VIADRUS P7C Manual for boiler operation and installation

Size: px
Start display at page:

Download "VIADRUS P7C Manual for boiler operation and installation"

Transcription

1 VIADRUS P7C Manual for boiler operation and installation GB_2016_50 GB_2015_47

2 Content: p. 1 Boiler Use and Advantages Technical parameters of the boiler Description Boiler Construction Location and installation Regulations and guidelines Placement options Putting into operation instructions for contractual service organization Delivery and accessories Installation procedure Installation of boiler drum Dismantling the boiler shell Cleaning tools mounting Boiler hydraulic diagram Electrical wiring diagram Verification activities before the boiler commissioning Putting into operation Control, regulation and safety elements Device for removing excess heat Equipment for heat exhausting accumulating reservoir Operating Instructions Boiler operation by user Control elements description Firing Operation Boiler cleaning - maintenance Fault conditions IMPORTANT NOTICE Instructions for the product disposal after its useful life period Warranty and liability for defects This manual is the original operating and installation manual. 2

3 Dear Customer, Thank you for purchasing a pyrolytic solid fuel boiler VIADRUS P7C and thus showing your confidence in the company VIADRUS a.s. For the correct way of handling your new boiler, please read the instructions for its use (especially the Chap. 6 Operating Instructions, Chap. 7 Boiler cleaning Maintenance and Chap. 9 Important warnings). Please follow the current information and take notice of instructions issued by the manufacturer or installation company that installed your boiler so that the long-life trouble-free operation of your boiler can be guaranteed both to your and our satisfaction. 1 Boiler Use and Advantages Boiler trade name: VIADRUS P7C- Boilers type code: P7C-S22D-X 1.X 2; P7C-S30D-X 1.X 2; P7C-S38D-X 1.X 2 S standard 22; 30; 38 boiler output in kw D wood X 1 revision in the current year year of the product launch X 2 The boiler VIADRUS P7C is a pyrolytic low-pressure cast iron boiler for lump wood, designed especially for heating houses. VIADRUS P7C control is solved by automatic regulation, using a lambda sensor for continuous regulation of combustion air supplied to the boiler to make the combustion most efficient. Burning of other materials (e.g. plastic) is forbidden. Boiler Advantages: ecological operation; high efficiency; high lifetime of the Czech cast iron heat exchanger; sophisticated manufacturing technology on the automatic forming lines with consistent and approved quality of the production process (ISO 9001, ISO ). performance grading according to the number of sections; simple operation and maintenance. preheating of the primary and secondary air; use of the lambda sensor for regulating the combustion air. 2 Technical parameters of the boiler Tab.. 1 Dimensions and technical parameters of the boiler Boiler type code S22D S30D S38D Boiler weight kg Water content l Flue socket diameter mm 160 Inner smoke pipe diameter mm 156 Stoking chamber volume l Boiler dimensions: width x height mm 740x1434 depth mm Stoking chamber depth mm Maximum water operating pressure kpa (bar) 400 (4) Minimum water operating pressure kpa (bar) 50 (0.5) Test water overpressure kpa (bar) 800 (8) Boiler hydraulic loss (at T 20 K) mbar Inlet water lowest temperature at the boiler inlet water connection C 50 Cold water temperature C 10 Overpressure for the relief heat exchanger (DBV 1-02) bar 6 Water temperature control range (in the regulator) C Noise level db Doesn t exceed level 65 db (A) Chimney draught mbar Boiler connections heating water DN 50 return water DN 50 Supply voltage 1/N/PE 230V AC 50 Hz TN - S Electric power consumption W 60 Electric power consumption in standby mode W 4 Electrical protection IP40 3

4 Tab.. 2 Thermal technical parameters of the boiler VIADRUS P7C Boiler type code: S22D S30D S38D Rated power kw Fuel consumption at rated output kg.h Fuel calorific power MJ.kg Fuel type Lump wood - hard Burning time h min. 2 Efficiency % Flue gas temperature at the outlet C Flue gas mass flow at the outlet kg.s -1 Boiler class in accordance with EN The values shown in Tab. 1 and Tab. 2 were measured during tests carried out using a prescribed fuel. ATTENTION! Low fuel quality can significantly affect the boiler output and emission parameters. Boiler type code S22D S30D S38D L [mm] L1 [mm] L2 [mm] L3 [mm] Fig.. 1 Main dimensions of the boiler 4

5 VIADRUS P7C-S22D Condensing boiler no Cogeneration solid fuel fired boiler no Combined boiler no Fuel Preferred fuel (only one type): Other suitable fuel: Wood logs, the moisture content 25% yes no Wood chips, moisture content 15-35% no no Wood chips, moisture content > 35 % no no Pressed wood in the form of pellets or briquettes no no Sawdust, moisture content of 50% no no Other wood biomass no no Non-wood biomass no no Hard coal no no Lignite (including briquettes) no no Coke no no Anthracite no no Briquettes from a mixture of fossil fuels no no Other fossil fuels no no Briquettes from a mixture of the biomass (30-70%) and no no fossil fuels Other mixture of biomass and fossil fuels no no Properties when operated on the preferred fuel: Seasonal energy efficiency of the inner space heating ƞ s [%]: 80 Energy Efficiency Index EEI: C Name Designatio n Value Unit Name Designatio n Value Unit Useful heat output Useful efficiency - at rated heat output P n 22 kw - at rated heat output ƞ n 83.9 % - at [30%/50%] rated heat - at [30%/50%] rated heat P output, if applicable p - kw output, if applicable ƞ p - % Cogeneration solid fuel fired boiler: Consumption of auxiliary electrical power: Electrical efficiency at rated - at rated heat output el max kw heat output ƞ el, n - % - at [30%/50%] rated heat output, if applicable el min - kw - built-in secondary equipment to reduce kw emissions, if applicable - in standby mode P SB kw Contact information VIADRUS a.s. Bezručova 300 Bohumín

6 VIADRUS P7C-S38D Condensing boiler no Cogeneration solid fuel fired boiler no Combined boiler no Fuel Preferred fuel (only one type): Other suitable fuel: Wood logs, the moisture content 25% yes no Wood chips, moisture content 15-35% no no Wood chips, moisture content > 35 % no no Pressed wood in the form of pellets or briquettes no no Sawdust, moisture content of 50% no no Other wood biomass no no Non-wood biomass no no Hard coal no no Lignite (including briquettes) no no Coke no no Anthracite no no Briquettes from a mixture of fossil fuels no no Other fossil fuels no no Briquettes from a mixture of the biomass (30-70%) and no no fossil fuels Other mixture of biomass and fossil fuels no no Properties when operated on the preferred fuel: Seasonal energy efficiency of the inner space heating ƞ s [%]: 80 Energy Efficiency Index EEI: C Name Designatio n Value Unit Name Designatio n Value Unit Useful heat output Useful efficiency - at rated heat output P n 38 kw - at rated heat output ƞ n 81.8 % - at [30%/50%] rated heat - at [30%/50%] rated heat P output, if applicable p - kw output, if applicable ƞ p - % Cogeneration solid fuel fired boiler: Consumption of auxiliary electrical power: Electrical efficiency at rated - at rated heat output el max kw heat output ƞ el, n - % - at [30%/50%] rated heat output, if applicable el min - kw - built-in secondary equipment to reduce kw emissions, if applicable - in standby mode P SB kw Contact information VIADRUS a.s. Bezručova 300 Bohumín

7 3 Description 3.1 Boiler Construction 1 Boiler drum 2 Ash door 3 Stoking door 4 Shell with fan 5 Heating water flange 6 Return water flange 7 Sealing 8 Ceramic nozzle 9 Left ceramics 10 Right ceramics 11 Upper ceramics 12 Servomotor flanges 13 Belimo actuators 14 Two-way safety valve DBV Plug 1/2 16 Connecting hose 17 Discharge valve 18 Spring bracket 19 Spring 20 Lambda sensor 21 Round sealing cord 22 Round sealing cord 23 Left side part of the shell 24 Right side part of the shell 25 Shell rear part 26 Shell rear right part 27 Shell rear left part 28 Shell front lower part 29 Shell front middle part 30 Control box 31 Handle 32 Shell upper part 33 Flap rod Fig.. 2 Main part of the boiler 7

8 The main part of the boiler VIADRUS P7C is cast iron sectional boiler drum made of grey cast iron according to EN 1561, quality 150. Pressure parts of boiler correspond to strength requirements according to EN The boiler drum is assembled of individual sections by means of pressed boiler inserts with 56 mm diameter and secured by anchor bolts. Sections create the feed space, combustion and ash space, water space and convective part of the boiler. Heating water outlet and inlet is located in the rear part of the boiler and is performed through two flanges with the outer thread G 2 for the connection to the heating system. Outlet with the thread G 1/2 is used to install the drain tap. Flue adapter fitted with channels for air preheating is connected to the rear section of the boiler. The lid with interposed insulation is connected to the smoke adapter; the lid prevents cooling of air preheated in the channels. The exhaust fan shell is connected to the smoke adapter. To clean the smoke adapter, three cleaning holes are placed along its perimeter, which ensure easy cleaning of the convection surface of the boiler rear section. The stoking and ash door are mounted to the front section. The air flowing into the boiler is regulated by the Belimo flaps located on the flanges, which are attached to the smoke adapter lid. The whole boiler drum is insulated by using a harmless mineral insulation which reduces losses by sharing heat into the surroundings. The steel shell is coloured by high-quality komaxit coat of paint. 4 Location and installation 4.1 Regulations and guidelines Boiler meets the following standards: EN ISO 12100:2011 Safety of machinery - General principles for design - Risk assessment and risk reduction EN 953+A1:2009 Safety of machinery - Protective covers - General requirements for the design and construction of fixed and movable protective covers CSN ISO 1819:1993 Equipment for continuous transport of cargo. Safety regulations. General provisions CSN ISO 11202:2010 Acoustics - Noise emitted by machinery and equipment - Determination of emission sound pressure levels at work stations and at other specified locations using approximate correction to the environment EN ISO 3746:2011 Acoustics - Determination of sound power levels and sound energy levels of noise sources using sound pressure Survey method using an enveloping measurement surface over a reflecting plane EN 303-5:2013 Boilers for central heating Part 5: Boilers for central heating for solid fuels, manually and automatically stocked, with nominal heat output of up to 500 kw Terminology, requirements, testing and marking. CSN :1997 Fire safety of heat installations EN 62233:2008 Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to human exposure EN ed. A1 Safety of electrical appliances for household and similar purposes. Part 1: General requirements EN :2007 Heating boilers - Test regulations for airborne noise emissions from heat generators - Part 1: Airborne noise emissions from heat generators. The boiler may be installed by a company holding a valid certification for its installation and maintenance. For the installation, a project must be elaborated in accordance with applicable regulations. The heating system must be filled with water that meets the requirements of CSN and especially its hardness must not exceed the required parameters. Tab.. 3 Recommended values Hardness mmol/l 1 Ca 2+ mmol/l 0.3 Concentration of total Fe + Mn mg/l (0.3)* *) recommended value ATTENTION!!! The manufacturer does not recommend to use antifreeze. 8

9 a) to the heating system CSN CSN CSN EN b) on the chimney CSN c) regarding the fire regulations CSN EN A1 Heating systems in buildings Design and installation Heating systems in buildings Safety devices Water and steam for thermal energy equipments with working pressure up to 8 MPa. Boilers for central heating Part 5: Boilers for central heating for solid fuels, manually and automatically stocked, with nominal heat output of up to 500 kw Terminology, requirements, testing and marking. Chimneys and connecting flue pipes Design. Fire safety of heat installations. Fire classification of construction products and building structures Part 1: Classification using data from reaction to fire tests. d) to the system for the HW heating CSN Heating systems in buildings - Hot water preparation - Design and projection. CSN Heating systems in buildings Safety devices. CSN Internal water piping e) to the power supply network CSN Electrical regulations. Identification of conductors by colours or numerals. Procedure provisions CSN Electrical regulations. Revision of electrical equipments. CSN ed. 2 Low-voltage electrical installations Part 1: Fundamental principles, assessment of general characteristics, definitions. CSN ed. 2 Low voltage electrical installations - Part 4-41: Protection for safety - Protection against electric shock CSN ed. 3 Electrical installations of buildings Part 5-51: Selection and erection of electrical equipment Common rules CSN ed. 2 Low-voltage electrical installations Internal electric distribution lines CSN Electrical regulations. Connection of electric instruments and appliances. CSN ed. 2 Safety requirements for flexible cords and cables EN Explosive atmospheres Part 10-1: Classification of areas Explosive gas atmospheres EN ed.3 Explosive atmospheres - Part 14: Electrical installations design, selection and erection EN ed. 2 Capacitors for AC motors Part 1: In general Design, testing, dimensioning Safety requirements Instructions for installation and operation. EN ed.2 Electric appliances for household and similar purposes Safety Part 1: General requirements EN Electric appliances for household and similar purposes Safety Part 2-102: Special demands on appliances containing the electric connections and burning the gas, oil and solid fuels EN ed. 4 Basic and safety principles for man-machine interface, marking and identification Identification of equipment terminals, conductor terminations and conductors EN ed. 2 Electromagnetic compatibility (EMC) - Part 6-3: Generic standards Emission standard for residential, commercial and and light industrial environments. EN ed. 3 Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current 16 A per phase). EN ed. 2 (ed. 3 Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current 16 A per phase and not subject to conditional connection. 9

10 4.2 Placement options When installing and using the boiler, all requirements of CSN must be complied with. The boiler positioning in the living space (including corridors) is prohibited! The boiler is approved for the basic environment AA5/AB5 according to CSN ed. 2. The boiler is equipped with the movable mains supply and plug. According to EN ed. 2 p , the boiler must be located so that the plug is accessible. The boiler positioning with regard to fire regulations: 1. Placement on the floor made of incombustible material place the boiler on a fireproof and heat-insulating base exceeding the boiler dimensions on the sides by 20 mm. if the boiler is installed in a cellar, we recommend to install it on a substructure at least 50 mm high. The boiler must stand horizontally, possible unevenness of the substructure is eliminated by means of adjusting screw of the motor mount. 2. Safe distance from flammable materials when installing and operating the boiler it is necessary to keep the safe distance of 200 mm from flammable materials with combustibility grade A1, A2, B and C (D); for easily flammable materials with combustibility grade E (F), which burn quickly and by themselves also after the ignition source removal (e.g. paper, cardboard, asphalt and tar boards, wood and fibreboards, plastics, flooring materials), the safe distance is doubled, that is 400 mm; the safe distance is to be doubled also when the fire reaction class is not proven. Tab.. 4 Fire reaction class Fire reaction class Examples of building materials and products classified to the fire reaction class (a choice from EN A1) A1 incombustible granite, sandstone, concrete, bricks, ceramic tiles, mortars, fire plasters,... A2 combustible with difficulty acumin, izumin, heraklith, lignos, boards and basalt felt, fibreglass boards,... B hardly combustible beech and oak wood, hobrex boards, plywood, werzalit, gypsum plasterboard, sirkolit,... C (D) medium combustible pinewood, larch, whitewood, chipboard and cork boards, rubber flooring,... E (F) easily combustible asphalt board, fibreboards, cellulose materials, polyurethane, polystyrene, polyethylene, PVC, Boiler positioning with regard to the necessary handling space: basic environment AA5/AB5 according to ČSN ed. 2, min mm handling space must be left in front of the boiler; of the boiler; minimum distance between the boiler rear side and wall is 400 mm; a gap min. 800 mm is left on the side of fuel tank in case of the feed screw removal; minimum distance from the side wall is 100 mm; at least 450 mm must be left above the boiler for cleaning the convection surface of the heat exchanger. The boiler positioning with regard to electrical network (mains): The boiler must be placed in such a way that the plug in socket (230V/50Hz) is always accessible. Placing of fuel: dry fuel has to be used in order to ensure its proper burning in the boiler. Fuel stored in cellar or at least sheltered is recommended by the manufacturer; it is prohibited to store the fuel behind the boiler or next to the boiler in the distance shorter than 400 mm; the manufacturer recommends to keep the distance between the boiler and the fuel min mm or store the fuel in a different room than the boiler is installed. Continuous air supply for burning and eventual ventilation must be provided into the room where the boiler is installed (the air consumption of the boiler VIADRUS P7C is about 75 m 3. h -1 ). Connection of the heating system piping or the heating element heater piping must be performed by authorized personnel. CAUTION: When connecting the boiler to the heating system, drain tap must be placed at the lowest point and as close to the boiler as possible. 10

11 Fig.. 3 The boiler positioning in boiler room 5 Putting into operation instructions for contractual service organization Putting into operation can be performed only by a contractual service company authorized to carry out this activity. 5.1 Delivery and accessories Standard equipment: boiler on the pallet in the box with the relevant number of sections including shell cleaning tools (cleaner, hook, brush with handle, spike) fan with shell 1pc accessories package 1pc electrical accessories package 1pc two-way safety valve DBV pc fill and drain tap 1/2 1 pc handling key 1pc BELIMO actuators 2 pc Actuators flanges 2 pc Heating water flange 1pc Return water flange 1pc Connecting hose 1pc Sales and technical documentation On request: Safety valve 1 pc Outside sensor CP6-P 1 pc Sensor CT4 length: 4m 1 pc Room controller ecoster pc Internet Module econet pc Bleeder valve 1 pc The boiler equipment ordered as "on request" is not included in the basic price of the boiler. 11

12 5.2 Installation procedure Installation of boiler drum 1. Set the boiler drum on the basement or foundation. 2. Disassemble right rear shell (13), left rear shell (12) and the lower rear shell (15). 3. Mount the return water flange (3). Install fill and drain tap (4) and the connecting hose (4) on the flange. Return water inlet must be connected to the heating system via a demountable joint. 4. Mount the heating water flange. Install the plug (7) and the two-way safety valve DBV 1-02 (6) at the heating water outlet. The valve can be mounted in a horizontal position only. Connect the free end of the connecting hose to the safety valve. Heating water outlet pipe must be connected to the heating system via a demountable joint. 5. Mount flanges for the flap actuator (8) at the cover of smoke adapter with screws M6x Adjust the flaps actuators (9) on the flanges so that the labeling of the flaps actuators and the flanges is consistent SAV-SAV, PAV- PAV. 7. Mount the fan with the shell (10) at the smoke adapter, before installing the shell it is necessary to apply mastic on the bearing joint between the shell and the smoke adapter. 8. Mount the rear parts of the boiler shell. 9. Connect the relevant electro. 10. Put the smoke pipe to the exhaust fan and insert into chimney hole. Smoke pipe diameter is given in Table. 1. When the flaps actuator are badly mounted, the boiler with operate incorrectly. 1 Boiler with the shell 2 Heating water flange 3 Return water flange 4 Fill and drain tap 5 Connecting hose 6 Two-way safety valve DBV Plug G ½ 8 Flaps actuators flange 9 Flaps actuators 10 Shell with fan 11 Sealing 12 Left rear shell 13 Right rear shell 14 Hose bracket 15 Lower rear shell Fig.. 4 Installation of boiler drum 12

13 5.2.2 Dismantling the boiler shell IMPORTANT NOTICE: Connect the lambda sensor to the module only when the boiler is not connected to the mains. 1. Before removing the shells, wiring of the fan and the flaps actuators must be first disconnected. 2. First, dismantle the connecting hose bracket (1), right rear shell (2), left rear shell (3) and lower rear shell (4). 3. Before removing the upper part of the shell with the control box (5), disconnect the wiring leading to the lambda sensor or unscrew the lambda sensor from the smoke adapter. When handling with the lambda sensor, take extra care to avoid damage. 4. Removing the middle front part of the shell (6). 5. Before dismantling the middle lower part, unscrew the self-tapping screws M5. Then dismantle the middle lower part of the shell (7). 6. Dismount the handle of the stoking flap rod (8). 7. Unscrew the bolts M5x10 (A), which fix the side shells to the boiler drum. 8. Dismounting of the shell side parts (9,10). 1 Hose bracket 2 Right rear shell 3 Left rear shell 4 Lower rear shell 5 Upper part of the shell with the control box Fig.. 5 Dismantling the shell 6 Front middle shell 7 Lower middle shell 8 Handle 9 Right side shell 10 Left side shell Cleaning tools mounting To mount or dismount the brush, point for the spike and the cleaner (if included), use common assembly tools and leather gloves. 13

14 5.3 Boiler hydraulic diagram 1 boiler, 2 ecomax regulator, 3 boiler pump, 4 storage vessel (Master), 5 auxiliary storage vessel (Slave), 6 auxiliary storage vessel (Slave), 7 charge pump of the auxiliary storage vessel, 8 discharge pump of the auxiliary storage vessel, 9 boiler temperature sensor type CT4, 10 main storage vessel temperature sensor (top) type CT4 (TBH), 11 main storage vessel temperature sensor (bottom) type CT4 (TBL), 12 heating circuit temperature sensor type CT4, 13 heating circuit temperature sensor type CT4, 14 heating circuit pump TO1, 15 heating circuit servo actuator TO1, 16 heating circuit pump TO2, 18 outdoor temperature sensor CT6-P, 19 ecoster room panel 200 with room thermostat functionality or traditional room thermostat connected to the ECOMAX regulator, 20 room temperature sensor type CT7 connected to ecoster200 (note: usage of the sensor type CT7 is not necessary if the set room temperature is uniform for the entire building), 21 auxiliary storage vessel temperature sensor type CT4, 22 main storage vessel temperature sensor (middle) type CT4 (TBM), 23 switching valve for zoned heating of the main storage vessel, 24 backup source, 25 HW circulating pump. Fig.. 6 Diagram with the storage tank - without additional modules, 14

15 Fig.. 7 CONTROL BOX CONTROL BOX Boiler circuit diagram 15 ecomax860d1-h CONTROL UNIT ecolambda MODULE 2 HC1 SENSOR HW SENSOR STORAGE TANK UPPER SENSOR STORAGE TANK BOTTOM SENSOR OUTDOOR SENSOR HC1 ROOM THERMOSTAT ZERO BRIDGE LAMBDA SENSOR PRIMARY AIR FLAP HC1 PUMP BOILER PUMP HW PUMP HW CIRCULATION PUMP HC2 PUMP DISCHARGE PUMP OF THE AUXILIARY STORAGE TANK SECONDARY AIR FLAP TERMINAL PLATE HC1 THREE-WAY VALVE HC2 THREE-WAY VALVE SAFETY BRIDGE Conductor colours: bk black bn brown bu blue gnye yellow-green ye yellow gn green gy grey wh white rd red pk pink og orange SAV X1 Y1 Y5 B9 BTr1 N O2 PAV Q1 Q2 Q3 Q4 Q6 Q11 B41 A4 B1 B3 B4 Key: A1 5.4 Electrical wiring diagram

16 CONTROL BOX COVER CONTROL BOX Fig.. 8 CONTROL BOX COVER Boiler electric diagram 16 Exit 12Vss B21 B40 BT1 BTr2 D MV X1 X5 X6 X7 X8 X10 X11 X12 X13 X14 X15 Key: A1 A6 B2 B6 B8 ecomax860d1-h CONTROL UNIT ecoster200 ROOM DVICE BOILER SENSOR HC2 SENSOR AUXILIARY STORAGE TANK SENSOR SAFETY THERMOSTAT OUTDOOR SENSOR MIDDLE STORAGE TANK SENSOR HC2 ROOM THERMOSTAT BOILER CONTROL PANEL FAN MOTOR TERMINAL PLATE Q1 CONNECTOR Y1 CONNECTOR Q3 CONNECTOR Q2 CONNECTOR BTr1 CONNECTOR B1 CONNECTOR B3 CONNECTOR B4 CONNECTOR B41 CONNECTOR B9 CONNECTOR SAFETY BRIDGE

17 5.5 Verification activities before the boiler commissioning Before the boiler commissioning it is necessary to check: 1. Filling the heating system with water (check thermomanometer) and tightness of the system. The heating system must be thoroughly flushed in order to wash out all impurities that can be deposited in distribution and heating elements and can cause damage to the pump. Water for filling the boiler and heating system must be clear and colourless, without suspended solids, oil and aggressive chemicals. Its hardness must comply with CSN and in case the hardness does not suit, water must be treated. Even the multiple heating of water with the higher hardness does not exclude salts depositing on the walls of the boiler dram. Settlement of 1 mm calcite reduces the heat transfer at a given point from the metal to water by 10%. Heating systems with the open expansion tank allow direct contact of the heating water with atmosphere. During the heating season the water expanding in the tank absorbs oxygen, which increases the corrosive effects while there is a considerable evaporation of water. To refill, only water treated according to CSN may be used. During the heating season it is necessary to keep a constant volume of water in the heating system. When refilling the heating system with water it must be ensured that no air is sucked into the system. Water from the boiler and the heating system must never be discharged or taken for usage except for the emergency cases like repairs etc. Water discharge and filling with new water increases the danger of corrosion and scale development. If it is necessary to refill water in the heating system, refill water only into the cold boiler in order to prevent damage of the exchanger. 2. Connection to the chimney this connection can be made only with the agreement of a chimney firm (chimney revision). 3. Connection of the two-way safety valve DBV Connection to the mains. 5. Tightness of the stoking and ash door: Boiler type code S22D S30D S38D L [mm] L1 [mm] L2 [mm] L3 [mm] Fig.. 9 Connecting dimensions of the boiler 17

18 5.6 Putting into operation 1. Fire the boiler. 2. Bring the boiler to the necessary operating temperature. The recommended output water temperature is 80 C. 3. Turn on the exhaust fan. 4. Check the two-way safety valve DBV 1-02 function. 5. Operate the boiler in operating condition according to relevant standards. 6. Check again the boiler tightness. 7. Familiarize users with the boiler operation and maintenance. 8. Make a record to the warranty card. 5.7 Control, regulation and safety elements Manometer - is used to detect water pressure in the boiler. Safety thermostat (irreversible) - serves to protect the boiler against overheating. It is set to 95 C. In case of failure, it is necessary to deactivate the safety thermostat manually after cooling of the boiler. Activation of the safety thermostat switches off the exhaust fan, it is signalled by the orange light on the control box panel. 1 Control panel of the ecomax 860 regulator 2 Thermomanometer 3 Fuse 4 Boiler marking Obr. č. 1 The control box with the ecomax 860 regulator 5.8 Device for removing excess heat The two-way safety valve DBV 1-02 serves to remove excess heat in case the water temperature in the boiler exceeds 95 C. If the system is equipped with the two-way safety valve DBV 1-02 and the boiler becomes overheated (outlet water temperature is higher than 95 C), the two-way safety valve creates cold water circuit until the time the temperature drops below the limit temperature. At this moment, the discharge cooling equipment and the cold water inlet for the system refilling are simultaneously closed. A - cold water inlet B - output to the boiler C - output to the drain D - input from the boiler Fig.. 10 Two-way safety valve DBV

19 Specifications of the two-way safety valve DBV 1-02 (from Regulus) Opening temperature (limit): 100 C (+0-5 C) Maximum temperature: 120 C Maximum pressure on the boiler side: 400 kpa (4 bar) The maximum pressure on the water side: 600 kpa (6 bar) Nominal flow at p 100 kpa (1 bar): 1.9 m 3 /h Use Two-way safety valve DBV 1-02 is designed for central heating boilers protection against overheating. In the valve drum, the discharge and refill valves are controlled by thermostatic element. When achieving the limit temperature the discharge and refill valve open simultaneously, which means that cold water flows into the boiler while hot water is drained from the boiler. When the temperature drops below the limit, the discharge and filling valves are closed simultaneously. ATTENTION! Do not replace the safety valve. In case of reaction of the two-way safety valve, when there could be refilled water that does not conform to CSN , it is necessary to adjust water in the system so that it again conforms to this standard. 1 Boiler 2 Two-way safety valve DBV Safety valve 4 Reducing valve 5 Filter 6 Ball valve Fig.. 11 Installation 19 7 Pump 8 Excess heat removal 9 Fill and drain tap I Cold water inlet II Heating water outlet III Return water inlet Recommended diagram of the two-way safety valve DBV 1-02 connection Installation may only be performed by a qualified person. For proper operation of the thermostatic two-way safety valve it is necessary to comply with the prescribed conditions for its installation and respect the flow directions indicated on its body. The safety valve is always mounted in the outlet pipe of the boiler or directly on the boiler in its upper part where the heated water leaves boiler and is transported into the heating system. When installing the valve, it is necessary to check whether the use of the 3/4 socket, which can be both in the pipeline and on the boiler, ensures complete immersion of the valve thermostatic element after the valve installation. After mounting into the socket, at the point "C" (see Fig. 9), the discharge pipe is connected through which the hot water from the boiler will flow to drain. At the point "A" (see Fig. 9), the supply of cooling water is connected (Fig. 10), which ensures cooling the boiler down after the valve putting into operation. At the cooling water inlet, a filter to remove mechanical impurities must be installed. At the point "B" (see Fig. 9) there is connected the pipeline, which according to Fig. 10 leads to the return line of the heating system near the boiler. Regular maintenance Check 1x per year, turn the safety valve head to remove possible contaminants seated in the valve. Clean the filter at the cooling water inlet. Important It is not possible to reverse flows, so it is necessary to observe the filling and draining indication on the valve.

20 5.9 Equipment for heat exhausting accumulating reservoir We require connection of the pyrolytic boiler with storage tanks. Benefits: Lower fuel consumption (by 20-30%), the boiler is running at full power until the fuel burnout and optimum efficiency High service life of the boiler and the chimney - minimum production of tars and acids The combination of the heating elements with underfloor heating More comfortable heating Ecological heating Possible combination with other ways of heating Calculation of the smallest capacity of the accumulating heat exchanger, where: V sp Q N T b Q H Q min accumulating reservoir capacity in liters nominal heat power in kw combustion time in hours buildings heat load in kw smallest heat power in kw V sp = 15T b x Q N (1-0,3 x (Q H /Q min )) The sizes of the accumulating reservoir have to be determined on the basis of the boiler power and the used fuel. The biggest capacity has to taken into consideration, whereas the minimum used capacity of the reservoir has to be 300 l. In case that the reservoir is fully charged, it is necessary to shut down the boiler and heat up by heat from the accumulating reservoir. After the heat is spent in the reservoir, put the boiler into operation again. The accumulating reservoir enables provision of heat comfort and at the same time the boiler operation. ATTENTION! Failure of it will cause extreme pollution of the boiler drum. Hydraulic schemes of the boilers with an accumulating reservoir are at disposal in the project materials of Viadrus at 6 Operating Instructions Incorrect operation and improper combustion of fuel leads to damage to the product. During the first firing of the cold boiler, water condenses therein, which flows down the inner walls. The condensation of water on the boiler stops once the boiler reaches the operating temperature. When operating the boiler at the temperature lower than 60 C, water can condense on the boiler drum, that can lead to the so called low-temperature corrosion, which shortens the life of the boiler exchanger. Therefore we recommend to operate the boiler at 60 C and higher. Guarantee of the clean and good combustion is using only dry natural wood. To achieve the rated output of the boiler, wood moisture content must be max. 20%. If the wood moisture content is higher than 20%, the boiler output declines. Damp wood burning releases water which condenses on the walls of the boiler and the chimney, this leads to an increased formation of tar and water vapour, which reduces the life of the heat exchanger. Additionally, improper combustion leads to occurrence of aggressive agents that cause decrease of the heat-bearing surfaces wall thickness, which may also cause perforation of the exchanger. Fuel must be stored in a dry place. For heating, do not use plastics, household waste, chemically treated wood residues, waste paper, wood chips, brushwood, waste from pressed sheets of bark or chipboard. Follow the instructions for the boiler operation. When operating the boiler follow the recommended operating temperature. When operating the boiler, use only approved fuel. 20

21 Recommended dimensions of wood blocks Dry split wood logs, diameter from 80 to 150 mm. Length according to Table 5 Tab.. 5 Log length Boiler type code S22D S30D S38D L [mm] Calorific power MJ /kg Moisture % Manufacturer's note: The boiler performance and operation is guaranteed at max. moisture up to 20% During the damp wood combustion, the boiler does not operate in the gasification mode, this leads to the performance reduction, emission deterioration and flue gas condensation in the boiler. These factors shorten the life of the boiler and chimney. Fig.. 12 Location of the fuel in the boiler 6.1 Boiler operation by user Operating instructions of the ECOMAX 860 D control unit are supplied separately Control elements description 1. "MENU" button 2. Positioning button and "ENTER button 3. "EXIT" button Fig.. 13 Panel view The value of the adjusted parameter can be increased or decreased by turning the positioning button. This is an element for the quick control of the regulator. By pressing this button, select the parameter you wish to correct or confirm the pre-set value. The regulator is activated by pressing the button, then the regulator switches to the STOP working mode Firing 1. Check the water volume in the heating system on the manometer. 2. Open the shut-off valves between the boiler and the heating system. 3. Check mechanical function of the shorting flap. 4. Clean the boiler drum, passages between the segments on the nozzle, sweep the ashes out of the ceramics in the bottom door and suck the ashes out of ribbing of the sections. 5. Connect the ecomax 860 D control unit to the mains. The unit is in the Standby mode. By pressing the button, select the function Activate regulator. The regulator is in Stop phase. 6. Put the kindling on the nozzle through the stoking door - small timber and dry smaller chips and paper on it. 7. Ignite the kindling in the funnel. 8. Let the kindling flare. 21

22 9. Stoke smaller chips to the fire so that to increase the intensity of the flame at a slight opening of the door. If the flame intensity is sufficient, press MENU and put the control unit into operation by selecting MENU FIRING. With the activation of the FIRING mode, the fan turns on, providing sufficient airflow to fire the boiler. After the firing time expiration or reaching the preset temperature of the boiler, the WORK mode is automatically activated. 10. Open the shortening flap, push the positioning button on the regulator and select "STOKING", wait 5-10 s, open the stoking door and refuel to the entire volume of the funnel. 11. Close the door and the shorting flap and select "WORK by pressing the knob. 12. If the outlet water temperature exceeds the set production value of 40 C for 30 min., the boiler firing was successful and the automatic operation of the boiler is switched. If not, repeat the procedure Operation 1. Set the desired output temperature of the boiler (55 87 C, the manufacturer recommends 80 C). The preset temperature of the boiler can be adjusted by changing the following parameters: MENU Boiler setting Boiler set temperature Note: The set temperature of the boiler can be automatically adjusted according to the needs of the control unit, if it is too low, it will automatically increase in order to preheat boiler with HW and ensure a constant temperature for all heating circuits of the mixers. 2. According to heat needs and burning intensity, it is necessary to refuel during the boiler operation. At each stoking, it is necessary to select the STOKING function on the control unit, wait 10 seconds to exhaust the flue gas, slowly open the stoking door, add fuel to the entire volume of the funnel, close the door and select the WORK function by pressing the button. 3. After firing, heat the boiler at full power (at 2-4 loadings) at a given volume of the storage tank to C, then let the boiler burn out. Then you can take heat from the tank (storage tank) by means of the three-way valve during the time corresponding to the size of the storage tank. 7 Boiler cleaning - maintenance The manufacturer recommends regular annual service inspection, which is necessary to ensure the safe operation of the boiler, maintain sustained high boiler efficiency and durability of its components. ATTENTION! Perform cleaning only before firing and only with the cold furnace. 1. Clean the boiler drum, sweep the ashes out of the nozzle hole and the funnel space, sweep the ashes out of the ceramics in the bottom door and suck the ashes out of ribbing of the sections. It must be done before each firing. Do not pull out the nozzle and the funnel lining. 2. The ash must be put into incombustible containers with lids. During the work, it is necessary to use protective equipment and ensure personal safety. 3. After the heating season, it is necessary to clean the boiler flue gas passages and the fan impeller. 4. After the heating season, treat the pivots of all doors. Cleaning of the boiler drum, the combustion chamber and the smoke adapter: - First, turn on the exhaust fan, open the stoking door and sweep the ashes through the slot into the combustion chamber of the boiler drum. - Remove ashes and unburned pieces of fuel from the combustion chamber by means of the cleaner. - Before cleaning the smoke adapter, it is necessary to remove the rear parts of the shell (1). Then, unscrew two upper cleaning covers (2) and clean the flue gas passage by means of the brush. After cleaning, it is necessary to open the bottom cleaning hole and suck the ashes (2) with the vacuum cleaner (3). - Clean the vents of the boiler drum with the brush. Brush of polyamide cannot be used at higher temperatures (cleaning must be performed only with the cold boiler drum). - Clean (sweep) the inside part of the door from ash and soot. 22

23 1. Rear shell 2. Cleaning covers 3. Vacuum cleaner Fig.. 14 Cleaning of the boiler drum and combustion chamber 8 Fault conditions Malfunction Cause Correction measure The boiler output is too low Excessive amount of condensate is formed in the stoking area of the boiler. Exhaust fan does not rotate or is too noisy Beware! Non-rotating fan leads to incomplete combustion and the formation of tar deposits The calorific value of fuel is insufficient, fuel moisture is higher than 20% Clogged or deformed fan propeller Reversible fan Clogged nozzle Failure to comply with the operating conditions Incorrect or too wet fuel Low boiler water temperature Only when the fan does not rotate: The maximum boiler temperature is reached The fan motor or starting capacitor are defective The fan propelled is sintered Use prescribed fuel with the prescribed moisture value Clean the fan propeller or replace it Checking the direction of the fan rotation Clean the nozzle hole by the fire poker Check transport pressure, return line temperature Use prescribed or dry fuel At the control unit, check / raise the minimum boiler water temperature and ensure the minimum return line temperature of 60 C by appropriate adjusting of the the mixing valve Fault did not occur! The boiler is working properly. Exhaust fan starts when opening the stoking door. Too much fuel loaded Fan or capacitor have to be replaced by a specialist company. Clean the fan propeller from the tar and deposits, when damage is detected, replace the fan propeller 23

24 9 IMPORTANT NOTICE he boiler may only be used for the intended purposes. The boiler can be operated only by adults familiar with this instruction manual. Do not leave unattended children near the operated boiler. The boiler is not intended for use by persons (including children) whose physical, sensory or mental disability or lack of experience and knowledge prevents them from using the appliance safely, if they are not supervised or were not instructed to use the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance. If there is a danger of development and penetration of combustible vapours or gases into the boiler room or at works with temporarily developed fire or explosion danger (gluing the floorings, painting with flammable paints etc.), the boiler must be put out of operation before such works. It is forbidden to use flammable liquids for the boiler firing. Flame control is done by opening the upper door. However it must be borne in mind that in this state there is an increased danger of sparks flying into the boiler room space. After performing the flame visual check, the door must be closed. During the boiler operation it is forbidden to overheat it in any way. Do not put any objects made of flammable materials on the boiler and within a distance smaller than the safe distance from the boiler. When removing the ash from the boiler, no flammable substances must be at the minimum distance of 1500 mm from the boiler. The ash must be put into incombustible containers with lids. After the heating season, it is necessary to clean the boiler including the flue pipe. The boiler room must be kept clean and dry. It is forbidden to interfere with construction and electrical installation of the boiler. ATTENTION! Low fuel quality can significantly affect the boiler output and emission parameters. When mounting, installation and operation of the appliance it is necessary to meet the standards valid in the relevant destination country. Connect the lambda sensor to the module only when the boiler is not connected to the mains. In case of failure to comply with these conditions, warranty repairs cannot be claimed. The list of contractual service organizations is attached separately. 10 Instructions for the product disposal after its useful life period VIADRUS a.s. is the contract partner of the company EKO-KOM a.s. with the client number F The packaging complies with EN The packaging should be disposed of as follows: - plastic foil, cardboard package - use the special waste collection point - metal tightening tape - use the special waste collection point - wooden base is intended for single use and cannot be further used as a product. Its disposal is subject to the law 477/2001 Sb. and 185/2001 Coll. as amended. Individual parts of the boiler should be disposed of as follows: - exchanger (grey cast iron) - use the special waste collection point - piping, shell - use the special waste collection point - other metal parts - use the special waste collection point - insulation material ROTAFLEX - through a firm dealing with waste collection and disposal In case of loosing the use properties of the product, back collection service can be used (if applicable), in case the manufacturer states it is waste, the waste should be disposed according to the valid legislation of the country. 24

25 11 Warranty and liability for defects For its boilers, VIADRUS a.s. provides basic warranty for the period of 24 months from the date of purchase, max. 30 months from date of shipment from the factory. Condition for the warranty is compliance with the instructions for installation, mainly: Connection according to the manufacturer's wiring diagrams performed by a mounting or installation company with a valid installation certificate. Putting into operation by a service company with a valid service certificate. Compliance with the instructions included in the boiler operation and installation manual. Performance of periodic inspections set by the manufacturer by a service company with a valid service certificate. Usage of the original spare parts supplied by the manufacturer. Sending information on the boiler putting into operation (sent by the end user - the consumer) to the manufacturer. In particular, it is necessary to specify when and by whom the boiler was put into operation and the precise address of the boiler operation. VIADRUS a.s. provides an extended warranty on the boiler drum for a period of 60 months from the date of purchase, max. 66 months from date of shipment from the factory. Condition for recognition of the extended warranty period is: Fulfilment of conditions for recognition of the basic warranty period. Sending information on the boiler putting into operation (sent by a service company - the consumer) to the manufacturer. Performance of the regular service inspections to the extent prescribed by the manufacturer, by the service company with a valid service certificate. For any claim regarding the shell the customer is obliged to submit the packaging label of the boiler shell. It is located on the cardboard in which the shell is dispatched. User is obliged to entrust fault rectification to a contractual service accredited by VIADRUS, otherwise the guarantee for boiler proper function is not valid. If the boiler is operated in accordance with the instructions provided in the "Boiler operation and installation manual", the boiler does not require any special service interventions. "Certificate of quality and completeness of the boiler VIADRUS P7C" serves as the "Warranty card after its filling. The user is obliged to perform regular maintenance of the boiler. Each notice of defect must be made immediately after its finding always in writing and by a telephone agreement. In case of failure to comply with these guidelines, the warranty will not be recognized by the manufacturer. The manufacturer reserves the right to make changes within the product innovations that need not be included in this manual. The guarantee does not apply to: - defects caused by improper mounting and improper operation of the product and faults caused by improper maintenance see Chap. 8 - product damage during transport or other mechanical damage; - defects caused by failure to observe water quality in the heating system see Chapter 4.1 and 5.3 or by using antifreeze; - defects caused by improper storage; - defects caused by the boiler operation with the non-prescribed fuel (see Tab. 3 and 4). - defects caused by failure to follow instructions provided in this manual; - defects caused by natural disaster or force majeure. 25

26 26

HERCULES U 32 Manual for boiler operation and installation

HERCULES U 32 Manual for boiler operation and installation HERCULES U 32 Manual for boiler operation and installation GB_2017_20 GB_2015_46 Content p. 1 Boiler Use and Advantages... 3 2 Technical parameters of the boiler... 3 3 Description... 5 3.1 Boiler Construction...

More information

VIADRUS A2C Manual for boiler operation and installation

VIADRUS A2C Manual for boiler operation and installation VIADRUS A2C Manual for boiler operation and installation GB_2016_31 GB_2016_28 Content: page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 4 3 Description... 8 3.1 Boiler

More information

VIADRUS A0C Manual for boiler operation and installation

VIADRUS A0C Manual for boiler operation and installation VIADRUS A0C Manual for boiler operation and installation GB_2016_31 GB_2016_28 Content: page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 4 3 Description... 11 3.1 Boiler

More information

VIADRUS U 22 Manual for boiler operation and installation

VIADRUS U 22 Manual for boiler operation and installation VIADRUS U 22 Manual for boiler operation and installation GB_2017_14 LP GB_2015_24 Contents page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 3 3 Description... 4 3.1 Construction

More information

PANTHER P Automatic Boiler Operator's Manual

PANTHER P Automatic Boiler Operator's Manual KOVARSON s.r.o. Lhota u Vsetína 4 755 01, Vsetín tel. CZ: +420 571 420 926 tel. SK: +421 949 176 717 email: info@kovarson.cz PANTHER P Automatic Boiler Operator's Manual - 1 - Dear Customer, Thank you

More information

VIADRUS HERCULES U 24 Manual for boiler operation and installation

VIADRUS HERCULES U 24 Manual for boiler operation and installation VIADRUS HERCULES U 24 Manual for boiler operation and installation GB_2014_21 Table of contents page 1. Technical information... 3 1.1 Usage... 3 1.2 Boiler advantages... 3 1.3 Boiler technical data...

More information

VIADRUS HERCULES U26 ECO Manual for boiler operation and installation

VIADRUS HERCULES U26 ECO Manual for boiler operation and installation VIADRUS HERCULES U26 ECO Manual for boiler operation and installation GB_2015_21 GB_2016_48 Table of contents: page 1 Boiler use and advantages... 3 2 Boiler technical data... 3 3 Description... 6 3.1

More information

VIADRUS A0C Manual for boiler operation and installation

VIADRUS A0C Manual for boiler operation and installation VIADRUS A0C Manual for boiler operation and installation GB_2017_30 GB_2016_28 Content page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 3 3 Description... 6 3.1 Boiler structure...

More information

VIADRUS HERCULES U 26 Manual for boiler operation and installation

VIADRUS HERCULES U 26 Manual for boiler operation and installation VIADRUS HERCULES U 26 Manual for boiler operation and installation GB_2016_48 2010 GB_ 2015_20_model 2010 Table of contents: page 1 Boiler use and advantages... 3 2 Boiler technical data... 3 3 Description...

More information

VIADRUS A0C Manual for boiler operation and installation

VIADRUS A0C Manual for boiler operation and installation VIADRUS A0C Manual for boiler operation and installation GB_2017_45 LP GB_2016_28 Content page 1 Usage and advantages of the boiler... 3 2 Technical data of the boiler... 3 3 Description... 5 3.1 Boiler

More information

VIADRUS HERCULES Hercules U U26 AND INSTALLATION

VIADRUS HERCULES Hercules U U26 AND INSTALLATION VIADRUS HERCULES Hercules U U26 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALLATION Table of contents: page 1. Boiler use and advantages... 3 2. Boiler technical data... 3 3. Description... 8

More information

HERCULES Gre H e e n rc E u c l o e s T e 2 r 6

HERCULES Gre H e e n rc E u c l o e s T e 2 r 6 HERCULES Green Hercules Eco Therm U26 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALATION Contents: page 1. Produced variants of boiler... 3 2. Technical data of the boiler... 4 3. Boiler description...

More information

Hercules U2 LIGNAT 6

Hercules U2 LIGNAT 6 Hercules LIGNATOR U26 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALLATION Table of contents: page 1. Boiler use and advantages... 3 2. LIGNATOR boiler technical data... 4 3. Description... 7 3.1

More information

UNI. Cast-iron solid fuel boiler. Installation and operating instructions

UNI. Cast-iron solid fuel boiler. Installation and operating instructions UNI Cast-iron solid fuel boiler Installation and operating instructions Rev. June 2010 Content: 1. Introduction 2. Characteristics of boilers 3. Technical parameters 4. Delivery and accessories 5. Location

More information

VIADRUS CLAUDIUS K 2 Manual for boiler operation and installation

VIADRUS CLAUDIUS K 2 Manual for boiler operation and installation VIADRUS CLAUDIUS K 2 Manual for boiler operation and installation GB_2016_43 GB_2016_35 Content p. 1 Manufactured boiler versions... 3 2 Boiler Uses and Advantages... 3 3 Specifications... 4 4 Boiler description...

More information

VI He ADrcules U26 RUS G 350 CALOR SRL -

VI He ADrcules U26 RUS G 350 CALOR SRL   - VIADRUS Hercules G U26 350 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALLATION Table of contents: page 1. Boiler use and advantages... 3 2. Boiler VIADRUS G 350 technical data... 4 3. Description...

More information

SERVICE AND INSTALLATION MANUAL FOR CENTRAL HEATING BOILER BENEKOV R100

SERVICE AND INSTALLATION MANUAL FOR CENTRAL HEATING BOILER BENEKOV R100 SERVICE AND INSTALLATION MANUAL FOR CENTRAL HEATING BOILER BENEKOV R100 1 Dear customer, thank you for purchasing the automatic boiler BENEKOV R100 and the confidence in the products manufactured by BENEKOVterm

More information

PELLETS BURNER 15-60kW MOC

PELLETS BURNER 15-60kW MOC PELLETS BURNER 15-60kW MOC. Please read those documentation before first start up the unit. Improper burner start may lead to its damage and may create a danger for end user! Table of Contents: 1. Admission

More information

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN To respected customer, We are very pleased for your trust and your decision to buy our product. You made a good choice,

More information

SOLID FUEL HEATING UNIT TYPES NPS 35 AND NPS 70 ORIGINAL INSTRUCTION MANUAL

SOLID FUEL HEATING UNIT TYPES NPS 35 AND NPS 70 ORIGINAL INSTRUCTION MANUAL SOLID FUEL HEATING UNIT TYPES NPS 35 AND NPS 70 ORIGINAL INSTRUCTION MANUAL 1. General information The Original Instruction Manual constitutes an integral and material part of the product, and is to be

More information

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4 Wood gasification process... Wood as a fuel... Boiler construction - its elements...4 Boiler construction - materials...4 EKO advantages...4 Boiler construction - schematics... Boiler dimensions... Boiler

More information

SAUNA HEATER INSTALLATION AND OPERATING MANUAL

SAUNA HEATER INSTALLATION AND OPERATING MANUAL SAUNA HEATER INSTALLATION AND OPERATING MANUAL Type Stoveman 13 Models 13R; 13R-M; 13; 13-M; 13R-LS; 13R-M-LS; 13-M-LS; 13-LS Heating output in the sauna room 15.4 kw Sauna room cubage 6-13 m³ Fuel Wood

More information

Hercu Wle o s o U dp2

Hercu Wle o s o U dp2 Hercules Woodpell U26 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALLATION Table of contents: page 1. Produced variants of boiler...3 1.1 Order...3 2. Use and advantages of boiler...3 3. Boiler

More information

USER MANUAL 9kW LILLY PELLET STOVE

USER MANUAL 9kW LILLY PELLET STOVE USER MANUAL 9kW LILLY PELLET STOVE Table of Contents.Overview of Stove Parts... 2.Technical Characteristics... 3 3.Important Information... 4 4.Pellet Specification...5 5.Technology... 6 6.Installation...

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service

More information

Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1

Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1 Gasification boiler PYROLYT INSTRUCTION MANUAL ver. 1.1 THERMOSTAHL would like to thank and congratulate you on your purchasing this boiler device and ensure that you have made a good choice. PYROLYT boiler

More information

W W W. A T T A C K. S K

W W W. A T T A C K. S K Combined boiler ATTACK WOOD&PELLET for WoOd and pellets INSTRUCTIONS FOR USE W W W. A T T A C K. S K CONTENTS CONTENTS... 2 1. GENERAL INFORMATION... 4 1.1 INTRODUCTION... 4 1.2. SAFETY... 4 1.3 BOILER

More information

MCL-BIOMIX. multifuel boiler with mixing mechanism kw FUELS MAIN FEATURES

MCL-BIOMIX. multifuel boiler with mixing mechanism kw FUELS MAIN FEATURES MCLBIOMIX multifuel boiler with mixing mechanism 811.046 kw MCLBIOMIX is an automatic biomass boiler with a mixing system for light fuel, such as woodchips, sawdust and cereals. The boiler is equipped

More information

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF PELLET BOILER OF SERIES BISOLID

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF PELLET BOILER OF SERIES BISOLID MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF PELLET BOILER OF SERIES BISOLID 20 July 2017 CONTENT page. 1. IMPORTANT INFORMATION ABOUT THE PELLET BOILER OPERATION... 3 1.1. SAFETY INSTRUCTIONS...

More information

1. Order and Auxiliaries

1. Order and Auxiliaries VIADRUS Hercules G U26 90 MANUAL FOR ASSEMBLY Návod OF BOILER k obsluze Contents: page 1. Order and Auxiliaries...3 1.1 Order...3 1.2 Delivery a accessories...3 2. Boiler Uses and Advantages...4 3. VIADRUS

More information

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve Connection and energy management compact unit 2850 series ACCREDITED CALEFFI 01259/14 GB ISO 9001 FM 21654 ISO 9001 No. 0003 Function The connection and energy management compact unit enables combining

More information

PER-EKO type KSW & KSW PLUS Instruction Manual

PER-EKO type KSW & KSW PLUS Instruction Manual TABLE OF CONTENTS INTRODUCTION..... 3 1. GENERAL INFORMATION..... 3 1.1. Application.. 3 1.2. Fuel..... 3 1.3. Dimensions & technical parameters........ 4 2. BOILER TECHNICAL SPECIFICATION...... 4 2.1.

More information

Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H

Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H 1. 2. 3. 4. 5. 6. 7. Fire box door Ash pan door Air inlet control Fuel drawer Side flue gas connector Oven door with double glass Protective cover for

More information

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL Heating, Air Conditioning, Ventilation Отопление-Кондиционеры-Вентиляция MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL 1. Usage MTM 8-30 universal oil heater is designed for heating commercial rooms

More information

PELLET BURNER PV 350

PELLET BURNER PV 350 PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION

More information

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK CONTENTS EN ATTACK DPX THE WOOD GASIFYING BOILER... 4 1 INTRODUCTION... 6 2 3 4 1.1 GENERAL DESCRIPTION...

More information

Operation and installation manual

Operation and installation manual 1 Operation and installation manual. 2015.12.07 ORIGINAL MANUAL part 1/2 Dear User, To fully understand the principles of proper and economical operation of the boiler and to make it comfortable and safe,

More information

HE H R e C rc U u L le E s S U D 2 U 6

HE H R e C rc U u L le E s S U D 2 U 6 HERCULES Hercules DUO U26 MANUAL FOR BOILER Návod OPERATION k obsluze AND INSTALLATION Table of contents: page. 1. Use of boiler and its advantages...3 2. Boiler technical data...3 3. Description...7 3.1

More information

SOLID FUEL RANGE COOKERS TYPE 9105 TYPE 9107 OPERATION & MAINTENANCE MANUAL INSTALLATION MANUAL

SOLID FUEL RANGE COOKERS TYPE 9105 TYPE 9107 OPERATION & MAINTENANCE MANUAL INSTALLATION MANUAL SOLID FUEL RANGE COOKERS TYPE 9105 TYPE 9107 OPERATION & MAINTENANCE MANUAL INSTALLATION MANUAL TYPE 9105, 9107 07/2014 TYPE 9105, 9107 07/2014 1 OPERATION & MAINTENANCE MANUAL Dear customer, Thank you

More information

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A Remeha Fuel oil/gas boilers EN Installation and Service Manual 300016859-001-A 63115 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It

More information

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK FD PELLET yattack

More information

VIADRUS HERCULES ECO Manual for boiler operation and installation

VIADRUS HERCULES ECO Manual for boiler operation and installation VIADRUS HERCULES ECO Manual for boiler operation and installation GB_2015_11 SD Table of contents: page 1. Produced boiler variants...3 1.1 Purchase order...3 2. Boiler usage and advantages...3 3. Boiler

More information

MANUAL. Page 1/44

MANUAL.     Page 1/44 MANUAL FOR INSTALLATION AND OPERATION OF A HEATING SYSTEM, CONSISTING OF HOT WATER WOOD PELLET BOILER FROM SERIES PELLETHERM V4 AND AUTOMATED WOOD PELLET BURNER FROM SERIES GP IV http:// www.greenecotherm.eu

More information

THE WOOD GASIFYING BOILER ATTACK SLX PROFI / LAMBDA TOUCH INSTRUCTIONS FOR USE

THE WOOD GASIFYING BOILER ATTACK SLX PROFI / LAMBDA TOUCH INSTRUCTIONS FOR USE THE WOOD GASIFYING BOILER ATTACK SLX PROFI / LAMBDA TOUCH INSTRUCTIONS FOR USE W W W. A T T A C K. S K CONTENT 1 INTRODUCTION... 5 2 3 4 5 6 1.1 GENERAL DESCRIPTION... 5 1.2 DESCRIPTION OF MARKINGS OF

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20 INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8

More information

Installation & Manual. Model T-25

Installation & Manual. Model T-25 Installation & Manual TR Central Heating Stove With Solid Fuel Model T-25 Tested according to DIN EN 13240 For product efficiency and emission values, see the declaration of conformity! TABLE OF CONTENTS

More information

INSTRUCTIONS FOR INSTALLATION, SETTING AND USE

INSTRUCTIONS FOR INSTALLATION, SETTING AND USE BUILT-IN FIREPLACE INSTRUCTIONS FOR INSTALLATION, SETTING AND USE 1. BUILT-IN FIREPLACE SPECIFICATION - WIDE 730 mm - DEPTH 426 mm - HEIGHT 543 mm - NOMINAL POWER 11 KW - CHIMNEY POT DIAMETER Ø 180 mm

More information

Instructions for Operation and Maintenance of Containers

Instructions for Operation and Maintenance of Containers Instructions for Operation and Maintenance of Containers Container Handling 1. Containers are designed for transport on a flat loading area that is 2.5 m wide, which enables support of the load-bearing

More information

Combined boiler. for solid fuel and pellets

Combined boiler. for solid fuel and pellets Combined boiler ATTACK WOOD&PELLET for solid fuel and pellets W W W. A T T A C K. S K MODEL STRUC TURE OF THE AT TACK BOILERS THE NEW LINE OF ATTACK BOILERS FOR WOOD AND PELLETS 3000 000 6000 4 ATTACK

More information

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60 HG 675 X 60 HG 675 CX 60 HG 675 CN 60 HG 675 CW 60 1 2 1. : 93/68: 90/396: 2006/95/CE: 2004/108/CE: - 1935/2004:. 2002/95/CE: RoHS 2.,.,,,,...,. (,..)..,,.,. ( ),,, ;,,.,.....,.,,,,,,...,. (..),,.,..,.,,,,

More information

Ladan. Wood gasification boiler. Instruction for use, installation and assembly of boiler.

Ladan. Wood gasification boiler. Instruction for use, installation and assembly of boiler. Ladan Wood gasification boiler Instruction for use, installation and assembly of boiler. Content Content...2 General description...3 Technical parameters...4 Protection against boiler overheating...5 Dimensional

More information

MCL-BIO. Fuels. Main features. multifuel biomass boiler. group of companies

MCL-BIO. Fuels. Main features. multifuel biomass boiler. group of companies multifuel biomass boiler group of companies is an automatic pelletbiomasswood boiler for industrial use (811.16 kw). Thanks to its special design, it can function on multiple fuels without any change on

More information

MANUAL FOR ASSEMBLY OF BOILER VIADRUS G 300

MANUAL FOR ASSEMBLY OF BOILER VIADRUS G 300 MANUAL FOR ASSEMBLY OF BOILER VIADRUS G 300 Date of revision 8/2007 Contents: 1. Boiler use and advantages...3 2. VIADRUS GLADIATOR G 300 Boiler Technical Data...4 3. Generally...6 4. Boiler Installation...6

More information

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+ INSTALLATION AND OPERATING INSTRUCTIONS Ariterm 60+ CONTENTS General.... 2 Installation.... 4-5 Installation of temperature limit valve... 6 Measurements and connections... 7 Technical specifications and

More information

Heating with log wood

Heating with log wood English Heating with log wood De Luxe 18-40 Lambda 18-40 1 Competence is our success... HERZ FACTS: 60 subsidiaries Group headquarter in Austria Research & development in Austria Austrian owner 2.600 employees

More information

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER WITH RELAY CONTROL

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER WITH RELAY CONTROL MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER WITH RELAY CONTROL PASSPORT OF ELECTRIC BOILER WITH RELAY CONTROL ECOTERMAL MR 6, 8, 10, 12, 15, 22, 30 kw MX 37, 45, 52, 60 KW MODULE

More information

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders Operation and maintenance manual for the KSP Spark series boilers equipped with feeders Thank you for purchasing PEREKO heating boiler. This documentation applies to the KSP Pelet boilers with fuel feeder

More information

SOLID FUEL RANGE COOKER

SOLID FUEL RANGE COOKER SOLID FUEL RANGE COOKER TYPE 9101 OPERATION & MAINTENANCE MANUAL INSTALLATION MANUAL TYPE 9101 07/2014 1 TYPE 9101 07/2014 2 OPERATION AND MAINTENACE MANUAL Dear customer, Thank you for purchasing of the

More information

REV.01 /

REV.01 / REV.01 / 2012 123794 CAUTION! Observe the safety instructions of this installation and maintenance manual before placing the boiler in operation. If an unqualified person carries out installation, adjustment,

More information

BW Type Solid Fuel Boilers Installation and Maintenance Instructions

BW Type Solid Fuel Boilers Installation and Maintenance Instructions BW Type Solid Fuel Boilers Installation and Maintenance Instructions This Installation and Maintenance Instructions contain important information for the safe and correct installation, start-up and trouble-free

More information

ENAMELED INDIRECT WATER HEATERS

ENAMELED INDIRECT WATER HEATERS INSTRUCTIONS ENAMELED INDIRECT WATER HEATERS ST-300DE HEAT PUMPS Please read this manual carefully before installing the heater! Dear Customer, Sinclair Corporationt Ltd. thanks you for your decision

More information

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200. Issue 01

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200. Issue 01 CHESNEY S Bio-Ethanol Installation & User Manual model: EFB1200 Issue 01 1 2 Thank you for choosing this Chesney s Bio-Ethanol fire. Please read this information guide carefully in order to safely install,

More information

Wood logs boiler with a gasication eect IGNIS KW. INSTRUCTIONS MANUAL for usage and maintenance

Wood logs boiler with a gasication eect IGNIS KW. INSTRUCTIONS MANUAL for usage and maintenance Wood logs boiler with a gasication eect IGNIS 20-40 KW INSTRUCTIONS MANUAL for usage and maintenance Prhovacka bb 22310 Simanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs

More information

KALVIS-2-20, 2-25, 2-30, 2-40

KALVIS-2-20, 2-25, 2-30, 2-40 - 2 - Attention! Get acquainted with this technical certificate before installing the boiler.it will allow you to install the boiler correctly and to run it as efficiently as possible. 1. Technical data.

More information

Instruction manual - GB. Contents

Instruction manual - GB. Contents Instruction manual - Contents 1. Intended use 3 2. Technical specifications 3 Control panel for boilers with ventilator 4 Control panel for boiler DC15E 4 Advantages of boilers 5 3. Technical data 6 Boiler

More information

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i. Additional Operating Instructions SITRANS F Vortex flowmeters Ex-i Edition 09/2018 CONTENTS 1 Safety instructions 3 1.1 General notes... 3 1.2 EU conformity... 3 1.3 Approval according to the IECEx scheme...

More information

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200 with resevoir. Issue 01

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200 with resevoir. Issue 01 CHESNEY S Bio-Ethanol Installation & User Manual model: EFB1200 with resevoir Issue 01 1 2 Thank you for choosing this Chesney s Bio-Ethanol fire. Please read this information guide carefully in order

More information

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59 SOUND-INSULATED FAN OPERATION MANUAL _v.1(2)-en.indd 1 10.08.2015 15:20:59 CONTENT Introduction 3 General 3 Safety rules 3 Transport and storage requirements 3 Manufacturer's warranty 3 Fan design 4 Delivery

More information

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty.

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty. ARREDO E BENESSERE So old fashioned... An intelligent choice When on a cold winters night the warm glowing flames of the KALDUS boiler are there to welcome you back home, you will be pleased that you decided

More information

MANUAL FOR BOILER OPERATION AND INSTALLATION VIADRUS HERCULES U 24

MANUAL FOR BOILER OPERATION AND INSTALLATION VIADRUS HERCULES U 24 MANUAL FOR BOILER OPERATION AND INSTALLATION VIADRUS HERCULES U 24 Updating date 39/2007 Table of contents page 1. Technical information... 3 1.1 Usage... 3 1.2 Boiler advantages... 3 1.3 VIADRUS HERCULES

More information

INSTRUCTIONS FOR INSTALLATION AND USE OF ZINO 700,900,1100

INSTRUCTIONS FOR INSTALLATION AND USE OF ZINO 700,900,1100 INSTRUCTIONS FOR INSTALLATION AND USE OF ZINO 700,900,1100 English 09-2011 WARNING : THE SUPLIER TAKES NO RESPONSIBILITY FOR ANY POSSIBLE DAMAGE, POOR WORKING APPLIANCES AND ACCIDENT AS A RESULT OF INCORRECT

More information

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19 OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER Version DC19 1. Application. Controller RK-2006LPP is designed for temperature control of solid fuel fired water boilers

More information

Handling or using the product improperly and in disregard of the instructions with this mark might result in serious bodily injury or death.

Handling or using the product improperly and in disregard of the instructions with this mark might result in serious bodily injury or death. Please Read: Safety Precautions DC AC In order to ensure that this product is used safely, be sure that you read and understand the following precautions fully and use the product only as directed. Be

More information

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17 MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17 CE Tested by the DIN EN 13240 15a B-VG Austria Type 1 Color Emajl d.o.o. Alaginci 87 a 34000 Požega Croatia www.color.hr team@color.hr 1 Attention!

More information

Operation and maintenance manual. for the boilers with feeder: KSR Beta and KSR Beta Plus

Operation and maintenance manual. for the boilers with feeder: KSR Beta and KSR Beta Plus Operation and maintenance manual for the boilers with feeder: KSR Beta and KSR Beta Plus Thank you for purchasing PEREKO boiler. This technical documentation applies to feeder boilers from the KSR Beta,

More information

OPERATING INSTRUCTIONS with safety features

OPERATING INSTRUCTIONS with safety features Solid fuel boiler TKK3 with wood pellet burner TERMEC 70-90 KW OPERATING INSTRUCTIONS with safety features Prhova ka bb 22310 imanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs

More information

Cooker Hood Instruction Manual

Cooker Hood Instruction Manual Cooker Hood Instruction Manual Model number(s): RHSCH601SS/B & RHSCH901SS/B IMPORTANT: RETAIN FOR FUTURE REFERENCE Contents Safety Instructions. 3-6 Product Overview. 7 Positioning. 8 Operational modes.

More information

Solid fuel hot water boiler TKH KW INSTRUCTIONS MANUAL for usage and maintenance

Solid fuel hot water boiler TKH KW INSTRUCTIONS MANUAL for usage and maintenance Solid fuel hot water boiler TKH 250-400 KW INSTRUCTIONS MANUAL for usage and maintenance Prhovacka bb 22310 Simanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs April

More information

Operating and installation instructions for Fire Lotus H586

Operating and installation instructions for Fire Lotus H586 Operating and installation instructions for Fire Lotus H586 Version 1, 24 May 2016 Introduction Congratulations on your new Lotus Fire. We hope and believe that it will give you many hours of warmth.

More information

Operation and maintenance manual. for charging boilers: KSW Alfa, KSW Alfa Plus, KSW Master, KSW Prima

Operation and maintenance manual. for charging boilers: KSW Alfa, KSW Alfa Plus, KSW Master, KSW Prima Operation and maintenance manual for charging boilers: KSW Alfa, KSW Alfa Plus, KSW Master, KSW Prima Thank you for purchasing PEREKO boiler. This documentation applies to KSW ALFA, KSW ALFA PLUS, KSW

More information

USER S MANUAL. Centrifugal inline fan. VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125. VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315

USER S MANUAL. Centrifugal inline fan. VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125. VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315 USER S MANUAL VKMz 100 Q VKMz 100 VKMz 125 Q VKMz 125 VKMz 150 VKMz 160 VKMz 200 Q VKMz 200 VKMz 250 Q VKMz 250 VKMz 315 Q VKMz 315 Centrifugal inline fan VKMz CONTENTS Contents... 2 Safety requirements...

More information

1. Contents Principle General information Parts list Assembly Technical drawing... 18

1. Contents Principle General information Parts list Assembly Technical drawing... 18 1. Contents 1. Contents... 2. Principle... 2 3. General information... 3-7 4. Parts list... 8 5. Assembly... 9-17 6. Technical drawing... 18 2. Principle All instructions provided with products must be

More information

CALEFFI. Anti-condensation recirculation and distribution unit. 281 series 01224/14 GB. Replaces dp 01224/12 GB. Function

CALEFFI. Anti-condensation recirculation and distribution unit. 281 series 01224/14 GB. Replaces dp 01224/12 GB. Function Anti-condensation recirculation and distribution unit 8 series ACCREDITED ISO 900 FM 654 ISO 900 No. 000 CALEFFI 04/4 GB Replaces dp 04/ GB GB Function The anti-condensation recirculation and distribution

More information

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE W W W. A T T A C K. S K ATTACK DPX Wood gasifying boiler - Assembly, control heat up and attendance training is perfomed

More information

TECHNICAL PASSPORT INSTALLATION AND MAINTENANCE MANUAL

TECHNICAL PASSPORT INSTALLATION AND MAINTENANCE MANUAL Pellet boiler TECHNICAL PASSPORT INSTALLATION AND MAINTENANCE MANUAL SAFETY 1.1. Notes about this instruction This manual contains important information about proper installation, testing, use and maintenance

More information

ISO 9001 TUV CERT CE

ISO 9001 TUV CERT CE ISO 9001 TUV CERT CE INSTRUCTION MANUAL CONTENT 2 1. Boiler application 2. Principle of work 3. Description of the controller 3.1. Front panel of EKOSTER 2 3.2. Main functions of EKOSTER 2 4. Gasification

More information

INSTALLATION AND SERVICE INSTRUCTIONS. The biggest Czech producer of fi replace inserts. Accurate and precise design of details

INSTALLATION AND SERVICE INSTRUCTIONS. The biggest Czech producer of fi replace inserts. Accurate and precise design of details The biggest Czech producer of fi replace inserts Accurate and precise design of details BeF Home, s. r. o. Kotvrdovice 277 679 07 Kotvrdovice Tel.: 516/428 240 Fax: 516/428 244 IČO: 255246 The best price

More information

Index. Operating Instructions. Installation Instructions

Index. Operating Instructions. Installation Instructions Index Information on the boiler plate Boiler dimensions, Boiler packaging dimensions Technical parameters Introduction Ensuring safety of equipment and people, Head loses 2 3 4 5 6 Operating Instructions

More information

MODERATOR Vento Eko 15,20,25 kw

MODERATOR Vento Eko 15,20,25 kw MODERATOR Vento Eko 15,20,25 kw INSTRUCTION MANUAL Manufacturer: Moderator Sp. z o.o., 17-200 Hajnówka, ul. 11 -go Listopada 16a, Poland Tel. +48/85/682 75 20; 682/85/682 75 21, Fax +48/85/682 75 29 biuro@moderator.com.pl,

More information

USERS MANUAL FOR GAS BOILERS

USERS MANUAL FOR GAS BOILERS USERS MANUAL FOR GAS BOILERS PLEASE READ THE MANUAL CAREFULLY: IT CONTAINS IMPORTANT INFORMATION REGARDING SAFETY, INSTALLATION, USE AND MAINTENANCE OF THE APPLIANCE MODELS: NOVADENS 24 NOVADENS 24C NOVADENS

More information

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL CONTENT 3 Introduction 3 General 3 Safety rules 3 Storage and transportation rules 3 Manufacturer s warranty 4 Fan design 4 Delivery set 5 Technical data

More information

- 12, , TECHNICAL INSTRUCTIONS

- 12, , TECHNICAL INSTRUCTIONS HEATING TECHNIQUE Centrometal d.o.o. - Glavna, Macinec, Croatia, tel: +8 7, fax: +8 7 TECHNICAL INSTRUCTIONS for installation, use and maintenance of hot water boiler and installation of additional equipment

More information

VETO CLEANER 500 FLUE GAS CLEANER

VETO CLEANER 500 FLUE GAS CLEANER As of serial number 3100 0001 VETO CLEANER 500 FLUE GAS CLEANER USER MANUAL SPARE PARTS LIST Manufacturer: ALA TALKKARI Veljekset Ala-Talkkari Oy FI-62130 HELLANMAA TEL. +358 6 433 6333 FAX +358 6 437

More information

Operating manual. Pellet boiler. Orlan Pellet ISO 9001

Operating manual. Pellet boiler. Orlan Pellet ISO 9001 Operating manual Pellet boiler Orlan Pellet ISO 9001 Contens 1. Boiler s use...................................................................... 3 2. Boiler s way of working...........................................................

More information

User and maintenance manual

User and maintenance manual GB User and maintenance manual IMPORTANT SAFETY INSTRUCTIONS These instructions shall also be available on website: docs.whirlpool.eu. YOUR SAFETY AND THAT OF OTHERS IS HIGHLY IMPORTANT. This manual and

More information

TECHNICAL AND OPERATIONAL DOCUMENTATION

TECHNICAL AND OPERATIONAL DOCUMENTATION METAL AND BOILER FACTORY 28-100 Busko-Zdrój, Owczary, ul Przemysłowa 3 Tel No +4841 378 46 19, fax +4841 370 83 10 TECHNICAL AND OPERATIONAL DOCUMENTATION SAS MULTI FLAME BURNER ADAPTED FOR BURNING OF

More information

Service Manual. Unit: Pellet burner. Type: ROT-POWER. Models: kw, kw

Service Manual. Unit: Pellet burner. Type: ROT-POWER. Models: kw, kw Service Manual Unit: Pellet burner Type: ROT-POWER Models: 15-70 kw, 20-100 kw BTI GUMKOWSKI Sp. z o.o. Sp. k. ul. Obornicka 71, 62-002Suchy Las Phone +48 606-936-692, +48 61-811-70-37 biuro@kipi.pl update:

More information

HEATING BOILERS Astra H-25 E Astra H-32 E Astra H-45 E

HEATING BOILERS Astra H-25 E Astra H-32 E Astra H-45 E ASTRA MACHINERY PLANT AB ANNO 1929 HEATING BOILERS Astra H-25 E Astra H-32 E Astra H-45 E CONTACT INFORMATION OF THE FACTORY: MACHINERY PLANT ASTRA AB ULONŲ G. 33, LT-62161 ALYTUS, LITHUANIA TEL.: +370

More information

USER S MANUAL, MAINTENANCE MANUAL INSTALLATION INSTRUCTIONS

USER S MANUAL, MAINTENANCE MANUAL INSTALLATION INSTRUCTIONS D F:\Home\RD\ME\FUNNY\FUNNYGB.WP IN-FIRE Jubilee USER S MANUAL, MAINTENANCE MANUAL INSTALLATION INSTRUCTIONS 07DHIFFUA 03/99-1 - Dear Customer! Congratulations on the purchase of your new Bodart & Gonay

More information

VIADRUS K 5 Manual for boiler operation and installation

VIADRUS K 5 Manual for boiler operation and installation VIADRUS K 5 Manual for boiler operation and installation GB_2017_41 GB_2016_42 1 Content: page 1 Produced versions of boilers... 3 2 Usage and advantages of the boiler... 3 3 Technical data... 4 4 Boiler

More information