Alta Vista Transportation Corridor Environmental Study Report November 2005

Size: px
Start display at page:

Download "Alta Vista Transportation Corridor Environmental Study Report November 2005"

Transcription

1 Alta Vista Transportation Corridor Environmental Study Report November ALTERNATIVE DESIGNS The Preferred Solution to providing additional transportation system capacity through the AVTC study area, for the Official Plan horizon year of 2021, is a four-lane facility, of which one vehicle lane in each direction is reserved for High Occupancy Vehicles (HOV) and buses. A major recreational pathway would also be an integral part of the solution. The four-lane facility would link Conroy Road (at Walkley Road) at the south end of the Corridor with Nicholas Street (at the Hwy 417 interchange) at the north end of the Corridor. The next phase of the EA process identified and evaluated a set of reasonable alternative designs to implement the Preferred Solution. A detailed report entitled, Evaluation Of Alternative Designs and Assessment of The Preferred Design April 2005" (Appendix G) was prepared and circulated to the study TAC and PAC for review and comment. The following sub-sections summarize this phase of the EA. 6.1 Common Design Objectives Given the nature of the Preferred Solution, together with the locational influences and the Official Plan policy context for the AVTC, the following are the fundamental components and common design objectives of all alternative designs evaluated: The facility, will be designed as an arterial road, in accordance with its designation in the Official Plan and its intended function; The facility will be designed as a low speed arterial road, with a posted speed of 60 kph. Where possible, efforts will be made through geometric and landscape design to reduce and control travel speeds; A 3m wide Major Recreational Pathway will be provided, linking the existing City recreational pathway located on the west side of Conroy Road to the existing NCC pathway system along the Rideau River; The facility will provide an on-road cycling route linking Conroy Road to Lees Avenue, comprising a 2.0m wide dedicated cycling lanes along the outside curb in each direction; Transit supportive features will be incorporated in consultation with OC Transpo; The facility will be designed in a manner that provides for surplus adjacent lands to be utilized in accordance with their designations in the Official Plan and the Plan for Canada s Capital; Opportunities to minimize the effects on adjacent land uses associated with the facility s construction or operation will be investigated; Opportunities will be provided for the use of surplus Corridor lands for Major Open Space uses as defined in the Official Plan, including the relocation of allotment garden plots in the same vicinity; and Between Walkley Road and Riverside Drive, the facility will be designed as a Scenic Route, contributing to the continuity of the City s greenspace network and its open space character. Opportunities to design the northern portion of the Corridor (between Riverside Drive and Hwy 417) as a Scenic Route will also be pursued. The following sub-sections of this report describe the various ways of applying these design objectives to the four geographic sections which together comprise the Corridor. 6.2 South Section Alternative Designs The South Section involves the portion of the AVTC between Walkley Road and Smyth Road. This section is characterized as a wide open space corridor ranging in width from approximately 150m to more than 250m and flanked primarily by low density residential uses and parkland. This section of the Page 46

2 Alta Vista Transportation Corridor Environmental Study Report November 2005 Corridor is relatively void of physical features that would influence facility alignment, other than existing hydro transmission towers that should be avoided when possible. These are the main features that would influence the design and evaluation of the alternatives. In addition to the common design objectives, the area-specific design objectives for the South Section are to: Minimize effects of the operation of the facility on adjacent uses including residents and parkland users, in an equitable manner along both sides of the Corridor; Connect with Conroy Road at Walkley Road in an manner that corresponds with the existing Conroy Road alignment; and Provide safe and multi-modal connections with Conroy Road, Kilborn Avenue, Pleasant Park Road, and Smyth Road, to maximize community mobility, reduce travel distances, and minimize existing and projected cut-through traffic on local streets. The design variables for this section are based on alignment location and curvature, and median treatment. It is important to note that these designs should be considered as concepts. Specific details such as setbacks from adjacent land uses, or the curvatures selected, or the width of medians should be viewed as examples only, and not precise. The objective of the alternative designs is to enable an evaluation of them at a conceptual level, with details to follow when the Preferred Design is refined. South Section Alternative Design 1: Central Alignment with Narrow Median The defining characteristics of this alternative (Figure 6-1) are as follows: The alignment is straight and more or less in the centre of the Corridor; Minor curvatures are present to align with Conroy Road and to maintain the centrally located alignment; The median is a continuous 5.0m width between intersections; and The closest points of proximity to adjacent residential lot lines are approximately: 38m near Conroy Road; 55m south of Kilborn Avenue; and 65m at Pleasant Park Drive. South Section Alternative Design 2: Central Alignment with Wide Landscaped Median The defining characteristics of this alternative (Figure 6-2) are as follows: The alignment is more or less in the centre of the Corridor; Gentle curvatures are present and the facility flares out around strategically located wide medians; The medians vary in width from approximately 40m to 90m; and The closest points of proximity to adjacent residential properties are approximately: 40m near Conroy Road; 45m south of Kilborn Avenue; 35m south of Pleasant Park Drive; and 50m north of Pleasant Park Drive. South Section Alternative Design 3: Meandering Alignment and Narrow Median The defining characteristics of this alternative (Figure 6-3) are as follows: The alignment deviates from the centre of the Corridor as it weaves from side to side; Gentle curvatures are present, creating a meandering alignment; The median is a continuous 5.0m width between intersections; and The closest points of proximity to adjacent residential properties are approximately: 40m near Conroy Road; 50m south of Kilborn Avenue; 35m south of Pleasant Park Drive; and 57m north of Pleasant Park Drive. Page 47

3 HAIG SMYTH DORVAL PLEASANT PARK KILBORN URBANDALE WALKLEY CONROY LYNDA Figure 6-1: South Section Alternative Design 1

4 HAIG SMYTH DORVAL PLEASANT PARK KILBORN URBANDALE WALKLEY CONROY LYNDA Figure 6-2: South Section Alternative Design 2

5 HAIG SMYTH DORVAL PLEASANT PARK KILBORN URBANDALE WALKLEY CONROY LYNDA Figure 6-3: South Section Alternative Design 3

6 Alta Vista Transportation Corridor Environmental Study Report November Central Section Alternative Designs The Central Section encompasses the portion of the AVTC between Smyth Road and Alta Vista Drive. This section is characterized as an approximately 90m wide open space corridor flanked by the Ottawa Hospital Complex to the south and west, and by a high school and technology park to the east. An approximately 30m to 50m wide hydro corridor runs along the east and north sides of the Corridor. Primarily low density residential, institutional, and parkland uses exist to the north of the Hydro corridor, in the Riverview Park Community. The Hospital Woods is a valued environmental feature located in the northeast corner of this Corridor section. These are the key features that would influence the design and evaluation of the alternatives. In addition to the common design objectives, the area-specific design objectives for this section are to: Minimize effects of the operation of the facility on adjacent uses including residents, parkland users, students and employees; Provide a high degree of intersection connectivity to the Smyth Road Hospital Complex and Technology Park; Provide safe and multi-modal connections with Smyth Road and Alta Vista Drive; Protect options to locate a future east-west rapid transit facility in and/or adjacent to the Corridor (as designated in the Official Plan, yet under appeal); Locate pedestrian connections between the Riverview Park Community and the Ottawa Hospital Complex at future signalized intersections (for safe crossings); and Minimize the impact of the project on the Hospital Woods through various means such as reducing the amount of woodlot displaced, retaining a large contiguous core area, and/or providing opportunities for woodlot enhancement or reforestation. Similar to the South Section, the design variables for this section are alignment location and curvature, and median treatment. Based on these variables, four alternative designs were developed for evaluation. Central Section Alternative Design 1: Central Alignment, Narrow Median The defining characteristics of this alternative (Figure 6-4) are as follows: The alignment is straight and more or less in the centre of the Corridor; One long gentle curve is provided where the alignment transitions from north-south to east-west; The median is a continuous 5.0m width between intersections; Three intermediate intersections are provided; and The closest points of proximity of the travel lanes to adjacent residential properties are approximately 90m at Riverview Park and 200m at Browning Avenue. Central Section Alternative Design 2: Central Alignment, Wide Landscaped Median The defining characteristics of this alternative (Figure 6-5) are as follows: Gentle curves are provided where the alignment transitions from north-south to east-west, and where the facility flares out around the wide medians; The medians widen out to approximately 50m in two locations; Three intermediate intersections are provided; and The closest points of proximity of the travel lanes to adjacent residential properties are approximately 55m at Riverview Park and 150m at Browning Avenue. Page 51

7 Alta Vista Transportation Corridor Environmental Study Report November 2005 Central Section Alternative Design 3: Meandering Alignment, Narrow Median The defining characteristics of this alternative (Figure 6-6) are as follows: The alignment deviates from the centre of the Corridor as it weaves from side to side; Gentle curvatures are present throughout the section, creating a meandering alignment; The median is a continuous 5.0m width between intersections; Three intermediate intersections are provided; and The closest points of proximity of the travel lanes to adjacent residential properties are approximately 70m at Riverview Park and 180m at Browning Avenue. Central Section Alternative Design 4: Shared Use of Ring Road The defining characteristics of this alternative (Figure 6-7) are as follows: North of Smyth Road, the alignment veers to the west and follows the route of the existing Hospital Ring Road; The alignment follows the southern portion of the Corridor, with a slight meander; The long curve that is provided where the alignment transitions from north-south to east-west is very gentle; The median is a continuous 5.0m wide between intersections; Five intermediate intersections are provided; and The closest points of proximity of the travel lanes to adjacent residential properties are approximately 91m at Riverview Park and 220m at Browning Avenue. Page 52

8 ROGER GUINDON KEATS RIVERSIDE OLD RIVERSIDE CN RAIL ALTA VISTA PETER MORAND SMYTH Figure 6-4: Central Section Alternative Design 1

9 ROGER GUINDON KEATS RIVERSIDE OLD RIVERSIDE CN RAIL ALTA VISTA PETER MORAND SMYTH Figure 6-5: Central Section Alternative Design 2

10 ROGER GUINDON KEATS RIVERSIDE OLD RIVERSIDE CN RAIL ALTA VISTA PETER MORAND SMYTH Figure 6-6: Central Section Alternative Design 3

11 ROGER GUINDON KEATS RIVERSIDE OLD RIVERSIDE CN RAIL ALTA VISTA PETER MORAND SMYTH Figure 6-7: Central Section Alternative Design 4

12 Alta Vista Transportation Corridor Environmental Study Report November Riverside Section Alternative Designs The Riverside Section involves the portion of the AVTC between Alta Vista Drive and the approach to the Rideau River crossing. This section is characterized by the complexity of routing a facility that intersects with Alta Vista Drive and crosses the CN Rail line, the Southeast Transitway, Old Riverside Drive, and Riverside Drive. Existing hydro towers and the adjacency of apartment buildings are also important features to be considered. West of Riverside Drive, the alignment must have regard for a landfill area, the Rideau River Park Woods, and the Rideau River shoreline and flood plain on the east and south side of the River. These are the key features that would influence the design and evaluation of the alternatives. In addition to the common design objectives, the area-specific design objectives for this section are to: Minimize effects of the operation of the facility on adjacent uses including residents, and parkland users; Protect options to provide a recreational pathway and cycling connections to the existing NCC recreational pathway along the Rideau River; Protect options to locate a future east-west rapid transit facility in and/or adjacent to the Corridor (as designated in the Official Plan, yet under appeal); Provide safe and efficient multi-modal connection with Riverside Drive, which is a designated arterial road, in order to provide a quality connection to the Ottawa Hospital Complex from the arterial road system; Grade-separate the proposed facility by passing under the existing CN Rail line, passing over the Transitway, and terminating Old Riverside Drive with cul-de-sacs; Realign Riverside Drive and pass the proposed facility over it, to enable the rail and Transitway grade-separations while maintaining acceptable roadway grades and safe road operating conditions; Bridge structure clearances are assumed to be 4.8m minimum for the high pavement point to the bottom of structure for a road overpass, and 5.0m minimum from the high pavement point to the bottom of structure for a rail overpass; Minimize site alteration of existing landfill areas, to lessen risks and potential costs related to potentially contaminated soil and groundwater in that area; and Minimize the impact of the project on the natural features of the Rideau River, by diminishing the amount of woodlot displaced, and by curtailing site alteration along river banks and flood plain. Given the nature of the design influences and objectives for this Section of the AVTC, the range of alternative design approaches is restricted. Design variables for this section are primarily alternative means of connecting to and crossing the realigned Riverside Drive. Three alternative designs were developed as described below. As well, the original 1994 RMOC concept for this section was also reconsidered. Riverside Section Alternative Design 1: Hincks Lane Connection The defining characteristics of this alternative (Figure 6-8) are as follows: West of Alta Vista Drive, the facility passes under the CN rail line, over the transitway, and over a realigned Riverside Drive; Old Riverside Drive is terminated with cul-de-sacs along both sides of the proposed facility, as there would not be sufficient vertical separation to allow it to pass under. Emergency vehicle access is provided to the north section of Old Riverside Drive from the westbound on-ramp to the Transitway; The alignment proceeds along the west side of the landfill mound area and along the east side of a wooded area adjacent to the Rideau River; Page 57

13 Alta Vista Transportation Corridor Environmental Study Report November 2005 A two-way full-movement road link would be provided to Riverside Drive west of the existing Hincks Lane intersection; The alignment allows for a possible future signalized intersection to adjacent NCC lands, if required; and The approach to the Rideau River crossing is designed to align with a potential connection to Nicholas Street at the Hwy 417 interchange. Riverside Section Alternative Design 2: Hincks Lane and Frobisher Lane Connections This design (Figure 6-9) is similar to Alternative Design 1 for this Section except that two connections between the proposed facility and Riverside Drive are proposed. The first connection is a one-way westbound connection from Riverside Drive at Hincks Lane to the proposed facility. The second connection is a one-way south/eastbound off-ramp connection from the proposed facility to realigned Riverside Drive at Frobisher Lane. Riverside Section Alternative Design 3: Frobisher Lane Connection This design (Figure 6-10) is similar to Alternative Design 2 for this Section except that the connection to the proposed facility from Riverside Drive at Hincks Lane is not provided. Riverside Section 1994 Concept This option (Figure 6-11), that influenced the City s acquisition of the portion of the existing AVTC between Riverside Drive and the Rideau River, involved the westerly diversion and extension of Riverside Drive (near Hincks Lane) across the Rideau River to a connection at the Nicholas and Hwy 417 interchange. The facility would connect with Riverside Drive in a clover-leaf format just north of Frobisher Lane. Riverside Drive and the Alta Vista Parkway would then merge into the same four-lane road for a distance of approximately 600m, before diverging back into their own corridors. The 1994 design concept was evaluated by the Study Team and was considered to fail because the roadway geometry used at the time was not consistent with current standards, and because the short distance of Riverside Drive (between its westerly diversion and the Alta Vista Parkway clover-leaf connection to it) provided insufficient weaving and merging distance for combined traffic volumes that would be using it. Significant safety and traffic operations issues would exist, and the short merging of two at-capacity arterials for a 600m distance would cause the common section of road and the intersections at either end to fail. Page 58

14 417 LEES 417 RIDEAU RIVER RIVERSIDE ALTA VISTA NICHOLAS BRUNSWICK LEES CHESTNUT SIMCOE SPRINGHURST RIVIÈRE RIDEAU OLD RIVERSIDE CN RAIL Figure 6-8: Riverside Section Alternative Design 1

15 417 RIDEAU RIVER LEES 417 RIVERSIDE ALTA VISTA NICHOLAS BRUNSWICK LEES CHESTNUT SIMCOE SPRINGHURST RIVIÈRE RIDEAU OLD RIVERSIDE CN RAIL Figure 6-9: Riverside Section Alternative Design 2

7.1 Refinements To The Preliminary Preferred Design Concept

7.1 Refinements To The Preliminary Preferred Design Concept 7.0 PREFERRED DESIGN AND ASSESSMENT 7.1 Refinements To The Preliminary Preferred Design Concept A preliminary preferred design concept, as described in the previous section, was identified for each of

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

Bank Street Secondary Plan

Bank Street Secondary Plan 1.1 Introduction The is a guide to the long term design and development of the portion of Bank Street between Riverside Drive and Ledbury Park, and provides direction on land use, built form, design, parking,

More information

Rideau River to Ledbury Park

Rideau River to Ledbury Park RUe Bank Plan de conception communautaire Bank StReet community Design Plan Rideau River to Ledbury Park March 2012 Prepared by: In association with: Greenberg Consultants Inc. D14-010-056 Bank Street

More information

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK Welcome! The purpose today is to: Present the Study Background; Describe Alignment Alternatives Analyzed; Present the Evaluation of

More information

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE TWO November 28, 2018 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting

More information

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). III. ALTERNATIVES A. CONSTRUCTION METHOD ALTERNATIVES NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives). One of the

More information

Urban Design Review Panel Submission. The Ottawa Train Yards - Office Development. 405 Terminal Avenue. 17 April Table of Contents.

Urban Design Review Panel Submission. The Ottawa Train Yards - Office Development. 405 Terminal Avenue. 17 April Table of Contents. Table of Contents PHOTOGRAPHS OF EXISTING SITE CONDITION URBAN DESIGN BRIEF PART A: Summary and Response to City Urban Design Guidelines and Policies PART B: Site Specific Urban Design Objectives PART

More information

Commissioners Road West Realignment Environmental Assessment

Commissioners Road West Realignment Environmental Assessment City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 1 March 30, 2017 Welcome to the Public Information Centre This first Public Information Centre

More information

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013 APPENDIX 5 - Guiding Design Vision and Principles Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013 Vision Statement The redevelopment of the former

More information

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015 St. Laurent Transit Improvements Innes / Industrial to Smyth Public Information Session December 2, 2015 Agenda Introduction Project Background Preliminary Design Widening for transit lanes Roadway resurfacing

More information

Route 7/15 Norwalk. Route 7/15 Norwalk Project Project Advisory Committee Meeting #5. Wednesday, November 14 th, Norwalk City Hall

Route 7/15 Norwalk. Route 7/15 Norwalk Project Project Advisory Committee Meeting #5. Wednesday, November 14 th, Norwalk City Hall Route 7/15 Norwalk Project Project Advisory Committee Meeting #5 Route 7/15 Norwalk PAC Meeting #5 November 14, 2018 Wednesday, November 14 th, Norwalk City Hall Route 7/15 Norwalk - AGENDA Introductions

More information

Right-of-Way Acquisitions and Relocations Technical Memorandum

Right-of-Way Acquisitions and Relocations Technical Memorandum Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional

More information

Services Department B September 10, 2007

Services Department B September 10, 2007 Report To: Development Services Committee Item: Date of Report: DS-07-246 September 5, 2007 From: Commissioner, Development File: Date of Meeting: Services Department B7200-0001 September 10, 2007 Subject:

More information

7.0 Confederation Heights

7.0 Confederation Heights 7.0 7.1 Location This chapter applies to the area generally bounded by the Rideau River, Riverside Drive, Brookfield Road, the CNR rail line, Data Centre Road, more specifically as shown on Schedule N

More information

SOUTH KEYS TO BLOSSOM PARK Bank Street Community Design Plan

SOUTH KEYS TO BLOSSOM PARK Bank Street Community Design Plan SOUTH KEYS TO BLOSSOM PARK Bank Street Community Design Plan September 28, 2015 1 Visit us: Ottawa.ca/planning This page has been intentionally left blank 2 Table of Contents 1.0 Introduction... 8 1.1

More information

Transportation. Strategies for Action

Transportation. Strategies for Action Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;

More information

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London Bostwick Road Municipal Class Environmental Assessment Public Information Centre #2 June 14, 2017 Welcome! Welcome to the 2 nd Public Information Centre for the. Representatives from the and the consulting

More information

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary Executive Summary Background As congestion continues to affect mobility in the region, the Ozarks Transportation Organization (OTO) is particularly concerned with traffic movement. The North-South Corridor

More information

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270. Seneca Meadows Seneca Meadows has an industrial park in its southern end and a mixed-use employment area planned for the north end. The district benefits from extensive I-270 visibility, stream valley

More information

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below: Race Road/Jessup Village Planning Study (H550601) Project Newsletter Spring 2015 Project Description The Study Team, consisting of staff from Anne Arundel County (Department of Public Works and Department

More information

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement (blank page) WestConnex New M5 5-42 (blank page) WestConnex New M5 5-44 5.5 Tunnels 5.5.1 Main alignment tunnels The main alignment tunnels would be about nine kilometres long, with the western tunnel

More information

Kanata Light Rail Transit Planning and Environmental Assessment Study

Kanata Light Rail Transit Planning and Environmental Assessment Study Kanata Light Rail Transit Planning and Environmental Assessment Study Public Open House #2 Transportation Services Department December 7, 2017 Agenda Review study progress Confirm the Preferred Corridor

More information

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT JUNE 2015 PREPARED BY: FOTENN Consultants Inc. 223 Mcleod Street Ottawa, ON K2P OZ8 (613) 730-5709 PREPARED FOR: Kanata

More information

Issues Requiring Future Study

Issues Requiring Future Study Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem

More information

Report to: Development Services Committee Report Date: April 24, 2017

Report to: Development Services Committee Report Date: April 24, 2017 SUBJECT: Cornell Rouge National Urban Park Gateway - Report on Design Charrette and Next Steps PREPARED BY: Lilli Duoba, MES, MCIP, RPP, Manager, Natural Heritage (ext. 7925) REVIEWED BY: Marg Wouters,

More information

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

WHAT IS THE PURPOSE OF THE OPEN HOUSE? WHAT IS THE PURPOSE OF THE OPEN HOUSE? OPEN HOUSE PURPOSE The purpose of the open house is to provide an update on the study process and introduce the preliminary concept alternatives. The open house provides

More information

Pedestrian Project Award Institute of Transportation Engineers

Pedestrian Project Award Institute of Transportation Engineers Pedestrian Project Award Institute of Transportation Engineers Rideau Canal Pedestrian Crossing Planning and Environmental Assessment Report The Setting The Rideau Canal and its adjacent pathways are highly

More information

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA 1 1 Purpose of Public Information Centre #2 To provide interested and/or potentially affected stakeholders with an opportunity to participate in the planning and decision-making process for this Municipal

More information

2290+ STADIUM VILLAGE STATION ABOVE FIELD) (T.O "

2290+ STADIUM VILLAGE STATION ABOVE FIELD) (T.O 1 + PROPOSED o.8 UROU 3 15 + 32+ 32 CROSS-OVER PROPOSED o.8 PROPOSED o.8 CROSS-OVER DOUBLE at H ia ha LR w 1:1 33 + 3 5+ 33 34 h:\projects\\hi-mu\layou\feasibiliy SUDY\Enhanced\_alignment_comparison.dgn

More information

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street Welcome City of Cornwall Municipal Class Environmental Assessment Proposed Improvement and Extension of Lemay Street Redevelopment and Design of the Municipal Works Yard Public Information Centre #1 Thursday,

More information

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21 Table 2-4: North Segment Alignment Analysis 2-21 SCARBOROUGH RAPID TRANSIT Based on the above analysis (detailed analysis is contained in Appendix A-4), North Alignment 3 is preferred because it: Has the

More information

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative

More information

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

TOWN OF WHITBY REPORT RECOMMENDATION REPORT TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Council REPORT NO: PL 95-09 DATE OF MEETING: October 13, 2009 PREPARED BY: Planning/Public Works Joint Report FILE NO(S): N/A LOCATION: N/A REPORT

More information

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE 3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations

More information

Services Department F May 28, 2007

Services Department F May 28, 2007 Report To: Development Services Committee Item: Date of Report: From: DS-07-144 May 23, 2007 Commissioner, Development File: Date of Meeting: Services Department F-7000-0013 May 28, 2007 Subject: Gibb

More information

Mavis Road Class Environmental Assessment

Mavis Road Class Environmental Assessment Mavis Road Class Environmental Assessment Public Information Centre #2 Wednesday November 9, 2016 6:00 to 8:00 p.m. Please sign in and complete a comment sheet Review the displays on your own or join in

More information

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement Durham-Orange Light Rail Transit Project October 2016 1. Introduction The Combined FEIS/ROD summarizes the effects of the D-O LRT

More information

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES In This Chapter Goals & Strategies 182 Project List 183 Future Land Use 186 11 IMPLEMENTATION STRATEGIES NORTH AUGUSTA, SC 2017 COMPREHENSIVE PLAN 179 Individual commitment to a group effort that is what

More information

Eglinton West LRT Update

Eglinton West LRT Update Eglinton West LRT Update Community Consultation Update May 16, 2016 Background Rapid transit along Eglinton Ave between Kennedy Station and Pearson Airport was included in the Metrolinx Regional Transportation

More information

PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON

PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON Conseil des écoles publiques de l'est de l'ontario (CEPEO) French Public School Board TABLE OF CONTENTS

More information

5.0 Community Design Plan

5.0 Community Design Plan 5.0 Community Design Plan The Community Design Plan for the Mer Bleue area is a composite of three plans: Land Use Plan Transportation Plan Municipal Servicing Plan Read together, these Plans and associated

More information

Southeast Extension to RidgeGate Parkway Scoping Booklet

Southeast Extension to RidgeGate Parkway Scoping Booklet Southeast Extension to RidgeGate Parkway Scoping Booklet PUBLIC SCOPING MEETING SCHEDULE Public Scoping Meeting Wednesday, November 2, 2011 6:00pm to 7:30pm City of Lone Tree Recreation Center Willow Room

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016] [Amendment #166, January 12, 2016] The policies of this Secondary Plan are in effect, save and except for the property at 560 Rideau Street, for which there remains a site specific appeal to this Secondary

More information

Complete Neighbourhood Guidelines Review Tool

Complete Neighbourhood Guidelines Review Tool Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The

More information

7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT

7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT 7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations contained

More information

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Carteret Industrial Road 98547 This project will address the upgrade of Carteret Industrial Road. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under

More information

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Pubic Information Centre #1 Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Open House # 1 Tonight, we invite you to.

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study Reconstruction of Regional Road 45 (Creek Road) Between Regional Road 27 (River Road) and Regional Road 63 (Canborough Road) in the Township of Wainfleet Municipal Class EA Study Public Information Centre

More information

A. INTRODUCTION B. PROJECT LOCATION

A. INTRODUCTION B. PROJECT LOCATION Chapter 1: Project Description A. INTRODUCTION The Lower Manhattan Development Corporation (LMDC), a subsidiary of the New York State Urban Development Corporation, doing business as the Empire State Development

More information

Precinct. Strategies5

Precinct. Strategies5 This section describes the distinct precincts that make up the campus and the specific opportunities and proposed initiatives associated with each. It sets the stage for the Precinct Plans, which provide

More information

Bylaw C-1186 Adopted November 5, Planning and Development Services

Bylaw C-1186 Adopted November 5, Planning and Development Services Bylaw C-1186 Adopted November 5, 2007 Planning and Development Services CITY OF GRANDE PRAIRIE OFFICE CONSOLIDATION BYLAW C-1186 A Bylaw to adopt the Westgate Area Structure Plan (As Amended by Bylaw C-1186-1,

More information

B. Paul Croft, MCIP, RPP Senior Transportation Planner, Delcan Corporation

B. Paul Croft, MCIP, RPP Senior Transportation Planner, Delcan Corporation Downtown Ottawa Transit Tunnel (DOTT) Planning and Environmental Assessment (EA) Study: Strengthening Transit and Land Use Integration in the National Capital B. Paul Croft, MCIP, RPP Senior Transportation

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Town Center. Block 5 Existing multifamily residential units are expected to remain. Area Guidelines Germantown s districts should be developed as distinct communities with unique features that are supported through the guidelines. The guidelines not only help distinguish these districts

More information

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA FINANCIAL PROJECT ID NUMBER 411189-2-22-01 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 4 Prepared

More information

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

Official Plan Amendment Number 272

Official Plan Amendment Number 272 Official Plan Amendment Number 272 to the Official Plan of The Corporation of the Town of Oakville NORTH OAKVILLE EAST SECONDARY PLAN Town of Oakville Official Plan Amendment 272 Part 1, Constitutional

More information

Commissioners Road West Realignment Environmental Assessment

Commissioners Road West Realignment Environmental Assessment City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 2 November 29, 2017 Welcome to the Public Information Centre This 2 nd Public Information Centre

More information

Appendix E: Evaluation of Network Alternatives - July 2017

Appendix E: Evaluation of Network Alternatives - July 2017 Appendix E: Evaluation of Network Alternatives - July 2017 1 Overview This Appendix provides information used in the corridor level screening and detailed corridor assessment. Corridor Level Screening:

More information

OVERVIEW OF PLANS FOR THE JEFFERSON COUNTY COUNTRYSIDE FARM In the Context of Quality Place Characteristics

OVERVIEW OF PLANS FOR THE JEFFERSON COUNTY COUNTRYSIDE FARM In the Context of Quality Place Characteristics OVERVIEW OF PLANS FOR THE JEFFERSON COUNTY COUNTRYSIDE FARM In the Context of Quality Place Characteristics By Steve Grabow, Professor and Community Development Educator University of Wisconsin-Extension,

More information

4. INITIAL CONCEPT DEVELOPMENT AND SCREENING

4. INITIAL CONCEPT DEVELOPMENT AND SCREENING 4. INITIAL CONCEPT DEVELOPMENT AND SCREENING A coordinated effort by the project team and members of the three oversight committees (Citizen Advisory, Technical Advisory, and Steering) led to 17 initial

More information

Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment

Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment Note: Due to the broad scope of the Official Plan Review, this list is not exhaustive of the extent of changes in the comprehensive

More information

BESSARION-LESLIE CONTEXT PLAN

BESSARION-LESLIE CONTEXT PLAN Development in the Bessarion-Leslie area will be consistent with the following urban design guidelines. They provide a framework for development in the area and are to be read in conjunction with the urban

More information

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017 Community Meeting No. 2 May 31, 2017 Transportation Projects On or Near SH 199 SH 199 from 0.3 miles south of FM 1886 to south end of Lake Worth bridge Construct freeway mainlanes and frontage roads 10-Year

More information

Emery Village Road 2A Municipal Class Environmental Assessment Study

Emery Village Road 2A Municipal Class Environmental Assessment Study PW12.11 STAFF REPORT ACTION REQUIRED Emery Village Road 2A Municipal Class Environmental Assessment Study Date: March 30, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3 1 Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Study Process and Purpose of PIC 3 2 Study Commencement February 2016 Phase 1: Problem and Opportunity Identify problems and opportunities

More information

CONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS

CONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS 8-2 Land Use 8.0 LAND USE CONTENTS 8.1 GENERAL LAND USE 8.1.1 Uses provided for in all Land Use Designations 8.1.2 Uses prohibited in Hazardous Lands, Hazardous Sites and Special Policy Areas 8.1.3 Uses

More information

The Commissioner of Engineering and Public Works recommends that this report be received for information purposes.

The Commissioner of Engineering and Public Works recommends that this report be received for information purposes. COMMITTEE OF THE WHOLE FEBRUARY 1, 2011 407 TRANSITWAY - ENVIRONMENTAL PROJECT REPORT MINISTRY OF TRANSPORTATION CITY WIDE Recommendation The Commissioner of Engineering and Public Works recommends that

More information

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc.

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc. Commercial Development Proposal 2168 Tenth Line Road Report September 2015 Prepared for Minto Developments Inc. Paquette Planning Associates Ltd. 56 Hutchison Avenue Ottawa, Ontario K1Y 4A3 PH: 613-722-7217

More information

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting.

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting. N HIGHWAY OFF RAMP 2.5 Roads A legible road network with a clear hierarchy will help create a connected community, both within and surrounding the Milton Heights. The following section outlines the proposed

More information

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights ANCHORAGE PARKS & RECREATION Nichols Park Design and improve neighborhood park 2008 Challenge Grant applicant. 2008 $500K State Grant for Neighborhood Parks. Tikishla Park Lighting, paved parking, hockey

More information

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1 1 Adelaide Street / Canadian Pacific Railway (CPR) Why Are We Here? 2 The purpose of Public Information Centre (PIC) #1 is to: Introduce the study Provide the study background and context Identify the

More information

Co-ordinator Transportation Committee. Director Engineering Division Environment and Transportation Department HUNT CLUB ROAD INTERCHANGE

Co-ordinator Transportation Committee. Director Engineering Division Environment and Transportation Department HUNT CLUB ROAD INTERCHANGE 38 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 12-97-R079 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

Edmonton s LRT Setting the Stage for Heading Further South

Edmonton s LRT Setting the Stage for Heading Further South 4 Capital Projects Project Updates Edmonton s LRT Setting the Stage for Heading Further South Art Washuta, P.Eng. AECOM Canada Ltd. Edmonton, Alberta Carole Cej, P.Eng. City of Edmonton Edmonton, Alberta

More information

APPENDIX C SPECIAL PLANNING AREAS

APPENDIX C SPECIAL PLANNING AREAS SPECIAL PLANNING AREAS There are five Special Planning Areas (SPAs) on the Land Use Diagram (Figure LU-2). The SPAs are areas with significant new growth potential that require more detailed subsequent

More information

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY SEPTEMBER 2016 Introduction The Platteview Road Corridor Study was led by the Metropolitan Area Planning Agency (MAPA) with assistance from

More information

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background TRAINING SESSION 1: The Urban Design Streetscape Manual is a reference tool developed to help implement City policy and guide the design, construction and maintenance of streetscape improvements in Toronto.

More information

3.0 master plan concept

3.0 master plan concept 3.0 master plan concept 3.1 introduction The purpose of the Huron Church Road Master Plan Concept is to provide an overview of the Master Plan design process, identify preliminary streetscape installations

More information

appendix and street interface guidelines

appendix and street interface guidelines appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher

More information

Animating the Rideau Canal December 2013

Animating the Rideau Canal December 2013 Executive Summary Animating the Rideau Canal December 2013 Why study the Rideau Canal? The Rideau Canal has been an important part of Ottawa throughout its history, and has shaped and been shaped by the

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

178 Carruthers Properties Inc.

178 Carruthers Properties Inc. 178 Carruthers Properties Inc. Planning Rationale for 178 Carruthers Avenue Site Plan Control Application June 2014 Table of Contents 1.0 Introduction 2.0 Overview of Subject Property 3.0 Current Zoning

More information

TABLE OF CONTENTS INTRODUCTION PLAN CONCEPT... 3

TABLE OF CONTENTS INTRODUCTION PLAN CONCEPT... 3 TABLE OF CONTENTS BY-LAW NO. Z-1 INTRODUCTION... 1 1.0 PLAN CONCEPT... 3 1.1 Mission... 3 1.2 A Future Vision for Fredericton... 3 1.3 Growth Strategy Goals... 5 National Context... 5 Provincial Context...

More information

1.0 South Nepean Secondary Plan for Areas 1, 2 & 3

1.0 South Nepean Secondary Plan for Areas 1, 2 & 3 1.0 South Nepean Secondary Plan for Areas 1, 2 & 3 1.1 Introduction This Secondary Plan has been prepared to provide a more detailed approach to policy formulation and implementation than provided for

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

WELCOME TO OPEN HOUSE # 3

WELCOME TO OPEN HOUSE # 3 Bayview Avenue Class Environmental Assessment Study Steeles Avenue to Elgin Mills Road WELCOME TO OPEN HOUSE # 3 Please sign in and join our mailing list Why Are We Here Tonight? Study Process and Purpose

More information

141 GEORGE STREET PLANNING RATIONALE

141 GEORGE STREET PLANNING RATIONALE 141 GEORGE STREET PLANNING RATIONALE MINOR ZONING BY-LAW AMENDMENT NOVEMBER 2, 2016 PLANNING RATIONALE 223 McLeod Street Ottawa, ON K2P 0Z8 613.730.5709 fotenn.com INTRODUCTION FOTENN Consultants is acting

More information

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015 Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment Public Information Centre #2 April 22, 2015 1. Study Process PHASE 1 PHASE 2 PHASE 3 PHASE 1 : Problem/Opportunity

More information

Background Summary Report

Background Summary Report Background Summary Report May 2014 Submitted by Macaulay Shiomi Howson Ltd. In association with AMEC MMM Group Brook McIlroy Inc. Hemson Consulting Ltd. Table of Contents 1. Introduction... 1 2. Why is

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT DATE: January 26, 2017 SUBJECT: The Virginia Department of Transportation s Transform I-66 Inside the

More information

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH 112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG060310124909PGH C ontents Introduction 1 Project Overview 1 Public Involvement and Technical Coordination 4 Description

More information

City of Toronto. Emery Village Transportation Master Plan

City of Toronto. Emery Village Transportation Master Plan City of Toronto Emery Village Transportation Master Plan May 2009 Emery Village Transportation Master Plan Toronto, ON May 2009 Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel:

More information

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities A. Background 1 A Main Street Master Plan Study was performed and completed in October of 2007. The study was initiated to review current land uses and development patterns along Main Street, from Parrish

More information

4.1 Build Alternative 1 Construction Phasing

4.1 Build Alternative 1 Construction Phasing SECTION 4 Implementation Plan This section discusses potential segmentation of the build alternatives into multiple projects for implementation of improvements to the NSH from Rabbit Creek Road to 36th

More information

Riverside South. Rapid Transit Study. Riverside South. Value Planning Workshop

Riverside South. Rapid Transit Study. Riverside South. Value Planning Workshop Riverside South Rapid Transit Study Peter Steacy, P. Eng. Program Manager Transportation Environmental Assessments City of Ottawa Value Planning Workshop Christopher Gordon, P. Eng. Project Manager Transportation

More information