

DIVISION WALL-HUNG STAINLESS STEEL HEATING BOILERS

DIVISION WALL-HUNG STAINLESS STEEL HEATING BOILERS XPAK FT TYPE H - MODELS 088AR-398A SUGGESTED SPECIFICATIONS Catalog No.: 2100.91 Effective: 05/01/15 Replaces: new DIVISION 23 52 33.13 WALL-HUNG STAINLESS STEEL HEATING BOILERS PART 1 - GENERAL 1.1 SUMMARY

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

SECTION HEATING BOILER FEEDWATER EQUIPMENT

SECTION HEATING BOILER FEEDWATER EQUIPMENT SECTION 23 53 00 HEATING BOILER FEEDWATER EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes boiler feedwater pumps, de-aerators, accessories, controls and tanks. 1.2 REFERENCES A. ASME (American

More information

SECTION ROTARY-SCREW WATER CHILLERS

SECTION ROTARY-SCREW WATER CHILLERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Factory-assembled packaged chiller. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled water connections. E. Electrical power connections.

More information

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15732 - PACKAGED ROOFTOP AIR CONDITIONING UNITS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Package roof top unit. B. Heat exchanger. C. Refrigeration components. D. Unit operating controls. E. Roof

More information

SECTION FUEL-FIRED DOMESTIC WATER HEATERS

SECTION FUEL-FIRED DOMESTIC WATER HEATERS SECTION 22 34 00 FUEL-FIRED DOMESTIC WATER HEATERS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not

More information

FINNED WATER-TUBE POOL HEATERS

FINNED WATER-TUBE POOL HEATERS HI DELTA, TYPE P - MODELS 992C-2342C SUGGESTED SPECIFICATIONS Catalog No.: 6000.611 Effective: 10-31-16 Replaces: NEW FINNED WATER-TUBE POOL HEATERS - GENERAL 1.1 SUMMARY A. Section includes gas-fired,

More information

SECTION FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 FUEL-FIRED, DOMESTIC WATER HEATERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

CONTENTS AUTOMATIC TRANSFER SWITCHES

CONTENTS AUTOMATIC TRANSFER SWITCHES CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training

More information

EG Controls. SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF E G

EG Controls. SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF E G E SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF DATE: 11/13/06 2/1/07 1 Copyright, E, Inc. E 1. ENERAL...4 1.1 Scope Of Work... 4 1.2 Codes and Standards... 4 2. PRODUCTS...5

More information

STR-Series Indirect-Fired Air Turnover Units

STR-Series Indirect-Fired Air Turnover Units STR-Series Indirect-Fired Air Turnover Units Equipment Specifi cations 1.800.589.3691 www.weather-rite.com GAS/OIL HEATING ONLY INDIRECT-FIRED AIR TURNOVER UNIT GUIDE SPECIFICATIONS PART 1 GENERAL [Gas][Oil][Gas/Oil

More information

A. Product Data: Include rated capacities, furnished specialties and accessories.

A. Product Data: Include rated capacities, furnished specialties and accessories. BASE BID: SECTION 15542 FUEL-FIRED RADIANT HEATERS PART 1 - GENERAL 1.1 SUMMARY A. Furnish and install a Co-Ray-Vac Low Intensity Vented Infrared Radiant Vacuum Gas Heating System. System must be certified

More information

Bids received after scheduled opening time will be returned to Bidder unopened.

Bids received after scheduled opening time will be returned to Bidder unopened. SPECIFICATIONS FOR INSTALLATION OF LOCHINVAR CREST CONDENSING BOILER FBN1251 or SIMILAR SYSTEM FOR THE MANCHESTER RECREATION COMPLEX Requested bidders, please provide a TURNKEY PRICE for the DEMOLISHING

More information

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings. SECTION 15481 COMPRESSED AIR SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and pipe fittings, including valves, unions and couplings. B. Air compressor. C. After cooler. D. Refrigerated air dryer.

More information

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT February 29, 2012 RFP NO: 17 PROJECT: Josephine County Justice Center HVAC Upgrades BID CLOSING DATE: NO CHANGE: March 8, 2012 / NOT LATER

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

SECTION CHILLERS

SECTION CHILLERS SECTION 15650 PART I - GENERAL 1.01 WORK INCLUDED A. Extent of work shall be as indicated on Drawings and provisions of this section, including schedules and equipment lists associated with either Drawings

More information

SECTION WATER HEATERS

SECTION WATER HEATERS SECTION 15457 WATER HEATERS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete hot water generating system with necessary accessories as indicated on Construction Documents, as specified, and

More information

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section15621 Packaged Reciprocating Water Chillers Page 1 of 5

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section15621 Packaged Reciprocating Water Chillers Page 1 of 5 Issued 2006/08/01 Section15621 Packaged Reciprocating Water Chillers Page 1 of 5 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3

More information

Brunswick-Glynn County Joint Water & Sewer Commission

Brunswick-Glynn County Joint Water & Sewer Commission Brunswick-Glynn County Joint Water & Sewer Commission INVITATION FOR BIDS DATE: 18 August 2015 PROJECT: Academy Creek Sludge Dryer Repairs 1.0 PROJECT DESCRIPTION The Brunswick-Glynn Joint Water & Sewer

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.01 SECTION INCLUDES A. Water heaters. B. Packaged water heating systems. C. Domestic water heat exchangers. D. Water storage tanks. E. Water softeners. F. Reverse osmosis equipment. G.

More information

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower SECTION 15682 CENTRIFUGAL WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC) 3. 15711 - Induced Draft Cooling Tower B. Removal

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

SECTION Fire Pumps

SECTION Fire Pumps SECTION 21 30 00 Fire Pumps PART 1 GENERAL 1.1 WORK INCLUDED A. Furnish, install and test a motor-driven fire pump, jockey pump, and controllers in the space provided and as shown in the contract drawings.

More information

SAMPLE SPECIFICATIONS

SAMPLE SPECIFICATIONS Page 1 of 6 3-03 SAMPLE SPECIFICATIONS The following sample specifications are provided by Superior Boiler Works to assist you in providing your customer with the specific needs for that application. The

More information

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus ADDENDUM FORM INVITATION TO TENDER: 2016-067 ADDENDUM NO: 1 DATE ISSUED: June 23, 2016 ISSUED BY: Monty Thibeault DESCRIPTION: Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

DIVISION FINNED WATER-TUBE BOILERS

DIVISION FINNED WATER-TUBE BOILERS HI DELTA, TYPE H - MODELS 992C-2342C SUGGESTED SPECIFICATIONS Catalog No.: 2000.953 Effective: 10-31-16 Replaces: NEW DIVISION 23 52 33.13 FINNED WATER-TUBE BOILERS - GENERAL 1.1 SUMMARY A. Section includes

More information

FINNED WATER-TUBE POOL HEATERS

FINNED WATER-TUBE POOL HEATERS HI DELTA, TYPE P - MODELS 502C-902C SUGGESTED SPECIFICATIONS Catalog No.: 6000.601A Effective: 07-12-18 Replaces: 10-31-16 FINNED WATER-TUBE POOL HEATERS - GENERAL 1.1 SUMMARY A. Section includes gas-fired,

More information

RBI MASTERSPEC. A. This Section includes gas-fired, non-condensing finned copper water tube water heaters for heating hot water.

RBI MASTERSPEC. A. This Section includes gas-fired, non-condensing finned copper water tube water heaters for heating hot water. MSWFTIII-7 SECTION 22 34 36.29 - SAMPLE SPECIFICATION FOR RBI FUTERA III MODULATING WATER HEATER PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

SPECIFICATION DIVISION 23 SECTION DESCRIPTION DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION FIRE TUBE BOILERS (STEAM)

SPECIFICATION DIVISION 23 SECTION DESCRIPTION DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION FIRE TUBE BOILERS (STEAM) ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

FGR. Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM. FGR-8 through FGR-22 (25 HP to 1000 HP)

FGR. Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM. FGR-8 through FGR-22 (25 HP to 1000 HP) FGR Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM FGR-8 through FGR-22 (25 HP to 1000 HP) Gas, Light Oil or Combination MANUFACTURED BY JOHN ZINK COMPANY, LLC

More information

SECTION PACKAGED HEAT TRANSFER SYSTEM

SECTION PACKAGED HEAT TRANSFER SYSTEM PACKAGED HEAT TRANSFER SYSTEM Page 1 of 6 SECTION PACKAGED HEAT TRANSFER SYSTEM 1 GENERAL 1.1 SUMMARY A. Packaged steam-to-water heat transfer system 1.2 REFERENCES A. ASHRAE American Society of Heating,

More information

Attachment A District 1000 Boiler Replacement District 10 Project # Building #

Attachment A District 1000 Boiler Replacement District 10 Project # Building # I. Base Bidding Requirements Attachment A 00 Boiler Replacement This is a Base Bid project; the following describes the Base Bid requirements. Contractors are to provide bids for Base Bid #1. BASE BID

More information

GP COMBUSTION EQUIPMENT INC 100 Sheldon Dr., Units 16/17 Cambridge, Ontario N1R 7S7. Model C Forced Draft Burners. Natural Gas or Propane MODEL C10

GP COMBUSTION EQUIPMENT INC 100 Sheldon Dr., Units 16/17 Cambridge, Ontario N1R 7S7. Model C Forced Draft Burners. Natural Gas or Propane MODEL C10 Model C Forced Draft Burners Natural Gas or Propane MODEL C10 MODEL C4 GP COMBUSTION EQUIPMENT INC 100 Sheldon Dr., Units 16/17 Cambridge, Ontario N1R 7S7 Telephone: (519) 620-0230 Telefax: (519) 620-0232

More information

MOHICAN. MOHICAN 4-Pass Water Boiler, HP, PSI Section

MOHICAN. MOHICAN 4-Pass Water Boiler, HP, PSI Section SPECIFICATION SHEETS Steam Sample Specification Water Sample Specification MOHICAN SPECIFICATION SHEET The following sample specifications are provided by Superior Boiler Works to assist you in providing

More information

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!! Sample Written Program For Your Company For BOILER SAFETY Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-781-1446 Email: info@se-safety.com Purpose Boiler Safety Program The

More information

AFUE up to 85.2% Heating Input 105,000 to 245,000 Btuh

AFUE up to 85.2% Heating Input 105,000 to 245,000 Btuh WATER HEATERS / BOILERS COWB3 Oil-Fired Hot Water Boiler PRODUCT SPECIFICATIONS Bulletin No. 0654 March 08 Supersedes September 05 AFUE up to 85.% Heating Input 05,000 to 45,000 Btuh MODEL NUMBER IDENTIFICATION

More information

A. American National Standards Institute (ANSI) : Establishes requirements applicable to certifying direct gas-fired heaters.

A. American National Standards Institute (ANSI) : Establishes requirements applicable to certifying direct gas-fired heaters. Section 15 _ Energy Recovery Air Handling System Part 1: GENERAL 1.1 Section Includes: A. Energy Recovery Air Handler B. Controls (most by Others) C. Equipment Schedule 1.2 Related Sections: A. Section

More information

Direct Fired Heater Model AD Specification

Direct Fired Heater Model AD Specification Direct Fired Heater Model AD Specification Description A Direct-fired gas heating and ventilating unit(s), as indicated on the drawings shall be furnished. Unit(s) shall be tested in accordance with ANSI

More information

FLEXCORE SERIES MASTERSPEC

FLEXCORE SERIES MASTERSPEC FLEXCORE SERIES MASTERSPEC MSFC-2 SECTION 23 52 16 - CONDENSING HIGH EFFICIENCY STAINLESS STEEL FIRETUBE BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,

More information

MODEL CEW OHIO SPECIAL

MODEL CEW OHIO SPECIAL MODEL CEW OHIO SPECIAL 100-225 HP Steam Wet-back Packaged Burner CONTENTS FEATURES AND BENEFITS...A9-3 Less than 360 Square Feet of Heating Surface:...A9-3 Front and Rear Doors:...A9-3 Natural Gas, No.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,

More information

SECTION AIR COOLED WATER CHILLERS

SECTION AIR COOLED WATER CHILLERS PART 1 GENERAL 1.1 SECTION INCLUDES A. Chiller package B. Charge of refrigerant and oil C. Controls and control connections D. Chilled water connections E. Starters F. Electrical power connections 1.2

More information

REQUEST FOR QUOTES (RFQ) # Issue Date: September 21, 2017

REQUEST FOR QUOTES (RFQ) # Issue Date: September 21, 2017 Procurement Division Public Services Building 2051 Kaen Road Oregon City, OR 97045 (503) 742-5444 (Office) REQUEST FOR QUOTES (RFQ) #2017-66 Issue Date: September 21, 2017 Project Name: Quote Due Date/Time:

More information

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

SECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower SECTION 15684 ROTARY SCREW WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC) 3. 15711 - Induced Draft Cooling Tower B.

More information

SECTION ELECTRIC WATER HEATERS

SECTION ELECTRIC WATER HEATERS SECTION 22 36 01 ELECTRIC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION SAMPLE SPECIFICATION FOR BOILER CONTROLLER CONVERSION KIT

SECTION SAMPLE SPECIFICATION FOR BOILER CONTROLLER CONVERSION KIT SECTION 23 09 33 SAMPLE SPECIFICATION FOR BOILER CONTROLLER CONVERSION KIT HARSCO INDUSTRIAL, PATTERSON-KELLEY NURO CONTROL CONVERSION KIT Part 1 - GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 / CSA 4.9

More information

WATER HEATERS / BOILERS GSB8-E. Gas-Fired Steam Boiler PRODUCT SPECIFICATIONS. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB E

WATER HEATERS / BOILERS GSB8-E. Gas-Fired Steam Boiler PRODUCT SPECIFICATIONS. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB E WATER HEATERS / BOILERS -E PRODUCT SPECIFICATIONS Gas-Fired Steam Boiler Bulletin No. 20653 September 202 Supersedes Bulletin No. 20263 AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh MODEL NUMBER

More information

AFUE up to 83.9% Heating Input 50,000 to 299,000 Btuh

AFUE up to 83.9% Heating Input 50,000 to 299,000 Btuh HEATERS / BOILERS GWB8-E Gas-Fired Hot Water Boiler PRODUCT SPECIFICATIONS Bulletin No. 065 July 06 Supersedes September 05 AFUE up to 83.9% Heating Input 50,000 to 99,000 Btuh MODEL NUMBER IDENTIFICATION

More information

GSB8. CONSERVATOR Gas-Fired Steam Boiler. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB S MODEL NUMBER IDENTIFICATION FEATURES

GSB8. CONSERVATOR Gas-Fired Steam Boiler. AFUE up to 82.7% Heating Input 75,000 to 299,000 Btuh GSB S MODEL NUMBER IDENTIFICATION FEATURES P R O D U C T S P E C I F I C AT I O N S W A T E R H E A T E R S / B O I L E R S CONSERVATOR Gas-Fired Steam Boiler Bulletin No. 20263 October 200 Supersedes September 2008 AFUE up to 82.7% Heating Input

More information

.2 Section Waste Management and Disposal.

.2 Section Waste Management and Disposal. Issued 2005/06/01 Section 15624 Packaged Rotary Screw Water Chillers Page 1 of 5 PART 1 General 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3

More information

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS SECTION 23 34 16 CENTRIFUGAL HVAC FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Drawings and general provisions of the contract, including General and Special Conditions and Division 01 Specification

More information

High Plume Blowers Suggested Specification Section (Master Format 1996) Suggested Specification Section (Master Format 2004)

High Plume Blowers Suggested Specification Section (Master Format 1996) Suggested Specification Section (Master Format 2004) High Plume Blowers Suggested Specification Section 15500 (Master Format 1996) Suggested Specification Section 23 38 16 (Master Format 2004) PART 1 GENERAL 1.01 WORK INCLUDED High Plume Laboratory Exhaust

More information

GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO.

GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO. GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO. GBI 201-5 3C For a proper installation and in order to receive the best in operating life and efficiency from your

More information

LGB Gas fired boiler

LGB Gas fired boiler LGB Gas fired boiler Control Supplement LGB-5 Series 2 Propane gas CSD-1 Control System Part Number 550-110-682/0304 Please read this page first Hazard definitions To the installer... The following terms

More information

Diocese of Cleveland Facilities Services Corporation

Diocese of Cleveland Facilities Services Corporation Diocese of Cleveland Facilities Services Corporation BOILER MAINTENANCE and SERVICING SEASONAL MAINTENANCE - to be performed by trained boiler technician or boiler contractor only: 1. Disassemble the low

More information

SECTION FIRE PUMP AND CONTROLS

SECTION FIRE PUMP AND CONTROLS SECTION 15320 FIRE PUMP AND CONTROLS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Fire pump, jockey pump, and controls including necessary accessories as shown in Construction Documents, specified

More information

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS Annex Laundry and Shower Alterations ADDENDUM #1 March 7, 2019 ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS A. Invitation to Bid - Call for Bids has been modified as follows: 1. Notice

More information