1 COUNTY OF ALAMEDA GENERAL SERVICES AGENCY-TECHNICAL SERVICES DEPARTMENT ADDENDUM No. 2 to PROJECT No for Highland ATR Make Ready Work Project Highland Campus Service Building DATE: December 8, 2008 Issued by the General Services Agency, Technical Services Department, 1401 Lakeside Drive, Oakland, California. TO ALL PROSPECTIVE BIDDERS for the above project, notice is hereby given that the following changes, modifications, corrections, clarifications, and additions, as herein set forth, shall apply to the specifications and drawings described herein and shall be made part thereof and subject to all requirements as if originally specified or drawn. Receipt of this Addendum No.2 must be acknowledged on the form in the bid proposal in writing. The following Sections have been modified as follows: Specifications: SPECIFICATION SECTION DIRECT DIIGITAL CONTROL SYSTEM 1. Replace Specification Section with Specification Section dated. SPECIFICATION SECTION AIR DISTRIBUTION SYSTEMS AND EQUIPMENT 1. Replace Specification Section with Specification Section dated. SPECIFICATION SECTION AIR HANDLING SYSTEMS AND EQUIPMENT 1. Replace Specification Section with Specification Section dated.

2 Highland ATR Make Ready Work Project Highland Campus Service Building Project # Addendum 2 December 5, 2008 Drawings: SHEET AD101 DEMOLITION PLAN 1. Revise Demolition Note #1 to read (E) FIRE HOSE STATIONS TO REMAIN UNTIL NEW STATIONS BECOME ACTIVE SHEET A111 FIRST FLOOR RENOVATION PLAN 1. Add the following sheet notes: 8. LEAVE THE FLOORS, WALLS AND CEILINGS OF ROOM 7 - HALLWAY UNFINISHED UNTIL THE END OF PHASE 2 and 9. SEE DET. 5&6/S3 FOR STRUCTURAL REINFORCING AT NEW OPENINGS IN CONCRETE WALLS FOR DOORS 1A & 15A SHEET A121 FLOOR PLANS 1. Replace Detail 1 00 Basement Floor Plan with attached sketch SK-A001 (Revised to show that the door to abandoned elevator shaft shall be removed and infilled. Added the corresponding note: REMOVE AND INFILL (E) ELEVATOR DOOR, SEE DET. 2/A507 ) SHEET A301 MECHANICAL SHAFT SECTION 1. Add Sheet A301 in its entirety to the set SHEET A404 - ENLARGED PLANS 1. Replace Detail 8 - EAST ENTRANCE DETAIL PLAN with attached Sketch SK-A002 (Revised to locate structural reinforcing of new opening in existing concrete wall. Added the corresponding note: SEE 5&6/S3 FOR STRUCTURAL REINFORCING ) 2. Replace Detail 9 - WEST ENTRANCE DETAIL PLAN with attached Sketch SK-A003 (Revised to locate structural reinforcing of new opening in existing concrete wall. Added the corresponding note: SEE 5&6/S3 FOR STRUCTURAL REINFORCING ) SHEET A405 ENLARGED PLANS 1. Replace Detail 4 - ENLARGED PLAN - SHAFT - SECOND FLOOR with attached Sketch SK-A004 (Revised to show soffit overhead.) 2. Replace Detail 12 - ENLARGED PLAN - SHAFT ROOF with attached Sketch SK- A005 (Revised to eliminate ductwork penetrations of roof which will occur underneath rooftop mechanical unit and be shown in mechanical drawings.) Page 2 of 6

3 Highland ATR Make Ready Work Project Highland Campus Service Building Project # Addendum 2 December 5, 2008 SHEET A507 DETAILS 1. Replace Detail 9 MECHANICAL CURB with attached Sketch SK-A006 (Added the following notes: SAWCUT OPENING WHERE REQUIRED and PROVIDE WATERTIGHT PATCH TO EXISTING ROOFING & VERIFY W/ FIELD WATER TEST ) 2. Replace Detail 10 - FRAMING TO CONCRETE WALL JOIN 1 with attached Sketch SK-A007 (Detail revised to locate structural reinforcing of new opening in existing concrete wall. Added the corresponding note: 4x4x1/4 STEEL TUBE, SEE 5&6/S3 FOR STRUCTURAL REINFORCING DETAILS ) 3. Replace Detail 11 - FRAMING TO CONCRETE WALL JOIN 2 with attached Sketch SK-A008 (Detail revised to locate structural reinforcing of new opening in existing concrete wall. Added the corresponding note: 4x4x1/4 STEEL TUBE, SEE 5&6/S3 FOR STRUCTURAL REINFORCING DETAILS ) 4. Replace Detail 12 - FRAMING TO CONCRETE WALL JOIN 3 with attached Sketch SK-A009 (Detail revised to locate structural reinforcing of new opening in existing concrete wall. Added the corresponding note: 4x4x1/4 STEEL TUBE, SEE 5&6/S3 FOR STRUCTURAL REINFORCING DETAILS ) SHEET A603 FINISH SCHEDULE 1. Add the following note to Room 13 Data Room: 3/4" THICK RESISTANT PLYWOOD TELEPHONE BACKBOARD ON ALL SIDES, UP TO 8' A.F.F. 2. Add the following general note: 6. LEAVE THE FLOORS, WALLS AND CEILINGS OF ROOM 7 - HALLWAY UNFINISHED UNTIL THE END OF PHASE 2 SHEET M002 SCHEDULES MECHANICAL - Replace sheet in its entirety to show the following revisions: 1. Revised Air Handling Units Schedule. SHEET M003 SCHEDULES MECHANICAL - Replace sheet in its entirety to show the following revisions: 1. Revised Chiller Schedule. 2. Revised Pump Schedule. SHEET M201 RENOVATION FLOOR PLAN - Replace sheet in its entirety to show the following revisions: 1. Added General Note. 2. Added pipe sizes for HWS/HWR risers to roof. Page 3 of 6

4 Highland ATR Make Ready Work Project Highland Campus Service Building Project # Addendum 2 December 5, Added duct and pipe sizes near Column 10/Q. SHEET M202 ROOF PLAN MECHANICAL - Replace sheet in its entirety to show the following revisions: 1. Relocated supply and return ducts to Third Floor ceiling. 2. Added heating hot water supply and return pipe sizes. SHEET M301 MECHANICAL PASSAGE PLANS - Replace sheet in its entirety to show the following revisions: 1. Deleted Partial Plan 4/M Revised Partial Plan 3/M301. SHEET M601 - DETAILS MECHANICAL - Replace sheet in its entirety to show the following revisions: 1. New sheet, added details. SHEET M602 DETAILS MECHANICAL - Replace sheet in its entirety to show the following revisions: 1. New sheet, added Boiler Piping Diagram. SHEET M701 CONTROL DIAGRAMS MECHANICAL - Replace sheet in its entirety to show the following revisions: 1. Revised Heating Hot Water Control Detail. 2. Revised Air-Cooled Chiller System Detail. SHEET E0.1 LEGEND & ABBREVIATIONS - Replace sheet in its entirety to show the following revisions: 1. Revised wiremold symbol legend and description. 2. Revised telecommunication outlet description. SHEET E2.1 LIGHTING FLOOR PLAN - Replace sheet in its entirety to show the following revisions: 1. Relocated switch n & o to column 7 & R. SHEET E3.1 POWER & SIGNAL FLOOR PLAN - Replace sheet in its entirety to show the following revisions: 1. Added existing technical ground bar in data room. Page 4 of 6

5 Highland ATR Make Ready Work Project Highland Campus Service Building Project # Addendum 2 December 5, Added sheet note #17 & # Added 1inch Conduit between floor boxes. 4. Added in 1inch Conduit after homerun LPA-12, 14, Added sheet not tag #6 for copier machine in room #17 & room # Changed sheet not #7 to #18 at wiremold telephone homeruns. 7. Added note Contractor to coordinate with furniture supplier for proper connection and termination. At the end of sheet note #7, #11 & # Added note connected by contractor after by furniture supplier,. SHEET E4.1 FIRE ALARM SYSTEM FLOOR PLAN - Replace sheet in its entirety to show the following revisions: 1. Revised sheet note # 2 to read Provide system tie-in with the existing Autocall Fire Alarm system panel at pull box in basement. 2. Indicated existing Fire Alarm pull box and existing Autocall Fire Alarm Panel location on floor plan. SHEET E5.2 HVAC FLOOR PLAN - Replace sheet in its entirety to show the following revisions: 1. Added receptacles for Building Controller BMTX-1 and Trane Controller. 2. Added sheet notes #5 & #6. SHEET E6.1 DETAILS & DIAGRAMS - Replace sheet in its entirety to show the following revisions: 1. Deleted detail #5 Ground Bus Bar Detail 2. Added note#6 See architectural plans for fire wall location & ratings at detail #7. SHEET E6.2 DETAILS & DIAGRAMS - Replace sheet in its entirety to show the following revisions: 1. Changed all panel name LPA to LPC in Lighting Control Panel LCP SHEET E7.2 PANEL SCHEDULES - Replace sheet in its entirety to show the following revisions: 1. Revised panel schedule LPA 2. Revised panel schedule LPC Attachments: Specifications Page 5 of 6

6 Highland ATR Make Ready Work Project Highland Campus Service Building Project # Addendum 2 December 5, SECTION DIRECT DIGITAL CONTROL SYSTEM 2. SECTION AIR DISTRIBUTION SYSTEMS AND EQUIPMENT 3. SECTION AIR HANDLING SYSTEMS AND EQUIPMENT Architectural Sheets, Dated 12/02/08 1. A301 MECHANICAL SHAFT SECTION Architectural Sketches, Dated 12/02/08 2. SK-A001 BASEMENT FLOOR PLAN; Ref. Dwg. 1/A SK-A002 EAST ENTRANCE DETAIL PLAN; Ref. Dwg. 8/A SK-A003 WEST ENTRANCE DETAIL PLAN; Ref. Dwg. 9/A SK-A004 ENLARGED PLAN - SHAFT - SECOND FLOOR; Ref. Dwg. 4/A SK-A005 ENLARGED PLAN - SHAFT - ROOF; Ref. Dwg. 12/A SK-A006 MECHANICAL CURB; Ref. Dwg. 9/A SK-A007 FRAMING TO CONCRETE WALL JOIN 1; Ref. Dwg. 10/A SK-A008 FRAMING TO CONCRETE WALL JOIN 2; Ref. Dwg. 11/A SK-A009 FRAMING TO CONCRETE WALL JOIN 3; Ref. Dwg. 12/A507 Mechanical Sheets, Dated 10/14/08 1. M002 SCHEDULES MECHANICAL 2. M003 SCHEDULES MECHANICAL 3. M201 RENOVATION FLOOR PLAN Pipe Sizing for HWS/HWR shall be 2 dia. 4. M202 ROOF PLAN MECHANICAL 5. M301 MECHANICAL PASSAGE PLANS 6. M601 DETAILS MECHANICAL 7. M602 DETAILS MECHANICAL 8. M701 CONTROL DIAGRAMS MECHANICAL Electrical Sheets, Dated 12/02/08 1. E0.1 LEGEND & ABBREVIATIONS 2. E2.1 LIGHTING FLOOR PLAN 3. E3.1 POWER & SIGNAL FLOOR PLAN 4. E4.1 FIRE ALARM SYSTEM FLOOR PLAN 5. E5.2 HVAC FLOOR PLAN 6. E6.1 DETAILS & DIAGRAMS 7. E6.2 DETAILS & DIAGRAMS 8. E7.2 PANEL SCHEDULES END OF ADDENDUM NO. 2 Page 6 of 6

7 UPPER ROOF 56' - 6" MECH. UNIT, S.M.D TH STREET OAKLAND, CA (510) (E) CLERESTORY WINDOW (E) CONC. ROOF DECK (E) CONC. BEAM MECHANICAL CURB, TYP. ON ALL SIDES OF PENETRATING DUCTWORK, SEE 9/A ROOF 42' - 0" ARCHITECT'S STAMP DUCTWORK TURNS IN PLAN ACOUSTIC CEILING TILE (E) CONC. SHAFT WALLS INFILL (E) ELEVATOR DOOR, SEE DETAIL 2/A507,TYP. DUCTWORK, S.M.D. INFILL (E) ELEVATOR DOOR, SEE DETAIL 2/A507,TYP. ABANDONED ELEVATOR SHAFT (N) SHAFT WALL IN CLERKS OFFICE MECHANICAL DUCTWORK, S.M.D. VERTICAL PENETRATION, TYP. (E) CONC. FLOOR SLAB FIRE-RATED GYP. BD. SOFFIT HORIZONTAL PENETRATION, TYP. (E) CONC. SHAFT WALLS (E) CONC. BEAM (E) CONC. FLOOR SLAB DUCTWORK, S.M.D. ACOUSTIC CEILING TILE GYP. BD. SOFFIT 03-THIRD FLOOR 27' - 0" 02-SECOND FLOOR 13' - 6" 01-FIRST FLOOR 0' - 0" CONSULTANT'S STAMP Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA MECHANICAL SHAFT SECTION ELEVATOR ABANDONED IN PLACE AT BASEMENT LEVEL DATE ISSUE REV. 11/06/08 100% CD 12/02/08 ADDENDUM # BASEMENT -10' - 8" DRAWN BY: DB CHECKED BY: LM DATE: SCALE: 1/4" = 1'-0" 12/02/08 1 MECHANICAL SHAFT SECTION A301 1/4" = 1'-0" A301 JOB NO: OF 1 SHEETS 12/2/2008 5:23:11 PM 2008 VBN Architects

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24 REMOVE AND INFILL (E) ELEVATOR DOOR, SEE DET. 2/A507 1 DSA FILE NO. DSA APPL NO. STAMP: th Street Oakland, CA Tel (510) Fax (510) TITLE: REFERRING DRAWING: REFERENCE DOCUMENT: PROJECT: Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA /A121 ADDENDUM #2 BASEMENT FLOOR PLAN DATE: SCALE: DRAWN BY: JOB NO.: DRAWING NO.: 12/02/08 1/16" = 1'-0" DB SK - A VBN ARCHITECTS

25 R ALIGN 1' - 0" BOOK DROP CLOSET 7' - 6" EAST ENTRY 0 7 A A402 2' - 7" SEE 5&6/S3 FOR STRUCTURAL REINFORCING KEYPAD, N.I.C. 10 A507 9 DSA FILE NO. DSA APPL NO. STAMP: th Street Oakland, CA Tel (510) Fax (510) TITLE: EAST ENTRANCE DETAIL PLAN REFERRING DRAWING: REFERENCE DOCUMENT: PROJECT: Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA DATE: SCALE: DRAWN BY: JOB NO.: DRAWING NO.: 12/02/08 1/2" = 1'-0" DB SK - A VBN ARCHITECTS 3' - 0" 7' - 5" 3' - 3 1/2" 8/A404 ADDENDUM #2

26 4' - 1" B 7 4' - 5" 5' - 0" 12 A507 6' - 6" 5' - 0" 1 12 A507 KEYPAD, N.I.C. SEE 5&6/S3 FOR STRUCTURAL REINFORCING WEST ENTRY 23 DSA FILE NO. DSA APPL NO. STAMP: th Street Oakland, CA Tel (510) Fax (510) TITLE: REFERRING DRAWING: REFERENCE DOCUMENT: PROJECT: Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA /A404 ADDENDUM #2 WEST ENTRANCE DETAIL PLAN DATE: SCALE: DRAWN BY: JOB NO.: DRAWING NO.: 12/02/08 1/2" = 1'-0" DB SK - A VBN ARCHITECTS

27 F G H J K L M N O REMOVE AND INFILL (E) ELEVATOR DOOR, SEE DET. 2/A507 1 A301 FIRE-RATED GYP. BD. SOFFIT AT 9'-6" A.F.F DSA FILE NO. DSA APPL NO. STAMP: th Street Oakland, CA Tel (510) Fax (510) TITLE: REFERRING DRAWING: REFERENCE DOCUMENT: PROJECT: Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA /A405 ADDENDUM #2 ENLARGED PLAN - SHAFT - SECOND FLOOR DATE: SCALE: DRAWN BY: JOB NO.: DRAWING NO.: 12/02/08 3/16" = 1'-0" DB SK - A VBN ARCHITECTS

28 DSA FILE NO. DSA APPL NO. STAMP: th Street Oakland, CA Tel (510) Fax (510) N O P 1 TITLE: REFERRING DRAWING: REFERENCE DOCUMENT: PROJECT: Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA /A405 ADDENDUM #2 ENLARGED PLAN - SHAFT - ROOF DATE: SCALE: DRAWN BY: JOB NO.: DRAWING NO.: 12/02/08 3/16" = 1'-0" DB SK - A VBN ARCHITECTS 1 A301 (E) SKYLIGHT MECHANICAL UNIT, S.M.D. FOR EXACT SIZE, LOCATION AND DETAILS A507 TYP. ON ALL SIDES

29 MECH UNIT SHEET METAL COUNTER FLASHING, S.M.D. 8" MIN. PRE-MANUFACTURED METAL CURB W/ 2X WOOD NAILER RIGID INSULATION, THICKNESS TO MATCH WOOD NAILER CANT STRIP X6 WOOD NAILER W/ CTSK 3/.8" DIA. EXPANSION 6'-0" MAX. MIN 2 PER SIDE, 8" MAX, FROM ENDS BASE FLASHING BUILT UP ROOFING OVER RIGID INSULATION. ROOF OPENING S.S.D. (E) CONC. ROOF DECK SAWCUT OPENING WHERE REQUIRED PROVIDE WATERTIGHT PATCH TO EXISTING ROOFING & VERIFY W/ FIELD WATER TEST th Street Oakland, CA Tel (510) Fax (510) TITLE: MECHANICAL CURB REFERRING DRAWING: 9/A507 REFERENCE DOCUMENT: ADDENDUM #2 PROJECT: Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA STAMP: DATE: SCALE: DRAWN BY: JOB NO.: DRAWING NO.: 12/02/08 3" = 1'-0" DB SK - A VBN ARCHITECTS

30 1 4X4X1/4 STEEL TUBE, SEE 5 &6/S3 FOR STRUCTURAL REINFORCING DETAILS (E) CONC. WALL EXPANSION BOLT, TYP. SEALANT AND BACKER ROD, TYP. SAWCUT WALL OPENING, SEE 8/A404 FOR LOCATION GYP. BD, TYP. MTL. FRAMING, TYP th Street Oakland, CA Tel (510) Fax (510) TITLE: FRAMING TO CONCRETE WALL JOIN 1 REFERRING DRAWING: 10/A507 REFERENCE DOCUMENT: ADDENDUM #2 PROJECT: Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA STAMP: DATE: SCALE: DRAWN BY: JOB NO.: DRAWING NO.: 12/02/08 3" = 1'-0" DB SK - A VBN ARCHITECTS

31 MTL. FRAMING, TYP. GYP. BD, TYP. CORNER GUARD SAWCUT WALL OPENING, SEE 8/A404 FOR LOCATION EXPANSION BOLT SEALANT AND BACKER ROD, TYP. (E) CONC. WALL 4x4x1/4 STEEL TUBE, SEE 5&6/S3 FOR STRUCTURAL REINFORCING DETAILS th Street Oakland, CA Tel (510) Fax (510) TITLE: FRAMING TO CONCRETE WALL JOIN 2 REFERRING DRAWING: 11/A507 REFERENCE DOCUMENT: ADDENDUM #2 PROJECT: Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA STAMP: DATE: SCALE: DRAWN BY: JOB NO.: DRAWING NO.: 12/02/08 3" = 1'-0" DB SK - A VBN ARCHITECTS

32 4x4x1/4 STEEL TUBE, SEE 5&6/S3 FOR STRUCTURAL REINFORCING DETAILS 1 WALL AS SCHEDULED SEALANT AND BACKER ROD, TYP. EXPANSION BOLT SAWCUT WALL OPENING, SEE 9/A404 FOR LOCATION (E) CONC. WALL th Street Oakland, CA Tel (510) Fax (510) TITLE: FRAMING TO CONCRETE WALL JOIN 3 REFERRING DRAWING: 12/A507 REFERENCE DOCUMENT: ADDENDUM #2 PROJECT: Highland Hospital Medical Records and Library Renovation Alameda County, GSA 1411 E 31st St Oakland, CA STAMP: DATE: SCALE: DRAWN BY: JOB NO.: DRAWING NO.: 12/02/08 3" = 1'-0" DB SK - A VBN ARCHITECTS

33 SECTION DIRECT DIGITAL CONTROL SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Product furnished but not installed under this Section. B. Products not furnished or installed but integrated with the work of this Section. C. Related Sections. D. Description. E. Approved Control System Contractor. F. Quality Assurance. G. Codes and Standards. H. System Performance. I. Submittals. J. Warranty. K. Ownership of Proprietary Material PRODUCT FURNISHED BUT NOT INSTALLED UNDER THIS SECTION A. Hydronic Piping: 1. Control valve. B. Ductwork Accessories: 1. Automatic Dampers. 2. Terminal Unit Controls. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 1 of 45 Section

34 1.03 PRODUCTS NOT FURNISHED OR INSTALLED BUT INTEGRATED WITH THE WORK OF THIS SECTION A. Heat Generation Equipment. 1. Boiler controls. B. Refrigeration Equipment. 1. Chiller controls RELATED SECTIONS A. The General Conditions of the Contract, Supplementary Conditions, and General Requirements are a part of these Specifications and shall be used in conjunction with this Section as a part of the Contract Documents. Consult them for further instructions pertaining to this work. B. The following sections constitute related work: 1. Common Work Results for HVAC. 2. Air Distribution Systems and Equipment. 3. Air Handling Systems and Equipment. 4. Testing, Adjusting, and Balancing for HVAC. 5. Electrical. 6. Fire Protection DESCRIPTION A. Direct Digital Control (DDC) technology shall be used to provide the functions necessary for control of systems defined for control on this project. B. The control system shall accommodate simultaneous multiple user operation. Access to the control system data should be limited by operator password. An operator shall be able to log onto any workstation of the control system and have access to all designated data. C. The control system shall be designed such that each mechanical system will operate under stand-alone control. As such, in the event of a network communication failure, or the loss of other controllers, the control system shall continue to independently operate the unaffected equipment, D. Communication between the control panels and all workstations shall be over a highspeed network. All nodes on this network shall be peers. A modem or network communications card shall be provided to for remote access to the system. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 2 of 45 Section

35 1.06 APPROVED CONTROL SYSTEM CONTRACTORS AND MANUFACTURERS A. Approved Control System Contractors and Manufacturers. Manufacturer Name Product Line Contractor Name/Address Contact Trane Tracer Summit Pacific Coast Trane Controls Mike Cleary 310 Soquel Way Sunnyvale, CA (408) The above list of manufacturers applies to operator workstation software, controller software, the custom application programming language, Building Controllers, Custom Application Controllers, and Application Specific Controllers. All other products specified herein (i.e., sensors, valves, dampers, and actuators) need not be manufactured by the above manufacturers 1.07 QUALITY ASSURANCE A. The above list of manufacturers applies to operator workstation software, controller software, the custom application programming language, Building Controllers, Custom Application Controllers, and Application Specific Controllers. All other products specified herein (i.e., sensors, valves, dampers, and actuators) need not be manufactured by the above manufacturers: 1. The Installer shall have an established working relationship with the Control System Manufacturer of not less than three years. 2. The Installer shall have successfully completed Control System Manufacturer's classes on the control system. The Installer shall present for review the certification of completed training, including the hours of instruction and course outlines upon request. 3. The installer shall have an office within 50 miles of the project site and provide 24-hour response in the event of a customer call CODES AND STANDARDS A. Work, materials, and equipment shall comply with the rules and regulations of all codes and ordinances of local, state and federal authorities. As a minimum, the installation shall comply with the current editions in effect 30 days prior to receipt of bids of the following codes: 1. National Electric Code (NEC). 2. International Building Code (IBC). 3. International Mechanical Code (IMC). 4. Underwriters Laboratories: Products shall be UL-916-PAZX listed. 5. ANSI/ASHRAE Standard (BACnet). 6. ANSI/EIA/CEA (LonTalk). DIRECT DIGITAL CONTROL SYSTEM Addendum 2 3 of 45 Section

36 1.09 SYSTEM PERFORMANCE A. Performance Standards. The system shall conform to the following: 1. Graphic Display. The system shall display a graphic with a minimum of 20 dynamic points with current data displayed within 20 seconds of the request. 2. Graphic Refresh. The system shall update all dynamic points with current data within 30 seconds. 3. Object Command. The maximum time between the command of a binary object by the operator and the reaction by the device shall be 10 seconds. Analog objects shall start to adjust within 10 seconds. 4. Object Scan. All changes of state and change of analog values shall be transmitted over the high-speed network such that any data used or displayed at a controller or workstation will be current, within the prior 60 seconds. 5. Alarm Response Time. The maximum time from when an object goes into alarm to when it is annunciated at the workstation shall not exceed 45 seconds. 6. Program Execution Frequency. Custom and standard applications shall be capable of running as often as once every 5 seconds. The Contractor shall be responsible for selecting execution times consistent with the mechanical process under control. 7. Performance. Programmable Controllers shall be able to execute DDC PID control loops at a selectable frequency from at least once every 5 seconds. The controller shall scan and update the process value and output generated by this calculation at this same frequency. 8. Multiple Alarm Annunciation. All workstations on the network shall receive alarms within 5 seconds of each other. 9. Reporting Accuracy. Table 1 lists minimum acceptable reporting accuracies for all values. Table 1 Reporting Accuracy Measured Variable Reported Accuracy Space Temperature ±0.5 C [±1 F] Ducted Air ±1.0 C [±2 F] Outside Air ±1.0 C [±2 F] Water Temperature ±0.5 C [±1 F] Delta-T ±0.15 C[±0.25 F] Air Flow (terminal) ±10% of reading *Note 1 Air Pressure (ducts) ±25 Pa [±0.1 "W.G.] Air Pressure (space) ±3 Pa [±0.01 "W.G.] Water Pressure ±2% of full scale *Note 2 DIRECT DIGITAL CONTROL SYSTEM Addendum 2 4 of 45 Section

37 1.10 SUBMITTALS Note 1: (10%-100% of scale) (cannot read accurately below 10%) Note 2: for both absolute and differential pressure Note 3: * not including utility supplied meters A. Contractor shall provide shop drawings and manufacturers standard specification data sheets on all hardware and software to be provided. No work may begin on any segment of this project until the Engineer and Owner have reviewed submittals for conformity with the plan and specifications. Six (6) copies are required. All shop drawings shall be provided to the Owner electronically as.dwg or.dxf file formats. B. Quantities of items submitted shall be reviewed by the Engineer and Owner. Such review shall not relieve the contractor from furnishing quantities required for completion. C. Provide the Engineer and Owner, any additional information or data which is deemed necessary to determine compliance with these specifications or which is deemed valuable in documenting the system to be installed. D. Submit the following within 60 days of contract award: 1. A complete bill of materials of equipment to be used indicating quantity, manufacturer and model number. 2. A schedule of all control valves including the valve size, model number (including pattern and connections), flow, CV, pressure rating, and location. 3. A schedule of all control dampers. This shall include the damper size, pressure drop, manufacturer and model number. 4. Provide manufacturers cut sheets for major system components. When manufacturer's cut sheets apply to a product series rather than a specific product, the data specifically applicable to the project shall be highlighted or clearly indicated by other means. Each submitted piece of literature and drawings shall clearly reference the specification and/or drawing that the submittal is being submitted to cover. Include: a. Building Controllers. b. Custom Application Controllers. c. Application Specific Controllers. d. Operator Interface Computer(s). e. Portable Operator Workstation. f. Auxiliary Control Devices. g. Proposed control system riser diagram showing system configuration, device locations, addresses, and cabling. h. Detailed termination drawings showing all required field and factory terminations. Terminal numbers shall be clearly labeled. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 5 of 45 Section

38 i. Points list showing all system objects, and the proposed English language object names. j. Sequence of operations for each system under control. This sequence shall be specific for the use of the Control System being provided for this project. k. Provide a BACnet Product Implementation Conformance Statement (PICS) for each BACnet device type in the submittal. l. Color prints of proposed graphics with a list of points for display. E. Project Record Documents. Upon completion of installation submit three (3) copies of record (as-built) documents. The documents shall be submitted for approval prior to final completion and include: 1. Project Record Drawings. These shall be as-built versions of the submittal shop drawings. One set of electronic media including CAD.DWG or.dxf drawing files shall also be provided. 2. Testing and Commissioning Reports and Checklists. 3. Operating and Maintenance (O & M) Manual. These shall be as-built versions of the submittal product data. In addition to that required for the submittals, the O & M manual shall include: a. Names, address and 24-hour telephone numbers of Contractors installing equipment, and the control systems and service representative of each. b. Operators Manual with procedures of operating the control systems including logging on/off, alarm handling, producing point reports, trending data, overriding computer control, and changing set points and other variables. c. Programming Manual with a description of the programming language including syntax, statement descriptions including algorithms and calculations used, point database creation and modification, program creation and modification, and use of the editor. d. Engineering, Installation and Maintenance Manual(s) that explains how to design and install new points, panels, and other hardware; preventative maintenance and calibration procedures; how to debug hardware problems; and how to repair or replace hardware. e. A listing and documentation of all custom software created using the programming language including the point database. One set of magnetic media containing files of the software and database shall also be provided. f. One set of electronic media containing files of all color-graphic screens created for the project. g. Complete original issue documentation, installation, and maintenance information for all third party hardware provided including computer equipment and sensors. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 6 of 45 Section

39 h. Complete original issue media for all software provided including operating systems, programming language, operator workstation software, and graphics software. i. Licenses and warranty documents for all equipment and systems. j. Recommended preventive maintenance procedures for all system components including a schedule of tasks, time between tasks, and task descriptions. F. Training Materials: The Contractor shall provide a course outline and training material for all training classes at least six weeks prior to the first class. The Owner reserves the right to modify any or all of the training course outline and training materials. Review and approval by Owner and Engineer shall be completed at least 3 weeks prior to first class WARRANTY A. Warrant all work as follows: 1. Labor & materials for control system specified shall be warranted free from defects for a period of twelve (12) months after final completion acceptance by the Owner. Control System failures during the warranty period shall be adjusted, repaired, or replaced at no charge or reduction in service to the Owner. The Contractor shall respond to the Owner's request for warranty service within 24 hours during customary business hours. 2. At the end of the final start-up/testing, if equipment and systems are operating satisfactorily to the Owner and Engineer, the Owner shall sign certificates certifying that the control system's operation has been tested and accepted in accordance with the terms of this specification. The date of Owner's acceptance shall be the start of warranty. 3. Operator workstation software, project specific software, graphics, database, and firmware updates shall be provided to the Owner at no charge during the warranty period. Written authorization by Owner must, however, be granted prior to the installation of such changes. 4. The system provider shall provide a web-accessible system and support on-line resource that provides the Owner access to a question/answer forum, graphics library, user tips, upgrades, and manufacturer training schedules OWNERSHIP OF PROPRIETARY MATERIAL A. All project-developed hardware and software shall become the property of the Owner. These items include but are not limited to: 1. Project graphic images. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 7 of 45 Section

40 2. Record drawings. 3. Project database. 4. Project-specific application programming code. 5. All documentation. PART 2 PRODUCTS 2.01 SECTION INCLUDES A. Materials. B. Communication. C. Operator Interface. D. Web Server Operator Interface. E. Application and Control Software. F. Building Controllers. G. Custom Application Controllers. H. Application Specific Controllers. I. Input/Output Interface. J. Auxiliary Control Devices COMMUNICATIONS A. This project shall comprise of a network utilizing high-speed BACnet for communications between Building Controllers and PC Workstations. LonTalk subnetworks shall be used for communications between Building Controllers, Custom Application Controllers and Application Specific Controllers. B. The controls Contractor shall provide all communication media, connectors, repeaters, hubs, and routers necessary for the DDC system internetwork. C. All Building Controllers shall have a communications port for connections with the operator interfaces. This may be either a network interface node for connection to the Ethernet network or an RS-232 port for Point to Point connection. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 8 of 45 Section

41 D. Remote operator interface via a 56K baud modem shall allow for communication with any and all controllers on this network as described in the following paragraph. E. Communications services over the internetwork shall result in operator interface and value passing that is transparent to the internetwork architecture as follows: 1. Connection of an operator interface device to any one building controller on the internetwork will allow the operator to interface with all other building controllers as if that interface were directly connected to the other controllers. Data, status information, reports, system software, custom programs, etc., for all building controllers shall be available for viewing and editing from any one building controller on the internetwork. 2. All database values (i.e., points, software variable, custom program variables) of any one building controller shall be readable by any other building controller on the internetwork. This value passing shall be automatically performed by a controller when a reference to a point name not located in that controller is entered into the controller's database. An operator/installer shall not be required to set up any communications services to perform internetwork value passing. F. The time clocks in all controllers shall be automatically synchronized daily OPERATOR INTERFACE A. Operator Interface. Furnish [1] PC based workstations as shown on the system drawings. Each workstation shall be able to access all information in the system. Workstations shall reside on the same high-speed network as the building controllers, and also be able to dial into the system. B. Workstation information access shall use the BACnet Protocol. Communication shall use the ISO (Ethernet) Physical/Data Link layer protocol. Remote communications shall use the BACnet Point to Point Physical/Data Link Layer Protocol. C. Hardware. Each operator workstation shall consist of the following: 1. Personal Computer. Furnish IBM-compatible PCs to be used as DDC system workstation. The CPU shall be a minimum of an Intel Pentium 4 or AMD Athlon 64 processor and operate at a minimum 2.2 GHz. Include a minimum 512 Megabytes of RAM, 48X CD ROM drive, 80 Gigabyte hard disk, and two-button mouse. Furnish all required serial, parallel, and network communication ports, and all cables for proper system operation. The PC shall include a minimum 17", color monitor with 1024 x 768 screen resolution. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 9 of 45 Section

42 2. Modems. Furnish auto-dial telephone modems and associated cables as required for communication to remote buildings, and workstations. The modem shall be capable of transmitting at up to 56K baud, and communicate over voice-grade telephone line. D. System Software: 1. Operating System. Furnish a commercially available, concurrent multi-tasking operating system. Acceptable operating systems are Microsoft Windows XP Professional. 2. System Graphics. The Operator Workstation software shall be graphically oriented. The system shall allow display of up to 10 graphic screens at once for comparison and monitoring of system status. Provide a method for the operator to easily move between graphic displays and change the size and location of graphic displays on the screen. The system graphics shall be able to be modified while the system is on line. An operator with the proper password level shall be able to add, delete, or change dynamic points on a graphic. Dynamic points shall include analog and binary values, dynamic text, static text, and animation files. Graphics shall have the ability to show animation of equipment. Animation capabilities shall include the ability to show a sequence of images reflecting the position of analog outputs, such as valve or damper positions (V17). Graphics shall be capable of launching other PC applications. 3. Custom Graphics. Custom graphic files shall be created with the use of commonly available graphics packages such as Corel Paint Shop Pro. The graphics generation package shall create and modify graphics that are saved in industry standard formats such as BMP, GIF and JPEG. 4. Graphics Library. Furnish a complete library of standard HVAC equipment such as chillers, boilers, air handlers, terminals, fan coils, and unit ventilators, including 2-dimensional and 3-dimensional graphic depictions. The library shall include a minimum of 300 such files available for use by the Owner. This library shall also include standard graphical representations of equipment including fans, pumps, coils, valves, piping, dampers, and ductwork. The library shall be furnished in a file format compatible with the graphics generation package program. 5. Engineering Units. Allow for selection of the desired engineering units (i.e. Inch pound or SI) in the system. Unit selection shall be able to be customized by locality to select the desired units for each measurement. Engineering units on this project shall be Inch Pound. E. System Applications. Each workstation shall provide operator interface and off-line storage of system information. Provide the following applications at each workstation. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 10 of 45 Section

43 1. Automatic System Database Save and Restore. Each workstation shall store on the hard disk a copy of the current database of each building controller. This database shall be updated whenever a change is made in any panel in the system. The storage of this data shall be automatic and not require operator intervention. In the event of a database loss in a building management panel, the first workstation to detect the loss shall automatically restore the database for that panel. 2. Manual Database Save and Restore. A system operator with the proper password clearance shall be able to archive the database from any system panel and store on magnetic media. The operator shall also be able to clear a panel database and manually initiate a download of a specified database to any panel in the system. 3. System Configuration. The workstation software shall provide a graphical method of configuring the system. The user with proper security shall be able to add new devices, and assign modems to devices. This shall allow for future system changes or additions. 4. On-Line Help and Training. Provide a context sensitive, on line help system to assist the operator in operation and editing of the system. On-line help shall be available for all system functions and shall provide the relevant data for that particular screen. Additional help shall be available through the use of hypertext links onscreen. 5. Security. Each operator shall be required to log on to the system with a user name and password in order to view, edit, add, or delete data. System security shall be selectable for each operator. The system supervisor shall have the ability to set security levels for all other operators. Each operator password shall be able to restrict the operator s access for viewing and/or changing each system application, full screen editor, and object. Each operator shall automatically be logged off of the system if no keyboard or mouse activity is detected. This auto logoff time shall be set per operator password. All system security data shall be stored in an encrypted format. 6. System Diagnostics. The system shall automatically monitor the operation of all workstations, printers, modems, network connections, building management panels, and controllers. The failure of any device shall be annunciated to the operator. 7. Alarm Notification. Alarm messages shall use full language, easily recognized descriptors for alarm. System shall allow the user to have up to 10 popup windows appear for incoming alarms. The popup dialog shall allow the user to silence and acknowledge alarms, view an expanded message or graphic, and add and save comments for the alarm. 8. Alarm Processing. Any object in the system shall be configurable to alarm in and out of normal state. The operator shall be able to configure the alarm limits, warning limits, states, and reactions for each object in the system. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 11 of 45 Section

44 9. Alarm Reactions. The operator shall be able to determine what actions, if any, are to be taken, by object, during an alarm. Actions shall include logging, printing, start a custom control program, displaying messages, dialing out to remote workstations, paging or text message to a cell phone, forwarding to an address, providing audible annunciation or displaying specific system graphics. Each of these actions shall be configurable by workstation and time of day. An object in alarm that has not been acknowledged within an operator specified time period shall be re-routed to an alternate operator specified alarm receipt device. For text messaging, the system shall support TAP protocol including parities 7-E- 1 and 8-n-1, such that if the system fails to dial out/connect with one parity it will automatically try the other one. 10. Alarm and Event Log. The operator shall be able to view all logged system alarms and events from any location in the system. The operator shall be able to sort and filter alarms from events. Alarms shall be sorted in up to 5 color-coded categories based on Owner preference (V17). Include an alarm count summary for each alarm category on the system toolbar. An operator with the proper security level may acknowledge and clear alarms. All that have not been cleared by the operator shall be archived to the hard disk on the workstation. Provide a comment field in the event log that allows a user to add specific comments associated with any alarm. 11. Trend Logs. The operator shall be able to define a trend log for any data in the system. This definition shall include interval, start-time, and stop-time. Trend intervals of 30 seconds,1, 5, 15, 30, and 60 minutes as well as once a shift (8 hours), once a day, once a week, and once a month shall be selectable. Each trend shall accommodate up to 64 system objects. The system operator shall be able to determine how many samples are stored in each trend. Trend data shall be sampled and stored on the Building Controller panel and be archived on the workstation hard disk. Trend data shall be able to be viewed and printed from the operator interface software. Trends must be viewable in a text-based format or graphically. Trends shall also be storable in a tab delimited ASCII format for use by other industry standard word processing and spreadsheet packages. 12. Dynamic Graphical Trending. The system shall have the ability to save the data collected by a trend object and display that collected data in a graphical chart. Trend viewing capabilities shall include the ability to show up to 10 points on a chart, to include live and/or historical data. Each data point trend line shall be an individual color, and include on-graph icons that represent associated events/alarms, manual overrides, and automated changes that have occurred over the time frame represented on the chart. Navigation and viewing functions shall include scrolling and zooming of x and y axes, and a trace display of the associated time stamp, and values for any selected point along the x-axis. Trend data shall be able to be stored for up to 10 years on the PC workstation. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 12 of 45 Section

45 13. Object and Property Status and Control. Provide a method for the operator to view, and edit if applicable, the status of any object and property in the system. These statuses shall be available by menu, on graphics or through custom programs. 14. Clock Synchronization. The real time clocks in all building controllers and workstations shall be synchronized on command of an operator. The system shall also be able to automatically synchronize all system clocks; daily from any operator designated device in the system. The system shall automatically adjust for daylight savings time if applicable. 15. Reports and Logs. Provide a reporting package that allows the operator to select, modify, or create reports. Each report shall be definable as to data content, format, interval, and date. Report data shall be archived on the hard disk for historical reporting. Provide the ability for the operator to obtain real time logs of designated lists of objects. Reports and logs shall be stored on the PC hard disk in a format that is readily accessible by other standard software applications including spreadsheets and word processing. Reports and logs shall be readily printed to the system printer. The operator shall be able to designate reports that shall be printed or stored to disk at selectable intervals. Provide a means to list and access the last 10 reports viewed by the user a. Custom Reports: Provide the capability for the operator to define any system data into a daily, weekly, monthly, or annual report. These reports shall be time and date stamped and shall contain a report title. b. Standard Reports. The following standard system reports shall be provided for this project. These reports shall be readily customized to the project by the owner. 1) Electrical Meter Report: Provide a monthly report showing the daily electrical consumption and peak electrical demand for each building meter. Provide an annual (12 month) summary report showing the monthly electrical consumption and peak demand for each meter. 2) All Points in Alarm Report: Provide an on demand report showing all current alarms. 3) All Points in Override Report: Provide an on demand report showing all overrides in effect. 4) Schedule Report: Provide a summary of all schedules including Holiday and Exception schedules. 5) Commissioning Report: Provide a one time report that lists all equipment with the unit configuration and present operation. 6) Gas Meter Report: Provide a monthly report showing the daily natural gas consumption for each meter. Provide an annual (12 month) report that shows the monthly consumption for each meter. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 13 of 45 Section

46 7) Weather Data Report: Provide a monthly report showing the daily minimum, maximum and average outdoor air temperature and the number of heating and cooling degree days for each day. Provide an annual (12 month) report showing the minimum, maximum and average outdoor air temperature for the month and the number of heating and cooling degree days for the month. F. Workstation Applications Editors. Each PC workstation shall support dedicated screens for editing of all system applications. Provide editors for each application at the PC workstation. The applications shall be downloaded and executed at the appropriate controller panels. 1. Controller. Provide a full screen editor for each type custom application, and application specific controller that shall allow the operator to view and change the configuration, name, control parameters, and system set-points. 2. Scheduling. An editor for the scheduling application shall be provided at each workstation. Provide a monthly calendar for each schedule. Exception schedules and holidays shall be shown clearly on the calendar. Provide a method for allowing several related objects to follow a schedule. An advance and delay time for each object shall be adjustable from this master schedule. An operator shall be able to modify the schedule. Schedules shall be able to be easily copied between objects and/or dates. 3. Manual Control and Override. Provide a means of manually controlling analog and binary output points. Control overrides shall be performed through a simple, graphical on-off-auto editor for binary points, and auto-manual selector for analog control. Provide a icon indicator of override status when a point, unit controller or application has been overridden manually. 4. Air System Equipment Coordination. Provide editor screens with monitoring and control functions that group together and coordinates the operation of air handling equipment and associated VAV boxes as specified in the sequence of operations. For each air system, the editor pages shall include: a. System mode of the air handling system. b. Listing and assignment of the associated air handler and VAV boxes. c. AHU supply air cooling and heating setpoints. d. AHU minimum, maximum and nominal static pressure setpoints. e. VAV box minimum and maximum flow, and drive open and close overrides. 5. Chiller System. A chiller plant control application shall be configured using a full screen editor and shall provide operating status for the system. The display shall include: a. System mode of the chiller plant. b. Chiller enable/disable status. c. System supply water setpoint. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 14 of 45 Section

47 d. System supply and return water temperature. e. System Chilled water pump status. f. Chiller or system failure information. 6. Heating Hot Water Boiler System. A heating hot water boiler plant control application shall be configured using a full screen editor and shall provide operating status for the system. The display shall include: a. System mode of the heating hot water boiler plant. b. Heating hot water boiler enable/disable status. c. System supply water setpoint. d. System supply and return water temperature. e. System heating hot water pumps status. G. Custom Application Programming. Provide the tools to create, modify, and debug custom application programming. The operator shall be able to create, edit, and download custom programs at the same time that all other system applications are operating. The system shall be fully operable while custom routines are edited, compiled, and downloaded WEB SERVER OPERATOR INTERFACE A. Furnish a Web Server to allow daily operations functions to be accomplished from any network connected web browser. B. Operators shall be able to utilize any commercially available browser such as Microsoft Internet Explorer or Netscape Navigator. No additional software shall have to be installed on the client PC for normal operation of the system. C. All communications between the web browser and web server shall be encrypted using 128 bit SSL encryption. D. Web server shall be able to be located on the owners Intranet or on the Internet. E. Web server shall have the ability to automatically obtain an IP (Internet Protocol) address using DHCP. Use of static IP addressing shall also be supported. F. Any unlimited number of users shall be able to access the web server. A minimum of 30 users shall be able to utilize this device at the same time. G. The Web browser client shall support Sun Microsystems Java 2 (JRE or higher) plug-in. H. Operators shall be required to enter in a valid user name and password to access the system. The view of the system provided for the user will be customized based on user identity. DIRECT DIGITAL CONTROL SYSTEM Addendum 2 15 of 45 Section

SECTION BUILDING AUTOMATION SYSTEM

SECTION BUILDING AUTOMATION SYSTEM SECTION 25 10 00 BUILDING AUTOMATION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Work hereunder includes a complete and operational, fully-tested, distributed logic, direct digital control system for control

More information

SECTION INSTRUMENTATION AND CONTROLS FOR HVAC

SECTION INSTRUMENTATION AND CONTROLS FOR HVAC SECTION 230923 INSTRUMENTATION AND CONTROLS FOR HVAC PART 1: GENERAL... 2 1.1 Related Sections... 2 1.2 Description... 2 1.3 Approved Control Systems... 2 1.4 Quality Assurance... 3 1.5 Codes and Standards...

More information

MEPF SPECIFICATIONS SECTION ELECTRICAL GENERAL PROVISIONS SECTION BASIC MATERIALS AND METHODS. MFE MEPF Specification Index Index - 1

MEPF SPECIFICATIONS SECTION ELECTRICAL GENERAL PROVISIONS SECTION BASIC MATERIALS AND METHODS. MFE MEPF Specification Index Index - 1 MEPF SPECIFICATIONS SECTION 15010 - MECHANICAL GENERAL PROVISIONS SECTION 15150 - SUPPORTS AND ANCHORS SECTION 15190 - MECHANICAL IDENTIFICATION SECTION 15250 - MECHANICAL INSULATION SECTION 15510 - HYDRONIC

More information

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM. ENGINEERING SPECIFICATION INTELLIGENT REPORTING FIRE DETECTION SYSTEM February 2017

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM. ENGINEERING SPECIFICATION INTELLIGENT REPORTING FIRE DETECTION SYSTEM February 2017 SECTION 13850 (28 31 00) FIRE DETECTION AND ALARM SYSTEM ENGINEERING SPECIFICATION INTELLIGENT REPORTING FIRE DETECTION SYSTEM February 2017 PART 1 GENERAL 1.1 DESCRIPTION A. This specification includes

More information

C. The system shall be capable of turning luminaires on/off (where supported by the luminaire) as well as full range dimming.

C. The system shall be capable of turning luminaires on/off (where supported by the luminaire) as well as full range dimming. SECTION 260943 SPECIFICATIONS - Wireless Network Lighting Controls. PART 1 - GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY AND KEY SYSTEM DIFFERENTIATORS A. The lighting control system specified herein shall

More information

Architectural and Engineering Specification for a Security Management System. StarNet 2

Architectural and Engineering Specification for a Security Management System. StarNet 2 Architectural and Engineering Specification for a Security Management System StarNet 2 Jan 2, 2018 Page 1 of 12 AE-S2-IN-R1-EN-01/18 This document is intended to provide performance specifications and

More information

ONYX FirstVision Specification Interactive Firefighters Display

ONYX FirstVision Specification Interactive Firefighters Display ONYX FirstVision Specification Interactive Firefighters Display NOTIFIER is a registered trademark, and ONYX FirstVision, NOTI FIRE NET, and VeriFire are trademarks of Honeywell International Inc. Microsoft

More information

Section PERIMETER SECURITY SYSTEMS

Section PERIMETER SECURITY SYSTEMS Section 28 16 43 PERIMETER SECURITY SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Provide and install a perimeter security system as herein specified for the purpose of detecting entry into a designated security

More information

i-vu CCN 4.0 Owner s Guide

i-vu CCN 4.0 Owner s Guide i-vu CCN 4.0 Owner s Guide CARRIER CORPORAION 2007 A member of the United echnologies Corporation family. Stock symbol UX. 11-808-377-01 07/07 able of Contents ACCESSING YOUR SYSEM... 3 YOUR SYSEM DEAILS...

More information

A. GENERAL - Building Automation System (BAS) Contractor shall provide and install:

A. GENERAL - Building Automation System (BAS) Contractor shall provide and install: 11-01-2011 PART 1 GENERAL 1.01 Work Included: A. GENERAL - Building Automation System (BAS) Contractor shall provide and install: 1. A fully integrated Building Automation System (BAS), incorporating direct

More information

March 9, 2009 Project TRINITY COUNTY COURTHOUSE RESTORATION Groveton, Texas ADDENDUM NO. 2

March 9, 2009 Project TRINITY COUNTY COURTHOUSE RESTORATION Groveton, Texas ADDENDUM NO. 2 March 9, 2009 Project 874.001 TRINITY COUNTY COURTHOUSE RESTORATION Groveton, Texas A. PURPOSE AND INTENT ADDENDUM NO. 2 This addendum is issued for the purpose of modifying the plans and specifications

More information

Integrated Automation Instrumentation & Terminal Devices

Integrated Automation Instrumentation & Terminal Devices Sections Included In This Standard: 1.1 Building Systems Control 1.2 Building Aumotation Systems (BAS) 1.1 BUILDING SYSTEMS CONTROL A. HVAC CONTROLS: 1. General: Temperature control zones shall not combine

More information

CompleteView Alarm Client User Manual. CompleteView Version 4.6.1

CompleteView Alarm Client User Manual. CompleteView Version 4.6.1 CompleteView Alarm Client User Manual CompleteView Version 4.6.1 Table of Contents Introduction... 1 Overview...2 System Requirements...2 Configuration... 3 Starting the Alarm Client...3 Menus...3 File

More information

Cardax System Comparison

Cardax System Comparison System Comparison Hardware FT Series 5 Syst Com 131102 Syst Com 131102 2 Contents 1. Introduction... 5 2. System Diagrams... 7 3. Hardware Comparison... 10 4. Comparison... 11 Syst Com 131102 3 Syst Com

More information

Architectural and Engineering Specification for a Real-Time Locating System Flare

Architectural and Engineering Specification for a Real-Time Locating System Flare Architectural and Engineering Specification for a Flare AE-T1-IN-R3-E-0617 Page 1 of 14 This document is intended to provide performance specifications and operational requirements for the Flare. It is

More information

Table of Contents. i-vu CCN Standard 4.2

Table of Contents. i-vu CCN Standard 4.2 i-vu CCN Standard 4.2 Owner's Guide CARRIER CORPORATION 2009 A member of the United Technologies Corporation family Stock symbol UTX Catalog No. 11-808-381-01 7/13/2009 Table of Contents Accessing your

More information

Diagnostics and Monitoring System WEB Tool 2. User Manual

Diagnostics and Monitoring System WEB Tool 2. User Manual Diagnostics and Monitoring System 2 (Translation of the original documentation) User Manual S/N: Valid from: 01.05.2012 Rev.: 2.0 2 Rev. 1.... 1 1.1 General information... 1 1.1.1 Equipment... 1 1.1.2

More information

FACILITY CONTROLS BUILDING AUTOMATION SYSTEM (BAS) DESIGN AND CONSTRUCTION STANDARD

FACILITY CONTROLS BUILDING AUTOMATION SYSTEM (BAS) DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. The design guidelines contained herein include the requirements for integrated automation facility controls at The University of Texas at Austin. It is the intention of

More information

DUVAL COUNTY PUBLIC SCHOOLS ENERGY MANAGEMENT CONTROL SYSTEMS (EMCS) PART 1 - GENERAL 1.1 SCOPE OF WORK

DUVAL COUNTY PUBLIC SCHOOLS ENERGY MANAGEMENT CONTROL SYSTEMS (EMCS) PART 1 - GENERAL 1.1 SCOPE OF WORK PART 1 - GENERAL 1.1 SCOPE OF WORK A. The work covered by this section includes shop drawings, plans, equipment, labor, materials, engineering, technical supervision, programming, set up (including inputting

More information

Network Hardware and wiring (quiz)...

Network Hardware and wiring (quiz)... 4120 Network/TSW (FA049) Course Agenda Day 1 Course Introduction (Presentation)... 8:00 am to 8:30 am Break Module 1 Installing and Configuring Network Software Applications 4120 New Network Programmer

More information

Window Replacements & HVAC Upgrade (Eastern Middle School) Bid Opening Date: 3/15/18 Opening Time: 11:00 a.m. RFB #

Window Replacements & HVAC Upgrade (Eastern Middle School) Bid Opening Date: 3/15/18 Opening Time: 11:00 a.m. RFB # ADDENDUM NO. 3 March 22, 2018 Window Replacements & HVAC Upgrade (Eastern Middle School) Bid Opening Date: 3/15/18 Opening Time: 11:00 a.m. RFB # 2195-18 This Addendum No. 3 is being issued to make changes

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

Architectural and Engineering Specification for a. Flash / Flare

Architectural and Engineering Specification for a. Flash / Flare Architectural and Engineering Specification for a Flash / Flare June 27, 2014 Page 1 of 12 T1DA0115-001 Rev D This document is intended to provide performance specifications and operational requirements

More information

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC PART 1 GENERAL SECTION 23 0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC 1.01 RELATED WORK UNDER OTHER SECTIONS: A. In addition to the general building construction, work directly related to the automatic

More information

SECTION BUILDING AUTOMATION AND AUTOMATIC TEMPERATURE

SECTION BUILDING AUTOMATION AND AUTOMATIC TEMPERATURE SECTION 23 0900 - BUILDING AUTOMATION AND AUTOMATIC TEMPERATURE PART 1 - GENERAL 1.1 DESCRIPTION A. The work described under this division is for all labor, materials, and equipment required for the construction

More information

WebStat Temperature Control System WITH WEB-BASED BUILDING MANAGEMENT

WebStat Temperature Control System WITH WEB-BASED BUILDING MANAGEMENT WebStat Temperature Control System WITH WEB-BASED BUILDING MANAGEMENT ENGINEERING GUIDE SPEC 1. GENERAL 1.1 SUMMARY A. Furnish all labor, materials, equipment, and service necessary for a complete and

More information

SECTION ENERGY MANAGEMENT CONTROL SYSTEMS (EMCS)

SECTION ENERGY MANAGEMENT CONTROL SYSTEMS (EMCS) SECTION 15910 ENERGY MANAGEMENT CONTROL SYSTEMS (EMCS) PART 1 - GENERAL 1.1 SCOPE OF WORK A. The work covered by this section includes shop drawings, plans, equipment, labor, materials, engineering, technical

More information

Tech Data Sheet D01662GB0_Esgraf 4.1 and Configuration Server 30/2011 2/(5)

Tech Data Sheet D01662GB0_Esgraf 4.1 and Configuration Server 30/2011 2/(5) Tech Data Sheet D01662GB1_Esgraf 4.1 and Configuration Server 30/2011 1/(5) Esgraf 4.1 graphical user interface, configuration server and fire detectors contamination monitoring Esgraf 4.1 ESGRAF is a

More information

Operation Manual Fighter ProVision Software. Version: 0.0 Revision: 1

Operation Manual Fighter ProVision Software. Version: 0.0 Revision: 1 Operation Manual Fighter ProVision Software Version: 0.0 Revision: 1 TABLE OF CONTENTS 1. Introduction 5 2. Software Installation 5 3. PC Users 6 3.1 Introduction 6 3.2 Default Code 6 3.3 Edit PC User

More information

CARD ACCESS CONTROL SYSTEM

CARD ACCESS CONTROL SYSTEM SECTION 13851 CARD ACCESS CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete, operable, tested, integrated proximity access control system, to operate on a proximity principle where

More information

I/A Series A 2 Software FoxAlert Alarm Manager

I/A Series A 2 Software FoxAlert Alarm Manager Product Specifications I/A Series A 2 Software FoxAlert Alarm Manager PSS 21S-2B2 B4 Current Alarms Display Most Recent Alarms Display Summary Displays By Status Alarm History Display An Extensive Collection

More information

REMOTE MONITORING AND ALARM SYSTEM

REMOTE MONITORING AND ALARM SYSTEM FUNCTIONALITY A. The water and wastewater facilities remote monitoring, reporting and alarm notification system shall be comprised of a hosted, Web-based user-interface which communicates to remotely monitored

More information

Virginia Tech Standards for Building Automation System

Virginia Tech Standards for Building Automation System March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES SECTION 23 09 00 AUTOMATIC TEMPERATURE CONTROLS SYSTEM (ATCS) PART 1 GENERAL REQUIREMENTS WORK INCLUDED General Requirements: Section 23 09 00 shall be bid direct to the Mechanical Contractor. The existing

More information

PRO-WATCH NOTIFIER SECONDARY FIRE INTERFACE ARCHITECT AND ENGINEERING SPECIFICATION

PRO-WATCH NOTIFIER SECONDARY FIRE INTERFACE ARCHITECT AND ENGINEERING SPECIFICATION Section 00000 SECURITY PRO-WATCH NOTIFIER SECONDARY FIRE INTERFACE ARCHITECT AND ENGINEERING SPECIFICATION PART 1 GENERAL A. The intent of this document is to specify the minimum criteria for the design,

More information

Samsung SDS BMS Ver.2.0. Technical Specification

Samsung SDS BMS Ver.2.0. Technical Specification Samsung SDS BMS Ver.2.0 Technical Specification Technical Specifications All rights and title, including all intellectual property rights to Samsung SDS BMS" is retained by Samsung SDS Co, Ltd. ("SDS"),

More information

B. This Section includes DDC controls for Lighting system installed on the same operator interface as the HVAC controls.

B. This Section includes DDC controls for Lighting system installed on the same operator interface as the HVAC controls. SECTION 17000 BUILDING MANAGEMENT SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

ADDENDUM NO.1. March 4, 2013 HEAT PUMP REPLACEMENT FOR: GATE CITY ELEMENTARY SCHOOL

ADDENDUM NO.1. March 4, 2013 HEAT PUMP REPLACEMENT FOR: GATE CITY ELEMENTARY SCHOOL ADDENDUM NO.1 March 4, 2013 HEAT PUMP REPLACEMENT FOR: GATE CITY ELEMENTARY SCHOOL The data included hereinafter is issued by the Engineer (Engineered Systems Associates, 1355 East Center, Pocatello, ID

More information

by Honeywell WINMAG THE ULTIMATE VIGILON TEXT AND GRAPHICS SOFTWARE

by Honeywell WINMAG THE ULTIMATE VIGILON TEXT AND GRAPHICS SOFTWARE WINMAG THE ULTIMATE VIGILON TEXT AND GRAPHICS SOFTWARE by Honeywell WINMAG, The Ultimate Vigilon Text And Graphics Software WINMAG offers the best possible integrated visual data and management solution

More information

FIRE & LIFE SAFTEY STANDARD

FIRE & LIFE SAFTEY STANDARD Title: Effective Date: 01/01/14 Revised Date: 1/1/14 Code References: Title 16, Chapter 16.16 of the Roseville Municipal Code, NFPA 72 Note: This standard is a summary of Fire Department clarifications

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

SECTION GENERATOR PARALLELING CONTROLS

SECTION GENERATOR PARALLELING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used. PART 1 GENERAL 1.01 Scope of Standard A. This Standard is intended to assure that fire alarm and signaling systems at Sam Houston State University provide the highest level of life safety possible. This

More information

opti-visor ultra-efficient chiller plant automation Typical specification

opti-visor ultra-efficient chiller plant automation Typical specification opti-visor ultra-efficient chiller plant automation Typical File No: 90.893 Date: february 9, 2015 Supersedes: 90.893 Date: april 20, 2012 contents 1.0 Chilled water plant 4 1.1 General system requirements

More information

AK-CS On Board Guide

AK-CS On Board Guide MAKING MODERN LIVING POSSIBLE AK-CS On Board Guide electronic controls & sensors About this guide The AK-CS On Board guide highlights the use of the RMT tool, allowing remote software management. Consult

More information

SECTION INTEGRATED AUTOMATION FACILITY CONTROLS

SECTION INTEGRATED AUTOMATION FACILITY CONTROLS PART 1: GENERAL 1.01 SCOPE OF WORK A. General Contractor shall furnish and commission a fully integrated building automation system (BAS), incorporating direct digital control (DDC) for energy management,

More information

Feature Summary. I. System

Feature Summary. I. System I. System A. Supports up to 60 VAV HVAC Units 1. Each HVAC Unit Can Support up to 59 VAV Boxes 2. Constant Volume Units Can Be Integrated With VAV Units 3. System Can Support Over 3000 Controllers B. Fill-in

More information

Fire Operator Workstation (Fire OWS) User s Guide

Fire Operator Workstation (Fire OWS) User s Guide Fire Operator Workstation (Fire OWS) User s Guide 1-1 Fire Operator Workstation (Fire OWS) User s Guide Introduction This user s guide details the components, capabilities, and operation procedures of

More information

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2 Architectural & Engineering Specifications Control Panel 1.0 GENERAL... 2 1.1 SCOPE OF WORK... 2 1.1.1 Introduction... 2 1.2 GENERAL CONDITIONS... 2 1.2.1 After-Sales Support... 2 1.2.2 Quality assurance...

More information

ModSync Sequencing System Installation & Operation Manual. For use with Fulton Steam Boilers.

ModSync Sequencing System Installation & Operation Manual. For use with Fulton Steam Boilers. ModSync Sequencing System Installation & Operation Manual For use with Fulton Steam Boilers. Revision 3.0 8/21/2008 - 2 - Table of Contents Introduction Page 4 Features Page 4 Sequence of Operation Page

More information

Procidia iware AlarmWorX32. AlarmWorX32 Viewer January 2010

Procidia iware AlarmWorX32. AlarmWorX32 Viewer January 2010 Procidia iware AlarmWorX32 AlarmWorX32 Viewer Siemens Protection AG 2008. notice All / Copyright rights reserved. notice Introduction / Contents Procidia iware is an operator interface software designed

More information

Patriot Systems Limited

Patriot Systems Limited COPYRIGHT 1997 - The Patriot Systems Ltd. Patriot Alarm Monitoring Automation Package is licensed for use on one computer, by the original person, or company, or organisation whose name is registered with

More information

F (5 - Tender Specs)

F (5 - Tender Specs) Bid Opportunity No.: 518-2007 Page 1 of 30 Part 1 General 1.1 General Scope And Related Work.1 All Work required by these Controls Specifications, Schedules, Point Lists and Drawings shall be coordinated

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

TrueAlarm Fire Alarm Systems

TrueAlarm Fire Alarm Systems TrueAlarm Fire Alarm Systems UL, ULC, CSFM Listed; FM Approved* Features TrueSite Incident Commander provides 4100ES mounting for the Simplex TrueSite Workstation: All-in-one touchscreen computer/monitor

More information

TrueAlarm Fire Alarm Systems

TrueAlarm Fire Alarm Systems TrueAlarm Fire Alarm Systems UL, ULC, CSFM Listed; FM Approved* Features TrueSite Incident Commander provides 4100ES mounting for the Simplex TrueSite Workstation: All-in-one touchscreen computer/monitor

More information

RFP Addendum 2 March 31, 2016

RFP Addendum 2 March 31, 2016 RFP Addendum 2 March 31, 2016 For Best Value Procurement Option Three Security Upgrades Ph 1 UT Health Science Center SBC No. 540/013-04-2015 This Addendum forms a part of the Request for Proposals (RFP)

More information

Advanced Facility Air-Management Technology

Advanced Facility Air-Management Technology Internet-Enabled HVAC Monitoring & Control Maximum Digital Precision & Total Configuration Flexibility Pure and Simple Solutions Advanced Facility Air-Management Technology AbsolutAire s Facility Air-Management

More information

BMS Specification. Lonix Ltd.

BMS Specification. Lonix Ltd. BMS Specification 1 (18) BMS Specification Lonix Ltd www.lonix.com BMS Specification 2 (18) INDEX 1 System Architecture...3 1.1 System Integration...3 1.2 Layered System Architecture...3 1.2.1 Service

More information

OJD ITB No Attachment E Duress Alarm Equipment Specifications

OJD ITB No Attachment E Duress Alarm Equipment Specifications Duress Alarm Equipment Specifications PART 1 GENERAL 1.1 SECTION INCLUDES A. Duress devices. B. Alarm control panel. C. Signaling devices. 1.2 REFERENCE STANDARDS A. NFPA 70 - National Electrical Code;

More information

Manual# User s Manual. 200E Series. DCU 210E/208E Diesel Engine Control Unit RP 210E Remote Panel

Manual# User s Manual. 200E Series. DCU 210E/208E Diesel Engine Control Unit RP 210E Remote Panel Manual# 1006494 User s Manual 200E Series DCU 210E/208E Diesel Engine Control Unit RP 210E Remote Panel User's Manual Rev. 1.0 Marine Pro 200E Series ~~~ DCU 210E Diesel Engine Control Unit DCU 208E Diesel

More information

Pro-Watch Software Suite. Architect and Engineering Specifications. January 9, 2002 Revision 3.4

Pro-Watch Software Suite. Architect and Engineering Specifications. January 9, 2002 Revision 3.4 Architect and Engineering Specifications Revision 3.4 SECTION 13800 BUILDING AUTOMATION AND CONTROL Part 1 GENERAL 1.0.1. GENERAL 1.0.2. REFERENCES 1.0.3. DEFINITIONS 1.0.4. SYSTEM DESCRIPTIONS 1.0.5.

More information

Oracle Communications Performance Intelligence Center

Oracle Communications Performance Intelligence Center Oracle Communications Performance Intelligence Center System Alarms Guide Release 10.2.1 E77506-01 June 2017 1 Oracle Communications Performance Intelligence Center System Alarms Guide, Release 10.2.1

More information

IntesisBox BACnet/IP Server - Notifier ID3000 series

IntesisBox BACnet/IP Server - Notifier ID3000 series IntesisBox Server - Notifier ID3000 series Gateway for integration of Notifier ID3000, ID3002, ID50 and ID60 fire panels into enabled control systems. Integrate your Notifier fire panels into your BACnet

More information

Delta ORCAview 3.40 BACNET PROTOCOL IMPLEMENTATION CONFORMANCE STATEMENT

Delta ORCAview 3.40 BACNET PROTOCOL IMPLEMENTATION CONFORMANCE STATEMENT Date: December 12, 2012 Vendor Name: Delta Controls Inc. Product Name: ORCAview Product Model Number: DOW-340 Product Version: 3.40 BACnet Protocol Revision: 6 Product Description: ORCAview is an industry

More information

UniNet 2000 Specification Integrated Facilities Management Monitoring and Control Systems Version /12/2002

UniNet 2000 Specification Integrated Facilities Management Monitoring and Control Systems Version /12/2002 UniNet 2000 Specification s Version 2.1 04/12/2002 UniNet 2000 is a trademark of Notifier Page 1 of 14 INDEX Alarm Monitoring...8 Incident Reporting Module....11 APPLICABLE PUBLICATIONS...4 INSTALLATION:...13

More information

Avigilon Control Center System Integration Guide

Avigilon Control Center System Integration Guide Avigilon Control Center System Integration Guide with Gallagher Command Centre INT-CARDAX-C-Rev3 Copyright 2013 Avigilon. All rights reserved. No copying, distribution, publication, modification, or incorporation

More information

TLS-300 UST Monitoring and Leak Detection System

TLS-300 UST Monitoring and Leak Detection System Part 1 General System Requirements 1.1 Description TLS-300 UST Monitoring and Leak Detection System A. These Specifications are intended to provide information by which prospective bidders may understand

More information

Before you install ProSeries Express Edition software for network use

Before you install ProSeries Express Edition software for network use Before you install ProSeries Express Edition software for network use The following pages describe system requirements and other information you need to know before installing ProSeries Express Edition

More information

DeltaV Operate. DeltaV Operate. Introduction. DeltaV Product Data Sheet. Robust and secure plant operations

DeltaV Operate. DeltaV Operate. Introduction. DeltaV Product Data Sheet. Robust and secure plant operations February 2016 Page 1 DeltaV Operate You can easily manage your process with. Robust and secure plant operations Powerful operator interface, optionally up to four monitors Constant visibility and access

More information

Patriot Systems Limited

Patriot Systems Limited COPYRIGHT 1997 - The Patriot Systems Ltd. Patriot Alarm Monitoring Automation Package is licensed for use on one computer, by the original person, or company, or organization whose name is registered with

More information

SECTION ENERGY MANAGEMENT SYSTEM (EMS)

SECTION ENERGY MANAGEMENT SYSTEM (EMS) SECTION 13810 ENERGY MANAGEMENT SYSTEM (EMS) PART 1 GENERAL 1.01 SUMMARY A. Section Includes: The energy management system (EMS) including the following major subsystems: HVAC temperature controls, HVAC

More information

DTW Master Specification Section EMCS: Start Up, Verification and Commissioning

DTW Master Specification Section EMCS: Start Up, Verification and Commissioning Page 1 of 6 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Related Sections..1 The contractor is to ensure that all related work is co ordinated among all specification sections, as well as between Division 11,

More information

HERCULES 6 GRAPHICS SYSTEM

HERCULES 6 GRAPHICS SYSTEM HERCULES 6 GRAPHICS SYSTEM USER MANUAL Protec Fire Detection PLC, Protec House, Churchill Way, Nelson, Lancashire, BB9 6RT. Telephone: +44 (0) 1282 717171 Fax: +44 (0) 1282 717273 Web: www.protec.co.uk

More information

PotterNet Fire & Facility Supervising Station

PotterNet Fire & Facility Supervising Station Features Connect up to 1000 Potter panels in a single building, local campus, or multiple sites worldwide using LAN/WAN/Internet Native Ethernet networking connectivity with fire panels and client stations,

More information

SECTION INTEGRATED AUTOMATION COMMISSIONING

SECTION INTEGRATED AUTOMATION COMMISSIONING SECTION 25 08 00 INTEGRATED AUTOMATION COMMISSIONING PART 1. GENERAL 1.01 SECTION INCLUDES: A. BAS and equipment testing and start-up B. Validation of proper and thorough installation of BAS and equipment

More information

L CONNECTION NETWORK Commercial Controls

L CONNECTION NETWORK Commercial Controls L CONNECTION NETWORK Commercial Controls SIMPLIFIED, CENTRAL CONTROL Simplified Control for Your Facility The L Connection Network not only enhances comfort and energy-efficiency throughout your facilities,

More information

[ [ ADMIN PANEL USER GUIDE

[ [ ADMIN PANEL USER GUIDE [ [ ADMIN PANEL USER GUIDE ADMIN PANEL USER GUIDE 2 Contents Logging In & Systems Overview 3 System Details 5 Analytics 6 View Alarms 8 Manage Alarms 9 Create Alarms 10 Device Reporting Alarm 11 Monthly

More information

Laptop / PC Programming Manual

Laptop / PC Programming Manual Laptop / PC Programming Manual Doc. # Fire PC Program rev B 01.07 This Document is property of Evax Systems, Inc. The Evax Fire Solutions Programmer Components 2 1.0 System Setup 4 1.1 Interface Setup

More information

FUNCTIONAL DESIGN SPECIFICATION

FUNCTIONAL DESIGN SPECIFICATION Issue Date: Issued To: Revision: FUNCTIONAL DESIGN SPECIFICATION Specification Number: SP-XXXX Company Name Signature Date Issued By: Manutec Ltd. Approved By: Approved By: Approved By: Approved By: Authorised

More information

ACTIVE INFRARED BARRIER

ACTIVE INFRARED BARRIER Although PROTECH provides high security indoor intrusion sensors for the military and government markets, our specialty is outdoor protection. Since we first introduced our PIRAMID outdoor dual technology

More information

BlackBerry AtHoc Networked Crisis Communication Siemens Indoor Fire Panel Installation and Configuration Guide Release Version 7.

BlackBerry AtHoc Networked Crisis Communication Siemens Indoor Fire Panel Installation and Configuration Guide Release Version 7. BlackBerry AtHoc Networked Crisis Communication Siemens Indoor Fire Panel Installation and Configuration Guide Release Version 7.3, October 2017 Copyright 2017 BlackBerry Limited. All Rights Reserved.

More information

Monitoring Operator Guide. Access Control Manager Software Version

Monitoring Operator Guide. Access Control Manager Software Version Monitoring Operator Guide Access Control Manager Software Version 5.10.10 2018, Avigilon Corporation. All rights reserved. AVIGILON, the AVIGILON logo, ACCESS CONTROL MANAGER, ACM, ACM VERIFY AND TRUSTED

More information

Instruction manual MTL process alarm equipment. October 2016 CSM 725B rev 2 MTL RTK 725B. Configuration Software Manual

Instruction manual MTL process alarm equipment. October 2016 CSM 725B rev 2 MTL RTK 725B. Configuration Software Manual Instruction manual MTL process alarm equipment October 2016 CSM 725B rev 2 MTL RTK 725B Configuration Software Manual SECTION 1 - INTRODUCTION... 5 Basic Requirements... 5 SECTION 2 - SOFTWARE INSTALLATION...

More information

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO.

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO. PURCHASING SECTION 6645 148 th Street, Surrey, B.C. V3S 3C7 Tel: 604-590-7274 Fax: 604-599-0956 E-mail: purchasing@surrey.ca ADDENDUM NO. 2 REQUEST FOR QUOTATIONS (RFQ) NO.: 1220-040-2014-001 TITLE: DISTRICT

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS A. Minimum lighting control (base scope of work) shall include all corridors. The lighting in all the corridors shall be turned on (if not already on) if

More information

ION Meter Alerts TECHNICAL NOTE NOVEMBER In This Document

ION Meter Alerts TECHNICAL NOTE NOVEMBER In This Document 70072-0125-01 TECHNICAL NOTE NOVEMBER 2006 ION Meter Alerts A PowerLogic ION meter can send alerts to indicate a user specified power system condition such as a power quality problem (including surges,

More information

Centroid Snet 2. Battery Management Software. User Manual V1.1. Eagle Eye Power Solutions, LLC Keeping an Eye on Your Critical Power!

Centroid Snet 2. Battery Management Software. User Manual V1.1. Eagle Eye Power Solutions, LLC Keeping an Eye on Your Critical Power! Eagle Eye Power Solutions, LLC Keeping an Eye on Your Critical Power! Centroid Snet 2 Battery Management Software User Manual V1.1 www.eepowersolutions.com Tel: 1-877-805-3377 info@eepowersolutions.com

More information

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

November 11, City of Sparks 215 S. 21 st St. Sparks, NV November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of

More information

OPTIMUM APPLIED SYSTEMS,

OPTIMUM APPLIED SYSTEMS, OPTIMUM APPLIED SYSTEMS, INC. HEAT COMPUTER 3500 DSL TECHNICAL SPECIFICATIONS HC 3500 GENERAL SYSTEM DESCRIPTION The Heat Computer is a computerized building heating control system that utilizes sensors

More information

Design Standards Brief Section 9 Building Automation System and Automatic Controls

Design Standards Brief Section 9 Building Automation System and Automatic Controls Property Services Design Standards Brief Section 9 Building Automation System and Automatic Controls Issue 6 2009 Section 9 Building Management and Information Systems and Automatic Controls CONTENTS PART

More information

Avigilon System Integration Guide. for the Avigilon Control Center and Access Control Manager

Avigilon System Integration Guide. for the Avigilon Control Center and Access Control Manager Avigilon System Integration Guide for the Avigilon Control Center and Access Control Manager 2014-2016, Avigilon Corporation. All rights reserved. AVIGILON, the AVIGILON logo, AVIGILON CONTROL CENTER,

More information

15900 HVAC INSTRUMENTATION AND CONTROLS

15900 HVAC INSTRUMENTATION AND CONTROLS 15900 HVAC INSTRUMENTATION AND CONTROLS PART 1 GENERAL - Andover Controls BAS system is the standard for the University, and may be specified as a proprietary item. 1.0 RELATED DOCUMENTS A. Drawings and

More information

Supervisor OPERATIONS MANUAL. Heat-Tracing Controller Configuration and Monitoring Software. Versions up to 2.7xx. INSTALL-118 (Europe)

Supervisor OPERATIONS MANUAL. Heat-Tracing Controller Configuration and Monitoring Software. Versions up to 2.7xx. INSTALL-118 (Europe) OPERATIONS MANUAL Supervisor Heat-Tracing Controller Configuration and Monitoring Software Versions up to 2.7xx INSTALL-118 (Europe) THERMAL MANAGEMENT Raychem-AR-H57576-SupervisorOperations-EN-1706 THERMAL

More information

DeltaV Analyze. Introduction. Benefits. Continuous automated DeltaV System alarm system performance monitoring

DeltaV Analyze. Introduction. Benefits. Continuous automated DeltaV System alarm system performance monitoring DeltaV Distributed Control System Product Data Sheet December 2016 DeltaV Analyze Continuous automated DeltaV System alarm system performance monitoring Trends of alarms, events, and user actions Identification

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information