City Development Department 9500 Civic Center Drive Thornton, Colorado FAX

Size: px
Start display at page:

Download "City Development Department 9500 Civic Center Drive Thornton, Colorado FAX"

Transcription

1 City Hall City Development Department 9500 Civic Center Drive Thornton, Colorado FAX Ben Swanson Dormie Capital Partners 3740 Dacoro Lane, Suite 200 Castle Rock, CO RE: Quebec Plaza (Northeast corner of East 128 th Avenue and Quebec Street) Pre-Application Meeting Summary Notes Dear Mr. Swanson: A pre-application meeting was held at the city of Thornton (city) offices on March 16, 2017 to review a proposed retail development project for the property listed above. Following is a summary of city staff comments from the meeting. This summary is not intended to be an all-inclusive list of the process nor requirements for the proposed development. It is ultimately the developer s responsible to adhere to all City Codes, Regulations, Specifications, etc. In addition, the comments included are based upon the information provided to the city prior to the pre-application meeting and do not necessarily reflect the ad hoc conversations regarding new information provided during the pre-application meeting or alternate plans brought to the meeting. CURRENT PLANNING Planner I (Ty Robbins, ) 1. City s Development Review Process: a. The first city review is three weeks, beginning on Mondays, with comments due back to the applicant the following Wednesday. b. Each subsequent review by the city is two weeks, beginning on Mondays, with comments due back to the applicant the following Wednesday. c. The city accepts electronic submittals. 2. The required development applications include the following:

2 Page 2 a. Overall Development Plan/Conceptual Site Plan Amendment (ODP/CSP) may be processed administratively if [per Sec (e)] the development proposal does not: i. Alter the basic relationship of the proposed development to adjacent property. i iv. Change the uses permitted Increase the maximum density, floor area ratio, or height. Decrease the amount of required off-street parking. v. Reduce the minimum yards required at the boundary of the site. b. Development Permit (DP) - requires public hearing with Development Permits and Appeals Board (DPAB). c. Subdivision Plat Amendment (SUBA) - administrative process d. Developer s Agreement (DA) - administrative process e. Civil Construction Drawings (CDs) - administrative process f. Building Permits - administrative process 3. Overall Planning Issues: a. Land use: general retail and a restaurant with drive-through are uses allowed by right. Refer to the attached Quebec Plaza PD standards and use chart in Sec for a complete list of allowed uses. b. Lot standards: i. Maximum building coverage: 50 percent. c. Setbacks: i. Twenty-five feet to public streets (25-foot landscape buffer required along East 128 th Avenue and Quebec Street) i Zero feet to interior property lines. Sixty-foot building setback to residential property line (must also maintain a 25-foot landscape buffer adjacent to residential property).

3 Page 3 d. Building height: i. 35-foot maximum. e. Parking: i. Restaurant one space per 100 square feet of floor area. i iv. Restaurant with drive-through one space per 150 square feet of floor area. Refer to Sec for a complete list of parking requirement for each use. Angled parking is not allowed. Drive aisles must be a minimum of 24 feet in width for double rows of 90-degree parking. v. If shared parking is desired or necessary, a cross lot parking agreement shall be established and reflected on the subdivision plat. The city may require a parking study demonstrating offset parking demands for the proposed uses to ensure adequate overall parking within the development. f. Architecture: i. Refer to the architectural standards in the PD. Commercial design standards in Sec through also apply. Additional screening and/or landscaping may be required to mitigate impacts to residential properties. Staff will pay close attention to building service areas and areas where headlights might shine onto residential properties. g. Lighting: i. A photometric plan shall be submitted and review as part of the DP. Pole lights shall be downcast cut-off type not to exceed 14 feet in height. Light levels shall not exceed onehalf foot candle at the site property lines. All building lighting shall not cast any off-site glare on adjacent properties or streets, and must be shielded and directed either downward or toward the building. h. Signage:

4 Page 4 i. Per the Quebec Plaza PD, a comprehensive sign package shall be submitted for review and approval to the city with the Development Permit. Refer to the city s sign standards in Chapter 18 for signage allowances and requirements. i. Development applications and checklists can be found on the city s website: velopment-applications.aspx j. Policy Planning Items: i. Currently, the subject property is designated Commercial on the Future Land Use Map (FLUM). The proposed use is allowed within this designation. Measures that mitigate the facility s environmental impact beyond those which are required by the development and building codes are encouraged. DEVELOPMENT ENGINEERING Civil Engineer (Tim Semones, ) 1. Water System: a. This site is within the Zone 1C water pressure zone, which has an HGL of With elevations within this site varying from 5114 to 5124, static water pressures are anticipated to be in the range of psi b. An existing eight-inch waterline is looped through the site. This existing eight-inch waterline should be used for domestic and fire connections. Reconstruction of the waterline may be necessary depending on potential conflicts with proposed building footprints. If modifications are necessary to the on-site water line, a stub to Lot 2 will need to be maintained and a looped water system for both Lots 1 and 2 will need to be maintained. 2. Sanitary Sewer System: a. An existing eight-inch sanitary sewer line has already been constructed to this site and should be utilized for sanitary sewer service connections to both Lot 1 and Lot 2. If modifications are necessary to this on-site sanitary sewer line, a stub to Lot 2 will need to be maintained.

5 Page 5 3. Drainage: a. The outlet structure for the existing detention pond for this site will need to be modified to provide WQCV & EURV for both Lots 1 & 2. Assuming that the proposed impervious area of the site is not changing from the original Final Drainage Report then 100-year orifice plate for this pond could remain the same. Modifications to the existing outlet structure will be necessary to meet this requirement. b. The site has an existing 18-inch storm sewer system that conveys runoff to the existing detention pond near the southeast corner of the site. Please confirm that the existing storm sewer pipes are sized to adequately carry the anticipated minor year runoff from the proposed construction and from any future upstream development within this site. The existing storm sewer system may need to be reconstructed in some areas depending on how the proposed building footprints conflict with the existing layout. 4. Streets: a. The 2009 City of Thornton Transportation Plan shows the section of Quebec Street adjacent to this site as a six-lane arterial road at ultimate build-out. The east curb line of Quebec Street has been constructed to its ultimate location, including a right turn lane into the property. Any future widening of Quebec Street from a four-lane arterial road to a six-lane arterial road is anticipated to occur in the center section of Quebec Street. b. The 2009 City of Thornton Transportation Plan shows the section of 128 th Avenue adjacent to this site as a four-lane minor arterial road at ultimate build-out. Right-of-Way has already been dedicated along the frontage of this site for the ultimate north half of 128 th Avenue, but 128 th Avenue remains a two-lane road section along the property frontage. It is anticipated that when 128 th Avenue is widened to its ultimate four-lane minor arterial road cross section along the frontage of this property that the widening will mostly occur on the south side of 128 th Avenue. The existing curb line along the north side of 128 th Avenue may be able to remain in its existing location, west of the south entrance. Please coordinate with the design engineer for the Creekside subdivision (Todd Lyon of Jansen Strawn) to confirm the ultimate lane alignments for 128 th Avenue will not require a shift of the existing northern curb line. The north curb line should be placed in its ultimate location with this proposed development. c. The median on the north leg of Quebec Street has already been constructed, and there is no requirement for a median on the east

6 Page 6 leg of 128 th Avenue, so no monies are required for median construction. d. It is recommended that a sidewalk connection be provided from the sidewalk along Quebec Street to the restaurant site in the southwest corner of the site. e. The existing curb ramp on the east side of the north-south access drive will need to be relocated to align with the access drive to the west. f. Per the ADA, at least one accessible path is required from the public sidewalk along 128 th Avenue or Quebec Street to each of the proposed businesses. Accessible routes typically follow the circulation path for the site. g. The traffic conformance letter will need to include new traffic counts and a traffic signal warrant analysis for the intersection of 128 th Avenue and Quince Street to show if a traffic signal will be warranted in the near term or in the long term (20-year) scenarios as a result of this development. 5. Required Reports (see project website for report requirements): a. A traffic conformance letter is required with the proposed development. b. A utility conformance letter is required showing that this development is in compliance with the master utility report that was originally prepared for this site. c. A drainage conformance letter is required showing that this development is in compliance with the final drainage report for this site. WQCV & EURV volumes must be provided in the existing detention pond so the outlet structure may need to be modified to comply with current design standards. Assuming that the proposed impervious area of the site is not changing the 100-year orifice plate for this pond would remain the same. The conformance letter will need to include the output from the current version of UD-Detention showing drain times to confirm that the drain times for the detention pond comply with state water law (97 percent of five year must drain within 72 hrs., 99 percent of five year must drain within 120 hours.) 6. Associated Agreements and Fees: a. Advance for Construction: $37,500 has already been paid to the city for one-quarter of the cost of the traffic signal at 128 th Avenue and Quebec Street.

7 Page 7 b. Advance for Construction: $75,000 has already been placed in escrow for one-half of the cost of the traffic signal at 128 th Avenue and Quince Street. c. Reimbursement Agreements: i. Glen Eagle Waterline: $26, (already paid) i Quebec Riverdale Sanitary Sewer: $1, (already paid) Glen Eagle Sanitary Sewer: $ (already paid) 7. Additional Considerations: a. All dry utilities are provided by Xcel Energy, United Power, Comcast, Centurylink, etc. Most of this site is within the United Power service area, but a strip along the western edge of the property is within the Xcel Energy Service Area. b. Street lights will need to be installed along 128 th Avenue and Quebec Street to meet the street light spacing requirements of Table in the city of Thornton Standards and Specifications (150 +/- 50, per same side of road). An existing street light already exists along the property frontage on 128 th Avenue, along the property frontage on Quebec Street, and at the intersection of 128 th Avenue and Quebec Street. Additional street lights are necessary to meet the city s spacing requirements. All new street lights shall be LED. Once final acceptance has been granted for the project, all new street lights within the Xcel Energy service area will be city owned and maintained, and all new street lights within the United Power service area will be owned and maintained by United Power. Street lights that will be city owned will require that wiring diagrams and voltage drop calculations be included with the proposed construction drawings. c. It is suggested that LED lights be used for all site lighting. Site lighting levels shall meet the requirements specified in Section c.2 of City Code. d. Tap and meter shall match size, or the development fee for the larger size is required to be paid. 8. Required Involvement from External Agencies: a. Note: All submittals intended for the review of these agencies shall be submitted to the city. The city will forward the information directly to the agency when appropriate:

8 Page 8 i. State Discharge Permit / Storm Water Management Plan - Required by State for all new developments over one acre. LANDSCAPE ARCHITECTURE Senior Landscape Architect (Heidi Feigal, ) 1. Twenty-five percent landscape area is required for this site per the Planned Development Standards (PD). 2. A 25-foot landscape buffer measured from the right-of-way is required on both Quebec Street and 128 th Avenue. 3. Review the Planned Development Standards for landscape requirements that are different from the straight Code. One of the PD standards requires 10-foot wide internal parking lot islands, which may be difficult to meet on the plan as shown. The city will support amending this requirement to provide narrow islands in the center area to preserve the parking spaces. No trees allowed in islands less than nine feet, however existing trees in good condition will be given tree equivalent credit. 4. A one to two-foot vehicle overhang clear of plant material should be provided at head-in parking, as well as headlight screening with plants where adjacent to public roads and where cars face the residential subdivision. 5. Any drive-thru lane requires headlight screening with evergreen and deciduous plants. 6. The landscape plan required with the Re-zoning Overall Development Permit submittal is conceptual in nature and does not require plant labels, details or a plant list. Show landscaping all the way out to the curb, not just within the property lines. Show landscaping in the Quebec Street right-ofway and buffer up to the entrance from Quebec Street. 7. The city requires separate Irrigation Construction Drawings prepared by a qualified professional be submitted to the Landscape Architects for review. They can be submitted separately or with the civil construction drawings (usually not with the first submittal but after site layout and Development Permit landscaping is determined). 8. There is an existing three-quarter-inch dedicated Irrigation meter with backflow on the site. There are no outstanding fees or water bills. There has been no use of water on the site since It is possible that this meter was intended to serve only the shared detention pond and right-ofway landscaping for both lots. It may be that the internal landscaping was intended to be irrigated with each lot s domestic meter which is allowed.

9 Page 9 9. The overall site cannot exceed a Moderate water-demand as defined in the Code. 10. A Business Owners Association is required to be formed to share maintenance of the detention pond which serves both lots on the property. 11. Loading, trash areas and utility boxes are required to be screened (trash with a wall per PD) to the best extent possible. 12. The Certificate of Occupancy (C.O.) will not be issued for any new building until the landscaping is installed. If weather does not allow landscape installation at the time of the C.O. a cash surety (150 percent of the cost of landscaping and irrigation) is required. 13. A separate landscape construction permit is required at the time of installation, and the landscaping Use and Sales Tax will be collected, unless these are paid at the time of Construction Permit. 14. The applicants are encouraged to review Sec. 800 of the Standards and Specifications and City Code Chapter 18, Division 9 for more landscaping information. THORNTON FIRE DEPARTMENT (TFD) Fire Protection Engineer (Dan Biro, ) 1. TFD enforces the 2015 International Fire Code and locally adopted amendments. 2. B-40R turning exhibit shall be provided showing the apparatus moving through all turns including all entrances to the site. 3. NO PARKING FIRE LANE sign locations will be determined at the conceptual site plan review. 4. TFD does not release the building construction permit until construction access roads are installed and approved. END OF COMMENTS

10 Page 10 The above comments summarize the comments from city staff at the preapplication meeting. If you require further assistance, please do not hesitate to call me at I look forward to hearing from you soon. Sincerely, Ty Robbins Planner I TR/vn Enclosure(s) cc: Ben Swanson, Applicant (ben.swanson@dormiecapital.com) Peggy S. Friesen, Applicant (pfriesen@engineeringserviceco.com) Jason O Shea, Development Director Grant Penland, Current Planning Manager Cassie Free, Development Engineering Manager Dan Biro, Fire Protection Engineer II Tim Semones, Civil Engineer Heidi Feigal, Senior Landscape Architect File: Quebec Plaza Pre-App V:\PLANNING DIVISION\Pre-Applications\Quebec Plaza\Retail Development \Quebec Plaza Pre-App Summary.docx

Summary Notes for a pre-application meeting for a proposed Cheddar s restaurant south of the southeast corner of East 104 th Avenue and Grant Street

Summary Notes for a pre-application meeting for a proposed Cheddar s restaurant south of the southeast corner of East 104 th Avenue and Grant Street City Hall City Development Department 9500 Civic Center Drive 303-538-7295 Thornton, Colorado 80229-4326 FAX 303-538-7373 www.cityofthornton.net Mark Rogers Chief Operating Officer Roaring Fork Restaurants

More information

Re: Thorncreek Commons Commercial Response to Pre-Application Meeting held September 24, 2014 Comments

Re: Thorncreek Commons Commercial Response to Pre-Application Meeting held September 24, 2014 Comments 8/20/2015 Jay Ruchti Senior Planner City Development Department City of Thornton 9500 Civic Center Drive Thornton, CO Re: Thorncreek Commons Commercial Response to Pre-Application Meeting held September

More information

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX City Hall City Development Department 9500 Civic Center Drive 303-538-7295 Thornton, Colorado 80229-4326 FAX 303-538-7373 www.cityofthornton.net Brian Connolly Otten Johnson 950 17 th Street, Suite 1600

More information

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

PLANNED UNIT DEVELOPMENT Date: April 5, 2018 PLANNED UNIT DEVELOPMENT Date: April 5, 2018 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Robert Myers Robert Myers 2955 and 2989 Dauphin Street (Southeast corner of Dauphin Street and Sage Avenue) CITY

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

CITY PLANNING COMMISSION AGENDA. ITEM NO: 6.a 6.b STAFF: LONNA THELEN

CITY PLANNING COMMISSION AGENDA. ITEM NO: 6.a 6.b STAFF: LONNA THELEN Page 156 CITY PLANNING COMMISSION AGENDA ITEM NO: 6.a 6.b STAFF: LONNA THELEN FILE NO(S): A. - CPC ZC 08-00069 QUASI-JUDICIAL B. - CPC CU 08-00070 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER: PHIL LONG VALUCAR

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. December 21, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, 2015 6:30 P.M. - ARDEN HILLS CITY HALL PLANNING CASES A. Planning Case 15-016; Final Planned Unit Development Arden Plaza;

More information

Drexel, Barrell & Co.

Drexel, Barrell & Co. Drexel, Barrell & Co. June 18, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning

More information

Site Development Plan (SDP) Checklist

Site Development Plan (SDP) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 303-660-1393 or CRGov.com Site Development Plan (SDP) Checklist A complete Site Development Plan (SDP) submittal will contain

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 & PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL

More information

SUBMITTAL REQUIREMENTS

SUBMITTAL REQUIREMENTS WHEN PROCESS TYPE III IS USED References to Process Type III applications are found in several places in the Milton Municipal Code (MMC), indicating that the development, activity, or use, is permitted

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165 Planning Commission Charter Township of Lyon 58000 Grand River Ave. New Hudson, MI 48165 Subject: AP-18-68; 11 Mile and Milford Road Park, Site Plan Review #1 Based on site plan dated 11/12/18 Location:

More information

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 # 9 ZON2016-01032 PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 DEVELOPMENT NAME JJT Properties LLC LOCATION 1147 & 1151 East I-65 Service Road South and 1180 Sledge Drive (Southeast corner

More information

Thanksgiving Point Office Site Plan Approval Planning Commission Report

Thanksgiving Point Office Site Plan Approval Planning Commission Report Lehi City Planning Commission Staff Report Meeting Date: March 24, 2016 Thanksgiving Point Office Site Plan Approval Planning Commission Report Applicant: Sean Onyon VCBO Architecture Requested Action/Purpose:

More information

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

Rezoning Transportation Analysis Petition Number: General Location Identifier: , , From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Rick Grochoske, PE rgrochoske@charlottenc.gov 704-432-1556 CDOT s review of this rezoning petition is intended to

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents City of Yelm Tahoma Terra Final Master Plan Development Guidelines Table of Contents Table of Contents... 1 Purpose... 2 Low Density Residential (R4-6)... 3 Moderate Density Residential (R6-10)... 5 Neighborhood

More information

COUNCIL COMMUNICATION

COUNCIL COMMUNICATION Meeting Date: August 23, 2016 COUNCIL COMMUNICATION Agenda Item: Agenda Location: Public Hearing Work Plan # N/A Legal Review: X 1 st Reading 2 nd Reading Subject: A public hearing regarding a Conceptual

More information

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208) MEMORANDUM Archuleta County Development Services Planning Department 1122 HWY 84 P. O. Box 1507 Pagosa Springs, Colorado 81147 970-264-1390 Fax 970-264-3338 TO: Archuleta County Planning Commission FROM:

More information

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church R E S O L U T I O N WHEREAS, the Prince George s County Planning Board is charged with the approval of Detailed Site Plans pursuant to Part 3, Division 9 of the Zoning Ordinance of the Prince George s

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review City of Pontiac Office of Land Use and Strategic Planning 47450 Woodward Ave, Pontiac, MI 48342 T: 248.758.2800 F: 248.758.2827 Property/Project Address: Sidwell Number:

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN) Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Business License Building Fire Prevention Planning Public Works 707.648.4310 707.648.4374 707.648.4565 707.648.4326 707.651.7151 PLANNED DEVELOPMENT

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

Design Review Application *Please call prior to submittal meeting to determine applicable fees* CITY OF EAGLE 660 E. Civic Lane, Eagle, ID 83616 Phone#: (208) 939-0227 Fax: (208) 938-3854 Design Review Application *Please call prior to submittal meeting to determine applicable fees* FILE NO.: CROSS

More information

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS Name of Project: Poulsbo Meadows; A Planned Residential Development (PRD)/Plat Applicants Name: PBH Group LLC/Byron Harris PO Box 1010 Silverdale, WA 98038 Description

More information

CITY of RIDGEFIELD TYPE I DECISION SITE PLAN REVIEW (SPR 99-10) PDM MOLDING INC. PHASE II EXPANSION

CITY of RIDGEFIELD TYPE I DECISION SITE PLAN REVIEW (SPR 99-10) PDM MOLDING INC. PHASE II EXPANSION Page 1 CITY of RIDGEFIELD TYPE I DECISION SITE PLAN REVIEW (SPR 99-10) PDM MOLDING INC. PHASE II EXPANSION TO: Mayor, and Members of the Ridgefield City Council and Planning Commission FROM: Eric Eisemann

More information

Project phasing plan (if applicable) 12 copies of site plan

Project phasing plan (if applicable) 12 copies of site plan SITE PLAN REVIEW PERMIT APPLICATION City of Grand Haven, 11 N. Sixth Street, Grand Haven, MI 49417 Phone: (616) 847-3490 Fax: (616) 844-2051 Website: www.grandhaven.org 1. Project Information Address/location

More information

Request Conditional Use Permit (Car Wash Facility) Staff Recommendation Approval. Staff Planner Jonathan Sanders

Request Conditional Use Permit (Car Wash Facility) Staff Recommendation Approval. Staff Planner Jonathan Sanders Applicant Property Owner SunTrust Bank Public Hearing October 10, 2018 City Council Election District Princess Anne Agenda Item 2 Request Conditional Use Permit (Car Wash Facility) Staff Recommendation

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012 DEVELOPMENT NAME SUBDIVISION NAME LOCATION OSR Subdivision OSR Subdivision 5559 Old Shell Road (South side of Old Shell Road, 570

More information

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY COUNCIL STUDY SESSION MEMORANDUM City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared by: Mayor and City Council Charles Ozaki, City and County Manager Kevin Standbridge, Deputy City and County

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC.

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC. . 8 February 9, 2011 Public Hearing APPLICANT: REQUEST: Conditional Use Permit for an automobile service station with a convenience store ADDRESS / DESCRIPTION: 2448 Nimmo Parkway PROPERTY OWNER: COURTHOUSE

More information

CITY OF ZEELAND PLANNING COMMISSION

CITY OF ZEELAND PLANNING COMMISSION APPLICATION FOR SITE PLAN REVIEW AND SPECIAL LAND USE Date City Official App. Filing Fee Rec'd ($350) NOTE TO APPLICANT: Please submit this application for Site Plan Review along with twenty (20) copies

More information

Department of Planning & Development Planning Unit

Department of Planning & Development Planning Unit Department of Planning & Development Planning Unit Website: www.cityofmadison.com Madison Municipal Building 215 Martin Luther King, Jr. Boulevard P.O. Box 2985 Madison, Wisconsin 53701-2985 TDD 608 266

More information

Rapid City Planning Commission Rezoning Project Report

Rapid City Planning Commission Rezoning Project Report Rapid City Planning Commission Rezoning Project Report July 21, 2016 Applicant Request(s) Case # 16RZ022 Rezoning from Office Commercial District to Light Industrial District Companion Case(s): 16RZ023-Rezoning

More information

D1 September 11, 2013 Public Hearing APPLICANT:

D1 September 11, 2013 Public Hearing APPLICANT: D1 September 11, 2013 Public Hearing APPLICANT: BEACH MUNICIPAL FEDERAL CREDIT UNION PROPERTY OWNER: SISTERS II, LLC STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-2 Agriculture

More information

THE CITY OF MOBILE, ALABAMA

THE CITY OF MOBILE, ALABAMA THE CITY OF MOBILE, ALABAMA LETTER OF DECISION Ark of Safety, Inc. Mobile, AL 36617 Re: (Northwest corner of Main Street and First Avenue, extending to the Southwest corner of Esau Avenue and Main Street.)

More information

Initial Submission Review - The Land at Harmony: A United Methodist Faith Community - CSP Application Number: DA Case Number:

Initial Submission Review - The Land at Harmony: A United Methodist Faith Community - CSP Application Number: DA Case Number: Planning & Development Services Planning Division 15151 E. Alameda Parkway, Ste. 2300 Aurora, Colorado 80012 303.739.7250 June 28, 2016 Stephanie Price The United Methodist Church 5101 S Dayton St Greenwood

More information

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting 1. Call To Order 2. Roll Call of Members 3. Chairman's Comments PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT Joint Planning and Zoning Meeting January 11, 2017 6:00 PM Courthouse

More information

CRESCENT RESOURCES INC.

CRESCENT RESOURCES INC. CRESCENT RESOURCES INC. Due Diligence Checklist Project Name: Client: Project No. Date: 1 Survey Review survey for compliance with Crescent Resources, Inc. s Instructions to Surveyors (see below): All

More information

Deerfield Township Community Development Department

Deerfield Township Community Development Department STAFF REVIEW Deerfield Township Community Development Department To: From: Hayfaa Wadih, AICP Lois McKnight, AICP Meeting Date: April 13, 2015 Re: Stage 2, Final Detailed Plan for Lot #41 at Arbor Square

More information

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Applicant Name Phone / Fax / Address City State Zip Code  . Property Owner Phone / Fax / Address City State Zip Code Master Development Plan Application Community Development Department City of Redmond 411 SW 9 th Street Redmond, Oregon 97756 541-923-7721 541-548-0706 FAX Master Development Plan Fee $38,862.52 File Number

More information

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009 PROPOSED NEW SECTION 10.486 Stormwater Quality and Detention Facilities, Public Streets. A. Purpose. It is the City s policy to maintain the natural hydrology and preserve water quality by mitigating the

More information

Rezoning Petition Pre-Hearing Staff Analysis September 17, 2018

Rezoning Petition Pre-Hearing Staff Analysis September 17, 2018 Rezoning Petition 2017-043 Pre-Hearing Staff Analysis September 17, 2018 REQUEST Current Zoning: R-3 (single family residential), R-17MF (multi-family residential), and CC (commercial center) Proposed

More information

Department of Planning & Development Planning Unit

Department of Planning & Development Planning Unit May 20, 2005 Department of Planning & Development Planning Unit Website: www.cityofmadison.com Madison Municipal Building 215 Martin Luther King, Jr. Boulevard P.O. Box 2985 Madison, Wisconsin 53701-2985

More information

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018 Rezoning Petition 2018-015 Pre-Hearing Staff Analysis April 16, 2018 REQUEST LOCATION Current Zoning: R-4 (single family residential) and UR-2(CD) (urban residential, conditional) Proposed Zoning: UR-2(CD)

More information

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Rezoning Transportation Analysis Petition Number: General Location Identifier: From: Kelsie Anderson, PE Kelsie.Anderson@charlottenc.gov 704-432-5492 Staff Reviewer: Kory Hedrick, PE, PMP Khedrick@charlottenc.gov 704-432-6511 CDOT s review of this rezoning petition is intended to

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS ARTICLE 3 CHAPTER 4 LANDSCAPING AND SCREENING REQUIREMENTS SEC 3.401 SEC 3.402 (D) (E) PURPOSE: The purpose of this Chapter is to establish minimum standards for the design, installation, and maintenance

More information

Agenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch

Agenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch Applicant Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch Public Hearing March 14, 2018 City Council Election District Kempsville Agenda Item 6 Request Conditional Rezoning (B-2 Community

More information

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts 02111 617-451-2770 fax 614-482-7185 www.mapc.org Serving the 101 Cities Towns in the Metropolitan Boston Region MEMORANDUM TO:

More information

Commercial Site Plan Review Checklist

Commercial Site Plan Review Checklist Commercial Site Plan Review Checklist Updated 1/5/2015 Project Name: EPM #: _ Street: Contact: Phone: Date Submitted: _ Fax: Reviewer: Email: First Review: Second Review: _ Third Review: Reviews Required

More information

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Town of Windham. Planning Department 8 School Road Windham, ME voice fax Town of Windham Planning Department 8 School Road Windham, ME 04062 voice 207.864-5960 fax 207.892.1916 MEMO DATE: TO: Staff Review Committee FROM: Amanda Lessard, Planner Cc: Ellen Rathbone, St. Germain

More information

M E M O R A N D U M. Principal Planner. HEARING DATE: March 13, 2018 CASE NUMBER: PC

M E M O R A N D U M. Principal Planner. HEARING DATE: March 13, 2018 CASE NUMBER: PC M E M O R A N D U M TO: FROM: PREPARED BY: Plan Commission Technical Review Committee Tim Semmann, AICP Principal Planner DATE DISTRIBUTED: March 6, 2018 HEARING DATE: March 13, 2018 CASE NUMBER: PC18-2561

More information

Rapid City Planning Commission Rezoning Project Report

Rapid City Planning Commission Rezoning Project Report Rapid City Planning Commission Rezoning Project Report April 5, 2018 Item # 4 Applicant Request(s) Case # 18RZ008 Rezoning request from General Agricultural District to Low Density Residential District

More information

Request Conditional Use Permit (Automobile Service Station) Staff Recommendation Approval. Staff Planner Bill Landfair

Request Conditional Use Permit (Automobile Service Station) Staff Recommendation Approval. Staff Planner Bill Landfair Applicant Property Owner RTR Real Estate Associates, Tidewater Investments, LLC, Bruce Ranomski Public Hearing December 12, 2018 City Council Election District Centerville Agenda Item 7 Request Conditional

More information

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES The Parks Planning and Development Division of the City of Modesto s Parks, Recreation and Neighborhoods Department is responsible for the task of reviewing

More information

REQUEST: Conditional Change of Zoning (AG-1, B-1,R-15 to Conditional R-7.5)

REQUEST: Conditional Change of Zoning (AG-1, B-1,R-15 to Conditional R-7.5) REQUEST: Conditional Change of Zoning (AG-1, B-1,R-15 to Conditional R-7.5) 26 March 14, 2012 Public Hearing APPLICANT: KROLL ENTERPRISES, INC. PROPERTY OWNER: N&K PROPERTIES, LLC/B&W DEVELOPMENT LLC STAFF

More information

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC STAFF S ANALYSIS AND RECOMMENDATION Planning Commission (CPC) Public Hearing Date: MAY 17, 2016 CPC Time Remaining: 100 DAYS Applicant s Agent: DANIEL L. CASKIE (804-569-7060) Applicant s Contact: MICHAEL

More information

KEIZER STATION PLAN INTRODUCTION

KEIZER STATION PLAN INTRODUCTION KEIZER STATION PLAN INTRODUCTION Planning for this area began in 1987 when the Keizer Comprehensive Plan established the Chemawa Activity Center and McNary Activity Center. The first Chemawa Activity Center

More information

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET PRE-APPLICATION CONFERENCE Prior to the actual filing of a Master Plan application, it is strongly recommended that the applicant contact Planning

More information

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN November 2010 EXPLANATORY NOTES (Secondary Plan Area 22) General (pertaining to all secondary plan office consolidations)

More information

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK Page 34 CITY PLANNING COMMISSION AGENDA ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK FILE NOS: CPC ZC 12-00035 QUASI-JUDICIAL CPC NV 12-00036 QUASI-JUDICIAL AR DP 12-00039 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER:

More information

SITE PLAN REVIEW APPLICATION

SITE PLAN REVIEW APPLICATION SITE PLAN REVIEW APPLICATION CITY OF THE DALLES Community Development Department 313 Court Street The Dalles, OR 97058 (541) 296-5481, ext. 1125 Fax (541) 298-5490 www.ci.the-dalles.or.us Date Filed File#

More information

PLANNED UNIT DEVELOPMENT APPLICATION

PLANNED UNIT DEVELOPMENT APPLICATION PLANNED UNIT DEVELOPMENT APPLICATION CITY OF THE DALLES Community Development Department 313 Court Street The Dalles, OR 97058 (541) 296-5481, ext. 1125 Fax (541) 298-5490 www.ci.the-dalles.or.us Date

More information

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts 02111 617-451-2770 fax 614-482-7185 www.mapc.org Serving the 101 Cities and Towns in the Metropolitan Boston Region MEMORANDUM

More information

7 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC.

7 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC. 7 February 9, 2011 Public Hearing APPLICANT: PROPERTY OWNER: COURTHOUSE MARKETPLACE OUTPARCELS, L.L.C. STAFF PLANNER: Faith Christie REQUEST: Modification of Conditional Change of Zoning approved by the

More information

STAFF REPORT. To: Planning Commission Meeting date: February 10, Approval of a waiver to reduce the landscaping and parking requirements

STAFF REPORT. To: Planning Commission Meeting date: February 10, Approval of a waiver to reduce the landscaping and parking requirements # 12 ) WAV-01-16 COLEMAN AIRPARK II & III WAIVER PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: February 10, 2016 Item: WAV-01-16 Prepared By: Marc Jordan GENERAL INFORMATION: Applicant:

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Kevin Kemp

Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Kevin Kemp Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Kevin Kemp Location 845 Lynnhaven Parkway GPIN 14963473030000 Election District Rose Hall Site Size 0.40 acre portion of a 6.35 acre

More information

NOTES: 1.) THE BOGGY CREEK RD. AND SIMPSON RD. IMPROVEMENTS DEPICTED ON THIS PLAN ARE BASED ON RECORD CONSTRUCTION PLANS AND HAVE NOT BEEN SURVEYED. 2.) EXISTING RESIDENTIAL BUILDING STRUCTURES AND ANCILLARY

More information

ARTICLE 6: Special and Planned Development Districts

ARTICLE 6: Special and Planned Development Districts ARTICLE 6: Special and Planned Development Districts 6-10 Traditional Neighborhood Development (TND) District 6-10.10 Purpose and Intent The Traditional Neighborhood Development (TND) District provides

More information

PHASE III DRAINAGE REPORT

PHASE III DRAINAGE REPORT PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village

More information

ARTICLE 17 SITE PLAN REVIEW

ARTICLE 17 SITE PLAN REVIEW ARTICLE 17 SITE PLAN REVIEW 17.01 INTENT AND PURPOSE The intent of this section is to provide for consultation and cooperation between the applicant and the township planning commission so that the applicant

More information

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road 13. corner of 159 th Street and Quivira Road 1. APPLICANT: HNTB Corporation is the applicant for this request. 2. REQUESTED ACTION: The applicant is requesting approval of a preliminary plat for a 383-lot

More information

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC 14 October 10, 2012 Public Hearing APPLICANT: MPB, INC PROPERTY OWNER: MUNDEN & ASSOCIATES, LP STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-1 & AG-2 to Conditional O-2) ADDRESS

More information

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT MAY 8, 2014 The Planning and Development Department hereby forwards to the Planning

More information

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021 ITEM NO FDP #130021 MEETING DATE July 23, 2013 STAFF Pete Wray ADMINISTRATIVE TYPE I HEARING STAFF REPORT PROJECT: APPLICANT: OWNER: Harmony Technology Park Third Filing, Second Replat Custom Blending,

More information

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa To: Planning and Zoning Commission From: City Staff Date: November 15, 2016 Re: Case #16026 Raymore Activity Center Site Plan GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Applicant/ Property Owner:

More information

Landscaping Standards

Landscaping Standards CHAPTER 29 ARTICLE 403 29.403 Landscaping Standards Purpose: The purpose of this section is to protect and promote the public health, safety and general welfare by requiring landscaping in relation to

More information

Description. Summary. MCPB Item No. Date: 01/17/13. Bethesda Crescent, Limited Site Plan Amendment, A, A

Description. Summary. MCPB Item No. Date: 01/17/13. Bethesda Crescent, Limited Site Plan Amendment, A, A THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 01/17/13 Bethesda Crescent, Limited Site Plan Amendment, 81984005A, 81984003A Parag Agrawal, Senior Planner, parag.agrawal@montgomeryplanning.org,

More information

s t a f f r e p o r t

s t a f f r e p o r t Colerain Township Board of Trustees August 10, 2010 8:30 p.m. Major Amendment to Final Development Plan: Case No.: ZA2005-09, Springdale Retail s t a f f r e p o r t Report Prepared By: Amy Bancroft, Land

More information

PDR /21/15 Noah Beals 1/7/15 xx

PDR /21/15 Noah Beals 1/7/15 xx PDR150001 1/21/15 Noah Beals 1/7/15 xx 01.07.15 HTP Harmony Frontage Infrastructure Preliminary Design Review Project Narrative a) What are you proposing/use? The HTP Harmony Frontage Infrastructure project

More information

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08) CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08) 26.01 DESCRIPTION AND PURPOSE. Landscaping is an important element of the use, development and preservation of land, and a significant factor

More information

Request Modification of Conditions (Automobile Service Station) Staff Recommendation Approval. Staff Planner Jimmy McNamara

Request Modification of Conditions (Automobile Service Station) Staff Recommendation Approval. Staff Planner Jimmy McNamara Applicant Larae Tucker Property Owner Doswell Ventures, LLC Public Hearing May 10, 2017 City Council Election District Princess Anne Agenda Item 3 Request Modification of Conditions (Automobile Service

More information

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY A. Purpose: 1. Regulatory Requirement and Use Mitigation: The purpose of this appendix is to provide a regulatory context (standards)

More information

11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC

11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC 11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC REQUEST: Conditional Use Permit for Religious use STAFF PLANNER: Karen

More information

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units:

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units: The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

TO: Glynn County Islands Planning Commission. Karl Bursa, AICP, Planner II. SP3124 Aviator Plaza. DATE: November 17, 2015

TO: Glynn County Islands Planning Commission. Karl Bursa, AICP, Planner II. SP3124 Aviator Plaza. DATE: November 17, 2015 COMMUNITY DEVELOPMENT DEPARTMENT Planning and Zoning Division 1725 Reynolds Street, Suite 200, Brunswick, GA 31520 Phone: 912-554-7428/Fax: 1-888-252-3726 TO: Glynn County Islands Planning Commission MEMO

More information

PLANNING COMMISSION REPORT Public Hearing Item FINAL DEVELOPMENT PLAN FOR BAUER FARM; XPRESS WELLNESS URGENT CARE; 4700 OVERLAND DR (MKM)

PLANNING COMMISSION REPORT Public Hearing Item FINAL DEVELOPMENT PLAN FOR BAUER FARM; XPRESS WELLNESS URGENT CARE; 4700 OVERLAND DR (MKM) PC Staff Report 06/22/15 FDP-15-00108 Item No. 6-1 PC Staff Report 06/22/2015 ITEM NO. 6 PLANNING COMMISSION REPORT Public Hearing Item FINAL DEVELOPMENT PLAN FOR BAUER FARM; XPRESS WELLNESS URGENT CARE;

More information

CHAIR AND MEMBERS PLANNING & ENVIRONMENT COMMITTEE GEORGE KOTSIFAS MANAGING DIRECTOR, DEVELOPMENT & COMPLIANCE SERVICES & CHIEF BUILDING OFFICIAL

CHAIR AND MEMBERS PLANNING & ENVIRONMENT COMMITTEE GEORGE KOTSIFAS MANAGING DIRECTOR, DEVELOPMENT & COMPLIANCE SERVICES & CHIEF BUILDING OFFICIAL TO: CHAIR AND MEMBERS PLANNING & ENVIRONMENT COMMITTEE FROM: SUBJECT: GEORGE KOTSIFAS MANAGING DIRECTOR, DEVELOPMENT & COMPLIANCE SERVICES & CHIEF BUILDING OFFICIAL APPLICATION BY: 2261531 ONTARIO LIMITED

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018 Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road

More information

11 May 9, 2012 Public Hearing APPLICANT: KROGER LIMITED PARTNERSHIP I

11 May 9, 2012 Public Hearing APPLICANT: KROGER LIMITED PARTNERSHIP I REQUEST: Conditional Use Permit (Automobile Service Station (Fuel Sales) ADDRESS / DESCRIPTION: 3901 Holland Drive 11 May 9, 2012 Public Hearing APPLICANT: KROGER LIMITED PARTNERSHIP I PROPERTY OWNER:

More information

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1 = 600' LOCATED IN THE SOHWEST QUARTER OF SECTION, TOWNSHIP SOH, Case # Z 6 - Legal Description Tract G, H and J of the Villages at Riverdale Filing No., a part of the Southwest quarter of Section, Township South,

More information

2 August 14, 2013 Public Hearing APPLICANT: CRESCENT COMMUNITY CENTER CORP. PROPERTY OWNER: S. L. ETHERIDGE, LLC

2 August 14, 2013 Public Hearing APPLICANT: CRESCENT COMMUNITY CENTER CORP. PROPERTY OWNER: S. L. ETHERIDGE, LLC 2 August 14, 2013 Public Hearing APPLICANT: CRESCENT COMMUNITY CENTER CORP. PROPERTY OWNER: S. L. ETHERIDGE, LLC REQUEST: Conditional Use Permit (religious use) STAFF PLANNER: Karen Prochilo ADDRESS /

More information