1 Refurbishment of Jessie Street Centre 2 12 Macquarie Street, Parramatta, New South Wales Dalton Veitch, mechanical services engineer, Wood & Grieve Engineers, Sydney PROJECT OVERVIEW Commencement Jessie Street Centre (JSC) is an office complex situated in the Parramatta business district. It was completed in 1987, is currently owned and managed by Brookfield Multiplex (BM), and had the original services until this refurbishment. At the commencement of this refurbishment project, the client engaged Wood & Grieve Engineers (WGE) to provide a Life Cycle Upgrade Report to identify actions required to meet their objectives for the building. These objectives were: Efficiency and quality improvements to achieve a NABERS design rating of 4.5 Stars, a Green Star design rating of 4 Stars, and the provision of an environment for tenants which was considered high quality, while minimising energy, water, and gas usage. Services upgrades commensurate with the Property Council of Australia A Grade level for type and location of existing building. Refurbishment for a 20-year plant life. Plant redundancy as far as practicable. Upgrade of particular essential services, including conversion of the original smoke purge system to a zone pressurisation system, and re-commissioning of the stair pressurisation systems. To address these aims, BM engaged WGE s Environmentally Sustainable Design (ESD) Department to carry out energy modelling of the existing building and systems to provide a strategy for achieving the functional objectives. JSC is a multi-storey office complex with reinforced concrete structure and facades predominantly of glazed curtain wall construction. It has the following characteristics: single-level belowground car park (300-plus spaces) plus loading dock; above-ground entry foyer with a six-storey atrium (not open to the floors); South Wing with five office floors; North Wing with seven office floors; main tower with 20 office floors; varying floor plates with podium levels around 5,500 sq m each and tower levels around 1,800 sq m each. There is gross lettable area of around 55,000 sq m. Jessie Street Centre external facade. The new calculated cooling load for central plant is 6000 kwr and there are currently three x 2,200 kwr chillers installed. The system comprised four main AHU plant rooms serving North Wing, South 30 Eco li b r i u m OC TO B E R
2 Wing, and Main Tower, including a major plantroom on level two (L2) also housing the chillers and pumps, while cooling towers and heating water boilers were situated at the top of the building (main tower L21), with duct and pipe risers within the building cores. The air conditioning was conventional multi-storey design, using chillers, cooling towers, and built-up variable air volume (VAV) air handling units (AHUs) with ducted supply air and an older type building monitoring and control system (BMCS). The floor air conditioning supply used fan-assisted VAV boxes for the centre zones, and non-fan VAV boxes for the perimeter zones, supplying via light air troffers. The AHUs are zoned North, West, South, East, and Centre, with vertical risers connecting zones of similar orientation and solar load characteristics. Various office tenancies on Level 1 (entry level) were air conditioned by fan coil units using chilled and hot water. These systems did not have variable air volume or outside air economy cycle. A number of specific areas that could require cooling beyond normal office hours had air conditioning via fan coil Energy modelling was carried out on the existing building. units connected to the base building chilled water system, requiring operation of a reasonably large low load chiller, plus pumps and cooling tower, after hours. These included lift motor rooms, and various electrical rooms. Flowtech AIR CONDITIONING Independent Commissioning Agents Commissioning Management Air & Water Balancing Surveys of Existing Plant & Buildings Dilapidation & Performance Reports Retro-Commissioning Existing Buildings AS1851 Essential Services Maintenance NEBB Certification Preventative Maintenance Pressure Testing: Clean Rooms & Ducting International Projects Unit 1/54 Nealdon Drive Meadowbrook Brisbane Qld 4131 Tel: Fax: admin@f lowtech.com.au markgilby@f lowtech.com.au lowtechac.com.au OC TO B E R Eco li b r i u m 31
3 The building had been maintained to a standard considered well above average, and existing systems were generally in excellent condition. Where systems or components could be reused without sacrifice of efficiency they were retained. The client was well informed, with experienced and knowledgeable personnel providing design direction and decisions throughout the design and construction process. Services contractors were well suited to the nature of the project, and were flexible, cooperative, communicative and resourceful. REFURBISHMENT WORKS To achieve the desired Green Star rating, many works were undertaken involving all building services. Various parts of the building were refurbished, and a comprehensive BMCS installed to monitor and control building operation. The focus in the following section of this article is on some of the air conditioning works and the approach taken. Challenges There were two significant challenges for the project. One was that the building was existing. Many aspects could not be changed or designed to suit current objectives as a new building could be (e.g. orientation, structure, glazing, plant locations, car parking and other amenities). This provided significant limitations compared to green field designs. Second, the building was tenanted, a status the client wished to retain. Therefore, JSC needed to remain fully occupied with services functioning to an acceptable level throughout the refurbishment. The challenges posed limitations on which facets could be amended, as well The centre was fully occupied throughout the refurbishment. as restraints on feasibility of works, while keeping the building operational. All challenges were met and overcome. Strengths In addition to some challenges, the project had much going for it. The building had an original design that could be considered reasonably good for the date of construction in terms of architecture (appearance and suitability for purpose), provision of tenant services, and energy efficiency. It incorporated well zoned air conditioning with economy cycles, provision of tenant condenser water and tenant supplementary outside air. The building was double glazed, with internal blinds. Air conditioning system refurbishment The approach to achieve the desired efficiency and high-quality refurbishment for the air conditioning systems was determined by the mechanical services consultants and implemented. This involved an extensive replacement and refurbishment program. Old full-load and part-load chiller sets were replaced with new, high-efficiency chiller sets supplying chilled water at lower than typical temperature. Modelling showed that over one year it would be more efficient for the building to save on fan power by using lower supply air volumes at lower temperature, driving efficient chillers and cooling towers slightly harder instead. AHU cooling coils were replaced with new cooling coils matched to low temperature chilled water (4.5 C entering the coil) and providing low temperature supply air (8.5 C leaving the air handling unit). AHU heating coils were single row (minimal air resistance, which would reduce further as air flows were lowered) and typically in excellent condition, so were retained, with new control valves. 32 Eco li b r i u m OC TO B E R
4 VAV boxes were replaced with all new boxes suitably insulated for the low supply air temperature (without any fan-assisted boxes) and sized to handle final lower supply air flows (at low temperature) but able to handle interim higher air flows while refurbishment was in process. On any given AHU system, changeover was staged such that floors were changed over one at a time, so there was an interim mix. New swirl diffusers were installed in ceilings, providing adequate air mixing and thermal comfort with the VAV system and low temperature supply air. Additionally, the new T5 light fittings being installed would not perform well with low temperature supply air troffers fitted to them. New main stainless steel cooling towers were installed on a new steel support structure on top of the south wing, Level 6. This installation allowed room for four towers (three duty/one standby) and new risers down to the Level 2 chillers and pumps, with a minimal final changeover period. The existing old main cooling towers were in excellent condition and were retained on Level 21 for provision of tenant condenser water. All cooling tower fans have new variable speed drives. All fans were specified as being replaced with new fans, selected for efficiency, also having high-efficiency electric motors (refer to additional comments below). All pumps were replaced with new pumps to suit the required duties, with redundancy in most cases (e.g. four for three) with high-efficiency motors. The existing collection of variable speed drives of varying age and capability was replaced with new, higher efficiency drives, and almost all fans and pumps were powered via new drives complete with high level interface to the building monitoring and control system (BMCS). For the air distribution system, new motorised smoke dampers were added at the cores for both supply air take-offs and return air/smoke spill sub-ducts, to facilitate zone pressurisation. Damper control panels were installed on the floors to allow the smoke control logic to override the normal hours/after hours damper operation, in the event of a fire situation. New manual supply air balancing dampers were also added to supply take-offs for commissioning balancing of the risers. A new BMCS was installed throughout. It handles all services and requirements except security and lifts, which have dedicated control systems. This included all new sensors, new damper motors, new VAV box drives, and new control valves. Particular attention was paid to insulation of supply air ductwork, considering the low temperatures now involved. All existing thermal insulation in AHUs was checked to ensure good condition, with repairs/ replacement occurring where necessary. Exposed ductwork in plant rooms was clad with additional external insulation. It would have been difficult to replace the ductwork, with new ductwork having thicker internal insulation, and the NEW & IMPROVED EVAPODRY TRAY the complete solution The probe senses condensate that has accumulated in the tray and energises the heating element. When the probe senses the liquid has evaporated, the heating element is turned off. For information or a free quote, call us on or visit our website at Probe COFFS HARBOUR - HEAD OFFICE SYDNEY - MELBOURNE - BRISBANE ABN Pro Pipe Supplies Pty Ltd, Main Street, Beverly, SA5009 t: enquiries@propipesupplies.com.au OC TO B E R Eco li b r i u m 33
5 The six-storey atrium. duct runs were generally at heights that would avoid accidental damage to the added external insulation. The external insulation to ducts within the core shafts was practically inaccessible, and calculations showed heat gain in these areas to be tolerable, so duct insulation within the cores remained untouched. Specialist duct cleaning contractors were engaged to clean ductwork interiors as part of the refurbishment process. In the larger duct risers this sometimes necessitated abseiling down inside the duct from a top access panel. The existing mechanical services switchboards were either replaced or rebuilt using modern switchgear. The two existing heating water boilers were replaced with two new boilers of similar capacity to the old ones and boiler room ventilation upgraded. A new Fire Fan Control Panel with controls and indication for essential services (zone pressurisation, stair pressurisation, etc.) was integrated into the new FIB for the building. Note regarding AHU supply fans It should be noted that AHU supply fans (20 +) were specified to be replaced with smaller fans. However, as these are large centrifugal fans, removal and replacement from the multiple AHUs within the plant rooms would in many cases involve demolition of large areas of AHUs and leave patching afterwards. Additionally, these fans were assessed as being of high-quality manufacture and in excellent condition due to the maintenance regime. Therefore gross replacement could be counter-productive. A series of tests were run to check on the stability and performance of these fans at lower air quantities (i.e. VAV, but turning down from a lower maximum). Results were positive, and after fan curves were examined for individual fan efficiencies in their respective new operating regions, the outcome was that supply fans were generally retained. They were, however, refurbished with new bearings, new belt drives, new highefficiency motors, new spring mounts, and painted as necessary. Associated mechanical services elements Various other elements were integrated into the refurbishment. Outside air economy cycles were placed on all AHUs, using enthalpy control. CO 2 monitoring was allowed for on office floors, with a sensor placed in approximately every second temperature sensor. Floor shut-off provision for unoccupied floors, or after-hours operation of limited areas. Small cooling systems that would be used after hours, such as lift motor room cooling, or security room cooling, were taken off the main chilled water and changed to individual package units using tenant condenser water. This avoids chiller operation after hours for minor loads. Car park exhaust systems were made variable speed (new axial fans with VSDs), controlled via BMCS using input from CO and NO 2 sensors throughout the parking level. Side-stream filtration and automatic water treatment systems were added to the condenser water system to minimise bleed requirements and water usage. Tenant condenser water provision was increased to Property Council of Australia A Grade level. Motorised dampers on mechanical services plant, including smoke dampers, were replaced, bearing in mind the 20-year refurbishment aim, and were fitted with new drive motors to match the BMCS. The air conditioning infrastructure tender documentation was prepared by the mechanical services engineers as a number of self-contained separate packages. These individual packages included chilled water system, air handling units, essential services (stair pressurisation and smoke exhaust), tenant condenser water upgrade, BMCS, and heating water plant. Efficiency improvements At the commencement of the investigation, reporting, modelling, and design process in 2007, a full year s data (late 2004 to late 2005) was obtained on electrical and gas energy usage for Jessie Street Centre. With input on the building s floor area and hours of use, this equated to total energy consumption of 557MJ/m 2 or emissions of 110kgCO 2 /m 2. The simulation modeling estimated that after the proposed upgrade works the total energy usage would be 343MJ/ m 2 (reduced by 38% from 2004/2005) or 72kgCO 2 /m 2 (reduced by 34% from 2004/2005). The actual energy usage, to date, has indicated that the building performance is close to these predicted improvements. Points of interest for this refurbishment With an existing building, particular restrictions occur, sometimes requiring more lateral approaches. It would have been difficult, disruptive, and expensive to install new chilled water risers, from Level 2 chillers/pumps up to Level 21 plant room. Existing risers were 300mm diameter mild steel pipe, with chilled water running at about the maximum allowable velocity (based on tables of acceptable velocities re pipe erosion for the pipe material). Slightly more capacity was needed in the upgrade, so existing risers were assessed for corrosion (in situ) and appeared to be in excellent condition due, presumably, to effective water treatment. The decision was made to retain them, and the chilled water temperature split was increased to deliver the required capacity at the same flow rate. Pumps, chillers, and coils were then selected to suit the temperature split. Existing main cooling towers were situated in a notch in the side of the 34 Eco li b r i u m OC TO B E R
6 roof plantroom. They were constructed of stainless steel and were in excellent condition, so all options for achieving the required increased capacity (plus redundancy) using these existing towers were explored. However, this could not be achieved without serious disruption to the existing plant room, with many negative consequences. Therefore, an alternative location was found at a lower level (Level 6) on the roof of the south wing, and a full steel A typical ceiling, with swirl diffusers. platform erected above a concrete and membrane roof to handle the transfer of structural loads. This required a DA submission to Council, and surveying of another piping riser down the south wing from Level 6 to the car park, across the car park, down the southern driveway, and up into the Level 2 chiller plant room. This route was determined, and new piping installed as two 300 dia. pipes for flow, and two for return, to make handling the piping in limited spaces easier. Mild steel was used. The Jessie St Centre refurbishment at a glance Building details Owner/manager: Brookfield Multiplex Mechanical services engineers: Wood & Grieve Engineers ESD: Wood & Grieve Engineers Duct-cleaning: Clean Air Technologies Services contractors: Triple M Mechanical Services Equipment BMCS: Johnson Controls Chiller sets: Powerpax Swirl diffusers: Krantz Cooling towers: BAC VXT Compressors: Turbocor
V4 15JUNE2016 (COPYRIGHT: DEPARTMENT OF INDUSTRY)
V4 15JUNE2016 (COPYRIGHT: DEPARTMENT OF INDUSTRY) ACN 114 572 084 "Driving Sustainability through Teamwork" e: pcthomas@teamcatalyst.com.au m: 0417 405 478 CALCULATING COOL USER GUIDE V4 15JUNE2016 Page
More informationSPACE CONDITIONING IN COMMERCIAL BUILDINGS Overview
SPACE CONDITIONING IN COMMERCIAL BUILDINGS Overview As in residential buildings the purpose of mechanical conditioning and ventilation is to maintain air quality and thermal comfort in buildings, with
More informationOperating Performance
INFORMATION SHEET 1 Jackson Engineering Advisers are specialist Building Services Engineers. This information sheet is offered as an aid to Building Owners and Managers as a guide to plant life expectancies.
More informationCOLD STORAGE WAREHOUSE, USING DIRECT EXPANSION AMMONIA REFRIGERANT Ray Clarke ISECO Consulting Services Pty Ltd
COLD STORAGE WAREHOUSE, USING DIRECT EXPANSION AMMONIA REFRIGERANT Ray Clarke ISECO Consulting Services Pty Ltd Abstract This paper presents the design approach adopted for the expansion of a large existing
More informationA full list of energy conservation opportunities (ECO) for air-conditioned buildings
A full list of energy conservation opportunities (ECO) for air-conditioned buildings Team France (Project coordinator) Armines - Mines de Paris Austria Austrian Energy Agency Belgium Université de Liège
More informationMECHANICAL SERVICES 101. Ian White
MECHANICAL SERVICES 101 Ian White Contents 1. Ventilation 2. Heat Gains & Losses 3. Heating Ventilation Air Conditioning (HVAC) Systems What are Building Services Building Services incorporate all aspects
More information1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT
Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story
More informationMadeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)
Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085
More informationSmoke Master SMIA Compact pressurisation and smoke exhaust system
Smoke Master SMIA Compact pressurisation and smoke exhaust system Fläkt Woods FIFLO EN 2009.09 2 All rights reserved. Contents System overview... 4 Design and operation... 5 Technical specification...
More informationHow about Savings in Time, Money, Energy and Longer Life?
Chapter 17: The Value of Maintaining Evaporative Cooling Equipment 97 The Value 17 of Maintaining Evaporative Cooling Equipment 1. Cooling Tower Maintenance and Upgrades... What s in it for You? How about
More informationGuidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may
More informationStructure 4. Lifts 6. Mechanical Services 10. Building Management System (BMS) 20. Electrical Services 21. Communication Services 24.
TECHNICAL MANUAL TECHNICAL MANUAL Contents Structure 4 Lifts 6 Mechanical Services 10 Building Management System (BMS) 20 Electrical Services 21 Communication Services 24 Security 25 Fire Protection Services
More informationAIR TREATMENT. ReCOOLER HP» INTEGRATED COOLING/HEATING FUNCTION WITH REVERSIBLE HEAT PUMP IN THE eq AIR HANDLING UNIT
AIR TREATMENT ReCOOLER HP ReCOOLER HP» INTEGRATED COOLING/HEATING FUNCTION WITH REVERSIBLE HEAT PUMP IN THE eq AIR HANDLING UNIT Energy efficiency the essence of our solutions All our research, development
More informationAugust 15, 2013 Page 1 of 19
Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning
More informationCHAPTER 4. HVAC DELIVERY SYSTEMS
CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer
More informationMechanical System Redesign. Dedicated Outdoor Air System. Design Criteria
Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed
More informationASHRAE Illinois Chapter 2015 Excellence in Engineering Awards
ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating
More informationHeat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools
Heat Recovery Dehumidification (HRD) system Designed for municipal swimming pools A dehumidification and ventilation system with dynamic heat pump heat recovery to swimming pool water and air ENVIRONMENTAL
More informationPRODUCT RANGE: ROOFTOP PACKAGE
Packaged Air Cooled Reverse Cycle Type Air Conditioner Range 11-125kWr With Energy / Heat Recovery The Roof Top Packaged unit range is designed to be used when high fresh air quantities are required. They
More informationVariable Speed Drives: Reducing the energy costs of commercial HVAC systems
Variable Speed Drives: Reducing the energy costs of commercial HVAC systems Factsheet Using Variable Speed Drives (VSDs) to reduce the cost of heating, ventilation and air conditioning (HVAC) systems in
More information4. OVERVIEW OF MECHANICAL SYSTEM
4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in
More informationHVAC 101. H V A C S y s t e m s
H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationEADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option
EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option
More informationELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.
B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.
More informationRetrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended
More informationASHRAE JOURNAL ON REHEAT
Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide
More informationINTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012
HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.
More informationImproving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks
Improving Performance with a Building Tune-Up Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks How much is too much? Most buildings can cut total energy use by 5-30% while
More informationChallenges and Methods of Estimating a Conceptual HVAC Design
Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.
More informationEnergy-Efficiency Measures List
Guidelines for Public Agencies Energy-Efficiency Measures List 1.0 Envelope 1.1 Reduce Heat Losses-Ceiling/roof 1.11 Additional Ceiling/Roof Insulation 1.12 Exhaust Attics 1.13 Use Light-Colored Roof Surfaces
More information2. CURRICULUM. Sl. No.
. CURRICULUM Sl. No. Code Title No. of Lecture Hours 1 RAC 001 Fundamentals of Refrigeration and Air 60 conditioning RAC 00 Psychrometry, Heat load Estimation for 70 Air conditioning and Refrigeration
More informationGeneral HVAC Recommendations
General HVAC Recommendations DESIGN GUIDELINES FOR ENERGY EFFICIENT HVAC SYSTEMS Thank you for your interest in energy efficiency! Energy efficient heating, ventilation, and air conditioning (HVAC) equipment
More informationAir Handling Units. Real HVACR people who understand your needs.
Air Handling Units Real HVACR people who understand your needs. Copyright HC Heat-Exchangers (PTY) Ltd. 1 Copyright HC Heat-Exchangers (PTY) Ltd. 2 About the HC AHU range HC Heat-Exchangers rich engineering
More informationDESIGN GUIDELINES SECTION HVAC
3/15/17 Cooling Methodology Chiller Plants Configurations monitoring Preferred DESIGN GUIDELINES SECTION 15700 HVAC Air-cooled chillers < or = 300 tons; water-cooled chillers > 300 tons Variable volume
More informationFAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney
FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1
More informationShippensburg University
Shippensburg University Horton Hall HVAC Feasibility Study PREPARED FOR: Shippensburg University 1871 Old Main Dr. Shippensburg, PA 17257 SHIPPENSBURG PROJECT: SU-2017/25 RPA PROJECT: 17118.001 DATE: December
More informationSECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...
SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...
More informationChilled Water system
Chilled Water system Introduction For large installations the Condenser, Evaporator, Compressor and Expansion device can be purchased as a package unit, known as a Chiller. The usual package consists of
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section
More informationQuality Products AHU Repair, Refurbishment and Replacement
Quality Products AHU Repair, Refurbishment and Replacement We are engineers specialising in the repair, refurbishment and replacement of ventilation systems. We have considerable experience in solving
More informationSystemair product news - Fans NEWS
Systemair product news - Fans NEWS Perfect Climate. Anywhere. Anytime Smart, energy-saving solutions for ventilation and air-conditioning. Well-thought-out system solutions for every application area.
More informationMechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013
Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...
More informationRaised Access Floor - (AE Breadth Area)
Raised Access Floor - (AE Breadth Area) Currently, the Plaza has a raised access flooring system on both the 7 th and 8 th floors. The 8 th floor is designed with an independent HVAC system utilizing an
More informationHVAC Controls Upgrades: Requirement Details ( )
REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,
More informationAdvanced Air. Hard Wired Damper Control Panels. Systems 10, 11, & 12. Hard-Wired Systems. Bespoke Systems Available. Value Engineered Solutions
ISSUE A, MAY 2008 Hard Wired Damper Control Panels Systems 10, 11, & 12 Hard-Wired Systems Bespoke Systems Available Value Engineered Solutions Overview The Hard-Wired Control Panels On a number of projects
More informationState of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney
Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled
More informationJob Name Control Systems Description Date
Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In
More informationRAMAPO COLLEGE OF NEW JERSEY CCA0803 PHASE II HOUSING REHABILITATION 2012
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationHVAC 101. The Basics of Heating, Ventilation and Air Conditioning
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort
More informationHVAC Water chiller selection and optimisation of operation
HVAC Water chiller selection and optimisation of operation Introduction Water-chiller is a broad term describing an overall package that includes an electrical control panel, refrigeration plant, water
More informationIDL20e (2 way discharge) IDS60e (4 way discharge) Inffusers. UDI (vertical discharge) Frequently Asked Questions
IDL20e (2 way discharge) IDS60e ( way discharge) Frequently Asked Questions UDI (vertical discharge) Inffusers INFFUSER FREQUENTLY ASKED QUESTIONS The following are frequently asked questions (FAQ s) on
More informationFan Selection. and Energy Savings
Fan Selection and Energy Savings Reducing power consumption by minimizing system pressure loss and choosing the right equipment HBy BRIAN MLEZIVA Greenheck Fan Corp. Schofield, Wis. Power Consumption HVAC
More informationKensington Aldridge Academy, London W10
Kensington Aldridge Academy, London W10 Fire Safety Review Job Number: 1103 June 2018 FIRE SAFETY REVIEW CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION 2.0 FIRE SAFETY REQUIREMENTS 3.0 EXTERNAL WALL SPECIFICATION
More informationEarthWise System Seminar
EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States
More informationPFS Single stage axial fan The axial fan for modern boiler plants
PFS Single stage axial fan The axial fan for modern boiler plants This large axial fan, type PFS- 400-236, was installed in 1987 at the Salmisaari coal-fired power station in Helsinki, Finland. The photo
More informationImplementing sustainable water strategy through development industry engagement
Implementing sustainable water strategy through development industry engagement Ian Director, Organica Engineering, Melbourne, Australia E-mail: iadams@organicaeng.com.au Edward Cotter Sustainability Leader,
More informationSECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL
SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationTECHNICAL SPECIFICATIONS ANZ TOWER
TECHNICAL SPECIFICATIONS ANZ TOWER GENERAL Development Name Address Location Total Net Lettable Area (Office) Liberty Place ANZ Tower 242 Pitt Street Through to 161 Castlereagh Street Sydney s Mid Core
More informationFeasibility of a Liquid Desiccant Application in an Evaporative. Cooling Assisted 100% Outdoor Air System
Feasibility of a Liquid Desiccant Application in an Evaporative Cooling Assisted 100% Outdoor Air System M.H.Kim 1, S.K.Han 1, S.Y. Cho 2, and J.W.Jeong 1* 1 Department of Architectural Engineering, Hanyang
More informationMECCI Engineers. Institute of Engineering Design & Research
MECCI Engineers Institute of Engineering Design & Research (An ISO 9001:2015 DAC International Certification for EPC Consulting, Engineering Project & Training Company) HVAC Design Course Content For Regular
More informationABOUT US OUR EXPERTISE WHAT IS ENERGY RECOVERY? ERV (Energy Recovery Ventilation) AHU (Air Handling Units) PAC (Package Air Conditioning Equipment)
COMPANY PROFILE ABOUT US THE LEADERS IN AIR TO AIR HEAT RECOVERY. ARMCOR AIR SOLUTIONS IS A DYNAMIC, PROFESSIONAL COMPANY RESPECTED BY THE AIR CONDITIONING INDUSTRY FOR OUR TRACK RECORD IN PROVIDING ADVICE,
More informationHeat pump and energy recovery systems
SBS5311 HVACR II http://ibse.hk/sbs5311/ Heat pump and energy recovery systems Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2017 Contents Basic concepts Air-to-air
More information7. MECHANICAL SYSTEM DESIGN
7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved
More informationDIVISION 15 MECHANICAL
DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with
More informationChilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2
Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2 john.woollett@swegon.se, jonas.akesson@swegon.se SUMMARY The main focus of the paper will be on active beam technology regarding
More informationSmoke Master SMPA Compact pressurisation system
Smoke Master SMPA Compact pressurisation system Fläkt Woods FILO E 2009.07 2 All rights reserved. Contents System overview...4 Design and operation...5 Technical specification...6 Electric and control
More information1.0 CONDITIONS FOR CHILLED WATER SUPPLY (PRIMARY SIDE BY DHCS SUPPLIER)
GENERAL This document contains the basic technical information for Architectural, Civil & Structural and M&E Building Services as required by supplier to achieve optimum operation. The time frame required
More information"This is only the scope of work for the project. For more information, interested parties should contact Procurement at
"This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a
More informationSUNWARM AIR SOLAR PRE-HEAT VENTILATION SYSTEM
SOLAR PRE-HEAT VENTILATION SYSTEM SUNWARM USES SOLAR ENERGY TO REDUCE THE HEATING DEMAND OF THE HOME AS WELL AS PROVIDING A COMPLETE VENTILATION SOLUTION. 76 BENEFITS Sunwarm Air provides both a ventilation
More informationRosemex Products 96 VENTILATION CLIMATAIR COMPARTMENT AIR HANDLING UNITS
10 Rosemex Products 96 VENTILATION CLIMATAIR COMPARTMENT AIR HANDLING UNITS 2 INDEX Page Description - Introduction -Application - Data... 2 Typical Installation... 3 Sound performance... 3-6 Dimensional
More informationElement Z General Design Requirements Existing Facilities Information
Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and
More informationIntumescent Fire Dampers
Ph 1300 858 010 Intumescent Fire Dampers Fire resistant walls and floors in a building play an important part in containing the spread of fire and smoke. However, a building also needs to be well ventilated
More informationINTRODUCTION. JAU /JCC/JVC Series Jet Fans - for car park ventilation
JAU /JCC/JVC Series Jet Fans - for car park ventilation INTRODUCTION Pacific HVAC Engineering is able to offer a complete solution in car park ventilation at a competitive price with in house developed
More information"This is only the scope of work for the project. For more information, interested parties should contact Procurement at
"This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a
More informationProblems Air and Water Distribution Systems
Problems Air and Water Distribution Systems ME419 D. Abata 1. Cooled air at 1 atm, 50 F, and 10% relative humidity is transported in a 600 ft long circular sheet metal duct at a rate of 800 cfm. If the
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section
More informationCOMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units
COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection
More informationA Case Study on. Energy Management Control System for. Refrigeration Plant. Nestle Ice Cream Plant Mulgrave
A Case Study on Energy Management Control System for Refrigeration Plant Nestle Ice Cream Plant Mulgrave Summary Nestle s ice cream plant, located on Wellington Road in Mulgrave Victoria, utilises a very
More informationSubmitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University
More informationCOST-EFFECTIVE FIRE-SAFETY RETROFITS FOR CANADIAN GOVERNMENT OFFICE BUILDINGS
, Volume 1, Number 3, p.123-128, 1999 COST-EFFECTIVE FIRE-SAFETY RETROFITS FOR CANADIAN GOVERNMENT OFFICE BUILDINGS D. Yung and G.V. Hadjisophocleous Fire Risk Management Program, Institute for Research
More informationCI/SfB X. DF / IDF Series GAS FIRED COMBINED HEATING AND VENTILATION
CI/SfB 56.83 X DF / IDF Series GAS FIRED COMBINED HEATING AND VENTILATION DF / IDF Series GAS FIRED COMBINED HEATING AND VENTILATION Introduction Nordair Niche is one of the UK's leading specialists in
More informationBALANCING ENERGY EFFICIENCY & INDOOR THERMAL COMFORT
BALANCING ENERGY EFFICIENCY & INDOOR THERMAL COMFORT Ashak Nathwani AM Adjunct Senior Lecturer ashak.nathwani@sydney.edu.au PRESENTATION THREE SESSIONS This presentation will be in three parts addressing
More informationDISTRIBUTION SYSTEMS. Water Piping and Pumps
DISTRIBUTION SYSTEMS Water Piping and Pumps Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They are targeted
More informationSeries V Layout Guidelines
VT0, VT1, VF1,VF0,VC1 & VCA Open circuit cooling towers, closed circuit cooling towers, and evaporative condensers all depend upon an adequate supply of fresh, ambient air to provide design capacity. Other
More informationINNOVATIVE HVAC SOLUTIONS FOR AN AUTOMOTIVE PLANT IN SOUTHERN ITALY
INNOVATIVE HVAC SOLUTIONS FOR AN AUTOMOTIVE PLANT IN SOUTHERN ITALY Dr. Ing. Alex Sandelewski alsandel@tin.it ASC Engineering Srl Via Ausonio 26 20123 Milano, Italy Abstract An automotive part manufacturing
More informationMEPS COMPLIANT. Product Review OPA-RK Series. Ducted Packaged Roof Top Air Conditioners kw 137 kw. Extra Long Life Epoxy Coated Outdoor Coil
Ducted Packaged Roof Top Air Conditioners Product Review OPA-RK Series Extra Long Life Epoxy Coated Outdoor Coil Nominal Cooling Capacity 10.6 kw 137 kw MEPS COMPLIANT INVERTER MODEL MODELS MARCH 2014
More informationLayout. Guidelines11. Chapter 11: Layout Introduction
Guidelines11 Chapter 11: Layout 37 Layout 1. Introduction Open circuit cooling towers, closed circuit cooling towers and evaporative condensers all depend upon an adequate supply of fresh, ambient air
More informationAHU INSTALLATION & OPERATION MANUAL
AHU INSTALLATION & OPERATION MANUAL VERSION 2 AIR HANDLING UNIT MODELS: AHU 500, AHU 900, AHU 1200, AHU 1700, AHU 2000, AHU 2500, AHU3500, AHU 4500, AHU 5000, AHU 6000, AHU 7000, AHU 8000, AHU 10000, AHU
More information-DUCTED SYSTEM- OPERATING INSTRUCTIONS
HOMEDEAL AIR CONDITIONING (QLD) PTY LTD Heating & Cooling Specialists Sales, Service and Maintenance (07) 3397 8900 www.homedealairconditioning.com.au Contractors Licence No.897403 -DUCTED SYSTEM- OPERATING
More informationSmoke extract fan SMHA HATCH
12.11.2012 Contents Product overview... 3 Construction... 4 Specification... 5 Selection... 6 Installation... 7 Electrical connections... 8 Dimensions and weights... 9 Product code and accessories... 10
More informationSenior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1
Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9
More informationHood Depot Internatioonal, Inc., Phone S. Powerline Road, Deerfield Beach, FL
The Kitchen Cool by Hood Depot is a conditioned make up air unit design with flexibility, form and function kept in mind. Our unit offers a variety of configurations that allow the customer to customize
More informationUnderfloor Air Distribution:
Underfloor Air Distribution: An underfloor air distribution system utilizes a plenum space between the structural slab and the underside of a raised floor to distribute the conditioned air to the room.
More informationI615. Westgate Precinct
I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct
More informationAIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems
233100 AIR DISTRIBUTION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 230700 HVAC Insulation B. Section 237300 Air Handling C. Section 230900 Building Automation and Control System Guidelines D. Section
More informationRe-Engineering Votey Hall:
Re-Engineering : Investment of Deferred Maintenance $$ into an aged Engineering Building by: Lynn Wood Retro-Commissioning Engineer Physical Plant Department New Construction: STEM $104M Central Campus
More informationHONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING
ASHRAE s BEST This article was published in ASHRAE Journal, November 2010. Copyright 2010 American Society of Heating, Refrigerating and -Conditioning Engineers, Inc. Reprinted here by permission from
More informationCommercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark
Commercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark Introduction: Energy use is the single largest operating expense in commercial office
More informationVariCool VAV. (Variable Air Volume) 9 to 70 tons Variable Air Volume Water-Cooled and Chilled Water. Unique Solutions for All-Indoor HVAC Projects
VariCool VAV (Variable Air Volume) 9 to 70 tons Variable Air Volume Water-Cooled and Chilled Water Unique Solutions for All-Indoor HVAC Projects Water Source Heat Pump Water-Cooled Chilled Water Modular
More information