New Neighbourhood at South Bradwell, Great Yarmouth Persimmon Homes Ltd Environmental Statement Non Technical Summary.

Size: px
Start display at page:

Download "New Neighbourhood at South Bradwell, Great Yarmouth Persimmon Homes Ltd Environmental Statement Non Technical Summary."

Transcription

1 New Neighbourhood at South Bradwell, Great Yarmouth Persimmon Homes Ltd November 2013

2

3 Table of Contents 1 INTRODUCTION 1 2 WHAT ARE THE PROPOSALS? 5 3 THE ENVIRONMENTAL EFFECTS AND HOW THEY WILL BE MINIMISED 9 4 CONCLUSIONS 19 5 WHAT HAPPENS NEXT? 27

4

5 Introduction 1

6

7 1 INTRODUCTION 1.1 Persimmon Homes Limited are seeking planning permission for land to the south of Bradwell, in the Borough of Great Yarmouth, hereafter referred to as the application site. The Proposed Development is for upto 850 market and affordable homes, public open space, local community facilities, and flexible mixed use development areas well linked to existing facilities, employment locations and other services including delivery of part of the A12/ A143 Great Yarmouth Link Road. 1.2 The application is submitted as a hybrid as follows: i. Full planning permission sought for Phase 1 of the residential development (8.3ha), including 150 houses, open space, highway improvements (new junction onto the A143 and the first section of the new Link Road); ii. Outline planning permission across the remainder of the site (47.7ha) for upto 700 new homes, 10.36ha of commercial/ employment land, a new primary school, local neighbourhood centre, including retail and other community uses. 1.3 The Local Planning Authority (LPA), Great Yarmouth Borough Council (GYBC), consider that the proposals constitute EIA Development for the purposes of the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 ( the EIA Regulations ) and, as such, an (ES) is required. 1.4 An (ES) is then prepared that explains the findings of the EIA process. This is to make sure that, before new development is allowed to go ahead, the Local Planning Authority has all the necessary environmental information before them, and that the likely significant environmental effects have been assessed and that the mitigation measures envisaged can be controlled to remove, reduce or remedy the adverse effects identified before planning permission is granted. 1.5 The contains the detailed environmental information which has been requested by both Great Yarmouth Borough Council and its consultees, to assist them, as the decision maker, in determining the planning application. 1.6 This document provides a summary, in nontechnical language, of the Environmental Statement submitted in support of the application for planning permission to develop land south of Bradwell 1.7 A copy of the and other application documents can be viewed at the offices of Great Yarmouth Borough Council, at the following address during their normal office hours: Great Yarmouth Borough Council Town Hall Hall Plain Great Yarmouth Norfolk 1.8 A paper copy of the, together with its technical appendices, can be purchased from Bidwells (address below) at a cost of Alternatively, a CD containing the planning application submission (which includes the ) is also available to purchase at a cost of (prices are inclusive of VAT). Bidwells 16 Upper King Street Norwich Norfolk NR3 1HA 1

8

9 What are the proposals and who has been involved? 2

10

11 2 WHAT ARE THE PROPOSALS? Background to the Proposed Development Area 2.1 The site adjoins the merged settlements of Bradwell and Gorleston, between the A143 Beccles Road, Bradwell and Woodfarm Lane, Gorleston. Bradwell is located to the north east and Gorleston directly to the east. The James Paget Hospital is located due east of the site. 2.2 To the south west of the site is the village of Browston Green which includes Browston Hotel and golf course. The large village of Belton is located to the north west of the site. 2.3 There are some dwellings associated with the site of Hobland Hall on Hobland Road to the south of the site. 2.4 Wheatcroft Farm and Cottages are located on the southern edge of the proposal site. The farm contains various historic buildings. The cottages, located at the junction of Clay and Gorleston Lanes, are not present on the 1891 map of the area but are present on the The site ranges in topography from approximately 8-13m AOD. There is a ridge of land at approximately 12-13m AOD running south east to north west across the site. These subtle changes in site level provide some screening to the land in the north east of the site. 2.6 The site slopes away from the central ridge towards the north east and south west. There are no drainage ditches on the site as would be characteristic in some other parts of Norfolk and Suffolk. 2.7 The site is currently in use for arable farming and is understood to have been so in recent history. 2.8 Many of the original enclosure field boundaries have been removed within the last 100 years, although some remain. The most notable of these are those either side of Clay Lane footpath. 2.9 There are two vehicular tracks into the site, one from Browston Lane, which runs eastwards to Wheatcroft Farm, and Gorleston Lane, which runs westwards from Woodfarm Lane to Wheatcroft Cottages Browston Lane runs across the western point of the site from the A143 to Browston Green. This is to be diverted as part of the new road proposals Woodfarm Lane runs from Beacon Park and joins into Oriel Avenue at the eastern part of the site There are two public footpaths running into or past the site. The first of these is Clay Lane/ Hobland Lane, which runs in a north/south direction through the centre of the site from the A143 to Hobland Road. The second is Jew s Lane, which runs along part of the eastern edge of the site from the A143 in Bradwell to Woodfarm Lane. The Site and its Setting 2.13 The site adjoins the merged settlements of Bradwell and Gorleston, between the A143 Beccles Road, Bradwell and Woodfarm Lane, Gorleston. The development pattern to the north of the site in Bradwell is mainly medium density family housing, with a mixture of housing types. There is also an existing development site, currently under construction further to the north east, adjacent to an area of allotments. There is little landscaping on these boundaries. To the east, in Gorleston, are school playing fields, and Beacon Park. Description of the Proposals 2.14 The area will be developed as a medium scale sustainable urban extension, well related to the Great Yarmouth/Bradwell/Gorleston area. It will comprise a number of linked neighbourhoods, integrated with existing and established communities and neighbourhoods It will comprise at least 850 market and affordable homes, public open space, local community facilities and flexible mixed use employment area well linked to existing facilities, employment locations and other services could include local schools, shops and medical facilities. 5

12 2.16 Importantly, the development of the land will also enable the delivery of the A12/A143 Great Yarmouth Link Road. Concept Masterplan 2.17 The new Link Road, which has received Central Government funding to support upto 70% of the construction costs, will vastly improve transport links in the area, particularly to and from the A143 Beccles Road and areas to the west. This link will greatly improve access to and from the James Paget Hospital and Beacon Park employment areas and the rest of Gorleston and Southern Great Yarmouth, without the need to go through residential areas in Bradwell and neighbouring areas, significantly reducing pressure on the A143 close to Great Yarmouth The new Bradwell to Gorleston access road will reduce transport pressures on the southern part of Oriel Avenue, by enabling a new link from Oriel Avenue to the access road between the school and football ground The detailed planning application for the A12/ A143 Great Yarmouth Link Road is being submitted by and determined by Norfolk County Council. In order to retain the Government funding, the majority of the Link Road will need to be constructed by March View Towards Central Open Space (Phase 1) Who Has Been Involved? 2.20 The following organisations have been engaged by either the Local Planning Authority or the Applicant s project team to inform the EIA process and the preparation of the planning application: Great Yarmouth Borough Council Officers: -- Planning; -- Environmental Health/Protection Norfolk County Council: -- Highways; -- Ecology. Environment Agency; Anglian Water; Historic Environment Service; Natural England; Norfolk Wildlife Trust; Highways Agency; UK Power Networks; BT Open Reach; National Grid A full list of consultees are outlined within the Statement of Community Involvement submitted with the planning application. 6

13 The environmental effects and how they will be minimised 3

14

15 3 THE ENVIRONMENTAL EFFECTS AND HOW THEY WILL BE MINIMISED Legal Framework for the Environmental Impact Assessment 3.1 The Environmental Impact Assessment has been carried out in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations An assessment of the effects has been made and measures to reduce adverse effects recommended. Approach to Assessment 3.2 The approach taken to the EIA is to assess the likely significant direct and indirect effects of the Proposed Development on relevant receptors and environmental resources by evaluating changes to the baseline environment that are attributable to the Proposed Development. 3.3 In describing the significance of the effects identified in these assessments of environmental topics, a seven-point scale is generally used: Major adverse; Moderate adverse; Minor adverse; Negligible/Neutral; Minor beneficial; Moderate beneficial; Major beneficial. 3.4 The potential environmental effects have been considered against a pre-development baseline (i.e. existing site conditions) and the potential effects are measured on the basis of the extent to which they deviate from this baseline, their significance and the potential for avoiding or ameliorating such effects. These mitigation measures have been identified and incorporated within the application proposals, taking account of the cumulative or interactive environmental effects arising from the Proposed Development together with other development projects in the local area. Scoping 3.5 In order to focus the on those aspects of the development that have the potential to give rise to likely significant environmental effects, a scoping report was submitted to Great Yarmouth Borough Council at the conception of this project. As the project has developed, and the assessment work has been undertaken, the scope of the Environmental Statement has been refined. The scoping report was submitted to Great Yarmouth Borough Council on 9 July 2012, and their Scoping Opinion was adopted on 14 September The purpose of this scoping stage was to ensure that all relevant environmental issues were identified and assessed to provide the Local Planning Authority and its consultees with the opportunity to comment on the proposed content of the and the assessment methodology/techniques to be used. 3.7 The advice received back from Great Yarmouth Borough Council identified that the Proposed Development was likely to raise a number of issues that would need to be considered by the EIA process and, as a result, the intention was to assess the impacts of the Proposed Development upon the following environmental aspects: Agriculture; Air Quality; Archaeology; Climate Change & Renewable Energy; Ecology; Flood Risk, Drainage & Water Resources; Landscape & Visual Impact; Noise; Socio Economic; Transport; and Utility Infrastructure. 3.8 For each of the environmental aspects identified above, the assessment of impacts considered the impacts arising during both the construction and operational phases of the Proposed Development. The operational phase refers to the stage when the development is completed and occupied. 3.9 The following section provides a summary of the conclusions for each of the topics assessed, as part of the EIA process and reported within the. 9

16 Agriculture 3.10 The Agricultural Land Classification maps identify the Proposed Development land as Grade 1 & 2, although the maps are considered inaccurate and only soil sampling would confirm the grade. Notwithstanding this, it is assumed that the land is a mix of Grade 1 and Grade 2 agricultural land Although there are no measures to mitigate the permanent loss of agricultural land, only 0.04% of the total area of Grade 1 & 2 land in Norfolk and less than 1% of this grade of land in Great Yarmouth Borough would be lost to the development The ability for the remainder of the farms and adjoining agricultural land to remain in productive agricultural use will not be jeopardised by the scheme. The receipts from the sale of the land will provide capital investment for the farming business. Air Quality 3.13 There are no Air Quality Management Areas designated in the immediate vicinity of the Proposed Development. Background data for the Site and available monitoring data in the surrounding area suggests that the current nitrogen dioxide (NO 2 ) and particulate matter (PM 10 ) concentrations are below the Air Quality Strategy objectives An assessment of the potential effects on local air quality from construction and operational activities on the Proposed Development has been carried out. The methodology has been discussed and agreed with Great Yarmouth Borough Council s Environmental Health Officer A qualitative assessment of the potential effects on local air quality from construction activities on the Proposed Development has been carried out. This showed that during site activities releases of dust and PM 10 were likely to occur. The greatest potential for nuisance problems to occur will be within 350 metres of the construction site perimeter and 500m from the site access. However, through good site practice and the implementation of suitable mitigation measures through a Construction Environmental Management Plan, the residual effect of dust and PM 10 releases will be reduced to acceptable levels (minor adverse to negligible significance for human receptors and negligible significance for ecological receptors) and will be temporary An air quality assessment of the potential effects during the construction and operational phases was undertaken using an air quality dispersion model (ADMS Roads) to predict the changes in NO 2 and PM 10 concentrations that would occur due to traffic flows associated with the construction and operation of the Proposed Development The results showed that the construction of the Proposed Development would have an insignificant effect on NO 2 and PM 10 concentrations and would not cause any exceedances of the statutory objectives for these pollutants With the Proposed Development operational, the results of the air dispersion modelling showed that there would be an insignificant effect on PM 10 concentrations, but that there may be significant (moderate adverse) effects on NO 2 concentrations. Notwithstanding this, all pollutant concentrations are predicted to meet the statutory objectives with the Proposed Development operational, and the Proposed Development is, therefore, considered to comply with national and local policy. Archaeology 3.19 Archaeological survey (fieldwalking and geophysical survey) and research (archaeological desk-based assessment) has demonstrated that the Application Site has the potential to contain archaeological remains of prehistoric and postmedieval date and a lesser potential to contain remains of Romano-British, Saxon and medieval date Groundworks associated with the Proposed Development have the potential to disturb or destroy any archaeological remains that may exist within the Application Site. In order to mitigate for this, further archaeological work will be required. A programme of archaeological trial trench evaluation has been agreed with the local authority and this will help to determine the extent and character of any archaeological remains within the site. This work will help to identify if further mitigation work is required; any such work is likely to comprise open-area excavation, but this must be agreed with the Norfolk Historic Environment Service prior to it being carried out The Proposed Development also has the potential to impact upon the historic character 10

17 of the surrounding area. However, this impact is likely to be of negligible significance and mitigation may only be achieved through the design of the Proposed Development Residual impacts are minimal, although archaeological excavation, by its very nature, leads to the destruction of archaeological remains. The records and data generated, however, have the potential to contribute to a greater understanding of the archaeology of the area and this may, therefore, be seen as a beneficial impact of the Proposed Development The effect of the Proposed Development in conjunction with other planned developments in the surrounding area comprises the gradual loss of the archaeological resource of the wider area and the loss or alteration of the historic landscape in this same area. The use of appropriate mitigation measures, as proposed for this site, will help to reduce the effect of the adverse impacts associated with development. Climate Change & Renewable Energy 3.24 The Proposed Development will impact on climate change, primarily through the emission of greenhouse gases during manufacture, construction and occupation. The emissions, primarily Carbon Dioxide (CO 2 ) and Nitrogen Oxide (NO x ), have been calculated for all activities associated with the Proposed Development, including the transport of materials to site and the transport movements associated with occupation The development is replacing agricultural land and, as a result, there is an increase in emissions. The mitigation measures proposed result in a 10% reduction in emissions, when compared to development constructed to current regulations and that 10% of the energy demand will be provided by renewable sources The emissions arising from the Proposed Development represent % of the UK emissions and clearly an even smaller proportion of international emissions. The impact of the development is therefore not considered significant in the context of national and international figures The impact that Climate Change will have on the development has been considered in relation to rising temperatures. The design of the housing to the latest Building Regulations and the non-residential buildings to BREEAM very good rating (formally or informally) provides a robust design to minimise the impact of rising temperatures in relation to passive solar design and ventilation. Ecology 3.28 The site currently consists of an area of arable land, including hedgerows, mature trees, and small area of improved grassland and scrub. It is directly adjacent to existing urban development on its north and east sides, but has open farmland to the south and east There were no nationally protected [Schedule 1] birds, rare or scarce plants or Great Crested Newts identified on the site or being affected by the development The site has, amongst others, the following features of interest : Two European protected sites [Natura 2000], being Breydon Water and Halvergate Marshes within 4km; Locally significant lengths of hedgerows and grass field margins; Minor use by grass snake; Communities of breeding and wintering birds typical of an arable landscape, including breeding Skylark, Yellow hammer and Song Thrush; Low levels of usage by six species of bats for foraging and commuting; Bat roosts within mature trees on the site and within adjacent farm buildings An assessment was made of the effects of the future project against this baseline scenario Given the provision of public open space on the site compliant with Natural England s Accessible Natural Greenspace Standards, which allows for sufficient greenspace to be provided within the development itself, no indirect effects from increased recreational pressures are seen as likely on the European protected sites of Breydon Water and Halvergate Marshes The present site restoration scheme will result in a net loss of arable land, but a net gain in hedgerows and grassland. There will be a minor temporary loss of hedgerows as some are removed for the development, though these are mostly non-linking hedgerows. Postdevelopment, the length of hedgerows will be 11

18 more than double than existing, though these will take some years to mature. The habitat creation should result in a positive contribution to the following national action plans for habitats [Section 41 habitats]: Lowland Mixed Deciduous Woodland; Hedgerows; Ponds; Lowland Meadows In addition, with mitigation works undertaken and habitat creation as outlined, there should be a positive contribution for the following national action plans species [Section 41 ]: Common Toads; Hedgehogs; Song Thrush; Noctule, Soprano Pipistrelle and Brown Long-eared Bats Existing arable bird communities will be replaced by more urban and woodland species The resulting avoidable effects of development are identified and potential mitigation provided. These include specific measures for nesting birds, for any Grass Snake and for any bats, as well as protection during construction of habitats within the immediate surrounding area To inform long-term management of landscaping areas and other public open spaces, a Biodiversity Action Plan is suggested for the site. It is recommended that any woodland management plan should be undertaken to the standards of the UK Woodland Assurance Scheme There are no significant remaining effects once mitigation is taken into account. Given that the mitigation is delivered, then there are no significant constraints for site development from ecology. Flood Risk & Drainage 3.39 An assessment of the scheme has considered the potential impacts of the Proposed Development on flood risk, drainage and water resources both during the construction phase and upon completion Anglian Water confirm that the sewerage system has sufficient capacity to accommodate the development and that it will not cause any significant detriment to the capacity of the existing sewerage system. The additional volume of flow will also not result in any reduction in quality or increased discharges to the environment The proposed system of surface water infiltration and storage within the development site will ensure that there is no significant flood risk to downstream land owners. Using unlined features, designed to take into account climate change, will ensure that water can soak into the ground at all times and not cause a problem off-site Essex and Suffolk Water supply drinking water to the area from its Water Treatment Works at Lound and have confirmed that there is sufficient spare capacity to supply the application site. There is no need for any new resources such as boreholes since Lound Water Treatment Works is supplied from Fritton & Lound Lakes, fed from the River Waveney. Water saving devices can be installed in all properties which will reduce the potential demand on the existing resources available It may be summarised that no significant environmental effects will result in relation to drainage and water resources from the development proposals at South Bradwell. Landscape and Visual Impact 3.44 An assessment of the local landscape and townscape in and around the proposal site has been undertaken to ascertain the potential landscape, townscape and visual impacts of the development upon the proposal site and its surroundings The assessment distinguishes between landscape (townscape) impacts and visual impacts. Landscape impacts are changes in the fabric, character and quality of the landscape. Visual impacts relate solely to changes in available views of the landscape and the effects of those changes on people. Impacts can be beneficial as well as adverse The Landscape and Visual Impact Assessment has been produced in accordance with prevailing professional guidance. Landscape Assessment 3.47 In general, the wider area, particularly that to the south, is of good quality with frequent areas of woodland and a strong network of wellmaintained hedgerows with trees. However, the area of the proposal site and to the north west is a degraded landscape with incongruous features 12

19 such as the pylons and buildings from a range of periods with associated sheds and barns. The majority of hedgerows have been removed over the past 100 years. The edge of the current built form of Bradwell does not sit sensitively into the landscape and its transition into the open landscape has not been considered The local landscape demonstrates few designated areas outside of the Broads and has no ancient woodland. Hedgerow loss is notable The site is generally level and is in use for arable farming. Many of the hedgerows and trees have been removed through farming practices, although key hedgerows run along both sides of Clay Lane footpath which cuts across the site in approximately north south direction. Another hedgerow runs alongside Jew s Lane, which marks the north eastern boundary of the proposal site. Away from these key hedgerows, there are few landscape features within the site due to farming practices and lack of maintenance Predicted impacts are generally of a beneficial nature due to the restoration of the landscape structure of the area of the proposal site and the introduction of new landscape features throughout The only potential impacts which may be adverse in nature relate to the setting of Clay Lane footpath and Wheatcroft Cottages. These impacts relate to the change in the setting of these elements through the addition of new areas of development where there is currently none. Visual Assessment 3.52 The visual envelope of the Proposed Development is small and is mainly limited to viewpoints in the region of Hobland Road to the south, from Browston Lane to the south west and the A143 to the west. Views are possible from locations immediately adjacent to the proposal site The Proposed Development has a relatively small Zone of Visual Influence (ZVI), which is generally restricted to viewpoints within the A143, Browston Lane and Hobland Road. Close views are also possible from the neighbouring dwellings and the Public Rights of Way which pass through the site The effects of greatest magnitude are on receptors in residential dwellings and on Public Rights of Way adjacent to the proposal site. The sensitivity of these receptors to change is reduced due to the low visual amenity of the area resulting from the degraded condition of the landscape Mitigation measures relate to the introduction of a strong landscape infrastructure, which is not designed to screen views towards the residential development but to soften views towards it and aid its integration into the local landscape Once mitigation has matured, the Proposed Development will form a sensitive extension to Bradwell and a well-designed edge to the built form. Maturation of vegetation will take time and its continued maintenance is essential to successful establishment In summary, the Proposed Development will result in the loss of an area of rural countryside which contains few landscape features and has a very low landscape value. The development will restore and enhance the landscape structure, contributing to the local landscape character and helping the development to integrate sensitively into the local landscape The development has the potential to provide a positive addition to the local area and to Bradwell as a whole. Noise 3.59 In terms of acoustics, there are three aspects of the development that have been examined; noise from construction activities, the potential for the site to have a noise impact on existing properties, and the provision of a satisfactory acoustic environment for future residents Construction noise is subject to specific legislative control and the development will be managed using a Construction Environment Management Plan that will ensure noise impacts are minimised It is unlikely that the new development would produce noise levels that would affect existing properties as it is predominantly residential in nature, but the increase in traffic on the local road network will increase noise levels, albeit by a small margin in the majority of cases. On the majority of roads in the area, the increase in road traffic will result in a slight increase in noise levels. 13

20 3.62 The new employment area is remote from existing dwellings and is unlikely to affect them due to the separation distance. Noise emissions from the employment area may be controlled so as not to affect the new dwellings and this will, therefore, ensure existing properties are protected A relatively small part of the site is affected by road traffic noise from the adjacent A143 and the proposed new Link Road, but the effect reduces as the separation distance from the road increases No other noise sources are likely to affect future residents. For the overwhelming majority of new dwellings, provided they are separated from the A143 and the Link Road by sufficient distance, noise levels, both internally and externally, will meet the requirements of the local authority. For a small number of proposed dwellings close to the A143, a suitable boundary fence will be provided to reduce road traffic noise in amenity spaces to a satisfactory level. Socio Economic 3.65 An assessment of the potential impacts arising from the proposals in relation to socio economic issues has been undertaken. This has included an assessment of the likely housing provision and associated population arising from the Proposed Development and the potential impacts of the new population upon social infrastructure including schools, health and community facilities and recreation and open space provision. Employment impacts have also been considered The Proposed Development, taken together with adjoining development within South Bradwell, will provide 1,000 new houses creating a new community of approximately 2,300 people. In addition, the Proposed Development will provide a new employment area and local centre providing 1,800 new Full Time Equivalent jobs Without mitigation, the introduction of these new residents could place pressure on the capacity of existing services and community facilities. The proposals, therefore, incorporate various facilities to meet the needs of the new population and ensure that the community is as self-contained and sustainable as possible and does not place undue pressure on existing facilities elsewhere within South Bradwell or the surrounding area. These include the provision of a new primary school, extensive areas of public open space and new community facilities to serve the dayto-day needs of residents Consequently, following implementation of these mitigation measures it is considered that impacts on social infrastructure within the surrounding area will be negligible whilst the employment opportunities created during the construction phase and following the completion of the mixed use employment area and local centre will result in major beneficial impacts on the local economy. Additionally, the significant areas of accessible public open space proposed within the site will result in a further minor beneficial impact. Any residual adverse impacts are likely to be outweighed by the various beneficial impacts identified As a result, overall it is, therefore, considered that the Proposed Development would have a moderate beneficial impact in relation to community infrastructure and the local economy. Transport 3.70 The traffic and transport assessment has considered the potential impacts of development traffic and transport at the construction and operational phases of the Proposed Development For the construction phase, potential impacts resulting from the change in Heavy Goods Vehicle traffic has been assessed. For the operational phases, the potential impacts of development traffic on traffic delay, congestion, separation of communities by roads (severance) and road safety have been assessed. This has been based on the phased approach adopted in the Transport Assessment and considered the impact of the full, wider site development of 1000 dwellings and employment zone (worse case scenario) An assessment has been undertaken of the worst case construction period, based on an assessment year of 2015, and has used goods vehicle construction traffic information and personal injury accident data. It is considered that there is sufficient capacity on the highway network to accommodate the level of predicted movements, which are of a temporary nature, associated with the construction phase and the traffic will not have a significant impact. 14

21 3.73 Temporary provision will be made within the site to accommodate Heavy Goods Vehicles and construction staff to ensure no parking occurs on the highway during this period For the operational period, the level of potential change in delay and constraint at 11 junctions in the study area has been assessed using industry standard computer based software packages. These junctions were discussed and agreed during scoping discussions with both Norfolk County Council and the Highways Agency It should be noted that the assessment considers proposed road improvement works on the network (to be delivered as part of a planning consent associated with an adjacent site) and the full delivery of the proposed A12/A143 Great Yarmouth Link Road, both of which are assumed to be in place as the development comes forward. On this basis, the development will not have a significant adverse impact on driver delay or constraint on the network in the 2018, 2023 and 2026 assessment years For two junctions on the network, driver delay and constraint will be reduced below the proposed future base (do nothing) levels, which is regarded as a benefit. The provision of the Link Road and implementation of specific improvements to junction signal infrastructure will ensure that the development traffic can be satisfactorily accommodated. The development will not have an adverse impact on pedestrian and cycle severance caused by changes in traffic flows on the road network. As part of the development, a scheme to improve pedestrian and cycle linkages and connectivity to nearby facilities will be provided, complementing existing networks in the area and ensuring that the site is highly accessible by a variety of transport modes Additionally, it has been concluded following a detailed review of personal injury accidents that there are no trends in accidents that are likely to be exacerbated by the development traffic. The proposed site access roundabout junction on the A143 will replace an existing staggered priority t-junction arrangement that has been the source of a small number of accidents. It is, therefore, considered to represent a significant improvement to road safety in the area In summary, the overall impact of the development is considered to be negligible. Utility Infrastructure 3.79 The Utility Infrastructure assessment has considered the predicted impacts of the development on the requirements for upgrading, diverting and installing new utility infrastructure In order to supply the Proposed Development with utility infrastructure, there will be changes to the existing utility infrastructure in the South Bradwell area Where possible, the Proposed Development makes allowance to incorporate infrastructure within the overall layout and retain the existing infrastructure, such as underground high voltage electric cabling and telecommunications In the case of overhead cabling, such as telecommunications, the opportunity to transfer the infrastructure to underground within the public highway will remove the visual impact that currently exists Improvements to the existing utility infrastructure will be made to the water supply and gas with the installation of infrastructure within the A12/A143 Link Road connecting existing infrastructure A service corridor will be provided within the A12/A143 Link Road from which the Proposed Development could be served Overall, in the worse-case the impact from the installation of the utility infrastructure will be negligible. 15

22

23 Conclusions 4

24

25 4 CONCLUSIONS 4.1 In accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011, the has assessed the likely significant environmental effects of the Proposed Development to create a new neighbourhood to the south of Bradwell. 4.2 The assessment has been based upon a range of detailed technical reports and assessments, with the reporting the likelihood of significant environmental effects occurring during the construction and operational phases of the Proposed Development. Appropriate mitigation and enhancement measures have been recommended and the residual impacts, i.e. impacts following mitigation and will remain, are assessed and outlined in Table It is anticipated that the mitigation measures identified will be implemented either through appropriate planning conditions or legal agreement. Table 4.1: Residual Impacts Environmental Aspect Description of Effects Significance of Residual Effects Agriculture Loss of Grade 1 & 2 Land Major Adverse (Loc) - Negligible (Reg) Air Quality Archaeology Loss/damage to soil resource Impact on existing Farming business Loss of Habitat Construction Increase in dust generated by on-site construction activities and potential effects on local air quality at sensitive receptors Increase in PM10 concentrations arising from on-site construction activities and effects on local air quality at sensitive receptors Increase in air pollutant concentrations (NO 2 and PM10) arising from exhaust emissions from construction vehicles and plant and effects on local air quality at sensitive receptors Operational Increase in air pollutant concentrations (NO 2 and PM10) arising from exhaust emissions from operational vehicles and effects on local air quality at sensitive receptors Truncation/destruction of sub-surface archaeological deposits through intrusive groundworks Alteration to character of historic landscape Cumulative diminution of the archaeological resource of the wider Great Yarmouth area. Moderate Adverse Negligible Moderate Adverse /Negligible /Negligible Negligible/None Moderate Adverse - Negligible Minor Beneficial Minor Beneficial 19

26 Environmental Aspect Description of Effects Significance of Residual Effects Climate Change and Renewable Energy Ecology Construction CO 2 emissions from the manufacture of materials, transportation to site and plant operations contributing to global climate change NO x emissions associated with manufacture of materials, transportation to site and operations on site contributing to global climate change Operational CO 2 emissions associated with heating, hot water, electrical appliances etc during occupation contributing to global climate change NO x emissions associated with boiler operations for heating and hot water contributing to global climate change CO 2 emissions associated with transport movements associated with the Proposed Development contributing to global climate change Rising temperatures as a result of climate change resulting in dwellings too hot to live in and work places too hot to work in without the requirement for energy hungry air conditioning units Designated Sites Breydon Water SPA Halvergate Marshes SPA Breydon Water SSSI Halvergate Marshes SSSI Habitats Arable Negligible Negligible Moderate Adverse Moderate Adverse Neutral Neutral Neutral Neutral Neutral 20

27 Environmental Aspect Description of Effects Significance of Residual Effects Ecology Hedgerows Neutral Flood Risk, Drainage & Water Resources Landscape & Visual Impact Improved grassland Unimproved grassland Woodland Pond Species Flora Grass Snakes Breeding Birds Wintering Birds Hedgehogs Brown Hares Bats roosts Bats foraging and commuting habitat Foul Drainage Surface Water Drainage Flood Risk Water Resources Views from northern part of Clay Lane, from Jew s Lane and from Gorleston Lane (Viewpoints 1-4) Views from dwellings along A143 (Viewpoint 5) Neutral Slight Beneficial Moderate Beneficial Slight Beneficial Minor Beneficial Neutral Neutral Neutral Neutral Neutral Neutral Neutral - Negligible Moderate Beneficial Minor Beneficial Negligible Major/Moderate Adverse Minor Beneficial Views from Browston Lane (viewpoint 7) Views from residences on Browston Lane (Viewpoint 9) Views from Hobland Road and the southern end of Clay Lane (Viewpoints 10 and 11) Views from New Road and from Browston Lane (Viewpoints 6 and 8) Impacts upon Clay Lane Footpath Moderate/Minor Beneficial Moderate/Minor Beneficial Moderate/Minor Beneficial Minor Beneficial Moderate Adverse 21

28 Environmental Aspect Description of Effects Significance of Residual Effects Noise Construction Noise Employment area operational noise (non-traffic noise) Road traffic noise A143 Road traffic noise New Road Road traffic noise Browston Lane Road traffic noise Burnett Road Road traffic noise Pinecot Avenue Road traffic noise Primrose Way Road traffic noise Church lane Road traffic noise Long Lane Road traffic noise Mill Lane Road traffic noise Shrublands Way Road traffic noise A12 Road traffic noise Middleton Road Road traffic noise Brasenose Road Road traffic noise Bridge Road Road traffic noise Hospital access Road traffic noise Kennedy Avenue Road traffic noise Links Road Road traffic noise Beaufort Way Road traffic noise Jenner Road Road traffic noise Camelot Road Road traffic noise Carrel Road None None None None Major Adverse None None None Socio Economic Population Negligible Housing Pre-school Education Primary Education Secondary Education Health Services Major Beneficial Moderate Beneficial Moderate Beneficial Moderate Beneficial Minor Beneficial 22

29 Environmental Aspect Description of Effects Significance of Residual Effects Socio Economic Community Facilities Minor Beneficial Recreation & Open Space Moderate Beneficial Construction Employment Minor Beneficial Operational Employment Major Beneficial Transport Construction Increase in HGV Traffic Negligible Parking Requirements None Road Safety / Accidents Negligible Pedestrian & Cycle Severance Negligible Operational Increase in Traffic Flows Negligible Increase in Driver Delay None Road Safety / Accidents None Pedestrian & Cycle Severance Negligible Utility Infrastructure Water Supply None Telecommunications None Electric None Gas None 23

30

31 What happens next? 5

32

33 5 WHAT HAPPENS NEXT? 5.1 Following the submission of the planning application, including the Environmental Statement in November 2013, there will be an opportunity for any interested parties to make their views clear to Great Yarmouth Borough Council as the Local Planning Authority, who will take them into consideration when the application is determined in due course. 5.2 The full containing the results of the detailed Environmental Impact Assessment, and a set of documents supporting the planning application, will be available to view by prior appointment at Great Yarmouth Borough Council offices during normal office hours. 27

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) PROPOSAL: LOCATION: APPLICANT: Amendments to the design of a scheme for a 49.99MW battery

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY APRIL 2010 INTRODUCTION This document is the Non-Technical Summary (NTS) of an Environmental Statement

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

SPG 1. * the northern and western sections which are open fields used for pasture and grazing; SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY INTRODUCTION NTS.1 CEMEX UK Properties Limited is applying for planning permission to South Cambridgeshire District Council (SCDC) for the redevelopment of the former CEMEX cement

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site

More information

Norwich Research Park South Environmental Statement Non Technical Summary

Norwich Research Park South Environmental Statement Non Technical Summary Norwich Research Park South Environmental Statement Non Technical Summary Bullen Developments Limited October 2012 Table of Contents 1. Introduction 1 2. What are the Proposals? 3 3. Who has been Involved?

More information

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015 Causeway Farm, Petersfield Environmental Statement October 2015 2 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals... 6 2.1

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham 1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

LAND NORTH OF NETHERHOUSE COPSE, FLEET

LAND NORTH OF NETHERHOUSE COPSE, FLEET REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

Land at Fiddington Hill Nursery, Market Lavington

Land at Fiddington Hill Nursery, Market Lavington Land at Fiddington Hill Nursery, Market Lavington Briefing Report for Market Lavington Parish Council Persimmon Homes (Wessex) April 2016 Background This brief report has been prepared following the Market

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Ref: A073350/SM/sm Date: 13 September 2013

Ref: A073350/SM/sm Date: 13 September 2013 Ref: A073350/SM/sm Date: 13 September 2013 Ian Parkinson Development Control Team Leader Planning Portsmouth City Council Civic Offices Guildhall Square Portsmouth PO1 2AY Dear Ian LIGHT & GLEAVE VILLA

More information

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments SUMMARY This Advice Note provides

More information

Ʊ ± ªº Œª ºª ø ª ª ± ª

Ʊ ± ªº Œª ºª ø ª ª ± ª Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale

More information

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011

Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Introduction An application for outline planning permission has been submitted

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Hybrid outline/detailed planning application comprising an outline planning application for 196 residential dwellings, landscaping, open space, estate roads and infrastructure, plus 4 permanent gypsy and

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

UTT/16/1466/DFO GREAT DUNMOW MAJOR

UTT/16/1466/DFO GREAT DUNMOW MAJOR UTT/16/1466/DFO GREAT DUNMOW MAJOR PROPOSAL: LOCATION: APPLICANT: AGENT: Reserved matters approval for the accesses to the site and principal roads within the site including spine road following outline

More information

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary

The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1 The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1. Introduction This report summarises the results of an assessment that has been undertaken to determine how a proposed

More information

ECOLOGICAL ADVICE SERVICE

ECOLOGICAL ADVICE SERVICE ECOLOGICAL ADVICE SERVICE TO: FROM: Guy Wilson Marie Thibault DATE: 11 th August 2016 SUBJECT: CA/16/01502/FUL / Land adjoining Goose Farm, Canterbury Thank you for requesting advice on this application

More information

M4 Corridor around Newport Environmental Statement Volume 3: Appendices

M4 Corridor around Newport Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices At Issue March 2016 CVJV/AAR 3 rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Volume 3: Contents 1

More information

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Maidstone Medical Campus Ltd is applying to Maidstone Borough Council for

More information

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site

More information

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments Watford Local Plan Part 2 Publication Stage Environmental Report Appendix 3: Consultation Comments August 2016 Appendix 3 - Responses to Consultation of the Local Plan Part 2 As required by the SEA Directive,

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

NRP North Environmental Statement Non Technical Summary. Norwich Research Park North Environmental Statement Non Technical Summary.

NRP North Environmental Statement Non Technical Summary. Norwich Research Park North Environmental Statement Non Technical Summary. Norwich Research Park North Environmental Statement Non Technical Summary Non Technical Summary Introduction The Norwich Research Park (NRP) is an important component of the East of England life sciences

More information

Habitat Regulations Assessment (HRA) Screening Determination. May 2017

Habitat Regulations Assessment (HRA) Screening Determination. May 2017 Cholsey Parish Council Cholsey Neighbourhood Plan Habitat Regulations Assessment (HRA) Screening Determination May 2017 Cholsey Neighbourhood Plan Page! 1 of! 10 SASR - HRA v1.1 Page Left Intentionally

More information

Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd

Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary For Wates Developments Ltd and Pellipar Investments Ltd December 2015 Contents 1 Introduction 3 2 The Proposals 8 3 Environmental

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Cotswolds AONB Landscape Strategy and Guidelines. June 2016 Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

Re-location of Rugby Farmers Mart

Re-location of Rugby Farmers Mart Re-location of Rugby Farmers Mart LaSalle Investment Management Barberry Logo here Environmental Statement Non-Technical Summary August 2017 Re-location of Rugby Farmers Mart Non-Technical Summary Report

More information

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...

More information

INTRODUCTION. Land south of Bishopswood Lane, Tadley

INTRODUCTION. Land south of Bishopswood Lane, Tadley 0 INTRODUCTION THE SITE Introduction Gladman Developments Ltd. has successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial

More information

Environmental Statement (Volume 1) Non Technical Summary

Environmental Statement (Volume 1) Non Technical Summary Environmental Statement (Volume 1) Non Technical Summary Prepared by: The Environment Partnership Haydock Point Environmental Statement (Volume 1): Non-Technical Summary March 2017 Contents 1. Introduction

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

A303 Stonehenge. Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment. Volume 6

A303 Stonehenge. Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment. Volume 6 A0 Stonehenge Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment Volume 6 September 2017 Appendix D Client Scheme Requirements (CSRs) and Policy Assessment D.1 CSR Assessment

More information

Lower Herne Village Hollamby Estates (2005) Ltd Environmental Statement Non-Technical Summary June 2015 INSERT PICTURE HERE

Lower Herne Village Hollamby Estates (2005) Ltd Environmental Statement Non-Technical Summary June 2015 INSERT PICTURE HERE Environmental Statement Non-Technical Summary June 2015 INSERT PICTURE HERE Table of Contents 1 INTRODUCTION 1 2 SITE LOCATION AND PROPOSED DEVELOPMENT 3 3 THE ASSESSMENT 8 4 CONCLUSIONS 16 5 WHAT HAPPENS

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary PINEWOODS HOLIDAY PARK: HORSE PADDOCK June 2014 1 Introduction 1.1 The existing Pinewoods Holiday Park is located approximately 1 km to the north of Wells-nextthe-Sea on the north Norfolk coast. Pinewoods

More information

Wiltshire Council s Core Strategy

Wiltshire Council s Core Strategy HAWKE Wiltshire Council s Core Strategy 2006-2026 As part of its Core Strategy (master plan), Wiltshire Council needs to find areas to develop for employment purposes up to 2026. This land was first suggested

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 14 July 2015 by I Radcliffe BSc(Hons) MCIEH DMS an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 18 August 2015 Appeal

More information

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral

More information

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom Elvetham Chase, Fleet Environmental Statement: Non-Technical Summary November 2016 A Ne w F e tte r P lace 8-10 New Fetter Lane London EC4A 1AZ United Kingdom T +44 (0) 20 7467 1470 F +44 (0) 20 7467 1471

More information

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence 1 Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence Prepared by the Neighbourhood Plan Steering Group on behalf of Garway Parish Council with assistance from 2 Table of

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY May 2016 CONTENTS CONTENTS... i 1 Introduction... 1 2 The Proposed Development... 3 3 Need and Alternatives

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

and Netherhall Road and Camp Farm EIA

and Netherhall Road and Camp Farm EIA and Netherhall Road and Camp Farm EIA Environmental Statement - Non Technical Summary December 2012 in association with 1. Introduction Story Homes applied to Allerdale Borough Council (ABC) in May 2011

More information