Wood logs boiler with a gasication eect IGNIS KW. INSTRUCTIONS MANUAL for usage and maintenance

Size: px
Start display at page:

Download "Wood logs boiler with a gasication eect IGNIS KW. INSTRUCTIONS MANUAL for usage and maintenance"

Transcription

1 Wood logs boiler with a gasication eect IGNIS KW INSTRUCTIONS MANUAL for usage and maintenance Prhovacka bb Simanovci, Srbija Tel/Fax oce@termomont.rs May 17, 2011

2 Contents 1 Boiler design and properties Dimenzije Technical properties according to EN On product How It Works 3 3 Recommendations for boiler shipment and storage Delivery form What's in the box Boiler installation Boiler placement Chimney Connecting the boiler with a central heating system Closed system Closed system combined heating with solar panels Closed system combined heating with solar panels Open system Boiler In Use Circulation Pump Thermostat Maintenance and cleaning Safety features Thermal safety in case of overheat (closed systems) A Deklaracija o Konformnosti 13 1

3 1 Boiler design and properties 1. Upper door for placing wood-logs 2. Secondary air inlet (manual regulation) 3. Lower door for cleaning 4. Primary air regulation 5. Thermostatic draught regulator 6. Chain for air regulation 7. Connectors for safety heat exchangers 8. Connection for excess water outlet 9. Sensor placement 10. Flue box 11. Flue 12. Secondary ue (ap) 13. Secondary ue ap handle 14. Opening for cleaning the ue box 15. Fill/Drain tap 16. Return 17. Base 18. Flow 1.1 Dimenzije Type IGNIS Weight (kg) A B C D E F G H I L (mm) (mm) (mm) (mm) (mm) (col) (mm) (mm) (mm) (mm) IGNIS IGNIS IGNIS Technical properties according to EN Nominal power IGNIS (KW) Power range (KW) Necessary draught (mbar) Water content (l) Flue gases temperature (at nominal power) ( C) Heating chamber volume (dm3) Mass ow at nominal power (kg/s) 0,016 0,021 0,045 Electrical network (V/Hz) 230/50 230/50 230/50 IP Protection Temperature regulation range ( C) Min. temperature of the return line ( C) Eciency 76% 76% 75% Boiler class

4 1.3 2 On product Boiler primarily uses dry wood as fuel with caloric value > 15 MJ/kg, max. moisture content 15%; Boiler is produced following the guidelines of the European norm EN 303/5; According to norm demands inner walls of the boiler are 5 mm thick; Combustion takes place inside the heating chamber specially designed to put large amount of woodlogs Single combustion load can hold up to 6 hours Boiler comes with removable ash-tray, cleaning kit and thermometer; The upper zone of the boiler has a special round shape made of reproof ceramics with turbulators for optimum e ciency; Water test is done at 6 bar pressure. How It Works IGNIS uses wood-logs - by its construction it could be called a 'boiler with wood gasi cation e ect'. Following image depicts the combustion principle of this boiler. 1. Combustion chamber 2. 'Catalyst' with tubulators 3. Heat exchanger of the safety valve line 4. Tubulators (heat exchangers inside the upper zone) 5. Secondary ue opening 6. Flue box (a part of the heating chamber around the ue) 7. Boiler water 7.1 Boiler water around the ue chamber 8. Secondary air inlet 9. Primary air inlet 10. Return 11. Flow As IGNIS is similar to wood gasi cation boilers, the main properties of the wood gasi cation boilers will be outlined rst. A wood gasi cation boiler, thanks to its special geometry, and thanks to use of the 3

5 fan, brings the woodlogs in the state of 'gasication' - the process where light weighted hydrocarbons. The ame has a specyphic blue colour and the eciency of such solid fuel boiler is 10-15% greater than that of the conventional ones. Another interesting property of wood gasication boilers is that the woodlogs are placed in the upper chamber and the ame is inverse - going upside down contrary to conventional boilers. Wood gasication combustion requires a constant and stationary boiler operation. It is thus necessary to have an additional heat tank to accept the excess heat made by boiler. It is also necessary to perfectly adjust temperatures between the heat tank, ow and return line of the boiler to prevent condensation. All in one, wood gasication allows maximum comfort with wood-logs as a fuel, but with certain investment to be made into additional equipment. The IGNIS boiler lls the room between the less pricey conventional boilers, which demand rell of wood more often and maximum comfort yet more pricey wood gasication boilers (with heat tank). Because of its technical construction IGNIS allows the wood gasication eect (in amoutn much less than 'real' wood gasication boilers) but only using the natural draught of the boiler, without a fan and without a necessary heat tank. What is still necessary is the protection against condensation (mixed valve, by pass of the boiler). IGNIS does not have an inverse ame. As it does not posses the automatic regulation via fan, optimum combustion is achieved by setting the primary and secondary air. Primary air is controlled by the draught regulator (to be ordered separately) and the secondary air is to be set manually. In which way the wood gasication eect is achieved? Wood gasication process takes place in the upper zone of the boiler - within the so-called 'reproof catalyst'. This is a special cylindric part of the heating chamber. On its upper side there are special heat exchangers (tubulators). Below the catalyst with presence of secondary air, at very high temperatures, solid particles are accelerated to certain level until they combust completely. Short-chain hydrocarbons are released. Flue gases are passing through turbulators - in contact with increased surface of the tubulators ue gases are additionally cooled down - exit ue gas temperature is thus lower compared with conventional boilers. The eciency is higher. The concentration of dust, particles and COX/NOX is lower. IGNIS has a secondary ap inside the chamber. The role of this is to shorten the passage of ue gases and increase the draught in the boiler when necessary (during ignition for instance). when th ere is stable this secondary ap should be closed. IGNIS also has a so-called 'ue-box'. Water content of the boiler is maximized occupying a part of the ue chamber. 3 Recommendations for boiler shipment and storage 3.1 Delivery form The boiler comes in three parts, boiler chamber, pellet storage and the boiler housing packed separately. Chamber is wrapped with plastic sheet, and upper door containing reproof glass should have a small styrofoam protection sheet. The whole set is transported on wood pallet. The boiler must always stand in its vertical position. The rotation of the boiler during the shipment or installation represents a serious risk and can lead to damaging the boiler. It is forbidden to stack boilers vertically one onto other. The boiler can be stored only in closed rooms with no atmospheric inuence. The humidity in the storing room also must not exceed the critical value of 80%, so as not to create any condensate. The temperature of the storing room must be in the range of +/- 40 C. 3.2 What's in the box The following parts are supplied together with the boiler: Cleaning kit 4

6 Cleaning brush Warranty paper 4 Boiler installation 4.1 Boiler placement The boiler room should have air-conditioning. The boiler should be mounted in the boiler room permiting access to all its parts as shown below: 4.2 Chimney Boiler connection to the chimney is shown in the gure: Proper dimensioning of the chimney is a very important premise for optimum boiler performance. The purpose of the chimney is to take out the products of combustion but also to secure necessary air draught in the boiler. The graph shows how to chose the necessary height for the chimney as a function of chimney opening. Proper chimney insulation is very important and should be at least 50 mm thick. Depending on the necessary draught of the boiler, the cross section and the height of the chimney are determined. Please advise technical material given by chimney producer. Minimum chimney height for wood boilers is 6 m. Round chimney made of stainless steel modules is recommended in order to keep the condensation inuence low. 5

7 6

8 5 Connecting the boiler with a central heating system 5.1 Closed system The following schemes show how to connect the boiler to the central heating installation with or without a heat accumulator tank: System parts: 1. Boiler 2. Heat accumulator 3. Heat exchanger 4. Non-return valve 5. Mixing valve 6. Pump of the radiator heating 7. Automatic regulation for the radiator heating 8. Expansion vessel 9. Exchanger pump 10.Valve 11.Thermo-manometer 12. Expansion vessel 13. Four-arm mixing valve 14. 7

9 It is not necessary to install the heat accumulator. However, it is recommended.for 1 KW power of the boiler, a capacity of the heat accumulator of l is recommended. One must also bear in mind that the power of the boiler must be enough in order to both warm up the water in the accumulator, as well as to provide direct feed to the installation in very cold periods the chosen power of the boiler should be 1.5 higher than the power of an oil-gas boiler for the given squaring. It is recommended that the closed central heating system is supplied with an expansion tank, the capacity of which must amount to at least one tenth of the total capacity of the system (including the water volume in the boiler). The system must also have an automatic aeration valve with the help of which air will be eliminated from the system. The use of a safety valve is obligatory (with a 2-3 bar threshold, depending on the power of the boiler) and it must be mounted near the boiler. It is also necessary that the system has a thermometer and manometer in order to read the temperature and pressure in the system. In case of using conventional solid fuel, the temperature of the return line should not fall below 60 C, so as to avoid leaking, i.e. condensation in the boiler, which can further lead to corrosion. The temperature of the starting line should not fall below 70 C. It is recommended to use a four-arm mixing valve on the return line of the boiler or a regulation group such as LADDOMAT 21. It is also recommended to mount a lth catcher on the return line. Qualied installer should be entrusted with the mounting of the heating and the initial operation. This must be a person who will take over the responsibility and guarantee the correct operation of the boiler and of the complete central heating system. In the case of an incorrectly planned system with manifesting deciencies caused by the respective person's incorrect installation of the system, which can again lead to an incorrect operation of the boiler, the complete liability for the material damage and potential new costs arising in relation to it is borne exclusively by the person who was entrusted with the mounting of the central heating system, and not by the boiler manufacturer, sales representative or seller. 5.2 Closed system combined heating with solar panels The following scheme depicts a heating system connected over a hybrid solar boiler within an accumalation tank: 8

10 System parts: 1. Boiler 2. Heat accumulator 3. Heat exchanger 4. Non-return valve 5. Distributor 6. Mixing valve 7. Pump of the radiator heating 8. Pump of the oor heating 9. Regulator of the automatic regulation for the radiator heating 10. Regulator of the automatic regulation for the oor heating 11. Receiver 12. Expansion tank 13. Exchanger pump 14.Valve 15.Thermo-manometer 16. Filth catcher 17. Four-arm mixing valve 18. Safety valve 5.3 Closed system combined heating with solar panels Termomont in its oer of solar boilers also has a 'hybrid' version of a heat accumulation tank and stainless steel solar boiler in one: ATS combined tank. When boiler heats up the 'technical' water inside the boiler - as do the solar panels through the spirale. The drinking water is inside the inner vessel which 9

11 is heaten indirectly by the technical water. 5.4 Open system The following scheme shows how to connect the boiler to the open central heating system: System parts 1. Boiler IGNIS 2. Valve 3. Thermo-manometar 4. Boiler circle pump 5. Three-way mixing valve or LADDOMAT Heat accumulator tank 7. Three-way mixing valve 8. Automatic three-way mixing valve 9. Circulation pump for radiator heating 10. Open expansion vessel 11. Automatic regulation MRTR Plus (First) 12. Heating circle 13. Sanitary water circulation pump 14. Sanitary water accumulation tank SOLAR I 10

12 6 Boiler In Use 6.1 Circulation Pump Thermostat Boiler should be equipped with a thermostat for the system circulation pump. The thermostat threshold can be set on certain value and only when the temperature is higher than that, the circulation pump will be turned on. This thermostat is primarily used when ring with solid fuel, in order to prevent the low temperature of the return line which can lead to condensation as a consequence. As the heating up process with wood pellets is usually much faster compared to conventional wood, the eect of condensation should not take place at all when burning pellets. The default value for temperature threshold is set at 60 C. 6.2 Maintenance and cleaning Using wood pellets as a primary fuel means very low level of ashes (less than 1%). The cleaning of the boiler can thus be performed once per week and does not take more than 5 minutes. Burner ash-tray should be however cleaned every day or two - operation which takes less than a minute. Using pellets means also low temperature of the ue gases due to the high eciency of combustion. This means the boiler would last much longer compared to combustion with traditional solid fuels such as wood or coal. 7 Safety features 7.1 Thermal safety in case of overheat (closed systems) Burner has two main safety features: The internal feeeding auger prevents re passing from the boiler to the burner body. The other feature is that if the temperature of the ue gases does not drop below 250 C the burner will be forced to work with minimum power (which means minimum quantity of pellets added every time). For additional hydraulic protection in the closed systems it is necessary to install to safety thermal valve shown on image (to be bought separately, not an integral part of the boiler). If for some reason the temperature of the water inside the boiler should exceed 95 C this valve would release the water from the water supply system to cool down the water temperature inside the boiler. 11

13 Connection scheme for the thermal safety valve: 1. Cold water entering from the water supply system 2. Cold water entry into boiler 3. Hot water going outside the boiler 4. hot water ending in the sewage water system 5. Thermo-valve sensor To connect the safety valve: Connect the sensor of the valve (outter thread 1/2") at depicted place on the boiler, position 5 (inner thread 1/2") Connect the cold water entry (on valve's input is marked with C) than connect the exit line (valve marked with: ) with the corresponding exit line on the boiler (position 21) Connect position 21 (on the boiler) with the input line on the valve (valve is marked with: ) Connect the valve (marked with S) to the sewage system. 12

14 A Deklaracija o Konformnosti We, Termomont d.o.o. with legal seat on the address Prhova ka street bb, imanovci, Republic of Serbia, under sole responsibility declare that: Kotlovi na vrsto gorivo tipa IGNIS 20, IGNIS 30, IGNIS 40 produced and as by its construction, design and performances are in accordance with the following norms and directives prescripted by the European Union: 97/23 EEC Pressure device directive EN 303/5 Norm for solid fuel boilers" imanovci, May 17, 2011 Signature of the responsible person

OPERATING INSTRUCTIONS with safety features

OPERATING INSTRUCTIONS with safety features Solid fuel boiler TKK3 with wood pellet burner TERMEC 70-90 KW OPERATING INSTRUCTIONS with safety features Prhova ka bb 22310 imanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs

More information

Solid fuel hot water boiler TKH KW INSTRUCTIONS MANUAL for usage and maintenance

Solid fuel hot water boiler TKH KW INSTRUCTIONS MANUAL for usage and maintenance Solid fuel hot water boiler TKH 250-400 KW INSTRUCTIONS MANUAL for usage and maintenance Prhovacka bb 22310 Simanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs April

More information

Biomass. Biomass solid fuel boiler range

Biomass. Biomass solid fuel boiler range Biomass Biomass solid fuel boiler range Biomass Fuelling positive change For more than150 years, Baxi has been at the forefront of heating technology Baxi leads the way with new and pioneering heating

More information

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4 Wood gasification process... Wood as a fuel... Boiler construction - its elements...4 Boiler construction - materials...4 EKO advantages...4 Boiler construction - schematics... Boiler dimensions... Boiler

More information

INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS INSTALLATION AND OPERATING INSTRUCTIONS CONTENTS 2 6 7 8 9 10-12 16 17 18 18 19 2 GENERAL TRANSPORTATION, STORAGE AND OPENING THE PACKAGE Receiving the goods - Storage Opening the package 3 INSTALLATION

More information

Boiler Technical Specifications (2013)

Boiler Technical Specifications (2013) ACT Bioenergy Boiler Dimensions 0.5-0.85 Million Btu/h (150-250kW) Model CP500 CP600 CP750 CP850 Heat Output in MBtu/h (kw) 510 (150) 610 (180) 750 (220) 850 (250) Height ft (mm) 6 1 (1855) 6 1 (1855)

More information

MANUAL. Page 1/44

MANUAL.     Page 1/44 MANUAL FOR INSTALLATION AND OPERATION OF A HEATING SYSTEM, CONSISTING OF HOT WATER WOOD PELLET BOILER FROM SERIES PELLETHERM V4 AND AUTOMATED WOOD PELLET BURNER FROM SERIES GP IV http:// www.greenecotherm.eu

More information

- 12, , TECHNICAL INSTRUCTIONS

- 12, , TECHNICAL INSTRUCTIONS HEATING TECHNIQUE Centrometal d.o.o. - Glavna, Macinec, Croatia, tel: +8 7, fax: +8 7 TECHNICAL INSTRUCTIONS for installation, use and maintenance of hot water boiler and installation of additional equipment

More information

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+ INSTALLATION AND OPERATING INSTRUCTIONS Ariterm 60+ CONTENTS General.... 2 Installation.... 4-5 Installation of temperature limit valve... 6 Measurements and connections... 7 Technical specifications and

More information

USER MANUAL 9kW LILLY PELLET STOVE

USER MANUAL 9kW LILLY PELLET STOVE USER MANUAL 9kW LILLY PELLET STOVE Table of Contents.Overview of Stove Parts... 2.Technical Characteristics... 3 3.Important Information... 4 4.Pellet Specification...5 5.Technology... 6 6.Installation...

More information

Manual and installation instructions. Function. Operating phase

Manual and installation instructions. Function. Operating phase LADDOMAT M120 Manual and installation instructions Thermal layering Function Thanks to its design and control features, the Laddomat M120 means optimal thermal layering in storage tanks, with a low and

More information

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN To respected customer, We are very pleased for your trust and your decision to buy our product. You made a good choice,

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

INSTRUCTION MANUAL. for installation and operation of solid fuel cookers. Victoria and Victoria Lux

INSTRUCTION MANUAL. for installation and operation of solid fuel cookers. Victoria and Victoria Lux INSTRUCTION MANUAL for installation and operation of solid fuel cookers Victoria and Victoria Lux VICTORIA-05 Ltd. CONTENTS 1. Introduction... 3 2. Technical specifications and description... 3 3. Cooker

More information

Heating with log wood

Heating with log wood English Heating with log wood De Luxe 18-40 Lambda 18-40 1 Competence is our success... HERZ FACTS: 60 subsidiaries Group headquarter in Austria Research & development in Austria Austrian owner 2.600 employees

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL INSTALLATION AND OPERATION MANUAL PRESSURISED STEEL BOILERS AR 30 AR 1000 RADIALAND - BOILER's INSTALLATION MANUAL version 1.0 / 15-02-2008 The company E. is outstanding in the field of central heating

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service

More information

ISO 9001 TUV CERT CE

ISO 9001 TUV CERT CE ISO 9001 TUV CERT CE INSTRUCTION MANUAL CONTENT 2 1. Boiler application 2. Principle of work 3. Description of the controller 3.1. Front panel of EKOSTER 2 3.2. Main functions of EKOSTER 2 4. Gasification

More information

USER MANUAL FOR SOLID FUEL STOVE VOLCANO - 24kW

USER MANUAL FOR SOLID FUEL STOVE VOLCANO - 24kW USER MANUAL FOR SOLID FUEL STOVE VOLCANO - 4kW Dear customers, Thank you and congratulations, because with this purchase you became a member of large family of satisfied customers of ''ABC PROIZVOD''.

More information

PELLET BURNER PV 350

PELLET BURNER PV 350 PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION

More information

HDG K SERIES. Wood pellet boiler. The perfect alternative to fossil fuels. Receive up to

HDG K SERIES. Wood pellet boiler.   The perfect alternative to fossil fuels. Receive up to (56.81) April 2013 Receive up to 2635 RHI back every year for the next seven years HDG K SERIES Wood pellet boiler The perfect alternative to fossil fuels www.euroheat.co.uk The K Series pellet boiler,

More information

Solid biofuel solutions

Solid biofuel solutions Solid biofuel solutions Clean heat with locally produced fuel Solid biofuels are the individually most important component in the conversion to a sustainable energy mix. Heat production from wood based

More information

Importance of a Draught Regulator

Importance of a Draught Regulator Importance of a Draught Regulator The purpose of a chimney (stack) is to generate a draught (draft) that will transport smoke and fumes away from the point of combustion. The chimney design and arrangement

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20 INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8

More information

Heating with wood chips

Heating with wood chips Heating with wood chips YOUR RELIABLE PARTNER Present years on the market 110 for over 20-60 Our success is our expertise... HERZ-Armaturen Ges.m.b.H The company Founded in 1896, HERZ has had an ongoing

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass HM model. With a suitable

More information

INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER

INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER INSTRUCTION MANUAL Content 1. Boiler application...3 2. Principle of work...3 3. Description of the controller...4 3.1. Front panel of

More information

AIEA Presentation. Wood pellets heating systems.

AIEA Presentation. Wood pellets heating systems. AIEA Presentation Wood pellets heating systems Introduction to the AIEA 16 Local Energy Agencies in Ireland, including 3 in Northern Ireland. Association of Irish Energy Agencies (AIEA) formed in November

More information

Instruction manual for installation, operation and maintenance of automatic pellet burner of series GP on solid fuel hot water boiler VIADRUS U26

Instruction manual for installation, operation and maintenance of automatic pellet burner of series GP on solid fuel hot water boiler VIADRUS U26 Instruction manual for installation, operation and maintenance of automatic pellet burner of series GP on solid fuel hot water boiler VIADRUS U26 www.greenecotherm.eu Producer Address Thank You for buying

More information

Combined boiler. for solid fuel and pellets

Combined boiler. for solid fuel and pellets Combined boiler ATTACK WOOD&PELLET for solid fuel and pellets W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK

More information

Smart Heating Technology Ltd. U Statku 653/24, Ostrava-Bartovice Czech Republic

Smart Heating Technology Ltd. U Statku 653/24, Ostrava-Bartovice Czech Republic Smart Heating Technology Ltd. U Statku 653/24, 717 00 Ostrava-Bartovice Czech Republic AUTOMATIC BIOMASS BOILERS Smart 150 500 1500 kw SMART INDUSTRIAL PARK Ostrava-Bartovice 18 000 m 2 Automatic Boilers

More information

MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF AN AUTOMATED PELLET BURNER FROM SERIES GP XX SC.

MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF AN AUTOMATED PELLET BURNER FROM SERIES GP XX SC. MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF AN AUTOMATED PELLET BURNER FROM SERIES GP XX SC http://www.greenecotherm.eu Pellet burner GP xx sc 1 Manufacturer Address ZMM Haskovo AD 67 Saedinenie

More information

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK FD PELLET yattack

More information

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set For boilers CentroPlus 25/35 and CentroPlus-B 25/35 (solid fuel and wood pellets fuel firing) TUPSCP-K-11-2016-ENG CONTENTS 1.Introduction 2. Status

More information

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty.

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty. ARREDO E BENESSERE So old fashioned... An intelligent choice When on a cold winters night the warm glowing flames of the KALDUS boiler are there to welcome you back home, you will be pleased that you decided

More information

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200 INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200 CE INSTRUCTION MANUAL Content 1. Boiler application...3 2. Principle of work...3 3. Description of the controller...4 3.1. Front panel of EKOSTER 2...4 3.2.

More information

BIOMASS BOILER DUAL THERM

BIOMASS BOILER DUAL THERM DUAL THERM PELLET/ WOOD BOILER AUTOMATIC FUEL SWAP BACK UP PROTECTION SYSTEM INTEGRATED IN BOILER HEAT EXCHANGER PELLET HOPPER INCLUDED HEAT EXCHANGER AND BURNER AUTOMATIC CLEANING SYSTEM AUTOMATIC LOG

More information

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power VICTRIX 90 is the new wall-hung condensing boiler for room heating only, set-up for independent functioning and for that in cascade mode

More information

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve Connection and energy management compact unit 2850 series ACCREDITED CALEFFI 01259/14 GB ISO 9001 FM 21654 ISO 9001 No. 0003 Function The connection and energy management compact unit enables combining

More information

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK CONTENTS EN ATTACK DPX THE WOOD GASIFYING BOILER... 4 1 INTRODUCTION... 6 2 3 4 1.1 GENERAL DESCRIPTION...

More information

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens Main components The bigger the need of heat output is. the bigger the components (storage. boiler. chimney etc.) In private houses the output need of the boiler is about 25 40 kw and in farms from 60 kw-

More information

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS CENTROMETAL d.o.o. Glavna 12 40306 Macinec Croatia tel: +385 40 372 600; fax : +385 40 372 611 TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set (60-90 kw) For boilers: EKO-CK P 70-110 TUPS-90K-09-2015-E-N-eng

More information

BIO-CK P Unit TECHNICAL INSTRUCTIONS. for installation, use and maintenance of hot water boiler and installation of additional equipment

BIO-CK P Unit TECHNICAL INSTRUCTIONS. for installation, use and maintenance of hot water boiler and installation of additional equipment HEATING TECHNIQUE Centrometal d.o.o. Glavna, 006 Macinec, Croatia, tel: +8 0 7 600, fax: +8 0 7 6 TECHNICAL INSTRUCTIONS for installation, use and maintenance of hot water boiler and installation of additional

More information

USE AND MAINTENANCE. Cm Pelet-set TECHNICAL INSTRUCTIONS. (14-35 kw) For boilers: EKO-CK P (EKO-CK 20-40) EKO-CKB P (EKO-CKB 20-40)

USE AND MAINTENANCE. Cm Pelet-set TECHNICAL INSTRUCTIONS. (14-35 kw) For boilers: EKO-CK P (EKO-CK 20-40) EKO-CKB P (EKO-CKB 20-40) TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set (14-35 kw) For boilers: EKO-CK P 20-40 (EKO-CK 20-40) EKO-CKB P 20-40 (EKO-CKB 20-40) TUPS-K-02-2011-E-N-ENG CONTENTS 1. Introduction....... 2. Status

More information

Cm Pelet-set - touch TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT

Cm Pelet-set - touch TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT CENTROMETAL d.o.o. Glavna 12 40306 Macinec Croatia tel: +385 40 372 600; fax : +385 40 372 611 TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT Cm Pelet-set - touch (60-90 kw) For boilers: EKO-CK

More information

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17 MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17 CE Tested by the DIN EN 13240 15a B-VG Austria Type 1 Color Emajl d.o.o. Alaginci 87 a 34000 Požega Croatia www.color.hr team@color.hr 1 Attention!

More information

PER-EKO type KSW & KSW PLUS Instruction Manual

PER-EKO type KSW & KSW PLUS Instruction Manual TABLE OF CONTENTS INTRODUCTION..... 3 1. GENERAL INFORMATION..... 3 1.1. Application.. 3 1.2. Fuel..... 3 1.3. Dimensions & technical parameters........ 4 2. BOILER TECHNICAL SPECIFICATION...... 4 2.1.

More information

TECHNICAL AND OPERATIONAL DOCUMENTATION

TECHNICAL AND OPERATIONAL DOCUMENTATION METAL AND BOILER FACTORY 28-100 Busko-Zdrój, Owczary, ul Przemysłowa 3 Tel No +4841 378 46 19, fax +4841 370 83 10 TECHNICAL AND OPERATIONAL DOCUMENTATION SAS MULTI FLAME BURNER ADAPTED FOR BURNING OF

More information

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO .Technical specifications Boiler power DESCRIPTION Water content in a boiler Required draft Supply

More information

Installation, operation and care Firewood boiler Vedolux 40 UB

Installation, operation and care Firewood boiler Vedolux 40 UB Installation, operation and care Firewood boiler Vedolux 40 UB 2008-09-23 Ver 2 Replaces: 05-11 VEDOLUX 40 UB Notes 0809 To be completed when the Vedolux 40 UB is installed Serial number:... Installation

More information

Boiler. Fire tube Boiler:

Boiler. Fire tube Boiler: Boiler What is Boiler? A closed metallic vessel in which the water is heated beyond the boiling temperature by the application of heat by the combustion of fuels to convert it into steam. The function

More information

Installation, operation and care. Pellmax UB. Burner not included Replaces:

Installation, operation and care. Pellmax UB. Burner not included Replaces: Installation, operation and care Burner not included 2011-11-11 ver: Replaces: Contents 11.11 otes...3 General...4 Function...4 Technical data...5 System principle Pellmax with radiator and tank-in-tank

More information

it warms us up! PRICE LIST

it warms us up! PRICE LIST warms us up! 09.2018 PRICE LIST Production Company Heiztechnik is a modern factory that produces boilers for burning solid fuels from 3,9 kw do 7 MW and complete container boiler rooms and other heating

More information

English. Heating with logs & wood pellets 20-40

English. Heating with logs & wood pellets 20-40 English Heating with logs & wood pellets 20-40 1 Competence is our succes HERZ FACTS: 22 companies Group headquarters in Austria Research & development in Austria Austrian owner 2.400 employees in more

More information

INSTRUCTION. for installation and operation of solid fuel fireplace

INSTRUCTION. for installation and operation of solid fuel fireplace INSTRUCTION for installation and operation of solid fuel fireplace SKLADOVA TEHNIKA Division Bitova tehnika 2 Ivan Momchilov St. 5100 Gorna Oryahovitsa CONTENTS 1.Introduction...3 2.Assembling of the fireplace...3

More information

HERZ ECO-Line Heating with logs or wood pellets

HERZ ECO-Line Heating with logs or wood pellets English HERZ ECO-Line Heating with logs or wood pellets Lambda 18-40 10-60 1 Competence is our success... HERZ FACTS: 50 companies Group headquarter in Austria Research & development in Austria Austrian

More information

Eligibility criteria

Eligibility criteria Accelerated Capital Allowances Eligibility Criteria Ref. No.: HWG 3.3 Category: Heating and Electricity Provision Technology: Boilers and Water Heaters Boilers and Water Heaters are defined as advanced

More information

C Bali R. Cast-iron boilers with atmospheric gas-fired burner. Life-enhancing heat

C Bali R. Cast-iron boilers with atmospheric gas-fired burner. Life-enhancing heat C 083-03 Bali R Cast-iron boilers with atmospheric gas-fired burner Life-enhancing heat GB Cast-iron boilers with atmospheric gas-fired burner Bali R Easy installation Silent operation Long life Wide range

More information

Instruction manual. GP45 cs. for installation and operation of Automatic pellet burner. p. 1/56

Instruction manual. GP45 cs. for installation and operation of Automatic pellet burner.  p. 1/56 Instruction manual for installation and operation of Automatic pellet burner GP45 cs http:// www.greenecotherm.eu p. 1/56 Producer Address ZMM Haskovo Plc. Bulgaria, Haskovo 6300, Saedinenie 67 blvd. Phone

More information

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating Pellet Boilers High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW Future of Ecological Heating Why choose an Ekoheat boiler? Ekopower is an innovative

More information

Smart Fire. pellets burning automatic boiler. Operation manual

Smart Fire. pellets burning automatic boiler. Operation manual Operation manual pellets burning automatic boiler Smart Fire This manual shall be kept by the user. Obey thoroughly instruction found here to facilitate long and safe operation of the boiler and preserve

More information

Rocket heater GAMERA

Rocket heater GAMERA Rocket heater GAMERA High efficiency heater on hard fuel Manufacturer: AGNON Ltd., Bulgaria Hissarya, 4 Han Kubrat STR. +359 885 525 464 WWW.GAMERA.EU ROCKETGAMERA@GMAIL.COM ATTENTION! Read the following

More information

The iqe Boiler Range. Combination and System T Boilers.

The iqe Boiler Range. Combination and System T Boilers. The iqe Boiler Range Combination and System T Boilers www.iqe.co.uk iqe - Max Technology Max Efficiency iqe is a select group of partners that have come together to create a unique product range of highly

More information

Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1

Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1 Gasification boiler PYROLYT INSTRUCTION MANUAL ver. 1.1 THERMOSTAHL would like to thank and congratulate you on your purchasing this boiler device and ensure that you have made a good choice. PYROLYT boiler

More information

Eco Angus Wood Pellet Boilers

Eco Angus Wood Pellet Boilers Eco Angus Wood Pellet Boilers ISO 9001 ISO 14001 1 Contents 3 Our product philosophy 3 Our approach 3 Manufacturing credentials 4 Orligno 400 4 Boiler construction 5 Boiler description 5 Burner 6 Technical

More information

DEVRON SERIES MULTI FUEL FIRED GASIFICATION HOT WATER BOILERS DEVRON-30, DEVRON-40 OPERATION, USE AND MAINTENANCE MANUAL

DEVRON SERIES MULTI FUEL FIRED GASIFICATION HOT WATER BOILERS DEVRON-30, DEVRON-40 OPERATION, USE AND MAINTENANCE MANUAL DEVRON SERIES MULTI FUEL FIRED GASIFICATION HOT WATER BOILERS DEVRON-30, DEVRON-40 OPERATION, USE AND MAINTENANCE MANUAL Rev A: JUNE 2017 INDEX 1- INTRODUCTION... 3 2- WARNINGS... 3 3- DECLARATION OF CONFORMITY...

More information

SERVICE AND INSTALLATION MANUAL FOR CENTRAL HEATING BOILER BENEKOV R100

SERVICE AND INSTALLATION MANUAL FOR CENTRAL HEATING BOILER BENEKOV R100 SERVICE AND INSTALLATION MANUAL FOR CENTRAL HEATING BOILER BENEKOV R100 1 Dear customer, thank you for purchasing the automatic boiler BENEKOV R100 and the confidence in the products manufactured by BENEKOVterm

More information

Laddomat. Mixing valves for solid fuel boilers. Version 1.01

Laddomat. Mixing valves for solid fuel boilers. Version 1.01 Laddomat Mixing valves for solid fuel boilers Version 1.01 Laddomat > Mixing valves for solid fuel boilers Why Laddomat This is the answer to those who burn wood or pellets and wonder why you should complement

More information

Operating manual. Pellet boiler. Orlan Pellet ISO 9001

Operating manual. Pellet boiler. Orlan Pellet ISO 9001 Operating manual Pellet boiler Orlan Pellet ISO 9001 Contens 1. Boiler s use...................................................................... 3 2. Boiler s way of working...........................................................

More information

USERS MANUAL FOR GAS BOILERS

USERS MANUAL FOR GAS BOILERS USERS MANUAL FOR GAS BOILERS PLEASE READ THE MANUAL CAREFULLY: IT CONTAINS IMPORTANT INFORMATION REGARDING SAFETY, INSTALLATION, USE AND MAINTENANCE OF THE APPLIANCE MODELS: NOVADENS 24 NOVADENS 24C NOVADENS

More information

Rozp.UE2015/ kw kw

Rozp.UE2015/ kw kw Rozp.UE2015/1189 7 kw - 7000 kw Production Company Heiztechnik is a modern factory that produces boilers for burning solid fuels from 3,9 kw do 7 MW and complete container boiler rooms and other heating

More information

HEATING TECHNIQUE PRODUCT CATALOGUE

HEATING TECHNIQUE PRODUCT CATALOGUE HEATING TECHNIQUE PRODUCT CATALOGUE about us Dear Colleagues, dear present and future users of our products A high quality product, effective use of the energy, protection of the environment and very satisfied

More information

PE1 Pellet. PE1 Pellet. Pellet boiler - Canada. PE1 Pellet APPROVED FOR EPA 2020 EMISSION LIMITS.

PE1 Pellet. PE1 Pellet. Pellet boiler - Canada. PE1 Pellet APPROVED FOR EPA 2020 EMISSION LIMITS. PE1 Pellet PE1 Pellet Pellet boiler - Canada PE1 Pellet Awarded the APPROVED FOR EPA 2020 EMISSION LIMITS Austrian Ecolabel! www.froeling.com 1 Heating with pellets For more than 50 years Froling has specialised

More information

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF PELLET BOILER OF SERIES BISOLID

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF PELLET BOILER OF SERIES BISOLID MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF PELLET BOILER OF SERIES BISOLID 20 July 2017 CONTENT page. 1. IMPORTANT INFORMATION ABOUT THE PELLET BOILER OPERATION... 3 1.1. SAFETY INSTRUCTIONS...

More information

GENERAL RULES. Ensure that the installation of your product conforms to all the indications given below. English CHIMNEY STACK

GENERAL RULES. Ensure that the installation of your product conforms to all the indications given below. English CHIMNEY STACK 1.0 GENERAL RULES DT2010216-05 Ensure that the installation of your product conforms to all the indications given below. Fig. 1 CHIMNEY STACK SINGLE FLUEWAY OR CHIMNEY CONNECTION TO FLUE SOOT INSPECTION

More information

Aquaflam Wood boiler stoves and fireplace inserts

Aquaflam Wood boiler stoves and fireplace inserts www.hsflamingo.com Aquaflam Wood boiler stoves and fireplace inserts AQUAFLAM wood boiler stoves and fireplace inserts from the HS Flamingo workshop have many above-standard features. These innovative

More information

modern heating devices

modern heating devices PELLET AND WOOD-FIRED BOILERS modern heating devices www.hkslazar.pl PELLET BOILERS SMART FIRE thermal efficiency 92,1% ceramic burner The top-class materials used in the burner guarantee long-lasting

More information

USE AND INSTALLATION MANUAL

USE AND INSTALLATION MANUAL EN USE AND INSTALLATION MANUAL COD.8901112700 1. GENERAL INFORMATION... 4 1.1. Symbols used in this manual... 4 1.2. Proper appliance use... 4 2. GUARANTEE TERMS... 6 2.1. Warnings... 6 2.2. Exclusions...

More information

REV.01 /

REV.01 / REV.01 / 2012 123794 CAUTION! Observe the safety instructions of this installation and maintenance manual before placing the boiler in operation. If an unqualified person carries out installation, adjustment,

More information

Domestic Gas Safety Assessments (DGA) Competency Assessment Certification Scheme for Registered Gas Installers

Domestic Gas Safety Assessments (DGA) Competency Assessment Certification Scheme for Registered Gas Installers Domestic Gas Safety Assessments (DGA) Competency Assessment Certification Scheme for Registered Gas Installers Issue 1 September 2013 Public Version REFERENCE: QUERIES TO: CER/13/273 Paul Tierney (ptierney@cer.ie)

More information

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE CONTROL

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE CONTROL MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE CONTROL PASSPORT OF ELECTRIC BOILER WITH THREE STAGE CONTROL ECOTERMAL MRT/MODULE-T 6, 8, 10, 12, 15, 18, 24, 30

More information

W W W. A T T A C K. S K

W W W. A T T A C K. S K Combined boiler ATTACK WOOD&PELLET for WoOd and pellets INSTRUCTIONS FOR USE W W W. A T T A C K. S K CONTENTS CONTENTS... 2 1. GENERAL INFORMATION... 4 1.1 INTRODUCTION... 4 1.2. SAFETY... 4 1.3 BOILER

More information

Installation and operation manual for pellet boiler TANGRA HP 30. Manufactured in accordance with standard: - EN Rev.

Installation and operation manual for pellet boiler TANGRA HP 30. Manufactured in accordance with standard: - EN Rev. Installation and operation manual for pellet boiler TANGRA HP 30 Manufactured in accordance with standard: - EN 303-5 Rev. 04-2014-03-28 User manual TANGRA HP30 - Rev. 04-2014-03-28 2 Content 1. Introduction...

More information

Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H

Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H 1. 2. 3. 4. 5. 6. 7. Fire box door Ash pan door Air inlet control Fuel drawer Side flue gas connector Oven door with double glass Protective cover for

More information

WOOD CHIP HEATING HPK-RA

WOOD CHIP HEATING HPK-RA WOOD CHIP HEATING HPK-RA -60 Wood Chip Heating HPK-RA -60 TÜV certified 8 0 9 7 Efficiency of all boilers on full and part load operation more than 90%. 6 WOOD CHIP BOILER HPK-RA Description Cell wheel

More information

Wood log boiler HVS. Solarbayer Gasifying wood log boiler. Ecological hea ng with highest comfort! HVS E ECONOMIC HVS LC.

Wood log boiler HVS. Solarbayer Gasifying wood log boiler. Ecological hea ng with highest comfort! HVS E ECONOMIC HVS LC. Solarbayer Gasifying wood log boiler Wood log boiler HVS Ecological hea ng with highest comfort! HVS E ECONOMIC HVS LC LAMBDA CONTROL Solarbayer GmbH Am Dörrenhof 22 85131 Pollenfeld Preith Telefon: +49(0)8421/93598

More information

BW Type Solid Fuel Boilers Installation and Maintenance Instructions

BW Type Solid Fuel Boilers Installation and Maintenance Instructions BW Type Solid Fuel Boilers Installation and Maintenance Instructions This Installation and Maintenance Instructions contain important information for the safe and correct installation, start-up and trouble-free

More information

Cm Pelet-set TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT. (14-35 kw) For boilers: EKO-CKB P (EKO-CKB 20-40)

Cm Pelet-set TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT. (14-35 kw) For boilers: EKO-CKB P (EKO-CKB 20-40) TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT Cm Pelet-set (14-35 kw) For boilers: EKO-CK P 20-40 (EKO-CK 20-40) EKO-CKB P 20-40 (EKO-CKB 20-40) TUPS-M-11-2015-E-N-ENG CONTENTS 1. Introduction.....

More information

robus thinking alternative ENERGY

robus thinking alternative ENERGY robus ENERGY alternative thinking The UK distributor and service partner for the Black Star Range of boilers. Denmark s No.1 selling pellet boiler. robus ENERGY alternative thinking Wood pellet boilers

More information

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders Operation and maintenance manual for the KSP Spark series boilers equipped with feeders Thank you for purchasing PEREKO heating boiler. This documentation applies to the KSP Pelet boilers with fuel feeder

More information

Forward-looking and energy effi cient Biomass heating

Forward-looking and energy effi cient Biomass heating English Forward-looking and energy effi cient Biomass heating 349-499 kw Large buildings Hotel complexes Housing estate projects 1 Competence is our success... HERZ FACTS: 50 companies Group headquarter

More information

Installation instructions PYROMAT ECO. for contractors PYROMAT ECO GB 8/2012 Dispose after installation.

Installation instructions PYROMAT ECO. for contractors PYROMAT ECO GB 8/2012 Dispose after installation. Installation instructions for contractors PYROMAT ECO PYROMAT ECO 8/2012 Dispose after installation. Safety instructions Please follow these safety instructions closely to prevent accidents and material

More information

WOOD CHIP HEATING HPK-RA

WOOD CHIP HEATING HPK-RA HPK-RA -60 HPK-RA -60 TÜV certified 8 0 9 7 Efficiency of all boilers on full and part load operation more than 90%. 6 WOOD CHIP BOILER HPK-RA DESCRIPTION Cell wheel Wood chip burner in high-quality heat-resistant

More information

Olymp Werk GmbH c/o Grouped Renewables Ltd. PO Box 7180, Montrose DD10 0WX Tel: +44 (0) Web:

Olymp Werk GmbH c/o Grouped Renewables Ltd. PO Box 7180, Montrose DD10 0WX   Tel: +44 (0) Web: Introduction 2 Biomass Boilers Wood, Pellet, Chip -4 Oil Boilers 5-6 Thermal Solar 8 Pressurisation Units 10 One4All Heat Centre 7 Energy Saving Radiators 9 Combined Pressurisation and Degassing Units

More information

Cm Pelet-set (60-90 kw)

Cm Pelet-set (60-90 kw) CENTROMETAL d.o.o. Glavna 12 40306 Macinec Croatia tel: +385 40 372 600; fax : +385 40 372 611 TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT Cm Pelet-set (60-90 kw) For boilers: EKO-CK P

More information

Page 1. Cube Ref:

Page 1. Cube Ref: Page 1 Cube Ref: 388117 Linedrawing: Technical characteristics: Unit dimensions (cm) Fire box dimensions (cm) Flue Diameter Flue outlet Recommended fuel Log size loading from the front: Panoramic glass

More information

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A Remeha Fuel oil/gas boilers EN Installation and Service Manual 300016859-001-A 63115 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It

More information

PELMAX HEATING BOILER FOR SOLID FUEL

PELMAX HEATING BOILER FOR SOLID FUEL PELMAX HEATING BOILER FOR SOLID FUEL INSTALLATION, SERVICE AND MAINTENANCE MANUAL OF THE BOILER Member of the NIBE Group 21683 Issue 06.2012 Changes reserved Installation, service and maintenance manual

More information

General instructions for the Installation and use of wood-burning stoves

General instructions for the Installation and use of wood-burning stoves NOTICE General instructions for the Installation and use of wood-burning stoves CONFORMING TO THE EUROPEAN STANDARD EN13240 All our appliances conform to the standards in force and meet the safety requirements.

More information

Pellet boiler Electronic Modulation Automatic Cleaning Grinder system Easy Installation 4 power levels: 10, 16, 25, 43 kw

Pellet boiler Electronic Modulation Automatic Cleaning Grinder system Easy Installation 4 power levels: 10, 16, 25, 43 kw Pellet boiler Electronic Modulation Automatic Cleaning Grinder system Easy Installation 4 power levels: 0, 6, 5, 4 kw CLASS IN EN 0/5 Innovation with meaning BioClass NG IN EN 0/5 CLASS DOMUSA has managed

More information