Technical Committee on Industrial and Medical Gases

Size: px
Start display at page:

Download "Technical Committee on Industrial and Medical Gases"

Transcription

1 Technical Committee on Industrial and Medical Gases Date: July 10, 2009 To: Technical Committee on Industrial and Medical Gases From: Denise Beach, Staff Liaison/Senior Engineer Re: Agenda Package July ROP Meeting Enclosed is the agenda package for the July 23, 2009 web/teleconference for the Report on Proposals (ROP) meeting. Please ensure that you have reviewed the proposals in advance of the meeting. The agenda and proposals will be posted on the committee webpage. Some items to have available for the meeting include: Agenda packet with proposals; your copy of ; copies of other IMG standards you may wish to reference. Optional items that are sometimes useful include previous ROP/ROCs if handy. If you have any questions or comments, please feel free to reach me at (617) or by at dbeach@nfpa.org. You can reach the IMG TC Chair, Mike St. Clair at (614) or by at St-clair.1@osu.edu. Live Meeting Web Access. TC Members should have received a separate with instructions on connecting through the web. If you do not have the , please follow these steps to connect to the meeting: 1. Copy this address and paste into your web browser: 2. Copy and paste the required information: Meeting ID: 32Z7Q4 Entry Code: hw{.t=&9f Location: 3. Dial the conferencing service directly, and enter the participant code shown below: Toll-free: Toll: Participant Code:

2 Technical Committee on Industrial and Medical Gases Web/Teleconference AGENDA July 23, :00 4:00 PM 1. Chair s welcome, call to order, and opening remarks at 12:00 Noon. 2. Roll-call of Committee Members and Guests 3. Approval of Minutes from the April 2008 Report on Comments Meeting held in San Antonio, TX. 4. Staff Liaison Report A. Review of NFPA Policies and Committee Procedures B. Committee membership update The TC is within balance and size limits. M = 25%; IM = 25%; U = 25%; SE = 15%; I = 5%; RT = 5% C. Revision Cycle Review F2010 (last cycle F05) [IMG-AAA] Intent to enter cycle January 9, 2009 Proposal Closing May 29, 2009 Final Date for ROP Meeting August 28, 2009 ROP Published and Posted December 28, 2009 Comment Closing March 5, 2010 Final Date for ROC Meeting May 7, 2010 ROC Published and Posted August 27, 2010 Intent to make motion (ITMAM) closing October 22, 2010 Issuance of standard - NO controversy December 14, 2010 NFPA WSCE Meeting with NITMAM June 4-9, 2011 Issuance of Standard with controversy July 29, Old Business 6. New Business A. Review of public proposals (see enclosed Acrobat file) B. Creation of Committee proposals 7. Other Items? 8. Date/Location of Next Meeting. (ROC Meeting between March 5 and May 7, 2010) 9. Adjournment.

3 2010 FALL REVISION CYCLE PROCESS DATES STAGE PROCESS STEP FOR TC 1 PRELIMINARY 1.0 Notification of intent to enter cycle 1/9/ REPORT ON PROPOSALS (ROP) REPORT ON COMMENTS (ROC) TECH SESSION PREPARATION & ISSUANCE OF CONSENT DOCUMENTS 2.1 Proposal closing date 5/29/09* 2.2 Final date for ROP meeting 8/28/ Final date for mailing TC ballots 9/18/ Receipt of (TC) ballots by staff liaison 10/23/ Receipt of TC recirculation ballots 11/6/ Final date for TCC meeting 2.7 Final date for mailing TCC ballots 2.8 Receipt of TCC ballots 2.9 Receipt of TCC recirculation ballots 2.10 Final copy (w/ ballot statements) to Secretary, Standards Council 11/13/ Completion of Reports 11/20/ ROP Published and Posted 12/28/ Comment closing date 3/5/ Final date for ROC meeting 5/7/ Final date for mailing TC ballots 5/21/ Receipt of (TC) ballots by staff liaison 6/4/ Receipt of TC recirculation ballots 6/11/ Final date for TCC meeting 3.7 Final date for mailing TCC ballots 3.8 Receipt of TCC ballots 3.9 Receipt of TCC recirculation ballots 3.10 Final copy (w/ ballot statements) to Secretary, Standards Council 6/25/ Completion of Reports 7/16/ ROC Published and Posted 8/27/ Notice of Intent to Make a Motion (NITMAM) Closing Date 10/22/ Posting of Filed NITMAM 11/19/ Standards Council Issuance Date for Consent Documents 12/14/ Appeal Closing Date for Consent Documents 12/29/ TECHNICAL SESSION APPEALS & ISSUANCE OF DOCUMENTS W/ CAMS 5.0 Association Meeting for Documents with Certified Amending Motions 6/12-16/ Appeal closing date for Documents with Certified Amending Motions 7/6/ Council issuance for Documents with Certified Amending Motions 8/4/11 * Proposal Closing Dates may vary according to documents and schedules for Revision Cycles may change. Please check the NFPA website ( for the most up-to-date information on proposal closing dates and schedules.

4 TECHNICAL COMMITTEE ON INDUSTRIAL AND MEDICAL GASES TO: FROM: TECHNICAL COMMITTEE ON INDUSTRIAL AND MEDICAL GASES G. R. Colonna, Staff Liaison DATE: April 30, 2008 SUBJ: Minutes of April 16-17, 2008 Meeting; April 29 Conference Call I. Attendance: Members and Alternates: Michael St. Clair, Chair, NFPA Industrial Fire Protection Section, OH John Anicello, Airgas Inc., CA William Barlen, Barlen and Associates, Inc., NJ Rob Cameron, Airgas-Nor Pac, Inc., WA Ronald Czischke, Underwriters Laboratories Inc., IL David De Fina, Sterigenics International, Inc., IL Rob Early, Praxair, NY Keith Ferrari, Praxair, NC Larry Fluer, Fluer, Inc., Compressed Gas Association, CA Rick Ginn, Wright Brothers, Inc., National Welding Supply Association, OH Martin Gresho, Sandia National Laboratories, CA Gerald Hayes, Air Liquide America, Compressed Gas Association, AZ Charles Henrici, IL Glenn Mahnken, FM Global, RI Brian Musch, Sterigenics US, LLC, IL David Namyst, Intel Corporation, CA Eugene Ngai, Air Products and Chemicals, Inc., Compressed Gas Association, PA Roger Smith, Compressed Gas Association, Inc., VA Peter Steiner, Air Products & Chemicals, Inc., Compressed Gas Association, PA Randolph Viscomi, ARC Specialty Products Corporation, NJ (by telephone 4/16 only) Guy R. Colonna, NFPA, Staff Liaison

5 IMG-AAA Minutes April 16, 2008/Page 2 (plus April 29, 2008) Guests: Julie Cordero, Sandia National Laboratories, NM Jeff LaChance, Sandia National Laboratories, II. Minutes of Meeting: 1. The meeting was called to order at 8:45 a.m., Wednesday, April 16, 2008, at the Drury Plaza Hotel, San Antonio. 2. All members and guests were self-introduced. The Chair noted that the agenda for this meeting primarily involved completing the Committee's action on the ROC for NFPA 55. The chair noted that Jeff LaChance, Sandia National Laboratories, would make a presentation supporting the discussion on their work at Sandia on risk-informed separation distances for hydrogen. 3. The minutes of the previous meeting (June 26-28, 2007 and August 10, 2007) were approved as submitted. 4. The Staff reviewed the schedule for processing the ROC for NFPA 55. The deadline for NITMAM for the Fall 2008 cycle is October 17, If no NITMAM is filed, NFPA 55 will proceed to the Standards Council for issuance as a consent document and not be required to be considered during the Technical Committee Report session at the NFPA Annual Meeting next June in Chicago. 5. The Chair asked David DeFina and Randy Viscomi (joining the meeting by conference call) to update the Committee on the actions taken during this revision cycle to bring NFPA 560 requirements into NFPA 55, with the future objective of withdrawing NFPA 560. These discussions were directed to the new Chapter 14 in the ROP. A Committee Comment (Log #CC1) introduced the definition for pressure relief device based upon NFPA The Committee invited Jeff LaChance, Sandia National Laboratories to report on the research conducted by Sandia that produced the report, "Risk Informed Separation Distances for Hydrogen Gas Storage Facilities." This report will be posted to the Committee web page. 7. The Committee completed action on Public Comments and created 19 additional Committee Comments. The Committee identified a few items for which further review was requested - a conference call meeting was scheduled for April 29th to address these outstanding items. 8. Staff agreed to prepare a staff draft of NFPA 55 based upon the ROC actions. 9. The Committee discussed revision cycles for both NFPA 55 and (the next document scheduled for revision). Depending upon the revision cycle for NFPA 55 following this revision, the consensus was to have in the same cycle.

6 IMG-AAA Minutes April 16, 2008/Page 3 (plus April 29, 2008) 10. The Committee conducted a conference call meeting as a follow-up to the ROP meeting earlier in the month. The agenda for the conference call was limited to 6 items - Log#4, Log#20, Committee Comment development related to ROP items on metal hydride, Committee Comment to develop annex material, Log#6 and Committee Comment, and Log#10. Attendance on the conference call included: St. Clair, Anicello, Barlen, Czischke, De Fina, Early, Fluer, Gresho, Nii, Smith, Younis, Hayes, Musch, Ngai, and Henrici. 11. With the completion of the actions on the Public and Committee Comments, the Chair accepted a motion to prepare the ROC letter ballot for NFPA 55; the motion carried. The letter ballot for NFPA 55 will be prepared and sent to the Committee separately from these minutes. This concluded the Committee's agenda items pertaining to document revisions. 12. None of the Committee documents are currently in cycle so no date for a future meeting has been established at this time. 13. There being no further business, the meeting was adjourned at 5:30 p.m. on April 17 and 5:50 pm on April 29, 2008 (for the conference call). Respectfully submitted, G. R. Colonna, Staff Liaison

7 51A- Log #CP1 Technical Committee on Industrial and Medical Gases, Review entire document to: 1) Update any extracted material by preparing separate proposals to do so, and 2) review and update references to other organizations documents, by preparing proposal(s) as required. To conform to the NFPA Regulations Governing Committee Projects. 51A- Log #18 Keith Le Febvre, Sigma Engineered Systems Inspection of generator needs to be performed yearly to check for stress cracks. Generator (Rexarc style) tends to be stressed at nopper tubes and support feed tube. Cracks can occur over time. Note: Supporting material is available for review at NFPA Headquarters. 51A- Log #19 Keith Le Febvre, Sigma Engineered Systems Clarification of plumbing is required. We provide solutions to customers. one of those solutions was the installation of sight glasses on Ammonia Scrubbers built by Rexarc. This upgrade is rated at 300 psi and also has needle valves to reduce flow to these glasses. This provides a very reliable read of what a scrubber is doing and at each hourly inspection can be observed and determined if operating properly. With original equipment No visual indicator, the only way an operator is alerted of a problem is on alarm. This also makes setup of the equipment and check out infinitely easier. Sight glasses are being used in the Oxweld NA7 generator as a level indicator as well as water flow indicators and have predated the Rexarc design. Sight glasses we installed are 300 psi rated on a maximum 15 psi acetylene system. The scrubber and its gaskets will fail before the sight glass does, particularly with needle valves reducing flow to just what is required and nothing more. It was suggested that these sight glasses violate 51A. Note: Supporting material is available for review at NFPA Headquarters. 51A- Log #20 Keith Le Febvre, Sigma Engineered Systems Static eliminators are required on Rexarc compressor lube systems. Static charge can build up on lube oil canister resulting in 500K volt discharges. Note: Supporting material is available for review at NFPA Headquarters. 1

8 51A- Log #21 Keith Le Febvre, Sigma Engineered Systems Acetylene generator system emergency shutdown needs to be fitted with nitrogen purge and auto deluge activation. Safety improvement. Note: Supporting material is available for review at NFPA Headquarters. 51A- Log #22 Keith Le Febvre, Sigma Engineered Systems High pressure relief valves need to be located higher. Valve too low, subject to fouling. Note: Supporting material is available for review at NFPA Headquarters. 51A- Log #23 Keith Le Febvre, Sigma Engineered Systems A whole new section needs to be applied for scale detection. Cylinders require active bottom inspection for leaks. Note: Supporting material is available for review at NFPA Headquarters. 51A- Log #13 Update all referenced publications to the most current edition of the included documents. In addition: Update the extract text in the following sections: NFPA 1:2009 in Sections 3.3.5, , and NFPA 51:2007 in Sections and NFPA 5000:2009 in Sections 3.3.4, , 3.3.8, , and The extract text should be updated to reflect the current text in the source documents referenced. 2

9 51A- Log #14 Construction-related controls specified for buildings, and portions thereof, where high hazard contents are stored, used, or handled in quantities g reater than the maximum allowable quantity per control area as specified in NFPA The requirements for construction vary with the type of hazardous materials employed. A tier of building safety that exceeds the construction requirements for control areas to accommodate quantities of hazardous materials in excess of those permitted using the control area concept.[ 2009] NFPA uses the concept of protection levels in a manner that is analogous to Group H occupancies in other model codes. Although NFPA 1 and NFPA 5000 do not have unique occupancy classifications for occupancies containing hazardous materials, Protection Levels 1 to 5 in NFPA codes and standards reflect increased building safety requirements that are applicable to occupancies containing hazardous materials, which generally correlate to the Group H, Division 1 to 5 occupancy classifications in other codes. [ 2009] Delete the existing definition of Protection Levels and replace it with extract text from NFPA The definition is also correlated with NFPA 55:

10 51A- Log #3 4.4 Ventilation. Rooms housing acetylene operations, excluding calcium carbide storage rooms (see 5.2.7), shall be provided with mechanical exhaust or fixed natural ventilation ventilated in accordance with NFPA 55, Standard for the Storage, Use, and Handling of Compressed Gases and Cryogenic Fluids in Portable and Stationary Containers, Cylinders, and Tanks.that ventilates the space at a rate of not less than 1 ft3/min/ft2 (0.03 m3/min/0.09m2) of floor area over the area of storage or use Rooms or areas where gases other than acetylene are stored or used shall be ventilated in accordance with NFPA Calcium carbide storage rooms shall be in accordance with Continuous Operation. When mechanical exhaust systems are provided the systems shall operate continuously unless an alternate design is approved by the authority having jurisdiction Reduction in Ventilation. Mechanical exhaust ventilation shall be permitted to be reduced below 1 ft3/min/ft2 (0.03 m3/min/0.09 m2), provided that full ventilation is automatically restored when the acetylene concentration exceeds 25 percent of the lower flammable limit (LFL) when measured by a gas detection system in accordance with Section Shutoff Controls. Where powered exhaust ventilation is provided, a manual shutoff switch shall be provided outside of the room in a position adjacent to the principal access door to the room or in an approved location The switch shall be of the break-glass or equivalent type and shall be labeled as follows: WARNING: VENTILATION SYSTEM EMERGENCY SHUTOFF Inlets to the Exhaust System. Inlets to exhaust systems serving rooms used for acetylene operations shall be located within 12 in. (304.8 mm) of the highest point in the room Recirculation of Exhaust. Exhaust ventilation shall not be recirculated within the room or building Ventilation Discharge. The point of termination for the exhaust ventilation system discharge shall be a minimum of 15 m (50 ft) from air intakes to building ventilation systems, air-conditioning equipment, and air compressors. Fixed natural ventilation. The movement of air into and out of a space through permanent openings that are arranged in such a way that the required ventilation cannot be reduced by operating windows, doors, louvers or similar devices. The use of ventilation systems varies with the location of the manufacturing facility. Facilities located in warmer climates traditionally use natural ventilation as a means to ventilate the space and in warmer climates it is not unusual for a facility to have one exterior wall and a roof, or simply a roof for protection from the elements. On the other hand, facilities in colder climates are more likely to be enclosed and mechanical systems are used as a means to provide ventilation. The reference to NFPA 55 requires the code user to interpret application, e.g., are the gases heavier or lighter than air, etc. The revised provisions are intended to interpret the requirements of NFPA 55 as they may be applicable to acetylene manufacturing operations. Minor modifications were made to the fundamental provisions found in NFPA 55 for clarification. For example, the terms mechanical exhaust ventilation or exhaust ventilation were used to differentiate between mechanical and natural means. Ventilation for calcium carbide storage rooms was left under the direction of the building code as each building requires fundamental ventilation to prevent deterioration of the building and requirements vary based on occupancy. Additional reasons as to specific changes by section are as follows: Section 4.4: Requirements for ventilation have been revised to establish the criteria applicable to acetylene operations under the specific criteria listed in the sections that follow. Provisions have been added to recognize that natural ventilation may be used in lieu of mechanical exhaust as specified in NFPA 55. A term fixed natural ventilation has been added to avoid a reduction in required ventilation from the area under consideration. Section 4.4.1: This section is in effect an exception to 4.4 which defers to NFPA 55 for requirements when rooms or areas are used for gases other than acetylene. Section 4.4.2: The provisions for calcium carbide storage rooms including construction features and ventilation are 4

11 found in NFPA Section and 4.4.4: Requirements based on NFPA 55. The requirements in have been relocated from existing section with minor edits in units of measure. Section Acetylene with a molecular weight of 26 is lighter than air. The provisions for lighter than air gases have been drawn from NFPA 55 with a minor clarification to indicate that the highest point in the room or area is a bounding factor. Section 4.4.6: The exhaust air is treated as one pass air and recirculation is prohibited. Section 4.4.7: The point of termination for the ventilation discharge is coordinated with the requirements of NFPA 55. Editorial revisions have been made to the SI conversions equivalent to 1cfm/sf for clarity. A new definition has been added to Chapter 3 to define fixed natural ventilation. Ventilation systems that can be shut down by closing a door, window or similar devices should not be relied upon to be functional in all circumstances. In some cases the walls of the room may be open with the area located under a roof. In other cases ventilation may be achieved through the use of natural draft or similar means. When natural ventilation is used as a means of control it is intended that the openings used for the introduction or removal of air from the space be maintained in an open condition. 5

12 51A- Log #4 4.5* Gas Detection System. Rooms in which acetylene operations are conducted shall be provided with an a listed or approved flammable gas detection system. A.4.5 A listing standard for gas detection and sensing systems is published by Underwriter s Laboratories as UL Gas detection systems shall not be required for structures equipped with fixed natural ventilation and constructed as weather protection in accordance with the requirements of NFPA 55, System Design Listed System Required. The flammable gas detection system shall be listed or approved for use with acetylene and any other flammable gases used in the room. Add the following informational reference to Annex B under a new section for Underwriter s Laboratories (UL): UL 2075, UL Standard for Safety Gas and Vapor Detectors and Sensors, Add the following referenced publication to Section 2.2: NFPA 55,, Gas detection systems specified in Section 4.5 are required to be approved, while the gas detection systems required in existing Section are required to be listed. is a Standard and gas detection systems should be able to be either listed or approved. UL 2075 provides a listing standard for application in the event a listing is sought. By providing for the use of either a listed or approved gas detection system safety is maintained while allowing for the development of new technology. A new Section has been provided to exempt areas equipped with natural ventilation from the requirements for gas detection systems. Gas detection in spaces that are constructed with natural ventilation do not provide an adequate means to collect meaningful samples of the atmosphere of the surrounding space thereby calling into question the efficacy of any installed gas detection system. For areas constructed as weather protection (See NFPA 55:2009:6.5.2 the space is considered to be an outdoor area. Areas equipped with mechanical exhaust ventilation systems where operation of the mechanical system is designed to meet the minimum requirements for ventilation are required to be protected by a gas detection system as such spaces are allowed to reduce the required ventilation based on the presence of the gas detection system. 6

13 51A- Log # * Listed electric heaters shall be allowed to be used in operating areas regulated by when installed and used in accordance with the manufacturer s instructions and the listing. A The autoignition temperature for acetylene as listed in NFPA 497 is 305 C (581 F). Acetylene is the only material listed as being in Group A at the present time. Electrical equipment is required to comply with the requirements of NFPA 70, based on Class and Group designations determined by conditions as well as the material present Boilers, water heaters and other heating equipment containing one or more of the following potential hazards employing flames, or capable of creating sparks shall be located in a separate building or room not directly communicating with areas devoted to acetylene operations. (1) Open flames. (2) Release of sparks or spark generation during operation. (3) Exposed surface temperatures exceeding the lowest autoignition temperature of any of the materials present. The Electrical Code (NFPA 70) establishes the requirements for the use of electrical equipment and references NFPA 497 for specific materials where the autoignition temperature of acetylene is published. :1.5 would allow the use of this equipment today, when approved by the AHJ. Section 4.7 establishes the requirements for electrical equipment, and all electrical equipment must comply with the electrical code. A change in Section 4.6 to allow the use of listed electrical heating systems is in accord with the electrical code, and listed equipment is available that can be installed in electrically classified areas. Although the use of listed equipment in itself imposes requirements regarding the ignitability of vapors information regarding the autoignition temperature of acetylene is included in the code change. Section is in effect an exception to to allow the use of listed equipment. A reference to is included to alert the user to the base classification for areas of this nature. Listed products can be accessed on the Underwriter s Laboratories (UL) website at There are products available that can be used in both Class I and II locations and are suitable for use with various Groups classifications including those in Group A, B, C, etc. The proposed revision to Section is to alert users to the fact that surface temperatures are of concern as well as active sources of ignition such as open flame and sparks. The revision to the term create sparks has been made to direct the user to either a release of sparks or spark generation rather than opening the potential for spark creation to include things like the materials of construction for equipment contained in the area or other extrinsic elements of the installation such as floor construction, etc.. 51A- Log # Calcium carbide shall be stored in packages meeting U.S. Department of Transportation or Transport Canada regulations or in containers approved by the authority having jurisdiction. Calcium carbide may be stored or handled in containers other than original shipping containers. For example, hoppers that are used for transfer of the material or silos used to store the material may be used. Containers used in-house are not designed for release into the transportation system; therefore having a broad requirement to meet the requirements of the transportation system is not practical. 7

14 51A- Log # The use of multiple pressure relief devices serving the same section of a gas generator shall be allowed., provided that the aggregate cross-sectional venting area of the individual pressure relief devices is not less than the cross-sectional area of the common vent line to which they are connected * When multiple pressure relief devices are connected to a common vent line or manifold the cross-sectional area of the common vent line or manifold shall not be less than the aggregate cross-sectional venting area of the individual pressure relief devices connected. A The aggregate cross sectional area of the connected pressure relief devices is the sum of the cross sectional areas for each of the individual relief devices connected to the manifold. Existing Section is in error. The cross sectional area of the common vent line serving a system must be not less than or larger than the cross sectional areas of the pressure relief devices served. As currently written one could connect a series of pressure relief devices to a common vent line thereby exceeding the carrying capacity of the common vent line creating a back pressure on the system in the event multiple relief devices were to operate. The paragraph has been divided into a charging statement and a subparagraph in keeping with the Manual of Style. A clarifying note has been added to further explain the use of the term aggregate within the context of the requirements. 51A- Log # When discharging to sumps, pits, or other receptacles, the point of discharge shall be located outdoors not less than 15 ft (4.5 m) 25 ft (7.6 m) from sources of ignition and the line of adjoining property that is able to be built upon The minimum required distances shall not apply when fire barriers without openings or penetrations having a minimum fire resistive rating of 2 hours interrupt the line of sight between the storage and the exposure. The configuration of the fire barriers shall be designed to allow natural ventilation to prevent the accumulation of hazardous gas concentrations. The separation distance of 25 feet has been correlated with changes proposed to Section The 25 foot distance correlates the requirements for separation from ignition sources as found in 55: which prohibits the use of open flame, smoking and ignition sources within 25 feet of the area used for the storage or use of flammable gases. It could be noted that there is an apparent inconsistency between the requirements of 55:Table for separation from property lines as the table uses variable distances based on quantity. On the other hand the discharge to sumps, pits, etc. represent a circumstance where it must be assumed that the gas is always present. As a result the required distances are conservatively based. Encroachment on sources of ignition or property lines is allowed by proposed Section in a manner consistent with that used in 55:Table

15 51A- Log #6 Revise the title to Chapter 7 as follows: Chapter 7 Acetylene Gasholders, Purifiers, and Low and Medium Pressure Driers and Purifiers Revise the title to Section 7.3 as follows: 7.3* Low and Medium Pressure Purifiers and Driers. Purifiers and driers shall have inlet and outlet shutoff valves located and arranged so that they are able to be closed in an emergency. By definition LOW pressure acetylene does not exceed 1 psig. MEDIUM pressure acetylene includes pressures in the range >1 psig <15 psig, and HIGH pressure acetylene includes pressures >/= 15 psig to </=400 psig. The typical equipment (driers and purifiers) used are MEDIUM pressure systems. The revisions to the the titles to Chapter 7 and Section 7.3 recognize that the requirements apply to both low and MEDIUM pressure systems. 9

16 51A- Log #8 Revise Section as follows: Drain lines from high pressure [pressure above 15 psi (103 kpa)] acetylene systems, oil separators, condensate traps, and driers shall be piped outdoors to a location away from any not less than: (1) 25 feet (7.6 m) from building openings. (2) 25 feet (7.6 m) from sources of ignition. and (3) 10 feet (3 m) from combustible material. (4) 50 feet (15.2 m) from air intakes * The minimum required distances shall not apply when fire barriers without openings or penetrations having a minimum fire resistive rating of 2 hours interrupt the line of sight between the drain line discharge and the exposure. The configuration of the fire barriers shall be designed to allow natural ventilation to prevent the accumulation of hazardous gas concentrations. A Drains lines are designed to drain condensate or other fluids, they are not vent lines which are used to vent or exhaust gases from the system. Drain lines should be piped to the outside of the building to avoid potential evolution of vapors that have been entrained into a liquid discharge. The location and collection of liquid drainage will be controlled by environmental considerations depending on the nature of the discharge. Additional safeguards may be required when high pressure acetylene is vented. Protection against the potential ignition of vented gases due to a static electric discharge should be considered. For further information see NFPA 77 The use of rapid opening valves in drain lines should be avoided in order that unintended ignition does not occur. Add NFPA 77 to Annex I.1.1 as follows: NFPA Piping of any drain line should be to the exterior of the building, and not just those lines serving oil separators, condensate traps and driers. As currently written the term away from is unenforceable as it fails to provide the designer with guidance as to specific location. Distances have been chosen to correlate with the approach used in NFPA 55. Refer to Section for distance from building openings; Section for separation from combustibles, Section for sources of ignition and Section for the distance from air intakes. Drain lines are not vent lines per se, rather they are designed to drain fluid, however, it is possible to have gases entrained into the liquid and venting to the outside is appropriate. In older facilities the drain lines were taken to a drain pit or lime pond, in newer facilities the drain lines may be taken to tanks where the atmosphere in the tank is vented through a vent line. Additional requirements for discharge from systems that may contain residual calcium carbide or waste products from the process may be found in Section 6.5. Section has been added to provide flexibility to the user through the use of fire barriers. The concept has been taken from footnote a to Table in NFPA 55. The reduction in distance from air intakes is allowed with the recognition that discharge from a drain line is controlled. The discharge from system leakage or component failure such as those anticipated by 55:Table is not applicable as the discharge is controlled through the process. Informational annex notes have been provided to inform the reader as to the purpose of the drain lines and to avoid confusion between requirements for system vents which are regulated under separate requirements. Additional precautionary information is provided regarding concerns for static electricity and the use of rapid opening valves (ball valves, etc.) in discharge lines that could lead to unintended ignition in the drain line system. 10

17 51A- Log #7 Delete Section and relocate it to become a new Section 7.4 with modifications to include low pressure systems as follows (underlining and strikeouts show the modifications from ): 7.4 Drain Lines from Low and Medium Pressure Acetylene Systems. Drain lines from low and medium gauge pressure [15 psi (103 kpa) and lower] acetylene systems shall be permitted to be piped to an indoor drain where the effluent water drained from the system is visible to the operator from the drain valve location. Chapter 8 is specific to acetylene compressors and high pressure driers. Section was drafted to address requirements for low and medium pressure systems. Relocating the provision to Chapter 7 puts the requirement in the proper chapter. 51A- Log # Pressure Relief Device Vent Lines Pipes. Vent lines pipes serving equipment provided with pressure relief devices shall be in accordance with Pressure Relief Device Vent Lines Pipes. Vent lines pipes serving pressure relief valves shall be in accordance with The title to Sections and and the terminology used in the accompanying text has been revised to be consistent with Section Section consistently refers to these lines as pipes. Although the term line is used for other services, e.g., discharge lines (Section ), inlet lines ( ), etc., the term pipe is used when vents are mentioned. The change is intended to be editorial and consistency is warranted throughout the document. 51A- Log # Cylinder charging manifolds shall be provided with a shutoff valve and a blow-down valve vented to the outdoors or to the low pressure system * The blow-down valve shall either be arranged to vent the manifold to the outdoors in accordance with or the discharge shall be returned to a low or medium pressure acetylene system with the pressure rating and capacity to contain both the maximum pressure and volume released from the manifold. A Additional safeguards may be required when high pressure acetylene is vented. Protection against the potential ignition of vented gases due to a static electric discharge should be considered. For further information see NFPA 77 The use of rapid opening valves in vent lines should be avoided in order that unintended ignition does not occur. By definition a low pressure system is 1 psig or less. It is not uncommon for a facility to have a medium pressure system that would be available to vent the filling manifold back into. Venting of overpressure into low or medium pressure systems is able to be done safely providing the system receiving the gas has both the capacity and the pressure rating sufficient to handle the gas returned. A new subsection ( ) and accompanying annex note has been created to address the requirements of the Manual of Style. 11

18 51A- Log # Cylinder charging manifolds shall be provided with a shutoff valve and a blow-down valve vented to the outdoors or to the low pressure system * The blow-down valve shall either be arranged to vent the manifold to the outdoors in accordance with or the discharge shall be returned to a low or medium pressure acetylene system with the pressure rating and capacity to contain both the maximum pressure and volume released from the manifold. By definition a low pressure system is 1 psig or less. It is not uncommon for a facility to have a medium pressure system that would be available to vent the filling manifold back into. Venting of overpressure into low or medium pressure systems is able to be done safely providing the system receiving the gas has both the capacity and the pressure rating sufficient to handle the gas returned. A new subsection ( ) and accompanying annex note has been created to address the requirements of the Manual of Style. 51A- Log # A check valve shall be installed in the pipeline at each cylinder charging manifold and in each cylinder charging lead Check valves shall not be required on charging leads used to charge individual cylinders on mobile acetylene trailer systems equipped with manifold systems serving multiple containers. Mobile acetylene trailers contain cylinders that are manifolded in place. Cylinders are filled through the same manifold that is connected to the user system when the trailer is used as a mobile source. A check valve is a one-way valve that allows flow in one direction and blocks the flow in the reverse direction. When individual cylinders are placed into use the gas is controlled by the user through individual pressure control and discharge systems furnished by the user. By contrast the gas supply cylinders on mobile acetylene trailers are filled and consumed through a fixed manifold piping system integral to the trailer where the user provides controls on the discharge from the manifold system. Gas must be able to flow both into and out of the fixed cylinder manifold system, and the inclusion of check valves on individual cylinder leads would preclude either the filling or the use of gas through a singular piping system. Removal of the requirement for check valves allows the manifold system to function in a bidirectional manner when cylinders are filled or when the system is in use. Placement of a check valve on the cylinder manifold at the user location may be done, however, the check valve is not part of the mobile acetylene trailer system. 12

19 51A- Log #16 Revise Section 10.6 to address safeguards to include fire protection requirements for Mobile Acetylene Trailer Systems (MATS) for MATS charging facilities attendant to acetylene charging plants. Mobile Acetylene Trailer Systems (MATS) are the subject of Section At the current time reference is made to CGA G-1.6 Recommended Practices for Mobile Acetylene Trailer Systems, through the use of an annex note. There have been two recent (2007) fires involving MATS at user sites during unloading operations which have come to the attention of the National Transportation Safety Board (NTSB). Specific recommendations have been made by the NTSB regarding the G-1.6 document and CGA s Acetylene Committee is currently in the process of revising the publication with revision expected to be completed at the end of Copies of the NTSB report on the fires at the unloading facilities have been added to the IMG TCs e-committee pages and the document is on file at NFPA offices. The proposed code change has been entered to allow CGA s Acetylene Committee complete the task of review in order that the industry can reach consensus on the issue of fire protection for MATS at both loading as well as unloading facilities. Fire protection is the subject of Chapter 11 and perhaps a new Section is the appropriate place to establish a requirement for MATS. The proposal has been crafted to allow further consideration or clarification of the control strategy applicable to MATS within the context of the document. The IMG TC task group on is reviewing the NTSB report and potential revisions that may affect NFPA 51 are also being discussed. 51A- Log #12 1. Delete the title for B.2 Informational References and combine the remaining publications with B B.2 Informational References 2. Revise the CGA references located in B (and B.2) to the current publication and reorder as follows. CGA Pamphlet G-1, CGA Pamphlet G-1.6, CGA Pamphlet G-1.7, CGA G-1.8, CGA Safety Bulletin SB-4, Item No. 1: Strike the title for B.2 and incorporate the references to CGA G-1 and G-1.8 into B All of the references to CGA Publications are informational references having a subdivision of Informational References under a list of Informational References is not needed. All of the CGA references are informational. Item No. 2: Update the list of CGA references to the current publication as indicated. 13

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Nonvoting Industrial and Medical Gases Michael W. St. Clair, Chair Ostrander, OH [U] Rep. NFPA Industrial Fire Protection Section

More information

Committee on NFPA 51A

Committee on NFPA 51A Committee on M E M O R A N D U M TO: FROM: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant DATE: May 6, 2010 SUBJECT: ROC Letter Ballot The ROC letter ballot

More information

Technical Committee on Industrial & Medical Gases

Technical Committee on Industrial & Medical Gases Technical Committee on Industrial & Medical Gases MEMORANDUM TO: FROM: Technical Committee on Industrial & Medical Gases Denise Beach, Senior Engineer/Staff Liaison DATE: April 30, 2010 RE: NFPA 51A ROC

More information

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases Committee on 51A M E M O R A N D U M To: From: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant Date: June 14, 2010 Subject: NFPA 51A ROC Letter Ballot Circulation

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M National Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Industrial and Medical Gases Joanne

More information

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Tuesday, March 10; All Day Wednesday, March 11; All Day DRURY PLAZA HOTEL San Antonio Riverwalk 0. Administrative. A. Meeting Schedule.

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

560- installation of associated storage, piping, and distribution equipment; and Ostrander, OH [U]

560- installation of associated storage, piping, and distribution equipment; and Ostrander, OH [U] Report on Proposals F2006 Copyright, NFPA NFPA 560 Report of the Committee on Committee Scope: This Committee shall have primary responsibility for Industrial and Medical Gases documents on the storage,

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement 1 of 7 3/4/2016 12:02 PM Second Revision No. 5-NFPA 56-2016 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on This list represents the membership at the time the Committee was balloted on the text of this edition. Since that time, changes

More information

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951) Riverside County Fire Department Office of the Fire Marshal 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4777 Fax (951) 955-4886 Technical Policy Title: Plant Processing and Extraction

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

TECHNICAL COMMITTEE ON SOLVENT EXTRACTION PLANTS

TECHNICAL COMMITTEE ON SOLVENT EXTRACTION PLANTS TECHNICAL COMMITTEE ON SOLVENT EXTRACTION PLANTS MEMORANDUM TO: FROM: Technical Committee on Solvent Extraction Plants R. P. Benedetti DATE: May 2, 2012 SUBJECT: Agenda for Conference Call ROC Meeting

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

NFPA Technical Committee on Fire Tests

NFPA Technical Committee on Fire Tests National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Tests Tracy

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Tank Storage and Piping Systems R. P. Benedetti DATE: November 23, 2009 SUBJECT: Agenda for December

More information

NFPA 37 Public Comment Responses Page 1 of 32

NFPA 37 Public Comment Responses Page 1 of 32 of 30 11/4/2016 3:05 PM Public Comment No. 6-NFPA 37-2016 [ New Section after 1.6 ] TITLE OF NEW CONTENT Type your content here... 1.7 Pressure Measurement. All pressures expressed in this document are

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333

Subject: BSR Uniform Mechanical Code, 2015 Edition: Appeal on Proposal #333 Paul Cabot Administrator National Fuel Gas Ms. Gabriella Davis Recording Secretary, IAPMO Standards Council International Association of Plumbing and Mechanical Officials (IAPMO) IAPMO Group World Headquarters

More information

GASEOUS HYDROGEN SYSTEMS

GASEOUS HYDROGEN SYSTEMS CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 GENERAL 701.1 Scope. The installation of gaseous hydrogen systems shall comply with this chapter and Chapters 30 and 35 of the Fire Compressed gases shall

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Code (FCC-AAA) Gregory

More information

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts Guy R. Colonna, PE Division Manager, NFPA Combustible Dust Symposium Detroit, MI September 20, 2011 1 Objectives

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Storage and Warehousing of Containers and Portable Tanks R. P. Benedetti DATE: September 16, 2010 SUBJECT:

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

Technical Committee on Electrical Equipment Evaluation. ROC Meeting Agenda September 28-29, 2010 Providence, RI

Technical Committee on Electrical Equipment Evaluation. ROC Meeting Agenda September 28-29, 2010 Providence, RI Technical Committee on Electrical Equipment Evaluation ROC Meeting Agenda September 28-29, 2010 Providence, RI Item 10-09-1 Call to Order Item 10-09-2 Introductions Item 10-09-3 Staff Remarks Item 10-09-4

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

Plant Processing and Extraction Facilities

Plant Processing and Extraction Facilities Orange County Fire Authority Community Risk Reduction 1 Fire Authority Road, Building A, Irvine, CA. 92602 www.ocfa.org 714-573-6180 Plant Processing and Extraction Facilities Guideline G-16 Serving the

More information

Changes for the New Edition. Senior Engineer, NFPA NFPA

Changes for the New Edition. Senior Engineer, NFPA NFPA Changes for the New Edition Denise Beach Senior Engineer, NFPA NFPA Overview NFPA 58-2014 Substantive Changes TIAs 2017 Edition NFPA 58-2014 Substantive Changes Bulk and Industrial Plants 3.3.10 Bulk Plant.

More information

Proposed Changes to NFPA

Proposed Changes to NFPA 2017 NFPA Conference & Expo Proposed Changes to NFPA 72-2019 Presented by: Manuelita David (SIG-FUN), Jensen Hughes Warren Olsen (SIG-SSS), Fire Safety Consultants, Inc. Merton Bunker (SIG-AAC), EYP Architecture

More information

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition

National Fire Protection Association M E M O R A N D U M. NFPA Technical Committee on Construction and Demolition National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Construction

More information

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda*

NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda* NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda* NFPA Standards presented for Action Wednesday, June 24, 2015 starting @ 2:00pm: NFPA 33, Standard for Spray Application Using Flammable or

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Hot Work Operations

More information

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation.

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation. NFPA Technical Committee On Fire Hose NFPA 1961 Minutes Task Group Update Underwriters Laboratory November 15 th - 16 th 2016 Tuesday, November 15 th, 2016 Meeting called to order at 8:07 AM by Chairman

More information

ARTICLE 25. FUEL GAS CODE

ARTICLE 25. FUEL GAS CODE ARTICLE 25. Rule 1. Indiana Fuel Gas Code, 2003 Edition (Repealed) (Repealed by Fire Prevention and Building Safety Commission; filed Mar 18, 2008, 2:32 p.m.: 20080423-IR-675070479FRA, eff 90 days after

More information

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content Based on the 2018 International Fire Code, (IFC ) The International Fire Code (IFC ), establishes minimum regulations for fire safety. This handout will identify important changes in the IFC from 2015

More information

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems San Antonio, TX October 12-14, 2016 The following are the meeting minutes from the third meeting of the Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems held in San Antonio,

More information

NFPA s Standards Development Process

NFPA s Standards Development Process NFPA s Standards Development Process Revision Cycle 104 weeks or 141 weeks Guiding Principles Due process Openness Lack of dominance Seek society s balance between: Acceptable risk Commitment of resources

More information

Part I Extraction Process Equipment

Part I Extraction Process Equipment 745 West Colfax Avenue Denver, CO 80204 p: 720.913.3474 f: 720.913.3596 www.denvergov.org/fire MARIJUANA EXTRACTION GUIDELINE FOR COMMERCIAL / LICENSED FACILITIES The information contained within this

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: NEC Code-Making Panel 14 FROM: Kimberly Shea DATE:

More information

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached) TECHNICAL COMMITTEE ON WATER-COOLING TOWERS NFPA 214 (F2015) Second Draft Meeting Agenda February 17, 2014 10:00 AM - 1:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions

More information

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Mr. Merton Bunker, Committee Chair, called the meeting to order at 8:05 on Wednesday September

More information

NCEHSA Conference. Carbon Monoxide Detector Regulations for Lodging Establishments (S.L )

NCEHSA Conference. Carbon Monoxide Detector Regulations for Lodging Establishments (S.L ) NCEHSA Conference Carbon Monoxide Detector Regulations for Lodging Establishments (S.L. 2013-413) 1 Purpose of this session The purpose of this session is to review the provisions of Session Law 2013-413

More information

SC # /16/17/18/19/23/24 D#03-24

SC # /16/17/18/19/23/24 D#03-24 SC #03-7-15/16/17/18/19/23/24 D#03-24 Casey C. Grant, P.E. Secretary, Standards Council 26 July 2003 To: Interested Parties Subject: Standards Council Decision (Final): D#03-24 Standards Council Agenda

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM of 66 5/18/2015 1:01 PM Second Revision No. 36-NFPA 32-2015 [ Detail ] 6.5 Solvents (See Annex C for additional information on solvents) Submittal Date: Tue Mar 17 17:20:03 EDT 2015 Committee Statement:

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

NFPA 550 ROP Meeting Minutes

NFPA 550 ROP Meeting Minutes NFPA 550 ROP Meeting Minutes NFPA Technical Committee on Fire Risk Assessment Methods (FIR-AAA) June 24, 2010 Microsoft Live Meeting 1. Call to order. The meeting was called to order at 1:00 PM on Monday,

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Wood and Cellulosic

More information

FINAL* REPORT OF THE MOTIONS COMMITTEE

FINAL* REPORT OF THE MOTIONS COMMITTEE FINAL* REPORT OF THE MOTIONS COMMITTEE ON CERTIFIED AMENDING MOTIONS FOR PRESENTATION AT THE 2012 ASSOCIATION TECHNICAL MEETING JUNE 13-14, 2012 LAS VEGAS, NEVADA I. Introduction. This is the second and

More information

The Committee updated the edition dates for the reference sources for extracted text within the standard per the NFPA Manual of Style.

The Committee updated the edition dates for the reference sources for extracted text within the standard per the NFPA Manual of Style. Second Revision No. 51-NFPA 86-2013 [ Section No. 2.4 ] 2.4 References for Extracts in Mandatory Sections. NFPA 54, National Fuel Gas Code, 2009 2015 edition. NFPA 69, Standard on Explosion Prevention

More information

IRC - BUILDING - ELECTRICAL - ELECTRICAL TAC

IRC - BUILDING - ELECTRICAL - ELECTRICAL TAC IRC - BUILDING - ELECTRICAL - ELECTRICAL TAC W A R N I N G Copyright Notice: This document has been reproduced solely for considering proposed changes to the Florida Building Code with the permission of

More information

4/18/2017. *2012 edition of NFPA 99 has gone through a major overhaul. *This document is now a Code.

4/18/2017. *2012 edition of NFPA 99 has gone through a major overhaul. *This document is now a Code. Carsten Lunde, ASSE 6050 Instructor April 20, 2017 Carsten s Yearly Analysis, Inc. Any opinions expressed verbally by the speaker before you and all text in this presentation should be considered the speakers

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

2018 National Fuel Gas Code Summary List of Revisions Updated: 7/27/17

2018 National Fuel Gas Code Summary List of Revisions Updated: 7/27/17 The following list contains a summary of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. 1.1.1.1 (B), (C), & (D)

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR6005 SAF-BCF (32.2.1.1.2) Recommendation: 32.2.1.1.2 Where there are sleeping accommodations for more than 16 residents are provided, the occupancy shall be classified as a large facility in accordance

More information

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016) 2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016) Reference: Documents referenced for this bulletin are as follows: San

More information

Standards and Safety Update

Standards and Safety Update Standards and Safety Update Presented By: Michael J. Johnston Executive Director Standards and Safety, NECA Update Objectives Update on NFPA 70E and NECA Safety products Update on NECA S National Electrical

More information

2015 National Fuel Gas Code Summary List of Revisions Updated: 04/24/14

2015 National Fuel Gas Code Summary List of Revisions Updated: 04/24/14 The following list contains a summary of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. PIPING Various Brass REVISED

More information

FACT SHEET 2018 National Fuel Gas Code Summary List of Revisions rev

FACT SHEET 2018 National Fuel Gas Code Summary List of Revisions rev This fact sheet provides an overview of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. These revisions are published

More information

At its meeting of August 7-9, 2012, the Standards Council considered the above referenced matter.

At its meeting of August 7-9, 2012, the Standards Council considered the above referenced matter. SC #12-8-56 D#12-15 Amy Beasley Cronin Secretary, Standards Council 30 August 2012 To: Interested Parties Subject: Standards Council Decision (Final): D#12-15 Standards Council Agenda Item: SC#12-8-56

More information

NEC Requirement Guidelines 2002 Code Options for the Installation of Listed Less-Flammable Liquid-Filled Transformers

NEC Requirement Guidelines 2002 Code Options for the Installation of Listed Less-Flammable Liquid-Filled Transformers NEC Requirement Guidelines 2002 Code Options for the Installation of Listed Less-Flammable Liquid-Filled Transformers BULLETIN 92046 APPLICATION INFORMATION NOVEMBER 2002 SUPERSEDES August 2002 CONTENTS

More information

The Cannabis Industry: Fire Department Requirements

The Cannabis Industry: Fire Department Requirements The Cannabis Industry: Fire Department Requirements RVFD Standard 4.1 Rio Vista Fire Department 350 Main St. Rio Vista, CA. 94571 By: Jeff Armstrong, Fire Chief Updated December 2018 1 The purpose of this

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

2016 Annual Revision Cycle Consent Document NFPA 75

2016 Annual Revision Cycle Consent Document NFPA 75 2016 Annual Revision Cycle Consent Document NFPA 75 The Committee on Electronic Computer Systems produced a Technical Committee Report that received at least one Notice of Intent to Make a Motion (NITMAM)

More information

NFPA 45 NFPA 211 NFPA 1600

NFPA 45 NFPA 211 NFPA 1600 NFPA 45 NFPA 211 NFPA 1600 Prepared by: William E. Koffel, P.E., FSFPE Expertly Engineering Safety From Fire 1 Objectives Overview of the NFPA process Understand the scope and application of NFPA 45, NFPA

More information

Above Ground Fuel Tank Requirements

Above Ground Fuel Tank Requirements FIRE DEPARTMENT in cooperation with Above Ground Fuel Tank Requirements The purpose of this document is to provide information about general Fire Code requirements for above ground storage within the unincorporated

More information

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement Second Revision No. 20-NFPA 14-2015 [ Section No. 1.4 ] 1.4* Equivalency. Nothing in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength,

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

Technical Committee on Multiple Burner Boilers

Technical Committee on Multiple Burner Boilers Technical Committee on Multiple Burner Boilers AGENDA Salt River Project PERA Club 1 Continential Drive Tempe, AZ January 14-15, 2014 1. Chair s welcome, call to order, and opening remarks at 8:00 a.m.

More information

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES Sharon S. Gilyeat, P.E., Principal Koffel Associates, Inc. www.koffel.com sgilyeat@koffel.com Expertly Engineering Safety From Fire

More information

AMENDMENTS TO THE BUILDING AND FIRE CODE FOR THE CITY AND COUNTY OF DENVER

AMENDMENTS TO THE BUILDING AND FIRE CODE FOR THE CITY AND COUNTY OF DENVER AMENDMENTS TO THE BUILDING AND FIRE CODE FOR THE CITY AND COUNTY OF DENVER The 2016 Denver Building and Fire Code includes the following codes except as amendment herein. 2015 IBC (Building) 2015 IFC (Fire)

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

Committee on NFPA 30A

Committee on NFPA 30A Committee on M E M O R A N D U M TO: FROM: NFPA Technical Committee on Automotive and Marine Service Stations Patti Mucci, Administrative Assistant DATE: February 5, 00 SUBJECT: ROP Letter Ballot The ROP

More information

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX 1. Call to Order. The meeting of the Technical Committee on Fire Tests

More information

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION DuPont Formacel Z-2 FOAM EXPANSION AGENT TECHNICAL INFORMATION Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications Flammability of Formacel Z-2 and Other Alternative

More information

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT

Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call November 20, PM EDT Pre-First Draft Meeting Technical Committee on Wastewater Treatment Plants On line/conference Call vember 20, 2012 2-4 PM EDT (1-3 PM CT; 12-2 PM MT; 11-1 PM PT) 1. Welcome-Glenn McGinley, Committee Chair

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

ICC CODE CORNER 2012 IFC Code & Commentary

ICC CODE CORNER 2012 IFC Code & Commentary SECTION 910 SMOKE AND HEAT VENTS 910.1 General. Where required by this code or otherwise installed, smoke and heat vents or mechanical smoke exhaust systems and draft curtains shall conform to the requirements

More information

Historical Perspectives for Hydrogen Safety, Regulations, Codes and Standards (California and U.S.A.)

Historical Perspectives for Hydrogen Safety, Regulations, Codes and Standards (California and U.S.A.) Historical Perspectives for Hydrogen Safety, Regulations, Codes and Standards (California and U.S.A.) Jennifer Hamilton 11 September, 2013 CA overview CaFCP hydrogen fueling station West Sacramento» Second

More information

CORPUS CHRISTI FIRE PREVENTION MOBILE FOOD VENDOR REQUIREMENTS

CORPUS CHRISTI FIRE PREVENTION MOBILE FOOD VENDOR REQUIREMENTS CORPUS CHRISTI FIRE PREVENTION MOBILE FOOD VENDOR REQUIREMENTS FIRE EXTINGUISHER REQUIREMENTS 1. All commercial cooking operations require at least one 2A10BC rated (5 or 6 pound size) fire extinguisher.

More information

First Revision No. 15-NFPA [ Chapter 2 ]

First Revision No. 15-NFPA [ Chapter 2 ] Page 1 of 28 First Revision No. 15-NFPA 91-2013 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE

COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE 100126 The course is organized into three bands. Band A covers HVACrelated building components and other types

More information

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rule

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rule NEW YORK CITY FIRE DEPARTMENT Notice of Public Hearing and Opportunity to Comment on Proposed Rule What are we proposing? The Fire Department is proposing to amend Section 4601-01 of Title 3 of the Rules

More information