pun Concept Stage Plan

Size: px
Start display at page:

Download "pun Concept Stage Plan"

Transcription

1 STAFF REPORT TO THE PLANNING COMMISSION August 10, 2015 The Village at Arbor Lakes pun Concept Stage Plan Applicant: Owner: Requested Action: Location: Zoning: Doran MG Partners, LLC Kelly Doran 7803 Glenroy Rd #200 Bloomington, MN Same PUD Concept Stage Plan for the purpose of developing property into multiple uses including high density residential, hotel, office, medical and retail/service uses. Elm Creek Blvd / Hemlock Lane R-A, Single Family Agricultural Adjacent Land Use and Zoning: North: Medium Density Residential; PUD, Planned Unit Development East: Medium Density Residential and Regional Mixed Use - Non-Retail Focus; R-A, Single Family Agricultural South: Regional Mixed Use; PUD, Planned Unit Development West: Regional Mixed Use and High Density Residential and Medium Density Residential; PUD, Planned Unit Development Application Received: June 12, Day Review Deadline: August 11,2015 Additional 60 Day Review Deadline: October 10, 2015 STAFF COMMENTS: The applicant is requesting PUD Concept Stage Plan approval for a mixed-use development at the northeast corner of Hemlock Lane and Elm Creek Blvd. The proposal calls for apartments, hotels, restaurants, a grocery store, pharmacy, a variety of small retail and the potential for medical office, office, and/or senior units. The Gravel Mining Area Special Area Plan (GMA Plan) guides this property as High Density Residential on the north side and Regional Mixed Use-Non Retail Focus on the south side. A Neighborhood Commercial Node is also shown at the intersection of Hemlock Lane North and Arbor Lakes Parkway. An extension of Arbor Lakes Parkway is anticipated in the GMA Plan to G:ICASESI20 ISIThe Village at Arbor LakeslStaff ReportslPC ReportslThe Village at Arbor Lakes PUD Concept IS.docx

2 Staff Report to the Planning Commission The Village of Arbor Lakes PUD Concept Stage Plan August 10,2015 Page 2 bisect the property. Applicant's Proposal General Design Discussion: Staff notes that the loose leaf plan should be used for this review rather than the plans inside the booklet provided by the applicant. The applicant is proposing High Density Residential on the north side of the development, a mix of uses with some retail, but a fairly low percentage (19.7%) on the south side and an extension or Arbor Lakes Parkway between the two parts. A roundabout on Arbor Lakes Parkway provides access to a central north and south spine that serves the two parts of the project. Arbor Lakes Parkway is shown to be constructed up to the roundabout with ROW dedicated for a future extension when development occurs to the east. Decorative arbors are shown around the roundabout. A private drive that extends from a proposed full movement intersection at Hemlock Lane North and travels across the site before linking up with the intersection of Fountains Drive and Elm Creek Boulvard provides additional access to the south portion. Private drives with additional. right-inlright-out accesses provide traffic circulation in the interiors of the two portions. A right-in only is proposed along Elm Creek Boulevard to provide further access into the southern portion of the site. We note that because of the short timeframe in which we had to review the updated concept plan that Hennepin County has not had a chance to review this new plan (Elm Creek Blvd being a county road and Hemlock Lane being a future county road.) We have added a condition of approval that any approval is subject to future comments from Hennepin County. We will discuss more specifics with the numbers below but in general they appear to be in conformance with the GMA Plan. The corner of Elm Creek Boulevard and Hemlock Lane shows a decorative monument that will complement the other three corners. Staff Comments: 1. In general the plan appears to be consistent with the GMA Plan for the High Density Residential, Regional Mixed Use-Non Retail Focus and the Neighborhood Commercial Node. G:\CASES\20 IS\The Village at Arbor Lakes\Staff Reports\PC Reports\The Village at Arbor Lakes PUD Concept 8-1 O-IS.docx

3 Staff Report to the Planning Commission The Village of Arbor Lakes PUD Concept Stage Plan August 10,2015 Page 3 2. Specifics on necessary turn lanes and ROW width will come as part of a full traffic study that can come at a later date. It is likely that Arbor Lakes Parkway east of the roundabout will need more ROW. 3. The general plan of extending Arbor Lakes Parkway to the roundabout with any Development Stage is acceptable with a future extension occurring at a later date when development to the east occurs. 4. Staffhas strong concerns about a full movement intersection on Hemlock Lane between Arbor Lakes Parkway and Elm Creek Boulevard. A full movement, uncontrolled intersection would not meet access spacing standards, and staff's initial analysis is that this would create a very unsafe intersection with little benefit to the area. At this point we do not recommend approval of a full movement intersection at this location and note that any approval of this plan does not imply approval of a full movement intersection at this location. 5. Engineering staff will review the proposed private drive extending north from the intersection of Fountains Drive and Elm Creek Boulevard and if this is acceptable or ifit should be a public ROW. Regardless of its final status, access to the parcel to the east must be provided from this roadway. 6. Future comments from Hennepin County will need to be taken into account. North Side Proposal and Discussion: The applicant is proposing between apartment units on the 17.8 acres on the north side of the development. The Concept Plan shows 5 apartment buildings and a central two-story clubhouse at the center of the site. A notable feature is that the applicant is proposing that this be a gated community, with a staffed guard house at the main entrance. An additional gated entrance is proposed at a rightin/right-out off of Hemlock Lane. The applicant's narrative states that they intend the apartments to be luxury apartments and that the proposed 25,000-30,000 s.f. clubhouse would have a number of amenities associated with it. Traffic circulation would be provided by a private road network with green spaces and small surface parking lots near the buildings. Each building would also have underground parking. Staff Comments: 1. The proposed high density housing is generally in conformance with the GMA Plan however we note the max density is 33 units per acre which would calculate to a max of 587 units. The proposed density is 36.5 to 39.3 units per acre. The GMA Plan does allow for densities to go higher than 33 units per acre if the City determines that the project has extraordinary design, attributes, and/or amenities. 2. There are currently no gated communities in the city and so it would be good to discuss G:\CASES\20 IS\The Village at Arbor Lakes\Staff Reports\PC Reports\The Village at Arbor Lakes PUD Concept 8-1 O-IS.docx

4 Staff Report to the Planning Commission The Village of Arbor Lakes PUD Concept Stage Plan August 10, 2015 Page 4 this at a general level. 3. The placement of buildings along Hemlock Lane creates a nice match for the taller residential buildings on the other side of the street and creates a gateway effect along this road. 4. The buildings along Arbor Lakes Parkway and the main entrance have a very good urban form. 5. The buildings on the east side will be in close proximity to active gravel mining for an indeterminate time and the applicant may wish to move these away from the eastern boundary. 6. The clubhouse will serve as an excellent terminus of view along the central spine. 7. The fence along Hemlock may prevent fire trucks from using Hemlock as a fire access road. A separate fire access road around the buildings may be necessary. 8. The fence along the back side of the units may also prevent fire trucks from using the proposed pedestrian trail/fire access road. 9. Any turn-arounds and curves would need to meet fire access standards. 10. We note that the proposed parking is under what code requires. While this can be dealt with further at the Development Stage, staff recommends that if the applicant does come forward with plans showing less parking than required by code, they should demonstrate to the City why this will work and not create a parking shortage. F or this review, the main items staff sees as discussion items are the proposed density (1) and the general idea of a gated community (2). These should be specifically addressed in the discussion and direction given as part of any recommendation to the City Council. Items 3-6 are simply commentary and items 7-10 can be dealt with at the Development Stage and can be noted as a condition of approval to be incorporated into the Development Stage. South Side Proposal and Discussion: The applicant is proposing a mix of commercial uses on the south side of the development including two hotels, two restaurants, a small grocery store, a pharmacy, a coffee shop, a bank, a retail building and one mixed use building with an undermined use. The proposal shows a very strong urban form along a central spine. The north portion of this spine is a private roadway. The southern portion is shown as a large plaza area with restaurants on the north end of it. A private east/west road extends off of Hemlock Lane on the west before turning south towards the intersection of Fountains Drive and Elm Creek Boulevard. The central spine and E/W road create four quadrants that we will discuss below. G:\CASES\20 IS\The Village at Arbor Lakes\Staff Reports\PC Reports\The Village at Arbor Lakes PUD Concept 8-1 O-IS.docx

5 Staff Report to the Planning Commission The Village of Arbor Lakes PUD Concept Stage Plan August 10,2015 Page 5 Regarding the mix of retail and non-retail, by square footage and percentage staff calculates the following Use S.F. % of total Retail (Grocery, Pharmacy, 53, % Restaurants, Coffee, Mixed Retail Building) N on Retail (Hotels, Bank, 215, % Office/Medical Office/Hotel/Senior) NW Quadrant: The applicant is showing a four-story, 108 room hotel along the central spine that will provide a great urban feel to this area and a desirable verticality to the development. In addition, a 14,000 s.f. grocery store is shown at the corner of Arbor Lakes Parkway and Hemlock Lane, and a coffee shop is shown with a surrounding drive-through. Access comes from both a right-in/right-out off of Arbor Lakes Parkway and from the main E/W drive. SW Quadrant: The applicant is showing a 13,000 s.f. pharmacy at the corner of Elm Creek Blvd and Hemlock Lane N, a 3,200 s.f. bank situated along the E/W drive and a 6,500 s.f. restaurant along the central spine. Access comes from the main E/W drive into the parking areas. SE Quadrant: The applicant is showing an additional 6,500 s.f. restaurant on the central spine and an 11,000 s.f. retail building along an extension of Fountains Drive that would mimic the form of the retail buildings to the south in The Fountains at Arbor Lakes. A drive-through is shown on the north side of this building. Access comes from the main E/W drive into the parking areas as well as from a right-in off of Elm Creek Boulevard. NE Quadrant: Along the central spine, the applicant is four-story, 98 room hotel and a 71,600 s.fbuilding (17,900 s.f. footprint) on the east side, adjacent to the storm pond, of an undetermined use. The plan labels this eastern building as hotel, office, medical office, senior housing. Staff will discuss this further below G:ICASESI201SIThe Village at Arbor LakeslStaffReportslPC ReportslThe Village at Arbor Lakes PUD Concept S.docx

6 Staff Report to the Planning Commission The Village of Arbor Lakes PUD Concept Stage Plan August 10,2015 Page 6 Access comes from the main E/W drive into the parking areas. A trail is shown on the east side between the eastern building and the adjoining storm water pond that will provide pedestrian access through the area. Staff Comments: 1. In general the applicant is showing great urban form, especially along the central spine. We think that the tall buildings on the north end and the restaurants on the southern portion will create an enticing pedestrian realm and will create a true sense of place in that this will be a unique environment for people to work, stay, shop, eat and live. The strong central spine ties together with the north side to create a unified, although distinct, development. 2. Along with the great central feature, each comer is also framed by a building so there is an urban design element both internally and externally. This helps block the view of the necessary, but not always visually appealing, parking lots. 3. Non-retail uses are the dominant use by square footage and the retail uses that are proposed (and identified) work very well with the internal and adjoining uses. We have some further comments on each of the quadrants below. 4. NW Quadrant: a. We appreciate the strong urban form created by the four-story hotel along the central spine and the excellent pedestrian corridor this will create. b. The small grocery store is a type of retail that works exceptionally well with the adjoining uses. Every person living in the residential area proposed on the north side of this development will need to shop for groceries and having a neighborhood scale store in such close proximity will allow easy pedestrian and vehicular access. The small size and location on the comer fits in well with urban design form that was missing from previous proposals for this site. We feel this is consistent with the types and form of retail envisioned in the Neighborhood Commercial Node shown in the GMA Plan. c. The coffee shop is another use that works well with the adjoining uses. It is somewhat removed from these adjacent uses but there appears to be an opportunity to make a strong pedestrian connection between the use and the central spine. We recognize the desire, and likely market need, for a drive-thru which creates some of the separation. Staff recommends that a more robust pedestrian corridor should be shown between the hotel and the coffee shop when development stage plans are submitted to help create the pedestrian connection between the central spine and the coffee shop. d. As noted above, any access from Hemlock Lane will require Engineering review and approval and staff s initial reaction to a full movement intersection is one of great concern. G:\CASES\20 IS\The Village at Arbor Lakes\Staff Reports\PC Reports\The Village at Arbor Lakes PUD Concept 8-1 O-IS.docx

7 Staff Report to the Planning Commission The Village of Arbor Lakes PUD Concept Stage Plan August 10,2015 Page 7 5. SW Quadrant: a. The continuation of the central spine with a restaurant and pedestrian plaza will help create a very dynamic and exciting environment here. The restaurants have excellent synergy with the hotels and adjacent residential. Their proximity to both the hotels and the residential to the north invites a great deal of non-vehicular travel which will help create a lively environment here. b. The pharmacy is a type of retail that works well with the adjoining uses, especially the residential to the north. Pharmacies act as a comer store with a variety of daily goods available besides medicines. It is a bit removed from the residential uses but with some additional sidewalks along the south side of the E/W street, there will still be good pedestrian connections along with good vehicular access. We note that there will be a drive-thru, but it is tucked away on the side and that the building is shown on the comer, creating a presence at this key intersection. c. As alluded to above, we recommend that an additional sidewalk be built along the south side of the E/W road to better facilitate pedestrian movement through the area. d. The bank is a non-retail use that does have some possible synergy with the adjacent residential. 6. SE Quadrant: a. As with above, the restaurant and plaza helps create a great urban space in this area. b. The proposed 11,000 retail building has a nice urban form, extending the form of the buildings along Fountains Drive to the south. Depending on the end uses that lease in this building, there could be additional synergy with the adjacent residential. We do note that the Trip Generation Analysis shows a fast food restaurant with a drive-through which may not be the most ideal use at this site, though this doesn't necessarily mean that it will ultimately be a fast food use. c. As with the SW Quadrant, staff recommends that an additional sidewalk be constructed on the south side of the E/W road. 7. NE Quadrant a. As with the hotel across the street, the four-story hotel helps create a great urban form and feel to the northern part of this mixed use area. b. The building shown on Lot 5 is speculative as far as use goes but does show a further commitment to a non-retail use as well as multiple stories. If it were to develop as an office or medical office building, there would likely be a need for some type of structured parking which the applicant has acknowledged. G:\CASES\20 15\The Village at Arbor Lakes-Staff Reports\PC Reports\The Village at Arbor Lakes PUD Concept docx

8 Staff Report to the Planning Commission The Village of Arbor Lakes PUD Concept Stage Plan August 10,2015 Page 8 c. Regarding the proposed uses listed for the building shown on Lot 5, all could potentially work with the senior housing being a slightly more unusual use at this site. With that said, high density housing is listed as a possibility in the GMA Plan for the Regional Mixed Use Non-Retail Focus area and ifthere is a market for it, it could add additional vitality to this area. Trip Generation and Discussion: The applicant and staff have compiled a basic trip generation analysis which is attached for the Planning Commission's review. The AUAR for this area estimated trips based on 300,000 s.f. of office and 510 apartments. In summary: Gross Trips Per Day AM Peak PM Peak Applicant's Proposal 14,437 1,267 1,299 AUAR Total 7, Staff notes a few main items with this: 1. There are no reductions for pass-by trips, diverted trips and internal trips. These are trips that go into and out of the site but don't actually increase traffic on adjacent streets. A use such as a coffee shop would expect to have a significant amount of pass-by trips (trips already on the adjacent streets), diverted trips (trips near-by on the system that go here instead of somewhere else (increasing traffic on adjacent streets but decreasing it elsewhere), and internal trips (trips from the hotels or office/med office/senior buildings.) 2. Trip generation science is only beginning to look at pedestrian or bicycle trips which could also be a decent amount in this location with the good synergy between the various uses. 3. Staff recently reviewed the total trip generation in the AUAR, both existing and proposed, and found that we are currently estimating 25,000 fewer trips per day than what was initially anticipated, so there is room to add additional trips. For the peak hour we are currently estimating 1,300 fewer trips than what was initially anticipated. 4. A full traffic analysis will need to be completed to determine the specifics of lane needs in the project and on the public roads proposed, but staff feels that there is enough room to accommodate the proposed traffic. At this time we feel that the road system will continue to operate as expected. G:\CASES\20 IS\The Village at Arbor Lakes\Staff Reports\PC Reports\The Village at Arbor Lakes PUD Concept 8-1 O-15.docx

9 Staff Report to the Planning Commission The Village of Arbor Lakes PUD Concept Stage Plan August 10, 2015 Page 9 STAFF SUMMARY: Overall, staff anticipates a very dynamic, exciting, and unique environment in the City of Maple Grove with this proposal. There is a strong urban form, a commitment to multiple multi-story buildings, and the proposal appears to us to meet the requirements and guidelines of the Gravel Mining Area Special Area Plan. At this point the two main issues of concern are the type of access off of Hemlock Lane North between Elm Creek Boulevard and Arbor Lakes Parkway and the nature of the road extending north from the Fountains Drive and Elm Creek Boulevard intersections. Both of these items can be worked out with more information from a full traffic study. Staff does have a few recommended conditions for some minor items and we feel all of these can be dealt with at the Development Stage level. STAFF RECOMMENDATION: Motion to remove this item from the table. If the Planning Commission finds that the proposal is in conformance with the goals and objectives of the Gravel Mining Area Special Area Plan, staff suggests a: Motion to recommend that the City Council direct the City Attorney to draft a Resolution approving the PUD Concept Stage Plan for The Village at Arbor Lakes, subject to: 1. The remaining pertinent recommendations contained in the memorandums from the Superintendent of Parks and Planning and Assistant City Engineer dated July 1 and July 2,2015, respectively 2. Engineering review and approval of the proposed intersection shown on Hemlock Lane North between Elm Creek Boulevard and Arbor Lakes Parkway. We note that at this time we do not recommend approval of this full movement access and any approval of this plan does not imply approval of this full movement access. 3. Access off Hemlock Lane will require an analysis of the free right from Elm Creek Boulevard and Hemlock Lane. Past analysis has recommended that this be reconfigured to remove the free right. 4. Engineering review and approval of the private drive north of the Fountains Drive and Elm Creek Boulevard intersection. 5. On the south side of this proposal, access to the parcel to the east shall be provided. 6. Any future comments from Hennepin County regarding the accesses proposed that may impact current and future county roads. 7. Engineer review and approval of the tum-around shown on the right-inlright-out on G:ICASESI20 ISIThe Village at Arbor LakeslStaff ReportslPC ReportslThe Village at Arbor Lakes PUD Concept 8-1 O-IS.docx

10 Staff Report to the Planning Commission The Village of Arbor Lakes PUD Concept Stage Plan August 10,2015 Page 10 Hemlock Lane, north of Arbor Lakes Parkway that accesses the residential area on the north side of the development. 8. Development Stage Plans shall conform to fire access standards. 9. Any Development Stage Plan with less parking than required by code shall demonstrate to the City's satisfaction as to why less parking will not create a parking shortage. 10. Development Stage Plans for Lots 2 & 3, Block 1 shall show a more robust pedestrian corridor should be shown between the hotel and the coffee shop when development stage plans are submitted to help create the pedestrian connection between the central spine and the coffee shop. 11. Development Stage Plans for lots 7-11, Block 1 shall show an additional sidewalk along the south side of the E/W road to better facilitate pedestrian movement through the area. 12. The applicant shall work to fill the proposed retail building on Lot 6 with uses or a use that demonstrates strong synergy with the adjacent uses, especially the residential to the north. 13. A full traffic study based on the approved concept plan shall be submitted with the first subsequent Development Stage plan. This may require modifications to the conceptual turn lane and ROW configurations. 14. A greenspace calculation shall be submitted to determine if any changes are necessary in the storm ponding that the site will use. 15. Any other conditions of approval that the Planning Commission find appropriate. The applicant shall acknowledge that Park Dedication requirements are based on staff review and recommendation to the Park and Recreation Board and their subsequent Board Action. Board meetings are held on the third Thursday of each month. Authored by: Peter Vickerman I Dick Edwards G:\CASES\20IS\The Village at Arbor Lakes\Staff Reports\PC Reports\The Village at Arbor Lakes PUD Concept 8-1O-IS.docx

11 Village at Arbor Lakes - Development Summary Use Summary: Lot 1, Block 1 lot 2, Block 1 Lot 3, Block 1 lot 4, Block 1 Lot 5, Block 1 Lot 6, Block 1 Lot 7, Block 1 Lot 8, 810ck 1 Lot 9, Block 1 Lot io, Block 1 lot 11, Block 1 lot 1, Block 2 Use: Neighborhood Commercial (Grocery) Neighborhood Commercial (Coffee) Regional Mixed Use (Hotel) Regional Mixed Use (Hotel) Regional Mixed Use (Hotel. Office, Medical, Senior, Housing) Undeveloped Regional Mixed Use (Retail) Regional Mixed Use (Full Service Restaurant) Regional Mixed Use (Full Service Restaurant) Regional Mixed Use (Bank) Regional Mixed Use (Pharmacy) High-Density Residential Building Sq. Ft. J Unit No.: 14, , rooms 98 rooms 17,900 sf/floor /10()"120 units N/A 11, , ,50Dsf 3,200 sf 13, S()"700 units Area Summary: Gross Site Area Acres: 42.5 ac. Percentage: 100% Lot 1, Block ac. Lot 2, Block 1 D.7 ac. lot 3, Slock ac. Lot 4, Block ac. lot 5, Block ac. Lot 6, Block ac. Lot 7, Block ac. lot 8, Block ac. lot 9, Block ac. Lot 10, Block 1 0.6ac. lot 11, Block ac. lot I, Block ac, Elm Creek Boulevard (77th Ave. N.) R-O-W 2.7 ac. Arbor Lake Parkway R-O-W 2.6 ac. Total 42.5 ac. Parking Summary: Required: lot I, Block 1 70 stalls lot 2, Block 1 3D stalls lot 3, Block stalls lot 4, Block stalls lot S, Block 1 ls0-600 stalls lot 6, Block 1 lot 7, Block 1 72 stalls lot 8, Block 1 13Sstalis lot 9, Block 1 13Sstalls lot 10, Block 1 18 stalls lot 11, Block 1 7Sstalls lot 1, Block stalls May or may not include underground or structured parking Provided: 78 stalls IS stalls 134stalJs l06stajls ID6stalls" na 74stalis 137 stalls 147 stalls 22 stalls 92 stalls 4.0% 1.6% 7.5% 4.9% 5.4% 1.2% 4.0% 4.7% 5.9% 1.5% 4.8% 41.9% 6.4% 6.1% 100% stalls = 1.4 stall/unit NORTH Village at Arbor Lakes - PUD Development Concept

12 Project Narrative South Development Node The Village at Arbor Lakes is the continuation of the City's Vision Plan that has built Arbor Lakes into a destination for the residents of Maple Grove and the broader region. Consistent with the City's vision, The Village of Arbor Lakes has a thoughtful balance of pedestrian and vehicle circulation routes that provides convenient routes between residential, hospitality, retail and restaurant uses. Continuity with previous Arbor Lakes development phases is accomplished by similar building massing across Elm Creek Boulevard as well as corner monument feature and landscape amenities of equal scale and quality. The amenities, pedestrian and vehicle circulation and tenant mix makes the Village of Arbor Lakes a fitting addition to the City's vision for the development of the Gravel Mining Area plan. Amenities The Village at Arbor Lakes Gateway Amenity: at the intersection of Elm Creek Boulevard and Hemlock Lane, the gateway element provides a gathering point for visitors and completes the last quadrant of the Gateway Amenity (Arbor Lakes Tower, The Shoppes at Arbor Lakes, The Fountains at Arbor Lakes) that started years ago. With a design approach that is complementary to the design work of the other three corners, The Village at Arbor Lakes Gateway Amenity will provide an entry plaza that frames the entry to the north on Hemlock Lane and diagonally to the full services restaurants uses proposed in the southwest corner of the site. The paver path will wind between the outdoor eating patios and welcome residents and guests into the southwest development node. Urban Promenade: the Urban Promenade is a physical and visual element to the site. Physically, the bermed and planted median will provide an over-sized green spine down the "Urban Promenade". The promenade will include on-street diagonal parking, large plaza pedestrian areas for seating with an overhead tree Doran Companies I The Village at Arbor Lakes I 19

13 Project Narrative South Development Node canopy. Ground planters will add additional color along the undulating four story facades with shrubs and perennials. The on-street parking provides easy access to hotel guests and those that require a brief stop in the area in association with the future development to the east of the promenade. Visually, the Urban Promenade will create a visual connection to the residential development node to the north of Arbor Lakes Parkway. The three and four story building massing along the Urban Promenade will relate to each other and also create a sense of place to the high-density residential development node to the north of Arbor Lakes Parkway. Neighborhood Commercial Node: consistent with the Maple Grove Gravel Mining Area Plan, the location and uses proposed in the southeast quadrant of the intersection of Hemlock Lane and Arbor Lakes Parkway provide a viable community amenity. With a mix of retail and service oriented uses, the Neighborhood Commercial node will provide walkable access to commercial goods and services for the local residents. Walks to the coffee shop for a cup of coffee and a conversation with a good friend on the landscaped patio and a short trip to the local drug store are the convenience the Neighborhood Commercial Node intends to provide to the local residents. A wide median south of the coffee shop, and generous landscaping will be provided at the right-in only from Hemlock Lane. 20 I Doran Companies I The Village at Arbor Lakes

14 Project Narrative South Development Node Pedestrian and Vehicle Circulation: A prominent feature of the development is the extension of Arbor Lakes Parkway. The development of this public roadway will create the framework for development nodes to the north and south, along with creating a link for the future development of the gravel mining area to Arbors Lake in the future. The benefits of the Arbor Lake Parkway can be summarized as follows: Consistent with the Gravel Mining Special Area Plan, the extension of Arbor Lakes Parkway will bisect the development and create two distinct development nodes; a high-density gated residential community to the north, and a regional mix-use development to the south. The roadway sections will be consistent with the existing parkway design approach west of Hemlock Lane and will include narrowing travel lanes, landscaped median, boulevard trees, and pedestrian and biking trails along the north and south side of the roadway. In lieu of a traditional traffic signal, a roundabout is proposed as a traffic control measure. Roundabouts reduce vehicle speeds, minimize vehicle weaving, automatically establish right-of-way, and reduce conflict points of a traditional intersection. The circulatory vehicle movements at roundabouts drastically reduce the critical conflicts resulting from red light running, left-turns against opposing traffic, right-angle conflicts at corners, and rear-end collisions. As a result, roundabouts significantly reduce vehicular crashes. The roundabout will provide access to the regional mixed-use development node to the south and allow traffic to continue through and access the high-density residential development node to the north. With respect to pedestrian circulation, roundabouts have defined crosswalk locations with splitter islands. The splitter island provides refuge to pedestrians and allows them to cross one direction of traffic at a time. While not included in the current development proposal, the R~O-W will be dedicated to the City of Maple Grove for the future extension of Arbor Lakes Parkways into the Gravel Mining Area to the east. In addition to the extension of Arbor Lakes Parkway, the development provides a thoughtful and convenient vehicle circulation through the following access points: At the southeast corner of the proposed development, Fountain Drive will be extended to the north and terminate with a roundabout. This roundabout will provide an easterly connection to the south development node along with creating a connection to a future development node located north of Elm Creek Boulevard south and west of the City's storm water pond. This roadway section will include a landscape median and a retail oriented boulevard design similar in nature to the retail development adjacent to Fountain Drive south of Elm Creek Boulevard. Doran Companies I The Village at Arbor Lakes I 21

15 Project Narrative South Development Node Along the south property line, a right-in only is proposed from Elm Creek Boulevard. This entry will allow westbound vehicles on Elm Creek Boulevard to conveniently enter the development onto the north-south central drive. The rightin only will also reduce the number of vehicles making a right turn at the intersection of Elm Creek Boulevard and Hemlock Lane, which is a benefit to the level of service of that intersection. Along the west, a right-in only is proposed from Hemlock Lane. This allows northbound vehicles on Hemlock Lane to conveniently enter the south development node onto the east-west drive. The right-in only will also reduce the number of vehicles making a right turn at the intersection of Hemlock Lane and Arbor Lakes Parkway, which is a benefit to the Level of Service of that intersection. Internal to the south development, a strong axial layout will provide logical traffic patterns and convenient access to the proposed uses. The axial layout is comprised of an urban street concept running north-south and a strong east-west connection. The urban street will include on street parking, landscaped median, and pedestrian plazas between the street and buildings. The east-west roadway will focus on convenient traffic movements into and out of the four quadrants of.the south development area. In the Neighborhood Commercial node (NW quadrant), a right-in/right-only is proposed from Arbor Lakes Parkway. This entrance provides convenient access for the local residents to and from the retail and service oriented uses. 22 I Doran Companies I The Village at Arbor Lakes

16 Project Narrative North Development Node Situated on 17 acres surrounded by the City of Maple Grove, The Village at Arbor Lakes is a development of six structures within a gated community is expected to contain approximately luxury apartment (rental) units. The promenade, established in the south node, extends to the north development, terminating at the centralized Clubhouse, which houses the extensive amenity package. These complementary sites of high density residential and mixed use commercial will allow local residents to form habits of urban living while in the suburbs. The proposed northern node has two points of ingress and egress to help traffic movement within the site. The design of The Village is consistent with the City vision for land use and density. The main access point is a strictly controlled entrance with a staffed guard house that is located to keep traffic flowing while providing a secure entry. Residential buildings are sited in a way to define the edges and establish a physical border simulating an urban designed gated community. The building footprints have a meandering design of complex irregular shapes that allows for pocket parks while evoking a sense of intimacy on such a large site. Each building will have residentdedicated underground parking with additional on grade parking. This conveniently located on grade parking will be shielded by berms and mature trees so not to diminish the campus feel. Doran Companies I The Village at Arbor Lakes I 23

17 Project Narrative North Development Node Varying building heights, undulating facades, and landscaped walks create visual interest. Design aesthetic will be a material combination predominately comprised of brick with secondary brick, stone accents, and stucco. Residential density, frequency and variety of buildings, and the presence of trees and vegetation all enhance the walkability of the site leading to improved social interaction, reduced crime, and increased sense of pride. Within the two-story, 25,000-30,000 square foot Clubhouse residents can enjoy an indoor pool, spa, sauna, state of the art fitness center, group fitness, coffee bar, game room, media room, golf simulator, community room, card room, private entertaining suites, and a business center. Outdoor amenities include an outdoor pool, community gardens, grilling stations, putting green, bocce ball court, fire pits, and dog park. Each building will also have its own car washing station and pet spa. The units will showcase granite countertops, individual washer and dryers, most have patios or decks, some units have four and five fixture bathrooms and many have separate dining areas. There will be diverse housing options offering variations for any lifestyle. The entire project will have high resolution security cameras to offer continued monitoring and safety for its residents. A suburban retreat, The Village at Arbor Lakes, will provide unparalleled quality of life and healthy living. The high quality of construction, unique design criteria and unmatched level of amenities will make it a draw for residents along the entire tier of northern suburbs. 24 I Doran Companies I The Village at Arbor Lakes

18 NEIGHBORHOOD LOCATION MAP M~ple Grove o ,000 Feet I I I I I I I I I

19 P.<..:!fJ/ -- OF,_.J, I ( I! J I Tiffj- I - <, _. ~1I1,II ~ I :':' I I rue \ Sf:" 1//; ~b: ~IO ~z e o ;l I/) C o E "C C o U Q).~ V)._ C QO +"" I/) x UJ

20 """"LEGEND""""",,,,,,,,,,,,,,,,,,,,, NORTH sec Village at Arbor Lakes - Existing Zoning Category and Present Use Map

21 .. - City of Maple Grove Maple Grove Parks and Recreation MEMORANDUM TO: Dick Edwards - Community Development Director ~ FROM: Chuck Stifter - Superintendent of Parks and Planning if ~ DATE: July 1,2015 SUBJECT: The Village at Arbor Lakes - PUD Concept Stage Plan Review After reviewing the above-mentioned submittal, the Park & Recreation Board staff has the following comments: The Park Dedication ordinance applies to this subdivision which requires a land dedication or a cash equivalent per unit based on the current rate. Staff recommends a cash dedication be accepted for The Village at Arbor Lakes based on the Park System Comprehensive Plan Park dedication fees for a mixed use subdivision area as follows: Commercial rates are $11,000 per acre Residential rates: Multi-dwelling are $3194 per unit Single family are $3993 per unit Affordable are $2995 per unit Fees will apply to all platted acres in the subdivision. This proposed subdivision is in Park Service Area 24. Park facilities are undeveloped in this service area at this time. General The recommendations above are that of the Parks and Recreation staff. Final park dedication requirements are acted on by the Parks and Recreation Board at their regularly scheduled monthly meetings. Applicants may pay the park dedication fee at any time after the final plat has been approved by the City Council and Park Board but it must be paid before the plat is released by the City for filing. Park dedication rates are reviewed annually in February by the City Council. The rate is applied at the time the plat is released to the County/or filing.

22 .ifuple Grove MEMORANDUM TO: FROM: Dick Edwards, Community Development Director Terry R. Muller, P.E., Assistant City Engineer ~ DATE: July 2,2015 SUBJECT: Village of Arbor Lakes - PUD Concept Stage Plan I have reviewed the above-subject PUD Concept plan and have the following comments: 1. Transportation. The development proposes a public street system of Arbor Lakes Parkway that runs east and west through the center of the development, including a roundabout feature and the extension of Fountain Drive to the north. Also, there is a right-in only entrance from Elm Creek Boulevard and from Hemlock Lane. The right-in access from Elm Creek Boulevard needs to be evaluated by City and Hennepin County staff to determine ifit can be approved. The right-in/right-out from the north development area may be problematic because visitors pulling up to the gate will have to back out to get to the attended gate. There is a sliver ofland between Fountain Drive and the Tiller property to the east that should be shown as right-of-way. There will be the need to obtain street right-of-way from the Tiller property for the construction of the proposed roundabout. There needs to be a trail constructed along the north side of Elm Creek Boulevard adjacent to this development. The proposed development shall establish a trail corridor in this area. 2. Utilities. There is an existing IS" sanitary sewer pipe that is extended to the northeast comer of the intersection of Hemlock Lane and Elm Creek Boulevard. Also, there is a 12" sanitary sewer pipe that was extended to Forestview Lane on the east side of Hemlock Lane. Both of these sanitary sewer systems are available to serve the proposed development. There is a 20" trunk watermain located on Hemlock Lane that will be extended to the east to serve the proposed development. Storm water from this development will be directed to a storm water pond located south of Arbor Lakes Parkway and east of Fountains Drive on the adjacent Tiller property. 3. This development is located in the Shingle Creek Drainage District, sub-district SC-A51 and SC-A64, as designated in the Maple Grove Storm Water Management Plan. The watershed may require infiltration basins and the developer should be prepared to provide them if required. 4. A feasibility study will be required to be prepared to estimate proposed costs and conduct a preliminary design review for this project. The applicant will be required to submit a surety to the Engineering Department that will guarantee payment for the preparation of the report by a City consultant. cc: Ken Ashfeld, P.E., Director of Public Works/City Engineer Jupe Hale, P.E., Transportation Operations Engineer Rick Lestina, Water Resources Engineer

23 8/3/2015 Plan Gross Trips Size Total Trips per AM Peak Day PM Peak Pharmacy 13,000 1, Coffee Shop 2,000 1, Bank 3, Hotel 206 1, Grocery Store 14,000 1, Retail Apparel 4, Retail Arts and Crafts 4, Retai Fast Food 2,200 1, Office 71, Restaurant 11, South Total 9, Apartments Grand Total 14,437 1,267 1,299 AUAR Total

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM DATE REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL Community Development PUD Concept & Development Stage Plan Preliminary Plat & Final Plat PREVIOUS

More information

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE DEVELOPMENT TEAM DONEGAL SOUTH Maple Grove, Minnesota March 27, 2017 Applicant/Developer/Builder:

More information

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL DATE REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL Community Development Territorial Greens PUD Concept Plan Development Stage Plan Subdivision (Preliminary

More information

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment Urban Design Brief Proposed Official Plan & Zoning By-Law Amendment 3244, 3263 and 3274 Wonderland Road South Southside Group December 23, 2015 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND

More information

STAFF REPORT TO THE PLANNING COMMISSION April 30, Copper Creek of Nottingham 13 th Addition PUD Development Stage Plan and Final Plat

STAFF REPORT TO THE PLANNING COMMISSION April 30, Copper Creek of Nottingham 13 th Addition PUD Development Stage Plan and Final Plat STAFF REPORT TO THE PLANNING COMMISSION Copper Creek of Nottingham 13 th Addition PUD Development Stage Plan and Final Plat Applicant: Owner: Requested Action: Location: Zoning: Adjacent Land Use and Zoning:

More information

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

VICTORIA DOWNTOWN DEVELOPMENT PLANNING VICTORIA DOWNTOWN DEVELOPMENT PLANNING A Vision & Guide for the Future Downtown Victoria thrives as a center for the community, offering a great mix of entertainment, culture, business, and recreational

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, 2015 6:30 P.M. - ARDEN HILLS CITY HALL PLANNING CASES A. Planning Case 15-016; Final Planned Unit Development Arden Plaza;

More information

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC 14 October 10, 2012 Public Hearing APPLICANT: MPB, INC PROPERTY OWNER: MUNDEN & ASSOCIATES, LP STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-1 & AG-2 to Conditional O-2) ADDRESS

More information

MIDTOWN MIXED-USE VILLAGE. TECHNICAL DATA SHEET COMPONENT C-1 FOR PUBLIC HEARING - PETITION NUMBER Project No RZ1.1. Issued.

MIDTOWN MIXED-USE VILLAGE. TECHNICAL DATA SHEET COMPONENT C-1 FOR PUBLIC HEARING - PETITION NUMBER Project No RZ1.1. Issued. N MIDTOWN MIXED-USE VILLAGE TECHNICAL DATA SHEET COMPONENT C- FOR PUBLIC HEARING - PETITION NUMBER 04-00 Project No. 496 Issued Revised SCALE: " = 0' N 0 0 0 40 RZ. c GENERAL PROVISIONS: a. SITE LOCATION.

More information

Welcome! to Keller Town Hall

Welcome! to Keller Town Hall Welcome! to Keller Town Hall Keller Town Center Planning a New Downtown What is Keller Town Center? A new, growing downtown district planned as an urban village A combination of retail and office spaces,

More information

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

Baumgarten MPUD. Exhibit 3 Evaluation Criteria Pursuant to LDC subsections 10.02.13 B, 10.02.08 F and Chapter 3 G. of the Administrative Code, staff s analysis and recommendation to the Planning Commission, and the Planning Commission s recommendation

More information

SECTION TWO: Urban Design Concepts

SECTION TWO: Urban Design Concepts SECTION TWO: Urban Design Concepts The Gardnerville Plan for Prosperity shapes economic opportunities presented by regional growth. The Urban Design Concepts provide policies and concepts for land use,

More information

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY COUNCIL STUDY SESSION MEMORANDUM City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared by: Mayor and City Council Charles Ozaki, City and County Manager Kevin Standbridge, Deputy City and County

More information

THEMES, VISION, + PRINCIPLES

THEMES, VISION, + PRINCIPLES CHAPTER 2: THEMES, VISION, + PRINCIPLES This page intentionally left blank. 20 VISION DRAFT AUGUST 2018 2 2 THEMES, VISION, + GUIDING PRINCIPLES The Key Themes, Vision, and Guiding Principles presented

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

2.0 THE PLATINUM TRIANGLE VISION

2.0 THE PLATINUM TRIANGLE VISION 2.0 THE PLATINUM TRIANGLE VISION The envisions an exciting future for the area surrounding Angel Stadium of Anaheim, the Honda Center and The Grove of Anaheim. 2.1 Planning Principles In order to further

More information

11 May 11, 2011 Public Hearing APPLICANT: SUKHWINDER SHINDA BHARIJ

11 May 11, 2011 Public Hearing APPLICANT: SUKHWINDER SHINDA BHARIJ 11 May 11, 2011 Public Hearing APPLICANT: SUKHWINDER SHINDA BHARIJ PROPERTY OWNER: S & J TRUCK TERMINAL, INC. REQUEST: Conditional Use Permit for mini-warehouse STAFF PLANNER: Leslie Bonilla ADDRESS /

More information

City of Lafayette Staff Report Design Review Commission

City of Lafayette Staff Report Design Review Commission City of Lafayette Staff Report Design Review Commission Meeting Date: February 13, 2017 Staff: Subject: Niroop K. Srivatsa DR13-14DDII Lennar Homes (Applicant), C-Zoning: Request for: (1) Review of Phase

More information

Town Center (part of the Comprehensive Plan)

Town Center (part of the Comprehensive Plan) Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center

More information

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET PRE-APPLICATION CONFERENCE Prior to the actual filing of a Master Plan application, it is strongly recommended that the applicant contact Planning

More information

Lehigh Acres Land Development Regulations Community Planning Project

Lehigh Acres Land Development Regulations Community Planning Project Lehigh Acres Land Development Regulations Planning Effort Summary In July, 2010 Commissioner Frank Mann invited the Lehigh Acres community to start discussing how to achieve their recently adopted community

More information

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT FEBRUARY 2013 TABLE OF CONTENTS 1.0 BACKGROUND... 1 1.1 Amendment... 1 2.0 LOCATION & CONTEXT... 2 2.1 Land Ownership... 2 3.0 POLICY CONTEXT... 3 3.1 Municipal Development Plan... 3 3.2 Capital Region

More information

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS Name of Project: Poulsbo Meadows; A Planned Residential Development (PRD)/Plat Applicants Name: PBH Group LLC/Byron Harris PO Box 1010 Silverdale, WA 98038 Description

More information

The Ritz-Carlton, Paradise Valley

The Ritz-Carlton, Paradise Valley The Ritz-Carlton, Paradise Valley 7000 E. Lincoln Drive Keys to Success Community Conversation II June 4, 2015 RITZ-CARLTON PARADISE VALLEY Town Council Study Session June 4, 2015 General Plan 2012 Land

More information

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan) STAFF REPORT Town of Clayton Planning Department 111 E. Second Street, Clayton, NC 27520 P.O. Box 879, Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 Planning Board May 22, 2017 Application Number:

More information

PLANNING REPORT CITY OF EAGAN. APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: December 18, 2014

PLANNING REPORT CITY OF EAGAN. APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: December 18, 2014 PLANNING REPORT CITY OF EAGAN REPORT DATE: December 8, 2014 CASE: 19-PA-11-11-14 APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: PROPERTY OWNER: The Flats at Cedar APPLICATION DATE: Nov. 21, 2014

More information

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories: Lakeside Business District Lakeside Business District Land Use Categories: Campus Commercial Campus Commercial means a mixture of uses which includes corporate offices, office parks, hotels, commercial,

More information

Urban Design Brief Fanshawe Park Road. Competition Toyota

Urban Design Brief Fanshawe Park Road. Competition Toyota Urban Design Brief 1300 Fanshawe Park Road Competition Toyota May 2, 2014 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND USE PLANNING CONTEXT... 1 1.1 The Subject Lands... 1 1.2 The Proposal...

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance

More information

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002 BACKGROUND Purchased as two parcels in 2001 and 2002 WHAT THE PROJECT IS AND IS NOT A Rezoning establishes the land use standards for Annexed and Zoned Greater Downtown District Historic Center September

More information

This Review Is Divided Into Two Phases:

This Review Is Divided Into Two Phases: Semiahmoo Town Centre Review The purpose of this review: To review the Semiahmoo Town Centre Concept Plan, originally approved in 1993, to ensure that this centre will continue to serve the needs of South

More information

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016 KASPER City of Georgetown, Texas PUD Planned Unit Development December 30, 2015 Revised January 27, 2016 Applicant: Sentinel Land Company, LLC 4910 Campus Drive Newport Beach, CA Prepared by: SEC Planning

More information

URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO

URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO URBAN DESIGN BRIEF 305, 309, & 315 SOUTHDALE ROAD WEST LONDON ONTARIO CARVEST PROPERTIES LTD. December 2013 Section 1 - Land Use Planning Context 1.1 Subject Lands The subject lands are located immediately

More information

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN The Village SPECIFIC PLAN Chapter 3 3.1 INTRODUCTION 3.1.1 Purpose This Chapter describes the development regulations applicable to the Mixed-Use and Transit Center Planning Areas. These form-based regulations

More information

PLANNING COMMISSION Work Session Meeting Agenda

PLANNING COMMISSION Work Session Meeting Agenda PLANNING COMMISSION Work Session Meeting Agenda 5200 85TH AVENUE NORTH BROOKLYN PARK MN 55443 PHONE (763) 424-8000 FAX (763) 493-8391 Wednesday, September 27, 2017-7:00 P.M. Brooklyn Township Room If due

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2. Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General

More information

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park PINE CURVE REZONING BACKGROUND Purchased as two parcels in 2001 and 2002 Annexed and Zoned Greater Downtown District Historic Center September 25, 2002 and October 7, 2002 WHAT THE PROJECT IS AND IS NOT

More information

4.1.3 LAND USE CATEGORIES

4.1.3 LAND USE CATEGORIES 4.1.3 LAND USE CATEGORIES a. City Center District The City Center District incorporates the existing character and mix of uses in downtown Belmont to encourage redevelopment and new development in keeping

More information

Neighborhood Districts

Neighborhood Districts NEIGHBORHOOD DISTRICTS SEVEN MAIN DISTRICTS Neighborhood Districts While the Development Plan provides a broad-scale overview of the neighborhood, this section focuses on uses and relationships at the

More information

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit Avila Ranch Avila Ranch Specific Plan Development Standards High Medium Density - High Residential Density Residential Lot and Building Lot and Standards Building (R-3) Standards (R-3) EXAMPLES These sketches

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

M E M O R A N D U M. Principal Planner. HEARING DATE: March 13, 2018 CASE NUMBER: PC

M E M O R A N D U M. Principal Planner. HEARING DATE: March 13, 2018 CASE NUMBER: PC M E M O R A N D U M TO: FROM: PREPARED BY: Plan Commission Technical Review Committee Tim Semmann, AICP Principal Planner DATE DISTRIBUTED: March 6, 2018 HEARING DATE: March 13, 2018 CASE NUMBER: PC18-2561

More information

CHAPTER 3. Design Standards for Business, Commercial, Industrial, Recreational and Institutional Uses

CHAPTER 3. Design Standards for Business, Commercial, Industrial, Recreational and Institutional Uses CHAPTER 3 Design Standards for Business, Commercial, Section Number Title Ordinance Number Date of Ordinance 16-3-1 Applicability 2006-11 2008-04 07-01-08 16-3-2 Uniform Standards for Architectural Design

More information

Policies and Code Intent Sections Related to Town Center

Policies and Code Intent Sections Related to Town Center Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections

More information

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC.

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC. . 8 February 9, 2011 Public Hearing APPLICANT: REQUEST: Conditional Use Permit for an automobile service station with a convenience store ADDRESS / DESCRIPTION: 2448 Nimmo Parkway PROPERTY OWNER: COURTHOUSE

More information

3.0 URBAN DESIGN. December 6, OVERVIEW

3.0 URBAN DESIGN. December 6, OVERVIEW Urban Design 3.0 URBAN DESIGN December 6, 2007 3.1 OVERVIEW The highly urban character of Easton Place is defined by the overall design of the community. The following sections provide an overview of the

More information

BOULEVARD AND PARKWAY STANDARDS

BOULEVARD AND PARKWAY STANDARDS 88-323 BOULEVARD AND PARKWAY STANDARDS 88-323-01 PURPOSE Considerable public and private investment exists and is expected to occur adjacent to boulevards and parkways within the city. The following standards

More information

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT August 2018 Page intentionally left blank The Brooklyn Park Library adjacent to the 85th Ave LRT Station Area. OVERVIEW The Blue Line LRT Extension / Bottineau corridor offers a unique opportunity to leverage

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

LIVE. WORK. ENTERTAIN.

LIVE. WORK. ENTERTAIN. LIVE. WORK. ENTERTAIN. A Charming, Mixed-use Development in Midlothian, Virginia BLACKWOOD DEVELOPMENT COMPANY, INC. d e s i g n s t u d i o 5701 grove avenue richmond va 23226 804.740.7500 www.1hg.net

More information

Developer s Program. The Station at East 54

Developer s Program. The Station at East 54 Developer s Program The Station at East 54 Existing Conditions The Station at East 54 is proposed for a 1.12 acre site at the northeast corner of Hamilton Road and Prestwick Road, tucked between the East

More information

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning Regency Developments Urban Design Brief Holyrood DC2 Rezoning Stantec Consulting Ltd. 7-31-2017 1. Overview Regency Developments intends to rezone the lands located at 8510 and 8511 93 Avenue, within the

More information

Behnke Ranch Property, Pasco County: Master Plan Development Approach

Behnke Ranch Property, Pasco County: Master Plan Development Approach February 24, 2014 , Pasco County: Master Plan Development Approach Location & Program The (Legacy PUD) is located in southwest Pasco County along State Road 54 approximately 1.5 miles west of the Suncoast

More information

Request Conditional Use Permit (Car Wash Facility) Staff Recommendation Approval. Staff Planner Jonathan Sanders

Request Conditional Use Permit (Car Wash Facility) Staff Recommendation Approval. Staff Planner Jonathan Sanders Applicant Property Owner SunTrust Bank Public Hearing October 10, 2018 City Council Election District Princess Anne Agenda Item 2 Request Conditional Use Permit (Car Wash Facility) Staff Recommendation

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

BACKGROUND / DETAILS OF PROPOSAL

BACKGROUND / DETAILS OF PROPOSAL 8 APPLICANT AND OWNER: MISSION ENTERPRISES, L.L.C STAFF PLANNER: Kristine Gay REQUEST: Conditional Use Permit ( Eating and Drinking Establishment within 100 of Protected District ) ADDRESS / DESCRIPTION:

More information

EXISTING COMPREHENSIVE PLAN

EXISTING COMPREHENSIVE PLAN EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an

More information

I. Introduction. Prior Approvals

I. Introduction. Prior Approvals Statement of Justification First National Bank 19790 Crystal Rock Drive, Germantown, Maryland Application for Site Plan and Limited Preliminary Plan Amendment I. Introduction DPH Architecture, for First

More information

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director MEMORANDUM DATE: March 15, 2019 TO: FROM: Chairman and Members Community Redevelopment Agency Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director SUBJECT: Camino Square, IDA No. CRP-16-02, located at 171

More information

CITY OF MAPLE GROVE PLANNING COMMISSION AGENDA SEPTEMBER 12, :00 P.M.

CITY OF MAPLE GROVE PLANNING COMMISSION AGENDA SEPTEMBER 12, :00 P.M. CITY OF MAPLE GROVE PLANNING COMMISSION AGENDA SEPTEMBER 12, 2016 7:00 P.M. 1. OPENING BUSINESS A. Call to Order B. Pledge of Allegiance C. Roll Call 2. ADDITIONS OR DELETIONS TO AGENDA Any Commissioner

More information

(DC1) Direct Development Control Provision DC1 Area 4

(DC1) Direct Development Control Provision DC1 Area 4 . General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the

More information

The subject site plan amendment proposes the following revisions to the approved site plan:

The subject site plan amendment proposes the following revisions to the approved site plan: PROPOSED AMENDMENT The subject site plan amendment proposes the following revisions to the approved site plan: 1. The building footprint was modified to accommodate the revised architectural design. 2.

More information

Prepared by: Casey Kempenaar, Senior Planner

Prepared by: Casey Kempenaar, Senior Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING September 13, 2017 Prepared by: Casey Kempenaar, Senior Planner REQUEST The applicant requests a Design Review Permit Modification

More information

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form- Based Code. Staff Recommendation Approval

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form- Based Code. Staff Recommendation Approval Applicant Property Owner Steven H. Murden Public Hearing June 14, 2017 City Council Election District Beach Agenda Item 8 Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort

More information

Staff Report to the North Ogden City Planning Commission

Staff Report to the North Ogden City Planning Commission Staff Report to the North Ogden City Planning Commission SYNOPSIS / APPLICATION INFORMATION Application Request: Concept review on a legislative application to rezone land located at approximately 1750

More information

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014 Courthouse Square Planning & Urban Design Study Courthouse Square Working Group #13 October 15, 2014 1 Courthouse Square Process Working Group Community Courthouse Square Advisory Groups & Civic Associations

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor. indian creek 180 extends south from 101st Street to I-435. The I-435 and Metcalf intersection is one of the primary intersections in the Kansas City Metro Area. The area includes several residential neighborhoods

More information

SYRINGA VALLEY SPECIFIC PLAN NARRATIVE

SYRINGA VALLEY SPECIFIC PLAN NARRATIVE SYRINGA VALLEY SPECIFIC PLAN NARRATIVE Introduction With this application, Pleasant Valley South LLC ( Pleasant Valley ) seeks the City of Boise s approval of a new Specific Plan Ordinance to be added

More information

Rezoning Petition Pre-Hearing Staff Analysis September 17, 2018

Rezoning Petition Pre-Hearing Staff Analysis September 17, 2018 Rezoning Petition 2017-043 Pre-Hearing Staff Analysis September 17, 2018 REQUEST Current Zoning: R-3 (single family residential), R-17MF (multi-family residential), and CC (commercial center) Proposed

More information

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018 Background and Process Monroe Expressway will be open by the end of 2018 Union County and Indian Trail identified a need to revisit

More information

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018 Rezoning Petition 2018-028 Pre-Hearing Staff Analysis May 21, 2018 REQUEST Current Zoning: MX-1 LLWPA (mixed use district, Lower Lake Wylie Protected Area), R-3 LLWPA (single family residential, Lower

More information

3.1 community vision. 3.3 required plan elements

3.1 community vision. 3.3 required plan elements Chapter 3 Community Form 3.1 community vision 3.2 Parks & landscaping concepts 3.3 required plan elements D R A F T 20 Community Form Chapter 3 3.0 Community form 3.1 community vision The Specific Plan

More information

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

PLANNED UNIT DEVELOPMENT Date: April 5, 2018 PLANNED UNIT DEVELOPMENT Date: April 5, 2018 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Robert Myers Robert Myers 2955 and 2989 Dauphin Street (Southeast corner of Dauphin Street and Sage Avenue) CITY

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 05-22-14 Consent Item - Park Potomac: Site Plan Amendment No. 82004015K MCS. Molline

More information

Rezoning Petition Zoning Committee Recommendation August 1, 2017

Rezoning Petition Zoning Committee Recommendation August 1, 2017 Rezoning Petition 2017-090 Zoning Committee Recommendation August 1, 2017 REQUEST LOCATION SUMMARY OF PETITION PROPERTY OWNER PETITIONER AGENT/REPRESENTATIVE COMMUNITY MEETING STATEMENT OF CONSISTENCY

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

New Berlin City Center Concept Review PDQ Food Stores, Inc

New Berlin City Center Concept Review PDQ Food Stores, Inc September 23, 2016 City of New Berlin Planning Commission 3805 S Casper Dr New Berlin, WI 53151 RE: New Berlin City Center Concept Review PDQ Food Stores, Inc Dear Plan Commission Members, On behalf of

More information

Rezoning Petition Final Staff Analysis June 18, 2018

Rezoning Petition Final Staff Analysis June 18, 2018 Rezoning Petition 2018-028 Final Staff Analysis June 18, 2018 REQUEST Current Zoning: MX-1 LLWPA (mixed use district, Lower Lake Wylie Protected Area), R-3 LLWPA (single family residential, Lower Lake

More information

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Town Center. Block 5 Existing multifamily residential units are expected to remain. Area Guidelines Germantown s districts should be developed as distinct communities with unique features that are supported through the guidelines. The guidelines not only help distinguish these districts

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: AUGUST 2, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director

More information

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5 VISION STATEMENT 3 UTILIZATION OF THE GUIDELINES 3 IMPLEMENTATION 3 PROCEDURES FOR DESIGN REVIEW 3 LAND USE AND ZONING 4 LAND USE 4 ELEMENTS:... 4 ZONING 4 ELEMENTS:... 4 BUILDING SCALE AND SETBACKS 5

More information

NWI Wetland Public Waters Inventory Low Density Residential Medium Density Residential. High Density Residential. Public or Institutional

NWI Wetland Public Waters Inventory Low Density Residential Medium Density Residential. High Density Residential. Public or Institutional Map 1.1 Future Land Use Jennings Bay West Arm Dutch Lake Harrisons Bay Lake Langdon Seton Lake Emerald Lake Black Lake Cooks Bay Halstead Bay Priest Bay Phelps Bay NWI Wetland Public Waters Inventory Low

More information

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014 [PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site

More information

M E M O R A N D U M July 27, 2018

M E M O R A N D U M July 27, 2018 M E M O R A N D U M July 27, 2018 To: Southlake 2035 Corridor Planning Committee From: Kenneth Baker, Sr. Director of Planning and Development Services Subject: Item #6 First National Bank Purpose Review,

More information

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS

More information

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO) TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 260-400 E. COLORADO BOULEVARD (PASEO COLORADO) RECOMMENDATION:

More information

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021 ITEM NO FDP #130021 MEETING DATE July 23, 2013 STAFF Pete Wray ADMINISTRATIVE TYPE I HEARING STAFF REPORT PROJECT: APPLICANT: OWNER: Harmony Technology Park Third Filing, Second Replat Custom Blending,

More information

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012 Gateway commercial MIXED USE MASTER SITE PLAN 1914 CENTRE STREET NORTH CALGARY, AB CANADA T2E 2S8 T. 403.264.7177 F. 403.264-7175 WWW.CITILAND.CA CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE

More information

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT MAY 8, 2014 The Planning and Development Department hereby forwards to the Planning

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

PDR /21/15 Noah Beals 1/7/15 xx

PDR /21/15 Noah Beals 1/7/15 xx PDR150001 1/21/15 Noah Beals 1/7/15 xx 01.07.15 HTP Harmony Frontage Infrastructure Preliminary Design Review Project Narrative a) What are you proposing/use? The HTP Harmony Frontage Infrastructure project

More information

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

4. INDUSTRIAL 53 CASTLE ROCK DESIGN 4. INDUSTRIAL 53 CASTLE ROCK DESIGN CASTLE ROCK DESIGN 54 4. INDUSTRIAL Overview Well-designed and attractive industrial centers are the product of blending economic realities with both functional and

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 23, 2019 DATE: April 12, 2019 SUBJECT: SP #413 SITE PLAN AMENDMENT to permit a fixed bar in a private outdoor café space with associated

More information

CHAPTER 2: FUTURE LAND USE CONCEPTS

CHAPTER 2: FUTURE LAND USE CONCEPTS CHAPTER 2: FUTURE LAND USE CONCEPTS INTRODUCTION The future land use concepts presented in this chapter are an expression of community support for a viable and vital US 50 Corridor. Land use recommendations

More information