Connell Wagner Pty Ltd ABN PO Box 19 The University of Newcastle Union Callaghan New South Wales 2308 Australia

Size: px
Start display at page:

Download "Connell Wagner Pty Ltd ABN PO Box 19 The University of Newcastle Union Callaghan New South Wales 2308 Australia"

Transcription

1 Connell Wagner Pty Ltd ABN PO Box 19 The University of Newcastle Union Callaghan New South Wales 2308 Australia Telephone: Facsimile: cwntl@conwag.com Morisset Structure Plan 29 October 2008 Reference Revision 6

2 Document Control Document ID: O:\PROJECTS\URBAN_DEVELOPMENT\ MORISSET STRUCTURE PLAN\VARIATION NO 2 - REXHIBITION\DRAFT DOCS\STRUCTURE_PLAN_REV6_FINAL_ DOC Rev No Date Revision Details Typist Author Verifier Approver 0 5 April 2007 Issue MM MM DB DB 1 10 May 2007 Issue MM MM DB DB 2 31 May 2007 Final Issue MM MM MS DB 3 7 April 2008 Update post exhibition JMD JMD DB DB 4 3 June 2008 Final Plan JMD JMD DB DB 5 3 September 2008 Final Plan (Revised) ALS ALS JMD DB 6 10 October 2008 Final Plan (Revised 2) ALS ALS JMD AL A person using Connell Wagner documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version; and b) Using the documents or data for any purpose not agreed to in writing by Connell Wagner.

3 Table of Contents Section Page Glossary of terms and abbreviations v Executive summary 1 1. Introduction Background Study funding and management Study process Background information 6 2. Policy Framework Lower Hunter Regional Strategy Planning principles Lifestyle Lake Macquarie LEP State Environmental Planning Policies Ministerial directions Policy implications for development Consultations Previous consultations Planning focus meeting Community meeting Public Exhibition of draft Morisset Structure Plan Public Re-exhibition of draft Morisset Structure Plan Natural environment Topography Geology and soils Hydrology Visual impacts Flora Fauna Key threatening processes Conservation values and principles Bushfire risk Implications for urban development Socio-economic environment Existing urban character and function Population growth and demographic profile Economic base Employment generating land use Community and cultural facilities Traffic and transport Infrastructure and services Mine subsidence Implications for urban development Planning for community needs Issues surrounding community development Community facilities 46 PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE i

4 6.3 Recreation and open space Commercial and retail development Employment lands Transport and infrastructure Summary of population and community needs Growth and development scenarios Structure plan options Comparative assessment Preferred development framework Key economic implications Structure Plan Principles Introduction Structure Plan Principles Development staging Implementation and development contributions Future reviews References 75 VOLUME 2: APPENDICES (available on request from Integrated Planning) Appendix A Minutes of the Planning Focus Meeting Appendix B Written responses to Planning Focus Meeting Appendix C Minutes of the Community Meeting Appendix D Written responses to Community Meeting Appendix E Issues Addressed by Public Briefing, Morisset, 17 July 2007 Appendix F Summary of Issues Raised by Public Submissions in Response to Exhibition of the Draft Morisset Structure Plan Appendix G Results of Origin Destination Traffic Survey Appendix H Summary of Issues Raised by Public Submissions in Response to Re-exhibition of the Draft Morisset Structure Plan PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE ii

5 LIST OF TABLES 2.1 Ministerial directions 3.1 Responses to planning focus meeting 3.2 Summary of community response 3.3 Summary of key issues raised by exhibition 3.4 Summary of key issues raised by re-exhibition 4.1 Remnant vegetation within study area 4.2 Threatened flora species in Morisset area 4.3 Threatened fauna species in Morisset area 4.4 Conservation status of remnant vegetation 4.5 Habitat fragment edge to area index summary 4.6 Definitions of riparian land 5.1 Age profile Morisset urban centre, planning district and LGA 5.2 RTA published and surveyed traffic volumes 6.1 Typical human and current LMCC service requirements 6.2 Community facilities: LMCC provision standards 6.3 Floor areas for multi-purpose centres 6.4 Level of service provision for recreation facilities Citywide S94 Plan 6.5 Schedule of works for recreation facilities (Morisset planning district) 6.6 Potential new and upgraded intersection proposals 7.1 Low growth scenario development yield summary 7.2 Medium growth scenario development yield summary 7.3 High growth scenario development yield summary 7.4 Comparative assessment of Morisset development scenarios 8.1 Potential urban expansion on investigation zoned land PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE iii

6 LIST OF FIGURES 1.1 Study Area 4.1 Physical Constraints 4.2 Predicted Endangered Ecological Species and Threatened Species Records 4.3 Ecological Constraints Habitat Movement Corridors and Indicative Core Riparian Zones 4.4 Ecological Constraints Tetratheca juncea habitat 5.1 Existing Zoning under Lake Macquarie LEP 5.2 Potential Urban Release Areas 5.3 Infrastructure and Transport Networks 8.1 Structure Plan 8.2 Morisset Commercial Area Issues and Opportunities 8.3 Community Facilities Plan PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE iv

7 Glossary of terms and abbreviations APZ Asset Protection Zone ASS Acid Sulphate Soils CBD Central Business District (or town centre ) DA Development Application DECC Department of Environment and Climate Change (formerly the Department of Environment and Conservation) DEH Department of Environment and Heritage DoL Department of Lands DoP Department of Planning DNR The former Department of Natural Resources (now part of DECC) EEC Endangered Ecological Community EP&A Act Environmental Planning and Assessment Act 1979 EPI Environmental Planning Instrument ESD Ecologically Sustainable Development ha Hectare HWC Hunter Water Corporation km Kilometre km 2 Square Kilometre LALC Local Aboriginal Land Council LEP Local Environmental Plan LES Local Environmental Study LGA Local Government Area LHCCREMS Lower Hunter and Central Coast Regional Environmental Management Strategy LMCC M / m 2 Metre / metre squared PCG Project Control Group PFM Planning Focus Meeting PfBP Planning for Bush Fire Protection RFS Rural Fire Service ROTAP Rare or Threatened Australian Plants RTA NSW Roads and Traffic Authority SEPP State Environmental Planning Policy STP Sewage Treatment Plant TSC Act Threatened Species Conservation Act 1995 WSUD Water Sensitive Urban Design WWTW Waste Water Treatment Works PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE v

8 Executive summary Morisset is recognised as an emerging centre that provides the opportunity to build a community based on the principles of ecologically sustainable development (ESD). Morisset was first identified as an important centre for urban development for the West Lakes area by in its Lifestyle 2020 Strategy. The Lower Hunter Regional Strategy has also identified Morisset as an emerging major regional centre that is expected to grow and take on a more substantial role in the region. Other development in the area outside Morisset, such as that proposed at Cooranbong, Dora Creek, Wyee and the Morisset Peninsula, will also impact on the township through increased demand for services and facilities. The Morisset township thus has an important role in satisfying such demands. Future development will lead to change that must be managed and subject to orderly planning to address issues such as increased population, demand for services and facilities, increased infrastructure requirements, and the protection of the environment. Consequently, there is a clear need to develop a Structure Plan that will underpin the future sustainable urban development of the township by providing guidance to any rezoning and development proposals that proceed in the area. The study area is approximately 750 hectares in size and contains the town centre and surrounding land. The township contains a range of land uses, including business, residential, utilities, transport corridors and open space. It also contains significant areas of remnant native vegetation that have considerable habitat and conservation value. The resolution of competing demands between habitat conservation and urban development within a sustainable framework is a key aim of the Structure Plan. Consultation for the Structure Plan has been focused on identifying a specific framework to be implemented for the township with respect to regional policies, infrastructure demands and environmental constraints. Consultation has included a Planning Focus Meeting with a variety of representatives from government agencies and stakeholder organisations as well as community meetings held when the exhibition phase of the project commenced. Written submissions from agencies, organisations and the community were also received which informed the planning process. Once prepared, the draft Structure Plan was exhibited from 23 June 2007 until 17 August 2007 and public comment sought. A briefing session was also organised by Council on 17 July 2007 during the exhibition period to inform the public regarding the plan and canvass community feedback. Following Council s consideration of the first round of submissions, the plan was re-exhibited in July August This final version of the Morisset Structure Plan reflects and incorporates pertinent comments made during the re-exhibition period. Consultation with the people of Morisset has revealed strong community spirit and a desire to foster sustainable outcomes. While change is largely seen as inevitable, even desirable, the community wishes to maintain the relaxed feeling of Morisset while improving community services and facilities. Feedback from various government agencies has indicated some constraints to the development of the township in terms of utilities and services, however, these consultations have also revealed opportunities to improve the existing services and facilities in the township so that it may fulfil its regional functions. The identification of regional infrastructure needs arising from the development of Morisset is a key outcome from the consultation. Significant environmental constraints identified include riparian corridors, bushfire threat, topography/soils, and the biodiversity and habitat values of remnant bushland. There is also a range of community development issues associated with future urban development, including improved local services and facilities, additional retail/commercial needs, improved transport links and services, expansion and upgrading of utilities, and the promotion of further employment opportunities. PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 1

9 has identified the likely population size that will reside in Morisset and surrounds, and the Department of Planning has set out employment and dwelling targets that will need to be achieved in the development of the township. In addition, a number of rezoning submissions, development applications and inquiries in relation to urban development in Morisset have been received by the Council. To identify how those targets may be met, and to allow decisions to be made on the rezoning/development proposals, various development scenarios have been examined to provide the basis for the Structure Plan. The scenarios examined are: Low Growth. This scenario has an emphasis on maximum retention of remnant bushland, habitat areas and corridors. This would see the development of around 30% of the land within the study area. Areas constrained by their physical or natural conditions were considered least suitable for development. Minor additional development in the town centre, in the form of employment generating land and road upgrades would occur. Moderate Growth. This would see protection of the more significant remnant vegetation identified as having habitat significance. Under this scenario around 50% of the study area would be developed. The development footprint would permit some urban development of land that is constrained through physical or natural constraints (subject to sustainable outcomes) in tandem with release of less constrained land. An increased investment in infrastructure would occur to allow release of urban land for residential and employment uses, increased density in the town centre and development of land that is considered suitable for medium term development under the low growth scenario. High Growth. This would maximise the development of all land, while providing habitat protection for the most important areas. This would represent development of around 70% of the study area. The high growth scenario would allow for the release of land that is preserved for medium term releases under the moderate growth scenario, subject to further investigations to identify land that is least constrained for urban development. High rates of growth would create high density built form in the town centre to allow a range of mixed use development. Further, there would be a release of more employment land in the medium term than for the moderate growth scenario. These options have been subject to a comparative assessment to determine if each would satisfy the Council and regional targets whilst also meeting environmental objectives. This assessment has determined that a combination of the Low and Medium Growth scenarios would achieve this aim. The Structure Plan has thus been developed on this basis. Principles for future development have been developed that detail a range of measures to address the key urban development issues raised by the investigations. These include: Desired future character and urban form the actions required to make Morisset an active, family and pedestrian-friendly centre. Environment and conservation measures to protect and enhance significant flora and fauna values, and in so doing improve the health of water bodies and general amenity of the area. PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 2

10 Community facilities those facilities that are required to support the population now and into the future. Town centre/commercial development how the town centre should develop and serve its regional role. Employment generating land use the requirements for industrial land so the town becomes more self-supporting through additional job creation. Infrastructure, roads and circulation provision of services, development of transport functions and ensuring enhanced pedestrian facilities are provided. Open space and recreation provide for the recreational and cultural needs of the community. Heritage conservation conserve important indigenous and other heritage items. Physical constraints and environmental hazards respond to the existing physical constraints and address bushfire risk, eroding soils and flooding. Staging of the development has also been considered both in terms of the principle of ensuring the most efficient use of infrastructure as well as in the context of the rezoning and other development proposals that have been put forward to Council. Proposed land uses and staging of future land releases are indicated in Figure 8.1. As a result of the analysis undertaken in preparation of the Structure Plan, it is recommended that priority be given to rezoning of land on the northern side of the railway. There are several areas of land on the northern side of the railway zoned 10 Investigation that are relatively unconstrained in terms of environmental and other physical constraints and have proximity to the town centre. The land south of the town centre owned by Koompahtoo Local Aboriginal Land Council is also identified for future urban development but is considered to have lower merit in the short to medium term (nominally 10 years) largely due to the significant biodiversity values of the site and limited road access from the town centre and freeway. Under the suggested low to moderate growth scenario, various traffic improvements will be necessary. These are depicted graphically in Figure 5.3. Awaba Street will require upgrading, with the unformed section of road between Kahibah/Stockton Street and Bridge Street to be constructed in the short-term (within 5 years) to allow access to anticipated residential development to the north of the town. Table 6.6 identifies intersection upgrades required to cater for anticipated traffic growth from within and through Morisset, particularly to provide for travel between Cooranbong and Morisset. The issue of a potential bypass of the town centre has been examined. Although further traffic investigations should be carried out to determine the specific requirements for, and the timing of, any bypass, the exhibited draft Structure Plan included two possible options. A northern town centre bypass could be established by extending Awaba Street west to Freemans Drive and east to Main Road 217, either via Moira Park Road and an upgraded rail underpass, both of which would require widening, or by constructing a rail flyover. To facilitate a second, southern option, a new rail crossing would be required linking Macquarie Street with Dora Street near its intersection with Stockton Street. The southern route could traverse and give access to the Koompahtoo land. Alternatively, an option that appeared to gain favour with the public, a route using existing streets (mainly Macquarie Street) could be employed. Public exhibition of the draft Structure Plan revealed strong community opposition to the northern, Awaba Street, option; and a general preference for the southern bypass option. Finalisation of the Structure Plan has reviewed the options and the northern bypass was removed. PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 3

11 A key recommendation of the Structure Plan is to establish Yambo Street as the pedestrian-friendly activity precinct of Morisset. Dora Street, which currently operates as Morisset s main street, is affected by traffic volumes and railway noise. Yambo Street offers the opportunity for continuous development along both sides of the street, has superior solar access and experiences lesser traffic/rail noise impacts. However, Dora Street should remain as the primary traffic route through Morisset in the short to medium term (nominally 10 years) and support the function of a transport interchange and appropriate retail and commercial uses. These concepts are illustrated in Figure 8.2. In relation to employment land uses, additional land for employment generation is proposed on the northern side of Mandalong Road and along Gimberts Road. This is expected to comprise a mixture of light industrial and bulky-goods style development. Morisset town centre currently has an ample supply of land zoned for retail and commercial uses albeit much of this land is presently occupied by residential dwellings which could constrain supply. Nevertheless, the current zoning regime in the town centre is considered appropriate in the short and medium term. The need for expansion of the Urban Centre zoning should be considered in future reviews of the Structure Plan in accordance with market demand. In terms of community facilities, the Structure Plan highlights the trend toward provision of district level rather than local facilities, co-located with other compatible services. The Structure Plan considers the provisions of Council s Citywide Section 94 Plan as it applies to Morisset in order to identify the need for any potential amendments to the Section 94 Plan. For example, while the current Section 94 Plan identifies the need for an extension of the Morisset Branch Library, the growth envisaged by the Structure Plan for the Morisset District suggests that a significantly larger library facility is likely to be required. Possible options include the existing facility (although expansion is constrained by the current lot size) or a new facility (which could be located elsewhere in the town centre subject to acquisition of an appropriate site). Current and anticipated demand for use of the Morisset Multipurpose Centre indicates that this facility will also require expansion, possibly within a five year timeframe. More detailed investigation is required to determine whether or not this expansion can be accommodated on the existing Multipurpose Centre site, or whether an additional site is required. The framework developed for this Structure Plan has responded to many known issues. However, it is recognised that this plan will and must evolve through the longer term planning process as this knowledge increases. Nevertheless, sufficient information is available to continue the process of community planning to create a vibrant centre based on sustainable development principles. PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 4

12 1. Introduction 1.1 Background The township of Morisset and its surrounds provide significant opportunities for additional urban development. Both ( LMCC ) and the NSW Department of Planning ( DoP ) support growth in this area of the city with Morisset being one of the six major mixed use regional centres identified in the Lower Hunter Regional Strategy (DoP, 2006). Morisset was considered in the Strategy to be an emerging major centre that is expected to grow and take on the role of a major centre in the future. As identified in Lifestyle 2020, LMCC considers Morisset to be the most appropriate settlement within the Morisset Planning District to concentrate urban growth over the next 20 years (LMCC, 2000). The study area that is the subject of the Structure Plan is presented in Figure 1.1. Morisset has numerous strategic attributes making it a logical choice as one of the city s growth centres. Attributes include: The town s location on the Main Northern Railway, with a centrally located and well-patronised station Proximity to the Sydney Newcastle F3 Freeway and a full interchange A town centre with established infrastructure and services surrounded by land potentially capable of supporting urban expansion A growing industrial estate providing employment opportunities for the town s residents However, the numerous rezoning proposals that have been submitted to Council could lead to an uncoordinated and, potentially, unsustainable response to urban development. Consequently, the Council determined that a single, co-ordinated framework for urban expansion in Morisset was the preferred approach. The Morisset Structure Plan is a strategic planning document that identifies key planning objectives and outcomes for urban expansion. The Structure Plan details key principles that should be followed to ensure sustainable development and broadly outlines required amendments to the Lake Macquarie Local Environmental Plan 2004 ( LEP 2004 ). The Structure Plan provides an appropriate framework for the future range of investigations that will occur for specific sites that will be subject to rezoning. The Structure Plan identifies the existing natural and socio-economic environment and outlines key opportunities and constraints to development. Opportunities for future growth of the township are presented through the identification of development scenarios for the development of the township which outlines key implications for each development scenario. In this way, rezoning proposals are placed in context which permits staging decisions to be made. The study brief requires the Structure Plan to assess: Possible development options and land use mixes (including areas suitable for high, medium and lower density housing) and the boundaries to the development and conservation areas The vehicular and pedestrian circulation pattern including linkages between arterial and subarterial roads and recommended new and upgraded intersections and rail underpasses Preferred locations for any future neighbourhood centres Potential locations for open space and community and recreational facilities having regard to predicted demand Buffers to watercourses PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 5

13 Bushfire asset protection zones Current land tenure and subdivision details Development precincts and their staging These issues are addressed throughout this Structure Plan and development controls aimed at formalising these principles are addressed in the final sections of the Structure Plan. 1.2 Study funding and management The Morisset Structure Plan is being jointly funded by LMCC and the DoP, and its preparation is being managed under the auspices of a Project Control Group ( PCG ). The PCG has had substantial input to the development of the Structure Plan and the recommendations for the future development of the Morisset township. 1.3 Study process The study brief required a staged approach to the investigations as follows: Stage 1 Review of existing background data Consultation with relevant authorities and the community Technical investigations to support the planning analyses Presentation of a Structure Plan for LMCC and the DoP Stage 2 Exhibition of Structure Plan Review of public submissions Amendments to Structure Plan in consultation with PCG Finalisation of Structure Plan 1.4 Background information A wide range of data sources were evaluated in the investigations including the following: Hunter Regional Environmental Plan 1989 Lifestyle 2020 (LMCC, 2000) Lake Macquarie Section 94 Contributions Plan Citywide (LMCC, 2004) Local Environmental Study for Rezoning 10 Investigation Land Stockton Street, Morisset North (Coombes, 2005) Lower Hunter Regional Strategy (DoP, 2006) Morisset Traffic Management Study (Cardno (NSW) Pty Ltd, 2005) Morisset Town Centre Area Plan (LMCC, undated) Preliminary Development Planning Report and Ecological Assessment Report Koompahtoo (GHD, 2005) Proposed Amendment to Lake Macquarie Local Environmental Plan 2004 Morisset F3 Business Park, Gimberts & Mandalong Roads, Morisset (Carman Surveyors, 2005) Report on Urban Design Workshop for Lifestyle 2020 (LMCC, 1999) Rezoning Submission for a Proposed Residential Precinct within the North Morisset Investigation Area (Optima Developments Pty Ltd, 2004) The Morisset Golf Course rezoning report (Johnson Partners, 2005) and associated reports such as Key Insights (2006) and HWR ecological (2005) Survey for Tetratheca Juncea (Elaeocarpaceae) for the Morisset Structure Plan, Lake Macquarie LGA, Report to. (Eastcoast Flora Survey, January 2008) PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 6

14 Squirrel Glider Review for the Morisset Structure Plan Area,. (M. P. Fallding, A. P. Smith, 2008) PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 7

15 2. Policy Framework There is a range of planning policies that impact on development in Morisset. Lifestyle 2020, the Lower Hunter Regional Strategy and Lake Macquarie LEP 2004 are the principal planning strategy documents that have identified the potential for growth in Morisset. They provide a general framework for growth which will be supplemented by this Structure Plan. 2.1 Lower Hunter Regional Strategy The Lower Hunter Regional Strategy applies to the five local government areas of Newcastle, Lake Macquarie, Port Stephens, Maitland and Cessnock, and is one of a number of regional strategies currently being prepared by the DoP that complements the Sydney Metropolitan Strategy (DoP, 2006). The primary purpose of the Regional Strategy is to ensure that adequate land is available and appropriately located to accommodate the projected housing, employment and environmental needs of the Region s population over the next 25 years in a sustainable fashion. The Strategy will be the preeminent planning document for the Lower Hunter region and future local planning initiatives will be expected to be consistent with its general approach (DoP, 2006). The Regional Strategy is based upon a population growth scenario which forecasts a population of 630,000 persons by The population forecast equates to an additional 125,000 persons over the period The key outcomes expected of the Strategy that are relevant to this Structure Plan are: Promoting a hierarchy of centres including an emerging major regional centre at Morisset. The utilisation of existing zoned vacant industrial land before consideration is given to any further new business parks. Having a greater proportion of jobs in major centres including Morisset. Encouragement of opportunities for home-based and localised employment in some town and localised centres likely to be increased. A greater proportion of employment will be in centres close to higher population densities and accessible via a variety of transport options. No net loss of biodiversity value to the Region (DoP, 2006). The way in which it is expected that these objectives will be achieved has been presented in the Strategy. Achievement of the objectives involves aligning LEPs to the Strategy, promoting consolidation in nominated centres (including Morisset) and protecting existing character by focusing new housing in centres and new release areas. Other methods to achieve the objectives include requiring local councils to demonstrate how dwelling capacity targets and outcomes will be achieved, implementation of an Urban Development Program to monitor housing supply and demand, neighbourhood planning in urban release areas and developer contributions from new urban development in greenfield areas (DoP, 2006). Employment growth in nominated city and regional centres will be considered in future amendment of LEPs and the principal environmental planning instruments ("EPIs") as well as home-based employment and localised jobs. Existing major centres will be supported by limiting retail and commercial development to nominated areas, including Morisset, and nominated centres will be supported by maintaining and facilitating specialised civic, education, medical and entertainment functions within those centres. The Strategy also aims to manage development pressures to minimise loss of natural resources, potential land use conflict and impact on the environment, including water resources and catchments (DoP, 2006). Finally, in terms of environmental management the Strategy promotes the need for a Regional Conservation Plan to protect the conservation value of areas that are not within the existing urban PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 8

16 footprint or a nominated new release area. The Regional Conservation Plan will introduce an offset scheme to ensure that the biodiversity impacts of urban development are offset by positive actions elsewhere and provide guidelines for certification (DoP, 2006). 2.2 Planning principles Lifestyle 2020 Lifestyle A Strategy for our Future ( Lifestyle 2020 ) was prepared by LMCC in 2000 to provide a broad framework for the future development of the City based on sustainable development principles. Lifestyle 2020 integrates economic, environmental, social and cultural strategies so that future land use planning within the City is directed towards a sustainable and shared vision. Extensive community consultation underpinned the development of Lifestyle LMCC and the community identified four core values to guide future development of Lake Macquarie: 1. Sustainability: integrating the management of environmental, economic, social and cultural elements to ensure that all resources of the City are respected, preserved, enjoyed and utilised in a sustainable manner both for current and future generations. 2. Equity: more fairly distributing and improved access to employment, housing, urban services, community facilities, environmental quality and recreation, and providing for a range of lifestyle opportunities to suit all members of the community. 3. Efficiency: facilitating a land use structure that provides a more comprehensive approach to the design of movement networks, open space and water management systems within a wide range of living, employment and leisure opportunities that are capable of adapting over time as the community changes. 4. Liveability: developing a well-designed, attractive and functional land use structure that results in diverse, accessible, compatible and vibrant environments that support security, identity, historic community and cultural diversity. It is the intent of the Structure Plan that it provide guidance for the urban expansion of Morisset within the core values that represent the aspirations of the community and LMCC. Due consideration has been given to Lifestyle 2020, other relevant planning strategies, and the various views of government authorities and relevant stakeholders in developing this Structure Plan. In relation to the future planning for Morisset, Lifestyle 2020 outlined the following core principles: Morisset will continue as the primary centre for the district, particularly through increased accessibility, employment, retail, urban amenity and medium and low density residential opportunities. Morisset will be the key centre for the provision of future community and social services and facilities, such as, a multi-use sports facility, a public swimming complex, a tertiary education facility or similar facility. The key opportunities within Lifestyle 2020 include: Incremental redevelopment to medium density housing within Morisset Town Centre, including on the southern side of the railway station. All new businesses or retail developments within the centre to include a residential component, in particular commercial redevelopment along Dora Street. Possible new major retail opportunities. The creation of vehicle and pedestrian links between the new development areas to the south. PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 9

17 The possibility of establishing a new TAFE on the site adjacent to the existing Hunter Water Corporation Land and reservoir on Coorumbung Street. The establishment of a new primary school to the southwest of the Town Centre as Koompahtoo land develops. Use of the gateway site at the corner of Wyee and Mandalong Roads by organisations that would promote a focus for health, healing and tourism activities in the area. Access to natural bushland within Morisset by developing pedestrian friendly public streets. The establishment of employment activity (light industry) in the vicinity of the rail bend north of the Morisset Railway. Establishment of a town square in front of Morisset Railway Station to provide a focus for community, entertainment and commercial activities. Vacant State Rail Authority land along Dora Street to be considered for commercial and retail activity. It is stressed that the above opportunities were expected to be subject to more rigorous assessments and testing. This Structure Plan provides a basis on which to apply such further assessment. 2.3 Lake Macquarie LEP 2004 The Lake Macquarie LEP 2004 identifies land use zonings and permissible activities within the Lake Macquarie local government area ( LGA ). The LEP also provides planning considerations for future development and identifies key sites such as indigenous and non-indigenous heritage sites. In response to Morisset s growth potential, much of the land (approximately 362ha in the study area) surrounding the town was zoned 10 Investigation under the LEP (2004). The objectives set out in the LEP for the 10 Investigation zone include: 1. To provide land for future development and/or conservation. 2. To ensure land is thoroughly assessed to substantiate future uses. 3. To ensure that land is released in a strategic and efficient manner consistent with the Lifestyle 2020 Strategy. 4. To require comprehensive local environmental studies to substantiate the capability and suitability of land proposed for rezoning. The study area is approximately 750 ha in size and contains a range of land uses, including business, residential, infrastructure, open space, environmental protection, rural and natural resources. There are also industrial land uses located appurtenant to the study area. Business uses are concentrated close to the Morisset Railway Station. The Central Business District (CBD) consists of commercial and retail sites and is located to the north of the Morisset Railway Station. Residential and commercial land use surrounds the station. A mix of residential, environmental protection, rural, open space and investigation land is found throughout the remainder of the study area. At the time of development of the Structure Plan there is no industrial land within the study area, although Council is currently preparing a LEP amendment that would provide approximately 50 hectares of light industrial land in the west of the study area. The existing gateway industrial estate is located adjacent to the south-western boundary of the study area. 2.4 State Environmental Planning Policies There are several State Environmental Planning Policies ( SEPPs ) of relevance to urban expansion in Morisset. PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 10

18 State Environmental Planning Policy 14 Coastal Wetlands SEPP 14 aims to ensure the protection and preservation of coastal wetlands for both economic and environmental purposes. The SEPP applies to specific wetland areas and prohibits development within such wetlands without the consent of local council and the agreement of the former Department of Environment and Conservation (now the Department of Environment and Climate Change - DECC ). Although there are a no SEPP 14 wetlands within the study area, the catchments have the potential to impact on SEPP 14 wetlands nos. 880, 881, 882, 883, 882, 886 and 887. State Environmental Planning Policy 44 Koala Habitat Protection SEPP 44 aims to encourage the conservation and management of areas of natural vegetation that provide habitat for koalas, and to ensure a permanent free-living population and to reverse the trend of koala population decline. Potential koala habitat is defined by SEPP 44 as that in which a minimum of 15 per cent of the trees in the upper or lower strata of the tree component are species listed in a Koala feed species in Schedule 2 of SEPP 44. Existing Local Environmental Studies ( LES ) do not indicate the presence of core koala habitat in the study area. State Environmental Planning Policy 71 Coastal Protection SEPP 71 aims to ensure that there is a consistent and strategic approach to coastal planning and management and to ensure there is a clear development assessment framework for the coastal zone. In particular, the SEPP aims to: Protect and manage the natural, cultural, recreational and economic attributes of the New South Wales coast. Protect and preserve beach environments and beach amenity. Protect and preserve the marine environment of New South Wales. Lake Macquarie is listed as a Coastal Lake in Schedule 1 of the SEPP and parts of the study area (generally east of Moira Park Road and north of Fishery Point Road) are considered to be within the coastal zone as they are not more than one kilometre from the coastal waters of the State. Clause 8 of SEPP 71 identifies matters for consideration that should be taken into account by a Council when it prepares a LEP. Issues such as pedestrian access, consideration of the contextual setting, environmental protection, heritage and coastal protection should form an integral part of any future development. State Environmental Planning Policy 66 Integration of Land Use and Transport The SEPP relates to certain development having a gross floorspace of more than 1,000m 2. The SEPP relates to development for commercial, industrial and community health development as well as some residential development such as subdivision and residential flat buildings. It is the intent of the SEPP that it improves accessibility, choice of transport, moderating travel distances and supporting public transport and efficient movement of freight. 2.5 Ministerial directions Section 117(2) of the Environmental Planning and Assessment Act, 1979 provides that the Minister issue directions to local councils concerning the preparation of LEPs. Although this Structure Plan is not a LEP, the implementation of the Plan will require amendments to the Lake Macquarie LEP. Consequently, these directions are relevant to that amendment process. The relevant Section 117(2) directions and requirements are summarised in Table 2.1 below. The rezoning of the land within the study area must be consistent with these directions or any inconsistency must be justified. PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 11

19 Table 2.1: Ministerial directions Direction Requirement 1. Acid Sulphate Soils Consider Acid Sulphate Soils Planning Guidelines and introduce provisions to manage 2. Approval, Concurrence and Consultation Not to contain provisions requiring concurrence, consultation or referral to a Minister or public authority unless approval granted from Minister or public authority and Director-General 3. Business Zones Must not result in reduction of floor space 5. Coal, Other Minerals and Extractive Resources Must consult with the DPI and consider land use conflict 6. Coastal Protection Consistent with Coastline Management Manual, NSW Coastal Policy and Coastal design guidelines and not alter, create or remove existing zonings 9. Conservation and Management of Environmental and Indigenous Heritage Conserve environmental and indigenous heritage 10. Designated Development Not to identify development as designated unless 11. Development in a Mine Subsidence District or on Unstable Land Liaise with Mine Subsidence Board and preclude development on unstable land 13. Environmental Protection Create, alter or remove existing zonings or identification of land or alter or remove existing provisions 15. Flood Prone Land Comply Flood Prone Land Policy and principles of Floodplain Development Manual, 2005 and not rezone certain land within flood planning areas or increase potential for flood impact 16. Industrial Zones Not reduce existing floor space ratios or height control 17. Integrating Land Use and Transport 18. Manufactured Home Estates and Caravan Parks 19. Planning for Bushfire Protection Consistent with Improving Transport Choice and The Right Place for Business and Services Retain zonings for manufacture home estates and identify suitable zones Consult Rural Fire Service and consider Planning for Bushfire Protection 20. Recreation Vehicles Use Not zone certain land or enable use for purposes of a recreation vehicle area and must consider existing guidelines 21. Residential Zones Residential land must be serviced, compatible with environmental quality of the area and not reduce permissible residential density 22. Rural Zones Not rezone rural land for urban purposes or increase permissible density and must retain existing zones and provision relating to the control of traffic generating development or access on major road frontages. 23. Special Area Zones and Recreation Zones Not create, alter or reduce existing reservations or zonings for public open space without approval public authority and Director-General PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 12

20 2.6 Policy implications for development Morisset was one of the six major mixed use regional centres identified in the Lower Hunter Regional Strategy. Morisset was considered in this Strategy to be an emerging major centre that is expected to grow and take on the role of a major centre in the future (DoP, 2006). LMCC also considers Morisset to be the most appropriate settlement within the Morisset Planning District for higher level urban growth over the next 20 years (LMCC, 2006). Development within Morisset will thus allow regional goals of population growth, urban expansion, employment generation and social improvement to be met. Appropriate urban growth should be achieved with due consideration to environmental outcomes and biodiversity issues. Morisset is ideally located with a choice of transport modes such as immediate access to the freeway and access to the main northern railway which offers opportunity for various employment generating activities. Morisset is also in a position to support major centres by relieving some pressure on retail centres such as Toronto and Lake Haven. An improved road network will provide regional streets for access to the wider region. Urban development in Morisset will also increase land supply to reduce pressure on land outside centres. It can also assist in increasing housing affordability through the creation of more diverse housing stock. Citywide and regional planning strategies have been developed in recognition that Morisset is an existing centre and it does not have significant constraints that would impede further development. However, at a local level, there are numerous development and conservation issues that must be resolved to ensure that future development occurs in a sustainable and acceptable fashion. PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 13

21 3. Consultations 3.1 Previous consultations Council, through the extensive community consultations undertaken as part of Lifestyle 2020, has developed a clear planning vision for Morisset. Aspects of the planning vision have been given further weight in the Lower Hunter Regional Strategy (DoP, 2006). The purpose of the current round of investigations is to identify specific issues associated with the town as an emerging major centre under that Strategy. The following briefly summarises the results of consultation undertaken in formulation of the Structure Plan. 3.2 Planning focus meeting A Planning Focus Meeting (PFM) was convened by LMCC on 17 August 2006 and involved a variety of representatives from agencies and organisations including: Landcom. Energy Australia (EA). Department of Environment and Climate Change (formerly the Department of Environment and Conservation). Mine Subsidence Board. Hunter New England Area Health. Catholic Schools Office. Hunter Water Corporation (HWC). Telstra. Roads and Traffic Authority (RTA). Rural Fire Service (RFS). Morisset Bus Services. Minutes of the PFM are presented in Appendix A. All agencies and organisations that were invited to the PFM were also invited to provide written comments. A number of written responses were received following the PFM (Appendix B) and are summarised in Table 3.1. Table 3.1 Responses to Planning Focus Meeting Authority Issues raised Section addressing issue Principle of improving or maintaining biodiversity should be Department of employed Environment and Consider compensation for any losses Conservation Strive to improve fauna corridors Consider biodiversity certification and improvement or maintenance of biodiversity Roads and Traffic Investigate road network, upgrading requirements and Authority alternatives Cyclist and pedestrian facilities should be reviewed and needs determined Review potential road traffic noise issues Identify requirements for contributions Development should be consistent with SEPP 66 Railcorp Investigate railway station and transport interchange 5.4 requirements to cater for growth Rail alignment improvements require consideration. 5.4 Energy Australia Future development will require significant distribution works , 4.6, 4.7, 4.8, , PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 14

22 3.3 Community meeting A community meeting was held at the Morisset Multipurpose Centre on 29 August 2006 for interested community members to hear about the development of the Structure Plan and to provide feedback. Approximately 50 community representatives attended the meeting. Feedback was provided in groups of approximately 10 persons with general discussion of all relevant issues as one group. The community was generally supportive of urban development in Morisset for a number of reasons, such as providing infrastructure upgrades, increasing services in the area and increasing the diversity of commercial enterprises. Community members identified the need for planned and appropriate development. Minutes of the Community Meeting are presented in Appendix C. A number of written responses were received following the community meeting and are presented in Appendix D. A summary of minutes of the meeting is presented in Table 3.2. Table 3.2 Summary of community response Issue Regional Role Morisset is a focal point for the area/industry should be promoted Morisset serves as a gateway to wider area Character and lifestyle choice are important Development Will promote employment, services, infrastructure/more employment Must consider diverse housing and development choice and existing natural environment Services and infrastructure must keep pace with development Town centre Require cultural facilities and improved access in and around town centre Increased density in town centre is appropriate Residential Medium density near the railway station Smaller lots sizes are suitable in new release areas Public open space in new release areas Services/Traffic Medical services to be improved Improvements to police, education and tourism facilities Improved traffic management required including cycleways and footpaths Provide bypass to southern side of town if development proceeds Consider sewerage load Social/Cultural Core of existing older population; need to consider housing for various age groups Maintain existing heritage sites Natural Bushfire management Steep slopes in certain areas Drainage and water quality Adequate environmental safeguards Section addressing issue 6.4, 6.7, , , 5.4, , , Staging Round town centre initially and then based on infrastructure Public Exhibition of draft Morisset Structure Plan The draft Structure Plan was exhibited for eight weeks during which a public briefing was held in Morisset on 17 July A précis of the issues addressed at this briefing is included in Appendix E. The Public response to this formal phase of the consultation for the project was strong with 38 detailed submissions received. The submissions are summarised and commented upon in detail at Appendix F. Submissions were received from local residents, owners of lands surrounding the town and various NSW Government agencies. PLAN\STRUCTURE_PLAN_REV6_FINAL_ DOCM 29/10/2008 REVISION 6 PAGE 15

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment Amendment No. 4 to Lake Macquarie Local Environmental Plan 2014 (PP_2014_LAKEM_005_00) Local Government Area: Name of Draft LEP: Lake

More information

Planning Proposal Toronto Road, Booragul. Amendment to Lake Macquarie Local Environmental Plan (LMLEP) 2014

Planning Proposal Toronto Road, Booragul. Amendment to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Planning Proposal Toronto Road, Booragul Amendment to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Local Government Area: Name of Draft LEP: Subject Land: Land Owner: Applicant: Folder Number:

More information

Lake Macquarie City. A copy of the published amendment including the instrument and maps, is provided in Attachment 7 of this report.

Lake Macquarie City. A copy of the published amendment including the instrument and maps, is provided in Attachment 7 of this report. Planning Proposal Amendment No. 77 to Lake Macquarie Local Environmental Plan 2004 and proposed Amendment to Draft Lake Macquarie Local Environmental Plan 2013 Minor Zone Boundary Adjustment - Pasminco

More information

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Local Government Area: Name of Draft LEP: Subject Land:

More information

Planning Proposal Wangi Power Station Complex Administrative Amendment Lake Macquarie Local Environmental Plan 2014

Planning Proposal Wangi Power Station Complex Administrative Amendment Lake Macquarie Local Environmental Plan 2014 Planning Proposal Wangi Power Station Complex Administrative Amendment Lake Macquarie Local Environmental Plan 2014 (Post Exhibition Version) Local Government Area: Name of Draft LEP: Subject Land: Land

More information

Planning Proposal under section 55 of the EP&A Act

Planning Proposal under section 55 of the EP&A Act FOR PUBLIC EXHIBITION [Brief description] Monday 10 October to Monday 27 October 2014 Planning Proposal under section 55 of the EP&A Act Port Macquarie-Hastings LEP 2011 (Amendment No 32) Mixed land zone

More information

Part 12 Precinct Area Plans - Wyee West

Part 12 Precinct Area Plans - Wyee West TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 EXTENT OF AREA PLAN... 1 1.3 EXISTING CHARACTER... 2 1.4 ENVIRONMENTAL ATTRIBUTES AND CONSTRAINTS... 2 1.5 DESIRED FUTURE CHARACTER... 3 1.6

More information

Planning Proposal Environmental and Recreation Zone Review Stage One

Planning Proposal Environmental and Recreation Zone Review Stage One Planning Proposal Environmental and Recreation Zone Review Stage One Local Government Area Name of Draft LEP: Subject Land: Lake Macquarie City Lake Macquarie Local Environmental Plan 2014 Environmental

More information

Draft Eastern District Plan

Draft Eastern District Plan Draft Eastern District Plan Submission_id: 31238 Date of Lodgment: 13 Dec 2017 Origin of Submission: Online Organisation name: Turrulla Gardens Pty Ltd C/- Mecone Organisation type: Industry First name:

More information

Wingecarribee Shire Council

Wingecarribee Shire Council Connell Wagner Pty Ltd ABN 54 005 139 873 2 Palmer Street North Parramatta New South Wales 2151 Australia Telephone: +61 2 8896 4100 Facsimile: +61 2 9890 3558 Email: cwpar@conwag.com www.conwag.com Moss

More information

Draft Ada Street Cardiff Area Plan

Draft Ada Street Cardiff Area Plan Draft Ada Street Cardiff Area Plan (Draft Amendment to Lake Macquarie Development Control Plan 2014) Exhibition: The draft Area Plan is on public exhibition from 29 February 2016 to 29 March 2016. Submissions:

More information

Planning Proposal. Rockdale Local Environmental Plan Two storey residential development in the R2 and R3 zones

Planning Proposal. Rockdale Local Environmental Plan Two storey residential development in the R2 and R3 zones Planning Proposal Rockdale Local Environmental Plan 2011 Two storey residential development in the R2 and R3 zones 16 October 2014 Contents Part 1 Part 2 Part 3 Part 4 Part 5 A statement of the Objectives

More information

Planning Proposal. Part of the Former Swansea Bowling Club Rezoning at Charles Street and Lake Road, Swansea

Planning Proposal. Part of the Former Swansea Bowling Club Rezoning at Charles Street and Lake Road, Swansea Planning Proposal Part of the Former Swansea Bowling Club Rezoning at Charles Street and Lake Road, Swansea Draft Amendment No. 26 to Lake Macquarie Local Environmental Plan 2014 As Published 16/03/2018

More information

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 Table of Contents Introduction... 3 Background to Review... 3 Comparison of the Schedules to the General Residential Zone... 7 Methodology... 7 Policy Context...

More information

MAYFIELD WEST SECONDARY PLAN PHASE 2

MAYFIELD WEST SECONDARY PLAN PHASE 2 MAYFIELD WEST SECONDARY PLAN PHASE 2 Public Open House #3 February 25, 2010 Draft Preferred Land Use Scenario TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Open House Agenda TOWN OF CALEDON 1. Welcome

More information

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole B2. Tāhuhu whakaruruhau ā-taone - Urban growth and form B2.1. Issues Tāhuhu whakaruruhau ā-taone The sheltering ridge pole Auckland s growing population increases demand for housing, employment, business,

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

DAREBIN PLANNING SCHEME AMENDMENT C137

DAREBIN PLANNING SCHEME AMENDMENT C137 Who is the planning authority? Planning and Environment Act 1987 DAREBIN PLANNING SCHEME AMENDMENT C137 EXPLANATORY REPORT This amendment has been prepared by the Darebin City Council, who is the planning

More information

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED 9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

GREENBANK DEVELOPMENT MASTERPLAN

GREENBANK DEVELOPMENT MASTERPLAN DEVELOPMENT MASTERPLAN POTENTIAL TRAIN STATION COMMUNITY CENTRE Greenbank will be a connected masterplanned community providing easy access to local and surrounding amenity. Affordable quality homes, green

More information

6 Growth Management Challenges and Opportunities

6 Growth Management Challenges and Opportunities 6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

TIDAPA Structure Plan

TIDAPA Structure Plan TIDAPA Structure Plan Prepared by Tract Consultants 28 MARCH 2017 0217-0074 Table of Contents 01 STRATEGIC CONTEXT Executive Summary Regional Context Page 3 Page 4 02 LOCAL CONTEXT Aerial Photograph Local

More information

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8 Rural Zone Policy RU2 RURAL ZONE - POLICY RU2.1 Introduction The natural resources of the rural environment in the Ruapehu District provide the basis for the existing and potential character, intensity

More information

4 RESIDENTIAL ZONE. 4.1 Background

4 RESIDENTIAL ZONE. 4.1 Background 4 RESIDENTIAL ZONE 4.1 Background The residential areas within the City are characterised by mainly lowrise dwellings sited on individual allotments. Past architectural styles, settlement patterns and

More information

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016)

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016) UNITARY PLAN UPDATE REQUEST MEMORANDUM TO FROM Phill Reid Linley Wilkinson DATE 25 September 2018 SUBJECT Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November

More information

Draft Western District Plan

Draft Western District Plan Powered by TCPDF (www.tcpdf.org) Draft Western District Plan Submission_id: 31440 Date of Lodgment: 15 Dec 2017 Origin of Submission: Online Organisation name: Goodman Property Services Australia Pty Ltd

More information

Exhibition of Oran Park and Turner Road Precincts

Exhibition of Oran Park and Turner Road Precincts 22 June 2007 Growth Centres Commission Mr. Angus Dawson PO Box 1457 PARRAMATTA NSW 2124 Dear Sir Exhibition of Oran Park and Turner Road Precincts UDIA NSW commends the Growth Centres Commission (GCC)

More information

Appendix 1 Structure plan guidelines

Appendix 1 Structure plan guidelines Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Appendix A. Planning Processes. Introduction

Appendix A. Planning Processes. Introduction 1 Planning Processes Introduction This appendix outlines a number of planning processes which are used in the Auckland Region to support the effective management of development in the region s rural and

More information

PART 02 HASTINGS POINT IN CONTEXT

PART 02 HASTINGS POINT IN CONTEXT PART 02 HASTINGS POINT IN CONTEXT 2.1 Background 2.1.1 Demographic Information 2.1.2 Existing Locality Characteristics 2.2 The Planning Framework 2.2.1 The Far North Coast Regional Strategy 2006 2.2.2

More information

Wallingford Neighbourhood Plan

Wallingford Neighbourhood Plan Wallingford Neighbourhood Plan Introduction What is neighbourhood planning? Neighbourhood planning was introduced by the Localism Act 2011 to give local people more influence over how development comes

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

... on the draft Arden Vision & Framework

... on the draft Arden Vision & Framework April 2017 Integrated world-class urban renewal Feedback... on the draft Arden Vision & Framework On 1 September 2016 the Victorian Planning Authority (VPA) released the draft Arden Vision & Framework

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

Planning Proposal. Council Adopted Version

Planning Proposal. Council Adopted Version Planning Proposal Amendment No.6 to Lake Macquarie Local Environmental Plan 2014 Warners Bay Town Centre Deferred Matter Dept Planning & Environment Reference No. PP_2014_LAKEM_001_00 Council Adopted Version

More information

North District What we heard

North District What we heard What we heard Vision to 2056 and Priorities Governance and implementation Infrastructure and funding The vision for a metropolis of three cities, and the 30 minute city. Feedback emphasised: That for the

More information

Northern Territory Compact Urban Growth Policy

Northern Territory Compact Urban Growth Policy Northern Territory Compact Urban Growth Policy A Reference Policy Document to clause 2.7 (Reference to Policy) of the NT Planning Scheme May 2015 Table of Contents 1 Policy Setting... 3 1.1 Context for

More information

Western City District What we heard

Western City District What we heard What we heard Vision to 2056 and Priorities Governance and implementation Infrastructure and funding The protection of the natural landscape including biodiversity and the Metropolitan Rural Area for food

More information

CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT

CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT CITY OF FREMANTLE PLANNING AND DEVELOPMENT SERVICES 8 WILLIAM STREET FREMANTLE WA 6160 PLANNING AND DEVELOPMENT ACT

More information

Part 10 Other plans

Part 10 Other plans Contents of Part 10 Part 10 Other plans... 10-1 10.1 Preliminary... 10-1 10.2 Palmview Structure Plan... 10-2 10.2.1 Preliminary... 10-2 10.2.2 Master Strategic Framework... 10-6 10.2.3 Master Precincts

More information

DRAFT GREATER SYDNEY REGION PLAN OBJECTIVES, STRATEGIES AND ACTIONS

DRAFT GREATER SYDNEY REGION PLAN OBJECTIVES, STRATEGIES AND ACTIONS Greater Sydney Commission DRAFT GREATER SYDNEY REGION PLAN OBJECTIVES, STRATEGIES AND ACTIONS Issued: 26 OCTOBER 2017 Version: 1 Subject: Greater Sydney Region and District Plans This information note

More information

ELLIOTT HEADS STRUCTURE PLAN

ELLIOTT HEADS STRUCTURE PLAN ELLIOTT HEADS STRUCTURE PLAN BACKGROUND This report has been prepared to provide an overview of the land that has been included in the Urban Footprint within the Wide Bay Burnett Regional Plan, September

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS Reference: #V157080 14 August 2018 Barwon Heads Lifestyle Group Pty Ltd C/- Best Hooper Lawyers Level 9, 451 Little Bourke Street MELBOURNE VIC 3000 Attention: Mr. Edward Mahony (Lawyer) Dear Edward RE:

More information

WATERLOO STATE SIGNIFICANT PRECINCT SUMMARY OF STUDIES

WATERLOO STATE SIGNIFICANT PRECINCT SUMMARY OF STUDIES WATERLOO STATE SIGNIFICANT PRECINCT SUMMARY OF STUDIES Technical studies will be undertaken to inform the master planning process for the Waterloo precinct to develop a Precinct Proposal to redevelop the

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Planning Proposal (PP007) Rezoning of Kylor Pty Ltd Land at Manyana

Planning Proposal (PP007) Rezoning of Kylor Pty Ltd Land at Manyana Planning Proposal (PP007) Rezoning of Kylor Pty Ltd Land at Manyana Prepared by Planning & Development Services Group Shoalhaven City Council File 50064E Version 1 - Gateway March 2015 Shoalhaven City

More information

REVISED DRAFT NORTH DISTRICT PLAN PLANNING PRIORITIES AND ACTIONS

REVISED DRAFT NORTH DISTRICT PLAN PLANNING PRIORITIES AND ACTIONS Greater Sydney Commission REVISED DRAFT NORTH DISTRICT PLAN PLANNING PRIORITIES AND ACTIONS Issued: 26 OCTOBER 2017 Version: 1 Subject: Greater Sydney Region and District Plans This information note is

More information

Western Sydney Parklands Australia s Largest Urban Park

Western Sydney Parklands Australia s Largest Urban Park Western Sydney Parklands Australia s Largest Urban Park 37 WLA 1 MAGAZINE 21 38 WESTERN SYDNEY PARKLANDS AUSTRALIA S LARGEST URBAN PARK Large urban parks have dual roles to play in meeting the demands

More information

Planning Proposal. Extension of West Wallsend Heritage Conservation Area Draft Amendment No. RZ/1/2015 to Lake Macquarie Local Environmental Plan 2014

Planning Proposal. Extension of West Wallsend Heritage Conservation Area Draft Amendment No. RZ/1/2015 to Lake Macquarie Local Environmental Plan 2014 Planning Proposal Extension of West Wallsend Heritage Conservation Area Draft Amendment No. RZ/1/2015 to Lake Macquarie Local Environmental Plan 2014 AS ADOPTED ON 22 AUGUST 2016 Local Government Area:

More information

DRAFT FOR YOUR FEEDBACK DRAFT LOGAN RESERVE PLAN

DRAFT FOR YOUR FEEDBACK DRAFT LOGAN RESERVE PLAN DRAFT FOR YOUR FEEDBACK CONTENTS INTRODUCTION... BACKGROUND... State Government... Council... PLANNING LEGISLATION AND RULES... CONSULTATION PROCESS...... ENVIRONMENT AND CONSERVATION... HOUSING... Proposed

More information

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards) CITY CLERK Clause embodied in Report No. 10 of the, as adopted by the Council of the City of Toronto at its meeting held on November 6, 7 and 8, 2001. 10 Parkland Acquisition Strategic Directions Report

More information

Wingecarribee Shire Council

Wingecarribee Shire Council Connell Wagner Pty Ltd ABN 54 005 139 873 2 Palmer Street North Parramatta New South Wales 2151 Australia Telephone: +61 2 8896 4100 Facsimile: +61 2 9890 3558 Email: cwpar@conwag.com www.conwag.com Moss

More information

The Proposed Auckland Unitary Plan (notified 30 September 2013)

The Proposed Auckland Unitary Plan (notified 30 September 2013) 3 Business zones Introduction There are 10 business zones in the Unitary Plan: City Centre Metropolitan Centre Town Centre Local Centre Neighbourhood Centre Mixed Use General Business Business Park Light

More information

South District What we heard

South District What we heard What we heard Vision to 2056 and Priorities Governance and implementation Infrastructure and funding Feedback supported: The vision for a metropolis of three cities, but emphasised the importance of infrastructure

More information

A Growing Community Rural Settlement Areas

A Growing Community Rural Settlement Areas Town of Huntsville Official Plan Review - POLICY BACKGROUND PAPER A Growing Community Rural Settlement Areas BACKGROUND: In addition to the fully municipally-serviced Urban Settlement Area and the Hidden

More information

The WAPC publications summarised in this report are (in order of policy importance):

The WAPC publications summarised in this report are (in order of policy importance): Summary of WAPC Publications Relevant to Local Biodiversity Planning As part of the delivery of the land use planning component of the Western Australian Natural Resource Management (NRM) program in 2011/12,

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive

More information

Part 4.25 Pasminco Area Plan

Part 4.25 Pasminco Area Plan 1 INTRODUCTION The purpose of this Area Plan is to guide the redevelopment of the former Pasminco Cockle Creek Smelter site and the former Incitec Pivot Fertilizer site. The Pasminco and Incitec sites

More information

Application Guide. Should you have any questions on the Outline Application please contact:

Application Guide. Should you have any questions on the Outline Application please contact: Application Guide Application Guide This guide describes the structure of the Outline Application, explains the different documents that have been submitted with it and identifies what will happen next.

More information

South of Eastern Strategic Direction Status Update

South of Eastern Strategic Direction Status Update STAFF REPORT ACTION REQUIRED South of Eastern Strategic Direction Status Update Date: July 10, 2014 To: From: Planning and Growth Management Committee Chief Planner and Executive Director, City Planning

More information

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Cotswolds AONB Landscape Strategy and Guidelines. June 2016 Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction

More information

Greater Geelong Planning Scheme Proposed Planning Scheme Amendment C and 5-19 Princes Highway, Norlane

Greater Geelong Planning Scheme Proposed Planning Scheme Amendment C and 5-19 Princes Highway, Norlane Greater Geelong Planning Scheme Proposed Planning Scheme Amendment C253 PLANNING SUBMISSION prepared for Bunnings Group Ltd by SJB Planning Pty Ltd Level 1, Building D 80 Dorcas Street SOUTHBANK VIC 3006

More information

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017 Page 1 of 14 EXECUTIVE SUMMARY This Land Use Amendment application covers an area of 43.76 hectares ± (108.14 acres ±) located in northeast Calgary, bound by Country Hills Boulevard NE to the south and

More information

OUR GREATER SYDNEY A metropolis of three cities. OVERVIEW. connecting people. DRAFT Greater Sydney Region Plan

OUR GREATER SYDNEY A metropolis of three cities. OVERVIEW. connecting people. DRAFT Greater Sydney Region Plan OUR GREATER SYDNEY 2056. A metropolis of three cities. OVERVIEW. connecting people. DRAFT Greater Sydney Region Plan October 2017 This document is an overview of the draft Greater Sydney Region Plan. To

More information

Draft South West District Plan - Campbelltown City Council Submission Attachment 1

Draft South West District Plan - Campbelltown City Council Submission Attachment 1 Draft South West District Plan - Campbelltown City Council Submission Attachment 1 Campbelltown City Council Report and Resolution - Draft South West District Plan - Draft Submission Ordinary Meeting 28/03/17

More information

South District Plan OVERVIEW

South District Plan OVERVIEW OUR GREATER SYDNEY 2056 Revised Draft South District Plan OVERVIEW Canterbury-Bankstown Georges River Sutherland Snapshot of the South District today and into the future The Greater Sydney Commission acknowledges

More information

Eastern City District Plan

Eastern City District Plan OUR GREATER SYDNEY 2056 Revised Draft Eastern City District Plan OVERVIEW Bayside Burwood Canada Bay City of Sydney Inner West Randwick Strathfield Waverley Woollahra Snapshot of the Eastern City District

More information

Session 4 New Urban Regions and Major Urban Extensions. Tackling Western Sydney s Urban Growth

Session 4 New Urban Regions and Major Urban Extensions. Tackling Western Sydney s Urban Growth Session 4 New Urban Regions and Major Urban Extensions Tackling Western Sydney s Urban Growth Stephanie Barker Rohan Dickson & Associates and consultant to NSW Growth Centres Commission Friday 8 February

More information

PHASE III: Reserved Matters Submission

PHASE III: Reserved Matters Submission Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE DD/MM/YY SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO3 EASTERN GOLF COURSE KEY REDEVELOPMENT SITE 1.0 A permit may be granted before a development plan has been

More information

Lake Macquarie Development Control Plan 2014 Revision 19. Adopted by Council 25 June 2018

Lake Macquarie Development Control Plan 2014 Revision 19. Adopted by Council 25 June 2018 Lake Macquarie City Council Lake Macquarie Development Control Plan 2014 Revision 19 DISCLAIMER When preparing and assessing development applications, the summarised changes outlined in the revision history

More information

Edward R. Sajecki Commissioner of Planning and Building

Edward R. Sajecki Commissioner of Planning and Building Corporate Report Clerk s Files Originator s Files CD.03.POR DATE: TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: February 27, 2012 Edward R. Sajecki Commissioner

More information

Integrated Urban Structuring in Australia An Overview of Principles and Practice

Integrated Urban Structuring in Australia An Overview of Principles and Practice ACNU08 Brisbane Integrated Urban Structuring in Australia An Overview of Principles and Practice Wendy Morris Ecologically Sustainable Design Pty Ltd Melbourne, Australia esdesign@netspace.net.au Ecologically

More information

EASTERN GOLF COURSE DEVELOPMENT PLAN OCTOBER 2013

EASTERN GOLF COURSE DEVELOPMENT PLAN OCTOBER 2013 DEVELOPMENT PLAN OCTOBER 2013 SECTION HEADING 2 DEVELOPMENT PLAN - OCTOBER 2013 TABLE OF CONTENTS PAGE INTRODUCTION 1.1 COMPONENTS OF THE DEVELOPMENT PLAN 5 SITE ANALYSIS 2.1 OVERALL SITE CONTEXT 6 2.2

More information

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING 3.1.1 The area referred to by the City Council, as Winchester Town, consists of the Winchester Wards plus the adjoining built up areas of Badger

More information

DRAFT WESTERN CITY DISTRICT PLAN PLANNING PRIORITIES AND ACTIONS

DRAFT WESTERN CITY DISTRICT PLAN PLANNING PRIORITIES AND ACTIONS Greater Sydney Commission DRAFT WESTERN CITY DISTRICT PLAN PLANNING PRIORITIES AND ACTIONS Issued: 26 OCTOBER 2017 Version: 1 Subject: Greater Sydney Region and District Plans This information note is

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

City of Hume Planning Scheme Amendment C207. Statement of Expert Evidence Provided to Planning Panels Victoria

City of Hume Planning Scheme Amendment C207. Statement of Expert Evidence Provided to Planning Panels Victoria 14 August 2017 Revision: 1 Reference: 1702 City of Hume Planning Scheme Amendment C207 Statement of Expert Evidence Provided to Planning Panels Victoria Stormwater Management Evidence for 35 Buckland Way

More information

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD Proposals for land at Smug Oak Lane BRICKET WOOD Previous Linden Homes and Wates Developments scheme Welcome Welcome to Linden Homes and Wates Developments public exhibition. Working together as joint

More information

Official Plan Review

Official Plan Review Official Plan Review Summary Report - The Built Environment August 2014 Part 1: Introduction Planning for a healthy, prosperous and sustainable community is an important goal for our municipality. From

More information

CASEY PLANNING SCHEME AMENDMENT C188

CASEY PLANNING SCHEME AMENDMENT C188 Who is the planning authority? Planning and Environment Act 1987 CASEY PLANNING SCHEME AMENDMENT C188 EXPLANATORY REPORT This amendment has been prepared by the Growth Areas Authority (now known as the

More information

EVALUATION OF MASTER PLAN ALTERNATIVES

EVALUATION OF MASTER PLAN ALTERNATIVES 7 The Environmental Report is required to identify, describe and evaluate reasonable alternatives, taking into account the objectives and geographical scope of the Master Plan 2008. Three plan alternatives

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

SPG 1. * the northern and western sections which are open fields used for pasture and grazing; SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended

More information

PART 1. Background to the Study. Avenue Study. The Danforth

PART 1. Background to the Study. Avenue Study. The Danforth The Danforth 1.1/ Study Purpose & Key Municipal Goals 1.2/ The Local Advisory Committee 1.3/ The Project Team 1.4/ Study Process/Summary of Method 1.5/ Summary of Consultation 1.1 Study Purpose and Key

More information

Briefing Document of CNP. June 2017

Briefing Document of CNP. June 2017 Cholsey Parish Council Cholsey Neighbourhood Plan Briefing Document of CNP June 2017 Cholsey Neighbourhood Plan Page! 1 of! 8 Cholsey Plan Briefing v1.4 Page Left Intentionally Blank Cholsey Neighbourhood

More information

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES Created September 2013 Penihana North Subdivision Design Criteria GUIDELINES TO THE RULES This part of the Plan sets out the design criteria for subdivision in Penihana North. The criteria will be considered

More information

MAYFIELD WEST SECONDARY PLAN PHASE 2

MAYFIELD WEST SECONDARY PLAN PHASE 2 MAYFIELD WEST SECONDARY PLAN PHASE 2 Council Information Workshop February 16, 2010 Draft Preferred Land Use Plan TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Workshop Agenda TOWN OF CALEDON 1. Welcome

More information

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN OKEFORD FITZPAINE NEIGHBOURHOOD PLAN Dear Parishioner, The Neighbourhood Plan Project Team have prepared this leaflet to summarise the full Neighbourhood Plan document. It provides a summary of the Vision,

More information

Town Planning Report. Combined Planning Permit and Planning Scheme Amendment Request under Section 96A of the Planning and Environment Act 1987

Town Planning Report. Combined Planning Permit and Planning Scheme Amendment Request under Section 96A of the Planning and Environment Act 1987 Town Planning Report Combined Planning Permit and Planning Scheme Amendment Request under Section 96A of the Planning and Environment Act 1987 1 Henry Street, Belmont Prepared by Tract Consultants for

More information

CORNUBIA RETAIL PARK- PLANNING REPORT REVERT 3

CORNUBIA RETAIL PARK- PLANNING REPORT REVERT 3 CORNUBIA RETAIL PARK- PLANNING REPORT 19.04.2013 REVERT 3 1 FOR: BY: 28 DEVONSHIRE AVENUE GLENWOOD DURBAN 4001 P.O. BOX 17390 CONGELLA 4013 T +27 31 202 9550 F +27 31 202 9551 1st FLOOR THE MEDIA MILL

More information

Planning Proposal Belmont Sportsman s Club Draft Amendment No. 65 to Lake Macquarie Local Environmental Plan (LM LEP) 2004

Planning Proposal Belmont Sportsman s Club Draft Amendment No. 65 to Lake Macquarie Local Environmental Plan (LM LEP) 2004 Planning Proposal Belmont Sportsman s Club Draft Amendment No. 65 to Lake Macquarie Local Environmental Plan (LM LEP) 2004 Local Government Area: Name of Draft LEP: Lake Macquarie City Council (LMCC) Lake

More information

QUEENSTOWN LAKES DISTRICT COUNCIL SUBDIVISION DESIGN GUIDELINES

QUEENSTOWN LAKES DISTRICT COUNCIL SUBDIVISION DESIGN GUIDELINES Attachment C: Draft QLDC Subdivision Design Guidelines QUEENSTOWN LAKES DISTRICT COUNCIL DESIGN GUIDELINES A DESIGN GUIDE FOR AND DEVELOPMENT IN THE URBAN ZONES QUEENSTOWN OFFICE 10 Gorge Road Queenstown

More information