REDSANDS NANTWICH ECOLOGICAL ASSESSMENT

Size: px
Start display at page:

Download "REDSANDS NANTWICH ECOLOGICAL ASSESSMENT"

Transcription

1 REDSANDS NANTWICH ECOLOGICAL ASSESSMENT TEP Genesis Centre Birchwood Science Park Warrington WA3 7BH Tel: Offices in Warrington, Market Harborough, Gateshead, London and Cornwall PLANNING I DESIGN I ENVIRONMENT

2 Redsands Nantwich Ecological Assessment Document Title Prepared for Prepared by Ecological Assessment Engine of the North TEP - Warrington Document Ref Author Sarah Sadler Date September 2016 Checked Approved Emma Pickering Marjorie Nadouce Amendment History Version Date Modified by Check / Approved by Reason(s) issue Status

3 Redsands Nantwich Ecological Assessment CONTENTS PAGE Executive Summary Introduction Site Description Methods Results Conclusions Recommendations References TABLES PAGE Table 1: Ecological information and consultations... 4 FIGURES PAGE Figure 1: Location of site within local landscape... 3 APPENDICES APPENDIX A: APPENDIX B: Desktop Study Technical Bat Report DRAWINGS G Phase 1 Habitat survey Version 2.0 September 2016

4 Redsands Nantwich Ecological Assessment Executive Summary 1. TEP were commissioned by Engine of the North to carry out an ecological assessment of a site at the former Redsands young offenders institute in Nantwich. This assessment has been requested to inform future development proposals for the site. 2. The site is situated within the open countryside area to the east of Nantwich, with land adjacent to the site predominantly used for agriculture. 3. There are no designated wildlife sites or S41 Habitats of Principle Importance on site or within influencing distance of the site. 4. The site is predominately amenity grassland with parkland/scattered trees and bounded on three sides with hedgerows. 5. The Schedule 9 invasive species, rhododendron, is present onsite. If this is to be removed it will need to be disposed of appropriately following vegetation clearance. 6. There are three waterbodies within 500m of the site with good to moderate terrestrial habitat connectivity for amphibians, including great crested newts. Further amphibians surveys are required to determine whether the development will have any implications on amphibians. 7. There are no implications for any development with regard to water vole, otter, reptiles, invertebrates or badgers. 8. If the trees, hedgerows and scrub will be removed for any development, replacement bird nesting opportunities will need to be provided to compensate for the loss of existing potential nest sites. 9. Vegetation clearance should ideally be implemented outside the bird nesting season (avoiding March to August inclusive). If this is not possible, a nesting bird check will need to be carried out by a suitably qualified ecologist immediately prior to the works commencing, to establish that no active bird nests are present Page 1 September 2016 Version 2.0

5 Redsands Nantwich Ecological Assessment 1.0 Introduction 1.1 TEP was commissioned in July 2016 to carry out an ecological assessment of land at the former Redsands young offenders institute in Nantwich. This assessment has been requested to inform proposals for future development of the site. 1.2 The ecological assessments comprised: Desktop study; Phase 1 habitat survey; and Daytime bat roost assessment. 1.3 This report has the following objectives: Detail the methods and results of the above surveys; To describe the existing vegetation and give an overview of the habitats present on the site; To identify whether there are any features of conservation value such as legally protected species or habitats of biodiversity importance; To advise of further surveys or mitigation requirements that might be needed prior to development of the site; and To outline opportunities to provide biodiversity enhancement within site proposals Page 2 September 2016 Version 2.0

6 Redsands Nantwich Ecological Assessment 2.0 Site Description 2.1 The site is an area of land along the A534, located between Willaston to the east and Nantwich to the west. The location is shown on the plan below (Figure 1). The approximate central grid reference is SJ The site is situated within the open countryside area outside of Nantwich, with land adjacent to the site predominantly used for agriculture. Figure 1: Location of site within local landscape (Contains Ordnance Survey data Crown copyright and database right 2016.) Page 3 September 2016 Version 2.0

7 Redsands Nantwich Ecological Assessment 3.0 Methods Desktop Study 3.1 Information regarding historic species records and protected sites within a 1km radius of the site was requested/gathered from the sources listed in Table 1. Table 1: Ecological information and consultations CONSULTEE/SOURCE OF INFORMATION Magic Map: Multi-Agency Geographic Information for the Countryside Section 41 NERC Act 2006 Google Maps Natural England, Magic Map Cheshire record NATURE OF INFORMATION Online mapping system identifying statutory and rural designations, citations, natural area boundaries etc. Habitats and species of principal importance for the conservation of biodiversity. Satellite imagery Online mapping system for England for S41 habitats and protected sites. Identification of records for protected species within the local area. Habitats and Flora 3.2 The Phase 1 habitat survey was undertaken by Senior Ecologist Emma Pickering on the 20th July The survey was carried out in accordance with the Phase 1 Habitat Survey assessment methods (JNCC 2010) and CIEEM's Guidelines for Preliminary Ecological Appraisal (2012) with habitat types and any incidental evidence of protected or invasive species noted. Limitations 3.3 The Phase 1 habitat survey was undertaken within the optimum survey season of mid-april to mid-october. There was therefore no limitation to the habitat survey with regard to the time of year. Fauna 3.4 During the Phase 1 habitat survey, the habitats present were assessed for their potential to support species of conservation concern, particularly statutorily protected species or S41 priority species Page 4 September 2016 Version 2.0

8 Redsands Nantwich Ecological Assessment Preliminary daytime inspection of buildings and trees for bats 3.5 A daytime survey of the buildings and trees within the site boundary was undertaken on 2 nd August 2016 by licenced ecologist Marjorie Nadouce (Natural England class licence CL18: Registration number CLS-CLS). This preliminary roost inspection and ground based tree inspection was undertaken in accordance with Bat Conservation Trust (BCT): Bat Surveys, Good Practice Guidelines (2016). The criteria for the roost assessment are shown in Appendix B. There are no seasonal constraints to preliminary bat roost assessments. 3.6 The buildings were searched for any evidence of use by bats, such as: Limitations Live or dead bats; Bat droppings; Feeding remains (e.g. stripped moth wings); Urine staining; and Fur oil staining. 3.7 Access to the all externals and internals of the building were accessible. 3.8 Bat droppings are one of the field signs that provide evidence of bat activity, but droppings on external surfaces can be washed or blown away by wet or windy weather. Lack of evidence during external surveys is therefore not conclusive of the absence of bats. Weather conditions during the survey were dry and warm with overcast cloud Page 5 September 2016 Version 2.0

9 Redsands Nantwich Ecological Assessment 4.0 Results Desktop Study 4.1 A summary of the results of the desktop study are set out below. Results, including maps of designated sites, are found in Appendix A. Protected Sites 4.2 There are no internationally, nationally or locally designated sites within 1km of the site boundary. 4.3 The site falls within the Impact Risk Zone for the Wybunbury Moss SSSI and RAMSAR. Natural England s Impact Risk Zones for Sites of Special Scientific Interest guidance states where consultation with Natural England for further advice is required. Depending on the planning proposal at the site, it may be necessary to consult with Natural England. Notable Habitats 4.4 One habitat of principal importance under Section 41 (S41) of the NERC Act (2006) occur within the 1km search area. A small parcel of Priority Habitat Inventory - deciduous woodland is located to the west of the site, approximately 600m away. Notable Species 4.5 Although there are no records of notable species within the site boundary, there are numerous records of notable species within 1km of the site. Species include those listed under any of the following: Mammals European Protected Species (EPS); Schedule 1 of the Wildlife and Countryside Act 1981, as amended (WCA1); Schedule 5 of the Wildlife and Countryside Act 1981, as amended (WCA5); Schedule 9 of the Wildlife and Countryside Act 1981, as amended (WCA9); Species of principal importance under Section 41 of the Natural Environment and Communities Act 2006 (S41); Protection of Badgers Act 1992 (PBA); Local Biodiversity Action Plan (LBAP); and Red and Amber listed Birds of Conservation Concern (BRd/BAm). 4.6 There are records of notable mammal species within 1km of the site. The notable recorded mammal species are as follows: Birds Common pipistrelle Pipistrellus pipistrellus (EPS, WCA5) West European hedgehog Erinaceus europaeus (S41) 4.7 There are records of three Schedule 1 bird species and fourteen Section 41 bird species located within 1km of the site boundary. The Schedule 1 birds records identified are: Page 6 September 2016 Version 2.0

10 Redsands Nantwich Ecological Assessment Barn Owl Tyto alba; Kingfisher Alcedo atthis; Redwing Turdus iliacus. 4.8 The fourteen S41 bird species are listed within Appendix A. Phase 1 Habitat Survey 4.9 A Phase 1 habitat survey of the site was undertaken, the habitat types were mapped and dominant vegetation species noted. Habitats present were also assessed for their potential to support protected species and any invasive species recorded. The habitats within the site are illustrated in Drawing G The following habitats are present within or immediately adjoining the site and are listed in order of abundance: Broadleaved parkland/scattered trees Amenity grassland Tall ruderal Species-poor modified neutral grassland Introduced shrub Hardstanding with ephemeral/short perennial Scattered broad-leaved trees Scattered scrub Plantation coniferous woodland Intact species poor hedgerow Broadleaved parkland/scattered trees and amenity grassland 4.11 The majority of the site consists of scattered broadleaved trees within amenity grassland. The parkland/scattered trees are less dense in the south east of the site and there is an area of just amenity grassland in the south. The parkland/scattered trees species consist mainly of sycamore Acer pseudoplatanus, pedunculate oak Quercus robur and ash Fraxinus excelsior. This area of parkland surrounds the main core group of buildings within the centre of the site. Tall ruderal 4.12 There is an area of tall ruderal vegetation in the north east section of the site around the Building B, this vegetation extends along the eastern boundary. Species consist of nettle Urtica dioica and great willow herb Epilobium hirsutum. Species-poor modified neutral grassland 4.13 The modified neutral grassland is found around the buildings in the central section of the site. The dominant species within this habitat is ragwort Jacobaea vulgaris with frequent Yorkshire fog Holcus lanatus and fescue species Festuca sp. Introduced shrub 4.14 There are two areas of introduced shrub species in the north of the site associated with the buildings Page 7 September 2016 Version 2.0

11 Redsands Nantwich Ecological Assessment Hardstanding with ephemeral/short perennial 4.15 Within the hardstanding around the buildings there are patches of ephemeral vegetation including species such as ragwort and spear thistle Cirsium vulgare. Plantation coniferous woodland 4.16 There are two small areas of plantation coniferous trees, the species are; western red cedar Thuja plicata, leyland cypress Cupressus leylandii and lawson cypress Chamaecyparis lawsoniana. Intact species poor hedgerow 4.17 The site is bounded by an intact species poor hedgerow to the north, east and south. The hedgerows are dominated by hawthorn Crataegus monogyna with occasional elm Ulmus minor 'Atinia' and sycamore on the southern boundary. The eastern boundary has occasional oak and hazel Corylus avallana. Protected and invasive plant species 4.18 There are no native plant species listed under Schedule 8 of the Wildlife and Countryside Act, 1981 (as amended) present within the site boundary Rhododendron Rhododendron ponticum occurs on site in two areas in the north east of the site next to patches of hardstanding. This is a Schedule 9 invasive species in the Wildlife and Countryside Act 1981 (as amended). Connectivity to the wider landscape 4.20 The site has good connectivity to the wider landscape to the north and south. However, the better connectivity for terrestrial species is to the north as there are two busy main roads that bound the site to the south and west. Fauna Bats- Ground Based Tree Assessment 4.21 During the daytime bat assessment a ground based assessment of the trees was carried out. The trees were all found to be too immature to contain features suitable to support roosting bats. The trees and hedgerows were considered to offer some limited potential for foraging and commuting bats. Bats- Internal and External Building Assessment 4.22 Records of common pipistrelle bat species were confirmed during the desktop study within a 1km radius of the site. Roosting Habitats 4.23 No buildings subject to the Preliminary Roost Assessment (PRA) were found to contain evidence of either current or historical use by bats. Building A was found to have 'negligible' potential and Building B 'low' potential to support roosting bats The full details of the PRA are presented within Appendix B and refers to plan G Page 8 September 2016 Version 2.0

12 Redsands Nantwich Ecological Assessment Amphibians 4.25 In line with guidelines set by Natural England, a buffer zone of 250m and 500m from the Redsands site was assessed to identify suitable habitat for potential breeding sites of amphibians including Great Crested Newts Triturus cristatus. Any waterbodies south of the A534 was excluded from the search as this main road were deemed to be a sufficient barrier to amphibian dispersal The search revealed a single pond that falls within a 250m buffer from the centre of the site and a further 2 ponds that fall within the 500m buffer from the centre of the site. Badger 4.27 No evidence of badger activity was found during the site survey (setts, mammal trails, footprints, latrines). The habitats on site are not considered to be suitable for sett construction but does provide limited foraging habitat. Birds 4.28 There are records of Schedule 1, Section 41, Red BoCC and Amber BoCC bird species within 1km of the site. The trees, hedgerows introduced shrub and scrub within the site provides potential nesting and foraging habitat for various bird species. No notable birds were observed during the site survey. Water vole and otter 4.29 There are no ditches or watercourses within the site itself or immediately adjacent and therefore no suitable water vole or otter habitat present. Reptiles 4.30 The habitat both within and immediately adjacent to the site is not considered to provide suitable foraging or refugia opportunities for reptiles based on the high level of vegetation management. Invertebrates 4.31 Both species and structural diversity is low within the site with limited floristic interest, which limits the available food for invertebrates and the potential for a diverse invertebrate assemblage to be present Page 9 September 2016 Version 2.0

13 Redsands Nantwich Ecological Assessment 5.0 Conclusions Designated sites 5.1 There are no internationally, nationally or locally designated sites within 1km of the site. 5.2 The site lies within the Impact Risk Zone for the Wybunbury Moss SSSI (3km from site). The Wybunbury Moss SSSI site is designated as it is one of the finest examples in the country of a schwingmoor and supports an outstanding assemblage of invertebrates including many nationally and locally rare species. Due to the proposed development site's location, it is highly unlikely that any proposed development will have any direct physical impacts on these designations or that any works proposed at the site would be considered to generate disturbance impacts to any species using the SSSI's in any way. It may however be necessary to consult with Natural England dependant on the final planning proposals. Habitats and flora 5.3 The habitats within site are overall, of low ecological value, comprising common species, many of which have been planted for their amenity value. The scattered trees around the site and the hedgerows will however, provide some value for wildlife such as nesting habitat for birds, foraging habitat for bats, and some ground cover/foraging habitat for small terrestrial mammals. These habitats should be retained where possible. Protected and Invasive Plant Species 5.4 There are no protected plant species (Schedule 8 of the Wildlife and Countryside Act) located either within the site or immediately adjacent. There are no implications to the development with regard to protected plant species. 5.5 The invasive species rhododendron is present on site, this is a schedule 9 species under the Wildlife and Countryside Act. The removal of this will need to be considered so as not to allow it to spread across the site. Fauna Bats 5.6 None of the trees within the site were found to be suitable to support roosting bats. However the scattered broad-leaved trees, areas of scrub and boundary hedgerows do have potential for both foraging and commuting bats, connecting habitat within the site to the wider area. The boundary feature in particular provide the most potential for bat foraging/commuting and should be retained within proposals where possible. 5.7 Building A was found to have negligible potential to support roosting bats and as such there are no further implications with regard to bats and Building A Page 10 September 2016 Version 2.0

14 Redsands Nantwich Ecological Assessment 5.8 Building B was found to have low potential to support bats (in line with BCT Guidelines) and as such, should be subject to a single dusk or dawn emergence survey at the appropriate time of year i.e. May-August to determine if it is in use by roosting bats. If bats are found during these further surveys then mitigation will be required, including obtaining a licence from Natural England to permit the works. Amphibians 5.9 Although there are no ponds within the site, there is one waterbody located within 250m and a further two within 500m of the site which could provide suitable habitat for breeding S41 amphibians including GCN. 250m is the distance that great crested newt will commonly forage, therefore there is a risk that newts could be present within the development site and be killed during construction. An amphibian survey will need to be carried out to investigate the ponds further, in order to determine whether there will be implications for development of the site with regard to great crested newts and other notable amphibians. Birds 5.10 The site contains areas of hedgerow and trees that may be utilised by nesting birds. All nesting birds are protected under the Wildlife and Countryside Act 1981 (as amended). There is no provision under the licensing system to allow disturbance or destruction of nests to facilitate development, so clearance of these habitats if required should be undertaken outside the nesting bird season (March to August inclusive). If this is not possible, a nesting bird check will need to be carried out by a suitably qualified ecologist immediately prior to the works commencing, to establish that no active bird nests are present. However in the event that active nests are discovered, a buffer zone will need to be implemented around the nest, the size of which will be dependent upon the species nesting. The nest will need to be monitored regularly by an ecologist, who will confirm when the nest is no longer active and clearance works can proceed within the buffer zone. Badger 5.11 Although the site offers some limited potential for badgers, there was no evidence of badger activity within the site or within the immediate vicinity during the site survey. There are currently no implications to any future development relating to badgers. Water vole and Otter 5.12 There is no suitable habitat for either water vole or otter within the site boundaries or immediately adjacent. There are therefore no implications to the development with regard to water voles or otter. Reptiles 5.13 No evidence of any reptile species was recorded during the site survey and no desktop records identified. The habitat within the site is of low suitability for reptiles and therefore it is considered unlikely that any reptile species are present within the site. There are no implications at this site with regard to reptiles Page 11 September 2016 Version 2.0

15 Redsands Nantwich Ecological Assessment Invertebrates 5.14 No records of any S41 invertebrate species were provided within the 1km search area and the habitats present on site lack the structural diversity that is likely to support a rich invertebrate assemblage. Therefore, invertebrates are not considered to represent a constraint to the future proposals at the site Page 12 September 2016 Version 2.0

16 Redsands Nantwich Ecological Assessment 6.0 Recommendations 6.1 Mature trees within the site and hedgerows around the perimeter of the site should, where feasible, be retained in order to maintain the foraging and shelter resource they provide for a range of species. 6.2 The invasive species Rhododendron (Schedule 9 of the Wildlife and Countryside Act) is present on site, if this needs to be removed it must be disposed of appropriately and not replanted. 6.3 Any lighting proposals for the scheme, including temporary lighting during construction works or security lighting, should avoid directly lighting of any tree canopies which are being retained, specifically around the boundary features. 6.4 The preliminary roost assessment identified building A as having negligible potential to support roosting bats and Building B as having low potential, in accordance with BCT guidance (see Appendix B). Prior to any works being undertaken on Building B, a single nocturnal bat emergence/re-entry survey will be required in order to establish the presence of bats, confirm species and enable an assessment of roost type e.g. maternity, transitional etc. 6.5 There is a single waterbody within 250m and a further two ponds within 500m of the site, all of which are surrounded by suitable terrestrial habitat that may be utilised by amphibians, including GCN, for commuting and foraging. Any development proposals would require further specific amphibian surveys to be undertaken, in order to ascertain whether a GCN mitigation strategy would be required for submission as a part of the development planning permission. 6.6 If trees and hedgerows are removed for development, replacement nesting opportunities will need to be provided within the site to compensate for the loss of existing potential nest sites. A suitable option would be to install nest boxes on retained trees or at suitable positions within the new build. Boxes would need to be sited at appropriate height and aspect, making best use of position in respect of the surrounding vegetation. 6.7 Vegetation clearance should ideally be implemented outside the bird nesting season (avoiding March to August inclusive). If this is not possible, a nesting bird check will need to be carried out by a suitably qualified ecologist immediately prior to the works commencing, to establish that no active bird nests are present. In the event that active nests are discovered, a buffer zone will need to be implemented around the nest, the size of which will be dependent upon the species nesting. The nest will need to be monitored regularly by the ecologist, who will confirm when the nest is no longer active and clearance works can proceed within the buffer zone. Biodiversity enhancement opportunities 6.8 Potential biodiversity enhancement measures which could be implemented on the site include: Installing a selection of bird boxes on the site will enhance nesting opportunities for a range of birds. As house sparrow were noted during Page 13 September 2016 Version 2.0

17 Redsands Nantwich Ecological Assessment the survey, boxes such as the 'Schwegler 1SP sparrow terrace' box could also be installed onto new buildings to encourage this species. Detailed mitigation with regard to bats will be determined on completion of the nocturnal emergence surveys however, enhancement of roosting opportunities could still be provided via the installation of bat boxes around the site. A range of bat boxes could be installed on retained trees or where feasible, within the structure of the new build. Landscaping proposals should consider provision of pockets of wildflower/grassland planting. The new planting mix should include an appropriate native grassland/wildflower seed mix which should enhance the ecological value of the site. Any ornamental/landscape planting should aim to include berry-bearing and nectar rich species can provide a foraging resource for a range of wildlife species including invertebrates, and will also provide a foraging resource for birds and bats Page 14 September 2016 Version 2.0

18 Redsands Nantwich Ecological Assessment References Chartered Institute of Ecology and Environmental Management. Guidelines for Preliminary Ecological Appraisal. (CIEEM Collins, J. Bat Surveys for Professional Ecologists: Good Practice Guidelines, 3rd Edition. Bat Conservation Trust, Committee, Joint Nature Conservation. Handbook for Phase 1 Habitat Surveys - A technique for environmental audit. Peterborough, Page 15 September 2016 Version 2.0

19 Redsands Nantwich Ecological Assessment APPENDIX A: Desktop Study Appendices September 2016 Version 2.0

20 Desk Based Ecology Appendix Desk Based Ecology Assessment Redsands Nantwich Approximate Central Grid Reference: SJ Contents Site location plan Extract from local plan Extracts of relevant planning policies Local site designations Local species records National site designations Habitat inventory records Desk Based Appendix

21 Desk Based Ecology Appendix Site location plan Central Grid Reference: SJ Contains Ordnance Survey data Crown copyright and database right Desk Based Appendix

22 Desk Based Ecology Appendix Extract of xxx Local Plan (adopted xxx) and supporting key Desk Based Appendix

23 Desk Based Ecology Appendix Extracts of relevant planning policies and supplementary planning guidance Desk Based Appendix

24 Desk Based Ecology Appendix Desk Based Appendix

25 Desk Based Ecology Appendix Desk Based Appendix

26 Desk Based Ecology Appendix Desk Based Appendix

27 Desk Based Ecology Appendix Desk Based Appendix

28 Desk Based Ecology Appendix Desk Based Appendix

29 Desk Based Ecology Appendix Desk Based Appendix

30 Desk Based Ecology Appendix Desk Based Appendix

31 Desk Based Ecology Appendix Desk Based Appendix

32 Desk Based Ecology Appendix Site designations provided by RECORD within 1km Desk Based Appendix

33 Desk Based Ecology Appendix Map provided by RECORD of species data within 1km Desk Based Appendix

34 Desk Based Ecology Appendix Desk Based Appendix

35 Desk Based Ecology Appendix Desk Based Appendix

36 Desk Based Ecology Appendix Extract of species data provided by RECORD within 1km Desk Based Appendix

37 Desk Based Ecology Appendix Desk Based Appendix

38 Desk Based Ecology Appendix MAGIC Map 1km search zone for designated wildlife sites - Map Desk Based Appendix

39 Desk Based Ecology Appendix MAGIC Map 1km search zone for designated wildlife sites Report No sites found Desk Based Appendix

40 Desk Based Ecology Appendix MAGIC Map search for SSSI Impact Risk Zones for site only SSSI Impact Risk Zones to assess planning applications for likely impacts on SSSIs/SACs/SPAs & Ramsar sites (England) 1. DOES PLANNING PROPOSAL FALL INTO ONE OR MORE OF THE CATEGORIES BELOW? 2. IF YES, CHECK THE CORRESPONDING DESCRIPTION(S) BELOW. LPA SHOULD CONSULT NATURAL ENGLAND ON LIKELY RISKS FROM THE FOLLOWING: All Planning Applications Infrastructure Airports, helipads and other aviation proposals. Wind & Solar Energy Solar schemes with footprint > 0.5ha, all wind turbines. Minerals, Oil & Gas Oil & gas exploration/extraction. Rural Non Residential Residential Rural Residential Air Pollution Any industrial/agricultural development that could cause AIR POLLUTION (incl: industrial processes, pig & poultry units, slurry lagoons > 750m³ & manure stores > 3500t). Combustion General combustion processes >50MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion. Waste Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill. Composting Discharges Water Supply GUIDANCE How to use the Impact Risk Zones /Metadata_for_magic/SSSI IRZ User Guidance v2.5 MAGIC 10Mar2016.pdf Sites of Special Scientific Interest (England) No Features found Desk Based Appendix

41 Desk Based Ecology Appendix MAGIC Map 1km search zone for habitat inventory data Desk Based Appendix

42 Redsands Nantwich Ecological Assessment APPENDIX B: Technical Bat Report Appendices September 2016 Version 2.0

43 REDSANDS PRELIMINARY BAT ASSESSMENT 1.0 GENERAL DETAILS Site Name Redsands Job Number 5857 Doc. Ref Site Location Nantwich Client Engine of the North Reason for Survey Date(s) 02/08/2016 Bat Assessment of buildings to inform the requirement for further surveys/mitigation and support planning application for future redevelopment of the site. Surveyor(s) Marj Nadouce, WML-A34 -Level 2 Bat licence (Registration number CLS-CLS ). Weather Overcast, some drizzle. Temperature 17 C. Seasonal Constraints No seasonal constraints to daytime internal and external inspection September 2016

44 Preliminary Bat Assessment Methods This preliminary roost inspection was undertaken in accordance with Bat Conservation Trust (BCT): Bat Surveys, Good Practice Guidelines (2016). The buildings were searched externally and internally for any evidence of use by bats, such as: Live or dead bats; Bat droppings; Feeding remains (e.g. stripped moth wings); Urine staining; Fur oil staining. Buildings and surrounding habitat were evaluated for their potential value to roosting bats applying the criteria described in Table 1. Table 1: Bat Potential Building Categories (based on BCT Guidelines 2016) Suitability Negligible Low Roosting Habitats Negligible potential roost features are present that are likely to be used by bats A structure with one or more potential roost features that could be used by individual bats opportunistically, but which do not offer sufficient space, shelter, protection, appropriate conditions and/or suitable surrounding habitat to be used on a regular basis or by larger numbers of bats. Commuting/ Foraging Habitats Negligible features on site likely to be used by commuting or foraging bats. A general lack of linear features and low habitat, structural or floristic diversity. Habitat that could be used by small numbers of commuting bats (e.g. a gappy hedgerow or an unvegetated stream) or foraging bats (e.g. a lone tree or small patch of scrub) but which is isolated from the surrounding countryside. Moderate A structure with one or more potential roost features that could be used by bats due to their size, shelter, protection, conditions and surrounding habitat, but which is unlikely to support a roost of high conservation status Continuous habitat connected to the wider landscape that could be used by bats for commuting (e.g. lines of trees or scrub or linked back gardens), or foraging bats (e.g. trees, scrub, water, grassland) September 2016

45 Preliminary Bat Assessment (maternity or hibernation). High A structure possessing one or more potential roost features that are suitable for use by larger numbers of bats on a regular basis and potentially for longer periods of time, due to their size, shelter, protection, conditions and surrounding habitat. Continuous high quality habitat that is strongly connected with the wider landscape that is likely to be used regularly by commuting bats (e.g. river valley, vegetated stream, woodland edge, hedgerows with trees) or foraging bats (e.g. broadleaved woodland, grazed parkland, tree-lined watercourses or ponds). Written Checked Authorised Initial MN EP MN 2.0 DAYTIME SURVEY RESULTS The buildings assessed were located within the site of the former Redsands secure childrens unit, located within a area immediately south of the A534 to th east of Nantwich. Central site grid reference is SJ Habitats in the immediate surroundings are limited, comprising hardstanding, roads, scattered trees and pasture. The buildings are located within an area of land proposed for future re-development and as such, are required to be subject to an assessment to determine their potential to support roosting bats. All buildings on site were assessed to check for the presence of bats, evidence of bats or any features that may have potential to support roosting bats e.g slipped/missing roof tiles, gaps in masonry/soffits etc. Where possible, all buildings within the site were assessed internally and externally during the survey. Photographic references and descriptions are provided below September 2016

46 Preliminary Bat Assessment Descriptions The buildings within the Redsands site are located over two distinct areas, the first of which is the main former low security facility (Building A). The adjacent building is known as Oak House (Building B) and was the former higher security block, which is fenced on all sides. BUILDING A All areas of Building A are situated immediately adjacent to each other and connected either internally or a via number of smaller single storey corridors, which allow access throughout the buildings. The roof of this building is flat with a small lip overhanging the top edge around the walls to the exterior. This was found to be flush to the brickwork with no potential acess for bats observed. This building is generally in poor condition and internally, leaks within the roof were noted at a number of locations where water damage and damp was evident from the inside. BUILDING B This building is situated to the north east of Building A and is surrounds on all sides by a high security fence. This is a single storey building of modern construction.. A wooden soffit box forms the perimeter of the roof structure where it meets the brickwork. Soffits are in parts, in poor condition with damage and rot evident, leaving large exposed gaps. Internally the building is in deteriorating condition with parts of the ceiling exposed to the outside. A very shallow roof void was noted containing pipework. No bat droppings, staining or other evidence of bat use was identified during the internal or external inspection of any of the buildings September 2016

47 Preliminary Bat Assessment Building ID Description Photograph Building A Mixed two/single storey building with lower levels connected via internal corridors. Assessed internally and externally. No gaps in masonry, spaces around doors/window frames etc were noted. Building is of relatively modern construction and is brick built with a flat roof. In poor condition internally due to vandalism with water damage extensive. No obvious potential access/egress points for bats noted. Internal ceilings are suspended with tiles and a 0.5m (approximate) gap above to base of the roof. No roof voids or other potential access points noted. Negligible potential to support bats. Known as Oak House, this is a single storey brick built building with a central courtyard area. Gently pitched roof and wooden soffits around perimeter of building. Photo 1: External view Building A A number of large gaps to the underside of the soffits were observed. These areas may provide access points for bats. Building B Not in current use in and deteriorating condition with some water damage form areas of the roof which are exposed to the elements. Internally, the roof is of wooden beam construction with a felt lining. Roof void is very shallow and contains insulated pipework. Some internal ceiling tiles missing, exposing outer roof structure and skylights. Other part of the internal roof are lined with pitch pine. Windows of upvc framed construction but currently boarded to the exterior. No obvious gaps or other features noted. Photo 2: Building B- Wooden soffits with gaps Tiled roof is in deteriorating condition with a number of slipped/broken tiles which may provide acees to the underside for bats. Low potential to support bats September 2016

48 Preliminary Bat Assessment 3.2 Survey Limitations Bat droppings are one of the field signs that provide evidence of bat activity, but droppings on external surfaces can be washed or blown away by wet or windy weather. Lack of this type of evidence alone during external surveys is therefore, not conclusive of the absence of bats. 3.3 Additional Observations During the survey a number of birds were observed around the buildings and within the areas of scrub within the grounds of the site. All nesting birds, their nests and eggs are protected under the Wildlife and Countryside Act 1981 (as amended). It is an offence to intentionally or recklessly, damage or destroy nests so all demolition works should be undertaken outside the bird nesting season (March to August inclusive). If this is not possible, a nesting bird check must be undertaken by a suitably qualified ecologist a maximum of 24 hours in advance of any clearance works. If a nest is confirmed, a standoff zone will need to be applied within which no works are undertaken until the ecologist has confirmed that any young have fledged and the nest is no longer in use. 4.0 INTERNAL/EXTERNAL BAT SURVEY RESULTS The daytime bat assessment was undertaken on 2nd August 2016 by licenced bat ecologist Marj Nadouce. Weather conditions during the survey were overcast with light rain and a temperature of 17 o c. Following the completion of the internal/external survey, Building A was identified as having negligible potential to support roosting bats. As such, no further surveys are required on this building prior to any demolition or roof refurbishment works taking place. Building B was identified as having low potential to support bats based on the presence of a small number of features i.e gaps in soffits, missing roof tiles, that could permit access for bats. As such, this building will require a single dusk or dawn emergence survey within the appropriate season, prior to any demolition or roof refurbishment works taking place. If any bats are encountered during works all activities must then cease and a licenced bat ecologist notified. The ecologist will advise the contractors of the necessary measures that are needed, including the requirement for a Natural England licence to enable works to continue. No bats or evidence of use by bats was noted within any of the buildings during the survey. 5.0 SUMMARY No evidence of bats was found during the internal and external inspection of the buildings, with only a small number of features that could provide a low level of potential roosting opportunities for bats, found to be present within Building B. A single further emergence/re-entry survey of this building is thus required prior to any demoltion works taking place. With regard to Building A, should any bats be found during work to this building, all activities will cease and no further work will be permitted until a Natural England licence has been obtained. The ecologist will advise on any necessary actions to be taken by the contractor in this situation. Building A has negligible potential and Building B low potential to support roosting bats (in accordance with the BCT Guidelines 2016) September 2016

49 Redsands Nantwich Ecological Assessment DRAWINGS G Phase 1 Habitat survey Drawings September 2016 Version 2.0

50 KEY Survey Boundary ( RP Rhododendron Ponticum EScattered Scrub Scattered Broad-leaved Trees Species-poor Intact Hedge Fence Plantation Coniferous Woodland Dense/Continuous Scrub Broad-leaved Parkland/ Scattered Trees MG M A G Species-poor Modified Neutral Grassland Tall Ruderal A Amenity Grassland E E E ( RP ( RP A A D D D D D D D D Hardstanding witheephemeral/short D D D DPerennial Introduced Shrub Buildings Hardstanding E E E E Reproduced by permission of Ordnance Survey on behalf of Her Majesty's Stationery Office. Contains OS data Crown Copyright and database right All rights reserved. Base mapping provided by client E Site Map 1:900 Rev Description Drawn Approved Date Genesis Centre, Birchwood Science Park, Warrington WA3 7BH Tel tep@tep.uk.com Project Cheshire East 5 Sites Title Phase 1 Habitat Survey - Redsands Metres Drawing Number G Drawn Checked Approved Scale Date Sheet 5 of 5 RE JS/EP MW A3 05/09/2016

51 HEAD OFFICE MARKET HARBOROUGH GATESHEAD LONDON CORNWALL Genesis Centre, Birchwood Science Park, Warrington WA3 7BH Harborough Innovation Centre, Airfield Business Park, Leicester Road, Market Harborough Leicestershire LE16 7WB Office 26, Gateshead International Business Centre, Mulgrave Terrace, Gateshead NE8 1AN 8 Trinity Street, London, SE1 1DB 4 Park Noweth, Churchtown, Cury, Helston Cornwall TR12 7BW Tel: Tel: Tel: Tel: Tel: tep@tep.uk.com mh@tep.uk.com gateshead@tep.uk.com london@tep.uk.com cornwall@tep.uk.com

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey

Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey Tandridge Local Plan Assessing the Ecological Suitability of 183 sites considered for development Tandridge District Council, Surrey PLANNING I DESIGN I ENVIRONMENT 1.0 INTRODUCTION TEP conducted Site

More information

Wingerworth, Chesterfield. February Surveyor: James Porter

Wingerworth, Chesterfield. February Surveyor: James Porter Report Wingerworth, Chesterfield February 2014 Surveyor: James Porter (Natural England Licence Number: CLS00241 Contents Contents Notice to readers 1.0 Introduction Background Information Site Description

More information

Land at Whiteditch Lane, Newport, Essex

Land at Whiteditch Lane, Newport, Essex Land at Whiteditch Lane, Newport, Essex Ecology Report Produced for Sworders Agricultural By March 2013 Document Control: Version Date Version Details Prepared by Checked by Approved by 0.1 01.03.2013

More information

Preliminary Ecological Appraisal

Preliminary Ecological Appraisal Preliminary Ecological Appraisal Seminar Outline What is Preliminary Ecological Appraisal (PEA)? What are the main objectives of PEA? Methods of PEA Wildlife legislation and planning policy Examples of

More information

Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire. Hazel Dormouse Surveys

Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire. Hazel Dormouse Surveys Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire A report to: Terra Strategic BSL Strategic Ltd. 2 The Courtyard 707 Warwick Road Solihull B91 3DA By: Udall-Martin Associates

More information

Land at Porch Farm, Kingsclere Ecology Briefing Paper, April 2016 C_EDP3343_01a

Land at Porch Farm, Kingsclere Ecology Briefing Paper, April 2016 C_EDP3343_01a C_EDP3343_01a Introduction 1.1 This Ecology Briefing Paper has been prepared by The Environmental Dimension Partnership Ltd (EDP) on behalf of Linden Homes. This briefing paper considers the ecological

More information

CLACKMANNANSHIRE COUNCIL STIRLING - ALLOA - KINCARDINE RAILWAY (ROUTE RE- OPENING) AND LINKED IMPROVEMENTS (SCOTLAND) BILL

CLACKMANNANSHIRE COUNCIL STIRLING - ALLOA - KINCARDINE RAILWAY (ROUTE RE- OPENING) AND LINKED IMPROVEMENTS (SCOTLAND) BILL CLACKMANNANSHIRE COUNCIL STIRLING - ALLOA - KINCARDINE RAILWAY (ROUTE RE- OPENING) AND LINKED IMPROVEMENTS (SCOTLAND) BILL GREAT CRESTED NEWT SURVEY REPORT JUNE 2003 Scott Wilson (Scotland) Ltd Contact:

More information

ECOLOGICAL ADVICE SERVICE

ECOLOGICAL ADVICE SERVICE ECOLOGICAL ADVICE SERVICE TO: FROM: Guy Wilson Marie Thibault DATE: 11 th August 2016 SUBJECT: CA/16/01502/FUL / Land adjoining Goose Farm, Canterbury Thank you for requesting advice on this application

More information

The TEP Landscape. Landscape Employers Event, University of Sheffield 7 th March 2018 PLANNING I DESIGN I ENVIRONMENT

The TEP Landscape. Landscape Employers Event, University of Sheffield 7 th March 2018 PLANNING I DESIGN I ENVIRONMENT The TEP Landscape Landscape Employers Event, University of Sheffield 7 th March 2018 PLANNING I DESIGN I ENVIRONMENT INTRODUCTION TO TEP Established in 1997, from a base in Warrington. Partnership formed

More information

Appendix C.1 Legislation and Policy Guidance

Appendix C.1 Legislation and Policy Guidance Appendix C.1 Legislation and Policy Guidance Conservation of Habitats and Species Regulations 2010 The Conservation of Habitats and Species Regulations 2010 (SI No. 2010/490) update and supersede The Conservation

More information

Basic Habitat Survey Tabernacle Gardens, Pembroke

Basic Habitat Survey Tabernacle Gardens, Pembroke Basic Habitat Survey Tabernacle Gardens, Pembroke Produced by The Wildlife Trust of South and West Wales Contact Ecologist: Position: Nathan Walton Wildlife Trust Officer Registered Office: Wildlife Trust

More information

OVERVIEW OF PLANNING POLICY AND PROCEDURE RELATING TO BIODIVERSITY IN ENGLAND

OVERVIEW OF PLANNING POLICY AND PROCEDURE RELATING TO BIODIVERSITY IN ENGLAND OVERVIEW OF PLANNING POLICY AND PROCEDURE RELATING TO BIODIVERSITY IN ENGLAND Disclaimer: This document is a guide to legislation and procedure relating to biodiversity in England. It is offered to readers

More information

Planning Application 13/00952/FULLS at Ampfield Hill, Romsey, Test Valley: Great Crested Newt Survey Following on From Ecological Assessment

Planning Application 13/00952/FULLS at Ampfield Hill, Romsey, Test Valley: Great Crested Newt Survey Following on From Ecological Assessment 10 June 2014 Mr Allan Clark esq Ampfield Parish Council Blue Haze Ampfield Hill Ampfield Romsey SO51 9BD By email only Our Ref: P13/46 Dear Mr Clark Planning Application 13/00952/FULLS at Ampfield Hill,

More information

DEACON LANDSCAPES, WOOTON, KENT ECOLOGY DORMOUSE SURVEY ISSUE 1 NOVEMBER 2015

DEACON LANDSCAPES, WOOTON, KENT ECOLOGY DORMOUSE SURVEY ISSUE 1 NOVEMBER 2015 DEACON LANDSCAPES, WOOTON, KENT ECOLOGY DORMOUSE SURVEY ISSUE 1 NOVEMBER 2015 Landscape Architects Ecology & Environment Masterplanning Arboriculture Historic Landscapes ISSUE NO. AUTHOR CHECKED BY DATE

More information

Dormouse Method Statement

Dormouse Method Statement , Northamptonshire A Report on behalf of April 2013 CONTENTS 1.0 Introduction 1.1 Purpose of this Method Statement 1.2 Site Background 1.3 Dormouse Ecology & Legal Protection 2.0 Methodology 2.1 Tool Box

More information

ECOLOGY DUE DILIGENCE REPORT

ECOLOGY DUE DILIGENCE REPORT ECOLOGY DUE DILIGENCE REPORT Saunderton Data Centre GP Limited, Haw Lane, Saunderton November 2010 Our Ref: JSL1776-R-003 RPS Lakesbury House Hiltingbury Road Chandlers Ford Hampshire SO53 5SS Tel: 0238

More information

Padgbury Lane North, Congleton. Great Crested Newt Mitigation Strategy

Padgbury Lane North, Congleton. Great Crested Newt Mitigation Strategy Padgbury Lane North, Congleton Great Crested Newt Mitigation Strategy February 2014 FPCR Environment and Design Ltd Registered Office: Lockington Hall, Lockington, Derby DE74 2RH Company No. 07128076.

More information

LILAC Housing: Site Management Plan

LILAC Housing: Site Management Plan LILAC Housing: Site Management Plan Prepared by: Joe Atkinson. Date: 30/10/2011 Version 1.0 Relevant Legislation & Policy Conservation Regulations 1994, 2007, 2009, 2010 Wildlife & Countryside Act 1981;

More information

EXTENDED PHASE ONE HABITAT SURVEY. Mid Wales Golf Centre Caersws Powys. Grid reference: SO

EXTENDED PHASE ONE HABITAT SURVEY. Mid Wales Golf Centre Caersws Powys. Grid reference: SO Arbor Vitae Environment 1 EXTENDED PHASE ONE HABITAT SURVEY Mid Wales Golf Centre Caersws Powys Grid reference: SO04139044 Arbor Vitae Environment 2 CONTENTS Executive summary 3 1 Introduction 1.1 Background

More information

Policy DM19: Development and Nature Conservation

Policy DM19: Development and Nature Conservation Avonmouth Wetland Habitat Project October 2010 and December 2011 (the Cresswell study). Policy Links Bristol Local Plan Core Strategy Lead Policy BCS4: Avonmouth and Bristol Port BCS9: Green Infrastructure

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Land near Chaffeymoor Farm Chaffeymoor Hill, Bourton, Dorset, SP8 5BY. Nearest postcode to land: SP8 5BU Grid reference: ST

Land near Chaffeymoor Farm Chaffeymoor Hill, Bourton, Dorset, SP8 5BY. Nearest postcode to land: SP8 5BU Grid reference: ST Land near Chaffeymoor Farm Chaffeymoor Hill, Bourton, Dorset, SP8 5BY. Nearest postcode to land: SP8 5BU Grid reference: ST 76648 30201 ECOLOGICAL IMPACT ASSESSMENT EcIA October 2015 1 CONTENTS 1. Survey

More information

HRA PLANNING Chartered Town Planning and Environmental Consultants

HRA PLANNING Chartered Town Planning and Environmental Consultants HRA PLANNING Chartered Town Planning and Environmental Consultants Screening Statement for the Purposes of Determining the need for Appropriate Assessment Proposed development of 74 no. residential units

More information

Non-technical summary

Non-technical summary Non-technical summary Introduction NTS.1 is applying for outline planning permission for a residential development of up to 80 dwellings on land at Hambrook, on the northern fringe of Bristol. NTS.2 An

More information

Devon hedges: Devon Hedges: There are numerous rules and pieces of. the law and other protection. The Law and Other Protection

Devon hedges: Devon Hedges: There are numerous rules and pieces of. the law and other protection. The Law and Other Protection Devon hedges: the law and other protection There are numerous rules and pieces of legislation that affect hedges, with the overall aim of protecting this habitat and its wildlife. This section summarises

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

Padgbury Lane South, Congleton. Great Crested Newt Mitigation Strategy

Padgbury Lane South, Congleton. Great Crested Newt Mitigation Strategy Padgbury Lane South, Congleton Great Crested Newt Mitigation Strategy February 2014 FPCR Environment and Design Ltd Registered Office: Lockington Hall, Lockington, Derby DE74 2RH Company No. 07128076.

More information

Ward: Fishbourne. Bethwines Farm Blackboy Lane Fishbourne Chichester West Sussex PO18 8B

Ward: Fishbourne. Bethwines Farm Blackboy Lane Fishbourne Chichester West Sussex PO18 8B Parish: Fishbourne Ward: Fishbourne FB/16/00961/FUL Proposal New pitched roof to the bunker building. Site Bethwines Farm Blackboy Lane Fishbourne Chichester West Sussex PO18 8B Map Ref (E) 483188 (N)

More information

Survey of proposed new access track, construction traffic and ALV passing places for Reeves Hill wind farm, Knighton, Powys

Survey of proposed new access track, construction traffic and ALV passing places for Reeves Hill wind farm, Knighton, Powys Survey of proposed new access track, construction traffic and ALV passing places for Reeves Hill wind farm, Knighton, Powys Phase I walkover with Great Crested Newt habitat assessment and mitigation details

More information

WALTON ROAD QUARRY, HARTLEBURY, WORCESTERSHIRE

WALTON ROAD QUARRY, HARTLEBURY, WORCESTERSHIRE WALTON ROAD QUARRY, HARTLEBURY, WORCESTERSHIRE Biodiversity Enhancement Report to Wienerberger Ltd Project Ref: 2017/130 v1 Worcestershire Wildlife Consultancy Lower Smite Farm Smite Hill Hindlip Worcester

More information

Criteria for the Selection of SINCs in the Mid-Valleys Area

Criteria for the Selection of SINCs in the Mid-Valleys Area Criteria for the Selection of Sites of Importance for Nature Conservation in the County Boroughs of Blaenau Gwent, Caerphilly, Merthyr Tydfil and Rhondda Cynon Taff (the Mid-Valleys Area ) Prepared by

More information

15.0 ECOLOGY AND NATURE CONSERVATION

15.0 ECOLOGY AND NATURE CONSERVATION 15.0 ECOLOGY AND NATURE CONSERVATION Introduction 15.1 This chapter of the ES assesses the likely significant effects of the Overall Development in terms of and is supported by Appendices 15.1 to 15.9.

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT Land to the South East of the A495, Bronington Erection of 31 Dwellings (27 dwellings and 4 bungalows including 4 Affordable Dwellings), Realignment and Improvements to A495 (including

More information

Galloper Wind Farm Limited

Galloper Wind Farm Limited Galloper Wind Farm Eastern Super Grid Transformer Project Environmental Statement Chapter 2 Site Description and Land Use Document Reference GWF/2/2/214 Galloper Wind Farm Limited CONTENTS Page 2 SITE

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

BRUNEL UNIVERSITY. Brunel University Biodiversity Action Plan

BRUNEL UNIVERSITY. Brunel University Biodiversity Action Plan BRUNEL UNIVERSITY Brunel University Biodiversity Action Plan July 2011 Brunel University Biodiversity Action Plan Introduction. In 1994 the Government at that time published the UK Biodiversity Action

More information

Error! Bookmark not defined.

Error! Bookmark not defined. CONTENTS Placement Intended Outcome... 1 Placement Aims... 1 Methodology... 2 Results... 3 Findings... Error! Bookmark not defined. Suggestions for Biodiversity interpretation on campus... 4 Put forward

More information

Balcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report

Balcombe Neighbourhood Plan. Habitats Regulations Assessment Screening Report Balcombe Neighbourhood Plan Habitats Regulations Assessment Screening Report Produced for Regulation 14 of the Neighbourhood Planning (General) Regulations 2012 17 th July 2015 1.0 Introduction 1.1 This

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

M4 Corridor around Newport Environmental Statement Volume 3: Appendices

M4 Corridor around Newport Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices At Issue March 2016 CVJV/AAR 3 rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Volume 3: Contents 1

More information

17 NOVEMBER 2015 PLANNING COMMITTEE. on Cttee Day: 73/73. Land To The Rear Of Brook Farm Rickford Worplesdon, Bagshot Road, Woking, Surrey

17 NOVEMBER 2015 PLANNING COMMITTEE. on Cttee Day: 73/73. Land To The Rear Of Brook Farm Rickford Worplesdon, Bagshot Road, Woking, Surrey 5l 14/0218 Reg d: 27.06.14 Expires:20.11.15 Ward: BR Nei. 17.07.14 BVPI Con. Target: 18 Exp: Number of Weeks On Target? on Cttee Day: 73/73 Y LOCATION: PROPOSAL: TYPE: Land To The Rear Of Brook Farm Rickford

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

Biodiversity Statement. Land at Londoneast-uk Business & Technical Park Presented to NTT Communications Corporation

Biodiversity Statement. Land at Londoneast-uk Business & Technical Park Presented to NTT Communications Corporation Delta-Simons Project Number 17-1150.01 Biodiversity Statement Presented to NTT Communications Corporation Issued: January 2018 Delta-Simons Project No. 17-1150.01 Delta-Simons Project Number 17-1150.01

More information

Planning, Taxi Licensing and Rights of Way Committee Report. Application No: P/2018/0103 Grid Ref:

Planning, Taxi Licensing and Rights of Way Committee Report. Application No: P/2018/0103 Grid Ref: Planning, Taxi Licensing and Rights of Way Committee Report Application No: P/2018/0103 Grid Ref: 291873.94 251225.81 Community Council: Treflys Valid Date: 25/01/2018 Officer: Thomas Goodman Applicant:

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

A16 Ecology: Application 2 - LBHF

A16 Ecology: Application 2 - LBHF A16 Ecology: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A16.1 This Chapter of the Addendum to the June 2011 Environmental Statement (ES) (hereafter

More information

Habitat Regulations Assessment (HRA) Screening Determination. May 2017

Habitat Regulations Assessment (HRA) Screening Determination. May 2017 Cholsey Parish Council Cholsey Neighbourhood Plan Habitat Regulations Assessment (HRA) Screening Determination May 2017 Cholsey Neighbourhood Plan Page! 1 of! 10 SASR - HRA v1.1 Page Left Intentionally

More information

NORTH WEST Biodiversity Strategy Condition 34 December 2012

NORTH WEST Biodiversity Strategy Condition 34 December 2012 NORTH WEST Condition 34 December 2012 North West Cambridge Report ref: C030/R1/v4 Date: 10 th December 2012 This report has been prepared on behalf of: University of Cambridge By: Mike Dean MD Ecology

More information

Applicant: Mr C Fletcher Agent: Ms B Stala Case Officer: Sally Smith (HBC) Jill Lee (WCC) Ward: Stakes Parish Southwick and Widley

Applicant: Mr C Fletcher Agent: Ms B Stala Case Officer: Sally Smith (HBC) Jill Lee (WCC) Ward: Stakes Parish Southwick and Widley Site Address: Berewood Phase 2 Development Site, London Road, Purbrook, Waterlooville Proposal: Reserved Matters Application for landscaping of Phase A of the Town Park (under Condition 6(i)d)), together

More information

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot PART A Report of: DEVELOPMENT MANAGEMENT SECTION HEAD Date of Committee: 26 th June 2014 Site address: Rounton, 28, Nascot Wood Road Reference Number: 14/00497/REM Description of Development: Reserved

More information

Neighbourhood Planning Guidance Local Green Spaces

Neighbourhood Planning Guidance Local Green Spaces Neighbourhood Planning Guidance Local Green Spaces Introduction This guidance note has been produced for communities preparing neighbourhood plans in North Dorset to help them to identify, assess and designate

More information

Legend. Pennsylvania Fields, Sedbury. River Wye. Aust Cliff. Severn Estuary. Cattybrook Brickpit Three Brooks. Severn Estuary

Legend. Pennsylvania Fields, Sedbury. River Wye. Aust Cliff. Severn Estuary. Cattybrook Brickpit Three Brooks. Severn Estuary Pennsylvania Fields, Sedbury River Wye Legend Other DCO Land Cooling Water Pipeline Corridor Electrical Connection & Utilities Corridor 10km buffer of Ramsar Severn Estuary Aust Cliff Local Nature Reserve

More information

Ecological Impact Assessment

Ecological Impact Assessment Ecological Impact Assessment P/2016/01107 Received 09/08/2016 Ecological Impact Assessment Standby Diesel Scheme New Farm, Tutbury, Staffordshire Principal Author: James Towers Date: July 2016 Address:

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Preliminary Ecological Appraisal Land off Dishforth Road, Sharow

Preliminary Ecological Appraisal Land off Dishforth Road, Sharow Preliminary Ecological Appraisal Land off Dishforth Road, Sharow Report reference: R-3017-01 Report Title: Preliminary Ecological Appraisal Land off Dishforth Road, Sharow Report Reference: R-3017-01 Written

More information

Proof of evidence on Dormice

Proof of evidence on Dormice ELECTRICITY ACT 1989 (Sections 36, 37, 62(3) & Schedule 8) TOWN AND COUNTRY PLANNING ACT 1990 (Section 90) and THE ELECTRICITY GENERATING STATIONS AND OVERHEAD LINES (INQUIRIES PROCEDURE (ENGLAND AND WALES))

More information

Hartest river corridor survey

Hartest river corridor survey Hartest river corridor survey Project no. Report Date 56/15 Final 21st September 2015 Prepared by Penny Hemphill BSc. Hons Checked by Simone Bullion BSc. Hons, PhD., MCIEEM SWT Trading Ltd Suffolk Wildlife

More information

UTT/16/1466/DFO GREAT DUNMOW MAJOR

UTT/16/1466/DFO GREAT DUNMOW MAJOR UTT/16/1466/DFO GREAT DUNMOW MAJOR PROPOSAL: LOCATION: APPLICANT: AGENT: Reserved matters approval for the accesses to the site and principal roads within the site including spine road following outline

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

Burrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006

Burrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006 Burrowing Owl Habitat Project at the Albany Plateau (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006 Submitted by The City of Berkeley Project history During

More information

LearnEcology Training

LearnEcology Training edna Environment LearnEcology Training EcIA GCN Dormouse Development QGIS Conservation Advanced CPD Ecological Assessment Report Writing BS2020 Intermediate Opportunities Bats Skills Networking Mitigation

More information

Bishopgarth Complex, Westfield

Bishopgarth Complex, Westfield West Yorkshire Police Estates Bishopgarth Complex, Westfield JULY 2014 RSK GENERAL NOTES Project No.: 660469 Title: Bishopgarth Complex, Wakefield Client: West Yorkshire Police Estates Date: July 2014

More information

Statutory and Non-Statutory Designated Sites and Ecology

Statutory and Non-Statutory Designated Sites and Ecology Statutory and Non-Statutory Designated Sites and Ecology The National Planning Policy Framework considers the conservation and enhancement of the natural environment in chapter 11 paragraphs 109-119, where

More information

Coldra Woods Hotel by Celtic Manor and Starbucks Drive Thru Restaurant. Ecological Assessment

Coldra Woods Hotel by Celtic Manor and Starbucks Drive Thru Restaurant. Ecological Assessment Coldra Woods Hotel by Celtic Manor and Starbucks Drive Thru Restaurant Broadhall (Coldra Woods) Ltd; Coldra Manor Resort and Idris Davies Ltd. Tel: 01225 783674 Email: shughes@environgauge.com St. John

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire

Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire Great Crested Newt Presence/Absence Survey and Population Size Class Estimate Survey A report to: Terra Strategic BSL Strategic

More information

HUNGERFORD SOLAR FARM

HUNGERFORD SOLAR FARM HUNGERFORD SOLAR FARM Key Facts The site comprises approximately 26 acres/10.6 hectares of Grade 3 and 4 agricultural land, currently in arable use. It will have a generation capacity of approximately

More information

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

`Code 2 - Accepted with comments

`Code 2 - Accepted with comments AE For Continuation Refer To CT-- A AE AE AE Realigned airfield Stopped Up AE Electricity substation Land drainage area Ecological mitigation pond Balancing pond South District Replacement floodplain storage

More information

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request TAYSIDE & CLACKMANNANSHIRE Tel: 01738 458582(direct line) Fax: 01738 458616 e-mail addresses: denise.reed@snh.gov.uk Niall Urquhart Team Leader Sustainability Clackmannanshire Council Kilncraigs Greenside

More information

Guidance for Developers on the Management of Biodiversity issues in the Planning Process

Guidance for Developers on the Management of Biodiversity issues in the Planning Process Biodiversity and the Planning Process Guidance for Developers on the Management of Biodiversity issues in the Planning Process 1.0 March 2017 Table of Contents: Page What is biodiversity and why is it

More information

Land East of Cromwell Lane

Land East of Cromwell Lane Land East of Cromwell Lane VISION DOCUMENT AUGUST 2016 The proposals for Land East of Cromwell Lane will be defined by existing landscape features, ensuring that the development offers a quality place

More information

Committee Date: 19/03/2015 Application Number: 2014/06414/PA Accepted: 06/01/2015 Application Type: Full Planning Target Date: 03/03/2015

Committee Date: 19/03/2015 Application Number: 2014/06414/PA Accepted: 06/01/2015 Application Type: Full Planning Target Date: 03/03/2015 Committee Date: 19/03/2015 Application Number: 2014/06414/PA Accepted: 06/01/2015 Application Type: Full Planning Target Date: 03/03/2015 Ward: Sparkbrook 41 White Road, Sparkbrook, Birmingham, B11 1EH

More information

STATEMENT OF COMMON GROUND (CD/H01) LAND ADJ A385 TOTNES ROAD COLLATON ST MARY APPEAL REFERENCE: APP/X1165/A/14/

STATEMENT OF COMMON GROUND (CD/H01) LAND ADJ A385 TOTNES ROAD COLLATON ST MARY APPEAL REFERENCE: APP/X1165/A/14/ STATEMENT OF COMMON GROUND (CD/H01) LAND ADJ A385 TOTNES ROAD COLLATON ST MARY APPEAL REFERENCE: APP/X1165/A/14/2214154 APPEAL BY TAYLOR WIMPEY (EXETER) LIMITED LOCAL PLANNING AUTHORITY TORBAY COUNCIL

More information

10 Ecology and Nature Conservation

10 Ecology and Nature Conservation 10 Ecology and Nature Conservation 10.1 Scope of the assessments 10.1.1 The assessments in relation to ecology and nature conservation have been focused on sites designated for their ecological / nature

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

Assessing the impact of smallscale wind energy proposals on the natural heritage

Assessing the impact of smallscale wind energy proposals on the natural heritage Scottish Natural Heritage Assessing the impact of smallscale wind energy proposals on the natural heritage Guidance March 2016 Version 3 1 Contents 1. Introduction. 3 2. Encouraging a spatial approach

More information

Pill Pond Local Area Brief

Pill Pond Local Area Brief May 2013 Contents Introduction 1 Background 2 Role and Purpose 4 Document Structure 4 Planning Conditions 15 and 18 4 Design Evolution 6 Design Guidance 9 1.0 Vision 10 2.0 Concept 12 3.0 Ecology 14 4.0

More information

Wild about Bolnore. Welcome to Bolnore Village, situated in the beautiful West Sussex countryside. ResIDENTS INFORMATION GUIDE

Wild about Bolnore. Welcome to Bolnore Village, situated in the beautiful West Sussex countryside. ResIDENTS INFORMATION GUIDE Wild about Bolnore Welcome to Bolnore Village, situated in the beautiful West Sussex countryside. Sustainability has been a key factor in the development of the village and considerable effort has been

More information

Calvert Energy from Waste Plant Calvert Landfill, Buckinghamshire Technical Appendix 11/2 Great Crested Newt Survey Report Waste Recycling Group

Calvert Energy from Waste Plant Calvert Landfill, Buckinghamshire Technical Appendix 11/2 Great Crested Newt Survey Report Waste Recycling Group Calvert Energy from Waste Plant Calvert Landfill, Buckinghamshire Technical Appendix 11/2 Great Crested Newt Survey Report Waste Recycling Group February 2009 Ref: 411-0197-00628 WRG i 411.0197.00628 CONTENTS

More information

LAND NORTH OF STAFFORD

LAND NORTH OF STAFFORD REPORT N O 62000589-ESVOL3 LAND NORTH OF STAFFORD ENVIRONMENTAL STATEMENT VOLUME 3: NON-TECHNICAL SUMMARY JULY 2016 LAND NORTH OF STAFFORD ENVIRONMENTAL STATEMENT VOLUME 3: NON-TECHNICAL SUMMARY Akzo Nobel

More information

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) PROPOSAL: LOCATION: APPLICANT: Amendments to the design of a scheme for a 49.99MW battery

More information

Ward: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works.

Ward: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works. Parish: Southbourne Ward: Southbourne SB/16/00205/OUT Proposal Site Outline application with all matters reserved. Erection of 5 no. dwellings and associated works. Dunkirk South Lane Southbourne Emsworth

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

National Character Area 70 Melbourne Parklands

National Character Area 70 Melbourne Parklands Summary The are a landscape of rolling farmland, parkland and woodland on the northern flanks of the ridge between Burton upon Trent and Swadlincote. The land slopes down to the River Trent, which borders

More information

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT PENRHYN QUARRY BETHESDA GWYNEDD Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT September 2010 PENRHYN QUARRY, BETHESDA, GWYNEDD Proposed development of an Inert Waste Recycling Facility

More information

Application No: Location: Coopers Beach Caravan Park, Church Lane, East Mersea, CO5 8TN. Scale (approx): 1:5000

Application No: Location: Coopers Beach Caravan Park, Church Lane, East Mersea, CO5 8TN. Scale (approx): 1:5000 Application No: 146075 Location: Coopers Beach Caravan Park, Church Lane, East Mersea, CO5 8TN Scale (approx): 1:5000 The Ordnance Survey map data included within this publication is provided by Colchester

More information

East Harptree Landscape & Character Assessment

East Harptree Landscape & Character Assessment East Harptree Landscape & Character Assessment Produced by East Harptree Parish Council in consultation with local residents September 2014 Contents The Parish of East Harptree: Objective Introduction

More information

NORTH WEST SECTOR HORLEY, SURREY

NORTH WEST SECTOR HORLEY, SURREY Welcome to our Exhibition We are delighted to present our plans for the first phase of the North-West Sector Horley development. We are holding this exhibition to give you the chance to view and comment

More information

Potential sources of guidance for EIA opinions and consents for Glastir Woodland Creation schemes

Potential sources of guidance for EIA opinions and consents for Glastir Woodland Creation schemes EIA guidance Potential sources of guidance for EIA s and consents for Glastir Woodland Creation schemes Every Glastir Woodland Creation plan requires an Environment Impact Assessment (EIA) to assess whether

More information

Land at Weather Oaks, Harborne, Birmingham, B17 9DD. Erection of 11 new dwellings and associated infrastructure, parking and landscaping

Land at Weather Oaks, Harborne, Birmingham, B17 9DD. Erection of 11 new dwellings and associated infrastructure, parking and landscaping Committee Date: 23/07/2015 Application Number: 2015/03396/PA Accepted: 29/04/2015 Application Type: Full Planning Target Date: 29/07/2015 Ward: Harborne Land at Weather Oaks, Harborne, Birmingham, B17

More information

Appendix 1

Appendix 1 Appendix 1 Appendix 2 PLANNING COMMITTEE 31 March 2015 APPLICATION NUMBER : CA//14/02087/FUL PROPOSAL : Redevelopment of site to provide two detached dwellings with detached garages, shared access

More information

St Michaels C of E Junior & Infant School, Nantmel Grove, Bartley Green, Birmingham, B32 3JS

St Michaels C of E Junior & Infant School, Nantmel Grove, Bartley Green, Birmingham, B32 3JS Committee Date: 06/03/2014 Application Number: 2013/08595/PA Accepted: 19/11/2013 Application Type: Full Planning Target Date: 14/01/2014 Ward: Bartley Green St Michaels C of E Junior & Infant School,

More information

Report reference: LT/WTE/LZH/1655/01/SCOPING June 2015

Report reference: LT/WTE/LZH/1655/01/SCOPING June 2015 PROPOSALS FOR THE SCOPE AND CONTENT OF AN APPLICATION FOR PLANNING PERMISSION AND AN ENVIRONMENTAL STATEMENT FOR THE EXTRACTION OF LIMESTONE FROM EXTENSION AREAS AT WHITWELL QUARRY, DERBYSHIRE Report reference:

More information

Approaching best practice: Improving project level certainty

Approaching best practice: Improving project level certainty Approaching best practice: Improving project level certainty Liz Halliwell Mammal Ecologist Jane Garner Species Team Leader (S) Formed in 2013 CCW, FCW, EAW Advisor, regulator, statutory consultee, responder,

More information