ADDENDUM NO. 4. Changes to the Project Book, Specifications, Contract Drawings and Questions and Responses

Size: px
Start display at page:

Download "ADDENDUM NO. 4. Changes to the Project Book, Specifications, Contract Drawings and Questions and Responses"

Transcription

1 ADDENDUM NO. 4 DATE: September 28, 2018 INVITATION FOR BID: T CSO Control Program Special Order 15A Division 47 - Screenings and Grit Removal Facilities DATED: August 6, 2018 BID DUE DATE: October 16, 2:30 p.m. EST (Change) BID OPENING DATE: October 16, 2:30 p.m. EST (Change) SUBJECT: Changes to the Project Book, Specifications, Contract Drawings and Questions and Responses PART 1: CHANGES TO PROJECT BOOK 1. In SPECIAL CONDITIONS OF THE CONTRACT Exhibit A, Attachment #4, Wage Determinations, delete General Decision Number: VA /12/2018 VA166 and replace with the General Decision Number: VA /15/2018 VA166 located at the end of this addendum in Appendix A. 2. In SPECIAL CONDITIONS OF THE CONTRACT Exhibit A, Attachment #4, Wage Determinations, delete General Decision Number: VA /05/2018 VA49 and replace with the attached General Decision Number: VA /04/2018 VA49 located at the end of this addendum in Appendix A. 3. On page 66 of the Project Book, after 2.1 B., add the following: 3.0 Wage Determination Use a. The Wage Determinations in General Decision Number: VA /04/2018 VA49 (Construction Type: Heavy) shall be used for all work depicted on Bid Drawings AG3 through and including AG31. b. The Wage Determinations in General Decision Number: VA /15/2018 VA166 (Construction Type Building) shall be used for all other work depicted on the remaining Bid Drawings. PART 2: CHANGES TO SPECIFICATIONS 1. In the table of contents, under DIVISION 11 EQUIPMENT, delete the following: Teledyne Isco 5800 Refrigerated Sampler In the table of contents, under DIVISION 14 - CONVEYING SYSTEMS, delete section title Jib Cranes and replace with Cranes and Hoisting Equipment. Addendum No /2018

2 3. In the specification SECTION CONSTRUCTION MANAGER AND ENGINEER, PART 1 GENERAL, 1.2 DEFINITIONS, A., on Page , delete (804) in the second sentence and replace with (800) In the specification SECTION MEASUREMENT AND PAYMENT, PART 1 GENERAL, 1.7 SCHEDULE OF CONTRACT ITEMS, G. Contract Item 7: Additional Length of Micropiles, on Page , insert Phase 2 before the word Additional. 5. In the specification SECTION MEASUREMENT AND PAYMENT, PART 1 GENERAL, 1.7 SCHEDULE OF CONTRACT ITEMS, G. Contract Item 7: Phase 2 Additional Length of Micropiles, on Page , Sub-sections 1. Description: and 3. Payment: insert Phase 2 before the word Additional. 6. In the specification SECTION MEASUREMENT AND PAYMENT, PART 1 GENERAL, 1.7 SCHEDULE OF CONTRACT ITEMS, L. Contract Item 12: Preparation & Clean-up for River Flooding, on Page , Sub-section 1. Description: delete 7 in the second paragraph sixth sentence and replace with In the specification SECTION LIMITATIONS ON SEQUENCE OF CONSTRUCTION, PART 1 GENERAL, 1.4 LIMITATIONS ON SEQUENCE OF CONSTRUCTION, I.3.b. (1), on Page , add the following: (a) Install ground and building monitoring system and establish movement survey baseline data prior to sheet piling and excavation activities. 8. In the specification SECTION LIMITATIONS ON SEQUENCE OF CONSTRUCTION, PART 1 GENERAL, 1.4 LIMITATIONS ON SEQUENCE OF CONSTRUCTION, I.3.b. (1), on Page , change paragraph numbers (a), (b), (c), (d) with (b), (c), (d), (e). 9. In the specification SECTION LIMITATIONS ON SEQUENCE OF CONSTRUCTION, PART 1 GENERAL, 1.4 LIMITATIONS ON SEQUENCE OF CONSTRUCTION, I., 2., after paragraph b., add the following: c. Provide a temporary power distribution panel board to operating equipment, influent screen and grit channel gates for the influent screen during installation of new MCC s. 10. In the specification SECTION LIMITATIONS ON SEQUENCE OF CONSTRUCTION, PART 1 GENERAL, 1.4 LIMITATIONS ON SEQUENCE OF CONSTRUCTION, I., 2. change paragraph numbers c., d., e., f., g., h., i., to d., e., f., g., h., i., j.,. 11. In the specification SECTION QUALITY CONTROL, PART 1 GENERAL, 1.7 COSTS OF INSPECTION, after paragraph C.5, on Page , insert 1.8 ACCEPTANCE TESTS. 12. In the specification SECTION QUALITY CONTROL, PART 1 GENERAL, 1.7 COSTS OF INSPECTION, D, on Page , delete ACCEPTANCE TESTS. Addendum No /2018

3 13. In the specification SECTION QUALITY CONTROL, PART 1 GENERAL, 1.7 COSTS OF INSPECTION, D, on Pages and , delete the paragraph numbers D, E and F and replace as A, B and C. 14. In the specification SECTION QUALITY CONTROL, PART 1 GENERAL, 1.8 FAILURE TO COMPLY WITH CONTRACT, on Page , delete paragraph number 1.8 and replace with In the specification SECTION QUALITY CONTROL, at the end of Table Field Testing Checklist on Page , after item QQQQ., insert the table in Appendix B Specifications. 16. In the specification SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS, PART 1 GENERAL, 1.1 SECTION INCLUDES, on Page , delete D. Temporary Construction. 17. In the specification SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS, PART 1 GENERAL, 1.1 SECTION INCLUDES, L., on Page , insert W before the words WTP Site Security. 18. In the specification SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS, PART 1 GENERAL, 1.8 TEMPORARY CONTROLS, H. Erosion Control:, on Page , insert Contract Drawings and before the word Specification. 19. In the specification SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS, PART 1 GENERAL, 1.9 TRAFFIC REGULATION, on Page , delete title TRAFFIC REGULATION and rename WWTP SITE SECURITY AND TRAFFIC REGULATION. 20. In the specification SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS, PART 1 GENERAL, 1.9 TRAFFIC REGULATION, on Page , delete Paragraph A and add the following: A. Parking: Provide and maintain suitable parking in designated or approved areas for the use of all construction workers and others performing work or furnishing services in connection with the Contract, to avoid any need for parking personal vehicles where they may interfere with public traffic or construction activities. All CONTRACTOR and subcontractor personnel shall park in the remote north lot and walk on to the site through the new east gate. Only contractor work vehicles required for the work will be allowed on site. B. Access: The contractor shall make provisions for a security guard with suitable climatecontrolled, weatherproof structure to monitor and record contractor activities for the duration of the construction. The guard station shall be located at the East Gate off Brander Street and shall be manned during all Contractor working hours. The guard shall be from a security firm with a minimum of 10 years experience in the security business. The contractor shall provide Addendum No /2018

4 badges for all employees and subcontractor employees that can be verified by the security guard. Badges shall be laminated in plastic with a metal clip which has the following information: employee name, photograph, employing contractor, personnel number. The security guard shall maintain a daily log and maintain a file of personnel, vehicles, and deliveries entering and leaving the Plant site. All construction equipment, deliveries and subcontractors shall access the Plant site through the East Gate. No construction traffic shall travel through the main WWTP gate. 21. In the specification SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS, PART 1 GENERAL, 1.9 TRAFFIC REGULATION, on Page , delete the paragraph numbers B and C and replace as C and D. 22. In the specification SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS, PART 1 GENERAL, on Page , delete Paragraph 1.12 WWTP SITE SECURITY in its entirety. 23. Replace specification SECTION OPERATION AND MAINTENANCE MANUALS with the specification located at the end of this addendum in Appendix B. 24. In the specification SECTION TRAINING, PART 1 GENERAL, 1.4 HOURS OF TRAINING, A., on Page , delete the table and replace with the following: Equipment Name Minimum Hours per Session Minimum Number of Sessions Gate and Operator and Controls 4 2 Mechanical Climber Screen (Grit 1) 4 2 Mechanical Chain and Rake Screen (Screenings and Grit Facility) 8 2 Grit Pumps and Controls 2 2 Grit Vortex and Controls 2 2 Grit Classifiers and Cyclones 2 2 Odor Control Fans and Controls 4 2 Odor Control Equipment and Controls 4 2 Screenings and Grit Building HVAC Equipment 6 2 Screenings and Grit Building Boiler/Hot Water Equipment 6 2 Field Mounted Instrumentation - 2 Phosphate Analyzer 2 2 Refrigerated Sampler 2 2 Addendum No /2018

5 Signaling and Fire Alarm 4 2 Sump Pumps 2 2 Boilers and Boiler Room Equipment 4 2 Condensing Units 2 2 Air Coils 2 2 Terminal Heat Transfer Units 2 2 Ductwork Accessories 2 1 Fans 4 2 HVAC Controls 8 5 Air Monitoring 4 2 Uninterruptible Power Supply Systems 4 4 Adjustable Frequency Drives 4 6 Electrical Monitoring System 4 4 Motor Control Center 4 4 Digital Video System 4 4 Fiber Optic Cables In the specification SECTION BYPASS PUMPING, PART 1 GENERAL, 1.1 DESCRIPTION, B.1, on Page , delete Section Submittals and replace with Section Submittals. 26. In the specification SECTION BYPASS PUMPING, PART 1 GENERAL, 1.3 SYSTEM DESCRIPTION, D.1.a, on Page , delete Division in the first sentence and replace with Diversion. 27. In specification SECTION SHORING,SHEETING AND BRACING, PART 1 GENERAL, 1.2 SUBMITTALS, B, on Page , delete State where the construction will be performed in the first sentence and replace with Commonwealth of Virginia. 28. In the specification SECTION DISINFECTION, PART 1 GENERAL, 1.3 QUALITY ASSURANCE, on Page , after paragraph 1.3 C., add the following: 1.4 SUBMITTALS A. Provide all submittals in accordance with Division 1 requirements including the following: pipe fill and drain procedures, equipment and apparatus including post disinfection treatment and disposal of the pipe contents. Addendum No /2018

6 29. In the specification SECTION CONCRETE FORMWORK, PART 1 GENERAL, 1.1 SUMMARY, A. Section Includes:, 1. Architectural., on Page , delete sub-section a and replace with the following: a. Exterior walls exposed to view, down to 6 inches below finish grade. b. Interior exposed walls, beams, columns and stairwells. c. Exposed undersides of floor slabs, roof slabs and stairs 30. In specification SECTION CAST-IN-PLACE-CONCRETE, PART 1 GENERAL, 1.1 SUMMARY, B. Architectural Concrete:, on Page , delete sub-sections 2 to 3 and replace with the following: 2. Interior exposed walls, beams, columns and stairwells 3. Exposed undersides of floor slabs, roof slabs and stairs 31. In the specification SECTION COLD-FORMED METAL FRAMING, PART 1 GENERAL, 1.4 SUBMITTALS, C. Structural Calculations:, on Page , delete state of the project. and replace with Commonwealth of Virginia In the specification SECTION METAL GRATED STAIRS, PART 1 GENERAL, 1.4 SUBMITTALS, C., on Page , delete state and replace with Commonwealth. 33. In the specification SECTION METAL PAN STAIRS, PART 1 GENERAL, 1.3 DESIGN REQUIREMENTS, A. Delegated Design:, on Page , insert registered in the Commonwealth of Virginia after the word engineer, in the sentence. 34. In the specification SECTION 05520, HANDRAILS AND RAILINGS, PART 2 PRODUCTS, 2.5 FABRICATION, on Page , after paragraph H., add the following: I. Provide expansion joints or provisions for movement for railing and toe board sections greater than 40 feet. 35. In the specification SECTION HANDRAILS AND RAILINGS, PART 2 PRODUCTS, 2.5 FABRICATION, on Page , delete paragraph numbers I., J., K., L. and replace as J., K., L., M In the specification SECTION METAL FLOOR GRATING AND PLATE, PART 1 GENERAL, 1.5 QUALIFICATIONS, A., on Page , delete State and replace with Commonwealth. 37. In the specification SECTION ACOUSTICAL CEILINGS, PART 1 GENERAL, 1.2 REFERENCES, on Page , after paragraph 1.2 A. 5., add the following: Addendum No /2018

7 1.3 SUBMITTALS A. Provide all submittals in accordance with Division 1 requirements. 38. In the specification SECTION ACOUSTICAL CEILINGS, PART 1 GENERAL, 1.3 SPARE PARTS, on Page , delete paragraph number 1.3 and replace with In the specification SECTION FIRE EXTINGUISHERS, PART 1 GENERAL, 1.2 QUALITY ASSURANCE, on Page , after paragraph 1.2 A., add the following: 1.3 SUBMITTALS A. Provide all submittals in accordance with Division In the specification SECTION STAINLESS STEEL SLIDE GATES, PART 2 PRODUCTS, 2.6 SLIDE GATE ELECTRIC MOTOR OPERATORS NONMODULATING, R. Push Buttons and Selector Switches:, on Page , delete paragraph R. and add the following: R. Local Display Module (LDM) Selector Switch and Push Buttons: Where the operator is 7 feet or less from the floor and in an accessible location, an LDM will be supplied. Local operation shall be by an Open and Close control knob and a Local-Stop-Remote selector knob with padlock capability in any position. Control knob shafts shall not penetrate the display/control module cover. Control knob position detection shall use Hall effect devices. Mechanical reed switches are not permitted. The actuator shall include three (3) long life-high intensity LED type pilot lights to indicate valve open, opening, closed, closing, stopped, and alarm conditions. Red & Green lights shall be reverse color programmable to indicate valve open and valve closed position as specified. The amber LED light shall indicate valve stopped in midposition. The local operation, display and calibration of actuator shall be through a LDM with LCD, liquid crystal display. For ease of operation the LDM shall be capable of being located parallel to and adjacent to the handcrank or on the front of the actuator s controls and perpendicular to the handcrank. The LDM shall be capable of being rotated in ninety degree increments for easier viewing. The liquid crystal display and LED lights shall be protected by an explosionproof tempered lime glass window. Plastic windows are not acceptable. S. Remote Display Module (RDM): An RDM shall be provided when the operator is more than 7 feet above the floor or in an inaccessible location and shall perform the same functions as the local display module LDM. The RDM control knobs shall not penetrate the display/control module cover. Control knob position detection shall use Hall effect devices. Mechanical reed switches are not permitted. The RDM shall be connected to the actuator with four wires (two wires for 24 Volts DC from actuator and two shielded twisted pair for RS-485 signal from the actuator) and shall be capable of being located up to 4000 ft from the actuator. Each actuator shall support a LDM, local display module and up to two RDMs. One RDM shall be powered from the actuator s 24 Volts DC power supply. The second RDM shall be powered from Addendum No /2018

8 customer s 120 Volts AC power. Local and remote displays shall be highly visible. The LCD viewing window shall be explosionproof rated tempered lime-glass window. Plastic windows are not permitted. The RDM display shall be identical to the LDM display and shall allow remote operation, diagnostics and set up same as the LDM. RDM and LDM shall be equipped with safety sensing of each displays selector switch position. When either the RDM or the LDM selector switch is in stop position the actuator shall not be capable of being run from either location. 41. In the specification SECTION STOP LOGS AND STOP GATES, PART 2 PRODUCT, 2.3 STOP LOGS AND APPURTENANCES, A. Stop Logs:, 1., on Page , delete on the Drawings. At the end of the sentence and replace with at the end of this Section. 42. In the specification SECTION NON-CLOG VORTEX PUMP, PART 1 GENERAL, 1.4 SUBMITTALS, B. Shop Drawings:, 5., on Page , after the word Information add the following:, including lubrication type and identify if motor bearings require lubrication. 43. In the specification SECTION NON-CLOG VORTEX PUMP, PART 1 GENERAL, 1.6 SPARE PARTS, A. General:, on Page , after sub-section 4., add the following: 5. One pump lower bushing 6. One pump impeller and one pump volute 44. In the specification SECTION NON-CLOG VORTEX PUMP, PART 2 PRODUCTS, 2.6 LUBRICATION, C. Lubrication Supply: on Page , after the first sentence, insert Provide the lubrication identification for the oil contained in the oil reservoir. In the second sentence delete the word the and replace with each. 45. In the specification SECTION NON-CLOG VORTEX PUMP, PART 2 PRODUCTS, 2.9 CONSTANT SPEED BELT DRIVE, A., on Page , at the end of the paragraph insert Provide adequate quantity of v-belts per assembly including corresponding part numbers In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.2 QUALITY ASSURANCE, B. Manufacturer s Qualifications: on Page , insert s after the word installation. 47. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.2 QUALITY ASSURANCE, B. Manufacturer s Qualifications:, 1., on Page , delete a in the second sentence and replace with provided for. 48. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.2 QUALITY ASSURANCE, B. Manufacturer s Qualifications:, 1., on Page , delete An in the third sentence and replace with A. Addendum No /2018

9 49. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.2 QUALITY ASSURANCE, B. Manufacturer s Qualifications:, 1. b., on Page , after the word all delete chamber is and insert chambers is greater than. 50. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.2 QUALITY ASSURANCE, B. Manufacturer s Qualifications:, 2., on Page , in the first sentence delete an. 51. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.2 QUALITY ASSURANCE, B. Manufacturer s Qualifications:, 2., on Page , in the second sentence delete in 1.2.E. and replace with specified in 1.3.E In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.2 QUALITY ASSURANCE, C. Coordination Responsibility:, 1., on Page , delete and and replace with and In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.3 SYSTEM DESCRIPTION, D., on Page , delete 30 mgd and replace with 70mgd. 54. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.4 SUBMITTALS, E., on Page , before paragraph E., add the following: E. Qualifications of manufacturer s field service representative to supervise performance testing of the vortex grit removal system equipment. 55. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.4 SUBMITTALS, E., on Page , delete paragraph number E. and replace as F In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.4 SUBMITTALS, F., on Page , delete paragraph F Seismic Anchorage and Bracing:. 57. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 1 GENERAL, 1.5 SPARE PARTS, A. General:, on Page , after sub-section 3., add the following: 4. One year supply of motor grease and lubrication. 5. One grit chamber drive motor. 58. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 2 PRODUCTS, 2.2 COMPONENTS, G. Grit Fluidizer: on Page , in the second paragraph after the word heavy insert Type. Addendum No /2018

10 59. In specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 3 EXECUTION, 3.1 MANUFACTURER S SERVICES, on Page , subsection A, in the schedule under Service delete Installation and replace with Concrete and Equipment Installation. 60. In specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 3 EXECUTION, 3.1 MANUFACTURER S SERVICES, on Page , subsection A, in the schedule Number of Trips for Installation Service, delete 1 and replace with In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 3 EXECUTION, 3.1 MANUFACTURER S SERVICES, on Page , insert the following: B. Provide assistance during structural concrete placement to include observation, guidance and coordination of construction joint locations and placement sequence to accommodate the new Vortex Grit Removal equipment and maintain installation tolerances within acceptable limits. 62. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 3 EXECUTION, 3.3 FIELD QUALITY CONTROL, A. Manufacturer s Field Service: on Page , delete manufacturers in the first sentence and replace with manufacturer. 63. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 3 EXECUTION, 3.4 PERFORMANCE TESTING, A., on Page , in the first sentence, after the word efficiency insert a period(.), delete and submitted to and reviewed and approved by the ENGINEER and replace with Submit to the ENGINEER for review and approval. 64. In the specification SECTION VORTEX GRIT REMOVAL SYSTEM, PART 3 EXECUTION, 3.4 PERFORMANCE TESTING, B. Head loss tests:, on Page , at the end of the paragraph, add the following: Range of flow between minimum and maximum specified in Paragraph In the specification SECTION GRIT SEPARATION AND CLASSIFYING EQUIPMENT, PART 1 GENERAL, 1.6 SPARE PARTS, on Page , after subsection 4, add the following: 5. Two liners for the cyclone separator. 66. Delete specification SECTION REFRIGERATED SAMPLER. 67. In the specification SECTION SIGNALING AND ALARM, on Page , in the section title, before the word ALARM insert FIRE. Addendum No /2018

11 68. In the specification SECTION CRANES AND HOISTING EQUIPMENT, 1.3 SYSTEM DESCRIPTION, B. Performance Requirements:, 2. Gantry Crane:, on Page , insert Rolling before the word Gantry. 69. In the specification SECTION CRANES AND HOISTING EQUIPMENT, 1.3 SYSTEM DESCRIPTION, B. Performance Requirements:, 2. Gantry Crane:, on Page , in Table ITEM delete FSJ-1 and FSJ-2 and replace with RG-1 and RG In the specification SECTION CRANES AND HOISTING EQUIPMENT, PART 3 EXECUTION, 3.2 FIELD QUALITY CONTROL, A. Manufacturer's Field Service: on Page , delete open and closed parenthesis in the paragraph. 71. Replace specification SECTION DUCTILE-IRON PIPE FITTINGS with the specification located at the end of this addendum in Appendix B. 72. In the specification SECTION VALVES, PART 2 PRODUCT, 2.15 ELECTRIC MOTOR OPERATORS - NONMODULATING, A. General: on Page , delete open and closed parenthesis in the paragraph. 73. In the specification SECTION VALVES, PART 2 PRODUCT, 2.15 ELECTRIC MOTOR OPERATORS - NONMODULATING, D. Open and Close Time Periods: on Page , delete 60 seconds in the first sentence and replace with 30 seconds. 74. In the specification SECTION VALVES, PART 2 PRODUCT, 2.15 ELECTRIC MOTOR OPERATORS - NONMODULATING, R. Push Buttons and Selector Switches:, on Page , delete paragraph R. and add the following: R. Local Display Module (LDM) Selector Switch and Push Buttons: Where the operator is 7 feet or less from the floor and in an accessible location, an LDM will be supplied. Local operation shall be by an Open and Close control knob and a Local-Stop-Remote selector knob with padlock capability in any position. Control knob shafts shall not penetrate the display/control module cover. Control knob position detection shall use Hall effect devices. Mechanical reed switches are not permitted. The actuator shall include three (3) long life-high intensity LED type pilot lights to indicate valve open, opening, closed, closing, stopped, and alarm conditions. Red & Green lights shall be reverse color programmable to indicate valve open and valve closed position as specified. The amber LED light shall indicate valve stopped in midposition. The local operation, display and calibration of actuator shall be through a LDM with LCD, liquid crystal display. For ease of operation the LDM shall be capable of being located parallel to and adjacent to the handcrank or on the front of the actuator s controls and perpendicular to the handcrank. The LDM shall be capable of being rotated in ninety degree increments for easier viewing. The liquid crystal display and LED lights shall be protected by an explosionproof tempered lime glass window. Plastic windows are not acceptable. Addendum No /2018

12 S. Remote Display Module (RDM): An RDM shall be provided when the operator is more than 7 feet above the floor or in an inaccessible location and shall perform the same functions as the local display module LDM. The RDM control knobs shall not penetrate the display/control module cover. Control knob position detection shall use Hall effect devices. Mechanical reed switches are not permitted. The RDM shall be connected to the actuator with four wires (two wires for 24 Volts DC from actuator and two shielded twisted pair for RS-485 signal from the actuator) and shall be capable of being located up to 4000 ft from the actuator. Each actuator shall support a LDM, local display module and up to two RDMs. One RDM shall be powered from the actuator s 24 Volts DC power supply. The second RDM shall be powered from customer s 120 Volts AC power. Local and remote displays shall be highly visible. The LCD viewing window shall be explosionproof rated tempered lime-glass window. Plastic windows are not permitted. The RDM display shall be identical to the LDM display and shall allow remote operation, diagnostics and set up same as the LDM. RDM and LDM shall be equipped with safety sensing of each displays selector switch position. When either the RDM or the LDM selector switch is in stop position the actuator shall not be capable of being run from either location. 75. In the specification SECTION VALVES, PART 2 PRODUCT, 2.15 ELECTRIC MOTOR OPERATORS - NONMODULATING, S. Limit and Torque Switches:, on Page , delete the paragraph number S. and replace with T In the specification SECTION VALVES, PART 2 PRODUCT, 2.15 ELECTRIC MOTOR OPERATORS - NONMODULATING, T. Additional Accessories:, on Page , before paragraph T., insert the following: U. Circuit Breaker Module (CBM): Where shown, provide the operator with a NEMA 6P rated CBM. The CBM shall interrupt the circuit between the actuator and the incoming power supply. The CBM shall be mounted in a separate electrical compartment which is close-coupled to the actuator. 77. In the specification SECTION VALVES, PART 2 PRODUCT, 2.15 ELECTRIC MOTOR OPERATORS - NONMODULATING, T. Additional Accessories:, on Page , delete the paragraph number T. and U. and replace with V. and W In the specification SECTION AIR OUTLETS AND INLETS, PART 3 EXECUTION, 3.2 INSTALLATION, D. Location: on Page , delete indicated on general construction "Reflected Ceiling Plans" and replace with shown. 79. In the specification SECTION AIR MONITORING, PART 2 PRODUCTS, 2.12 TRAINING, A., on Page , delete in the second sentence and replace with Addendum No /2018

13 80. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 1 GENERAL, 1.4 SYSTEM DESCRIPTION, C., on Page , delete Resident Engineer in the first sentence and replace with City. 81. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 1 GENERAL, 1.4 SYSTEM DESCRIPTION, C. 2., on Page , delete Resident Engineer s field office and replace with the City s existing facilities. 82. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 1 GENERAL, 1.4 SYSTEM DESCRIPTION, C. 3., on Page , delete - in the second sentence. 83. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 1 GENERAL, 1.4 SYSTEM DESCRIPTION, on Page , delete paragraph F. 84. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 1 GENERAL, 1.5 ENGINEERING REQUIREMENTS, B. 1., on Page , delete Resident Engineer trailer complex and replace with City s existing facilities. 85. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 1 GENERAL, 1.5 ENGINEERING REQUIREMENTS, B. sub-section 5. on Page , delete the word attached and insert located at the end of this section after the Sketch B. 86. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 1 GENERAL, 1.7 QUALITY ASSURANCE, E., on Page , delete Commissioner in the first sentence and replace with Construction Manager. 87. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 1 GENERAL, 1.7 QUALITY ASSURANCE, E., on Page , delete (as specified in 1.04F hereinbefore) in the second sentence and replace with as specified in 1.4F hereinbefore. 88. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 2 PRODUCTS, 2.1 ELECTRICAL SERVICE CONNECTION, A., Page , after the first sentence, insert Coordinate location with the Construction Manager. 89. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 2 PRODUCTS, 2.2 RACEWAYS AND WIRING, B., on Page , delete Commissioner in the second sentence and replace with ENGINEER. 90. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 3 EXECUTION, 3.2 OPERATION, A., on Page , delete each working day from 6:00 A.M. to 6:00 P.M., from Monday to Friday inclusive. and replace with continuously for the duration of the work until permanent electrical facilities and service can be provided. Addendum No /2018

14 91. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 3 EXECUTION, 3.2 OPERATION, on Page , delete paragraph B. 92. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 3 EXECUTION, 3.4 REMOVAL, A., on Page , delete Commissioner in the first sentence and replace with Construction Manager. 93. In the specification SECTION TEMPORARY ELECTRICAL SYSTEM, PART 3 EXECUTION, Sketch B, on Page , delete the sketch and replace with the following: Addendum No /2018

15 94. In the specification SECTION UNINTERRUPTIBLE POWER SUPPLY SYSTEMS, PART 1 GENERAL, 1.1 SUMMARY, B, sub-section 1. on Page , delete Section and replace with In the specification SECTION UNINTERRUPTIBLE POWER SUPPLY SYSTEMS, PART 3 EXECUTION, 3.2 FIELD QUALITY CONTROL, C. Manufacturer's Field Services: on Addendum No /2018

16 Page , delete Section at the end of the sentence and replace with Section In the specification SECTION ADJUSTABLE FREQUENCY DRIVES, PART 1 GENERAL, 1.1 SUMMARY, B. 1., on Page , delete Section and replace with Section In the specification SECTION ADJUSTABLE FREQUENCY DRIVES, PART 1 GENERAL, 1.7 SPARE PARTS AND SERVICE, B. General:, 1. d., on Page , delete, indicating lights. 98. In the specification SECTION ADJUSTABLE FREQUENCY DRIVES, PART 1 GENERAL, 1.7 SPARE PARTS AND SERVICE, B. General:, 1. n., on Page , after the word laptop, insert including software license for City programming and troubleshooting. 99. In the specification SECTION ADJUSTABLE FREQUENCY DRIVES, PART 2 PRODUCTS, 2.3 COMPONENTS, C. Programmable Controller:, on Page , delete Section Instrumentation and replace with Sections and In the specification SECTION ADJUSTABLE FREQUENCY DRIVES, PART 3 EXECUTION, 3.2 FIELD QUALITY CONTROL, C. Manufacturer s Field Services Representative: on Page , delete Section at the end of the sentence and replace with Section In the specification SECTION ELECTRICAL MONITORING SYSTEM, PART 1 GENERAL, 1.1 SUMMARY, B. 1., on Page , delete Section and replace with Section In the specification SECTION MOTOR CONTROL CENTERS, PART 1 GENERAL, 1.1 SUMMARY, B. 1., on Page , delete Section and replace with Section In the specification SECTION DIGITAL VIDEO SYSTEM, PART 1 GENERAL, 1.1 SECTION INCLUDES, B. 1., on Page , delete Section and replace with Section In the specification SECTION DIGITAL VIDEO SYSTEM, PART 1 GENERAL, 1.4 REFERENCE ABBREVIATIONS, A. sub-section 2. on Page , delete DVRS and replace with DVMRS In the specification SECTION DIGITAL VIDEO SYSTEM, PART 1 GENERAL, 1.5 SYSTEM DESCRIPTION, B., on Page , delete DVRS in the first sentence and replace with DVMRS. Addendum No /2018

17 106. In the specification SECTION DIGITAL VIDEO SYSTEM, PART 1 GENERAL, 1.5 SYSTEM DESCRIPTION, B., on Page , delete engineering in the last sentence and replace with contract In the specification SECTION DIGITAL VIDEO SYSTEM, PART 3 DELIVERY, STORAGE, AND HANDLING, 3.6 FIELD SERVICES, A. Manufacturer s Representative:, on Page , delete Section in the fourth sentence and replace with Section In the specification SECTION MODIFICATIONS TO EXISTING PLANT PCS SYSTEM, PART 3 EXECUTION, 3.6 TESTS, B., on Page , delete Section and replace with Section In the specification SECTION PROCESS CONTROL SYSTEM FACTORY ACCEPTANCE TESTING, PART 1 GENERAL, 1.1SUMMARY, B, delete the word weeks in the last sentence and replace with the word months In the specification SECTION PROCESS CONTROL SYSTEM FACTORY ACCEPTANCE TESTING, PART 1 GENERAL, 1.1 SUMMARY, I. 2., on Page , delete Section and replace with Section In the specification SECTION PROCESS CONTROL SYSTEM FACTORY ACCEPTANCE TESTING, PART 1 GENERAL, 1.2 SUBMITTALS, B., on Page , delete Section and replace with Section In specification SECTION PROCESS CONTROL SYSTEM COMMISSIONING, PART 1 GENERAL, 1.1 SUMMARY,C, sub-section 2, on Page , delete Section and replace with Section In the specification SECTION PROCESS CONTROL SYSTEM COMMISSIONING, PART 2 SITE ACCEPTANCE TESTING, 2.4 PURPOSE AND SCOPE, A., on Page , delete s from the word Staffs in the first sentence In the specification SECTION PROCESS CONTROL SYSTEM COMMISSIONING, PART 3 EXECUTION, 3.3 DEFECT HANDLING, A., on Page , delete changes in the first sentence and replace with modifications or adjustments In the specification SECTION PROCESS CONTROL SYSTEM COMMISSIONING, PART 3 EXECUTION, 3.3 DEFECT HANDLING, E. and F., on Page , delete Change Requests and replace with Request for Modifications In the specification SECTION PROCESS CONTROL SYSTEM COMMISSIONING, PART 3 EXECUTION, 3.3 DEFECT HANDLING, F., on Page , delete change request and replace with Request For Modifications. Addendum No /2018

18 117. In the specification SECTION PROCESS CONTROL SYSTEM TRAINING, PART 1 GENERAL, 1.1 REQUIREMENTS AND RESPONSIBILITIES, F. and G.2., on Page , delete Section and replace with Section In specification Section PROCESS CONTROL SYSTEM TRAINING, PART 1 GENERAL, 1.1 REQUIREMENTS AND RESPONSIBILITIES, G.6 on Page , insert the word Refrigerated before Sampler In the specification SECTION PROCESS CONTROL SYSTEM TRAINING, PART 1 GENERAL, 1.2 SUBMITTALS, B., on Page , delete within 180 days of the effective date of the Notice to Proceed, In the specification SECTION PROCESS CONTROL SYSTEM TRAINING, PART 1 GENERAL, 1.3 ON-SITE TRAINING, D. Generic Training Requirements:, 1., on Page , delete Section and replace with Section In the specification SECTION PROCESS CONTROL SYSTEM TRAINING, PART 3 EXECUTION, 3.1 TRAINING, A., on Page , delete Section and replace with Section In the specification SECTION PROCESS CONTROL SYSTEM INPUT/OUTPUT LIST, PART 1 GENERAL, 1.1 DESCRIPTION, B., 2., on Page , delete Section and replace with Section In the specification SECTION SHORING, SHEETING AND BRACING, PART 3 EXECUTION, 3.1 SHORING, SHEETING AND BRACING INSTALATION, after G. add the following: H. Prior to the start of installation of excavation support systems, the Contractor shall perform a field survey including photographs as necessary to record existing conditions at the site. During construction, the Contractor shall provide monitors and record information to detect any movement of the excavation support system and adjacent utilities and structures. Monitoring devices shall be installed at all adjacent utilities and existing structures to the new Screen and Grit Removal Building. The monitoring program and information recorded therefrom shall be designed and sealed by the registered Professional Engineer retained by the Contractor for excavation support systems work and submitted weekly for the Engineer's records. Addendum No /2018

19 PART 3: CHANGES TO CONTRACT DRAWINGS 1. On Cover Sheet change OWNER CONTRACT INFORMATION to OWNER CONTACT INFORMATION. 2. On Drawing AG2, revise the location of the Guard Shack by deleting the two Guard Shack locations shown adjacent the Temp Contractor Trailer, Parking and Laydown Area and east of the new Diversion Chamber and relocate a single Guard Shack south of Supplemental Pumping Station at the East Construction Entrance off the Access Road. 3. On Drawing AG4, delete the TEMP GUARD SHACK SEE NOTE 5 from Detail 2/AG4 Erosion and Sediment Control Practices. Delete Note 5 and renumber following notes accordingly. 4. On Drawing AG5, Detail 1/AG5 Erosion and Sediment Control Practices locate Temporary Guard Shack near the Inlet Protection shown in the south east quadrant and include label APPROXIMATE LOCATION OF TEMP GUARD SHACK SEE NOTE On Drawing AG8, in the last sentence of Note 2, replace the Specification reference from to In the last sentence of Note 8 replace State with Commonwealth. 6. On Drawing AG9, replace Note 3 with 3. Contractor shall install signs previously removed during demolition. Refer to DWG AG8. Contractor shall coordinate location of signs with Owner. 7. On Drawing AG9, delete location and reference to Temp Guard Shack shown north and east of the New Diversion Chamber. 8. Replace Drawing AG12 with revised Drawing AG12 located in Appendix C at the end of this Addendum. 9. Replace Drawing AG15 with revised Drawing AG15 located in Appendix C at the end of this Addendum. 10. In Profile 1 on Drawing AG16, label manhole located at Station MH 1. In Profile 2, label manholes located at Station and Station MH2 and MH 3 respectively. 11. In Profile 3 on Drawing AG17, label manhole located at Station MH In Profile 4 on Drawing AG18, label manholes located at Station , Station , Station and Station MH5, MH6, MH7 and MH8 respectively. 13. On Drawing AG19, in the last sentence of Note 2, replace the Specification reference from to Addendum No /2018

20 14. In the Influent Pipe Plan on Drawing AG20, label the new manhole on the New 8 Sanitary Sewer New MH1 and the new manhole on the New 8 Drain New MH Replace Drawing AG27 with revised Drawing AG27 located in Appendix C at the end of this Addendum. PART 3: REPLIES TO QUESTIONS 1. We respectfully request the engineer to add Perry Fiberglass Products, Inc / Envirogen Technologies to Section Odor Control Equipment: Bio-towers Part Reply 1: We already have designed the Odor Control Equipment around two manufacturers systems. The IFB contains provisions for submission of equivalent equipment from other manufacturers. However, at this stage of the project, the burden is with the manufacturer and bidding general contractors to determine the suitability of any proposed alternate equipment manufacturer s system and weigh potential impacts to other aspects of the project design such as: will the equipment fit in the space available, does the change impact other portions of the design such as electrical and instrumentation, does the alternative equipment provide the same or better performance that the design basis equipment, does the alternate equipment have equivalent or better life cycle costs and maintenance and parts support, etc. To ensure a level playing field for bidders, we require that the base bid be based upon using one of the specified equipment manufacturers and models. It should be pointed out that there is a cost to the City to have our engineering consultants evaluate any proposed alternative equipment, therefore alternate equipment submittals that are not properly and thoroughly documents will generally not be approved. Due to the cost of evaluating alternative equipment, this step is done after bids are opened and the prospective low responsive and responsible bidder is determined. Please refer to the IFB N0. T Project Book, under Bid Form, Instruction to Bidders: (page 8 of 66) (1), for the procedure to submit an Or Equal to the named equipment in the Major Equipment Schedule. Please also refer to specification SECTION 1600 MATERIAL AND EQUIPMENT, PART 1 GENERAL, 1.4 OR EQUAL SUBMITTAL. 2. Regarding the subject project specification section k.3 indicates all DI Grit pipe and fittings are to have Pro401 lining or equal whereas, the Pipe Schedule in section pg. 9 indicates the Grit pipe is to be Glass lined. Which is correct? Reply 2: See PART 2: CHANGES TO SPECIFICATIONS, Item No. 71. Addendum No /2018

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

SECTION GENERATOR PARALLELING CONTROLS

SECTION GENERATOR PARALLELING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES Page 226119-1 SECTION 226119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July

More information

SECTION GAS-FIRED RADIANT HEATERS

SECTION GAS-FIRED RADIANT HEATERS SECTION 23 55 23 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

15900 HVAC INSTRUMENTATION AND CONTROLS

15900 HVAC INSTRUMENTATION AND CONTROLS 15900 HVAC INSTRUMENTATION AND CONTROLS PART 1 GENERAL - Andover Controls BAS system is the standard for the University, and may be specified as a proprietary item. 1.0 RELATED DOCUMENTS A. Drawings and

More information

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS SECTION 23 34 16 CENTRIFUGAL HVAC FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Drawings and general provisions of the contract, including General and Special Conditions and Division 01 Specification

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018 SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DIRECTIVE NO: D-B

DIRECTIVE NO: D-B DIRECTIVE NO: D-B6 100604 1 LOW PRESSURE THERMAL FLUID PLANT AUTOMATED CONTROL SYSTEMS Date of Issue: June 4, 2010 General Details This directive is being issued to owners, licensed contractors, consulting

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS SECTION 23 22 23 STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable in the

More information

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No SECTION 213113 - ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

ADDENDUM NO. 1 COPPER COMMUNICATIONS CABLE AND VOICE AND DATA EQUIPMENT MONITORING, TESTING, AND REPAIR DEPARTMENT OF WATER RESOURCES

ADDENDUM NO. 1 COPPER COMMUNICATIONS CABLE AND VOICE AND DATA EQUIPMENT MONITORING, TESTING, AND REPAIR DEPARTMENT OF WATER RESOURCES ADDENDUM NO. 1 PROJECT TITLE: LOCATION: COPPER COMMUNICATIONS CABLE AND VOICE AND DATA EQUIPMENT MONITORING, TESTING, AND REPAIR CALIFORNIA AQUEDUCT SPECIFICATION NO.: 09-02 CONTRACT NO.: ISSUED BY: C51387

More information

SECTION (15833) - HVAC POWER VENTILATORS

SECTION (15833) - HVAC POWER VENTILATORS PART 1 GENERAL 1.01 SUMMARY SECTION 23 34 23 (15833) - HVAC POWER VENTILATORS A. Section Includes: 1. Centrifugal Roof Ventilators. 2. Up-blast Roof Exhaust Fans (Kitchen Hood Exhaust). 3. Ceiling-Mounted

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

SECTION AIR COILS

SECTION AIR COILS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

City of Duluth Festival Center 04/25

City of Duluth Festival Center 04/25 SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS Annex Laundry and Shower Alterations ADDENDUM #1 March 7, 2019 ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS A. Invitation to Bid - Call for Bids has been modified as follows: 1. Notice

More information

SECTION SECURITY TESTING AND COMMISSIONING

SECTION SECURITY TESTING AND COMMISSIONING SECTION 280800 - SECURITY TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 WORK INCLUDES A. General Description: This specification section covers the provision of preliminary testing, acceptance testing,

More information

SECTION HEATING BOILER FEEDWATER EQUIPMENT

SECTION HEATING BOILER FEEDWATER EQUIPMENT SECTION 23 53 00 HEATING BOILER FEEDWATER EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes boiler feedwater pumps, de-aerators, accessories, controls and tanks. 1.2 REFERENCES A. ASME (American

More information

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials. B B11.0 DIVISION 08 - OPENINGS SECTION 08 17 00 INTEGRATED DOOR OPENING ASSEMBLIES Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section numbers and

More information

Brunswick-Glynn County Joint Water & Sewer Commission

Brunswick-Glynn County Joint Water & Sewer Commission Brunswick-Glynn County Joint Water & Sewer Commission INVITATION FOR BIDS DATE: 18 August 2015 PROJECT: Academy Creek Sludge Dryer Repairs 1.0 PROJECT DESCRIPTION The Brunswick-Glynn Joint Water & Sewer

More information

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015 White Street Area Sewer Separation, Project ID 11240090 Date Issued: June 8, 2015 ADDENDUM NO. 3 This addendum will only be distributed via e-mail, but will remain available for viewing on the MSDGC website

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

1.3 REFERENCE STANDARDS

1.3 REFERENCE STANDARDS SECTION 28 4600 FIRE DETECTION AND ALARM PART 1 -GENERAL 1.1 SECTION INCLUDES A. Fire alarm system design and installation, including all components, wiring, and conduit. B. Circuits from protected premises

More information

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. NAME OF TENDER: CONSTRUCT, DELIVER AND COMMISSION 3 (THREE) LIFT STATION ELECTRICAL LOCATION OF WORK: 3 Separate work sites in

More information

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING SECTION 15990 PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING PROJECT NO. ####### PART I - GENERAL 1.01 WORK INCLUDED A. Final test and balance of air distribution systems. B. Final test and balance

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 22 23 STEAM CONDENSATE PUMPS SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

DeCA DESIGN CRITERIA HANDBOOK PRODUCT REFRIGERATION SYSTEM

DeCA DESIGN CRITERIA HANDBOOK PRODUCT REFRIGERATION SYSTEM GENERAL 1.01 See Criteria Sections 13060 and 15971 for additional information. 1.02 Summary. Product refrigeration includes all display cases, compressors, condensers, heat recovery coils, evaporators

More information

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses PART 1 - GENERAL 1.1 SCOPE A. Through Class III Commodity Classification, up to 12.2m of single, double or multiple row rack storage, up to 14.6m building height (VanQuish Fire Sprinkler System). Cartoned

More information

Construction Standards Page

Construction Standards Page Construction Standards Page 236313-1 SECTION 236313 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

CONTENTS AUTOMATIC TRANSFER SWITCHES

CONTENTS AUTOMATIC TRANSFER SWITCHES CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training

More information

SECTION ISOLATED POWER SYSTEMS

SECTION ISOLATED POWER SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

SECTION RECORD DOCUMENTS and FIELD ENGINEERING

SECTION RECORD DOCUMENTS and FIELD ENGINEERING PART 1-- SECTION 01050 RECORD DOCUMENTS and FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. THE GENERAL CONDITIONS DIVISION I, and SPECIAL PROVISIONS DIVISION II and SAMPLE CONTRACT FORMS

More information

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION SECTION 15990 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the Specifier in correctly specifying Mechanical System Testing Adjusting

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating

More information

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website. 4.e STATE OF MISSOURI County of Franklin ss. COMMISSION ORDER Commission Order No. 2016-316 Third Quarter Term 2016 Tuesday,August,09,2016 Bid Notice IN THE MATTER OF ADVERTISING FOR SEALED BIDS FOR SMOKE

More information

SECTION INSPECTION AND TESTING OF WORK

SECTION INSPECTION AND TESTING OF WORK SECTION 01455 PART I - GENERAL 1.01 SECTION INCLUDES A. Project Inspections and Procedures B. Scheduling Inspectors Notification requirements 1.02 RELATED SECTIONS A. Section 01310 COORDINATION B. Section

More information

SECTION DOMESTIC WATER PUMPS

SECTION DOMESTIC WATER PUMPS SECTION 22 11 23 DOMESTIC WATER PUMPS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following all-bronze and bronze-fitted centrifugal pumps for domestic cold- and hot-water circulation: 1. Close-coupled,

More information

SECTION WATER-SOURCE UNITARY HEAT PUMPS

SECTION WATER-SOURCE UNITARY HEAT PUMPS SECTION 23 81 46 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS SECTION 22 20 00 LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements",

More information

A. Product Data: Include rated capacities, furnished specialties and accessories.

A. Product Data: Include rated capacities, furnished specialties and accessories. BASE BID: SECTION 15542 FUEL-FIRED RADIANT HEATERS PART 1 - GENERAL 1.1 SUMMARY A. Furnish and install a Co-Ray-Vac Low Intensity Vented Infrared Radiant Vacuum Gas Heating System. System must be certified

More information

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices. SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance

More information

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-21 21 03.00 10 February 2009) ---------------------------------- Preparing Activity: USACE Superseding UFGS-21 21 03.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION AIR DUCT ACCESSORIES

SECTION AIR DUCT ACCESSORIES SECTION 23 33 00 AIR DUCT ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes back-draft dampers, combination fire-and-smoke dampers, duct access doors, fire dampers, smoke dampers, volume control

More information

SECTION COMMERCIAL-KITCHEN HOODS

SECTION COMMERCIAL-KITCHEN HOODS SECTION 23 38 13 COMMERCIAL-KITCHEN HOODS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Delete other items or paragraphs in the section that are not applicable and renumber

More information

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 23 05 93 - TESTING, ADJUSTMENT AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus ADDENDUM FORM INVITATION TO TENDER: 2016-067 ADDENDUM NO: 1 DATE ISSUED: June 23, 2016 ISSUED BY: Monty Thibeault DESCRIPTION: Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

More information

SECTION ENCLOSED CONTROLLERS

SECTION ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,

More information

Minnesota Rules, Chapter 4732 X-Ray Revision

Minnesota Rules, Chapter 4732 X-Ray Revision Minnesota Rules, Chapter 4732 X-Ray Revision DRAFT INDUSTRIAL RADIOGRAPHY X-RAY SYSTEMS, 2.0 (03/09/2018) Summary of Changes MDH made a number of changes to the Industrial Radiography rule draft v1.0 based

More information

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5 DOC Cremer Heating and Hot Water Plant Project Number: M 1411-04 TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION 21 30 00- WATER BASED FIRE PROTECTION SYSTEMS... 5 SECTION 22 40 00 -PLUMBING

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information

Campus Wide Fire Alarm Repairs

Campus Wide Fire Alarm Repairs BID # 15-24 Campus Wide Fire Alarm Repairs SECTION "C" TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey 08818-3050 PREPARED

More information

SECTION LIGHTING CONTROLS

SECTION LIGHTING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 09 23 LIGHTING CONTROLS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 2 Wicomico County Circuit Court Second Floor

More information

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code Part 1 - GENERAL 1.1 DESCRIPTION OF WORK A. Design and installation of an engineered Kidde ECS Advanced Delivery Systems (ADS), clean agent/waterless fire suppression system employing 3M Novec 1230 waterless

More information

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Construction Standards Page 233423-1 Copyright 2009 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified

More information

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ). SECTION 28 13 00 - ACCESS CONTROL PART I - GENERAL 1.1 SUMMARY A. This specification section describes the furnishing, installation, commissioning, and programming of a complete, turnkey, hardwired Andover

More information

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION DRY-PIPE SPRINKLER SYSTEMS Ul611-0l SECTION 211316- DRY-PIPE SPRINKLER SYSTEMS PARTl-GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions, and Division 1 Specification

More information

FIRE SUPPRESSION SPRINKLER SYSTEM

FIRE SUPPRESSION SPRINKLER SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this

More information

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15732 - PACKAGED ROOFTOP AIR CONDITIONING UNITS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Package roof top unit. B. Heat exchanger. C. Refrigeration components. D. Unit operating controls. E. Roof

More information

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply

More information

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings. DIVISION 26 ELECTRICAL SECTION 26 51 13 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings. B. Luminaire

More information

National Reach. Local Service.

National Reach. Local Service. National Reach. Local Service. Section 142600 LIMITED USE/LIMITED APPLICATION ELEVATOR PART 1 GENERAL 1.1 SECTION INCLUDES A. Limited Use/Limited Application (LU/LA) Hydraulic Passenger Elevator. B. The

More information

SECTION COOLING TOWERS

SECTION COOLING TOWERS SECTION 23 65 00 COOLING TOWERS PART 1 - GENERAL 1.1 DESCRIPTION A. Packaged, induced draft open circuit cooling tower complete with fill, fan, inlet louvers and associated accessories and equipment. 1.2

More information

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC PART 1 GENERAL 1.01 SUMMARY SECTION 23 08 00 COMMISSIONING OF HVAC A. This section covers the Contractor's and Commissioning Authority (CA) responsibilities for commissioning; each subcontractor or installer

More information

SECTION AIR DOORS

SECTION AIR DOORS SECTION 23 34 33 AIR DOORS Berner Series VSA air doors are designed for openings up to 12 ft for environmental separation and up to 10 ft for insect control. Berner Series VSB air doors are designed for

More information

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR SECTION 08 71 13 LOW ENERGY AUTOMATIC OPERATORS Specifier Note: Coordinate and edit articles

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1.03 RELATED SECTIONS: The following sections contain requirements that relate to this section.

1.03 RELATED SECTIONS: The following sections contain requirements that relate to this section. SECTION 15855 GAS FURNACE/DX COOLING UNIT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of contract including General and Supplementary Conditions of Division 1 of Specification

More information

SECTION FAN COIL UNITS

SECTION FAN COIL UNITS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

CP1-C5 COMPACTOR SPECS 2009

CP1-C5 COMPACTOR SPECS 2009 SECTION 11172 / 14560 TRASH COMPACTOR This section is based on a system produced by: Architectural Refuse Solutions, LLC 525 Kennedy Road Akron, Ohio 44305 Part 1 GENERAL 1.1 RELATED DOCUMENTS A. The general

More information

SECTION TESTING OF FIBER OPTIC CABLES

SECTION TESTING OF FIBER OPTIC CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

SECTION (13900) - FIRE SUPPRESSION SYSTEMS PART 1 GENERAL 1.01 SUMMARY SECTION 21 10 00 (13900) - FIRE SUPPRESSION SYSTEMS A. Section Includes: 1. Pipe and Fittings. 2. Sprinklers. B. Related Documents: 1. Marriott s Fire Protection and Life Safety

More information

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.01 SECTION INCLUDES A. Water heaters. B. Packaged water heating systems. C. Domestic water heat exchangers. D. Water storage tanks. E. Water softeners. F. Reverse osmosis equipment. G.

More information

CLASSIFIED PERSONNEL POSITION AVAILABLE POSTED: NOVEMBER 28, 2017 OPEN: UNTIL FILLED HVAC TECHNICIAN

CLASSIFIED PERSONNEL POSITION AVAILABLE POSTED: NOVEMBER 28, 2017 OPEN: UNTIL FILLED HVAC TECHNICIAN Hickman Mills C-1 School District 9000 Old Santa Fe Rd. Kansas City MO 64138 816-316-7217 CLASSIFIED PERSONNEL POSITION AVAILABLE POSTED: NOVEMBER 28, 2017 OPEN: UNTIL FILLED HVAC TECHNICIAN SALARY RANGE:

More information

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR SECTION 08734 COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES A. Overhead

More information

SECTION Process and Immersion Turbidity and Total Suspended Solids Sensor

SECTION Process and Immersion Turbidity and Total Suspended Solids Sensor SECTION 40 75 53 Process and Immersion Turbidity and Total Suspended Solids Sensor PART 1 General 1.01 SUMMARY A. Requirements for a digital sensor for process turbidity or Total Suspended Solids (TSS)

More information

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016 SECTION 23 21 23 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section.

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S Revised 04/13/16 SPECIFICATIONS - DETAILED PROVISIONS Section 17210 - Magnetic Flowmeters C O N T E N T S PART 1 - GENERAL... 1 1.01 GENERAL REQUIREMENTS... 1 1.02 PROJECT SPECIFIC REQUIREMENTS... 1 1.03

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES SECTION 26 05 19 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION AIR COILS

SECTION AIR COILS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 82 16 AIR COILS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section

More information

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS SECTION 236200 - PACKAGED COMPRESSOR AND CONDENSER UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT

More information

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan.

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan. ADDENDUM NO. 1 for MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140 Marquette, Michigan December 12, 2016 TO: ALL BIDDERS OF RECORD This addendum forms a part of

More information

HHA Bellerive Apartments 7225 Bellerive Houston, Texas J. Allen Management Managing Agent

HHA Bellerive Apartments 7225 Bellerive Houston, Texas J. Allen Management Managing Agent HHA Bellerive Apartments 7225 Bellerive Houston, Texas 77036 J. Allen Management Managing Agent Scope of Work: 1.) Water Heater Replacement with Vertical Boiler System 2.) Water Conditioning System (Softener)

More information

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER PART 1 GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 American National Standard for Gas-Fired Low Pressure Steam and Hot Water Boilers B. ASME Section

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information